A prefabricated cofferdam structure based on vacuum negative pressure fixing and its construction method

The assembled water-retaining cofferdam structure, which uses a vacuum negative pressure fixing system and rubber seals, solves the problems of damage to existing foundations and environmental impact caused by traditional cofferdams, achieves rapid and recyclable water-retaining effect, and improves sealing performance and water pressure resistance.

CN123109187APending Publication Date: 2026-11-17SHANGHAI FOUNDATION ENGINEERING GROUP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611376421.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional cofferdam construction suffers from damage to existing foundations, significant environmental impact, long construction periods, and poor adaptability. Existing underwater dynamic water sealing technology is also immature.

Method used

The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixation is adopted, including L-shaped water-retaining wall units, vacuum negative pressure fixation system, bottom sealing system, unit connection system and top anchoring system. The sealing and fixation are achieved by forming negative pressure adsorption through vacuum pump, rubber sealing and tenon and tenon connection.

Benefits of technology

It protects existing foundations, is quick to construct, environmentally friendly, recyclable, has good sealing properties, strong adaptability, high resistance to water pressure, and reduces environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109187A_ABST
    Figure CN123109187A_ABST
Patent Text Reader

Abstract

This invention discloses a prefabricated cofferdam structure and its construction method based on vacuum negative pressure fixing. The prefabricated cofferdam unit has an L-shaped structure. The vacuum negative pressure fixing system is set at the bottom of the cofferdam unit and includes multiple sealed chambers, vacuum pipes, and a vacuum pump to adsorb the cofferdam unit onto the riverbed. The bottom sealing system is set on the outer side of the bottom of the cofferdam unit, and a rubber sealing ring is set on the water-facing side or bottom surface of the cofferdam unit. The unit connection system is set between adjacent cofferdam units, and the gaps between adjacent cofferdam units are connected by mortise and tenon joints, with sealant filled in the gaps for water stoppage. The top anchoring system includes anchor piles set on the riverbank and anti-tension rods connecting the anchor piles to the cofferdam unit. This invention achieves rapid and reliable cofferdam construction through a combination of "negative pressure adsorption + mortise and tenon connection + anti-tension anchoring," effectively protecting the existing foundation of the riverbed, and is structurally stable, environmentally friendly, and reusable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of water conservancy engineering construction technology, specifically to a prefabricated cofferdam structure for rivers, lakes and other water bodies and its construction method. Background Technology

[0002] In water conservancy engineering construction, cofferdams are a commonly used temporary water-retaining structure used to create conditions for construction on dry land.

[0003] Traditional cofferdams come in various forms, including earth-rock cofferdams, concrete cofferdams, and sheet pile cofferdams. Among these, Larssen sheet piles or closed-pile cofferdams are widely used due to their fast construction speed and good water-stopping effect. However, these traditional cofferdam construction methods have the following significant drawbacks:

[0004] Damage to existing foundations: Larssen sheet piles and similar materials require strong external force to be inserted into the riverbed. When there are existing foundations such as artificial waterways, bridges, culverts, and pipelines beneath the riverbed, the piling process can easily cause irreversible damage to these foundations.

[0005] Significant environmental impact: Traditional cofferdam construction is often accompanied by noise, vibration and mud pollution, which affects the surrounding ecological environment and the reproduction and survival of aquatic organisms.

[0006] Long construction period and high cost: Traditional cofferdams usually have a long material preparation and construction period, and are difficult to recycle, resulting in high resource consumption.

[0007] Poor adaptability: Traditional cofferdams are poorly adaptable to working conditions with large water level changes or complex riverbed conditions, and often require customized treatment.

[0008] Among existing related patent technologies, such as the water-blocking and seepage-intercepting wall and the prefabricated cofferdam of the river-side gate pump disclosed in patent document (CN118461644A), this patent relies on "rubber gasket sealing connection" (claim 5) and slots to block water. However, in actual river environments, floating debris and silt on the water surface are very likely to get stuck in the slots, causing the rubber gasket to fail to adhere properly; and paragraph

[0031] of the specification admits that "if slight local seepage occurs, plastic film should be used to seal the gaps or sawdust should be used to seal the gaps." This "sawdust sealing" remedial measure cannot be implemented manually in deep water and high-pressure areas above 6m, indicating that its underwater dynamic water sealing technology is not yet fully mature. Therefore, this patent leaves a technological gap in terms of adaptability to complex geology, sealing performance in deep water and high pressure, and anti-piping design.

[0009] Therefore, there is an urgent need for a new type of cofferdam structure that can quickly and safely achieve the function of water retention while avoiding damage to the existing foundation of the riverbed. Summary of the Invention

[0010] The present invention aims to provide a prefabricated water-retaining cofferdam structure and its construction method based on vacuum negative pressure fixation, so as to solve the technical problems of traditional cofferdam construction such as damage to existing foundations, large environmental impact, and long construction period.

[0011] To achieve the above objectives, the present invention adopts the following technical solution: A prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing includes: at least one prefabricated water-retaining wall unit, a vacuum negative pressure fixing system, a bottom sealing system, a unit connection system, and a top anchoring system. The prefabricated water-retaining wall unit has an L-shaped structure and consists of vertical side walls, a back buttress rib wall, and a bottom plate. The vacuum negative pressure fixing system is located at the bottom of the water-retaining wall unit and includes multiple sealed chambers, vacuum pipes, and a vacuum pump for adsorbing the water-retaining wall unit onto the riverbed. The bottom sealing system is located at the bottom of the water-retaining wall unit. On the outer side of the bottom of the retaining wall unit, a rubber sealing ring is provided on the water-facing side or bottom surface. When the negative pressure system is activated, the rubber sealing ring is pressed against the riverbed surface under the action of the internal and external pressure difference, forming an effective seal. The unit connection system is set between adjacent retaining wall units and includes a tenon and mortise structure and sealant. The gaps between adjacent retaining wall units are connected by a tenon and mortise structure, and the gaps are filled with sealant to stop water. The top anchoring system includes anchor piles set on the riverbank and anti-tension rods connecting the anchor piles and the retaining wall units.

[0012] Furthermore, the vertical sidewalls and the back buttress ribs of the sidewalls are 200-300mm thick, the bottom plate is 400-600mm thick, and the spacing between the abdominal wall ribs and the longitudinal length of the prefabricated water-blocking unit are controlled at 3m.

[0013] Furthermore, the plurality of sealed chambers are spaced apart along the length of the bottom plate of the water-retaining wall unit, and each sealed chamber is connected to the vacuum pump through an independent vacuum pipe.

[0014] Furthermore, the vacuum pump is a water ring vacuum pump, which is arranged on an operating platform above the water surface.

[0015] Furthermore, the rubber sealing ring is made of a water-resistant, wear-resistant, and highly elastic material.

[0016] Furthermore, the mortise and tenon structure is a tongue and groove joint structure.

[0017] Furthermore, the anti-tension rod is a high-strength steel tension rod capable of being prestressed; one end of the anti-tension rod is connected to the top of the anchor pile, and the other end is connected to the embedded part on the back of the retaining wall, and a tensioning device is provided to apply prestress.

[0018] Furthermore, the anchor piles are steel pipe piles or precast concrete piles, driven into the stable soil layer of the riverbank.

[0019] 9. A construction method for a prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing as described above, comprising the following steps: S1: Drive anchor piles into the riverbank; S2: Hoist the prefabricated water retaining wall unit into place; S3: Connect adjacent prefabricated water retaining wall units through the mortise and tenon structure, and fill the gaps with sealant; S4: Connect the anti-pull rod to the anchor pile and the prefabricated retaining wall unit, and tension it; S5: Start the vacuum pump to evacuate the sealed chamber, so that the water-retaining wall unit is adsorbed onto the riverbed.

[0020] Furthermore, after all units are installed and secured, drainage work will be carried out on the inner side of the cofferdam to create dry construction conditions.

[0021] Compared with the prior art, the present invention has the following significant advantages: 1. Protection of existing foundations: This invention eliminates the need to drive piles into the riverbed, thus completely avoiding the risk of damage to existing foundations beneath the riverbed.

[0022] 2. Reliable fixation and good water-stopping effect: The "negative pressure adsorption + rubber sealing" method is used to firmly attach the cofferdam to the riverbed and ensure strong sealing, effectively preventing bottom leakage.

[0023] 3. High degree of prefabrication and rapid construction: All components are prefabricated, and only assembly and connection are required on site, which can greatly shorten the construction period.

[0024] 4. Recyclable and environmentally friendly: The prefabricated structure is easy to disassemble and reuse, and the construction process is vibration-free and mud-free, with minimal impact on the environment.

[0025] 5. High structural stability: The L-shaped structure itself has a certain anti-overturning ability, and with the help of the anti-tie rod system, it can effectively resist huge horizontal water pressure, resulting in high overall stability. Attached Figure Description

[0026] Figure 1 This is a schematic diagram of the overall structure of the prefabricated water-retaining cofferdam of the present invention; Figure 2 This is a plan view of the prefabricated water-retaining cofferdam of the present invention; Figure 3 This is a side elevation view of the prefabricated water-retaining cofferdam of the present invention; Figure 4 This is a construction flowchart of the prefabricated water retaining wall of the present invention. Detailed Implementation

[0027] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments.

[0028] like Figures 1 to 3 As shown, an embodiment of the present invention provides a prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing, comprising: Prefabricated retaining wall units: These units, constructed from reinforced concrete or high-strength steel, are L-shaped and consist of vertical side walls, rear buttress ribs, and a base slab. The vertical side walls and rear buttress ribs are 200-300mm thick, the base slab is 400-600mm thick, and the spacing between the side wall ribs and the longitudinal length of the prefabricated retaining unit are controlled to approximately 3m. The design of the L-shaped structure requires mechanical calculations based on the water-retaining height to ensure its resistance to overturning and sliding.

[0029] Vacuum negative pressure fixing system: Located at the bottom of the retaining wall unit, it includes multiple sealed chambers, vacuum pipes, and a vacuum pump, used to adhere the retaining wall unit to the riverbed. The multiple sealed chambers are spaced apart along the length of the base plate of the retaining wall unit. Each sealed chamber is connected to the vacuum pump via an independent vacuum pipe, facilitating isolation and maintenance in case of chamber failure. By activating the vacuum pump to evacuate air from the chamber, a negative pressure is created within the chamber. A water ring vacuum pump can be selected and is positioned on an operating platform above the water surface.

[0030] Bottom Sealing System: A rubber sealing ring is installed on the outer side of the bottom of the retaining wall unit, i.e., on the water-facing side or bottom surface of the retaining wall unit. When the negative pressure system is activated, the rubber sealing ring is pressed against the riverbed surface under the pressure difference between the inside and outside, forming an effective seal and ensuring the effectiveness of the negative pressure system. The rubber sealing ring should be made of water-resistant, wear-resistant, and highly elastic materials. Before placing the retaining wall unit, the bottom surface of the riverbed can be simply cleaned to ensure the sealing effect. (The last sentence appears to be incomplete and possibly refers to a separate, unrelated point about the bottom sealing system.) Unit connection system: This system, installed between adjacent retaining wall units, includes mortise and tenon joints and sealant. The gaps between adjacent retaining wall units are connected using mortise and tenon joints. Based on the mortise and tenon connection, the gaps are filled with sealant to stop water ingress, ensuring the continuity and watertightness of the entire cofferdam. The mortise and tenon joints use a concave-convex design, which ensures connection precision while also transferring some shear force. The sealant should be a slow-expanding polyurethane sealant.

[0031] Top anchoring system: This includes anchor piles installed on the riverbank and tie rods connecting the anchor piles to the retaining wall unit. Anchor piles are driven into the riverbank and rigidly connected to the prefabricated retaining wall unit via tie rods. The tie rods provide tension towards the riverbank to resist horizontal sliding forces generated by water pressure, increasing the horizontal anti-sliding stability of the cofferdam. The anchor piles can be steel pipe piles or precast concrete piles, driven into the stable soil layer of the riverbank. The tie rods can be high-strength steel bars or steel strands, with one end connected to the top of the anchor pile and the other end connected to an embedded part on the back of the retaining wall, and a tensioning device is installed to apply prestress.

[0032] like Figure 4 As shown in the figure, this invention also provides a construction method for a prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing, including the following steps: Step 1: Construction preparation: Clean the bottom of the riverbed and drive anchor piles into the riverbank.

[0033] Step 2: Hoisting and Positioning: Hoist the prefabricated modular retaining wall units section by section to the designed position.

[0034] Step 3: Unit connection: Connect adjacent units using mortise and tenon joints and fill the joints with sealant.

[0035] Step 4: Install the anti-pull rod: Connect one end of the anti-pull rod to the anchor pile and the other end to the retaining wall and tension it.

[0036] Step 5: Start the negative pressure: Start the vacuum pump to evacuate the bottom sealed chamber, so that the water retaining wall is tightly adhering to the riverbed under the action of negative pressure.

[0037] Step Six: Foundation Pit Drainage: After all units are installed and fixed, drainage work is carried out on the inner side of the cofferdam to create dry construction conditions.

Claims

1. A prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing, characterized in that, include: The system comprises at least one prefabricated retaining wall unit, a vacuum negative pressure fixing system, a bottom sealing system, a unit connection system, and a top anchoring system. The prefabricated retaining wall unit has an L-shaped structure, consisting of vertical side walls, a rear buttress rib, and a base plate. The vacuum negative pressure fixing system is located at the bottom of the retaining wall unit and includes multiple sealed chambers, vacuum pipes, and a vacuum pump, used to adhere the retaining wall unit to the riverbed. The bottom sealing system is located on the outer side of the bottom of the retaining wall unit, with a rubber sealing ring on the water-facing side or bottom surface. When the negative pressure system is activated, the rubber sealing ring is pressed against the riverbed surface under the pressure difference, forming an effective seal. The unit connection system is located between adjacent retaining wall units and includes mortise and tenon joints and sealant. The gaps between adjacent retaining wall units are connected using mortise and tenon joints, and the gaps are filled with sealant for water stoppage. The top anchoring system includes anchor piles installed on the riverbank and counter-tension rods connecting the anchor piles to the retaining wall units.

2. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The vertical sidewalls and the back buttress ribs of the sidewalls are 200-300mm thick, the bottom plate is 400-600mm thick, and the spacing between the abdominal wall ribs and the longitudinal length of the prefabricated water-blocking unit are controlled at 3m.

3. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The plurality of sealed chambers are spaced apart along the length of the bottom plate of the water-retaining wall unit, and each sealed chamber is connected to the vacuum pump through an independent vacuum pipe.

4. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The vacuum pump is a water ring vacuum pump, which is placed on an operating platform above the water surface.

5. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The rubber sealing ring is made of a water-resistant, wear-resistant, and highly elastic material.

6. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The mortise and tenon structure is a tongue and groove joint structure.

7. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The anti-tension rod is a high-strength steel tie rod that can be prestressed; one end of the anti-tension rod is connected to the top of the anchor pile, and the other end is connected to the embedded part on the back of the retaining wall, and a tensioning device is set to apply prestress.

8. The prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing according to claim 1, characterized in that, The anchor piles are steel pipe piles or precast concrete piles, driven into the stable soil layer of the riverbank.

9. A construction method for a prefabricated water-retaining cofferdam structure based on vacuum negative pressure fixing as described in any one of claims 1 to 8, characterized in that, Includes the following steps: S1: Drive anchor piles into the riverbank; S2: Hoist the prefabricated water retaining wall unit into place; S3: Connect adjacent prefabricated water retaining wall units through the mortise and tenon structure, and fill the gaps with sealant; S4: Connect the anti-pull rod to the anchor pile and the prefabricated retaining wall unit, and tension it; S5: Start the vacuum pump to evacuate the sealed chamber, so that the water-retaining wall unit is adsorbed onto the riverbed.

10. The construction method according to claim 9, characterized in that, after all units are installed and fixed, drainage work is carried out on the inner side of the cofferdam to form dry construction conditions.

Citation Information

Patent Citations

  • Water retaining and seepage stopping wall body and river-facing gate pump assembly type cofferdam formed by water retaining and seepage stopping wall body

    CN118461644A