An anchoring module, wind turbine tower and construction method
By using prefabricated anchoring modules in the factory and a construction process of top cable release-bottom radial anchoring-top tensioning, the structural durability and construction efficiency of prestressed steel tube concrete lattice towers have been solved, achieving efficient and safe tower construction suitable for various scenarios.
Patent Information
- Application Number
- CN202611598287.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-15
- Publication Date
- 2026-11-17
AI Technical Summary
The prestressed anchoring system of prestressed steel tube concrete lattice tower has problems such as insufficient structural durability, low construction efficiency, high cost and inherent limitations in structural performance. In particular, the traditional tensioning cavity setting leads to poor foundation structure compactness, easy water seepage and corrosion, and high construction safety risks.
Anchoring modules are used, including the first corner column segment, anchoring components and steel cylinders. The bottom radial anchoring of the prestressed steel strands is achieved through the combination of sliders, slide rails and rods, eliminating the traditional foundation tensioning cavity. The anchoring components are prefabricated in the factory and shipped as a whole. Combined with the construction process of top cable release and bottom radial anchoring, a drainage system is provided to prevent water seepage.
It improves structural durability and construction efficiency, reduces construction costs and safety risks, ensures the continuity of the foundation section, is suitable for near-water scenarios, and shortens the construction cycle.
Smart Images

Figure CN123109456A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wind power generation technology, specifically to an anchoring module, a wind turbine tower, and a construction method. Background Technology
[0002] Prestressed steel-concrete composite lattice towers are crucial support structures for large wind turbine generators. Their main body consists of four inclined steel-concrete composite columns (lattice columns), connected to the upper pure steel tower via a central steel-concrete composite transition section. External prestressed steel strands are arranged inside the inclined columns. Prestressing tension subjects the concrete to triaxial compression, significantly improving its ultimate strength, plasticity, and toughness. Simultaneously, the concrete provides lateral support to the inner wall of the steel tubes, effectively preventing local buckling failure and fully utilizing the steel's properties. This synergistic action of the steel-concrete composite structure achieves high load-bearing capacity and high lateral stiffness. Furthermore, the application of prestress ensures full-section compression of the concrete, with the vertical steel tube connecting flanges and bolts always under compression. This effectively reduces the average stress at the lattice tower nodes under fatigue loads, significantly improving the overall structure's fatigue life. Based on these advantages, prestressed steel-concrete composite lattice towers demonstrate excellent feasibility and economic viability in tall wind turbine structures and are gradually becoming one of the mainstream technologies in the industry.
[0003] Currently, the prestressed anchorage system for prestressed concrete-filled steel tube lattice towers typically employs a bottom-mounted tension cavity. This tension cavity is a large hollow structure pre-reserved within the foundation concrete to accommodate the prestressing tensioning equipment and provide operational space for bottom anchorage during construction. However, long-term engineering practice has revealed the following technical problems with this tension cavity approach:
[0004] Structural defects lead to insufficient durability. The tensioning cavity requires a complex piping system pre-embedded within the foundation to facilitate the insertion and anchoring of prestressing tendons. The dense reinforcement and irregular shape of the cavity in this area make concrete pouring extremely difficult, easily resulting in pouring defects such as honeycombing and voids around the cavity, severely affecting the density and integrity of the foundation structure. More critically, waterproofing the connection between the tensioning cavity and the upper corner columns is extremely difficult. Groundwater can easily seep into the cavity along the connection interface. Long-term water accumulation will cause severe corrosion of critical load-bearing components such as prestressed steel strands, wedges, and anchor plates, significantly reducing structural durability and even triggering major safety accidents such as prestressing failure.
[0005] Construction efficiency and cost are significant challenges. The installation of the tensioning cavity formwork requires extremely high precision, and the support and dismantling procedures are complex, extending the foundation construction period by more than 30%. Simultaneously, the excavation and backfilling of the cavity significantly increases earthwork and concrete usage. Tensioning operations must be carried out within narrow, confined cavities, resulting in minimal operating space, difficulty in personnel access, and high construction safety risks. Furthermore, the high cost of transporting and hoisting large tensioning equipment in mountainous wind farms further increases the overall project cost.
[0006] The structure has inherent limitations. The large cavity inevitably weakens the continuity of the foundation section. Under the huge overturning moment and vertical load on the bottom of the tower, the area around the cavity is prone to severe stress concentration, which can induce concrete cracking. At the same time, under the repeated action of dynamic loads such as wind vibration or earthquakes, the area around the cavity is prone to cumulative fatigue damage, becoming a weak link in the entire tower structure and threatening the long-term safe operation of the wind turbine tower during its service life.
[0007] Some related technologies attempt to address the aforementioned technical problems by eliminating the tension cavity in the foundation concrete. For example, Chinese patent CN120889476A discloses a prestressed steel-concrete composite tower ground anchor structure, which achieves the technical effect of eliminating the foundation cavity by setting the anchor seat on the surface of the concrete foundation, opening an installation groove on the top surface of the anchor seat, and having the lower end of the prestressed steel strand extend into the installation groove and be limited and fixed by the anchoring component. However, this solution still has the following technical problems: the anchor seat protrudes from the foundation surface, the anchoring component still needs to be installed on-site at the wind farm, and there is still room for improvement in construction efficiency; the anchoring component is set in the installation groove of the foundation anchor seat, which is low in position, and in near-water scenarios, there is still a risk of groundwater seeping into the installation groove along the interface between the anchor seat and the foundation. Summary of the Invention
[0008] The purpose of this invention is to provide an anchoring module, a wind turbine tower, and a construction method to alleviate or eliminate at least one of the aforementioned technical problems.
[0009] The present invention proposes an anchoring module comprising, from top to bottom, a first corner column segment, an anchoring assembly, and a steel cylinder.
[0010] The steel cylinder includes a cylinder body and a flange disposed at the lower end of the cylinder body, the flange being adapted to be connected to a concrete foundation by foundation anchor bolts;
[0011] The anchoring assembly includes an outer peripheral wall, a mounting base, a slider, and a rod. The upper end of the outer peripheral wall is welded to the lower end of the first corner column segment, and the lower end of the outer peripheral wall is welded to the upper end of the cylinder. The mounting base is fixedly connected to the inner side of the outer peripheral wall, and the mounting base is provided with a channel for the prestressed steel strand and the lower anchor head connected to the lower end of the prestressed steel strand to pass through.
[0012] The slider is installed in the mounting base in such a way that it can reciprocate linearly along the radial direction of the channel. The inner end of the rod is connected to the slider, and the outer end of the rod extends out of the outer peripheral wall. The rod is configured to drive the slider to reciprocate linearly along the radial direction of the channel between the unlocked position and the anchored position under the action of external force.
[0013] When the slider is in the unlocked position, the lower end of the prestressed steel strand and the lower anchor head can pass through the channel;
[0014] When the slider is in the anchor position, at least a portion of the slider extends radially inward into the channel to form a stop structure for stopping the lower anchor head on the path in which the lower anchor head moves upward along the channel.
[0015] Optionally, the mounting base includes a base plate portion whose outer periphery is connected to the inner peripheral surface of the outer peripheral wall, a mounting plate detachably connected to the lower part of the base plate portion by fasteners, and a slide rail fixedly connected to the mounting plate. The slider is slidably mounted on the slide rail, and the slider can reciprocate linearly along the slide rail in the radial direction of the channel.
[0016] Optionally, two sliders are installed in the mounting base. The two sliders are located on opposite sides of the channel. Each slider has a notch on its side facing the channel. When both sliders are in the anchor position, the notches of the two sliders are joined together to form a central hole through which the prestressed steel strand passes.
[0017] Optionally, the substrate portion is located above the slider, and the substrate portion limits the slider in the upward direction.
[0018] Optionally, the first corner column segment includes an outer sleeve and an inner sleeve, with concrete poured between the outer sleeve and the inner sleeve. The lower end of the outer sleeve is welded to the upper end of the outer peripheral wall, and the lower end of the inner sleeve is welded to the base plate portion.
[0019] Optionally, a protective wall is provided between the outer edge of the mounting plate and the base plate portion.
[0020] Optionally, the channel extends through the mounting base in the vertical direction, and a protective cover for protecting the lower end of the prestressed steel strand and the periphery of the lower anchor head is fixedly connected to the lower side of the mounting base.
[0021] The present invention also proposes a wind turbine tower, including a concrete foundation and an anchoring module as described in any of the above claims, wherein a foundation anchor is pre-embedded in the concrete foundation, the anchoring module is supported on the top of the concrete foundation, and the flange is fixedly connected to the foundation anchor.
[0022] Optionally, a drainage pipe is pre-embedded in the concrete foundation, one end of which is connected to the bottom of the inner cavity of the steel cylinder, and the other end of which extends to the outside of the concrete foundation.
[0023] The present invention also proposes a construction method, comprising the following steps:
[0024] Prefabricate any of the anchoring modules described above;
[0025] Concrete foundation construction is carried out, and foundation anchors are pre-embedded in the concrete foundation.
[0026] The anchoring module is installed on the concrete foundation, and the anchoring module is supported downward on the top of the concrete foundation. The flange edge is fixedly connected to the foundation anchor bolt.
[0027] The wind turbine tower is assembled. After the tower is assembled, the prestressed steel strands are threaded through the prestressed ducts of the steel-concrete corner column of the wind turbine tower. The prestressed steel strands are then conveyed downwards from the upper end of the prestressed ducts until the lower anchor head connected to the lower end of the prestressed steel strand passes through the channel of the mounting base of the anchoring module. This drives the rod, causing the slider to move to the locking anchor position. Then, the upper end of the prestressed steel strand is tensioned at the top of the wind turbine tower. After reaching the design stress value, the upper end of the prestressed steel strand is anchored.
[0028] This invention provides an anchoring module that eliminates the need for traditional foundation tensioning cavities, enabling prefabrication in the factory and on-site construction without the need for cavity opening, thereby avoiding water seepage in the tensioning cavity and improving construction efficiency. Attached Figure Description
[0029] Figure 1 This is a structural schematic diagram of the anchoring module described in some embodiments;
[0030] Figure 2 This is a structural schematic diagram of a portion of the anchoring module described in some embodiments;
[0031] Figure 3 This is a schematic diagram of the structure of the wind turbine tower described in some embodiments;
[0032] Figure 4 for Figure 3 Sectional view of part A in the middle;
[0033] Figure 5 for Figure 4 A magnified view of a portion of the view;
[0034] Figure 6 for Figure 3 A schematic diagram of the structure of part B.
[0035] In the diagram, 1—concrete-filled steel pipe corner column, 2—prestressed steel strand, 3—anchoring component, 4—steel cylinder, 5—concrete foundation, 6—foundation anchor bolt, 7—drainage pipe, 8—high-strength grouting layer, 9—lower anchor head, 10—cable release sheave, 11—suspension bracket, 12—limiting bracket, 13—roller, 101—first corner column segment, 102—second corner column segment, 103—outer sleeve, 104—inner sleeve, 105 —Concrete section, 106—Prestressed duct, 301—Outer peripheral wall, 302—Base plate section, 303—Mounting plate, 304—First through hole, 305—Slide rail, 306—Slider, 307—Rod, 308—Center hole, 309—Fastener, 310—Protective cover, 311—Protective wall, 312—First conical surface, 401—Cylinder, 402—Flange edge, 901—Second conical surface. Detailed Implementation
[0036] The embodiments of the present invention will be described below with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention and not for limiting the scope of protection of the present invention.
[0037] It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of the present invention. The illustrations only show the components related to the present invention and are not drawn according to the actual number, shape and size of the components in the actual implementation. In the actual implementation, the form, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.
[0038] In one embodiment, see Figure 1 , Figure 2 , Figure 4 and Figure 5 As shown, this invention discloses an anchoring module, comprising a first corner post segment 101, an anchoring component 3, and a steel cylinder 4 arranged sequentially from top to bottom.
[0039] The steel cylinder 4 includes a cylinder body 401 and a flange edge 402 disposed at the lower end of the cylinder body 401. The flange edge 402 is adapted to be connected to the concrete foundation 5 by a foundation anchor bolt 6.
[0040] The anchoring assembly 3 includes an outer peripheral wall 301, a mounting base, a slider 306, and a rod 307. The upper end of the outer peripheral wall 301 is welded to the lower end of the first corner column segment 101, and the lower end of the outer peripheral wall 301 is welded to the upper end of the cylinder 401. The mounting base is fixedly connected to the inner side of the outer peripheral wall 301. The mounting base is provided with a channel for the prestressed steel strand 2 and the lower anchor head 9 connected to the lower end of the prestressed steel strand 2 to pass through.
[0041] The slider 306 is installed in the mounting base in such a way that it can reciprocate linearly along the radial direction of the channel. The inner end of the rod 307 is connected to the slider 306, and the outer end of the rod 307 extends out of the outer peripheral wall 301. The rod 307 is configured to drive the slider 306 to reciprocate linearly along the radial direction of the channel between the unlocked position and the anchored position under the action of external force.
[0042] When the slider 306 is in the unlocked position, the lower end of the prestressed steel strand 2 and the lower anchor head 9 can pass through the channel;
[0043] When the slider 306 is in the anchor-locked position, at least a portion of the slider 306 extends radially inward into the channel to form a stop structure for stopping the lower anchor 9 on the path of the lower anchor 9 moving upward along the channel.
[0044] By adopting the above technical solution, the first corner column segment 101, the anchoring component 3, and the steel cylinder 4 are integrated into an anchoring module. The slider 306 of the anchoring component 3 moves radially along the channel and stops the anchor head 9 at the anchoring position, which can achieve bottom anchoring of the prestressed steel strand 2 without setting a traditional foundation tensioning cavity. Through the combination of the anchoring component 3 and the steel cylinder 4, the concrete foundation 5 at the bottom of the wind turbine tower does not need to be set with a foundation tensioning cavity or an anchor seat protruding from the surface of the concrete foundation 5. The anchoring module can be prefabricated in the factory and shipped as a whole. The anchoring component 3 does not need to be installed on the wind farm site. On-site cavity opening construction is eliminated, thereby avoiding the risks of water seepage, corrosion, and tensioning in confined spaces in the tensioning cavity, and improving construction efficiency and structural durability.
[0045] In the above technical solution, the anchoring component 3 is located on top of the steel cylinder 4, and there is a certain distance between the anchoring component 3 and the top of the concrete foundation 5. Even in the near-water scenario, the anchoring component 3 has a low risk of groundwater seepage, water immersion and corrosion.
[0046] In some embodiments, the mounting base includes a base plate portion 302 whose outer periphery is connected to the inner peripheral surface of the outer peripheral wall 301, a mounting plate 303 detachably connected to the underside of the base plate portion 302 by fasteners 309, and a slide rail 305 fixedly connected to the mounting plate 303. A slider 306 is slidably mounted on the slide rail 305 and can reciprocate linearly along the slide rail 305 in the radial direction of the channel.
[0047] Using the above technical solution, the base plate 302, mounting plate 303 and slide rail 305 provide stable support and radial guidance for the slider 306, so that the slider 306 moves smoothly and the anchoring position is accurate; the mounting plate 303 is detachably connected to the base plate 302 through fasteners 309, which facilitates the concrete pouring of the first corner column section 101 and the assembly, inspection and subsequent maintenance and replacement of the anchoring component 3 in the factory; the base plate 302 is connected to the outer peripheral wall 301, which helps to improve the overall rigidity and force transmission reliability of the anchoring component 3.
[0048] In a specific implementation, the base plate portion 302 and the outer peripheral wall 301 can be integrally formed, thereby making the base plate portion 302 and the outer peripheral wall 301 a single integral part; preferably, the base plate portion 302 and the outer peripheral wall 301 are forged integral parts. The fasteners 309 can be multiple bolts and multiple nuts.
[0049] In some embodiments, two sliders 306 are installed in the mounting base. The two sliders 306 are located on opposite sides of the channel. Each slider 306 has a notch on the side closest to the channel. When both sliders 306 are in the anchoring position, the notches of the two sliders 306 are joined together to form a central hole 308 through which the prestressed steel strand 2 passes. The diameter of the central hole 308 is smaller than the outer contour size of the lower anchor head 9 to prevent the lower anchor head 9 from moving upward along the channel.
[0050] Using the above technical solution, the two sliders 306 move towards each other from opposite sides of the channel, and the notches are joined together to form a central hole 308 through which the prestressed steel strand 2 passes. The diameter of the central hole 308 is smaller than the outer contour dimension of the lower anchor head 9, thus forming a reliable stop for the lower anchor head 9. The symmetrical arrangement on both sides ensures that the anchor is subjected to balanced force, reduces eccentricity, and improves the reliability and stability of the bottom radial anchor. After the prestressed steel strand 2 is tightened, the lower anchor head 9 is supported upward on the two sliders 306, which helps to form a bottom radial anchor with uniform force distribution, reliable force transmission, and high load-bearing capacity.
[0051] In some embodiments, the substrate portion 302 is located above the slider 306, and the substrate portion 302 limits the slider 306 in the upward direction.
[0052] With the above technical solution, the base plate 302 is located on the upper side of the slider 306 and forms an upper limit on the slider 306, which can restrict the slider 306 from moving upward or disengaging from the slide rail 305, ensuring that the slider 306 moves stably back and forth within the slide rail 305, and improving the working reliability and safety of the anchor locking mechanism.
[0053] In practical implementation, two parallel slide rails 305 can be set on the mounting plate 303, and the slider 306 is connected to both slide rails 305 at the same time.
[0054] In some embodiments, the first corner column segment 101 includes an outer sleeve and an inner sleeve, with a concrete portion 105 formed by concrete pouring provided between the outer sleeve and the inner sleeve. The lower end of the outer sleeve is welded to the upper end of the outer peripheral wall 301, and the lower end of the inner sleeve is welded to the base plate portion 302.
[0055] Using the above technical solution, the first corner column segment 101 adopts a hollow sandwich steel pipe concrete structure with concrete poured between the outer sleeve and the inner sleeve. The inner sleeve can also serve as a prestressed duct 106, and the concrete part 105 can provide lateral support to the steel pipe and prevent local buckling. The outer sleeve and the inner sleeve are respectively connected to the outer peripheral wall 301 and the base plate part 302, so that a clear and continuous force transmission path is formed between the first corner column segment 101 and the anchoring component 3, thereby improving the node stiffness and overall bearing capacity.
[0056] In practice, the first corner column section 101 can be welded to the forged flange composed of the outer peripheral wall 301 and the base plate 302 in the factory. Then, the forged flange is welded to the cylinder 401 of the steel cylinder 4. After welding, concrete is poured to form the concrete part 105. After curing and painting, the mounting plate 303, slide rail 305, slider 306 and rod 307 are installed on the inside of the forged flange to form a complete bottom prefabricated unit, which is then shipped to the wind farm as a whole.
[0057] In some embodiments, a protective wall 311 is provided between the outer edge of the mounting plate 303 and the substrate portion 302.
[0058] Using the above technical solution, the protective wall 311 is disposed between the outer edge of the mounting plate 303 and the base plate 302, which can form a protective enclosure for the anchoring components 3 such as the mounting plate 303, slide rail 305, and slider 306, reducing the ingress of external moisture, debris, and corrosive media, and improving the sealing, corrosion resistance, and durability of the anchoring area. In specific implementation, the protective wall 311 has a conical cylindrical structure with a diameter that gradually decreases from top to bottom. The upper end of the protective wall 311 can be fixedly connected to the base plate 302, and the lower end of the protective wall 311 can be fixedly connected to the mounting plate 303.
[0059] In some embodiments, the channel extends through the mounting base in the vertical direction, and a protective cover 310 for protecting the lower end of the prestressed steel strand 2 and the periphery of the lower anchor head 9 is fixedly connected to the lower side of the mounting base.
[0060] Using the above technical solution, the channel runs through the installation base in the vertical direction. The protective cover 310 is fixed to the lower side of the installation base and covers the lower end of the prestressed steel strand 2 and the periphery of the lower anchor head 9. This can isolate the anchoring end from the external environment, reduce the erosion of the lower anchor head 9 and steel strand by moisture, debris, etc., and improve the durability and reliability of the anchoring end. At the same time, the protective cover 310 can be prefabricated and installed in the factory, which is conducive to realizing on-site cavity-free construction.
[0061] As a preferred example, a first conical surface 312 for guiding and centering can be provided on the inner circumference of the protective cover 310, and a second conical surface 901 can be provided on the outer circumference of the lower anchor head 9. The first conical surface 312 and the second conical surface 901 cooperate to guide and center the lower anchor head 9, which helps to guide the lower anchor head 9 to automatically center during the downward cable release process, ensures that the lower anchor head 9 accurately reaches the anchoring position, helps to ensure that the lower anchor head 9 is evenly stressed and reliably anchored after anchoring, and helps to improve the efficiency of cable threading and anchoring construction.
[0062] As a specific example, a first through hole 304 is provided at the center of the mounting plate 303, and a second through hole is provided in the base plate portion 302. The first through hole 304 and the second through hole are coaxially arranged and form a channel. The first through hole 304 communicates with the inner cavity of the protective cover 310, and the second through hole communicates with the inner hole of the first corner column segment 101.
[0063] In one embodiment, please refer to Figures 1 to 6 The present invention provides a wind turbine tower, including a concrete foundation 5 and an anchoring module as described in any of the above. A foundation anchor 6 is pre-embedded in the concrete foundation 5, and the anchoring module is supported on the top of the concrete foundation 5. The flange 402 is fixedly connected to the foundation anchor 6.
[0064] Using the above technical solution, the anchoring module of the wind turbine tower is fixedly connected to the foundation anchor 6 pre-embedded in the concrete foundation 5 through the flange edge 402. The anchoring module is supported on the top of the concrete foundation 5, and the force transmission is direct and the connection is reliable. The concrete foundation 5 does not need to be equipped with a tensioning cavity, and the cross section is complete and continuous. Only conventional foundation construction and anchoring module installation are required on site, which can improve the overall integrity, durability and construction efficiency of the foundation.
[0065] In practical implementation, multiple second corner column segments 102 are sequentially connected to the upper side of the first corner column segment 101 to form a steel-concrete corner column 1 of the wind turbine tower. The structure of the second corner column segment 102 can refer to that of the first corner column segment 101. The inner sleeve of the first corner column segment 101 forms an inner hole, and the inner hole of the first corner column segment 101 is sequentially connected to the inner holes of the multiple second corner column segments 102 to form the prestressed duct 106 of the steel-concrete corner column 1. The prestressed duct 106 is arranged along the entire height of the wind turbine tower for the prestressed steel strands 2 to pass through.
[0066] As a preferred example, the concrete foundation 5 is a solid structure, and its top surface is a supporting plane. The flange edge 402 is supported on the top surface of the concrete foundation 5, and a high-strength grouting layer 8 can also be provided between the flange edge 402 and the top surface of the concrete foundation 5.
[0067] In some embodiments, a drainage pipe 7 is pre-embedded in the concrete foundation 5. One end of the drainage pipe 7 is connected to the bottom of the inner cavity of the steel cylinder 4, and the other end of the drainage pipe 7 extends to the outside of the concrete foundation 5.
[0068] Using the above technical solution, one end of the drainage pipe 7 pre-embedded in the concrete foundation 5 is connected to the lowest point of the bottom of the inner cavity of the steel cylinder 4, and the other end extends to the outside of the concrete foundation 5. This allows for the active drainage of any accidental water accumulation inside the steel cylinder 4, preventing water from contacting the lower anchor head 9, steel strands, and other anchoring components, thus avoiding corrosion. Combined with the upward movement of the anchoring point and the sealing protection structure, this forms a dual guarantee of "upward movement of the anchoring point + passive drainage," making the wind turbine tower suitable for scenarios near water and with high groundwater levels. During the operation of the wind turbine, if water accumulates inside the steel cylinder 4, it can be naturally drained to the outside of the concrete foundation 5 through the pre-embedded drainage pipe 7, preventing water from corroding the anchoring end and ensuring structural durability.
[0069] In one embodiment, the present invention provides a construction method, comprising the following steps:
[0070] Prefabricate any of the above anchoring modules;
[0071] Concrete foundation 5 is constructed, and foundation anchor bolts 6 are pre-embedded in concrete foundation 5.
[0072] The anchoring module is installed on the concrete foundation 5, and the anchoring module is supported downward on the top of the concrete foundation 5. The flange edge 402 is fixedly connected to the foundation anchor bolt 6.
[0073] The wind turbine tower is assembled. After the tower is assembled, the prestressed steel strand 2 is threaded. The prestressed steel strand 2 is conveyed downward from the upper end of the prestressed duct 106 of the steel pipe concrete corner column 1 of the wind turbine tower until the lower anchor head 9 connected to the lower end of the prestressed steel strand 2 passes through the channel of the installation base of the anchoring module, driving the rod 307 to move the slider 306 to the locking position. Then, the upper end of the prestressed steel strand 2 is tensioned at the top of the wind turbine tower. After reaching the design stress value, the upper end of the prestressed steel strand 2 is anchored.
[0074] Using the above technical solution, the anchoring module can be prefabricated in the factory. On-site foundation construction only requires pre-embedding the foundation anchors and installing and fixing the anchoring module. After the tower is assembled, prestressing construction is completed by releasing the cables from the top, radially locking the anchors at the bottom, and tensioning from the top. This eliminates the need for traditional foundation tensioning cavities, avoids on-site cavity construction and tensioning operations in narrow spaces, reduces construction difficulty, safety risks, and the cost of transporting and hoisting large equipment, shortens the construction cycle, and improves construction efficiency.
[0075] As a specific example, the construction method includes the following steps:
[0076] Factory prefabrication:
[0077] In the factory, the lower end of the outer sleeve 103 of the first corner column section 101 is first butt-welded to the upper end of the forged flange, which is composed of the outer peripheral wall 301 and the base plate 302. Then, the lower end of the forged flange is butt-welded to the upper end of the cylinder 401 of the steel cylinder 4, forming the bottom steel structure assembly. After the welding inspection is qualified, concrete is poured between the outer sleeve 103 and the inner sleeve 104 of the first corner column section 101 to form the concrete part 105. After the pouring is completed, curing is carried out. After the concrete reaches the design strength, anti-corrosion coating is applied. After the concrete curing and coating are completed, the anchoring assembly 3 is installed on the inside of the forged flange. Specifically, the slide rail 305 is first installed on the mounting plate 303, and then the slider 306 is slidably assembled on the slide rail 305. Then, the mounting plate 303 is connected to the forged flange, one end of the rod 307 is connected to the slider 306, and the other end extends to a position that is easy to operate. After the anchoring component 3 is installed, a protective cover 310 is installed on the outside of the forged flange and steel cylinder 4. At this point, the anchoring module has completed all prefabrication and assembly in the factory and is shipped to the wind farm site as a whole.
[0078] On-site foundation construction:
[0079] When pouring concrete foundation 5 on site, foundation anchor bolts 6 and drainage pipes 7 are pre-embedded. The inlet end of drainage pipe 7 is located directly below the installation position of steel cylinder 4, and its elevation is lower than the lowest point of the inner wall of the bottom of the cylinder 401 of steel cylinder 4. The outlet end bends and extends to the outside of the side wall of concrete foundation 5.
[0080] After the concrete foundation 5 reaches the design strength, it is leveled with a high-strength grouting layer 8, and then the flange edge 402 of the steel cylinder 4 is fastened to the concrete foundation 5 through foundation anchor bolts 6.
[0081] Tower assembly and prestressed construction:
[0082] After the tower is assembled, a suspension bracket 11 is arranged on the top of the tower, and a cable-laying wheel 10 is installed. A limiting bracket 12 and a roller 13 are installed at the top opening of each steel pipe concrete corner column 1.
[0083] Multiple strands of steel wire are bundled into a single prestressed steel strand 2, and the bottom anchoring end is pre-connected and fixed to the lower anchor head 9 by a clamp. Using the cable-releasing wheel 10 at the top of the tower, the entire bundle of steel strands is released downwards along the prestressed duct 106 inside the steel-concrete corner column 1, and the roller 13 serves to guide and reduce friction.
[0084] After the lower anchor head 9 moves through the channel to below the slider 306, it drives the rod 307 through the external pre-reserved process hole, pushing the slider 306 to slide radially inward along the slide rail 305. After the slider 306 slides to the designed position, its inner edge step locks the upper end face of the lower anchor head 9, completing the bottom radial mechanical anchoring.
[0085] After the bottom anchoring is completed, the upper end of the prestressed steel strand 2 is tensioned at the top of the tower. Once the design stress value is reached, the top wedge is anchored. After tensioning, the sealing of the protective cover 310 is checked.
[0086] To address the various defects in existing prestressed steel-concrete lattice towers caused by the tensioning cavity at the bottom, this invention provides an anchoring module, a wind turbine tower, and a construction method. The objectives of this invention are as follows:
[0087] The basic tensioning cavity was eliminated. By integrating and installing slider 306, slide rail 305 and rod 307 on the inner wall of the forged flange, the bottom radial anchor of the prestressed steel strand 2 was completed without a bottom operating chamber. This eliminated the problem of corrosion of prestressed tendons and anchors caused by water seepage in the cavity and improved the durability of the structure.
[0088] This achieves a highly efficient construction mode of "fully prefabricated in the factory and no cavity opening on site". The anchoring modules are prefabricated in the factory and shipped to the wind farm as a whole, eliminating the need for on-site cavity construction and tensioning operations in narrow spaces, thus shortening the construction period and reducing construction costs and safety risks.
[0089] After the tensioning cavity is removed, the foundation section remains intact and continuous, avoiding stress concentration and fatigue damage, and improving the overall bearing capacity and fatigue resistance of the foundation.
[0090] The pre-embedded drainage pipe 7 has its inlet end located at the bottom of the steel cylinder 4 and its outlet end leading out of the concrete foundation 5, so that the accidentally entered water can be discharged naturally, making the invention applicable to water-prone scenarios such as rivers, ditches, and high groundwater levels.
[0091] This invention has the following innovative features:
[0092] Innovation Point 1: Integrated Radial Anchor Locking Mechanism
[0093] The locking and anchoring mechanism is integrated and installed inside the forged flange. The mechanism consists of a slider 306, a slide rail 305, and a rod 307. The rod 307 pushes the slider 306 to slide radially inward along the slide rail 305, locking the upper end face of the lower anchor head 9. This design elevates the bottom anchoring point from the foundation anchor mounting groove to the inside of the forged flange, achieving mechanical bottom anchoring of the prestressed steel strand 2 without relying on the bottom operating chamber. Simultaneously, it allows the anchoring module to be prefabricated in the factory, realizing efficient construction with "fully prefabricated in the factory, no cavity opening required on site."
[0094] Innovation Point Two: In-factory Prefabrication Method for Anchoring Modules
[0095] After the outer sleeve 103 of the first corner column section 101 is welded, concrete poured, cured, and painted with the forged flange and the cylinder body 401 of the steel cylinder component 4 in the factory, the slide rail 305, slider 306, rod 307, and protective cover 310 are all installed on the forged flange to form a complete bottom prefabricated unit, which is then shipped to the wind farm as a whole. On-site, only conventional foundation construction and overall tower installation are required, eliminating the need for traditional on-site tensioning cavity construction and on-site installation of anchor components 3, significantly shortening the construction cycle and reducing construction costs.
[0096] Innovation Point 3: Prestressed process of top cable release - bottom radial anchoring - top tensioning
[0097] The process employs a "tower-top cable release, bottom radial anchoring, and tower-top tensioning" technique. A suspension bracket 11 and cable release wheel 10 are installed at the tower top to lower the entire bundle of steel strands. Rollers 13 at the top of the steel-concrete corner column 1 guide and reduce friction. At the bottom, a rod 307 drives a slider 306 to slide radially to complete the anchoring. Tensioning is then performed at the top. This method completely avoids the risks associated with tensioning operations in narrow underground cavities and eliminates the high transportation and hoisting costs of large tensioning equipment in mountainous wind farms.
[0098] Innovation Point 4: Passive Drainage System with Pre-embedded Drainage Pipe 7
[0099] During foundation construction, a drainage pipe 7 is pre-embedded. The inlet end is located at the lowest point of the inner wall of the bottom of the cylinder 401 of the steel cylinder 4, and the outlet end leads out of the concrete foundation 5, so that any accidental water accumulation inside the steel cylinder 4 can be naturally discharged. Together with the sealing structure that moves the anchor point to the inner wall of the forged flange, it forms a dual protection mechanism of "anchor point moving up + passive drainage", which fundamentally solves the risk of groundwater seeping into the anchoring area along the interface of the foundation anchor in near-water scenarios, making the present invention applicable to near-water scenarios such as the banks of rivers, ditches, lakes and areas with high groundwater levels.
[0100] The above embodiments are merely preferred embodiments provided to fully illustrate the present invention, and the scope of protection of the present invention is not limited thereto. Equivalent substitutions or modifications made by those skilled in the art based on the present invention are all within the scope of protection of the present invention. In the description of this specification, the reference to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., means that a specific feature, structure, material, or characteristic associated with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in any suitable manner in one or more embodiments or examples. Furthermore, those skilled in the art can combine and integrate the different embodiments or examples described in this specification.
Claims
1. An anchoring module, characterized in that, This includes, from top to bottom, the first corner column segment, the anchoring components, and the steel cylinder. The steel cylinder includes a cylinder body and a flange disposed at the lower end of the cylinder body, the flange being adapted to be connected to a concrete foundation by foundation anchor bolts; The anchoring assembly includes an outer peripheral wall, a mounting base, a slider, and a rod. The upper end of the outer peripheral wall is welded to the lower end of the first corner column segment, and the lower end of the outer peripheral wall is welded to the upper end of the cylinder. The mounting base is fixedly connected to the inner side of the outer peripheral wall, and the mounting base is provided with a channel for the prestressed steel strand and the lower anchor head connected to the lower end of the prestressed steel strand to pass through. The slider is installed in the mounting base in such a way that it can reciprocate linearly along the radial direction of the channel. The inner end of the rod is connected to the slider, and the outer end of the rod extends out of the outer peripheral wall. The rod is configured to drive the slider to reciprocate linearly along the radial direction of the channel between the unlocked position and the anchored position under the action of external force. When the slider is in the unlocked position, the lower end of the prestressed steel strand and the lower anchor head can pass through the channel; When the slider is in the anchor position, at least a portion of the slider extends radially inward into the channel to form a stop structure for stopping the lower anchor head on the path in which the lower anchor head moves upward along the channel.
2. The anchoring module of claim 1, wherein, The mounting base includes a base plate portion whose outer periphery is connected to the inner peripheral surface of the outer peripheral wall, a mounting plate detachably connected to the lower part of the base plate portion by fasteners, and a slide rail fixedly connected to the mounting plate. The slider is slidably mounted on the slide rail and can reciprocate linearly along the slide rail in the radial direction of the channel.
3. The anchoring module of claim 2, wherein, The mounting base is equipped with two sliders, which are located on opposite sides of the channel. Each slider has a notch on the side of the channel. When both sliders are in the anchor position, the notches of the two sliders are joined together to form a central hole through which the prestressed steel strand passes.
4. The anchoring module of claim 2, wherein, The substrate portion is located above the slider, and the substrate portion limits the slider in the upward direction.
5. The anchoring module of claim 2, wherein, The first corner column segment includes an outer sleeve and an inner sleeve, with concrete poured between the outer sleeve and the inner sleeve. The lower end of the outer sleeve is welded to the upper end of the outer peripheral wall, and the lower end of the inner sleeve is welded to the base plate portion.
6. The anchoring module of claim 2, wherein, A protective wall is provided between the outer edge of the mounting plate and the base plate.
7. The anchoring module of claim 1, wherein, The channel extends vertically through the mounting base, and a protective cover for protecting the lower end of the prestressed steel strand and the periphery of the lower anchor head is fixedly connected to the lower side of the mounting base.
8. A wind turbine tower, characterized in that The device includes a concrete foundation and an anchoring module as described in any one of claims 1-7, wherein a foundation anchor is pre-embedded in the concrete foundation, the anchoring module is supported on the top of the concrete foundation, and the flange is fixedly connected to the foundation anchor.
9. The wind turbine tower according to claim 8, characterized in that A drainage pipe is pre-embedded in the concrete foundation. One end of the drainage pipe is connected to the bottom of the inner cavity of the steel cylinder, and the other end of the drainage pipe extends to the outside of the concrete foundation.
10. A construction method, characterized by, Includes the following steps: Prefabricate the anchoring module as described in any one of claims 1-7; Concrete foundation construction is carried out, and foundation anchors are pre-embedded in the concrete foundation. The anchoring module is installed on the concrete foundation, and the anchoring module is supported downward on the top of the concrete foundation. The flange edge is fixedly connected to the foundation anchor bolt. The wind turbine tower is assembled. After the tower is assembled, the prestressed steel strands are threaded through the prestressed ducts of the steel-concrete corner column of the wind turbine tower. The prestressed steel strands are then conveyed downwards from the upper end of the prestressed ducts until the lower anchor head connected to the lower end of the prestressed steel strand passes through the channel of the mounting base of the anchoring module. This drives the rod, causing the slider to move to the locking anchor position. Then, the upper end of the prestressed steel strand is tensioned at the top of the wind turbine tower. After reaching the design stress value, the upper end of the prestressed steel strand is anchored.
Citation Information