A method for erecting a high-altitude suspended steel pipe mesh operating platform

By pre-assembling and lifting the high-altitude suspended steel pipe mesh operating platform on the ground, the problems of long erection period and large material consumption in the construction of tall structures are solved, and the construction of high-altitude operating platforms is achieved efficiently and safely.

CN123109371APending Publication Date: 2026-11-17CHINA HUAYE GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611487199.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the use of ground-mounted scaffolding or cantilevered platforms in the construction of tall structures has the problems of long erection periods and large material consumption.

Method used

The method of constructing a high-altitude suspended steel pipe mesh operating platform involves pre-assembling steel pipe mesh on the ground and lifting it as a whole to the design elevation using lifting equipment. The elevation and level are then adjusted using anchoring pre-embedded parts and a hanging system to form a high-altitude operating platform.

Benefits of technology

Reduce high-altitude assembly operations, improve erection efficiency and precision, reduce material usage, ensure construction safety, and shorten the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109371A_ABST
    Figure CN123109371A_ABST
Patent Text Reader

Abstract

This invention relates to the field of building construction technology, and provides a method for erecting a high-altitude suspended steel pipe mesh operating platform. The operating platform includes anchoring pre-embedded parts, pre-installed on the cylindrical wall of a tall structure; a steel pipe mesh, composed of multiple steel pipes spliced ​​together to form a mesh-like load-bearing base adapted to the cross-section of the tall structure; a suspension system, connecting the anchoring pre-embedded parts and the lifting points of the steel pipe mesh, used for adjusting the elevation and level of the steel pipe mesh; and protective components, installed on the steel pipe mesh. This invention employs ground pre-assembly and overall hoisting, using a slipform hoisting system to lift the entire structure to the design elevation, and achieving adjustment of the steel pipe mesh's elevation and level. Compared to traditional cantilever platforms, this shortens the construction period, reduces the amount of high-altitude work, and improves erection efficiency and accuracy. The steel pipe mesh can be disassembled and reused, avoiding the need for workers to disassemble each steel pipe individually while suspended in mid-air.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building construction technology, and in particular to a method for erecting a high-altitude suspended steel pipe mesh operating platform. Background Technology

[0002] In the construction of tall structures, large-span, heavy-load structures are often constructed on the upper part of the tower. Temporary operating platforms need to be set up at a certain elevation below the tower for the installation, welding and other operations of the lower load-bearing structure.

[0003] In existing technologies, ground-mounted scaffolding or cantilevered platforms are commonly used, which have problems such as long erection periods, large material consumption, and high dismantling risks. Summary of the Invention

[0004] This invention provides a method for erecting a high-altitude suspended steel pipe mesh operating platform, which solves the problems of long erection period and large material consumption in the existing technology that uses ground-mounted scaffolding or cantilevered platforms.

[0005] This invention provides a method for erecting a high-altitude suspended steel pipe mesh operating platform, comprising the following steps: S1. During the slipform construction of the tall structure cylinder wall, pre-embed anchoring parts at the design elevation position to form platform hanging anchoring points; S2. At the ground position, steel pipes are spliced ​​into steel pipe mesh that fits the cross-section of the tower. The steel pipe joints are connected by lap fasteners and reinforced with plates. S3. Set up suspension points on the steel pipe mesh and configure a suspension system. Connect the two ends of the suspension system to the anchoring embedded parts and the suspension points of the steel pipe mesh, respectively. S4. Use lifting equipment to lift the steel pipe mesh as a whole to the design elevation, and use the length adjustment device of the hanging system to make fine adjustments to the level and elevation of the steel pipe mesh. S5. Install protective components on the steel pipe mesh to form a complete high-altitude operation platform.

[0006] According to the present invention, a method for erecting a high-altitude suspended steel pipe mesh operating platform is provided. In step S2, the steel pipe mesh is pre-assembled on the ground and hoisted into place as a whole, reducing the number of high-altitude assembly operations.

[0007] According to the present invention, a method for setting up a high-altitude suspended steel pipe mesh operating platform includes a platform dismantling step after step S5: the steel pipe mesh is divided into several independent blocks, and the operators only perform cutting operations at the dividing points, and the divided mesh is lowered to the ground as a whole using the upper lifting equipment.

[0008] According to the present invention, in step S4, the lifting equipment is a slipform hoisting system, which is coordinated with multiple sets of length adjustment devices for synchronous adjustment.

[0009] According to the present invention, a method for erecting a high-altitude suspended steel pipe mesh operating platform is provided, in step S1, the anchoring pre-embedded parts are pre-embedded synchronously with the slipform construction of the cylinder wall.

[0010] The method for erecting a high-altitude suspended steel pipe mesh operating platform provided by the present invention involves pre-setting anchoring pre-embedded parts on the cylindrical wall of a tall structure. The anchoring pre-embedded parts provide hanging anchoring points. The steel pipe mesh is formed by splicing multiple steel pipes to form a mesh-like bearing base adapted to the cross-section of the tall structure.

[0011] The steel pipe lap joints of the steel pipe mesh are connected by fasteners, and the steel pipe joints of the steel pipe mesh are equipped with reinforcing plates, which enhances the overall rigidity and load-bearing capacity of the mesh and solves the structural stability problem of large-diameter circular mesh under high-altitude suspension.

[0012] The suspension system connects the anchoring embedded parts and the lifting points of the steel pipe mesh respectively. The suspension system is used to adjust the elevation and level of the steel pipe mesh, reducing the amount of high-altitude work and improving the efficiency and accuracy of the erection.

[0013] The protective components are installed on the steel pipe mesh to form an operating surface for construction workers, ensuring their safety. Attached Figure Description

[0014] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0015] Figure 1 This is a plan view of the high-altitude suspended steel pipe mesh operating platform provided by the present invention; Figure 2 This invention provides Figure 1 Sectional view of AA; Figure 3 This is a schematic diagram of the overall lifting of the steel pipe mesh provided by the present invention.

[0016] Figure label: 1. Cylinder wall; 2. Anchoring embedded parts; 3. Steel wire rope; 4. Steel pipe mesh; 5. Lifting point; 6. Walkway slab; 7. Guardrail; 8. Safety net; 9. Slipform hoisting system. Detailed Implementation

[0017] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.

[0018] In the description of the embodiments of the present invention, it should be noted that the terms "center," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the embodiments of the present invention. In addition, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0019] The following is combined Figures 1-3 The present invention describes a method for erecting a high-altitude suspended steel pipe mesh operating platform, comprising the following steps: S1. During the slipform construction stage of the tall structure cylinder wall 1, anchor embedded parts 2 are pre-embedded at the design elevation position to form the anchor points of the platform hanging system.

[0020] In the above steps, the anchoring embedded part 2 is positioned at the elevation of the platform hanging anchor point.

[0021] S2. At the ground position, steel pipes are spliced ​​into steel pipe mesh 4 that fits the cross-section of the tower body. The steel pipe joints are connected by lap fasteners and reinforced plates are installed.

[0022] The above steps enhance the overall rigidity and load-bearing capacity of the steel pipe mesh 4, solving the structural stability problem of large-diameter circular mesh under high-altitude suspension.

[0023] S3. Install suspension points 5 on the steel pipe mesh 4 and configure a suspension system. Connect the two ends of the suspension system to the anchor embedded part 2 and the suspension points 5 of the steel pipe mesh 4, respectively.

[0024] S4. Use lifting equipment to lift the steel pipe mesh 4 as a whole to the design elevation, and use the length adjustment device of the hanging system to make fine adjustments to the level and elevation of the steel pipe mesh 4.

[0025] In the above steps, the steel pipe mesh 4 is lifted as a whole by the hoisting system, which reduces the amount of high-altitude work and improves the efficiency and accuracy of the erection.

[0026] S5. Install protective components on the steel pipe mesh 4 to form a complete high-altitude operation platform.

[0027] In the above embodiments, a process of ground pre-assembly and overall lifting is adopted. First, the anchor points are pre-embedded, the steel pipe mesh 4 is assembled on the ground, and then the whole structure is hoisted into place and leveled. Finally, the protection is completed. Compared with the traditional high-altitude piece-by-piece scaffolding erection, this reduces the high-altitude operation procedures, improves the overall efficiency of platform erection, and constructs a high-altitude temporary operation platform that meets the requirements of welding and component installation.

[0028] In a specific embodiment of the present invention, in step S2, the steel pipe mesh 4 completes all pre-assembly on the ground and is hoisted into place as a whole, reducing the number of high-altitude assembly operations. All steel pipe layout, overlapping, fastening of fasteners, and welding of reinforcing plates are completed on the ground, without high-altitude steel pipe splicing and assembly operations.

[0029] In the above embodiments, most of the assembly work is transferred to the ground, avoiding the risk of falling from height caused by a large amount of high-altitude assembly. At the same time, the ground working conditions are better, the assembly quality is easier to control, and the on-site construction period is shortened.

[0030] In a specific embodiment of the present invention, after step S5, a platform dismantling step is also included: the steel pipe mesh 4 is divided into several independent blocks, and the operators only perform cutting operations at the dividing points. The divided mesh is then lowered to the ground as a whole using the upper lifting equipment. During dismantling, the operators only reach the dividing and cutting positions to complete the block division, without performing suspended dismantling of the steel pipes one by one. After the division is completed, each mesh is hoisted and lowered to the ground as a whole using the lifting equipment.

[0031] In the above embodiments, a dismantling mode of segmented cutting and overall hoisting is adopted. The steel pipe mesh 4 is divided into several blocks, and the segmented mesh is slowly lowered to the ground as a whole by the upper lifting equipment. The workers only operate briefly at the cutting point, avoiding the safety risks of dismantling steel pipes one by one in a suspended state during the traditional dismantling process.

[0032] In a specific embodiment of the present invention, in step S4, the lifting equipment is a slipform hoisting system, which is coordinated with multiple sets of length adjustment devices for synchronous adjustment. The slipform hoisting system lifts the pre-assembled complete steel pipe mesh 4 to the target height, and then simultaneously operates the hand-operated hoists at each lifting point 5 to fine-tune the length of each lifting point 5.

[0033] In the above embodiments, the existing slipform structure with its own lifting system 9 is directly utilized, eliminating the need for additional large-scale hoisting equipment. Furthermore, the simultaneous adjustment of multiple lifting points 5 can correct the overall tilt of the large-size steel pipe mesh 4, ensuring the platform remains level and meeting the required construction elevation.

[0034] In a specific embodiment of the present invention, in step S1, the anchoring pre-embedded part 2 is pre-embedded synchronously with the slipform construction of the cylinder wall 1. During the slipform concrete pouring construction of the cylinder wall 1, according to the platform hanging anchor point elevation given in the drawings, the pre-embedded steel plate with lifting ring is placed synchronously with the slipform process and is integrally poured and formed with the concrete of the cylinder wall 1.

[0035] In the above embodiments, the anchoring pre-embedded part 2 is embedded synchronously with the slipform construction, eliminating the need for subsequent drilling and anchoring operations on the formed cylinder wall, thus avoiding damage to the cylinder wall structure 1 caused by subsequent anchoring. The pre-embedded position has high accuracy, the anchoring steel plate and the cylinder wall concrete have good overall integrity, and the anchoring bearing capacity is more reliable.

[0036] The method for erecting a high-altitude suspended steel pipe mesh operating platform provided by the present invention adopts a combination of ground pre-assembly and overall lifting erection process. After the steel pipe mesh 4 is pre-assembled on the ground, it is lifted to the design elevation through a slipform hoisting system 9, and the elevation and level of the mesh are adjusted by using a length adjustment device, thereby reducing the amount of high-altitude work and improving erection efficiency and accuracy.

[0037] The high-altitude suspended steel pipe mesh operating platform provided in this embodiment of the invention includes anchoring pre-embedded parts 2, steel pipe mesh 4, suspension system and protective components.

[0038] The anchoring pre-embedded part 2 is pre-installed on the cylindrical wall 1 of the tall structure, and is used to provide the hanging anchoring points. The anchoring pre-embedded part 2 provides the upper anchoring foundation.

[0039] Steel pipe mesh 4 is made up of multiple steel pipes spliced ​​together to form a mesh-like load-bearing base adapted to the cross-section of tall structures, and steel pipe mesh 4 serves as the main load-bearing base.

[0040] The suspension system connects the anchor embedded part 2 and the suspension point 5 of the steel pipe mesh 4 respectively. The suspension system is used to adjust the elevation and level of the steel pipe mesh 4, and to achieve suspended installation and attitude adjustment.

[0041] The protective components are installed on the steel pipe mesh 4 to form an operating surface for construction personnel to work on, ensuring operational safety.

[0042] The high-altitude suspended steel pipe mesh operating platform provided by this invention adopts a suspended form for the entire platform, replacing traditional ground scaffolding and cantilever platforms, reducing material input, and enabling the construction of a high-altitude working surface below the upper part of a towering structure, meeting the installation and welding construction needs of large-span and heavy-load structures on the upper part of the tower.

[0043] In one specific embodiment of the present invention, the anchoring embedded part is an embedded steel plate with a lifting ring, which is used for connection of the suspension system. During the slipform construction of the tall structure cylinder wall, the embedded steel plate with the lifting ring is embedded in the inside of the cylinder wall concrete, with the lifting ring exposed on the inner side of the cylinder wall for the suspension system to attach to.

[0044] In the above embodiments, the pre-embedded steel plate with lifting ring is formed by pouring concrete along with the cylinder wall, which has high anchoring reliability. The lifting ring structure facilitates the quick connection and assembly of the hanging system, providing a stable anchoring point for the entire suspended platform, resisting the platform's own weight and construction live load, and avoiding the risk of anchoring point failure.

[0045] In a specific embodiment of the present invention, the suspension system includes a wire rope 3 and a length adjustment device; one end of the wire rope 3 is connected to the anchoring embedded part 2; one end of the length adjustment device is connected to the end of the wire rope 3 facing away from the anchoring embedded part, and the other end of the length adjustment device is connected to the steel pipe mesh 4. In this embodiment, a hand-operated hoist is used as the length adjustment device.

[0046] In the above embodiments, the wire rope 3 bears the main responsibility for suspension and force transmission, and the hand-operated hoist serves as a length adjustment device, which can flexibly change the effective length of the hoisting position. It can individually adjust the hoisting length of each hoisting point 5 of the steel pipe mesh 4, thereby correcting the elevation deviation and tilt of the platform and realizing the leveling operation of the steel pipe mesh 4.

[0047] In a specific embodiment of the present invention, the steel pipe lap joints of the steel pipe mesh 4 are connected by fasteners, and a reinforcing plate is provided at the steel pipe joint of the steel pipe mesh 4. Specifically, the steel pipes are joined by lap joints, and the lap joints are locked and fixed using multiple fasteners. A reinforcing steel plate is welded to the middle of the lap joint to form a reinforcing plate. The steel pipes are arranged and spliced ​​on the ground according to the cross-sectional dimensions of the tall tower structure to form a large-diameter circular mesh load-bearing base.

[0048] In the above embodiments, multiple fasteners fix the lap joints, and the reinforcing plate welded in the middle of the joints improves the bending and shear resistance of the steel pipe joints, enhances the overall rigidity and load-bearing capacity of the steel pipe mesh 4, solves the problem of easy deformation of the joints and insufficient overall stability of the large-diameter circular steel pipe mesh 4 under high-altitude suspension conditions, and ensures the structural safety of the platform when it bears construction loads.

[0049] In one specific embodiment of the present invention, the protective components include a walkway 6 laid on the steel pipe mesh 4, edge protection railings 7, and safety netting 8 fully covering the outside of the protection railings 7. The walkway 6 covers the upper part of the steel pipe mesh 4, forming a passageway for personnel to walk and work. Protection railings 7 are erected around the perimeter of the platform, and the outside of the railings is fully enclosed by safety netting 8.

[0050] In the above embodiments, the walkway 6 encloses the steel pipe mesh 4, providing a flat walking surface for workers; the guardrail 7 and the fully hung safety net 8 form a fully enclosed edge protection to prevent personnel and materials from falling from heights, meeting the requirements of high-altitude operation safety protection specifications.

[0051] In the description of the embodiments of the present invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in the embodiments of the present invention according to the specific circumstances.

[0052] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "method," "specific method," or "some methods," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or method is included in at least one embodiment or method of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or method. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or methods. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or methods described in this specification, as well as the features of different embodiments or methods.

[0053] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for erecting a high-altitude suspended steel pipe mesh operating platform, characterized in that, Including the following steps: S1. During the slipform construction stage of the high-rise structure cylinder wall (1), anchorage pre-embedded parts (2) are pre-embedded at the design elevation position to form the anchorage point of the platform hanging system; S2. At the ground position, steel pipes are spliced ​​into steel pipe mesh that is adapted to the cross section of the tower (4). The steel pipe joints are connected by lap fasteners and reinforced plates are installed. S3. Set up hanging points (5) on the steel pipe mesh (4), configure a hanging system, and connect the two ends of the hanging system to the anchor embedded part (2) and the hanging point (5) of the steel pipe mesh (4) respectively. S4. Use lifting equipment to lift the steel pipe mesh (4) as a whole to the design elevation, and use the length adjustment device of the hanging system to make fine adjustments to the level and elevation of the steel pipe mesh (4); S5. Install protective components on the steel pipe mesh (4) to form a complete high-altitude operation platform.

2. The method for erecting a high-altitude suspended steel pipe mesh operating platform according to claim 1, characterized in that, In step S2, the steel pipe mesh (4) completes all pre-assembly operations on the ground and is hoisted into place as a whole, reducing the high-altitude assembly operation process.

3. The method for erecting a high-altitude suspended steel pipe mesh operating platform according to claim 1, characterized in that, After the high-altitude operation platform is formed in step S5, the platform dismantling step is also included: the steel pipe mesh (4) is divided into several independent blocks, and the operators only carry out cutting operations at the dividing points. The upper lifting equipment is used to lower the divided mesh to the ground as a whole.

4. The method for erecting a high-altitude suspended steel pipe mesh operating platform according to claim 1, characterized in that, In step S4, the lifting equipment is a slipform hoisting system (9), which is coordinated with multiple sets of length adjustment devices for synchronous adjustment.

5. The method for erecting a high-altitude suspended steel pipe mesh operating platform according to claim 1, characterized in that, In step S1, the anchoring pre-embedded part (2) is pre-embedded synchronously with the slipform construction of the cylinder wall.