A rapid clamping and positioning method for laying steel structure floor decking
By using a quick-clamping positioning fixture, the horizontal arm of the fixture and the self-locking spiral top rod are used to achieve non-destructive and efficient fixation of steel structure floor decking, which solves the welding damage and fume risk caused by temporary spot welding fixation, and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202611580762.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-17
AI Technical Summary
In the existing technology, the temporary fixing method of spot welding when laying steel structure floor decking has problems such as welding damage to the galvanized layer, generation of smoke and dust, fire risk, and high subsequent cleaning costs.
A quick clamping and positioning fixture is adopted, including a horizontal arm, a vertical arm and a self-locking spiral top rod. It achieves firm clamping of the floor deck through the lever principle, avoiding welding, and uses the trapezoidal or triangular thread and anti-slip pressure head of the self-locking spiral top rod for fixation.
It achieves temporary fixing of floor decking without damage, with high efficiency and high precision, avoiding damage to the galvanized layer, reducing safety risks and environmental pollution, and improving construction efficiency and cost-effectiveness.
Smart Images

Figure CN123109408A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of steel structure construction, and in particular to a rapid clamping and positioning method for laying steel structure floor decking. Background Technology
[0002] In multi-story steel structure buildings, the installation of profiled steel sheet floor decking is a critical process. After installation, stud welding and rebar tying are required, necessitating temporary fixation of the floor decking to the underlying steel beams to prevent slippage and bounce. Currently, the most common practice is spot welding, where the floor decking is spot-welded to the upper flange of the steel beam at several points. This method has several drawbacks: the electric arc can burn the galvanized layer of the floor decking, creating potential corrosion points in the future; spot welding requires welders and welding machines, generating fumes and posing a fire risk; and after subsequent processes, these temporary welds need to be manually removed and ground, which is time-consuming, labor-intensive, and costly. The market urgently needs a temporary fixation solution that avoids welding and improves overall efficiency. Summary of the Invention
[0003] To address the aforementioned issues, this application proposes a rapid clamping and positioning method for laying steel structure floor decking. This method is based on a specialized clamp and replaces the traditional spot welding temporary fixing process, achieving non-destructive, highly efficient, and highly precise temporary fixing of components.
[0004] This invention proposes a clamping and positioning fixture for laying steel structure floor decking, comprising a horizontal arm, a vertical arm, and a mounting arm. The horizontal arm and the mounting arm are arranged in parallel, and the two ends of the vertical arm are respectively perpendicularly connected to the horizontal arm and the mounting arm.
[0005] A rapid clamping and positioning method for laying steel structure floor decking, employing a clamping fixture for rapid clamping and positioning of steel structure floor decking, includes the following steps: S1, the design position for laying the floor decking on the upper flange of the steel beam; S2: Insert the horizontal arm of the clamp under the upper flange of the steel beam from one side of the steel beam; S3: The self-locking spiral jack extends from above the mounting arm of the clamp. Rotating the self-locking spiral jack presses it against the surface of the floor deck. At the same time, the vertical arm of the clamp hooks onto the side of the upper flange of the steel beam, achieving a firm clamping of the floor deck through the lever principle. S4: Arrange multiple clamps at key points around the floor deck to temporarily fix the entire floor deck area.
[0006] Furthermore, the thread of the self-locking spiral push rod is a trapezoidal thread or a triangular thread with self-locking characteristics, and its top end is provided with a handle or a hexagonal head.
[0007] Furthermore, the lower end of the self-locking spiral push rod is provided with an anti-slip pressure head.
[0008] Furthermore, the anti-slip pressure head is made of a wear-resistant material with a high coefficient of friction, and its bottom surface is a serrated or knurled surface.
[0009] Furthermore, the thickness of the horizontal arm of the clamp is less than the gap at the connection between the upper flange and the web of the steel beam.
[0010] Furthermore, the horizontal arm of the clamp is provided with a guide ramp at its front end to facilitate insertion.
[0011] Furthermore, the horizontal and vertical arms of the clamp are integrally welded or integrally forged, and the overall strength meets the stress requirements for pressing and fixing the floor deck.
[0012] Furthermore, step S4 also includes stud welding, rebar tying, and concrete pouring.
[0013] Furthermore, after the floor decking installation is completed, loosen the self-locking spiral jack and remove the device to the next location for reuse.
[0014] The beneficial effects of this application are: it completely avoids heat damage to the galvanized layer of the floor deck, improving the building's durability; it is extremely simple to operate, and a single person can complete the fixing of a point in 10-20 seconds by hand or with simple tools, increasing efficiency several times; it eliminates the need for welders, welding machines, grinders, and auxiliary materials, and the device can be reused thousands of times, with extremely low cost per use; it is safe and environmentally friendly, with no open flame or welding fumes, reducing safety risks and environmental pollution. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 This is a flowchart illustrating a rapid clamping and positioning method for laying steel structure floor decking. Figure 2 This is a schematic diagram of a quick clamping and positioning fixture used for laying steel structure floor decking; Figure 3 This is a schematic diagram of the installation structure for a rapid clamping and positioning method for laying steel structure floor decking; 1. Clamp; 11. Horizontal arm; 12. Vertical arm; 13. Mounting arm; 2. Self-locking screw jack; 3. Floor deck; 4. Steel beam. Detailed Implementation
[0017] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application. All other implementations obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application. In the various drawings, the same elements are represented by the same or similar reference numerals, and for clarity, the various parts in the drawings are not drawn to scale.
[0018] See Figure 1-3 As shown, this invention proposes a quick clamping and positioning fixture 1 for laying steel structure floor decking, comprising a horizontal arm 11, a vertical arm 12, and a mounting arm 13. The horizontal arm 11 and the mounting arm 13 are arranged in parallel, and the two ends of the vertical arm 12 are perpendicularly connected to the horizontal arm 11 and the mounting arm 13, respectively. In this embodiment, the horizontal arm and the vertical arm of the fixture are integrally welded or integrally forged, and the overall strength meets the stress requirements for clamping and fixing the floor decking.
[0019] See Figure 1 As shown, a rapid clamping and positioning method for laying steel structure floor decking employs a clamping fixture for rapid clamping and positioning of steel structure floor decking, including the following steps: S1, the design position for laying the floor decking on the upper flange of the steel beam; S2: Insert the horizontal arm of the clamp under the upper flange of the steel beam from one side of the steel beam; S3: The self-locking spiral jack extends from above the mounting arm of the clamp. Rotating the self-locking spiral jack presses it against the surface of the floor deck. At the same time, the vertical arm of the clamp hooks onto the side of the upper flange of the steel beam, achieving a firm clamping of the floor deck through the lever principle. S4: Arrange multiple clamps at key points around the floor deck to temporarily fix the entire floor deck area.
[0020] See Figure 3 As shown, in this embodiment, the mounting arm 13 is provided with a threaded hole, and the self-locking spiral jack passes through the threaded hole into the inside of the clamp 1 and presses against the upper surface of the floor deck 3. The clamp 1 as a whole uses the upper flange sidewall of the steel beam as the force fulcrum, firmly pressing and fixing the floor deck 3 to the upper flange upper surface of the steel beam 4, so that it will not shift under wind load or construction disturbance.
[0021] Specifically, the thread of the self-locking spiral jack 2 is a trapezoidal thread or a triangular thread with self-locking characteristics, and its top end is provided with a handle or a hexagonal head. Preferably, the lower end of the self-locking spiral jack is provided with an anti-slip pressure head, which is made of a wear-resistant material with a high coefficient of friction. Its bottom surface is a serrated surface or a knurled surface, which is used to increase the friction between the self-locking spiral jack and the upper surface of the floor deck, to avoid the problem of the jack slipping and shifting during the tightening and pressing process, and at the same time, it can disperse the top pressure, avoid local pressure damage and deformation to the galvanized surface of the floor deck, and ensure the finished appearance quality of the floor deck.
[0022] See Figure 2 As shown, specifically, the thickness of the horizontal arm 11 of the clamp 1 is less than the gap at the connection between the upper flange and the web of the steel beam 4. Specifically, the front end of the horizontal arm 11 of the clamp 1 is provided with a guide slope for easy insertion. In this embodiment, Specifically, step S4 includes stud welding, rebar tying, and concrete pouring. Compared to the traditional spot welding temporary fixing method, this method does not require welding temporary positioning parts to the floor deck or steel beam in advance, will not cause additional damage to the galvanized layer of the floor deck, and also saves the subsequent steps of cutting off the temporary positioning parts and reapplying the anti-corrosion layer, which can effectively reduce the amount of construction work and reduce material waste.
[0023] Specifically, after the floor decking installation is completed, loosen the self-locking spiral jack and remove the device for reuse in the next location. If a single fixture is damaged, only the corresponding part needs to be replaced, resulting in lower operating costs and better compliance with green construction requirements. For different specifications of steel beams and floor decking, only the length of the fixture's horizontal arm and the length of the self-locking spiral jack need to be adjusted for adaptation, making it more versatile and adaptable.
[0024] The beneficial effects of this application are: it completely avoids heat damage to the galvanized layer of the floor deck, improving the building's durability; it is extremely simple to operate, and a single person can complete the fixing of a point in 10-20 seconds by hand or with simple tools, increasing efficiency several times; it eliminates the need for welders, welding machines, grinders, and auxiliary materials, and the device can be reused thousands of times, with extremely low cost per use; it is safe and environmentally friendly, with no open flame or welding fumes, reducing safety risks and environmental pollution.
[0025] In the accompanying drawings of this embodiment, the same or similar reference numerals correspond to the same or similar components. In the description of this application, it should be noted that if terms such as "upper," "lower," "left," and "right" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, they are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the accompanying drawings are only for illustrative purposes and should not be construed as limiting this patent. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.
[0026] In this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, without necessarily requiring or implying any actual relationship or order between these entities or operations. Finally, it should be noted that the above embodiments are clearly illustrative of the invention and not intended to limit the implementation. Those skilled in the art will recognize that various variations and modifications can be made based on the above description. It is neither necessary nor possible to exhaustively describe all possible implementations. However, obvious variations and modifications derived therefrom remain within the scope of this invention.
Claims
1. A quick clamping and positioning fixture for laying steel structure floor decking, characterized in that, It includes a horizontal arm, a vertical arm, and a mounting arm. The horizontal arm and the mounting arm are arranged in parallel, and the two ends of the vertical arm are respectively perpendicularly connected to the horizontal arm and the mounting arm.
2. A rapid clamping and positioning method for laying steel structure floor decking, employing the clamping fixture for rapid clamping and positioning of steel structure floor decking as described in claim 1, characterized in that, Includes the following steps: S1, the design position for laying the floor decking on the upper flange of the steel beam; S2: Insert the horizontal arm of the clamp under the upper flange of the steel beam from one side of the steel beam; S3: The self-locking spiral jack extends from above the mounting arm of the clamp. Rotating the self-locking spiral jack presses it against the surface of the floor deck. At the same time, the vertical arm of the clamp hooks onto the side of the upper flange of the steel beam, achieving a firm clamping of the floor deck through the lever principle. S4: Arrange multiple clamps at key points around the floor deck to temporarily fix the entire floor deck area.
3. The rapid clamping and positioning method for laying steel structure floor decking according to claim 1, characterized in that, The thread of the self-locking spiral push rod is a trapezoidal thread or a triangular thread with self-locking characteristics, and its top end is provided with a handle or a hexagonal head.
4. The rapid clamping and positioning method for laying steel structure floor decking according to claim 1, characterized in that, The lower end of the self-locking spiral jack is equipped with an anti-slip pressure head.
5. The rapid clamping and positioning method for laying steel structure floor decking according to claim 4, characterized in that, The anti-slip pressure head is made of a wear-resistant material with a high coefficient of friction, and its bottom surface is serrated or knurled.
6. The rapid clamping and positioning method for laying steel structure floor decking according to claim 1, characterized in that, The thickness of the horizontal arm of the clamp is less than the gap at the connection between the upper flange and the web of the steel beam.
7. The rapid clamping and positioning method for laying steel structure floor decking according to claim 6, characterized in that, The horizontal arm of the clamp has a guide ramp at its front end for easy insertion.
8. The rapid clamping and positioning method for laying steel structure floor decking according to claim 1, characterized in that, The horizontal and vertical arms of the clamp are integrally welded or integrally forged, and the overall strength meets the stress requirements for pressing and fixing the floor deck.
9. The rapid clamping and positioning method for laying steel structure floor decking according to claim 1, characterized in that, Step S4 is followed by stud welding, rebar tying, and concrete pouring.