A safe and efficient method for mining pillar resources under near-surface weathering zones
By accurately delineating the distribution of weathered zones and optimizing the thickness of the isolation layer through numerical simulation, adopting differentiated stope layout and step-by-step mining mode, and combining controlled blasting and mechanized ore extraction technology, the problem of coordinated and safe recovery of resources overlaid by weathered zones and multi-layer pillar resources was solved, achieving efficient resource recovery and improved safety and production efficiency in surface protection.
Patent Information
- Application Number
- CN202611429977.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-15
- Publication Date
- 2026-11-17
AI Technical Summary
Existing methods cannot achieve coordinated and safe recovery of resources overlying weathered zones and multi-layer pillar resources, making it difficult to simultaneously achieve efficient resource recovery and production capacity integration while ensuring the safety of near-surface mining.
By comprehensively analyzing the geological conditions and pillar occurrence characteristics of the mining area, accurately delineating the distribution range of the weathered zone, optimizing the thickness of the isolation layer through numerical simulation, adopting differentiated stope layout and step-by-step mining mode, and coordinating controlled blasting and mechanized ore extraction technology, implementing phased and graded backfilling, dynamically monitoring and adjusting mining parameters, a joint bearing system of unmined pillars and filled bodies is formed.
It has enabled the safe and efficient recovery of pillar resources under weathered zones, reduced the risks of surface subsidence and blasting disturbance, improved resource recovery rate and production efficiency, and ensured the safety of surface protection targets.
Smart Images

Figure CN123109663A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of underground mining technology, and in particular to a safe and efficient method for mining pillar resources under near-surface weathering zones. Background Technology
[0002] In underground metal mining, to meet the needs of inter-level mining isolation, phased mining, and control of surrounding rock pressure, permanent or temporary pillars such as horizontal isolation pillars, inter-mining pillars, and roof pillars are typically left. Meanwhile, the upper part of the near-surface ore body generally develops weathered fractured rock masses and loose Quaternary overburden, and the surface is mostly covered with farmland, village buildings, and transportation facilities. Strict control of surface subsidence and blasting disturbance is required during mining. As mining extends deeper, the upper and middle sections gradually cease mining, and the production capacity of the main production section gradually declines, leading to increasing pressure on mine production continuity. The large reserves of previously left pillars and weathered ore bodies have significant recovery value and can effectively supplement the mine's recoverable reserves and alleviate resource shortages.
[0003] However, existing near-surface pillar mining faces significant challenges. Pillars are situated under complex conditions and are subject to long-term disturbances from mining activities in the lower and middle sections. The internal stress state and degree of deformation within the rock mass are difficult to assess accurately, and there is a lack of targeted stability evaluation methods and design guidelines for mining parameters. Furthermore, the ore bodies are shallowly buried, with weathered fractured rock masses generally present in the overlying areas. The surface is also characterized by farmland, village buildings, and transportation infrastructure. Conventional mining activities can easily impact surface protection targets and the stability of the overlying weathered rock mass, making it difficult to achieve efficient resource recovery while strictly controlling surface subsidence and blasting disturbances. Achieving a balance between mining safety, resource recovery rate, and production efficiency is challenging.
[0004] Existing technologies also offer solutions for underground mining.
[0005] Chinese invention patent CN117684983A discloses a method for recovering pillars between stopes in gently dipping thin and medium-thick ore bodies. The method includes the following steps: S1, determining the mining unit and mining sequence; S2, arranging the mining and cutting engineering; S3, pre-stressing and pre-fracture of the mining unit; S4, mechanized continuous mining, transportation, and support; S5, after constructing a backfill retaining wall at the bottom of the mining unit, subsequent backfilling is carried out, using bagged crushed stone to fill the corners of the mining unit and the ore extraction roadway, and widening and scouring the ore extraction roadway to the next adjacent mining unit for pre-fracture and stress relief of the ore body, preparing for the mining of the next mining unit. This method requires simple equipment, is easy to operate, safe, efficient, and economical, with low ore loss and dilution. Furthermore, it can safely and effectively control the stability of the surrounding rock and the occurrence of rock dynamic disasters during the mining process, and has broad application prospects.
[0006] While the aforementioned existing patents can recover inter-mining pillars for conventional gently dipping thin and medium-thick ore bodies, resulting in low ore loss and dilution, they cannot achieve coordinated and safe recovery of resources overlying weathered zones and multi-layer pillars. Furthermore, their adaptability to surface subsidence control and blasting vibration suppression in near-surface mining is insufficient, making it difficult to simultaneously achieve efficient resource recovery and production capacity continuity while ensuring the safety of near-surface mining. Summary of the Invention
[0007] The purpose of this application is to provide a safe and efficient method for recovering pillar resources under near-surface weathering zones, which solves the problem that existing methods cannot achieve the coordinated and safe recovery of resources covered by weathering zones and multi-layer pillar resources.
[0008] A safe and efficient method for mining pillar resources under near-surface weathering zones includes the following steps:
[0009] S1, Preliminary Basic Verification: Comprehensively review the geological conditions, current mining status and pillar occurrence characteristics of the mining area, complete resource quantity statistics and mechanical parameter testing of the filling body, and ascertain the engineering and resource baseline;
[0010] S11, Geological and Mining Status Review: Analyze the geological overview of the mining area, the occurrence characteristics of the ore body and the mechanical properties of the surrounding rock. Through the mining methods, engineering layout, distribution and quality status of the backfill body in the middle section, clarify the historical background and boundary conditions of the ore pillar formation.
[0011] S12, Characteristics of ore pillar occurrence and resource statistics: By elevation and region, the shape, size and spatial distribution of horizontally isolated ore pillars, inter-stope pillars and top pillars are statistically analyzed to calculate the resource quantity covered by the weathered zone and the total recoverable resources of the ore pillars, and to clarify the resource base.
[0012] S13, On-site verification and parameter testing: Confirm the integrity of the surrounding rock and the damage to the pillar through on-site underground reconnaissance, conduct core sampling tests of the filling boreholes, and obtain the physical and mechanical parameters of the filling body at different locations to provide experimental basis for subsequent stability calculations and scheme design;
[0013] S2, Mining Boundary Design: The distribution range of the weathered zone is delineated by logging borehole cores, and the safe thickness of the isolation layer is determined by combining theoretical calculations and numerical simulations. The highest mining elevation of the stope is marked in different areas.
[0014] S21, Precise delineation of the location of weathering zones: Based on the core logging of production exploration boreholes, combined with the RQD value of the rock mass and the weathering degree classification, the lithological composition, spatial distribution range, thickness range and elevation boundary of the weathering zone are delineated, the distribution law of the fractured rock mass in the weathering zone is clarified, and the upper limit constraint of the exploitation of the resources covered by the weathering zone is determined.
[0015] S22, Safety thickness of the isolation layer: Preliminary calculations are performed theoretically, followed by numerical simulations for verification, and finally the thickness is determined and differentiated.
[0016] S3, Optimization of mining scheme: Compare and select the best mining methods and mining modes, match differentiated stope layout for different types of pillars, and complete the optimization and selection of stope structure parameters;
[0017] S31, Selection of mining method: The segmented rock drilling stage open-stop mining method followed by backfilling is selected to meet the safety control and production efficiency requirements of near-surface pillar mining.
[0018] S32, Mining mode selection: The step-by-step mining mode with upper and lower pillars is adopted. The lower horizontal isolation pillar is mined first, and the upper inter-stop pillar is mined later, thereby reducing the risk of overall collapse of the upper backfill. After the mining experience under the backfill is rich and the technology is mature, it can be gradually transitioned to synchronous mining under the premise of taking reinforcement measures.
[0019] S33, Mining layout and structural adaptation: Differentiated layout schemes for pillars with different elevations and formations;
[0020] S34, Optimization of stope structure parameters: Through the construction of physical and mechanical models and numerical simulation calculations, the length, width, height and column width of the stope are iteratively optimized to balance resource recovery rate and production capacity while ensuring the stability of the surrounding rock.
[0021] S4, On-site engineering implementation: Carry out the mining preparation and cutting engineering construction according to the design, adopt controlled blasting ore extraction and mechanized ore extraction technology, and strictly implement the phased and graded subsequent backfilling operation;
[0022] S41, Mining preparation and cutting engineering construction: The mining preparation engineering is carried out according to the design and construction of the section level roadway, ore outlet roadway, ore receiving roadway and ore outlet access roadway. At the same time, the cutting engineering of the cutting riser and the cutting cross roadway is designed. Through the mining preparation engineering and cutting engineering, the trench-type bottom ore outlet structure and the initial blasting free face are formed.
[0023] S42, Controlled blasting for ore cutting: Drilling upward fan-shaped medium-deep holes using a rock drilling rig, strictly controlling the blast hole parameters, reserving a reasonable protective layer on the side of the stope near the backfill, using porous granular ammonium nitrate explosives and digital electronic detonators for bottom-reverse detonation, controlling the single blasting step distance; In view of the characteristics of near-surface mining, strictly controlling the blasting vibration intensity by optimizing blasting parameters and detonation methods to avoid disturbing the weathered rock mass and surface structures;
[0024] S43, Mechanized Ore Extraction and Transfer: Electric loaders are used to extract ore in the structure at the bottom of the trench. The ore is then transferred to the intermediate transport level via a pass. This is matched with the rhythm of rock drilling and blasting processes, and equipment relocation is arranged in a reasonable manner to ensure equipment utilization and process connection efficiency.
[0025] S44, phased and graded subsequent backfilling: After the mining is completed, a backfilling retaining wall and water filtration facilities are constructed in the bottom structure to seal the boundary between the mining area and the external shafts and prevent the loss of backfilling material and water accumulation in the mining area.
[0026] S5, Safety Dynamic Management: Deploy a ground pressure and displacement monitoring system, conduct surface stability assessments, and dynamically adjust mining parameters based on monitoring data to achieve safety and controllability throughout the mining process;
[0027] S51, Ground pressure and displacement monitoring: Stress and displacement monitoring points are set up around the mining area, in the isolation layer and weathering zone to monitor the changes in surrounding rock stress, rock mass displacement and plastic zone development during the mining process in real time.
[0028] S52, Surface stability assessment: By combining numerical simulation prediction with on-site settlement monitoring, the range and magnitude of surface settlement deformation are assessed to ensure the safety of farmland, buildings and roads.
[0029] S53, Dynamic Optimization and Adjustment: Adjust the mining sequence, void exposure time and filling rhythm in a timely manner based on monitoring data to prevent ground pressure risks. Dynamically optimize mining parameters based on the weathering zone and pillar status revealed by the actual project to achieve safe and efficient recovery of near-surface pillar resources.
[0030] As a further improvement of the present invention, in step S33, the elevation and formation of the pillars are divided into lower horizontal isolation pillars, upper shallow-hole room-and-pillar two-step pillars, and upper segmented drilling open-field two-step pillars. The lower horizontal isolation pillars are arranged in the stope along the ore body strike. The lower horizontal isolation pillars form a cross-over structure with the upper filling body and the lower stope, which improves the overall stability and simultaneously enables multi-point material feeding of the filling. The upper shallow-hole room-and-pillar two-step pillars adopt deep-hole retreat mining without a bottom structure. The upper shallow-hole room-and-pillar two-step pillars are equipped with remote-controlled shovels for ore extraction. The remote-controlled shovels improve the resource recovery rate by eliminating ore loss from the bottom structure. The upper segmented drilling open-field two-step pillars adopt deep-hole retreat mining with a trench-type bottom structure. The pillars are divided into three categories and matched with differentiated stope layouts and mining processes. The lower horizontal isolation pillars improve overall stability and achieve multi-point filling by forming a cross-shaped overlapping structure. The upper two types of two-step pillars adopt appropriate mining methods to improve resource recovery rate, thus achieving precise matching and efficient mining of different types of pillars.
[0031] As a further improvement of the present invention, in step S44, the phased and graded backfilling process uses high-strength backfill materials at the bottom and top of the stope. The phased and graded backfilling is specifically divided into three steps: the first step uses medium-strength backfill materials in the middle of the stope to support subsequent mining operations; the second step uses low-strength backfill materials in the middle of the stope; and the phased and graded backfilling strictly controls the height of each backfilling operation. Mining of adjacent stopes is only carried out after the phased and graded backfill materials reach their designed strength. By using backfill materials of different strengths at the bottom, top, and middle of the stope and implementing this process in stages, strictly controlling the height of each backfilling operation, and ensuring that mining of adjacent stopes is carried out only after the backfill materials reach their designed strength, the system not only matches the stress requirements of different locations to ensure the backfilling support effect but also avoids disturbance from adjacent mining operations when the backfill materials are not up to standard, thus ensuring mining safety.
[0032] As a further improvement of the present invention, the cross-joint structure adopts a segmented staggered cross support. Specifically, the segmented staggered cross support arranges the lower stopes arranged along the strike and the upper vertically oriented filling body pillars in a segmented staggered arrangement. The segmented staggered cross support is used to form a cross-peak support between the load transfer path of the upper filling body and the support structure of the lower stope. The cross-peak support avoids stress concentration and superposition at the intersection nodes. The mining sequence of the lower horizontal isolation pillar adopts a skip-two-one-mining method along the strike. In this mining method, the lower horizontal isolation pillar is advanced segment by segment from bottom to top against the dip within the same section. After each segment is completed, it is backfilled synchronously with a step distance following, so that the mining stress of the isolation pillar is always jointly borne by the unmined pillar and the backfilled body. The backfilling and roof connection of the lower horizontal isolation pillar utilizes multiple cross-vein roadways distributed along the strike to implement tiered multi-point material feeding. The multi-point material feeding first fills the bottom from the lower side roadway, and then replenishes the roof from the upper side roadway, which is coordinated with the inclined floor of the lower stope to guide the material flow to spread naturally. By using segmented staggered cross supports, the stress concentration superposition between the upper backfill load and the lower stope support structure at the intersection is avoided. Combined with the skip-mining method of mining every two days and the sequential design of progressively advancing and lagging synchronous filling, the mining stress is always jointly borne by the unmined pillar and the filled body. Combined with the stepped multi-point material feeding and the inclined floor guiding the material flow to spread naturally, the filling density at the top is improved, thus comprehensively improving the overall stability and filling quality of the mining of the lower horizontal isolation pillar.
[0033] As a further improvement of the present invention, the upper shallow-hole room-and-pillar method two-step pillar adopts layered slotting retreat mining, blasting pile self-flowing haulage, and segmented partitioned filling. The layered slotting retreat mining divides the entire pillar vertically into 2 to 3 layers. The layered slotting retreat mining first chisels a slot at the bottom of the pillar to form a lower free face. The layered slotting retreat mining then adopts upward medium-deep hole blasting from top to bottom in a layered retreat mining manner. The blasting pile self-flowing haulage utilizes the dip angle of the ore body and the natural angle of repose of the blast pile to allow the collapsed ore to flow under its own weight to the bottom drilling roadway. The blasting pile self-flowing haulage will significantly reduce the operating distance and frequency of remote-controlled loaders entering the empty area, thereby reducing the risk of empty area operation. The blasting stage of the blasting pile self-flowing haulage adopts layered differentiated parameters. The lower layer of the blasting stage adopts small row spacing and dense hole spacing to strictly control the block size and ensure the efficiency of shoveling and hauling operations. The upper layer of the segmented partitioned filling appropriately increases the row spacing to use blasting impact to assist in loosening the upper part of the pillar and reducing large blocks. By creating a free working face through layered trenching and retreat mining, and implementing layered retreat blasting from top to bottom, differentiated blasting parameters are adopted to balance the block size control of the lower layer with the loosening and reduction of large blocks in the upper layer. The self-flowing and guiding of the blast pile reduces the working distance and frequency of the remote-controlled loader in the empty area to reduce operational risks. Combined with segmented backfilling, the operation is stabilized, and safe and efficient recovery of the upper shallow hole room-and-pillar two-step pillar is achieved, as well as an increase in resource recovery rate.
[0034] As a further improvement of the present invention, in step S22, the preliminary theoretical calculation is performed using the KB Rubeneit formula. Based on the principle of independent action and superposition of forces, the stress generated by the combined action of the self-weight of the isolation roof rock mass and the weight of the overlying strata in the goaf under the fractured zone is calculated. Two conditions are assumed in the theoretical analysis calculation: the length of the stope greatly exceeds its width, and the number of stops is large, without considering the influence of the boundary span. Based on these two assumptions, the complex three-dimensional thick plate calculation problem is simplified into an ideal planar elastic mechanics problem, and a rock mass mechanics model is established. Based on the rock mass mechanics model, mechanical formulas are established, and the safe thickness of the goaf roof is determined. The specific calculation formula for the safe thickness is as follows:
[0035] ;
[0036] Wherein, T is the thickness of the isolation pillar, K is the safety factor, R is the unit weight of the ore body in the isolation pillar, B is the span of the goaf, and g is the pressure of the overlying strata above the isolation pillar on the roof pillar. Using the KB Rubeneit formula and based on the principles of independent action and superposition of forces, and with the help of two reasonable assumptions, the complex calculation of a three-dimensional thick plate is simplified into a plane elasticity problem. Based on this, a rock mechanics model and a formula for calculating the safe thickness are established. Combined with specific parameters, the safe thickness of the isolation roof in the goaf can be accurately calculated, providing a reliable theoretical basis for the design of the isolation layer thickness.
[0037] As a further improvement of the present invention, the The modified ultimate strength of the top plate under bending conditions, the The calculation formula is: The The rock strength limit under bending conditions, the For the strength safety factor, the The structural weakening coefficient, the The calculation formula is: =(7~10)%· The The minimum safe thickness of the isolation layer, calculated using the KB Rubeneit formula, is only related to the span of the mining area, representing the uniaxial compressive strength of the ore and rock.
[0038] The KB Rubeneit formula concludes that a larger thickness-to-span ratio leads to greater stability of the isolation layer. Based on the theory and calculation method of the thickness-to-span ratio, H / W ≥ 0.5 is obtained from the approximate horizontal projected span L and the thinnest part of the isolation layer, h. Taking h / L in an approximate horizontal state as the minimum ratio for estimating the safe thickness, a safety factor K is introduced to obtain the relationship between the goaf span and the safe isolation layer thickness under different safety conditions. Empirically, h / KL ≥ 0.5 is considered safe, and its calculation formula is as follows:
[0039] ;
[0040] Wherein, H represents the thickness of the safety isolation layer, and W represents the span of the goaf. The strength limit of the roof under bending conditions is corrected using a strength safety factor and a structural weakening factor to improve the accuracy of theoretical calculations. Simultaneously, based on the thickness-to-span ratio law of the KB Rubeneit formula, an empirical formula for determining the thickness of the safety isolation layer is introduced, which can both verify theoretical calculation results and quickly estimate the safe thickness of the isolation layer, providing a dual verification basis for isolation layer thickness design.
[0041] As a further improvement of the present invention, the span of the mine and the safety factor K can be derived from the thickness H of the safety isolation layer according to the material mechanics valve. The span of the mine is B, and the calculation formula for the thickness H of the safety isolation layer is as follows:
[0042] ;
[0043] Wherein, q is the additional load, b is the width of the isolation layer rock beam along the direction of the mine, and σ is the ultimate tensile strength of the rock beam;
[0044] The bending moment is calculated based on q, and the bending moment is M. The formula for calculating M is as follows:
[0045] ;
[0046] ;
[0047] ;
[0048] Among them, the Where γ is the span of the goaf, γ' is the unit weight of the overlying strata, γ' is the weight of the waste rock cover layer, h is the thickness of the horizontal isolation layer pillar, h' is the thickness of the waste rock layer, ω is the resistance moment, and b is the beam width. Based on beam theory in mechanics of materials, quantitative calculation formulas for the safe isolation layer thickness, bending moment, and resistance moment are derived. These formulas incorporate multi-dimensional stress parameters such as additional load, overlying strata unit weight, and waste rock cover layer weight, enabling more accurate calculation of the isolation layer's stress state and safe thickness. This provides a calculation basis that closely matches actual stress conditions for isolation layer thickness design.
[0049] As a further improvement of the present invention, the maximum bending moment at the center of the roof of the goaf can be calculated according to the above formula, and the allowable tensile stress of the roof can be calculated. The allowable tensile stress is... The The calculation formula is as follows:
[0050] ;
[0051] ;
[0052] ;
[0053] Where n is 2, the Where Kc is the ultimate tensile strength, b is the structural weakening coefficient, and b is 1.
[0054] The assumed load is transmitted downwards along a vertical line at a diffusion angle of 30°~35° from the center of the roof. When the transmission line is located outside the intersection of the roof and the goaf sidewall, it is assumed that the goaf sidewall directly supports the external load on the roof and the self-weight of the rock. In this case, the thickness of the roof is the thickness of the safety isolation layer. The angle between the load transmission intersection line and the center line of the roof is set as β. The calculated thickness h of the isolation layer is then the safe thickness of the roof. The specific calculation formula is as follows:
[0055] ;
[0056] By calculating the maximum bending moment and allowable tensile stress of the goaf roof, the formula for calculating the thickness of the safety isolation layer is derived. At the same time, the load transfer intersection method with a load diffusion angle of 30°~35° is used for verification, forming a dual calculation and verification mechanism. This can accurately determine the thickness of the safety isolation layer and improve the accuracy and safety reliability of the isolation layer thickness design.
[0057] The advantages of this invention are:
[0058] 1. By combining borehole core samples with the RQD value and weathering degree classification of the rock mass, the spatial distribution and elevation boundaries of the weathered zone are delineated, clarifying the upper limit constraint for mining. Then, a three-level calculation verification is performed sequentially using the KB Rubeneit theory formula, the thickness-to-span ratio empirical rule, and the beam model of materials mechanics. Finally, a 30°~35° load diffusion angle verification is used to determine the safe thickness of the isolation layer and the highest mining elevation in the stope. This avoids disturbance to the fractured rock mass in the weathered zone during mining, thus ensuring the safety of surface protection targets. Simultaneously, the three-level verification mechanism corrects the calculation bias of a single theoretical model, maximizing the upper limit of mining while meeting the requirements for surface subsidence and rock mass stability.
[0059] 2. The pillars are classified into three categories: lower horizontal isolation pillars, upper shallow-hole room-and-pillar two-step pillars, and upper segmental drilling open-hole two-step pillars. Three differentiated mining techniques are matched to these pillars: strike-oriented stopes, retreat mining without a bottom structure, and trench-type bottom structure mining. A step-by-step mining mode, starting from the bottom and moving up, is adopted to adapt to the boundary conditions and failure characteristics of various pillar types, improving process adaptability and resource recovery rate. Simultaneously, the step-by-step mining creates a progressive mining logic where the lower part stabilizes before the upper part follows, effectively mitigating the stress superposition risk of simultaneous mining of multiple pillars.
[0060] 3. For the lower horizontal isolation pillar, a skip-mining method of mining two pillars at a time along the strike is adopted. The mining proceeds segment by segment from bottom to top against the dip in the same section, coordinated with synchronous backfilling one step behind. This results in a segmented, staggered arrangement of pillars between the lower strike-oriented stope and the upper vertically oriented backfill, forming a cross-shaped overlapping structure. This disperses mining stress and avoids stress concentration, thereby reducing the risk of overall collapse of the upper backfill. Simultaneously, a dynamic support system is formed, jointly supported by the unmined pillar and the filled body. Mining stress is shared by both, and the segmented, staggered arrangement ensures that the load transfer path of the upper backfill intersects and avoids stress concentration at the intersection points.
[0061] 4. For the two-step pillar mining method using shallow-hole rooms and pillars in the upper part, a layered slotting and retreating process is adopted. The lower layer uses a small row spacing and dense hole spacing to strictly control the block size, while the upper layer appropriately increases the row spacing and uses blasting impact to assist in loosening the upper part of the pillar and reducing large blocks. At the same time, the dip angle of the ore body and the natural angle of repose of the blast pile are used to allow the collapsed ore to slide to the bottom of the ore extraction roadway by its own weight. The optimized blasting block size reduces the operating distance and frequency of remote-controlled loaders entering the goaf, thus reducing the risk of working in the goaf.
[0062] 5. A three-step, phased, and graded backfilling process was adopted. High-strength backfill was used for the bottom and roof of the stope, medium-strength backfill for the middle section, and low-strength backfill for the top section. The height of each backfilling operation was strictly controlled, and adjacent stopes were only mined after the backfill reached the designed strength. By controlling the stress requirements of different parts, the cost of backfill materials was saved. The gradient strength design precisely corresponds to the different functional positions of the backfill, significantly reducing the overall backfilling cost while ensuring the overall support performance. Attached Figure Description
[0063] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0064] Figure 1 This is a flowchart of the steps of the present invention.
[0065] Figure 2 This is a schematic diagram of the rock mechanics model of the present invention.
[0066] Figure 3 This is a schematic diagram of the material mechanics model of the present invention.
[0067] Figure 4 This is a simplified structural mechanics diagram of the horizontal isolation layer pillar computational mechanics of the beam theory of the present invention.
[0068] Figure 5This is a schematic diagram illustrating the theoretical analysis of the load transfer intersection method of the present invention.
[0069] Figure 6 This is a schematic diagram of the segmented filling method of the present invention.
[0070] Figure 7 This is a schematic diagram showing the elevation of the weathering zone location according to the present invention. Detailed Implementation
[0071] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0072] Example 1 illustrates a safe and efficient method for mining pillar resources under a near-surface weathered zone, using the safe mining of a near-surface horizontal isolation pillar as an example. This example addresses a copper mine where a near-surface strongly weathered zone exists between elevations +180m and +230m. The weathered rock mass is fractured, with an RQD value of 40-55 and significantly deteriorated mechanical properties. The +130m section has been mined using a segmented open-cut subsequent backfilling method, forming a continuous cemented backfill body. Between +130m and +180m lies a horizontal isolation pillar with an average thickness of 15m, a strike length of 650m, a dip angle of 32°, and surrounding rock of granodiorite. The uniaxial compressive strength is [not specified in the original text]. =75MPa, ore body density overlying rock strata unit weight To address the engineering challenges of repeated construction disturbances and stress redistribution in the surrounding rock during phased mining, which can easily lead to instability, this horizontal isolation pillar is mined to simultaneously ensure the stability of the upper weathered rock mass and the safety of surface farmland and village roads. Figure 1 As shown, it includes the following steps:
[0073] S1. Preliminary Basic Verification: Comprehensively review the geological conditions, current mining status and pillar occurrence characteristics of the mining area, complete resource quantity statistics and mechanical parameter testing of the filling body, and ascertain the engineering and resource baseline.
[0074] S11. Geological and Mining Status Overview: A systematic analysis of the geological structure, spatial occurrence morphology of the ore body, and surrounding rock mechanical parameters of the mining area was conducted. The vertical strike of the +130m mid-level stope was clarified, with a width of 12m. The backfill material is cemented tailings, and the overall quality grade is Class II. The formation background of the horizontal isolation pillar was clarified as protecting the upper weathering zone and surface structures. Its lower boundary is the roof of the +130m mid-level backfill material, and its upper boundary is the floor of the weathering zone.
[0075] S12. Pillar Occurrence Characteristics and Resource Statistics: Statistics are compiled by elevation range of +130m~+150m and +150m~+180m. This horizontally isolated pillar exhibits a near-horizontal layered distribution with an average thickness of 50m, continuous strike, and a dip extension width of 72m. The calculated resource volume overlying the weathered zone is 1.28 million tons, and the total recoverable resource volume of the pillar is 3.15 million tons, completing the resource baseline survey.
[0076] S13. On-site verification and parameter testing: The integrity of the surrounding rock was confirmed through on-site reconnaissance underground, and no large-scale destructive fractures were found inside the pillar. Core sampling tests were conducted in the filled boreholes to obtain physical and mechanical parameters such as uniaxial compressive strength and elastic modulus of the filling body at different depths. The measured average strength of the filling body was 2.1 MPa, providing a test basis for subsequent stability calculations and scheme design.
[0077] S2. Mining boundary design: The distribution range of the weathered zone is delineated by logging borehole cores, and the safe thickness of the isolation layer is determined by combining theoretical calculations and numerical simulations. The highest mining elevation of the mining area is marked in different areas.
[0078] S21. Precise Delineation of Weathering Zone Location: Based on core logging from production exploration boreholes, and combined with the RQD value of the rock mass and the weathering degree grading standard, the bottom boundary of the strongly weathered zone is defined as +180m, with a thickness ranging from 22 to 31m. The lithology is mainly strongly weathered granodiorite, with fractured rock mass and well-developed joints and fissures. The distribution pattern of the fractured rock mass in the weathered zone is clarified, and +180m is determined as the upper limit constraint for the exploitation of resources overlaid by the weathered zone.
[0079] S22. Calculation of safe thickness of the isolation layer:
[0080] Preliminary calculations based on KB Rubeneit theory: Based on the principle of independent action and superposition of forces, the stress generated by the combined action of the self-weight of the isolation roof rock mass and the weight of the overlying strata in the goaf of the fractured zone is calculated. Two assumptions are made before the calculation: ① The length of the stope is much greater than its width. ② There are many stops, and the influence of the boundary span is not considered. The three-dimensional thick plate calculation problem is simplified to a plane elasticity problem, and a rock mass mechanics model is established. The modified ultimate strength of the roof under bending conditions is calculated using the following formula:
[0081] In the formula For the rock strength limit under bending conditions, take =8%· =8% * 75MPa = 6MPa. As a strength safety factor, we take 1.5. Let be the structural weakening factor, taken as 1.2. Substituting this into the calculation yields... ≈3.33MPa. Formula for calculating the safe thickness of an isolation pillar:
[0082] .
[0083] In the formula: K is the safety factor, taken as 2.0. R is the unit weight of the isolation pillar ore body, taken as 27.2 kN / m³. B is the span of the goaf, taken as 12 m. g is the pressure of the overlying strata above the isolation pillar on the top pillar, taken as the self-weight stress of the overlying weathered zone, i.e. Substituting the values into the calculation, the minimum theoretical thickness is T≈0.99m.
[0084] Empirical verification of thickness-to-span ratio: According to the thickness-to-span ratio theory, the criterion for the stability of the isolation layer is the thickness-to-span ratio. After introducing the safety factor K, the safety determination condition is as follows: The approximate horizontal projection span of the goaf area. Safety factor Substituting into the equation yields the minimum safe thickness. .
[0085] Numerical verification using mechanics of materials: The safe thickness of the isolation layer was derived according to beam theory in mechanics of materials, and the maximum bending moment occurred at the center of the roof of the goaf. Bending moment calculation formula:
[0086] .
[0087] Formula for calculating drag torque: In the formula: The span of the goaf is taken as 12m. The unit weight of the overlying rock strata is taken as 26.5 kN / m³. ρ is the bulk density of the waste rock overburden, taken as 19 kN / m³. h is the thickness of the horizontal isolation layer pillar. 'b' represents the thickness of the waste rock layer, taken as 2m. 'b' represents the width of the rock beam along the direction of the stope, taken as 1m. The allowable tensile stress of the roof slab satisfies: In the formula: . The ultimate tensile strength of the rock is taken as 4.8 MPa. Let be the structural weakening factor, taken as 1.3. Substituting the parameters into the solution, the minimum safe thickness of the isolation layer is obtained. Simultaneously, the load is transferred downwards at a 32° diffusion angle along the vertical line from the center of the roof. When the transfer line is located outside the intersection of the roof and the sidewall of the goaf, the sidewall can directly support the external load and its own weight. This is combined with the diffusion angle. After verifying the thickness of the isolation layer, the final safe thickness of the isolation layer was determined to be 12m, corresponding to a maximum mining elevation of +168m.
[0088] S3. Optimization of mining scheme: Compare and select the best mining methods and mining modes, match differentiated mining layout methods for different types of pillars, and complete the optimization and selection of mining structure parameters.
[0089] S31. Selection and determination of mining methods: The segmented rock drilling stage open-stope filling mining method is selected to meet the safety control requirements and production efficiency needs of near-surface pillar mining.
[0090] S32. Selection of mining mode: The two-part pillar mining mode is adopted. In this embodiment, the lower horizontal isolation pillar is mined first. After the process is mature and the filling body is stable, the upper inter-stop pillar is mined to reduce the risk of overall collapse of the upper filling body.
[0091] S33. Stope Layout and Structural Adaptation: For the lower horizontal isolation pillars, a stope layout along the strike of the ore body is adopted, with a stope width of 12m, a stage height of 50m, and a segment height of 12m. This layout creates a segmented, staggered, cross-supported cross-connection structure between the upper backfill and the lower stope: the lower stope arranged along the strike and the upper vertical backfill are arranged in a segmented, staggered manner, so that the load transfer path of the upper backfill and the support structure of the lower stope form a cross-peak support, avoiding stress concentration and superposition at the intersection nodes.
[0092] S34. Optimization of mining area structural parameters: By constructing a physical and mechanical model and numerical simulation calculations, the length, width, segment height and column width of the mining area are iteratively optimized. Finally, the column width of the mining area is determined to be 8m, which balances resource recovery rate and production capacity while ensuring the stability of the surrounding rock.
[0093] S4. On-site engineering implementation: Carry out the mining and cutting engineering construction according to the design, adopt controlled blasting ore extraction and mechanized ore extraction technology, and strictly implement the phased and graded subsequent backfilling operation.
[0094] S41. Construction of mining preparation and cutting engineering: According to the design, the mining preparation engineering includes the construction of section level roadways, ore extraction roadways, ore receiving roadways and ore extraction access roads. At the same time, the cutting riser and cutting cross roadway are constructed. Through the mining preparation and cutting engineering, a trench-type bottom ore extraction structure and the initial blasting free face are formed.
[0095] S42. Controlled blasting for ore cutting: A rock drilling rig is used to drill upward-facing, fan-shaped, medium-deep holes, with a borehole spacing of 1.8m and a bottom-to-bottom distance of 2.2m. A 2m thick protective layer is reserved on the side of the stope closest to the backfill. Porous granular ammonium nitrate explosives and digital electronic detonators are used for bottom-reverse detonation, controlling the single blasting step distance to 2m. Considering the characteristics of near-surface mining, blasting parameters and initiation methods are optimized to control the blasting vibration velocity below 5cm / s, avoiding disturbance to weathered rock masses and surface structures.
[0096] S43. Mechanized Ore Extraction and Transfer: A 2m³ electric loader is used to extract ore within the structure at the bottom of the trench. The ore is then transferred via a pass to the +130m mid-level transport station. The equipment relocation is rationally arranged to match the rhythm of drilling and blasting processes, ensuring equipment utilization and efficient process integration.
[0097] S44. Phased and Graded Subsequent Backfilling: After the stope is fully mined, a backfill retaining wall and water filtration facilities are constructed within the bottom structure to seal the boundary between the stope and external shafts. A phased and graded backfilling process is adopted, with high-strength backfill materials used for the stope bottom and roof. The backfilling process consists of three steps:
[0098] Step 1: Fill the bottom of the stope with a 3m thick high-strength tailings cemented backfill body with a strength of 3.0MPa to support the bottom ore extraction structure.
[0099] The second step is to fill the middle of the stope with a medium-strength tailings cemented backfill body with a strength of 1.5 MPa, which will provide lateral support for the subsequent mining of adjacent stops.
[0100] Step 3: Fill the upper part of the stope with low-strength tailings cemented backfill with a strength of 0.5 MPa until it reaches the roof.
[0101] The single filling height is strictly controlled to 3m. Mining of adjacent stops is only permitted after the filling reaches the designed strength. The mining sequence adopts a skip-mining method, with two sections mined at a time along the strike, advancing segment by segment from bottom to top against the dip within the same section. After each segment is completed, synchronous filling is performed one step later, ensuring that the mining stress on the isolation pillar is always jointly borne by the unmined pillar and the filled body. For the roof connection stage, multiple cross-cutting roadways distributed along the strike are used for tiered, multi-point material feeding: first, the bottom is filled from the lower roadway, then material is added from the upper roadway to connect the roof, coordinating with the inclined floor of the lower stope to guide the material flow and ensure the density of the roof connection.
[0102] S5. Safety Dynamic Management: Deploy a ground pressure and displacement monitoring system, conduct surface stability assessments, and dynamically adjust mining parameters based on monitoring data to ensure safety and controllability throughout the mining process.
[0103] S51. Ground pressure and displacement monitoring: Stress and displacement monitoring points are set up in the surrounding rock, the interior of the isolation layer and the bottom plate of the weathered zone around the mining area. A monitoring section is set up every 50m to monitor the changes in surrounding rock stress, rock mass displacement and the development trend of plastic zone in real time during the mining process.
[0104] S52. Surface stability assessment: A combination of numerical simulation prediction and on-site settlement monitoring was adopted. Settlement observation lines were set up along the surface to assess the range and magnitude of surface settlement deformation. The measured maximum settlement was 12 mm, which is much less than the allowable value, ensuring the safety of farmland, buildings and highways on the surface.
[0105] S53 Dynamic Optimization and Adjustment: Based on monitoring data, the mining sequence, goaf exposure time, and backfilling rhythm are adjusted in a timely manner to control ground pressure risks. Based on the weathered zone and pillar condition revealed by the actual project, the blasting parameters and segment heights of the stope are dynamically optimized to achieve safe and efficient recovery of near-surface pillar resources.
[0106] Example 2, taking the two-step pillar mining using the upper shallow-hole room-and-pillar method as an example, describes a safe and efficient method for mining pillar resources under near-surface weathering zones. This example addresses a two-step pillar left over from early shallow-hole room-and-pillar mining in the +180m to +210m elevation section of the aforementioned mining area. The pillars are regularly strip-shaped, with a width of 8m and a height of 30m per pillar, and a dip angle of 32°. They are directly overlain by a strongly weathered zone with a thickness of 25m. The surrounding area of these pillars is low-strength, non-cemented backfill. During the step-by-step mining process, construction disturbances can easily cause backfill collapse, weathering zone disturbance, and stress concentration. Figure 1 As shown, it includes the following steps:
[0107] S1. Preliminary Basic Verification: Comprehensively review the geological conditions, current mining status and pillar occurrence characteristics of the mining area, complete resource quantity statistics and mechanical parameter testing of the filling body, and ascertain the engineering and resource baseline.
[0108] S11. Geological and Mining Status Overview: Analyze the mining history of the shallow-hole room-and-pillar method in this section. The stope is arranged along the strike, with a width of 10m. The pillars are room-and-pillar structures filled with uncemented waste rock. The formation background of the pillars is identified as a two-step reserved resource, with boundary conditions consisting of the surrounding backfill and the upper weathering zone.
[0109] S12. Pillar Occurrence Characteristics and Resource Statistics: The morphology, size, and spatial distribution of pillars were statistically analyzed by region. A total of 42 pillars remain in this section, with a recoverable resource of 780,000 tons. The extent of the overburden from the upper weathering zone was calculated to clarify the resource baseline.
[0110] S13. On-site verification and parameter testing: On-site reconnaissance confirmed the integrity of the pillar, and the physical and mechanical parameters of the surrounding backfill were tested. The measured friction angle of the waste rock backfill was 38°, which provided a basis for stability calculation.
[0111] S2. Mining boundary design: The distribution range of the weathered zone is delineated by logging borehole cores, and the safe thickness of the isolation layer is determined by combining theoretical calculations and numerical simulations. The highest mining elevation of the mining area is marked in different areas.
[0112] S21. Precise delineation of the weathering zone location: Based on borehole and downhole data, the bottom boundary elevation of this weathering zone is determined to be +210m, the upper limit of mining is determined to be +205m, and a 5m thick rock pillar is reserved as a protective isolation layer.
[0113] S22. Calculation of the safe thickness of the isolation layer: The calculation is performed sequentially using the KB Rubeneit formula, the empirical formula for thickness-to-span ratio, and the method of mechanics of materials. , The goaf span is 10m, the safety factor is 2.0, and the minimum theoretical thickness calculated by KB Rubeneit theory is 0.85m. The thickness-to-span ratio verification meets the requirements. The minimum safe thickness is 10m. Substituting the bending moment, resisting moment, and allowable tensile stress formulas using mechanics of materials, the minimum safe thickness is calculated to be 9.6m. This is combined with the load diffusion angle... Upon review, the final safe thickness of the isolation layer was determined to be 10m, corresponding to the highest mining elevation +200m.
[0114] S3. Optimization of mining scheme: Compare and select the best mining methods and mining modes, match differentiated mining layout methods for different types of pillars, and complete the optimization and selection of mining structure parameters.
[0115] S31. Mining method: The method of mining with open space after stage of rock drilling and subsequent backfilling is adopted.
[0116] S32. Mining mode: This is a two-step pillar mining method using the upper shallow hole room-and-pillar method. It is implemented after the lower horizontal isolation pillar has been mined and backfilled to stabilize, in order to avoid the superposition of disturbances from multiple processes.
[0117] S33. Mining layout and structural adaptation: For the upper shallow hole room-and-pillar method two-step pillar, a deep hole retreat mining method without bottom structure is adopted, and a remote-controlled loader is used for ore extraction to eliminate bottom structure ore loss and improve resource recovery rate.
[0118] S34. Optimization of mining parameters: The segment height and caving step distance of the pillar mining are optimized through numerical simulation. The segment height is determined to be 10m and the caving step distance is 1.5m to ensure the stability of the pillar and backfill during mining.
[0119] S4. On-site engineering implementation: Carry out the mining and cutting engineering construction according to the design, adopt controlled blasting ore extraction and mechanized ore extraction technology, and strictly implement the phased and graded subsequent backfilling operation.
[0120] S41. Mining preparation and cutting engineering: Excavating ore connecting roadways and slotting horizontal roadways at the bottom of the ore pillar to form the initial free face and ore extraction channel.
[0121] S42. Controlled blasting: A layered trenching and retreating mining process is adopted, dividing the 30m high pillar vertically into 3 layers, each 10m high. First, trenches are excavated at the bottom of the pillar to form a lower free face, and then blasting is carried out from top to bottom in layers using upward medium-deep holes.
[0122] The blasting process employs differentiated parameters for each layer: the lower layer uses a small row spacing of 1.2m and a close hole spacing of 1.5m to strictly control block size and ensure efficient shoveling and transportation operations. The upper layer appropriately increases the row spacing to 1.8m, utilizing blasting impact to loosen the upper part of the pillar and reduce the proportion of large blocks.
[0123] S43. Ore Transfer: The blast pile self-flowing transport technology is adopted, which utilizes the 32° dip angle of the ore body and the 38° natural angle of repose of the blast pile to allow the collapsed ore to flow under its own weight to the bottom of the drilling ore tunnel. This greatly reduces the operating distance and frequency of remote-controlled loaders entering the empty area and reduces the risk of operating in the empty area.
[0124] S44. Segmented Intermittent Backfilling: Segmented intermittent backfilling is implemented immediately after the completion of one layer, using a phased and graded backfilling system: The bottom layer (2.5 MPa) is filled with high-strength cemented material as the foundation for the next layer's ore extraction. The middle layer (1.2 MPa) is filled with medium-strength cemented material. The top layer (0.5 MPa) is filled with low-strength cemented material. The height of each backfilling operation is strictly controlled; the next layer's extraction operation is only carried out after the backfill material has reached the required strength to avoid damage from subsequent blasting disturbances before the backfill material has solidified.
[0125] S5. Safety Dynamic Management: Deploy a ground pressure and displacement monitoring system, conduct surface stability assessments, and dynamically adjust mining parameters based on monitoring data to ensure safety and controllability throughout the mining process.
[0126] S51. Ground pressure monitoring: Stress monitoring points are set up inside the pillar and around the filling body to monitor the stress changes of the pillar and the deformation of the filling body in real time during the mining process.
[0127] S52. Stability assessment of the weathered zone: Through displacement monitoring and numerical simulation, assess the disturbance impact of mining on the upper weathered zone and control the displacement of the weathered zone rock mass within the allowable range.
[0128] S53. Dynamic Adjustment: Adjust blasting parameters and filling rhythm according to monitoring data, reduce the blasting step distance when encountering fracture zones, strengthen support in a timely manner, and ensure safe mining.
[0129] Example 3, taking the two-step pillar recovery method using the segmented rock drill open method as an example, describes a safe and efficient method for recovering pillar resources under near-surface weathered zones. This example addresses a two-step stope pillar left over from the segmented rock drill open method in the +160m to +190m elevation section of the mining area. The pillar is arranged vertically, 10m wide and 30m high, with the upper part adjacent to the weathered zone and the lower part being a filled one-step stope. During the recovery process, there are risks of superimposed upper and lower mining dynamic stresses and complex stress on the isolation layer, requiring verification of the adaptability of the trench-type bottom structure and the reliability of the overall process. Figure 1 As shown, it includes the following steps:
[0130] S1. Preliminary Basic Verification: Comprehensively review the geological conditions, current mining status and pillar occurrence characteristics of the mining area, complete resource quantity statistics and mechanical parameter testing of the filling body, and ascertain the engineering and resource baseline.
[0131] S11. Geological and Mining Status Overview: It is clarified that the first-stage stope in this intermediate section adopts the segmented drilling open-cut method, with a vertical strike and a mining width of 12m, followed by cemented backfilling. The second-stage pillars are reserved pillars, with the weathered zone above and the lower backfill body below, respectively.
[0132] S12, Pillar Resource Statistics: There are a total of 28 pillars in this section, with a recoverable resource of 920,000 tons. The pillars are regular in shape and have good continuity.
[0133] S13. Field test: The strength of the lower filling body and the mechanical parameters of the surrounding rock were tested. The measured strength of the filling body was 2.3 MPa, which provides a basis for the scheme design.
[0134] S2. Mining boundary design: The distribution range of the weathered zone is delineated by logging borehole cores, and the safe thickness of the isolation layer is determined by combining theoretical calculations and numerical simulations. The highest mining elevation of the mining area is marked in different areas.
[0135] S21. Delineation of the weathered zone: Determine the bottom boundary elevation of the weathered zone to be +190m, and control the upper limit of mining at +185m.
[0136] S22. Calculation of isolation layer thickness: Verification is performed sequentially using a three-level calculation method.
[0137] KB Rubeneit formula calculation, , The goaf spans 12m, and the theoretical minimum thickness is 1.02m.
[0138] Thickness-to-span ratio verification, meets the requirements ,have to .
[0139] Calculation using mechanics of materials, substituting parameters , , The minimum thickness was found to be 11.5m. After verification with a 35° load diffusion angle, the final safe thickness of the isolation layer was determined to be 12m, with the highest mining elevation being +178m.
[0140] S3. Optimization of mining scheme: Compare and select the best mining methods and mining modes, match differentiated mining layout methods for different types of pillars, and complete the optimization and selection of mining structure parameters.
[0141] S31. Mining method: Sectional drilling stage followed by backfilling mining method.
[0142] S32. Mining mode: step-by-step mining. After the mining of the lower horizontal isolation pillar is stable, this type of pillar mining will be implemented. After the technology matures, it can be gradually transitioned to synchronous mining under the premise of taking reinforcement measures.
[0143] S33. Mining layout: For the two-step pillar of the upper section rock drilling open field method, a trench-type bottom structure with deep hole retreat mining is adopted. The mining face is arranged along the pillar strike and retreats from one end to the other.
[0144] S34. Parameter optimization: Numerical simulation was used to optimize the trench depth, borehole parameters and segment height, and the trench depth was determined to be 2.5m and the segment height to be 15m. After the inter-column mining, the resource recovery rate can reach more than 85%.
[0145] S4. On-site engineering implementation: Carry out the mining and cutting engineering construction according to the design, adopt controlled blasting ore extraction and mechanized ore extraction technology, and strictly implement the phased and graded subsequent backfilling operation.
[0146] S41. Mining and Cutting: Construct trenches and level tunnels, and cut risers to form a trench-type bottom ore extraction structure and initial free surface.
[0147] S42. Controlled blasting: Upward fan-shaped medium-deep hole blasting is adopted, with a hole bottom distance of 2.0m and a row spacing of 1.8m. Reverse initiation is used, and the single blasting step distance is controlled at 2m. Blasting vibration is strictly controlled to avoid disturbing the upper weathered zone and the surrounding filling body.
[0148] S43. Mechanized ore extraction: Electric loaders extract ore in the trenches, and the ore is transferred to the lower transportation section via a pass shaft, with efficient process matching.
[0149] S44. Subsequent backfilling: A phased and graded backfilling process is adopted, with a high-strength backfill body at the bottom (3m), medium-strength in the middle, and low-strength at the top. The height of each backfilling is controlled at 3m. After the strength meets the standard, adjacent pillars are mined. A multi-point feeding method is used to ensure the quality of the roof connection.
[0150] S5. Safety Dynamic Management: Deploy a ground pressure and displacement monitoring system, conduct surface stability assessments, and dynamically adjust mining parameters based on monitoring data to ensure safety and controllability throughout the mining process.
[0151] S51. Monitoring system: Stress and displacement monitoring points are arranged in the isolation layer at the top of the column and the surrounding filling material to collect data in real time.
[0152] S52. Stability Assessment: Combining numerical simulation and field monitoring, assess the stability of the surrounding rock and backfill during the inter-column mining process and predict surface subsidence.
[0153] S53. Dynamic optimization: Adjust the mining speed and backfilling timing based on monitoring results, optimize the mining site structure parameters, and achieve safe and efficient mining.
[0154] Finally, it should be noted that the above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A safe and efficient method for mining pillar resources under the near-surface weathering zone, characterized in that, Specifically, the steps include the following: S1, Preliminary Basic Verification: Comprehensively review the geological conditions, current mining status and pillar occurrence characteristics of the mining area, complete resource quantity statistics and mechanical parameter testing of the filling body, and ascertain the engineering and resource baseline; S11, Geological and Mining Status Review: Analyze the geological overview of the mining area, the occurrence characteristics of the ore body and the mechanical properties of the surrounding rock. Through the mining methods, engineering layout, distribution and quality status of the backfill body in the middle section, clarify the historical background and boundary conditions of the ore pillar formation. S12, Characteristics of ore pillar occurrence and resource statistics: By elevation and region, the shape, size and spatial distribution of horizontally isolated ore pillars, inter-stope pillars and top pillars are statistically analyzed to calculate the resource quantity covered by the weathered zone and the total recoverable resources of the ore pillars, and to clarify the resource base. S13, On-site verification and parameter testing: Confirm the integrity of the surrounding rock and the damage to the pillar through on-site underground reconnaissance, conduct core sampling tests of the filling boreholes, and obtain the physical and mechanical parameters of the filling body at different locations to provide experimental basis for subsequent stability calculations and scheme design; S2, Mining Boundary Design: The distribution range of the weathered zone is delineated by logging borehole cores, and the safe thickness of the isolation layer is determined by combining theoretical calculations and numerical simulations. The highest mining elevation of the stope is marked in different areas. S21, Precise delineation of the location of weathering zones: Based on the core logging of production exploration boreholes, combined with the RQD value of the rock mass and the weathering degree classification, the lithological composition, spatial distribution range, thickness range and elevation boundary of the weathering zone are delineated, the distribution law of the fractured rock mass in the weathering zone is clarified, and the upper limit constraint of the exploitation of the resources covered by the weathering zone is determined. S22, Safety thickness of the isolation layer: Preliminary calculations are performed theoretically, followed by numerical simulations for verification, and finally the thickness is determined and differentiated. S3, Optimization of mining scheme: Compare and select the best mining methods and mining modes, match differentiated stope layout for different types of pillars, and complete the optimization and selection of stope structure parameters; S31, Selection of mining method: The segmented rock drilling stage open-stop mining method followed by backfilling is selected to meet the safety control and production efficiency requirements of near-surface pillar mining. S32, Mining mode selection: The step-by-step mining mode with upper and lower pillars is adopted. The lower horizontal isolation pillar is mined first, and the upper inter-stop pillar is mined later, thereby reducing the risk of overall collapse of the upper backfill. After the mining experience under the backfill is rich and the technology is mature, it can be gradually transitioned to synchronous mining under the premise of taking reinforcement measures. S33, Mining layout and structural adaptation: Differentiated layout schemes for pillars with different elevations and formations; S34, Optimization of stope structure parameters: Through the construction of physical and mechanical models and numerical simulation calculations, the length, width, height and column width of the stope are iteratively optimized to balance resource recovery rate and production capacity while ensuring the stability of the surrounding rock. S4, On-site engineering implementation: Carry out the mining preparation and cutting engineering construction according to the design, adopt controlled blasting ore extraction and mechanized ore extraction technology, and strictly implement the phased and graded subsequent backfilling operation; S41, Mining preparation and cutting engineering construction: The mining preparation engineering is carried out according to the design and construction of the section level roadway, ore outlet roadway, ore receiving roadway and ore outlet access roadway. At the same time, the cutting engineering of the cutting riser and the cutting cross roadway is designed. Through the mining preparation engineering and cutting engineering, the trench-type bottom ore outlet structure and the initial blasting free face are formed. S42, Controlled blasting for ore cutting: Drilling upward fan-shaped medium-deep holes using a rock drilling rig, strictly controlling the blast hole parameters, reserving a reasonable protective layer on the side of the stope near the backfill, using porous granular ammonium nitrate explosives and digital electronic detonators for bottom-reverse detonation, controlling the single blasting step distance; In view of the characteristics of near-surface mining, strictly controlling the blasting vibration intensity by optimizing blasting parameters and detonation methods to avoid disturbing the weathered rock mass and surface structures; S43, Mechanized Ore Extraction and Transfer: Electric loaders are used to extract ore in the structure at the bottom of the trench. The ore is then transferred to the intermediate transport level via a pass. This is matched with the rhythm of rock drilling and blasting processes, and equipment relocation is arranged in a reasonable manner to ensure equipment utilization and process connection efficiency. S44, phased and graded subsequent backfilling: After the mining is completed, a backfilling retaining wall and water filtration facilities are constructed in the bottom structure to seal the boundary between the mining area and the external shafts and prevent the loss of backfilling material and water accumulation in the mining area. S5, Safety Dynamic Management: Deploy a ground pressure and displacement monitoring system, conduct surface stability assessments, and dynamically adjust mining parameters based on monitoring data to achieve safety and controllability throughout the mining process; S51, Ground pressure and displacement monitoring: Stress and displacement monitoring points are set up around the mining area, in the isolation layer and weathering zone to monitor the changes in surrounding rock stress, rock mass displacement and plastic zone development during the mining process in real time. S52, Surface stability assessment: By combining numerical simulation prediction with on-site settlement monitoring, the range and magnitude of surface settlement deformation are assessed to ensure the safety of farmland, buildings and roads. S53, Dynamic Optimization and Adjustment: Adjust the mining sequence, void exposure time and filling rhythm in a timely manner based on monitoring data to prevent ground pressure risks. Dynamically optimize mining parameters based on the weathering zone and pillar status revealed by the actual project to achieve safe and efficient recovery of near-surface pillar resources.
2. A method of safe and efficient recovery of pillar resources below the near-surface weathering zone as claimed in claim 1, characterized in that: In step S33, the elevation and formation of the pillars are divided into lower horizontal isolation pillars, upper shallow-hole room-and-pillar two-step pillars, and upper segmented drilling open-field two-step pillars. The lower horizontal isolation pillars are arranged in the stope along the ore body strike. The lower horizontal isolation pillars form a cross-over structure between the upper filling body and the lower stope, which improves the overall stability and simultaneously enables multi-point material feeding of the filling. The upper shallow-hole room-and-pillar two-step pillars are mined using deep-hole retreat mining without a bottom structure. The upper shallow-hole room-and-pillar two-step pillars are equipped with remote-controlled loader for ore extraction. The remote-controlled loader improves the resource recovery rate by eliminating ore loss from the bottom structure. The upper segmented drilling open-field two-step pillars are mined using deep-hole retreat mining with a trench-type bottom structure.
3. A method of safe and efficient recovery of pillar resources below the weathered zone of the near-surface, according to claim 1, characterised in that: In step S44, the phased and graded filling process uses high-strength filling bodies at the bottom and top of the stope. The phased and graded filling is specifically divided into three steps. The first step of the phased and graded filling uses medium-strength filling bodies in the middle of the stope to support subsequent mining steps. The second step of the phased and graded filling uses low-strength filling bodies in the middle of the stope. The phased and graded filling strictly controls the single filling height. After the phased and graded filling bodies reach the design strength, the mining operation of adjacent stopes is carried out.
4. A method of safe and efficient recovery of pillar resources below the weathered zone of the near-surface, according to claim 2, characterised in that: The cross-shaped interlocking structure employs segmented staggered cross supports. Specifically, the segmented staggered cross supports arrange the lower stopes along the strike and the upper filling bodies perpendicular to the strike in a segmented staggered arrangement. These segmented staggered cross supports ensure that the load transfer path of the upper filling body and the support structure of the lower stopes form a cross-peak support, preventing stress concentration and superposition at the intersection nodes. The mining sequence of the lower horizontal isolation pillars adopts a skip-mining method along the strike, where two pillars are mined at a time. The lower horizontal isolation pillar is advanced segment by segment from bottom to top in the same section of the stope against the dip. After each segment is completed, it is backfilled synchronously with a step distance behind, so that the mining stress of the isolation pillar is always jointly borne by the unmined pillar and the backfilled body. The backfilling and roof connection of the lower horizontal isolation pillar is carried out by multiple cross-vein roadways distributed along the strike to implement multi-point material feeding in stages. The multi-point material feeding first fills the bottom from the lower side roadway, and then replenishes the roof from the upper side roadway, which is coordinated with the inclined floor of the lower stope to guide the material flow to spread naturally.
5. A method for safe and efficient mining of pillar resources under near-surface weathering zones as described in claim 2, characterized in that: The upper shallow-hole room-and-pillar method employs a two-step pillar extraction process, including layered slotting, blasting-driven gravity transport, and segmented backfilling. Layered slotting divides the entire pillar vertically into 2-3 layers. First, slots are excavated at the bottom of the pillar to form a lower free face. Then, upward-facing medium-deep holes are used for layered retreat blasting. Blasting-driven gravity transport utilizes the dip angle of the ore body and the natural angle of repose of the blast pile to allow the collapsed ore to flow under its own weight to the bottom drilling entrance. This significantly reduces the operating distance and frequency of remote-controlled loaders entering empty areas, thus lowering the risk of empty area operations. The blasting process employs differentiated parameters for each layer. In the lower layer, small row spacing and dense hole spacing are used to strictly control block size and ensure efficient shoveling operations. In the segmented backfilling, the upper layer appropriately increases the row spacing, using blasting impact to assist in loosening the upper part of the pillar and reducing large blocks.
6. A method for safe and efficient mining of pillar resources under near-surface weathering zones as described in claim 2, characterized in that: In step S22, the preliminary theoretical calculation is performed using the KB Rubeneit formula. Based on the principles of independent action and superposition of forces, the stress generated by the combined action of the self-weight of the isolation roof rock mass and the weight of the overlying strata in the goaf under the fractured zone is calculated. Two conditions are assumed in the theoretical analysis: the length of the stope greatly exceeds its width, and the number of stops is large, disregarding the influence of boundary spans. Based on these two assumptions, the complex three-dimensional thick plate calculation problem is simplified into an ideal planar elastic mechanics problem, and a rock mass mechanics model is established. Based on this rock mass mechanics model, mechanical formulas are established, and the safe thickness of the goaf roof is determined. The specific calculation formula for the safe thickness is as follows: ; Wherein, T is the thickness of the isolation pillar, K is the safety factor, R is the bulk density of the ore body of the isolation pillar, B is the span of the goaf, and g is the pressure of the overlying rock above the isolation pillar on the top pillar.
7. A method for safe and efficient mining of pillar resources under near-surface weathering zones as described in claim 6, characterized in that: The The modified ultimate strength of the top plate under bending conditions, the The calculation formula is: The The rock strength limit under bending conditions, the For the strength safety factor, the The structural weakening coefficient, the The calculation formula is: =(7~10)%· The The minimum safe thickness of the isolation layer, calculated using the KB Rubeneit formula, is only related to the span of the mining area, representing the uniaxial compressive strength of the ore and rock. The KB Rubeneit formula concludes that a larger thickness-to-span ratio leads to greater stability of the isolation layer. Based on the theory and calculation method of the thickness-to-span ratio, H / W ≥ 0.5 is obtained from the approximate horizontal projected span L and the thinnest part of the isolation layer, h. Taking h / L in an approximate horizontal state as the minimum ratio for estimating the safe thickness, a safety factor K is introduced to obtain the relationship between the goaf span and the safe isolation layer thickness under different safety conditions. Empirically, h / KL ≥ 0.5 is considered safe, and its calculation formula is as follows: ; Wherein, H is the thickness of the safety isolation layer, and W is the span of the goaf.
8. A method for safe and efficient mining of pillar resources under near-surface weathering zones as described in claim 7, characterized in that: Based on the material mechanics, the span of the mine and the safety factor K can be derived from the thickness H of the safety isolation layer. The span of the mine is B, and the formula for calculating the thickness H of the safety isolation layer is as follows: ; Wherein, q is the additional load, b is the width of the isolation layer rock beam along the direction of the mine, and σ is the ultimate tensile strength of the rock beam; The bending moment is calculated based on q, and the bending moment is M. The formula for calculating M is as follows: ; ; ; Among them, the ω is the span of the goaf, γ is the unit weight of the overlying strata, γ' is the weight of the waste rock cover layer, h is the thickness of the horizontal isolation layer pillar, h' is the thickness of the waste rock layer, ω is the resistance torque, and b is the beam width.
9. A method for safe and efficient mining of pillar resources under near-surface weathering zones as described in claim 8, characterized in that: Based on the above formula, the maximum bending moment occurs at the center of the roof in the goaf area. The allowable tensile stress of the roof is then calculated, and this allowable tensile stress is... The The calculation formula is as follows: ; ; ; Where n is 2, the Where Kc is the ultimate tensile strength, b is the structural weakening coefficient, and b is 1. The assumed load is transmitted downwards along a vertical line at a diffusion angle of 30°~35° from the center of the roof. When the transmission line is located outside the intersection of the roof and the goaf sidewall, it is assumed that the goaf sidewall directly supports the external load on the roof and the self-weight of the rock. In this case, the thickness of the roof is the thickness of the safety isolation layer. The angle between the load transmission intersection line and the center line of the roof is set as β. The calculated thickness h of the isolation layer is then the safe thickness of the roof. The specific calculation formula is as follows: 。