A drainage and reinforcement structure for deep landslide treatment
By designing a drainage and reinforcement structure consisting of seepage pipes, base pipes, flow guides, and anti-clogging components, the problems of weak landslide reinforcement performance and clogging were solved, achieving effective reinforcement and long-term stability of the landslide, and improving maintenance convenience and safety.
Patent Information
- Application Number
- CN202611631565.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-17
AI Technical Summary
Existing drainage reinforcement structures have weak reinforcement performance for landslides, and drainage steel pipes are prone to clogging, resulting in poor long-term stability and maintainability.
Design a drainage reinforcement structure for deep landslide control, including a seepage pipe, a base pipe, a flow guide, a flow guide plate, and an anti-clogging component. The structure uses the gravity of water to form a counterweight, which delays the blockage of sand and gravel, and uses the power of water flow to drive the sand and gravel out. Combined with a blockage detection component, the anti-clogging effect and maintenance safety of the system are improved.
It improved the restraint and reinforcement effect on the landslide, delayed the blockage of the drainage pipe, improved the long-term stability and maintenance convenience of the system, and ensured the landslide prevention and control effect and maintenance safety.
Smart Images

Figure CN123109186A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of landslide control technology, and in particular to a drainage and reinforcement structure for deep landslide control. Background Technology
[0002] Landslides are geological phenomena in which soil and rock masses on slopes undergo overall shearing and sliding deformation along weak internal structural surfaces under the action of their own weight stress and external loads, eventually detaching from the parent body and sliding downwards. They commonly occur in mountainous and hilly areas.
[0003] In deep landslides, natural rainfall infiltration, surface water soaking, and groundwater runoff continuously penetrate into the deeper parts of the slope. Water accumulates in large quantities in the slip zone, weak interlayers, and rock and soil fissures, causing the slip zone soil to soften and become muddy. This significantly reduces the cohesion between rock and soil particles, weakens the overall bearing capacity and stability of the slope, and thus induces landslide instability.
[0004] Currently, the treatment of deep landslides mostly employs drainage and reinforcement structures. The approach involves longitudinally burying drainage steel pipes within the landslide body to drain excess water and simultaneously reinforce the landslide mass through the support and restraint provided by the steel pipes themselves. However, longitudinally arranged steel pipes are primarily suitable for withstanding vertical compressive stress, but their resistance to lateral shear and thrust is insufficient. Under landslide thrust, they are prone to toppling and are unable to effectively restrain the lateral sliding of the landslide mass, thus exhibiting weak reinforcement capabilities. Furthermore, water in the soil easily carries sand, mud, and other solid particles into the steel pipes during infiltration, leading to blockages. Existing systems lack convenient methods for detecting blockages, which is detrimental to the long-term stability and maintainability of the drainage and reinforcement system. Summary of the Invention
[0005] The purpose of this invention is to address the problems of weak reinforcement performance of existing drainage reinforcement structures for landslides and easy blockage of drainage steel pipes, and to propose a drainage reinforcement structure for deep landslide treatment.
[0006] To achieve the above objectives, the present invention employs the following technology: a drainage and reinforcement structure for deep landslide control: comprising a seepage pipe extending longitudinally through the landslide body and the sliding belt into the interior of the sliding bed; a base pipe is fixedly connected to the bottom end of the seepage pipe; a flow guide is fixed inside the base pipe; the flow guide has openings on one side and at the bottom; a leakage hole is provided at the bottom of the flow guide; a drainage pipe is embedded inside the sliding bed, penetrating the base pipe and communicating with the side opening of the flow guide; a flow guide plate is hinged inside the flow guide; a receiving cylinder is slidably connected inside the base pipe; a sealing ring is fixed to the outer wall of the receiving cylinder; a support unit for elastically supporting the receiving cylinder is provided on the inner wall of the base pipe; and a toggle assembly is provided between the top of the receiving cylinder and the flow guide plate. When the guide plate blocks the side opening of the guide shroud, the water flows vertically into the base pipe first, and then overflows from the drain pipe after the water level rises; when the guide plate blocks the bottom opening of the guide shroud, the water and sediment flow directly out from the drain pipe after being guided by the guide plate.
[0007] As a further description of the above technology: the actuating assembly includes a toggle plate fixed to the top of the receiving cylinder, and a support rod is fixed to the end of the guide plate hinge shaft.
[0008] As a further description of the above technology: the support unit includes a support block slidably connected to the inner wall of the base tube, and a spring sheet is installed between the support block and the inner wall of the base tube.
[0009] As a further description of the above technology, it also includes an anti-clogging component, which includes a fixed pipe fixed inside the flow guide shroud, the fixed pipe being higher than the drain pipe, and an extension pipe with one end connected to the fixed pipe being embedded inside the slide bed, the other end of the extension pipe being equipped with a blockage detection component.
[0010] As a further description of the above technology: the blockage detection component includes a drain nozzle that is sleeved and fixed to one end of the extension tube, and the bottom of the inner wall of the drain nozzle is fixed with a plurality of retention plates fixed along a straight line.
[0011] As a further description of the above technology: the seepage pipe is sleeved with a retaining pipe, and the space between the retaining pipe and the base pipe is filled with a layer of crushed stone.
[0012] As a further description of the above technology: a top cover is fitted between the top of the seepage pipe and the top of the enclosure pipe, and several guide buckets are fixed on the inner wall of the seepage pipe.
[0013] As a further description of the above technology, it also includes a reinforcement mechanism, which includes a pressure plate slidably connected inside the base tube, an insert plate slidably connected to the bottom end of the base tube, and a connecting rod hinged between the pressure plate and the insert plate.
[0014] As a further description of the above technology, it also includes a flow guiding mechanism, which includes a water interception channel and a drainage channel opened on the slide. The water interception channel is arranged on the slide in the area above the rear edge of the slide body, and the drainage channel is arranged on the slide at the toe of the slide body.
[0015] As a further description of the above technology: a water diversion channel is provided on the surface of the slide and the slide body between the intercepting channel and the seepage pipe, and the interior of the drainage channel is built with anchoring blocks that wrap the drainage pipe.
[0016] In summary, due to the adoption of the above-mentioned technology in the drainage and reinforcement structure for deep landslide treatment, the beneficial effects of this invention are:
[0017] 1. This invention utilizes the base pipe to retain rainwater during the initial drainage stage. The gravity of the water creates a counterweight, applying additional pressure to the base pipe and effectively enhancing the constraint and reinforcement effect of the seepage pipe and base pipe on the sliding body. Furthermore, sand and gravel impurities carried by the water flow settle and accumulate within the base pipe, delaying drainage pipe blockage caused by sand and gravel. Long-term sedimentation and solidification of the sand and gravel further increase the embedding force between the base pipe and the sliding bed, allowing the reinforcement effect to gradually improve over the service life of the structure.
[0018] 2. After a certain amount of sand and gravel accumulates inside the base pipe, the present invention can guide the water falling in the seepage pipe by switching the state of the guide plate, and use the water flow power to push the sand and gravel out, making it difficult for the sand and gravel to settle inside the drainage pipe and improving the anti-clogging effect of the drainage pipe.
[0019] 3. After long-term service, the drainage pipes of the drainage reinforcement structure will gradually become clogged. When the blockage causes the water discharge rate to fall below the inflow rate of the base pipe, the water level inside the base pipe will continuously rise. This causes water carrying sand and gravel to be discharged through the blockage detection component via the fixed pipe and extension pipe. Maintenance personnel can determine whether water is flowing through the extension pipe by observing whether sand and gravel are trapped in the groove between adjacent retaining plates, thus determining whether the drainage pipe is clogged. This design contributes to the long-term stability and maintainability of the drainage reinforcement system. Furthermore, compared to directly observing the drainage of the extension pipe to determine whether the drainage pipe is clogged, this design allows maintenance work to be scheduled during rainy weather, improving the convenience of blockage detection while avoiding the risk of landslides for maintenance personnel, thus improving the safety of maintenance operations.
[0020] 4. This invention intercepts upstream rainwater through a water interception channel, preventing rainwater from flowing downstream and soaking the slip zone, thus avoiding landslides. Furthermore, when the drainage speed of the water interception channel is insufficient and the water level rises, some water will be diverted to the seepage pipe through the water diversion channel and discharged through the base pipe and drainage pipe, further dredging the water and improving the landslide prevention effect. Attached Figure Description
[0021] Figure 1 A three-dimensional schematic diagram of the entire invention is shown;
[0022] Figure 2 An overall planar sectional view of the present invention is shown;
[0023] Figure 3 The present invention is shown. Figure 2 Enlarged view of point A in the middle;
[0024] Figure 4 The present invention is shown. Figure 2 Enlarged view at point B in the middle;
[0025] Figure 5 The present invention is shown. Figure 2 Enlarged view at point C;
[0026] Figure 6 A schematic cross-sectional view of the base tube of the present invention is shown;
[0027] Figure 7 A schematic cross-sectional view of the air deflector of the present invention is shown;
[0028] Figure 8 The present invention is shown. Figure 7 Enlarged view at point D;
[0029] Figure 9 A schematic diagram of the water flow path in the first state of the present invention is shown;
[0030] Figure 10 A schematic diagram of the water flow path in the second state of the present invention is shown.
[0031] Legend:
[0032] 10. Slide; 11. Slide belt; 12. Slide body; 13. Gravel layer;
[0033] 21. Drainage pipe; 22. Base pipe; 23. Drainage pipe; 24. Flow guide; 25. Flow guide plate; 26. Receiving cylinder; 27. Sealing ring; 28. Actuating assembly; 281. Actuating plate; 282. Support rod; 29. Support unit; 291. Spring piece; 292. Support block;
[0034] 30. Anti-clogging component; 31. Fixing pipe; 32. Extension pipe; 33. Clogging detection component; 331. Drain nozzle; 332. Retention plate;
[0035] 41. Enclosure pipe; 42. Top cover; 43. Diversion hopper;
[0036] 50. Reinforcing mechanism; 51. Pressure plate; 52. Connecting rod; 53. Insert plate;
[0037] 60. Diversion mechanism; 61. Interception channel; 62. Water diversion channel; 63. Drainage channel; 64. Anchoring pier. Detailed Implementation
[0038] The following will describe, with reference to the accompanying drawings of the embodiments of the present invention, a drainage and reinforcement structure for deep landslide control according to the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0039] like Figures 1-10As shown, the present invention provides a drainage and reinforcement structure for deep landslide control, comprising a seepage pipe 21 that longitudinally penetrates the landslide body 12 and the sliding strip 11 and extends into the sliding bed 10, thereby effectively supporting the bottom of the seepage pipe 21 and reinforcing the landslide body 12. In addition, a base pipe 22 is provided, fixed to the bottom end of the seepage pipe 21 and connected to it. The base pipe 22 is entirely embedded inside the sliding bed 10, giving the entire structure of the base pipe 22 and the seepage pipe 21 a stronger resistance to lateral thrust. The sliding bed 10 is equipped with a drainage pipe 23 that runs horizontally through the side wall of the base pipe 22 and communicates with the inside of the base pipe 22. In rainy weather, rainwater and groundwater seep into the sliding body 12. Excess water in the soil seeps into the interior of the seepage pipe 21 through the circumferential holes of the seepage pipe 21, and then flows downward into the base pipe 22 under the action of gravity. Finally, it flows out to the outside through the horizontally arranged drainage pipe 23, thereby achieving landslide prevention and control.
[0040] The bottom end of the seepage pipe 21 extends into the interior of the sliding bed 10. Once the groundwater level rises to the same height as the bottom end of the seepage pipe 21, it can seep into the seepage pipe 21 for drainage. The water level cannot continue to rise, so the sliding zone 11 will not be soaked by groundwater, thus preventing the soil of the sliding zone 11 from softening and becoming muddy.
[0041] Reference Figure 6 and Figure 7 Based on the above design, a flow guide hood 24 is fixed inside the base tube 22 near the top wall. The flow guide hood 24 has openings on one side and at the bottom, and a drain hole at the bottom. The drain pipe 23 passes through the side wall of the base tube 22 and connects to the opening on the side of the flow guide hood 24. A flow guide plate 25 is hinged inside the flow guide hood 24. A receiving cylinder 26 is slidably connected inside the base tube 22 below the flow guide hood 24. A sealing ring 27 is fixed to the outer wall of the receiving cylinder 26, sealing the outer wall of the receiving cylinder 26 and the inner wall of the base tube 22. Because the drain pipe 23 passes through the base tube 22 near the top, water will remain inside the base tube 22 initially. Water will overflow into the drain pipe 23 and be discharged to the outside through it, only after the water level inside the base tube 22 rises to the same height as the drain pipe 23. Figure 9 This design utilizes the gravity of water to create a water counterweight inside the base pipe 22, applying downward pressure and enhancing the restraint and reinforcement effect of the seepage pipe 21 and the base pipe 22 on the sliding body 12. Furthermore, under these conditions, sand and gravel impurities carried by the water flow will settle and accumulate in the receiving cylinder 26, delaying blockage of the drainage pipe 23 caused by sand and gravel. Moreover, the long-term deposition and solidification of sand and gravel further increases the embedding force between the base pipe 22 and the sliding bed 10, allowing the reinforcement effect to gradually improve over the service life of the structure.
[0042] Reference Figure 6 , Figure 7 and Figure 8 To further prevent sand and gravel from clogging the drainage pipe 23, a support unit 29 is provided on the inner wall of the base pipe 22 to provide elastic support for the receiving cylinder 26. A toggle assembly 28 is provided between the top of the receiving cylinder 26 and the guide plate 25. The toggle assembly 28 includes a toggle plate 281 fixed to the top of the receiving cylinder 26, and a support rod 282 fixed to the end of the hinge shaft of the guide plate 25. The support unit 29 includes a support block 292 slidably connected to the inner wall of the base pipe 22. A spring piece 291 is installed between the support block 292 and the inner wall of the base pipe 22. Under the elastic force of the spring piece 291, the support block 292 is supported on the bottom of the receiving cylinder 26 by an inclined surface.
[0043] Initially, the guide plate 25 is slightly tilted towards vertical, blocking the side opening of the guide shield 24. At this time, the guide plate 25 is in contact with the inner wall of the guide shield 24 on its downward side. Under the support of the guide shield 24 and its own gravity, the guide plate 25 can maintain a stable posture, and the falling water flow will only impact the side of the guide plate 25 away from the supported surface. Therefore, the guide plate 25 will not actively flip over. Figure 9 As shown. When a certain amount of sand and gravel accumulates in the receiving cylinder 26, and rainwater fills the inside of the receiving cylinder 26, the combined weight of the sand and gravel and the water will exceed the upper limit of the load-bearing capacity of the support unit 29. At this time, the receiving cylinder 26 presses against the inclined surface of the support block 292, causing the support block 292 to compress the spring piece 291 and retract into the groove on the inner wall of the base tube 22. Without the support of the support block 292, the receiving cylinder 26 moves downward, causing the lever 281 to move downward. The end of the lever 281 pushes the support rod 282 downward, causing the guide plate 25 to flip, opening the side opening of the guide shroud 24 and closing the bottom opening. At this time, the guide plate 25 is still in an inclined state, as shown in the figure. Figure 10 As shown, with the support of the inner wall of the flow guide shroud 24, the flow guide plate 25 can still maintain its own stable posture and guide the water stably. The drainage reinforcement structure has entered the sand and gravel discharge stage from the sand and gravel deposition reinforcement stage.
[0044] To further explain, the load-bearing capacity of the support unit 29 can be controlled by selecting springs 291 with different elasticity; the specific choice depends on the actual situation. The end of the longer support rod 282 can be rotated by minimal pressure, thus the support rod 282 provides minimal resistance to the downward movement of the receiving cylinder 26. Therefore, the resistance of the support rod 282 can be ignored when using springs 291.
[0045] During the sand and gravel discharge stage, rainwater carrying sand and gravel enters the guide hood 24 and falls onto the overturned guide plate 25. After being guided by the inclined guide plate 25, the water is directly discharged to the outside through the drain pipe 23. Figure 10As shown. It should be noted that the downward movement of the receiving cylinder 26 increases the space in the base pipe 22 for retaining sand and gravel, which can further achieve the effects of anti-clogging and reinforcement by retaining sand and gravel. The leakage hole at the bottom of the guide shroud 24 is located between the guide plate 25 and the drain pipe 23. During the process of water flowing into the drain pipe 23 through the guide plate 25, some of the sand and gravel in the water will enter the interior of the base pipe 22 through the leakage hole under its own gravity, and some of the sand and gravel will be discharged to the outside with the water through the drain pipe 23. After the base pipe 22 is full of sand and gravel, the leakage hole is blocked by sand and gravel, and the rainwater will carry all the sand and gravel directly through the drain pipe 23 to the outside.
[0046] It is worth mentioning that, unlike the sand and gravel deposition and reinforcement stage where rainwater overflows through the drainage pipe 23, the water in the sand and gravel discharge stage has a certain kinetic energy when it is guided into the drainage pipe 23 by the guide plate 25. This energy can push the sand and gravel through the drainage pipe 23 for discharge, making it difficult for the sand and gravel to accumulate inside the drainage pipe 23, thus achieving the anti-clogging effect.
[0047] Through the above design, the present invention can not only apply additional pressure to the seepage pipe 21 and the base pipe 22 by means of water counterweight and sand accumulation to improve the constraint and reinforcement effect on the sliding body 12 and delay the blockage of the drainage pipe 23, but also, after the sand and gravel are accumulated, use the water flow power to push the sand and gravel by switching the state of the guide plate 25 to help the sand and gravel to be discharged, thereby improving the anti-blocking effect of the drainage pipe 23.
[0048] Reference Figure 2 and Figure 4 An anti-clogging component 30 is provided, comprising a fixed pipe 31 horizontally fixed inside the guide shroud 24, the fixed pipe 31 being higher than the drain pipe 23, and an extension pipe 32, one end of which is connected to the fixed pipe 31, being horizontally embedded inside the slide bed 10. When the drain pipe 23 is blocked, causing the water discharge rate to be lower than the water inflow rate, the water level inside the base pipe 22 will continuously rise, allowing water to be discharged through the fixed pipe 31 and the extension pipe 32, accelerating the drainage speed to prevent landslides. At this time, maintenance personnel can determine the blockage status of the drain pipe 23 by whether the extension pipe 32 is draining water.
[0049] A blockage detection component 33 is installed at the end of the extension pipe 32 away from the fixed pipe 31. The blockage detection component 33 includes a drain nozzle 331 sleeved and fixed to one end of the extension pipe 32. Several retention plates 332 are fixed along a straight line at the bottom of the inner wall of the drain nozzle 331. Water in the extension pipe 32 flows out to the outside through the drain nozzle 331. During this process, sand and gravel in the water will be deposited in the grooves between adjacent retention plates 332. Maintenance personnel can determine whether water has passed through the extension pipe 32 and whether the drain pipe 23 is blocked by removing the drain nozzle 331 and observing whether sand and gravel are present in the grooves between adjacent retention plates 332. Compared to directly observing the drainage of the extension pipe 32 to determine whether the drain pipe 23 is blocked, this design allows maintenance work to be scheduled during rainy weather, improving the convenience of blockage detection while avoiding the risk of landslides for maintenance personnel and improving the safety of maintenance work.
[0050] Reference Figure 3 To improve the water collection capacity of the seepage pipe 21, a retaining pipe 41 is fitted over the outside of the seepage pipe 21, and a gravel layer 13 is filled between the retaining pipe 41 and the base pipe 22. The gravel layer 13 forms a highly permeable water-conducting layer, facilitating water collection and infiltration into the interior of the seepage pipe 21, and preventing surrounding soil and rock from clogging the circumferential holes of the seepage pipe 21. The selected gravel particle size must be larger than the width of the circumferential holes of the seepage pipe 21. A top cover 42 is fitted between the top ends of the seepage pipe 21 and the retaining pipe 41 to enhance the fixing effect between the seepage pipe 21 and the retaining pipe 41. The inner wall of the seepage pipe 21 is fixed with several guide buckets 43. The top diameter of the guide buckets 43 is equal to the inner diameter of the seepage pipe 21, and the bottom diameter of the guide buckets 43 is smaller than the top diameter. As the water flows downward inside the seepage pipe 21, it will be collected in the middle of the seepage pipe 21 through the guide buckets 43 and fall down, which prevents the water from flowing along the inner wall of the seepage pipe 21 and causing loss, thereby improving the water collection rate.
[0051] Reference Figure 6 A reinforcement mechanism 50 is provided, which includes a pressure plate 51 slidably connected inside the base pipe 22. The pressure plate 51 is located directly below the receiving cylinder 26. An inclined insert plate 53 is slidably connected to the bottom end of the base pipe 22. A connecting rod 52 is hinged between the pressure plate 51 and the insert plate 53. The length of the connecting rod 52 is less than the diameter of the receiving cylinder 26. The weight of the receiving cylinder 26 presses down on the pressure plate 51, which pushes the insert plate 53 laterally through the connecting rod 52. This causes the insert plate 53 to extend laterally from the bottom side of the base pipe 22 and insert into the soil, further reinforcing the base pipe 22 and the seepage pipe 21. This allows the seepage pipe 21 and the base pipe 22 to withstand stronger lateral thrust, enhancing the reinforcement effect on the sliding body 12.
[0052] Reference Figure 1 To ensure the effectiveness of landslide prevention, the drainage and reinforcement structure is set up in multiple sets along the 12 direction of the landslide body, with each set of structures arranged in an alternating manner.
[0053] Reference Figure 1 , Figure 2 and Figure 5 The system also includes a flow guiding mechanism 60, which comprises an intercepting channel 61 and a drainage channel 63 located on the slide bed 10. The intercepting channel 61 is positioned on the slide bed 10 above the rear edge of the slide body 12 to intercept water flow and reduce water erosion of the slide body 12. The drainage channel 63 is positioned on the slide bed 10 at the toe of the slide body 12 to collect and guide water discharged from the drain pipe 23 and the extension pipe 32.
[0054] A water-diverting channel 62 is provided on the surfaces of the slide bed 10 and the slide body 12 between the intercepting channel 61 and the seepage pipe 21. The water-diverting channel 62 is shallower than the intercepting channel 61. When the drainage speed of the intercepting channel 61 is insufficient and the water level rises, some water will be diverted by the water-diverting channel 62 into the seepage pipe 21 and discharged through the base pipe 22 and the drainage pipe 23. An anchoring block 64 is built inside the drainage channel 63 to enclose the drainage pipe 23. The drainage pipe 23 is located on the side of the base pipe 22 facing the slope foot of the slide body 12. The anchoring block 64 supports one end of the drainage pipe 23, enabling the drainage pipe 23 to support the base pipe 22 and improve the stability of the base pipe 22. To prevent the anchoring block 64 from blocking drainage and accumulating sand, the bottom of the inner wall of the drainage channel 63 is inclined.
[0055] Construction steps: First, a pre-embedded hole is vertically drilled at the top of the sliding body 12. The pre-embedded hole penetrates the sliding body 12 and the sliding strip 11 in sequence and extends into the sliding bed 10. The seepage pipe 21, the base pipe 22 and the retaining pipe 41 are placed into the pre-embedded hole. After the soil around the retaining pipe 41 is compacted, the gravel layer 13 is filled between the retaining pipe 41 and the seepage pipe 21.
[0056] Next, a drainage channel 63 is excavated on the slide bed 10 at the toe of the slide body 12. Drainage pipes 23 and extension pipes 32 are nailed into the side wall of the drainage channel 63 until they are inserted into the insertion holes on the side wall of the base pipe 22. Due to the width limitation of the drainage channel 63, the drainage pipes 23 and extension pipes 32 can be assembled and extended from multiple pipe sections.
[0057] Finally, the intercepting channel 61 and the water diversion channel 62 were excavated, and the anchoring pier 64 was constructed.
[0058] Working principle: In the initial state, the deflector 25 blocks the side opening of the deflector 24, such as... Figure 9 As shown.
[0059] Water in the soil of the sliding body 12 seeps into the seepage pipe 21 and then flows into the base pipe 22. The water level in the base pipe 22 gradually rises. Once the water level reaches the same height as the drainage pipe 23, the water overflows into the drainage pipe 23 and is discharged into the drainage channel 63. The base pipe 22 strengthens its own stability through the pressure of the retained water, improving the reinforcement effect on the sliding body 12. Furthermore, during this process, sand and gravel carried in the water will be deposited in the base pipe 22. After long-term deposition and solidification, the sand and gravel can further increase the embedment force between the base pipe 22 and the sliding bed 10, so that the reinforcement effect gradually improves with the service life of the structure.
[0060] After water and sand fall into the base pipe 22, they enter the receiving cylinder 26. When a certain amount of sand and gravel accumulates in the receiving cylinder 26, and rainwater fills the inside of the receiving cylinder 26, the combined weight of the sand and gravel and water exceeds the upper limit of the load-bearing capacity of the support unit 29. At this time, the receiving cylinder 26 overcomes the elastic force of the spring piece 291 and presses the support block 292 into the groove on the inner wall of the base pipe 22. Then, the receiving cylinder 26 moves down, causing the lever 281 to move down. The end of the lever 281 pushes the support rod 282 downward, causing the guide plate 25 to flip, opening the side opening of the guide shroud 24 and closing the bottom opening with the guide plate 25. Figure 10 As shown.
[0061] Afterwards, the water in the seepage pipe 21 falls onto the guide plate 25, and the water is guided by the guide plate 25 and discharged directly into the drainage channel 63 through the drain pipe 23.
[0062] After the drain pipe 23 is blocked, the water level inside the base pipe 22 rises until it is aligned with the height of the fixed pipe 31. At this time, the guide plate 25 guides the water so that the water carrying sand and gravel can be discharged through the fixed pipe 31, the extension pipe 32 and the drain nozzle 331. During this process, the sand and gravel are easily retained by the grooves between the retention plates 332. Maintenance personnel can determine the blockage of the drain pipe 23 by checking the sand and gravel retention.
[0063] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art who makes equivalent substitutions or changes to the drainage and reinforcement structure for deep landslide treatment and its inventive concept disclosed in the present invention within the scope of the technology disclosed in the present invention should be covered within the scope of protection of the present invention.
Claims
1. A drainage and reinforcement structure for deep landslide treatment, characterized in that, The slide includes a seepage pipe (21) extending longitudinally through the slide body (12) and the slide belt (11) into the interior of the slide bed (10). The bottom end of the seepage pipe (21) is connected to and fixed with a base pipe (22). A flow guide (24) is fixed inside the base pipe (22). The flow guide (24) has openings on one side and at the bottom. A leakage hole is opened at the bottom of the flow guide (24). The slide bed (10) is embedded with a through-base pipe (22) and connected to the side of the flow guide (24). The drain pipe (23) with an open connection is connected to the drain pipe (24). The inside of the flow guide (24) is hinged with a flow guide plate (25). The inside of the base pipe (22) is slidably connected with a receiving cylinder (26). The outer wall of the receiving cylinder (26) is fixed with a sealing ring (27). The inner wall of the base pipe (22) is provided with a support unit (29) for elastically supporting the receiving cylinder (26). A toggle assembly (28) is provided between the top of the receiving cylinder (26) and the flow guide plate (25). When the guide plate (25) blocks the side opening of the guide hood (24), the water flows vertically into the base pipe (22) first, and then overflows from the drain pipe (23) after the water level rises; when the guide plate (25) blocks the bottom opening of the guide hood (24), the water and mud flow directly out from the drain pipe (23) through the guide plate (25).
2. The drainage and reinforcement structure for deep landslide treatment according to claim 1, characterized in that, The actuating assembly (28) includes a toggle plate (281) fixed to the top of the receiving cylinder (26), and a support rod (282) is fixed to the end of the hinge shaft of the guide plate (25).
3. The drainage and reinforcement structure for deep landslide treatment according to claim 1, characterized in that, The support unit (29) includes a support block (292) that is slidably connected to the inner wall of the base tube (22), and a spring piece (291) is installed between the support block (292) and the inner wall of the base tube (22).
4. The drainage and reinforcement structure for deep landslide treatment according to claim 1, characterized in that, It also includes an anti-blocking component (30), which includes a fixed pipe (31) fixed inside the flow guide (24), the fixed pipe (31) being higher than the drain pipe (23), and an extension pipe (32) with one end connected to the fixed pipe (31) is embedded inside the slide (10), and a blockage detection component (33) is installed at the other end of the extension pipe (32).
5. The drainage and reinforcement structure for deep landslide treatment according to claim 4, characterized in that, The blockage detection component (33) includes a drain nozzle (331) sleeved and fixed to one end of the extension tube (32), and the bottom of the inner wall of the drain nozzle (331) is fixed with a number of retention plates (332) fixed along a straight line.
6. The drainage and reinforcement structure for deep landslide treatment according to claim 1, characterized in that, The seepage pipe (21) is fitted with a retaining pipe (41), and a layer of crushed stone (13) is filled between the retaining pipe (41) and the base pipe (22).
7. A drainage and reinforcement structure for deep landslide treatment according to claim 6, characterized in that, A top cover (42) is fitted between the top of the seepage pipe (21) and the enclosure pipe (41), and several guide buckets (43) are fixed on the inner wall of the seepage pipe (21).
8. The drainage and reinforcement structure for deep landslide treatment according to claim 1, characterized in that, It also includes a reinforcement mechanism (50), which includes a pressure plate (51) slidably connected inside the base tube (22), an insert plate (53) slidably connected to the bottom end of the base tube (22), and a connecting rod (52) hinged between the pressure plate (51) and the insert plate (53).
9. A drainage and reinforcement structure for deep landslide treatment according to claim 1, characterized in that, It also includes a flow guiding mechanism (60), which includes a water interception channel (61) and a drainage channel (63) on the slide (10). The water interception channel (61) is arranged on the slide (10) in the area above the rear edge of the slide body (12), and the drainage channel (63) is arranged on the slide (10) at the toe of the slide body (12).
10. A drainage and reinforcement structure for deep landslide treatment according to claim 9, characterized in that, The surfaces of the slide (10) and slide body (12) are provided with a water diversion channel (62) between the intercepting channel (61) and the seepage pipe (21), and the interior of the drainage channel (63) is built with an anchor block (64) that wraps the drainage pipe (23).