Unconventional Protective Layer Rock Pre-splitting Layer Hydraulic Splitting Method
By using layered limiting splitting rods, precise splitting and crack control of hard rock in unconventional protective layer mining has been achieved, solving the problems of mining height control and protective layer integrity, and improving mining efficiency and safety.
Patent Information
- Application Number
- CN202611562086.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-10
- Publication Date
- 2026-11-17
AI Technical Summary
In unconventional protective layer mining, existing technologies struggle to achieve precise splitting and crack control in hard rock, leading to difficulties in controlling mining height, damage to the integrity of the protective layer, and poor pressure relief.
A layered limiting splitting rod is used. The layered location is determined by the survey data. The splitting head with limiting ribs expands radially in the borehole to form a local compressive stress boundary, which inhibits crack crossing. The splitting pressure and holding time are matched according to the layer to achieve precise crack initiation and arrest.
It achieves precise control of mining height, reduces the difficulty of coal cutting by mining machines, avoids the reduction of strength in non-mining sections, ensures the integrity of the protective layer structure and the pressure relief effect, and adapts to the safety of underground operations in high gas and water-scarce areas.
Smart Images

Figure CN123109654A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mining safety and rock mechanics control technology, specifically to an unconventional protective layer rock pre-splitting layer hydraulic splitting method, applicable to unconventional protective layer mining scenarios where thin coal seams, semi-coal-rock or rock layers are used as protective layers. Background Technology
[0002] In the prevention and control of coal mine outbursts, protective layer mining is an internationally recognized effective regional outburst prevention measure. Its significance lies in reducing the outburst risk by first mining a layer of coal or rock, thereby relieving pressure on adjacent outburst-prone coal seams, increasing permeability through fractures, and transferring stress. Conventional protective layers are generally selected from coal seams with no or relatively low outburst risk. However, in mines with a single main coal seam or where all coal seams are outburst-prone, there are no suitable conventional protective layers. The mining height is primarily determined by the distance from adjacent coal seams and the intermediate lithology. To ensure sufficient pressure relief for the adjacent target coal seam (the protected layer), the working face mining height is generally controlled above 1.8m. However, in such mines, there are no non-outburst-prone coal seams with a thickness exceeding 1.8m. With current technology and equipment, it is difficult to further reduce the mining height of high-powered coal mining machines; therefore, the working face mining height is generally controlled above 1.8m.
[0003] To address this, the project proposed unconventional protective layers such as thin coal seams, semi-coal-rock, and rock. The significance of these layers lies in their flexibility in selection, uniform pressure relief, and adjustable mining height, which can provide regional governance pathways for outburst-prone mines that do not have the conditions for conventional protective layers.
[0004] The difficulty of unconventional protective layer mining lies in the fact that, in order to meet the requirements of mining height and pressure relief, it is often necessary to break through the roof rock of the coal seam at a certain height. Taking the B1301 protective layer working face of Jinling Coal Mine of Zhengzhou Dengcao Enterprise Group as an example, the planned coal seam to be mined is No. 2 coal seam, with an average coal thickness of 0.8m and a mining height of 1.8m; the roof of No. 2 coal seam is soft rock layer 3, above which are limestone and fine sandstone, which constitute hard rock layer 1 that needs to be weakened in advance.
[0005] If the hard rock in the roof cannot be sufficiently weakened as expected, the coal mining machine will have a large cutting load, frequent component damage, and difficulty in controlling the mining height.
[0006] If the weakening range gets out of control, and cracks penetrate the rock strata interface and enter the structural layer that should be protected, it will damage the integrity of the unconventional protective layer, weaken the pressure relief effect, and even induce new surrounding rock disturbances.
[0007] Therefore, the technology truly needed in this scenario is not simply "splitting the rock," but rather "precisely splitting it according to its layers, fully fracturing it within the target layer, and actively stopping the cracks at the layer boundaries."
[0008] Based on existing data, the weakening of hard rock strata has long evolved along the path of "creating weak surfaces - driving propagation - forming a continuous surface". The early mainstream approach was blasting weakening, which uses explosives to create fractured and fissure zones in the rock mass, thereby weakening the integrity of the roof by propagating the blasted cracks.
[0009] Subsequently, hydraulic fracturing, gas phase fracturing, and integrated weakening methods were developed, which utilize high-pressure fluids, gases, or phase change energy to create fractures in the borehole and then propagate the fractures through continuous high pressure.
[0010] Subsequently, in order to avoid the limitations of blasting in high-gas mines, the ideas of hydraulic mechanical fracturing and slotting-assisted fracturing emerged. That is, firstly, slotting, jetting or particle cutting is used to create a guide weak surface, and then hydraulic splitting mechanism is used to expand and fracture the rock.
[0011] Continuous multi-point splitting inside the borehole represents another direction of extension, namely, inserting the splitting gun entirely into the borehole, increasing the thrust and stroke through multi-stage series hydraulic cylinders, splitting at the borehole opening and then lowering it a certain distance to repeat the splitting until the bottom of the borehole.
[0012] Existing literature 1 (CN113565505A) discloses a hydraulic rock breaking technology for continuous multi-point splitting within a borehole. This technology involves inserting a splitting gun, based on a multi-stage series of hydraulic cylinders, into the borehole and gradually lowering it until it is fully positioned inside the borehole. First, the borehole opening is split. Then, the return valve is opened to retract the wedge, separating the splitting front support from the borehole wall. The splitting gun is moved downwards a certain distance, and the oil injection and splitting are repeated, allowing the second splitting point to connect with the first splitting point at the borehole opening. This process of lowering and splitting is repeated until a macroscopic fracture surface is generated throughout the entire borehole depth. The technical contribution of this approach lies in extending the traditional splitting head, which can only operate in shallow holes, into a complete gun capable of continuous operation along the borehole axis. Its core objective remains increasing the splitting depth and improving rock breaking efficiency.
[0013] Existing document 2 (CN109779633A) discloses a hydraulic directional fracturing weakening method for hard roofs in coal mines. After drilling, this method first uses a hydraulic axial grooving drill bit to continuously cut grooves along the borehole axis to form axial slots. Then, a hydraulic splitting mechanism is pushed to the predetermined section of hard roof strata to be fractured, causing the strata to fracture and expand along the axial slots, thus completing the directional fracturing weakening. This document also discloses that the borehole diameter is not less than 75mm, a single borehole or multiple boreholes forming a directional fracturing weakening borehole group, parallel operation of each group of hydraulic splitting mechanisms, and the number of hydraulic splitting mechanisms in each group is set according to the length L of the hard roof strata section within the borehole. L is calculated using formulas based on the mining height, the bending and subsidence value of the basic roof strata, the coefficient of fragmentation, and the borehole inclination angle. The technical contribution of this approach lies in providing directional weak surfaces using axial slots and configuring splitting mechanisms according to the length of the weakened roof section.
[0014] Existing document 3 (CN111911158A) discloses a directional fracturing control and pressure relief device for hard roofs, and the corresponding directional fracturing control and pressure relief method. This method involves first drilling a fracturing borehole and flushing it, then introducing cutting particles into the flushing fluid through a venturi tube, mixing the cutting particles with the fluid. High pressure and the cutting particles then radially cut multiple grooves into the borehole. The borehole is then sealed, and finally, high-pressure fracturing fluid is used for fracturing and pressure relief, maintaining the pressure at the set maximum fracturing pressure for a certain period. The technical contribution of this approach lies in using grooves to reduce the difficulty of fracturing initiation and propagation, and then improving the pressure relief effect through fracturing and pressure holding.
[0015] It is evident that the natural direction of the existing technology tree is to advance towards stronger power, longer range, clearer direction, and a wider range of gaps.
[0016] For hydraulic fracturing in boreholes, natural extension transforms single-point fracturing into continuous multi-point fracturing, and connects the multi-point cracks into a macroscopic fracture surface.
[0017] For directional fracturing, natural extension involves prefabricated grooves, segmented fracturing mechanisms, and multi-pore parallel synchronous fracturing.
[0018] For fracturing and depressurization, natural extension is the process of grooving assistance, hole sealing pressurization, and pressure maintenance.
[0019] These directions all follow a common technical assumption: the easier it is for cracks to form, the more they can extend along a predetermined direction and penetrate into a surface, the more effective the weakening effect will be.
[0020] However, the aforementioned existing technologies have the following shortcomings: First, while blasting weakening has strong rock-breaking capabilities, the propagation of explosive energy is controlled by the charge structure, free surfaces, and weak bedding planes, making it difficult to stably define the energy release direction. When used in conjunction with unconventional protective layers for hard rock treatment, the blast impact and blast-induced cracks can easily disturb the rock strata interface, posing a risk of compromising the integrity of the protective layer. In high-gas mines, blasting operations are subject to even stricter safety constraints. Rock strata weakening has long followed the engineering inertia of "blasting to create cracks - crack propagation - roof collapse." When introducing unconventional protective layers, the field still tends to use new technologies to implement the existing "through-weakening" approach. Existing technologies focus on explosive energy driving crack propagation, lacking a control mechanism for rock strata interfaces as termination boundaries.
[0021] Second, hydraulic fracturing alone carries risks such as insufficient fracturing capacity, limited fracture size, and insufficient stability in the separation of layers in tight hard rock, and it relies on continuous water supply and high-pressure pumping. While slot-assisted fracturing reduces the difficulty of fracturing initiation by using slots, it still requires the combined action of flushing fluid, cutting particles, sealing fluid, and high-pressure fracturing fluid, resulting in a long process chain. Fluid supply, sealing reliability, and the capacity of high-pressure equipment directly affect operational feasibility. In water-scarce areas, under conditions of high gas intrinsic safety constraints, and confined downhole space, the application of this approach is limited.
[0022] More importantly, the goal of existing literature 3 is still to form a fracturing and pressure relief channel, without identifying the rock layer interface as the control boundary for different layer operations. Hydraulic fracturing and slotting fracturing have developed along the path of "high-pressure fluid fracturing - pressure holding and propagation - pressure relief and flow path formation". After introducing unconventional protective layer scenarios, the improvement is still mainly in the direction of enhancing the fracturing ability of fluid. Existing technologies focus on the driving of high-pressure fluid on the borehole wall or the root of the slot, and lack static fracturing boundaries that do not depend on a continuous process water source and limit the fracture range according to the layer.
[0023] Third, existing literature 1 has achieved continuous multi-point splitting within the same borehole, but the splitting location is determined by the mechanical lowering step distance. The length, cross-sectional area, and stroke of each cylinder are equal. The operational logic is to split the borehole opening, lower it a certain distance, split it again, and then penetrate it again until a macroscopic fracture surface is formed throughout the entire borehole. This approach solves the problem of insufficient splitting depth, but it inherently pursues axial penetration, cannot distinguish between the target hard rock layer, the protective layer, and adjacent rock layers, and cannot actively stop the splitting when reaching the rock layer interface.
[0024] When used for high-precision control of unconventional protective layers, this "penetration-oriented" logic amplifies the risk of cross-layer crack disturbance. The evolution of hydraulic fracturing in boreholes from "shallow-hole single-point fracturing" to "whole-wide entry and multi-point stepping" naturally follows the path of multi-stage series cylinders, equal-stroke stepping, and crack interconnection. Current technology focuses on determining the fracturing point and the interconnection of multiple cracks based on mechanical stroke, lacking an information control chain that uses pre-construction survey data to determine the fracturing layer and the operational boundaries within the layer.
[0025] Fourth, existing literature 2 has achieved axial groove guidance, configuration of splitting mechanisms according to the length of hard roof strata, and multi-pore parallel directional fracturing. However, its orientation relies on pre-cut groove geometry guidance, and its segment length L serves the calculation of the weakened roof segment and caving filling height, which is not layer interface management under unconventional protective layer mining height control. This approach does not disclose the independent matching of splitting pressure and holding time for different lithological strata, nor does it disclose the setting of limiting ribs at the root of the splitting head to form high radial compressive stress concentration on the borehole wall through local contact compression, thereby inhibiting cracks from crossing the preset strata. The development of directional fracturing technology from "free surface blasting" to "axial groove guidance" and "multi-pore parallel fracturing" is to implement the existing directional extension idea with a more explicit weak surface geometry. Existing technologies focus on pre-fabricated grooves to guide cracks to penetrate along a predetermined direction, lacking a mechanism that does not rely on pre-cut grooves but actively constructs compressive stress-induced crack arrest boundaries on the borehole wall.
[0026] Fifth, existing technologies still fall short in terms of automation and safety adaptation. Traditional manual hydraulic fracturing equipment lacks layered positioning and limiting structures, requiring repeated manual adjustments to the equipment position when processing hard rock formations. Under the high oil pressure required for hard rock fracturing, cracks easily penetrate across layers. Manual pressure adjustment struggles to match the stable pressure-holding load required for hard rock, resulting in uneven pressure relief across layers. Furthermore, the high gas, high dust, and confined spaces downhole necessitate equipment with explosion-proof, intrinsically safe, integrated, and interlocking protection capabilities. This deficiency dictates that the new approach must possess engineering usability.
[0027] In summary, the common logic of existing technologies is: weakening a rigid top plate = pre-set weak surface to guide crack creation + high pressure or expansion cracking to drive crack propagation + drilling through the surface.
[0028] This logic is reasonable in scenarios where timely roof collapse or the formation of pressure relief channels is required. However, in unconventional protective layer mining, the technical objective is changed to "only weaken the hard rock of the coal seam roof corresponding to the mining height, while maintaining the integrity of the protective layer structure." At this point, the existing understanding that "the larger the penetration, the more effective" no longer holds true. What truly needs to be established is a new technical logic: precise weakening of hard rock in unconventional protective layers through layered stratification = exploration data-driven layer identification, positioning, and parameter adjustment + root-limiting ribs constructing high radial compressive stress boundaries within the strata to prevent cracking + superposition of multiple parallel pores within the strata to induce cracking zones.
[0029] Therefore, how to precisely weaken hard rock at preset strata in unconventional protective layer working faces, while inhibiting cracks from penetrating across layers to the protective layer or adjacent strata, in order to achieve precise control of mining height, sufficient pressure relief of the protective layer, and efficient mining, has become a technical problem that urgently needs to be solved in this field. Summary of the Invention
[0030] The purpose of this invention is to provide a hydraulic fracturing method for pre-splitting unconventional protective layer rocks. This method is used in borehole hydraulic fracturing operations during unconventional protective layer mining. It defines the fracturing action segment based on the stratification location and constructs a local compressive stress boundary on the borehole wall to suppress crack crossing, thereby weakening the uniaxial tensile strength of the rock in the mining segment to reduce the cutting difficulty of the coal mining machine, and avoiding the reduction of the uniaxial tensile strength in the non-mining segment to reduce the difficulty of roof and floor maintenance during the mining process.
[0031] To achieve the above objectives, the present invention adopts the following technical solution: a hydraulic fracturing method for pre-splitting and layering rock in unconventional protective layer working faces, taking the overlying strata of coal seams in unconventional protective layer working faces as the object, the method comprising: Based on the pre-construction survey results and the stratification locations determined according to the mining height control requirements, the coal seam and its overlying strata are divided into mining sections and non-mining sections along the vertical direction. The mining section is located below the stratification location and includes the coal seam and its roof strata within the mining height range, and is hollowed out after mining. The roof strata of the coal seam need to be fractured to reduce its integrity and strength. The non-mining section is located above the stratification location and is a section that is retained to form a roof after mining and should not be disturbed by macroscopic through-cracks during splitting operations. The stratification location is the position corresponding to the coal mining height of the coal mining machine from the bottom of the coal seam upwards. In this embodiment, the coal mining height of the coal mining machine is 1.8m, that is, 1.8m upwards from the bottom of the coal seam. The strata interface is not used as the dividing line between the mining section and the non-mining section.
[0032] The mining height control requirement described in this invention refers to the range and degree of strata control required for the pre-fractured and weakened portions of the coal seam and its roof strata in order to control the working face mining height within the designed mining height. The mining height control requirement is determined based on the working face mining height, roof management requirements, on-site mine pressure observation data, and the interlayer spacing and intermediate lithology between the unconventional protective layer and the protected layer, generally controlling the working face mining height to be above 1.8m to ensure sufficient pressure relief for the protected layer. The mining height is a working parameter of the coal mining machine. When the coal mining height of the coal mining machine changes, the stratification position is the position corresponding to the changed coal mining height from the bottom of the coal seam upwards.
[0033] A layered limiting splitting rod, equipped with a splitting head and a limiting rib, is inserted into the borehole. The limiting rib is located at the root of the splitting head, positioning the layered limiting splitting rod along the borehole axis in the mining section. The splitting head is controlled to expand radially to compress the borehole wall, causing the circumferential tensile stress in the borehole wall within the mining section to exceed the tensile strength of the coal seam roof strata, thereby initiating and propagating cracks in the coal seam roof strata within the mining section. The limiting rib, as it expands radially, presses against the borehole wall, forming a local compressive stress boundary on the borehole wall at the root of the splitting head. This local compressive stress boundary inhibits crack propagation beyond the layered location towards the non-mining section.
[0034] Furthermore, before inserting the layered limiting splitting rod into the borehole, the method further includes: obtaining the strata interface depth, lithology, uniaxial compressive strength, layer thickness, and geostress level of the overlying strata of the coal seam through coring, borehole imaging, and stress detection, and recording the exploration results into the layered parameter template library of the control system; the layered position is determined according to the exploration results and mining height control requirements.
[0035] Furthermore, after the layered limiting splitting rod is positioned along the borehole axis in the mining section, the control system automatically matches the splitting pressure and holding time corresponding to the mining section from the layered parameter template library; the splitting pressure is controlled according to the initial pressure template of uniaxial compressive strength grading. The initial pressure template specifies: for weak rock layers with a uniaxial compressive strength of less than 30 MPa, the splitting pressure is 10-20 MPa, including both values; for medium-hard rock layers with a uniaxial compressive strength of 30-60 MPa, the splitting pressure is 20-35 MPa, including both values; for hard rock layers with a uniaxial compressive strength of 60-120 MPa, the splitting pressure is 35-50 MPa, including both values; and for extremely hard rock layers with a uniaxial compressive strength greater than 120 MPa, the splitting pressure is 50-60 MPa, including both values.
[0036] Furthermore, the pressure holding time is obtained by the control system from the layer parameter template library. The pressure holding time is determined based on the layer thickness, uniaxial tensile strength and in-situ stress level of the roof strata of the coal seam in the mining section, combined with engineering experience values of similar engineering geological conditions.
[0037] Furthermore, the method also includes: multiple layered limiting splitting rods are respectively inserted into multiple boreholes arranged along the unconventional protective layer working face to work in parallel and in coordination, and load each row of boreholes in a top-down order, so that the top row of boreholes first forms a complete interface; the cracks that initiate in each mining section, the pressure relief disturbance zone and the micro-fracture damage zone formed around the boreholes are superimposed and connected in each mining section, so as to weaken the integrity and strength of the rock strata in each mining section as a whole.
[0038] Furthermore, multiple layered limiting splitting rods operating in parallel are connected to the same integrated explosion-proof hydraulic power unit. The pump group of the integrated explosion-proof hydraulic power unit supplies pressure to each layered limiting splitting rod in a coordinated manner. After the splitting operation of a single hole or all holes on the entire working face is completed, the machine is stopped in sequence, the shut-off valve is closed, the pressure is released to the return oil, the gauge pressure is confirmed to be zero, and then the layered limiting splitting rods are retrieved.
[0039] Furthermore, during the operation of the layered limiting splitting rod, the limiting ribs sequentially satisfy the following conditions: in the low-pressure positioning stage before the radial expansion of the splitting head, the limiting ribs do not interfere with the borehole wall, so that the layered limiting splitting rod can be lowered along the borehole to the mining section; in the high-pressure splitting stage during the radial expansion of the splitting head, the limiting ribs are pressed into the micro-protrusions on the borehole wall surface to form a frictional lock with the borehole wall, so as to prevent the layered limiting splitting rod from axially retracting; in the depressurization and recovery stage after the splitting operation is completed, the limiting ribs detach from the borehole wall, so that the layered limiting splitting rod can be withdrawn from the borehole.
[0040] Furthermore, along the direction of the working face advance, the boreholes are arranged in segments of 4m each within the mining stratum; where the mining stratum is hard limestone, the spacing between adjacent boreholes is 0.8m; where the mining stratum is fine sandstone, the spacing between adjacent boreholes is 0.5m.
[0041] Furthermore, the layered limiting splitting rod, the integrated explosion-proof hydraulic power unit that supplies high-pressure hydraulic oil to the layered limiting splitting rod, and the control system that controls the splitting operation all adopt intrinsically safe design for mining. The control system is equipped with overpressure, underpressure, and leakage safety interlocks. When there is overpressure, the pressure rise is stopped and the pressure is released. When there is underpressure, the feed is stopped and the system is locked. When there is leakage, the non-intrinsically safe side power supply is cut off and the system is locked. Before resetting the control system, the gauge pressure is confirmed to be zero.
[0042] The present invention has the following beneficial effects: This invention divides mining and non-mining sections based on the stratification locations determined by pre-construction exploration results and mining height control requirements. The splitting location is determined by exploration data rather than mechanical stroke, breaking through the existing technical route of hydraulic splitting in boreholes developing along the direction of "equal stroke step, point-by-point penetration to form a surface". It belongs to the paradigm adjustment from "penetration tool" to "stratification boundary control tool" in this direction. By limiting the splitting action section according to the stratification location, under the constraint of unconventional protective layer mining height control, it makes it possible to accurately process the roof strata of the coal seam corresponding to the mining height.
[0043] This invention features a limiting rib at the root of the splitting head of a layered limiting splitting rod. During radial expansion loading, the limiting rib presses into the micro-protrusions of the borehole wall with a small contact area to form frictional locking, creating a high-amplitude radial compressive stress concentration zone tangentially to the borehole wall. When the tension crack tip extends into this region in the vertical direction, the tension environment conducive to crack propagation is constrained by the high radial compressive stress field, causing a decrease in the stress intensity factor at the crack tip. This makes it difficult for the main crack to continue along its original direction and makes it prone to path deflection. This feature does not directly participate in crack initiation but actively constructs a stress abrupt change interface in a manner similar to a "crack control gate," confining the macroscopic crack within a preset layer segment. This provides an active crack arrest mechanism within the borehole and is a key structure for suppressing crack crossing and protecting the integrity of adjacent protective layers.
[0044] This invention classifies and matches fracturing pressure according to the uniaxial compressive strength of the mining section, and matches the holding time according to the layer thickness, uniaxial tensile strength, and in-situ stress level. This classification is not a fine-tuning of the parameters of existing isobaric operations, but a differentiated parameter supply based on the mechanical nature that "the tensile strength of rock is only 3 / 100 to 1 / 10 of the compressive strength, and fracturing only requires the tensile stress of the borehole wall to exceed the tensile strength; excessive pressure will cause cross-layer penetration" and the energy criterion that "the stress intensity factor at the crack tip must be maintained higher than the fracture toughness of the rock during the holding stage". This allows the fracturing parameters of each layer to be matched independently and without interference, realizing feedforward control of "adjusting pressure and holding time according to layer".
[0045] This invention achieves a closed-loop process of "layer identification---positioning---parameter adjustment---fracture initiation---fracture arrest": the stratigraphic level and mechanical parameters output by the rock strata exploration module are entered into the strata parameter template library; the multi-level positioning automatic feeding mechanism delivers the strata-limiting splitting rod to the preset layer; and the intrinsically safe mining PLC automatically calls the splitting pressure and holding time according to the current layer. This closed loop transforms the flow of technical information from the geometric guidance of existing technologies to feedforward control, overcoming the shortcomings of manual pressure adjustment in matching the stable holding load of hard rock and the uneven pressure relief of each layer, thus achieving independent and precise fracturing at each layer.
[0046] This invention supports the parallel and collaborative operation of multiple layered limiting splitting rods in multiple boreholes on the same working face. Through the linkage of pump groups, the fracturing zone, pressure relief disturbance zone and micro-crack damage zone of multiple boreholes are superimposed and connected to each other, realizing regional strength weakening from point to surface. Unlike the existing multi-hole synchronous directional fracturing, the premise of multi-hole parallel operation in this invention is that each borehole completes intra-layer fracturing and inter-layer boundary fracturing respectively. The superimposed object is the intra-layer fracturing zone rather than the cross-layer through surface, serving regional weakening rather than collapse into a surface.
[0047] This invention weakens the uniaxial tensile strength of the mining section, reducing the difficulty of coal cutting by the coal mining machine; it avoids the reduction of uniaxial tensile strength in non-mining sections, reducing the difficulty of roof and floor maintenance during mining.
[0048] This invention employs static hydraulic loading, eliminating the need for blasting and a continuous process water supply system. This reduces safety constraints and dependence on water sources for blasting operations in high-gas mines, making it suitable for water-scarce areas, intrinsically safe high-gas conditions, and confined underground spaces. An integrated explosion-proof hydraulic power unit, an intrinsically safe mining PLC, and triple safety interlocks for overpressure, underpressure, and leakage ensure safe underground operations.
[0049] This invention features fully developed fractures within the mining section, resulting in reduced rock mass integrity and strength, thus lowering the cutting load and difficulty of the coal mining machine. Non-mining sections are not disturbed by macroscopic through-cracks, preventing a decrease in rock strength outside the mining height control range and reducing the difficulty of roof and floor maintenance during mining. This ensures the integrity of the unconventional protective layer structure and the stability of the pressure relief channel, while simultaneously achieving precise mining height control, sufficient pressure relief of the protected layer, and efficient mining. Attached Figure Description
[0050] Figure 1 A schematic diagram of the unconventional protective layer rock strata structure, borehole layout, and layered limiting splitting rods; Figure 2 This is a schematic diagram of an integrated explosion-proof hydraulic power unit; Figure 3 This is a flowchart illustrating the construction process of the present invention. Figure 4 This is a comparison diagram of the borehole inner wall condition before and after pre-splitting. Detailed Implementation
[0051] In this invention, unless otherwise explicitly stated, the numerical range includes both ends.
[0052] Taking the B1301 protective layer working face of Jinling Coal Mine, Zhengzhou Dengcao Enterprise Group, as an example, the planned coal seam to be mined is No. 2 coal seam, with an average coal thickness of 0.8m and a mining height of 1.8m. During construction, a 4m splitting section is used, with a hole spacing of 0.8m for hard limestone and 0.5m for fine sandstone. Figure 1 and Figure 2 As shown, before construction, the rock strata interface 2 was delineated by core sampling, borehole imaging and stress detection. The stratigraphic position, lithology and mechanical parameters of hard rock layer 1, soft rock layer 3 and coal seam 4 were determined and entered into the stratification parameter template library.
[0053] like Figure 1 As shown, the hard rock layer 1 is located above the soft rock layer 3, and the soft rock layer 3 is located above the coal seam 4. The rock strata interface 2 is the natural interface between the hard rock layer 1 and the soft rock layer 3. The borehole 5 is arranged along the working face. When there are no obvious weak interlayers inside the coal seam 4, the stratification position can also be set in the rock strata above the coal seam 4 according to the mining height control requirements. The stratification position and the boundary of the non-mining section above form the boundary of the stratification position.
[0054] The mining height control requirement described in this invention refers to the range and degree of strata control required for the pre-fractured and weakened portions of the coal seam and its roof strata in order to control the working face mining height within the designed mining height. The mining height control requirement is determined based on the working face mining height, roof management requirements, on-site mine pressure observation data, and the interlayer spacing and intermediate lithology between the unconventional protective layer and the protected layer, generally controlling the working face mining height to be above 1.8m to ensure sufficient pressure relief for the protected layer. The mining height is a working parameter of the coal mining machine. When the coal mining height of the coal mining machine changes, the stratification position is the position corresponding to the changed coal mining height from the bottom of the coal seam upwards.
[0055] The limiting rib 6 is located at the root of the splitting head of the layered limiting splitting rod. In actual mines, the hard rock layer 1 can be limestone, fine sandstone, or other coal seam roof strata that require pre-fracture and weakening. The construction objective is to form sufficient fractures in the coal seam roof strata within the mining section, while simultaneously preventing macroscopic through cracks from crossing the stratification location and disturbing the non-mining sections.
[0056] The coal seam and its overlying strata are divided into mined and unmined sections along the vertical direction. The mined section is the section excavated after mining within the mining height range, including coal seam 4 and the roof strata above it. The roof strata include soft rock layer 3 and hard rock layer 1. The splitting operation targets the roof strata within the mined section. The unmined section is located above the stratification point and is the section where the roof is preserved after mining and should not be disturbed by macroscopic through-cracks during the splitting operation. The stratification point is the position corresponding to the mining height of the coal mining machine from the coal seam floor upwards. In this embodiment, the mining height of the coal mining machine is 1.8m, i.e., 1.8m upwards from the coal seam floor. The top row of boreholes is located at the stratification point, where the strata are either soft rock layer 3 or hard rock layer 1. The strata interface 2 is not used as the boundary between the mined and unmined sections.
[0057] When the mining height line falls within the soft rock layer 3, the top row of boreholes is located within the soft rock layer 3; when the sum of the thickness of the soft rock layer 3 and the thickness of the coal seam is less than the mining height, the mining height line enters the hard rock layer 1, and the top row of boreholes is located within the hard rock layer 1.
[0058] The mining section is determined by the mine's production technology department based on the engineering matching relationship between the mining height and the mechanical properties of the roof strata. Specific criteria include: geological survey reports, providing lithology, thickness, and uniaxial compressive strength of each roof stratum; mining design documents, specifying the working face mining height and roof management requirements; and on-site mine pressure monitoring data, including initial pressure step distance, periodic pressure step distance, and support load. When the uniaxial compressive strength of the hard roof strata is greater than 60 MPa, or when the uniaxial compressive strength is 30–60 MPa and the thickness is greater than 1 / 2 of the mining height, and mine pressure monitoring confirms that it is prone to forming large-area overhangs in the goaf, this hard roof stratum is identified as a coal seam roof stratum requiring fracturing to reduce its integrity and strength.
[0059] like Figure 2 As shown, the integrated explosion-proof hydraulic power unit consists of a valve assembly 7, a high-pressure oil pump 8, an explosion-proof motor 9, a tracked vehicle 10, and an oil tank 11. The entire unit moves to the working face with the tracked vehicle 10 and is then anchored. The explosion-proof motor 9 drives the high-pressure oil pump 8, which supplies hydraulic oil to the layered limiting and splitting rods through the valve assembly 7. The oil tank 11 supplies oil to the high-pressure oil pump 8 and receives return oil. The integrated explosion-proof hydraulic power unit is anchored after moving to the working face with the tracked vehicle 10, which centralizes and organizes the hydraulic pipelines and reduces the risk of leakage.
[0060] The layered limiting splitting rod is connected to the integrated explosion-proof hydraulic power unit via hydraulic lines. The splitting head of the layered limiting splitting rod is used for radial expansion within the borehole, and the limiting rib 6 is located at the root of the splitting head. There is no need to change the size and specifications of the splitting head; only different splitting pressures and borehole spacing need to be selected according to the rock strata properties.
[0061] The interior of the layered limiting splitting rod can adopt a composite sealing structure to improve its resistance to dust and water corrosion.
[0062] The limiting rib 6 is an elastic rib that is spaced along the outer circumference of the splitting rod. The limiting rib 6 is made of spring steel or elastic alloy steel, and the cross-section of the rib is arc-shaped or trapezoidal. The maximum outer diameter of the limiting rib 6 before radial expansion is smaller than the borehole diameter to ensure that it does not get stuck when lowered into place under low pressure. During high-pressure splitting, under the action of hydraulic expansion, the limiting rib 6 is squeezed and engaged with the borehole wall to form an anchor. After depressurization, as the splitting rod contracts, the limiting rib 6 disengages from the borehole wall so that the splitting rod can be smoothly withdrawn.
[0063] The layered intelligent control unit is connected to an integrated explosion-proof hydraulic power unit and a multi-stage positioning automatic feed mechanism. The multi-stage positioning automatic feed mechanism is used to feed the layered limiting splitting rod into borehole 5 and stop it at a preset layer position. The layered intelligent control unit has a built-in layered parameter template library. Its inputs include at least the depth, lithology, uniaxial compressive strength, layer thickness, and in-situ stress level of the rock layer interface 2. Its outputs include at least the feed stop position, splitting pressure setting value, pressure holding time setting value, pressure relief command, and reset command. Its feedback includes at least the actual pressure, feed position, and lockout status.
[0064] Regarding the fields in the layered parameter template library, feed stop confirmation criteria, layer error handling rules, multi-hole coordination timing, effective fracturing radius, fracturing arrest safety distance, and pressure holding time control, this invention is not limited to fixed values, criteria, or timing. The aforementioned fields, parameters, criteria, timing, and handling rules are determined based on the rock layer interface 2, lithology, uniaxial compressive strength, layer thickness, in-situ stress level, and field calibration results. Those skilled in the art, combining rock mechanics, hydraulic fracturing construction knowledge, and field exploration and testing methods, determine the corresponding parameter values and control logic.
[0065] The boreholes are in-seam boreholes drilled along the bedding planes of the coal seam, with the borehole axes arranged horizontally. The mining depth per mining cycle along the working face advance direction is 0.8m, and the mining section is removed during retreat mining. The drilling depth of the in-seam boreholes is set as an integer multiple of the mining depth, ensuring that each borehole covers an integer number of mining cycles. The spacing between adjacent boreholes is measured perpendicular to the working face advance direction.
[0066] The boreholes are arranged in multiple rows within the mining section, and are loaded sequentially from top to bottom. The top row of boreholes is located at the stratification point, and the fractures in the top row of boreholes extend horizontally and are interconnected to form a complete interface, precisely matching the mining height. The rock strata at the interface are also weakened to prevent the fractures from extending excessively upward. The area above the top row of boreholes is the non-mining section, and the area below it, down to the bottom of the coal seam, is the mining section.
[0067] The fractures in the rows of boreholes below the top row extend in all directions, weakening the overall mining section above the coal seam. The bottom row of boreholes is located at the bottom of the soft rock layer 3 and is higher than its bottom edge. The fracturing effect of the bottom row of boreholes may or may not affect coal seam 4. To save crushing energy, the fracturing effect of the bottom row of boreholes preferably does not affect coal seam 4. Coal seam 4 has low strength, so no boreholes are installed in it, and it does not require weakening; it is directly cut by the coal mining machine.
[0068] like Figure 3 As shown, the construction process of this embodiment includes the following steps.
[0069] S1. Construction preparation and drilling of borehole 5. Before construction, the rock strata interface 2 is determined by core sampling, borehole imaging and stress detection, and the stratification location is determined in combination with the mining height control requirements. The stratigraphic position, lithology and mechanical parameters of hard rock layer 1, soft rock layer 3 and coal seam 4 are measured, and the depth, lithology, uniaxial compressive strength, layer thickness and geostress level of each layer are entered into the stratification parameter template library.
[0070] S2. Determine the direction and angle of splitting within the hole.
[0071] Based on the axial direction of borehole 5, the spatial location of the layering position, and the direction of the fracture to be formed, determine the splitting direction and inclination angle of the layering limiting splitting rod in the hole.
[0072] S3. Lower the layered limiting splitting rod. The multi-level positioning automatic feeding mechanism delivers the splitting head to the preset layer corresponding to the roof stratum of the coal seam within the mining section according to the layered parameter template library.
[0073] S4. Determine the positioning and anchoring status. Determine whether the multi-level positioning automatic feed mechanism has reached the preset layer and locked, and whether the limiting rib 6 has formed an effective anchor with the hole wall; if it is not locked or the anchoring is invalid, then lower the layer limiting splitting rod again; if it is locked and the anchoring is effective, then execute S5.
[0074] S5. Start pre-fracking. First, load the top row of boreholes to extend the fractures in the top row horizontally and make them interconnected, forming a complete interface to prevent the fractures from extending excessively upwards; then load the boreholes below the top row. The layered intelligent control unit automatically calls the splitting pressure and holding time according to the current mining section. The pressure oil output from the high-pressure oil pump 8 enters the layered limiting splitting rod through the valve group 7, causing the splitting head to expand radially and apply a radial splitting load to the borehole wall. When the peak tangential tensile stress at the borehole wall exceeds the tensile strength of the coal seam roof strata, the coal seam roof strata in the mining section begin to fracture.
[0075] S6. Pressure Holding and Fracturing. After reaching the set fracturing pressure, the pressure is maintained according to the thickness of the roof strata, uniaxial tensile strength, and geostress level within the mining section. This ensures that the crack tip receives the energy input required for continued propagation, promoting the expansion and connection of micro-fractures within the mining section.
[0076] S7. Boundary Fracture Arrest. During radial expansion of the splitting head, the limiting rib 6 contacts and compresses the borehole wall with a small contact area, crushing the micro-protrusions on the borehole wall surface and embedding into the surrounding rock, forming frictional locking, thus radially anchoring the layered limiting splitting rod relative to the borehole wall. Simultaneously, the limiting rib 6 creates a localized additional stress field around the borehole wall and forms a high-amplitude radial compressive stress concentration zone tangential to the borehole wall. When the crack extends vertically to this compressive stress concentration zone, the tensile environment at the crack tip is constrained, the stress intensity factor at the crack tip decreases, and the path deflects, thereby preventing macroscopic cracks from crossing the mining section.
[0077] S8. Depressurization and Recovery. After the current layer splitting is completed, the layer intelligent control unit controls valve group 7 to depressurize, the splitting head retracts, and the limit rib 6 is released from anchoring to the borehole wall. After the single-hole operation and the full working face layer operation are completed, the pump is stopped, the shut-off valve is closed, the pressure is released to the return oil, the gauge pressure is confirmed to be zero, and the layer limit splitting rod is recovered in sequence to avoid disassembly under pressure.
[0078] The layered splitting described in this embodiment differs from conventional multi-point splitting with fixed-step feed and uniform pressure control. Conventional multi-point splitting determines the splitting location based on the mechanical stroke and tends to cause cracks at adjacent splitting points to extend along the borehole axis. In this embodiment, the splitting location is determined by the rock stratum interface 2 and layered mechanical parameters obtained before construction. The splitting pressure and holding time are independently determined according to the mining section, and a compressive stress boundary near the stratum boundary is formed on the borehole wall by a limiting rib 6. Therefore, the information flow shifts from mechanical stroke control to exploration data feedforward control, and the crack control objective changes from full borehole penetration to intra-layer zoning and stratum boundary crack arrest.
[0079] For weak rock formations with a uniaxial compressive strength of less than 30 MPa, such as mudstone or shale, the splitting pressure can be 10 MPa to 20 MPa, including both extreme values. For medium-hard rock formations with a uniaxial compressive strength of 30 MPa to 60 MPa, the splitting pressure can be 20 MPa to 35 MPa, including both extreme values. For hard rock formations with a uniaxial compressive strength of 60 MPa to 120 MPa, such as coarse-grained sandstone or limestone, the splitting pressure can be 35 MPa to 50 MPa, including both extreme values. For extremely hard rock formations with a uniaxial compressive strength greater than 120 MPa, such as granite or quartz sandstone, the splitting pressure can be 50 MPa to 60 MPa, including both extreme values. The above pressure values serve as initial templates, and specific engineering values are determined by combining the tensile strength of the roof strata of the coal seam within the mining section, the interface strength at the stratification location, the in-situ stress, and the borehole spacing. The tensile strength of rock is usually only 3 / 100 to 1 / 10 of its uniaxial compressive strength. Therefore, the fracturing pressure only needs to generate tensile stress in the borehole wall that exceeds the tensile strength of the coal seam roof strata to initiate fracturing.
[0080] When the soft rock layer 3 is within the mining height control range and the coal mining machine has great difficulty in cutting it, the soft rock layer 3 can also be used as the roof rock layer of the coal seam in the mining section for splitting and weakening. Its splitting pressure is matched according to the soft rock layer with a uniaxial compressive strength of less than 30MPa.
[0081] Excessive pressure may increase the risk of cracks crossing the stratification point and entering unmined strata. Therefore, the fracturing pressure is determined based on two objectives: low tensile strength initiation and prevention of high-pressure cross-strata. The primary objective is to ensure that the peak tangential tensile stress on the borehole wall exceeds the tensile strength of the roof strata of the coal seam within the mining section. The second objective is to avoid the formation of open-type macroscopic through cracks at the stratification locations.
[0082] The holding time is determined based on the thickness of the roof strata, uniaxial tensile strength, and in-situ stress level within the mining section, combined with empirical values from similar engineering geological conditions. The holding time is determined according to the energy requirements for continued crack propagation, i.e., maintaining the stress state at the crack tip necessary for continued propagation during the holding stage. For thick, hard rock strata with high in-situ stress, extending the holding time helps overcome the promoting effect of confining pressure on crack closure, allowing the microfracture network within the stratum to fully develop. Since the crack propagation rate is relatively fast after the fracturing pump reaches the set value, the holding time can be determined based on field surveys of crack propagation rate; the crack propagation rate can be investigated through borehole imaging, microseismic detection, or acoustic detection. During construction, the holding time can be determined through a trial fracturing of the first borehole and verified by the overlap of the fracturing zones in adjacent boreholes.
[0083] Multiple layered limiting fracturing rods can operate in parallel and collaboratively in multiple boreholes 5 within the same working face. Through pump group linkage, the fracturing zone, pressure relief disturbance zone, and micro-fracture damage zone of multiple boreholes 5 overlap and connect, causing the weakening of the coal seam roof strata within the mining section to expand from a single point of weakening to regional weakening. The parallel operation of multiple boreholes is based on the premise that each borehole has completed intra-layer fracturing and inter-layer fracturing arrest, avoiding the superposition of multiple boreholes evolving into cross-layer penetration.
[0084] The entire equipment has a protection rating of at least IP65. Electrical components are intrinsically safe for mining applications. The execution circuit uses static hydraulic loading and does not have a continuous process water supply system. The control unit is equipped with overpressure interlocks, underpressure interlocks, and leakage interlocks. In case of overpressure, pressure increase is stopped and pressure is released; in case of underpressure, feed is stopped and the system is locked; in case of leakage, the non-intrinsically safe side power supply is cut off and the system is locked. Before resetting, the gauge pressure is confirmed to be zero. The above safety design is suitable for high-gas, high-dust, and confined space conditions in coal mines, but conventional safety controls for leakage, overpressure, impact, and electrical faults may still be required on-site.
[0085] Taking the B1301 protective layer working face of Jinling Coal Mine, Zhengzhou Dengcao Enterprise Group, as an example, the planned coal seam to be mined is No. 2 coal seam, with an average coal thickness of 0.8m and a mining height of 1.8m. The roof of No. 2 coal seam is soft rock layer 3, above which are limestone and fine sandstone, forming hard rock layer 1. During construction, a 4m splitting section is used. The spacing between adjacent boreholes corresponding to hard limestone is 0.8m, and the spacing between adjacent boreholes corresponding to fine sandstone is 0.5m. The spacing between adjacent boreholes is measured perpendicular to the direction of face advancement. The borehole spacing is adjusted according to lithology to ensure that the fracturing zones of adjacent boreholes 5 overlap within the mining section and to prevent penetration into the coal seam 4. The optional borehole spacing verification criterion is: the borehole spacing is no more than twice the effective fracturing radius of the roof strata within the mining section minus the fracturing arrest safety distance; the effective fracturing radius and the fracturing arrest safety distance can be calibrated by in-hole imaging, microseismic detection, or acoustic detection.
[0086] like Figure 4 As shown, the change in the degree of fracture development inside the borehole can be qualitatively observed by comparing the state of the borehole inner wall before and after pre-fracture. After pre-fracture, the degree of fracture development on the borehole inner wall is higher than that under normal mining conditions, and multiple longitudinal fractures appear within different height ranges of the coal seam roof, indicating that the mining section has undergone pre-fracture weakening modification, resulting in a decrease in its integrity and mechanical strength.
[0087] This invention is not limited to a specific mine, a specific working face, or a fixed combination of rock strata. It can be applied to any scenario where conventional protective layers are unsuitable or impractical for mining, requiring the use of thin coal seams, semi-coal-rock layers, or rock strata as unconventional protective layers, and where it is necessary to break through the roof rock of the coal seam. The aforementioned layered control method, including layer identification, location, parameter adjustment, fracturing, and fracturing arrest, can be used. In addition to protective layer mining, this method can also be extended to coal mine engineering projects such as roadway excavation, roof cutting, and rock mass decompression. In this specification, m represents meters, and MPa represents megapascals.
[0088] The above embodiments are only used to illustrate and not limit the technical solutions of the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the present invention without departing from the spirit and scope of the present invention. Any modifications or partial substitutions should be covered within the scope of the claims of the present invention.
Claims
1. An unconventional protective layer rock pre-splitting layer hydraulic splitting method, characterized in that: Taking the overlying strata of coal seams in unconventional protective layer working faces as the object, the method includes: Based on the pre-construction survey results and the stratification location determined by the mining height control requirements, the coal seam and its overlying strata are divided into mining sections and non-mining sections along the vertical direction. The mining section is located below the stratification location and is a section that includes the coal seam and the roof strata above it within the mining height range and is hollowed out after mining. The roof strata of the coal seam need to be fractured to reduce its integrity and strength. The non-mining section is located above the stratification location and is a section that is retained to form a roof after mining and should not be disturbed by macroscopic through cracks during the splitting operation. A layered limiting splitting rod, equipped with a splitting head and a limiting rib, is inserted into the borehole. The limiting rib is located at the root of the splitting head, positioning the layered limiting splitting rod along the borehole axis within the mining section. The splitting head is controlled to expand radially to compress the borehole wall, causing the circumferential tensile stress on the borehole wall within the mining section to exceed the tensile strength of the coal seam roof strata, thereby initiating and propagating cracks in the coal seam roof strata within the mining section. The limiting rib, expanding radially, presses against the borehole wall, forming a local compressive stress boundary on the borehole wall at the root of the splitting head. This local compressive stress boundary inhibits crack propagation beyond the layered location towards the non-mining section.
2. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 1, characterized in that: Before inserting the layered limiting splitting rod into the borehole, the method further includes: obtaining the strata interface depth, lithology, uniaxial compressive strength, layer thickness and geostress level of the overlying strata of the coal seam through coring, borehole imaging and stress detection, and recording the exploration results into the layered parameter template library of the control system; the layered position is determined according to the exploration results and mining height control requirements.
3. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 2, characterized in that: After the layered limiting splitting rod is positioned along the borehole axis in the mining section, the control system automatically matches the splitting pressure and holding time corresponding to the mining section from the layered parameter template library. The splitting pressure is controlled according to the initial pressure template of uniaxial compressive strength classification. The initial pressure template specifies that: for weak rock layers with a uniaxial compressive strength of less than 30 MPa, the splitting pressure is 10-20 MPa, including both values; for medium-hard rock layers with a uniaxial compressive strength of 30-60 MPa, the splitting pressure is 20-35 MPa, including both values; for hard rock layers with a uniaxial compressive strength of 60-120 MPa, the splitting pressure is 35-50 MPa, including both values; and for extremely hard rock layers with a uniaxial compressive strength greater than 120 MPa, the splitting pressure is 50-60 MPa, including both values.
4. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 3, characterized in that: The pressure holding time is obtained by the control system from the layer parameter template library. The pressure holding time is determined based on the layer thickness, uniaxial tensile strength and in-situ stress level of the roof strata of the coal seam in the mining section, combined with the engineering experience value of the engineering geological conditions.
5. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 1, characterized in that: The method further includes: multiple layered limiting splitting rods are inserted into multiple boreholes arranged along the unconventional protective layer working face and work in parallel and collaboratively, and load each row of boreholes in a top-to-bottom order, so that the top row of boreholes forms a complete interface first; the cracks that initiate in each mining section, the pressure relief disturbance zone and the micro-fracture damage zone formed around the boreholes are superimposed and connected in each mining section, so as to weaken the integrity and strength of the rock strata in each mining section as a whole.
6. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 5, characterized in that: Multiple layered limiting splitting rods operating in parallel are connected to the same integrated explosion-proof hydraulic power unit. The pump group of the integrated explosion-proof hydraulic power unit supplies pressure to each layered limiting splitting rod in a coordinated manner. After the splitting operation of a single hole or all holes of the entire working face is completed, the machine is stopped in sequence, the shut-off valve is closed, the pressure is released to the return oil, and the gauge pressure is confirmed to be zero before the layered limiting splitting rods are retrieved.
7. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 1, characterized in that: During the operation of the layered limiting splitting rod, the limiting ribs sequentially satisfy the following conditions: in the low-pressure positioning stage before the radial expansion of the splitting head, the limiting ribs do not interfere with the borehole wall, so that the layered limiting splitting rod can be lowered along the borehole to the mining section; in the high-pressure splitting stage of the radial expansion of the splitting head, the limiting ribs are pressed into the micro-protrusions on the surface of the borehole wall and form a frictional lock with the borehole wall to prevent the layered limiting splitting rod from axially retracting; in the pressure relief and recovery stage after the splitting operation is completed, the limiting ribs detach from the borehole wall so that the layered limiting splitting rod can be withdrawn from the borehole.
8. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 7, characterized in that: Along the direction of the working face advance, the boreholes are arranged in sections of 4m each within the mining zone; where the mining zone is hard limestone, the spacing between adjacent boreholes is 0.8m. In the mining section, which consists of fine sandstone, the spacing between adjacent boreholes is 0.5m.
9. The unconventional protective layer rock pre-splitting layer hydraulic splitting method according to claim 1, characterized in that: The layered limiting splitting rod, the integrated explosion-proof hydraulic power unit that supplies high-pressure hydraulic oil to the layered limiting splitting rod, and the control system that controls the splitting operation all adopt intrinsically safe design for mining. The control system is equipped with overpressure, underpressure, and leakage safety interlocks. When there is overpressure, the pressure rise is stopped and the pressure is released. When there is underpressure, the feed is stopped and the system is locked. When there is leakage, the non-intrinsically safe side power supply is cut off and the system is locked. Before resetting the control system, the gauge pressure is confirmed to be zero.
Citation Information
Patent Citations
Coal mine hard roof hydraulic directional cracking weakening method
CN109779633A
Directional fracturing top control and pressure relief device for hard roof
CN111911158A
Hydraulic rock breaking process capable of continuously splitting rock at multiple points in drill hole
CN113565505A