A method for mining steeply inclined coal seams in coal and gas outburst mines
By adopting a top-down mining sequence layout in steeply inclined coal seams, combined with fan-shaped drilling in the lower control roadway and filling pillars in the connecting roadway, comprehensive management of rockburst, gas, and coal dust spontaneous combustion hazards was achieved, improving mining efficiency and safety while reducing costs.
Patent Information
- Application Number
- CN202611288334.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-17
AI Technical Summary
During the mining of steeply inclined coal seams, the control of rock bursts, gas, and spontaneous combustion of coal dust is difficult, and existing technologies suffer from low mining efficiency and high costs.
The working face is arranged in a top-down sequence. Pre-fracture and depressurization and gas pre-drainage are carried out by drilling fan-shaped holes in the lower control roadway. Combined with the intermittent filling of the suspended roof area in the connecting roadway to form a pillar, a three-dimensional ventilation system of double roadway intake and upper control roadway return is adopted to realize the parallel operation of rockburst control, gas drainage, fire prevention and extinguishing and mining operations.
It effectively solves the problems of rock bursts, gas, and spontaneous combustion of coal dust in steeply inclined coal seams, improves mining efficiency, reduces production costs, and ensures a safe and efficient mining process.
Smart Images

Figure CN123109659A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mine disaster prevention and control technology, specifically to a method for mining steeply inclined coal seams in coal and gas outburst mines. Background Technology
[0002] Rockbursts, gas explosions, and spontaneous combustion of coal dust are common hazards in coal mines and often coexist. For gently dipping coal seams with small dip angles, as well as horizontal and near-horizontal coal seams, the coordination of hazard management with working face layout and production is relatively mature. High-dipping coal seams generally refer to those with dip angles of 35° to 55°, with the lower limit of 35° determined by the natural angle of repose of the gangue. For high-dipping coal seams, after mining, gangue in the goaf tends to slide towards the working face transport roadway, creating a roof overhang on the return airway side, thus increasing the difficulty of coordinating hazard management with working face layout and production.
[0003] For steeply inclined coal seams, the overhanging roof on one side of the return airway can lead to large-scale roof collapse as the overhanging area increases, causing rockburst disasters. Due to the lighter density of methane than air, it tends to accumulate on the return airway side, creating a breeding ground for methane accumulation in the overhanging roof area. This area also poses a risk of roof collapse, making methane control extremely difficult and highly prone to causing gas disasters. This danger is even greater in mines with spontaneous combustion characteristics, where spontaneously combusting coal dust in the goaf can easily ignite methane gas. In other words, under steeply inclined conditions, the likelihood of rockbursts, methane, and spontaneous combustion of coal dust is higher, and a combined disaster is highly probable.
[0004] Patent CN116733468B discloses a method for arranging and supporting facilities in a fully mechanized longwall face with a large dip angle and thick coal seam. This method primarily reduces the dip angle of the lower section to below 25° by reserving bottom coal, thus improving the slippage of the support and scraper conveyor head. It also optimizes the width of the support top beam, the double-sided telescopic side guards, the bottom adjustment structure, and the electro-hydraulic linkage control to synergistically enhance the adaptability of the support. However, this method still suffers from drawbacks: reserving bottom coal increases the tunneling volume and cost; the linkage control between the bottom adjustment and side guards is complex; and the problems of rock bursts, gas, and coal dust spontaneous combustion remain unresolved.
[0005] Patent CN111485948B discloses a method for coordinated prevention and control of disasters in adjacent goaf areas of steeply inclined, high-gas coal seams. It employs numerical simulation to optimize advance speed, ventilation, and extraction parameters, combined with narrow coal pillar protection, high-level drilling extraction, and nitrogen injection for fire prevention and extinguishing, to achieve coordinated control of gas and spontaneous combustion. However, this method focuses on prediction and parameter optimization, with insufficient consideration for rockburst risks; furthermore, it fails to address the coupling problem between gas accumulation and roof fracture in steeply inclined overhanging areas, and disaster control and mining operations are often sequential, affecting mining efficiency.
[0006] Therefore, how to provide a safe and efficient mining method for steeply inclined coal seams in coal and gas outburst mines, in order to coordinate the management of rockburst, gas, and coal dust spontaneous combustion disasters with working face layout and production, has become an urgent problem to be solved in this field. Summary of the Invention
[0007] To address the technical challenges of coordinating the management of rockburst, gas and coal dust spontaneous combustion in steeply inclined coal seams, as well as the low efficiency and high production costs of mining operations, this invention provides a method for mining steeply inclined coal seams in coal and gas outburst mines. Through a top-down mining sequence and the arrangement of upper and lower control roadways, during mining operations at the working face under construction, fan-shaped boreholes in the lower control roadway are used to pre-fracturing and depressurizing the next working face and pre-draining gas. Simultaneously, pillars are formed by filling the suspended roof area through connecting roadways, and grouting is performed in fire prevention and extinguishing zones between adjacent pillars. A three-dimensional ventilation system with dual-roadway intake and upper control roadway return ventilation is adopted to achieve parallel rockburst management, gas extraction, fire prevention and extinguishing, and mining operations, resulting in safe and efficient mining.
[0008] The technical solution of this invention is as follows: This invention provides a method for mining steeply inclined coal seams in coal and gas outburst mines, comprising the following steps: S1. Several working faces are arranged sequentially from top to bottom along the dip of the steeply inclined coal seam, with a section coal pillar left between adjacent working faces; the mining sequence of each working face is set to be mining sequentially from top to bottom, and all working faces adopt the same layout and mining technology. S2. For working faces under construction, construct and transport horizontal roadways and track horizontal roadways along the strike, and then excavate control roadways along the strike in the coal seam floor at the track horizontal roadway of the next working face. The control roadway in the bottom coal seam of the working face track level roadway is the control roadway constructed during the previous working face mining. It is regarded as the upper control roadway of the working face. In the upper control roadway, several connecting roadways are constructed along the strike at the first interval to connect the track level roadway. Several connecting roadways are constructed along the strike at the second interval to the lower part of the designed position of the waste rock chute. From the mining direction of the working face, the connecting roadway on the side of the waste rock chute is opposite to the connecting roadway on the side of the even-numbered track level roadway. S3. Drill fan-shaped boreholes from the lower control roadway to the next working face to pre-fracturing and depressurizing coal seams and pre-draining gas in the next working face. S4. Along the working face advance direction, starting from the side of the waste rock chute, construct a waste rock chute in the connecting roadway. The waste rock chute is connected to the goaf of the previous working face to release waste rock as raw material for construction of backfill pillars. Sequentially construct backfill pillars from the even-numbered connecting roadways to the overhead area. The overhead area between adjacent backfill pillars is used as a fire prevention and extinguishing zone. Fire prevention and extinguishing materials are filled into the goaf from the fire prevention and extinguishing zone. S5. Fresh air is introduced simultaneously from the transport level tunnel and the track level tunnel, and discharged from the upper control tunnel.
[0009] Furthermore, in step S2, the first spacing is half of the second spacing, the connecting tunnel is constructed along the vein direction, perpendicular to the control tunnel and the track level tunnel, and the upper control tunnel is connected to the return air uphill tunnel.
[0010] Furthermore, in step S3, the specific method of constructing fan-shaped boreholes from the lower control roadway along the strike interval to the next working face is as follows: all fan-shaped boreholes pass through the coal seam in the next working face; then, based on the fan-shaped boreholes that have been pre-fracturing and depressurized, gas pre-drainage is carried out, and the depressurization and gas pre-drainage progress of the next working face is consistent with the mining progress of the working face under construction.
[0011] Furthermore, step S4 also includes: during the construction of the filling pillar, a mesh bag with the same volume as the filling pillar is prepared in advance, gangue is poured into the mesh bag from the connecting roadway, and after the gangue is poured, concrete material is poured into the gaps of the gangue in the filling pillar.
[0012] Furthermore, step S4 also includes the construction work of filling the mine pillar after the process of filling fire-fighting materials into the goaf from the odd-numbered connecting roadway in the fire prevention and extinguishing zone along the working face advancing direction.
[0013] Furthermore, step S4 also includes filling the fire prevention and extinguishing zone with gangue after the fire prevention and extinguishing work has been completed.
[0014] Furthermore, step S4 also includes: sealing off connecting alleys that are no longer in use by means of a partition.
[0015] Furthermore, in step S5, the fresh airflow entering from the transport level roadway reaches the overhead area between the filling pillar and the stope through the stope, and converges with the fresh air entering from the track level roadway. Then, carrying the gas from the overhead area, it enters the upper control roadway through the connecting roadway and is discharged. At the same time, the fresh air in the track level roadway is drawn to the filling pillar construction area and the fire prevention and extinguishing area by the fan and the air duct, and after becoming exhaust air, it enters the control roadway and is discharged.
[0016] Furthermore, in step S5, the connecting roadway on the side of the track level roadway in front of the stope is temporarily closed, so that the air can only enter the upper control roadway from the connecting roadway in the overhead area between the filling pillar and the stope.
[0017] Furthermore, it also includes step S6, continuing until the working face under construction is completely mined and the rockburst control and gas pre-drainage work for the next working face is completed; then, referring to the working face under construction, the next working face is carried out for back mining, pillar filling construction, and fire prevention and extinguishing work; the subsequent working face refers to the previous working face for rockburst control and gas pre-drainage.
[0018] The beneficial effects of this invention are as follows: (1) For coal seams with a steep dip of 35° to 55°, this invention adopts a top-down mining sequence for each working face, and all working faces use the same mining process. For working faces under construction, the control roadway of the previous working face is used as the upper control roadway and connected to the track roadway of the working face under construction. The lower control roadway is constructed in the coal seam floor at the transport roadway. During mining of the working face under construction, the next working face is protected against rockburst and gas is pre-drained by drilling fan-shaped boreholes through the lower control roadway, providing a safe foundation for the safe arrangement of the transport roadway and track roadway and mining of the next working face. At the same time, the even-numbered connecting roadway is used to fill the suspended roof area to form a filling pillar, and the odd-numbered connecting roadway is used to enter the fire prevention and extinguishing zone between the filling pillars to carry out fire prevention and extinguishing work in the goaf. With the help of a special ventilation scheme, the comprehensive prevention and control of coal dust spontaneous combustion in the goaf, gas accumulation in the suspended roof area and the disaster of roof breakage in the suspended roof area are solved.
[0019] (2) Based on the special layout of the upper and lower control roadways, the timing of construction and the coordination scheme with the working face, the invention can carry out the rockburst prevention and gas pre-drainage process, the roof breaking and gas disaster control, and the goaf fire prevention and extinguishing process of the next work simultaneously (in parallel), which greatly reduces the problem of long cycle and low efficiency caused by some or all of the schemes being carried out in sequence (in serial).
[0020] (3) Based on the special layout of the control roadway, the timing of construction and the coordination scheme with the working face, the present invention adopts the simultaneous intake of air in the transport roadway and the track roadway, and the return air in the upper control roadway can effectively solve the problem of gas accumulation in the overhead area and the upper corner, improve the ventilation quality of the working face under construction, and solve the problem of expected exhaust of fresh air source in the filling pillar construction area and the fire prevention and extinguishing area.
[0021] (4) In this invention, the connecting roadway in the upper control roadway is constructed in advance during the mining of the working face under construction, and the waste rock chute is only constructed during the mining of the working face under construction. This can greatly reduce the amount of parallel tunneling work during the mining of the working face under construction, and avoid the problem of slow tunneling progress due to insufficient exploration affecting the production progress of the working face under construction. The waste rock extraction of this invention can greatly save the waste rock transportation process, save the construction time of filling pillars, and avoid affecting the production progress of the working face under construction. Attached Figure Description
[0022] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0023] Figure 1 This is a schematic cross-sectional view of the safe mining method for steeply inclined coal seams according to the present invention.
[0024] Figure 2 This is a schematic diagram of the safe mining method for steeply inclined coal seams according to the present invention.
[0025] In the diagram, 1-Previous working face, 2-Working face under construction, 3-Next working face, 4-Transportation level roadway, 5-Track level roadway, 6-Section coal pillar, 7-Prevention and control roadway, 8-Connecting roadway, 9-Granite chute, 10-Fan-shaped borehole, 11-Goaf, 12-Isolation, 13-Moving air door, 14-Overhead area, 15-Fire prevention and extinguishing material, 16-Fire prevention and extinguishing area, 17-Fire pillar filling, 18-Mining area. Detailed Implementation
[0026] To enable those skilled in the art to better understand the technical solutions of this invention, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of this invention.
[0027] The steeply dipped coal seam mentioned in this invention generally refers to a coal seam with a dip angle of 35° to 55°. The lower limit of the dip angle of the steeply dipped coal seam, 35°, is determined by the natural angle of repose of the gangue.
[0028] Example 1 Taking a working face with a design length of 720m as an example, the specific details are as follows: like Figure 1-2 As shown, this invention provides a safe and efficient method for mining steeply inclined coal seams in coal and gas outburst mines, comprising the following steps: S1. Several working faces are arranged sequentially from top to bottom along the steeply inclined coal seam, with a section coal pillar 6 left between adjacent working faces; the mining sequence of each working face is set to be mining sequentially from top to bottom, and all working faces adopt the same layout and mining technology; for each working face, a transport roadway 4 and a track roadway 5 are arranged along the coal seam strike, with the track roadway 5 being higher than the transport roadway 4.
[0029] S2, the lower part of the working face 2 under construction is the next working face 3 that continues the production of the working face 2 under construction; for the working face 2 under construction, the construction transport roadway 4 and the track roadway 5 are driven along the strike, and the control roadway 7 is excavated along the strike in the coal seam floor at the same elevation level as the track roadway 5 of the next working face 3.
[0030] The upper part of the working face 2 under construction is the goaf 11 formed by the mining of the previous working face 1, and the control roadway 7 constructed during the mining of the previous working face 1. The control roadway 7 constructed during the mining of the previous working face 1 is designated as the upper control roadway 7 of the working face under construction. Within the upper control roadway 7, 72 connecting roadways 8 are constructed along the strike at 10m intervals to connect with the track level roadway 5 of the working face 2 under construction. 36 connecting roadways 8 are constructed along the strike at 20m intervals to the lower part of the designed position of the waste rock chute 9. From the mining direction (strike direction) of the working face, the connecting roadway 8 on the side of the waste rock chute 9 is opposite to the connecting roadway 8 on the side of the even-numbered track level roadway 5. The connecting roadways 8 are constructed along the vein direction, perpendicular to the control roadway 7 and the track level roadway 4. The upper control roadway 7 is connected to the return air incline.
[0031] S3. In the working face 2 under construction, several rows of fan-shaped boreholes 10 are drilled at intervals along the strike from the lower control roadway 7 to the next working face 3. All fan-shaped boreholes 10 penetrate the coal seam in the next working face 3. The fan-shaped boreholes 10 are used to pre-fracturing and depressurize the coal seam in the next working face 3 (hydraulic fracturing or loosening blasting) to solve the rockburst problem in the next working face 3. Then, based on the fan-shaped boreholes 10 that have been pre-fracturing and depressurized, gas pre-drainage is carried out to solve the gas problem in the next working face 3. The depressurization and gas pre-drainage work progress of the next working face 3 is basically consistent with the mining progress of the working face 2 under construction.
[0032] The borehole diameter, row spacing of adjacent rows, and angle between boreholes in the same row (bottom-out distance) of the constructed fan-shaped boreholes 10 should be sufficient to ensure adequate depressurization and gas extraction of the coal seam in the next working face 3. For example, the borehole diameter is 113-153 mm, the row spacing is 4.0-5.0 m, and the bottom-out distance is 4.0-5.0 m. If hydraulic fracturing is used for pre-fracturing and depressurization, the pump station operating pressure can be selected at 8-16 MPa and the flow rate is 200-280 L / min.
[0033] S4: After the roof of working face 2 collapses during mining, the gangue in the goaf 11 of working face 2 moves towards the haulage roadway 4 under its own weight, forming a suspended roof area on the side of the track roadway 5. Along the working face advancement direction, the gangue chute 9 is connected to the goaf 11 of the previous working face 1 through the connecting roadway 8, releasing gangue as raw material for filling the pillar 17. The gangue is then released through the even-numbered connecting roadways (2nd, 4th, ... 72nd). 8. Constructing and filling pillars 17 in the suspended roof area 14; the suspended roof area between adjacent filling pillars 17 serves as a fire prevention and extinguishing zone 16. Fire prevention and extinguishing material 15 (the type of fire prevention and extinguishing material 15 is known in the art and is not limited here) is injected from the fire prevention and extinguishing zone 16 into the goaf area 11 of the working face under construction. The fire prevention and extinguishing material 15 can fill the gaps between the gangue in the goaf area 11 of the working face under construction, preventing air and gas from entering the goaf area 11, thereby achieving the purpose of fire prevention and extinguishing.
[0034] In this embodiment, the width of the fire prevention and extinguishing zone 16 and the filling pillar 17 is 10m, meaning the center-to-center distance between adjacent fire prevention and extinguishing zones 16 is 20m, and the center-to-center distance between adjacent filling pillars is 20m. The thickness of the fire prevention and extinguishing zone 16 and the filling pillar 17 is the coal seam mining height, and the length is the distance between the upper boundary of the goaf 11 and the track roadway 5. For example, the filling pillar 17 needs to fill the space between the goaf 11 and the track roadway 5. The construction of the filling pillar 17 lags behind the mining work of the working face 2 by a lag distance of 10~30m.
[0035] During the construction of the filling pillar 17, a metal or plastic mesh bag with the same volume as the filling pillar 17 is prefabricated. The mesh bag entrance is set at the even-numbered connecting roadway 8 on the side of the track level roadway. Gangue is poured into the mesh bag from the connecting roadway 8, which can limit the movement range of the filling pillar and form a stable working face space for the fire prevention and extinguishing zone 16. In order to improve the stability of the filling pillar 17, after the gangue is poured, concrete material can be poured into the gaps of the gangue in the filling pillar 17 from the connecting roadway 8. The small gaps between the gangue in the filling pillar can reduce the flow range of the concrete, and at the same time, the stability of the filling pillar 17 can be guaranteed after the concrete material is poured.
[0036] Along the direction of the working face advance, the process of filling fire-fighting material 15 into the goaf 11 of the working face 2 within the fire prevention and extinguishing zone 16 of the odd-numbered (1st, 3rd, ... 71st) connecting roadway 8 on the side of the track level roadway is delayed after the construction of the filling pillar 17. That is, fire prevention and extinguishing work is carried out in the fire prevention and extinguishing zone 16 between the two filling pillars 17 after the construction of two adjacent filling pillars 17 is completed and stabilized.
[0037] Gangue was filled into fire prevention and extinguishing zone 16, where fire suppression work had been completed. Connecting lane 8, which is no longer to be used, was sealed off using partition 12.
[0038] S5: Ventilation and Gas Control in Overhead Area: Fresh air is introduced simultaneously from transport level 4 and track level 5. The fresh air flow from transport level 4 passes through stope 18 and reaches the overhead area 14 between filling pillar 17 and stope 18 (the upper corner where gas easily accumulates is also located here). It converges with the fresh air from track level 5 here, and then carries the gas from overhead area 14 through connecting roadway 8 into control roadway 7, and then is discharged through return air uphill. At the same time, fresh air in track level 5 is drawn by fans and air ducts to the construction area of filling pillar 17 and fire prevention and extinguishing area 16. After becoming exhaust air, it enters control roadway 7, and is then discharged through return air uphill.
[0039] A movable ventilation door 13 is installed in the control roadway 7. The movable ventilation door 13 is located at the position where the filling pillar 17 has been completed and the fire prevention and extinguishing process has been completed.
[0040] The connecting roadway 8 located on the side of the track level roadway 5 in front of the mining area 18 is temporarily closed, so that the air can only enter the upper control roadway 7 from the connecting roadway 8 in the suspended roof area 14 between the filling pillar 17 and the mining area 18.
[0041] S6: Continue in this manner until the working face 2 under construction is completed and the rockburst control and gas pre-drainage work for the next working face 3 is completed; then, with reference to the working face 2 under construction, carry out the back mining, pillar filling construction, and fire prevention and extinguishing work for the next working face 3, and at the same time, with reference to the next working face 3, carry out rockburst control and gas pre-drainage work for the next working face after that.
[0042] It should be noted that working face 2, which is under construction, is the successor to the previous working face 1. The construction plan of the previous working face 1 is the same as that of working face 2, which is under construction. That is, as the successor to the previous working face 1, the coal seam in working face 2 has already undergone rock burst control and gas pre-drainage during the mining of the previous working face 1.
[0043] Although the present invention has been described in detail with reference to the accompanying drawings and preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made to the embodiments of the present invention by those skilled in the art without departing from the spirit and essence of the invention, and such modifications or substitutions should all be within the scope of the present invention. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should also be covered within the protection scope of the present invention.
Claims
1. A method for mining steeply inclined coal seams in coal and gas outburst mines, characterized in that, Includes the following steps: S1. Several working faces are arranged sequentially from top to bottom along the dip of the steeply inclined coal seam, with a section coal pillar left between adjacent working faces; the mining sequence of each working face is set to be mining sequentially from top to bottom, and all working faces adopt the same layout and mining technology. S2. For the working face under construction, the construction transport level roadway and track level roadway are excavated along the strike, and the control roadway is excavated along the strike in the coal seam floor at the track level roadway of the next working face. Located in the bottom coal seam of the working face track roadway, it is a control roadway constructed during the previous working face mining and is regarded as the upper control roadway of the working face. In the upper control roadway, several connecting roadways are constructed along the strike at first intervals to connect with the track roadway, and several connecting roadways are constructed along the strike at second intervals to the lower part of the designed position of the waste rock chute. From the mining direction of the working face, the connecting roadway on the side of the waste rock chute is opposite to the connecting roadway on the side of the even-numbered track roadway. S3. Drill fan-shaped boreholes from the lower control roadway to the next working face to pre-fracturing and depressurizing coal seams and pre-draining gas in the next working face. S4. Along the working face advance direction, starting from the side of the waste rock chute, construct a waste rock chute in the connecting roadway. The waste rock chute is connected to the goaf of the previous working face to release waste rock as raw material for construction of backfill pillars. Sequentially, construct backfill pillars from the even-numbered connecting roadways to the overhead area. The overhead area between adjacent backfill pillars serves as a fire prevention and extinguishing zone. Fire prevention and extinguishing materials are then introduced into the goaf from the fire prevention and extinguishing zone. S5. Fresh air is introduced simultaneously from the transport level tunnel and the track level tunnel, and discharged from the upper control tunnel.
2. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, In step S2, the first spacing is half of the second spacing, the connecting tunnel is constructed along the vein direction, perpendicular to the control tunnel and the track level tunnel, and the upper control tunnel is connected to the return air uphill tunnel.
3. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, In step S3, the specific method of constructing the fan-shaped boreholes is as follows: all the fan-shaped boreholes pass through the coal seam in the next working face; then, based on the fan-shaped boreholes that have been pre-fracturing and depressurized, gas pre-drainage is carried out, and the depressurization and gas pre-drainage work progress of the next working face is consistent with the mining progress of the working face under construction.
4. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, Step S4 further includes: during the construction of the filling pillar, a mesh bag with the same volume as the filling pillar is prepared in advance, gangue is poured into the mesh bag from the connecting roadway, and after the gangue is poured, concrete material is poured into the gaps of the gangue in the filling pillar.
5. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, Step S4 further includes the construction work of filling the mine pillar after the process of filling fire-fighting materials into the goaf from the odd-numbered connecting roadway in the fire prevention and extinguishing zone along the working face advancing direction.
6. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, Step S4 also includes filling the fire prevention and extinguishing zone with gangue after the fire prevention and extinguishing work has been completed.
7. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, Step S4 also includes: sealing off connecting alleys that are no longer in use by means of a partition.
8. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, In step S5, the fresh air flow entering from the transport level roadway reaches the overhead area between the filling pillar and the stope through the stope, and converges with the fresh air entering from the track level roadway. Then, carrying the gas in the overhead area, it enters the upper control roadway through the connecting roadway and is discharged. At the same time, the fresh air in the track level roadway is drawn to the filling pillar construction area and the fire prevention and extinguishing area by the fan and the air duct, and after becoming exhaust air, it enters the control roadway and is discharged.
9. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, In step S5, the connecting roadway on the side of the track level roadway in front of the mining area is temporarily closed, so that the air can only enter the upper control roadway from the connecting roadway in the overhead area between the filling pillar and the mining area.
10. The method for mining steeply inclined coal seams in coal and gas outburst mines as described in claim 1, characterized in that, It also includes step S6, and so on until the working face under construction is mined and the rockburst control and gas pre-drainage work for the next working face is completed; then, with reference to the working face under construction, the next working face is mined, the pillar filling construction and fire prevention and extinguishing work are carried out; the subsequent working face is referenced to the previous working face for rockburst control and gas pre-drainage.