A method and apparatus for expanding the brine discharge capacity of a sedimentation salt cavern gas storage facility

By using brine drainage and expansion tubing and downhole power drilling tools in salt cavern gas storage facilities, the solid salt in the sediment is dissolved and the brine is drained, solving the problem of sediment residue in gas storage facilities, improving the cavity formation rate and space utilization of gas storage facilities, and avoiding potential corrosion and blockage risks.

CN123109596APending Publication Date: 2026-11-17CHINA ENERGY CONSTRUCTION DEEP EARTH TECHNOLOGY (HUBEI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611428300.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies cannot effectively handle the solid salt and residual brine in the sediment of salt cavern gas storage facilities, resulting in low cavity formation rate and space utilization of the gas storage facilities, and potential risks of downhole corrosion and blockage.

Method used

By using a brine drainage and expansion tubing string, combined with downhole power drills and sand control screens, and through alternating water and air injection processes, the sediment is drilled in and the solid salt is dissolved, and the brine is discharged. The downhole power drill is used to drill into the sediment, and the alternating water and air injection processes are combined to ensure that the brine in the sediment pores is fully discharged.

Benefits of technology

It significantly improves the cavity formation rate and gas storage space utilization rate of salt cavern gas storage, solves the problem of effective utilization of sediment space, avoids the risk of corrosion and blockage caused by residue, and does not affect the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109596A_ABST
    Figure CN123109596A_ABST
Patent Text Reader

Abstract

This invention discloses a method and apparatus for brine drainage and expansion of a salt cavern gas storage facility, relating to the construction and operation of salt cavern gas storage facilities. The method includes assembling a brine drainage and expansion tubing string and lowering it into the cavity of the salt cavern gas storage facility via injection and production pipes. When the brine drainage and expansion tubing string approaches the bottom of the cavity, the downhole power drill at the bottom of the tubing string is activated, and the tubing string is slowly lowered into the salt cavern sediment to a predetermined depth. Air is injected into the annular space between the brine drainage and expansion tubing string and the injection and production pipes. Under air pressure, the brine above the sediment enters the brine drainage and expansion tubing string through a sliding sleeve on the side wall and is discharged. After the brine above the sediment is discharged, the sliding sleeve is closed, and fresh water is injected into the cavity through the brine drainage and expansion tubing string to dissolve the solid salt in the sediment. Air is then injected into the annular space between the brine drainage and expansion tubing string and the injection and production pipes. This invention can effectively treat solid salt and residual brine in salt cavern sediment residue, thereby improving the cavity formation rate and gas storage space utilization rate of the salt cavern gas storage facility.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of salt cavern gas storage construction and operation technology, and in particular to a method and apparatus for draining brine and expanding the capacity of a sediment salt cavern gas storage facility. Background Technology

[0002] Salt cavern gas storage facilities are large-scale underground gas storage facilities built on underground salt rock strata. They use water-soluble cavity creation to form underground cavities to store compressed gas, and have significant advantages such as large gas storage capacity, good sealing performance, high injection and extraction rate, and complete recovery of the underlying gas.

[0003] Water-soluble cavity construction is the mainstream technology for constructing salt cavern gas storage facilities. It involves injecting fresh water into underground salt rock layers to dissolve the salt rock and gradually shaping an underground cavity that conforms to the design. After the cavity is constructed, the brine inside the cavity is discharged through a gas injection and brine discharge process, ultimately forming a gas storage space that can be put into operation.

[0004] However, in practical engineering applications, salt rock strata generally contain insoluble impurities such as mudstone and anhydrite. Furthermore, due to limitations imposed by water dissolution kinetics, a layer of sediment residue of a certain thickness will accumulate at the bottom of the salt cavern after cavity construction. This sediment residue contains a large amount of undissolved solid salt, and the gaps between the residue particles contain a large amount of brine. Existing conventional aeration and brine removal processes rely solely on air pressure to lift the free brine above the sediment layer to the surface, failing to penetrate deep into the sediment to displace the brine in the gaps, and even less to dissolve and recover the solid salt entrained in the residue.

[0005] The aforementioned technical bottlenecks directly result in the actual effective gas storage volume of salt cavern gas storage being far lower than the theoretical design value, with low cavity formation rate and space utilization rate, leading to a waste of underground salt rock resources and engineering construction investment. At the same time, the brine remaining in the sediment voids is prone to causing problems such as downhole tubing corrosion and salt crystallization blocking the flow channels during the long-term injection and production cycle of the gas storage, posing potential risks to the long-term safe and stable operation of the gas storage.

[0006] Therefore, there is an urgent need to design a technical solution that can effectively treat solid salt and residual brine in salt cavern sediment residue, so as to improve the cavity formation rate and gas storage space utilization rate of salt cavern gas storage. Summary of the Invention

[0007] The purpose of this invention is to provide a method and apparatus for draining and expanding the brine storage capacity of a salt cavern gas storage tank, in order to solve the problems existing in the prior art. This method can effectively treat the solid salt and residual brine in the salt cavern sediment residue, thereby improving the cavity formation rate and gas storage space utilization rate of the salt cavern gas storage tank.

[0008] To achieve the above objectives, the present invention provides the following solution: This invention provides a method for expanding the capacity of a sediment salt cavern gas storage facility by draining brine, comprising the following steps: Step 1: Assemble the brine discharge expansion column and install a sand-proof screen pipe that communicates with the inside of the brine discharge expansion column below it. Step 2: Lower the brine drainage and expansion tubing into the cavity of the salt cavern gas storage tank via the injection and production gas tubing; Step 3: When the brine drainage and expansion string approaches the bottom of the cavity, start the downhole power drill at the bottom of the brine drainage and expansion string and slowly lower the brine drainage and expansion string into the salt cavern sediment to the predetermined depth. Step 4: Inject air into the annular space between the brine discharge expansion tubing and the gas injection and production tubing. Under the action of air pressure, the brine above the sediment enters the brine discharge expansion tubing through the sliding sleeve on the side wall of the brine discharge expansion tubing and is discharged. Step 5: After the brine above the sediment is discharged, close the sliding sleeve, open the sand screen tube, and inject fresh water into the cavity through the sand screen tube of the brine discharge expansion column to dissolve the solid salt in the sediment. Step six: Air is injected into the annular space between the brine discharge expansion column and the gas injection and production pipe. Under the action of air pressure, the brine produced in the sediment enters the brine discharge expansion column through the sand control screen and is discharged to the ground.

[0009] In one embodiment, the sand screen is closed during the brine drainage and expansion tubing insertion process. The sand screen is opened when the brine drainage and expansion tubing is drilled to a predetermined depth of sediment and air is injected into the cavity.

[0010] In one embodiment, the method further includes step seven, which involves alternately injecting fresh water and air into the cavity. After each injection of fresh water, the water injection is stopped and the cavity is left to soak, allowing the fresh water to fully penetrate the sediment and residue to dissolve the solid salt. Then, air is injected through the annular space to drive the brine formed after dissolving the solid salt through the sand-proof screen pipe to the brine discharge expansion column and then discharge it to the ground.

[0011] This invention also provides a brine drainage and expansion device for a sedimentation salt cavern gas storage facility, comprising an injection-production gas pipe, a brine drainage and expansion tubing string, a sand control screen, and a downhole power drill bit; the injection-production gas pipe is fixedly installed inside the wellbore of the salt cavern gas storage facility; the brine drainage and expansion tubing string is installed inside the injection-production gas pipe, and a sliding sleeve is fitted on the outer wall of the brine drainage and expansion tubing string, and a filter screen hole is opened at the side wall of the brine drainage and expansion tubing string with the sliding sleeve, the sliding sleeve being able to move axially along the brine drainage and expansion tubing string to close or open the filter screen hole; the sand control screen is located below the brine drainage and expansion tubing string, and when the sand control screen is opened, it can connect to the internal cavity of the brine drainage and expansion tubing string; the downhole power drill bit is located at the bottom of the brine drainage and expansion tubing string.

[0012] In one embodiment, a one-way valve is provided between the sand control screen and the downhole power drill bit. When the one-way valve is open, it is in one-way communication with the inside of the brine discharge expansion string, so that the liquid in the brine discharge expansion string flows into the cavity of the salt cavern gas storage tank through the one-way valve.

[0013] In one embodiment, the inner sidewall of the sliding sleeve is provided with two symmetrically arranged sealing rings. The sealing rings are in sealing sliding contact with the outer sidewall of the brine discharge expansion tube column. When the sliding sleeve moves axially along the brine discharge expansion tube column until the filter screen hole is located between the two sealing rings, the filter screen hole is closed.

[0014] In one embodiment, the sand-proof screen tube includes an outer tube and a central tube. The outer tube is coaxially and fixedly connected to the brine discharge expansion column, and the outer tube has screen holes on its side wall. The central tube has a sliding sleeve structure, and the outer diameter of the central tube matches the inner diameter of the outer tube. The central tube can reciprocate within the brine discharge expansion column to close or open the outer tube.

[0015] In one embodiment, the brine discharge expansion tubing can be connected to an external water injection pipeline. The water injection pipeline is equipped with a high-pressure safety valve and a pressure monitoring device. When the water injection pressure of the water injection pipeline is greater than a set value, the high-pressure safety valve opens to release pressure.

[0016] In one embodiment, a surface casing is fixedly and sealed inside the wellbore of the salt cavern gas storage facility. A production casing is fixedly installed inside the surface casing. The injection and production gas pipe is installed inside the production casing, and a packer is provided between the inner wall of the injection and production gas pipe and the outer wall of the brine discharge expansion pipe string.

[0017] In one embodiment, the outer tube has a double-layer structure, including an outer tube outer layer and an inner tube outer layer arranged coaxially. The inner diameter of the sieve holes in the outer tube outer layer is larger than the inner diameter of the sieve holes in the inner tube outer layer, and the outer diameter of the central tube matches the inner diameter of the inner tube outer layer.

[0018] The present invention achieves the following technical effects compared to the prior art: This invention transforms previously unusable sediment space into effective gas storage space by extracting solid salt and residual brine from sediment residue, significantly improving the cavity formation rate and overall utilization rate of salt caverns. By drilling into the sediment with downhole power drills and combining alternating water and gas injection, the brine in the sediment voids is fully drained, improving brine removal efficiency. The brine removal and expansion operation of this invention can be completed within the conventional cavity construction cycle of a gas storage facility, without extending construction time or affecting the working gas ratio or construction period. The entire tubing string structure is compact and simple, with clearly defined functions for each component and clear downhole operation procedures, demonstrating good engineering feasibility. Attached Figure Description

[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a schematic diagram illustrating the working state of the brine discharge and expansion device of the sediment salt cavern gas storage tank in one or more embodiments of the present invention. Figure 2 for Figure 1 Enlarged view of point A; Figure 3 for Figure 1 Enlarged view of point B; Figure 4 for Figure 1 Enlarged diagram of point C.

[0021] In the diagram: 1-Downhole power drill string; 2-One-way valve; 3-Sand control screen; 4-Sliding sleeve; 5-Brine drainage expansion string; 6-Injection and production gas tubing; 7-Surface casing; 8-Production casing; 9-Safety valve; 10-Packer. Detailed Implementation

[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0023] The purpose of this invention is to provide a method and apparatus for draining and expanding the brine storage capacity of a salt cavern gas storage tank, in order to solve the problems existing in the prior art. This method can effectively treat the solid salt and residual brine in the salt cavern sediment residue, thereby improving the cavity formation rate and gas storage space utilization rate of the salt cavern gas storage tank.

[0024] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0025] Example 1 refer to Figures 1-4 This embodiment provides a method for expanding the capacity of a sediment salt cavern gas storage facility by draining brine, including the following steps: Step 1: Assemble the brine discharge expansion tube column 5 and install a sand-proof screen pipe 3 below the brine discharge expansion tube column 5 that communicates with the inside of the brine discharge expansion tube column 5. Step 2: Lower the brine drainage expansion tubing 5 into the cavity of the salt cavern gas storage tank via the injection and production gas tubing 6; Step 3: When the brine discharge expansion string 5 approaches the bottom of the cavity, start the downhole power drill 1 at the bottom of the brine discharge expansion string 5 and slowly lower the brine discharge expansion string 5 into the salt cavern sediment to the predetermined depth. Step 4: Inject air into the annular space between the brine discharge expansion tube 5 and the gas injection tube 6, open the sliding sleeve, and under the action of air pressure, the brine above the sediment enters the brine discharge expansion tube 5 through the filter screen at the sliding sleeve on the side wall of the brine discharge expansion tube and is discharged. Step 5: After the brine above the sediment is discharged, close the sliding sleeve, open the sand screen pipe, and inject fresh water into the cavity through the brine discharge expansion pipe column 5 to dissolve the solid salt in the sediment. Step 6: Inject air into the annular space between the brine discharge expansion tube 5 and the gas injection tube 6. During the gas injection process, the gas injection tube can pass through the packer used for sealing at the annular space and then extend into the cavity to inject gas. A sealing ring is set at the position where the gas injection tube passes through the packer. The packer can seal the annular space and the connection position with the gas injection tube to prevent the gas in the cavity from escaping out through the annular space during gas injection. Under the action of gas pressure, the brine produced in the sediment enters the brine discharge expansion tube 5 through the sand prevention screen tube 3 and is discharged to the ground. Step 7: Alternately inject fresh water and air into the cavity. The water injection pipeline is connected to the brine discharge expansion column 5 to inject water. After each injection of fresh water, stop the water injection and let it stand and soak to allow the fresh water to fully penetrate the sediment and residue to dissolve the solid salt. Then, air is injected through the annular space to drive the brine formed after dissolving the solid salt through the sand screen pipe 3 to the brine discharge expansion column 5 and then discharge it to the ground.

[0026] This invention transforms previously unusable sediment space into effective gas storage space by extracting solid salt and residual brine from sediment residue, significantly improving the cavity formation rate and overall utilization rate of the salt cavern. By drilling into the sediment using a downhole power drill bit 1, combined with alternating water and gas injection, the brine in the sediment voids is fully discharged, improving brine removal efficiency. The brine removal and expansion operation of this invention can be completed within the conventional cavity construction cycle of a gas storage facility, without extending construction time or affecting the working gas ratio or construction period. The entire tubing string structure is compact and simple, with clearly defined functions for each component, and clear downhole operation procedures, demonstrating good engineering feasibility.

[0027] In one embodiment, the sand screen 3 can be opened or closed. During the well entry process of the brine discharge expansion string 5, the sand screen 3 is in a closed state to prevent rock cuttings from entering the interior of the brine discharge expansion string 5. When the brine discharge expansion string 5 is drilled to a predetermined depth into the sediment and air is injected into the cavity, the sand screen 3 is opened. The sliding sleeve and the filter screen holes at the sliding sleeve are located below the brine liquid level but above the sediment. The sand screen 3 is located below the sediment. Under the displacement action of air pressure, the brine in the cavity enters the brine discharge expansion string 5 through the filter screen holes at the sliding sleeve. The filter screen holes at the sliding sleeve can filter the residue in the brine, preventing the residue from entering the brine discharge expansion string 5 and causing damage and blockage to the brine discharge expansion string 5.

[0028] Example 2 This embodiment provides a brine drainage and expansion device for a sludge salt cavern gas storage facility used in the brine drainage and expansion method of Embodiment 1, referencing... Figure 1 The system includes an injection / production gas pipe 6, a brine discharge expansion string 5, a sand screen 3, and a downhole power drill string 1. A surface casing 7 is fixedly and sealed inside the wellbore of the salt cavern gas storage facility. A production casing 8 is fixedly and sealed inside the surface casing 7. The injection / production gas pipe 6 passes through the production casing 8, and a packer 10 is installed in the annular space between the injection / production gas pipe 6 and the brine discharge expansion string 5. The gas injection line can pass through the packer 10, and a sealing gasket is installed at the penetration point to prevent gas leakage from the cavity. The bottom opening of the injection / production gas pipe 6 is located in the brine within the salt cavern gas storage facility. Above the liquid surface; the brine drainage expansion tubing 5 is inserted into the injection and production gas tubing 6, and the outer wall below the brine drainage expansion tubing 5 is provided with a filter screen hole. The filter screen hole is located below the brine liquid surface but above the sediment. A sliding sleeve is fitted at the position of the filter screen hole. The sliding sleeve can move along the axial direction of the brine drainage expansion tubing 5 to close or open the filter screen hole; the sand control screen pipe 3 is located below the brine drainage expansion tubing 5 and is located inside the sediment. When the sand control screen pipe 3 is opened, it can connect to the internal cavity of the brine drainage expansion tubing 5; the downhole power drill 1 is located at the bottom of the brine drainage expansion tubing 5.

[0029] In one embodiment, a one-way valve 2 is provided between the sand control screen 3 and the downhole power drill 1. When the one-way valve 2 is open, it is in one-way communication with the inside of the brine discharge expansion string 5, so that the liquid in the brine discharge expansion string 5 flows into the cavity of the salt cavern gas storage tank through the one-way valve 2. The one-way valve 2 is located near the downhole power drill 1. When the downhole power drill 1 drills downward in the cavity, the filter screen holes of the sand control screen 3 and the sliding sleeve are closed, and the one-way valve 2 is opened. External brine or other liquids are injected into the drilling position through the brine discharge expansion string 5 and the one-way valve 2, thereby cleaning and flushing the drilling position and cooling the downhole power drill 1 to ensure the safety of the drilling process.

[0030] In one embodiment, the inner side of the sliding sleeve 4 is provided with two symmetrically arranged sealing rings. The sealing rings slide and seal against the outer wall of the brine discharge expansion tube 5. A filter screen hole is opened on the side wall of the brine discharge expansion tube 5. When the sliding sleeve 4 moves axially along the brine discharge expansion tube 5 until the filter screen hole is located between the two sealing rings, the filter screen hole is closed. The specific control method of the sliding sleeve 4 is the prior art. For example, a traction rod can be connected to the inner side of the top of the sliding sleeve 4. The traction rod passes through the annular space and through the packer and extends to the ground. A sealing ring is set at the position where the traction rod passes through the packer to achieve a seal at that position, so that the traction rod and the packer are slidably and sealed together. Ground operator The operator can push the sliding sleeve 4 downward or pull it upward using the traction rod, causing the sliding sleeve 4 to move axially along the outer wall of the brine discharge expansion tube 5. During the movement, the sealing ring on the inner side of the sliding sleeve 4 is always in sealed contact with the outer wall of the brine discharge expansion tube 5. When the sliding sleeve 4 slides down to the point where the filter screen hole is between the two sealing rings, the filter screen hole is closed. Conversely, when the sliding sleeve 4 moves down or up to the point where the sealing ring is disengaged from the filter screen hole, the filter screen hole connects the inside of the brine discharge expansion tube 5 with the cavity of the salt cavern gas storage tank. In addition to the above control method, the movement of the sliding sleeve 4 can also be controlled by an electric drive. The electric push rod can also control the reciprocating movement of the sliding sleeve 4.

[0031] In one embodiment, the sand-proof screen tube 3 includes an outer tube and a central tube. The outer tube is coaxially and fixedly connected to the brine discharge expansion column 5, and the outer tube has screen holes on its side wall. The central tube has a sliding sleeve structure, and the outer diameter of the central tube matches the inner diameter of the outer tube. The central tube can reciprocate within the brine discharge expansion column 5 to close or open the outer tube. In another embodiment, the central tube can also be located on the outer side wall of the outer tube, forming an opening and closing mechanism similar to that of the sliding sleeve 4. To increase the filtration effect on residues in the brine, in one embodiment, the outer tube has a double-layer structure, including an outer layer and an inner layer arranged coaxially. The inner diameter of the screen holes in the outer layer is larger than that in the inner layer, and the outer diameter of the central tube matches the inner diameter of the inner layer. In another embodiment, a screen hole can be directly opened on the side wall below the brine discharge expansion column 5 to form the outer tube of the sand prevention screen 3. The length of the central tube is greater than the length of the outer tube. The driving structure for the central tube to move along the axial direction of the brine discharge expansion column 5 is the same as the driving structure of the sliding sleeve 4, so it will not be described in detail.

[0032] In one embodiment, the brine discharge expansion tube 5 can be externally connected to a water injection line. When water needs to be injected into the cavity, the brine discharge expansion tube 5 is connected to the water injection line; when brine needs to be discharged from the cavity, the brine discharge expansion tube 5 is connected to the brine discharge pipe. To control the safety risks during the alternating water and gas injection process, a high-pressure safety valve 9 and a pressure gauge are installed on the water injection line to ensure that the pressure-bearing capacity of the water injection line meets the requirements. Figure 1The high-pressure safety valve 9 shown is for illustrative purposes only and does not represent its specific structure or actual location. The ground-based system is equipped with a gas concentration monitoring and automatic shut-off system that automatically alarms and closes the gas injection valve when the salt concentration in the air is abnormal.

[0033] Example 3 This embodiment employs the technical solutions of Embodiments 1 and 2, specifically applied to the expansion and renovation of a single-chamber salt cavern gas storage facility. The salt cavern gas storage facility has already undergone conventional cavity construction, with a cavity diameter of 60m and a sediment residue thickness of approximately 15m. Evaluation revealed that approximately 30% of the solid salt in the sediment residue remains undissolved, and the brine volume in the voids of the residue accounts for approximately 20% of the total sediment volume, indicating significant expansion potential.

[0034] The brine discharge expansion string 5 used in this embodiment is configured as follows: The lower end is a downhole power drill 1, which uses a hydraulically driven downhole motor with a rated torque of 500 N·m; a check valve 2 is connected to it to prevent backflow of fluid within the string; above the check valve 2 is a sand screen 3, the outer tube of which is a stainless steel wire-wound screen tube, and the central tube of which is a sliding sleeve structure, with the outer diameter of the central tube matching the inner diameter of the outer tube, allowing for on / off control via surface operation; a sliding sleeve 4 is installed above the sand screen 3 to control the opening and closing of the filter screen holes on the brine discharge expansion string 5. Figure 1 The middle sliding sleeve 4 is for illustrative purposes only. Figure 1 The position of the middle sliding sleeve 4 does not represent its actual structure and position; the brine drainage expansion tubing 5 is a thickened tubing with an outer diameter of 88.9 mm; the gas injection and production tubing 6 is a casing with an outer diameter of 177.8 mm.

[0035] The specific steps are as follows: Step 1: Lower the assembled brine drainage and expansion tubing 5 into the salt cavern gas storage tank. During the well entry process, the sand control screen pipe 3 and the filter screen holes at the sliding sleeve are in the closed state.

[0036] Step 2: When the lower end of the brine discharge expansion column 5 is close to the bottom of the cavity (about 5m from the top of the sediment), open the one-way valve 2, and the ground is 15m away from the bottom. 3 Brine is pumped into the brine discharge expansion string 5 at a flow rate of / h. The brine is discharged through the check valve 2 and flushes the area where the downhole power drill 1 is located. The downhole power drill 1 is started and slowly rotates at a speed of 30r / min to drill into the sediment layer. At the same time, the brine discharge expansion string 5 is lowered at a speed of 0.5m / min. The downhole power drill 1 drives the brine discharge expansion string 5 to drill into the sediment residue layer.

[0037] Step 3: After the drilling depth reaches the predetermined value (the depth of sediment is about 12m), stop the pump and install the wellhead equipment.

[0038] Step 4: Open the sliding sleeve 4, and use the air injection pipe to inject air at a pressure of 2.0 MPa from the annular space between the brine discharge expansion column 5 and the gas injection and production pipe 6. The brine above the sediment will enter the brine discharge expansion column 5 through the filter screen at the sliding sleeve 4, and then be completely discharged to the ground facilities.

[0039] Step 5: After the brine is drained, close the sliding sleeve 4 and open the sand-proof screen tube.

[0040] Step 6: Connect the brine drainage and expansion tubing 5 to the water injection pipeline, at a length of 10m. 3 Fresh water is injected into the brine discharge expansion column 5 at a discharge rate of / h. After soaking the sediment and residue for 2 hours, the brine discharge expansion column 5 is connected to the brine discharge pipeline. The air injection pipe passes through the packer and is connected at a rate of 5m. 3 The brine, with a displacement of [amount] / h, is injected into the annular space below the packer to displace the brine produced by dissolution and the brine in the residue gaps, which is then discharged to the ground through the sand screen pipe 3 and the brine discharge expansion pipe column 5. Fresh water and air are injected alternately, with each cycle lasting approximately 4 hours.

[0041] Step 7: Repeat the alternating injection process described above. After 20 cycles, the dissolution rate of solid salt in the sludge reaches over 85%, and the total amount of brine discharged is approximately 800 m³. 3 The effective gas storage space of the salt cavern increases by approximately 1200m³. 3 Testing revealed that the gas storage chamber structure is stable and meets the requirements for safe operation.

[0042] Example 4 Based on Example 3, this example further optimizes the operating parameters. To address the low permeability of the sediment residue, an intermittent soaking stage is added during the alternating water and air injection process: after each water injection, water injection is stopped and the residue is allowed to stand for 4 hours to allow fresh water to fully penetrate into the residue and dissolve the solid salts, before air is injected for displacement.

[0043] After adopting this optimization scheme, the solid salt dissolution rate increased to 92%, the brine discharge increased by 10%, and the air consumption decreased by about 15%, resulting in a significant improvement in overall energy efficiency.

[0044] In addition, to control safety risks during the alternating water and gas injection process, a high-pressure safety valve 9 and a pressure monitoring device are installed on the water injection pipeline to ensure that the pressure-bearing capacity of the water injection pipeline meets the requirements. The facility for temporarily storing discharged brine on the ground is equipped with a gas concentration monitoring and automatic shut-off system, which automatically alarms and closes the gas injection valve when the salt concentration in the air is abnormal.

[0045] Example 5 This embodiment provides another optional brine drainage and expansion tubing string 5 configuration. For scenarios where the sediment and residue are hard and drilling is difficult, the downhole power drill 1 can be replaced with an impact drill 1, which uses hydraulic impact crushing and is combined with rotary drilling to effectively improve drilling efficiency.

[0046] Meanwhile, the outer tube of the sand control screen 3 adopts a double-layer structure. The outer layer is a coarse filter layer with a pore size of 1mm, which is used to block large solid particles; the inner layer is a fine filter layer with a pore size of 0.2mm, which is used for fine filtration. The double-layer structure reduces the risk of clogging of the sand control screen 3 while ensuring the filtration effect.

[0047] Specific examples have been used to illustrate the principles and implementation methods of this invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this invention. Furthermore, those skilled in the art will recognize that, based on the ideas of this invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of this invention.

Claims

1. A method for expanding the brine discharge capacity of a sedimentation salt cavern gas storage tank, characterized in that: Includes the following steps: Step 1: Assemble the brine discharge expansion column and install a sand-proof screen pipe that communicates with the inside of the brine discharge expansion column below it. Step 2: Lower the brine drainage and expansion tubing into the cavity of the salt cavern gas storage tank via the injection and production gas tubing; Step 3: When the brine drainage and expansion string approaches the bottom of the cavity, start the downhole power drill at the bottom of the brine drainage and expansion string and slowly lower the brine drainage and expansion string into the salt cavern sediment to the predetermined depth. Step 4: Inject air into the annular space between the brine discharge expansion tubing and the gas injection and production tubing. Under the action of air pressure, the brine above the sediment enters the brine discharge expansion tubing through the sliding sleeve on the side wall of the brine discharge expansion tubing and is discharged. Step 5: After the brine above the sediment is discharged, close the sliding sleeve, open the sand screen tube, and inject fresh water into the cavity through the sand screen tube of the brine discharge expansion column to dissolve the solid salt in the sediment. Step six: Air is injected into the annular space between the brine discharge expansion column and the gas injection and production pipe. Under the action of air pressure, the brine produced in the sediment enters the brine discharge expansion column through the sand control screen and is discharged to the ground.

2. The method for expanding the brine storage capacity of a sedimentation salt cavern gas storage facility according to claim 1, characterized in that: During the brine drainage and expansion tubing insertion process, the sand control screen is in a closed state. When the brine drainage and expansion tubing is drilled to a predetermined depth of sediment and air is injected into the cavity, the sand control screen is opened.

3. The method for expanding the brine storage capacity of a sedimentation salt cavern gas storage facility according to claim 1, characterized in that: It also includes step seven, which involves alternately injecting fresh water and air into the cavity. After each injection of fresh water, the water injection is stopped and the cavity is left to soak, allowing the fresh water to fully penetrate the sediment and residue to dissolve the solid salt. Then, air is injected through the annular space to drive the brine formed after dissolving the solid salt through the sand screen pipe to the brine discharge expansion column and then discharged to the ground.

4. A brine discharge and expansion device for a sedimentation salt cavern gas storage facility, characterized in that: include: The injection and production gas pipes are fixedly installed inside the wellbore of the salt cavern gas storage facility; A brine drainage expansion tube is inserted into the injection and production gas tube, and a sliding sleeve is fitted on the outer wall of the brine drainage expansion tube. A filter screen hole is opened at the side wall of the brine drainage expansion tube with the sliding sleeve. The sliding sleeve can move along the axial direction of the brine drainage expansion tube to close or open the filter screen hole. A sand screen is installed below the brine discharge expansion column, and when the sand screen is opened, it can connect to the internal cavity of the brine discharge expansion column. as well as The downhole power drilling tool is located at the bottom of the brine drainage and expansion tubing string.

5. The brine discharge and expansion device for a sedimentation salt cavern gas storage facility according to claim 4, characterized in that: A one-way valve is provided between the sand control screen and the downhole power drill. When the one-way valve is open, it is in one-way communication with the inside of the brine discharge expansion string, so that the liquid in the brine discharge expansion string flows into the cavity of the salt cavern gas storage tank through the one-way valve.

6. The brine discharge and expansion device for a sedimentation salt cavern gas storage facility according to claim 4, characterized in that: The inner wall of the sliding sleeve is provided with two symmetrically arranged sealing rings. The sealing rings are in sealing sliding contact with the outer wall of the brine discharge expansion tube column. When the sliding sleeve moves axially along the brine discharge expansion tube column until the filter screen hole is located between the two sealing rings, the filter screen hole is closed.

7. The brine discharge and expansion device for a sedimentation salt cavern gas storage facility according to claim 4, characterized in that: The sand-proof screen tube includes an outer tube and a central tube. The outer tube is coaxially and fixedly connected to the brine discharge expansion column, and the outer tube has screen holes on its side wall. The central tube has a sliding sleeve structure, and the outer diameter of the central tube matches the inner diameter of the outer tube. The central tube can reciprocate within the brine discharge expansion column to close or open the outer tube.

8. The brine discharge and expansion device for a sedimentation salt cavern gas storage facility according to claim 4, characterized in that: The brine discharge and expansion tubing can be connected to an external water injection pipeline. The water injection pipeline is equipped with a high-pressure safety valve and a pressure monitoring device. When the water injection pressure of the water injection pipeline is greater than the set value, the high-pressure safety valve opens to release pressure.

9. The brine discharge and expansion device for a sedimentation salt cavern gas storage facility according to claim 4, characterized in that: The wellbore of the salt cavern gas storage facility is fixedly sealed with a surface casing, and a production casing is fixedly installed inside the surface casing. The injection and production gas pipe is installed inside the production casing, and a packer is provided between the inner wall of the injection and production gas pipe and the outer wall of the brine discharge expansion pipe string.

10. The brine discharge and expansion device for a sedimentation salt cavern gas storage facility according to claim 7, characterized in that: The outer tube has a double-layer structure, including an outer tube outer layer and an inner tube outer layer arranged coaxially. The inner diameter of the sieve holes in the outer tube outer layer is larger than the inner diameter of the sieve holes in the inner tube outer layer. The outer diameter of the central tube matches the inner diameter of the outer tube inner layer.