Construction methods for enhancing the tensile strength of rock mass anchorage ends
By injecting low-viscosity modified resin slurry into the anchor hole and applying pulsed osmotic pressure, a permeable and solidified rock ring is formed, which solves the problem that the bonding material at the anchor end is difficult to penetrate into micro-cracks, and improves the tensile bearing capacity of the anchor end and the utilization rate of the surrounding rock.
Patent Information
- Application Number
- CN202611505191.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-24
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, bonding materials are difficult to penetrate into the micro-cracks in the borehole wall during anchoring construction. When the anchoring end is under tension, it is prone to peeling off and failing along the borehole wall interface, and the strength of the surrounding rock itself is not fully utilized.
Low-viscosity modified resin slurry is injected into the anchor hole to form a closed cavity. Then, pulsed osmotic pressure is applied to allow the slurry to repeatedly penetrate into the micro-cracks and solidify, forming a permeable and solidified rock ring. Finally, anchoring structural adhesive is injected and tension anchor bolts are implanted.
It improves the tensile bearing capacity of the anchoring end, makes full use of the strength of the surrounding rock itself, avoids interface peeling failure, and the construction process is simple and reliable.
Smart Images

Figure CN123109740A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of geological support construction technology, and in particular to a construction method for improving the tensile anchoring end of rock mass. Background Technology
[0002] Anchoring technology has evolved from mechanical expansion bolts and bonded anchors to chemical anchors. The number and scale of geotechnical engineering projects such as tunnels, slopes, foundation pits, and underground caverns using chemical anchors have continued to grow. Rock mass anchoring technology, as a core means of improving the self-stabilizing capacity of surrounding rock and controlling rock mass deformation, has been increasingly widely applied. In the development of anchoring technology, anchoring forms have evolved from ordinary cement mortar anchors and resin anchors to self-drilling anchors and prestressed anchor cables. The anchoring targets have also gradually expanded from soft rock and soil to hard rock and fractured rock masses. At the same time, the engineering community's expectations for the bearing capacity, durability, and construction efficiency of anchoring ends have continuously increased, driving the continuous development of anchoring construction technology towards refinement and high reliability.
[0003] Currently, the common construction process for embedding tension anchors or bolts in rock masses is "drilling—hole cleaning—grouting—anchor insertion": First, anchor holes are drilled in the surrounding rock. Rock debris is removed using high-pressure air or water. Then, cement mortar, cement grout, or anchoring adhesive is injected into the anchor holes. Finally, the anchor or bolt is inserted. The bonding force and mechanical interlocking between the cured adhesive and the hole wall connect the anchor or bolt to the surrounding rock, forming a unified structure to withstand axial tensile forces. For example, in tunnel engineering, system anchors rely on this interfacial bonding force to connect shallow surrounding rock with deep, stable rock mass, inhibiting deformation. In high slope treatment projects, pull-out anchors rely on this interfacial bonding force to resist slope slippage. For anchoring projects with high tensile strength requirements, high-performance bonding materials such as anchoring adhesive or high-strength mortar are often selected to achieve higher interfacial bond strength.
[0004] However, the tensile bearing capacity of the anchoring end in the above construction methods is highly dependent on the quality of the interfacial bonding between the bonding material and the anchor hole wall. Due to the disturbance of the surrounding rock mass by the drill bit, a large number of micro-cracks and structural surfaces are often distributed near the anchor hole wall. The viscosity of bonding materials such as cement mortar and anchoring structural adhesive is generally high, making it difficult to penetrate these micro-cracks under self-weight or low-pressure grouting conditions. The bonding material can usually only adhere to the surface of the hole wall and cannot form an effective bond with the deep surrounding rock. When the anchor is under tension, the failure is mostly manifested as the brittle failure of the bonding material and the anchor being pulled out along the hole wall interface. The tensile strength of the surrounding rock itself is not fully utilized, and the tensile bearing capacity of the anchoring end remains at a low level for a long time. This defect is particularly prominent in weak and fractured surrounding rock. Summary of the Invention
[0005] The main objective of this invention is to propose a construction method for improving the tensile strength of rock mass anchorage ends, aiming to solve the technical problems in the prior art where the bonding material is difficult to penetrate into the micro-cracks of the borehole wall during anchorage construction, the anchorage end is prone to peeling off and failing along the borehole wall interface when under tension, and the strength of the surrounding rock itself cannot be utilized.
[0006] To achieve the above objectives, in a first aspect, the present invention proposes a construction method for enhancing the tensile anchoring end of rock mass, used to implant tensile anchor bolts into the anchoring section of the rock mass, wherein an anchoring hole is pre-drilled within the anchoring section, the anchoring hole having an anchoring section wall facing the bottom of the hole and an opening facing outwards, the construction method comprising the following steps: The anchor hole is drilled in the surrounding rock at the designed depth. The hole wall of the anchoring section is cleaned. Then, a low-viscosity modified resin slurry is injected into the anchor hole so that the slurry forms a slurry section to be penetrated in the anchoring section. A seal is formed at both ends of the section of slurry to be permeated, thereby sealing the section of slurry to be permeated into a closed cavity; A pulsed osmotic pressure is applied to the sealed cavity, causing the slurry to repeatedly seep into the micro-cracks in the hole wall of the anchoring section during pressure cycling. The pulsed seepage pressure is released, and the unpermeable grout in the anchor hole is discharged, allowing the grout that has penetrated the micro-fractures to solidify in the surrounding rock. A permeable and solidified rock ring is formed on the borehole wall of the anchoring section, which is integrated with the surrounding rock. Anchoring structural adhesive is injected into the anchor hole that forms the permeable and solidified rock ring, and the tension anchor is implanted to complete the anchoring construction.
[0007] In one embodiment, the step of cleaning the hole wall of the anchoring section includes: The residue inside the anchor hole is blown away with high-pressure gas, and then the wall of the anchoring section is brushed repeatedly with a steel brush to expose the micro-cracks in the wall of the anchoring section and keep it dry and clean, forming a penetration channel for the slurry to enter.
[0008] In one embodiment, the step of injecting a low-viscosity modified resin slurry into the anchor hole includes: The injection volume of the grout is calculated based on the volume of the anchoring section and the set penetration depth; Grouting is performed according to the injection volume, so that the static liquid level of the grout is located at the upper third of the depth of the anchor hole, so that the section of grout to be penetrated completely covers the hole wall of the anchoring section.
[0009] In one embodiment, the step of applying pulsed osmotic pressure to the sealed cavity includes: The peak value of the pulsed osmotic pressure is set to 0.6 to 0.8 times the allowable grouting pressure of the surrounding rock, so that the grout can obtain osmotic power while avoiding splitting and damaging the surrounding rock.
[0010] In one embodiment, the pulsed osmotic pressure is applied in a pressure cycle, the number of pressure cycles is 3 to 5, and the single pressure holding time is 30 seconds, so that the slurry continuously penetrates into the microcracks during the pressure holding stage and remains in the microcracks without being drawn back during the pressure release stage.
[0011] In one embodiment, the step of forming a seal at both ends of the section of slurry to be permeated includes: Annular sealing bands that expand radially and fit against the wall of the anchor hole are formed at the lower and upper ends of the slurry section to be permeated; wherein the annular sealing band at the lower end is located below the slurry surface and the annular sealing band at the upper end is located above the slurry surface, so as to seal the slurry section to be permeated into the sealed cavity.
[0012] In one embodiment, the lower annular sealing strip is located between the slurry section to be permeated and the bottom of the hole, and the upper annular sealing strip is located between the slurry section to be permeated and the orifice. The two annular sealing strips are kept in radial contact throughout the entire process of applying the pulsed permeation pressure, so that the permeation pressure only acts on the hole wall of the anchoring section covered by the slurry section to be permeated.
[0013] In one embodiment, the step of draining the unpermeated flowing grout from the anchor hole includes: After the pulsed seepage pressure is released, the grout, which is still in a flow state, is pumped out of the hole from the orifice, so that only the grout that has seeped into the microcracks remains in the anchor hole. Allow to stand and cure until the slurry solidifies; A radially continuous, integrated permeable solidified rock ring is formed on the borehole wall of the anchoring section.
[0014] In one embodiment, the low-viscosity modified resin slurry is a modified epoxy resin slurry containing a diluent and a penetration promoter, with an initial viscosity of no more than 500 mPa·s and an initial setting time no less than the duration of all pressure cycles of the pulsed osmotic pressure, so as to ensure that the slurry maintains a permeable flow dynamic throughout the entire osmotic pressure process.
[0015] In one embodiment, the number of pressure cycles is adjusted according to the degree of fissure development in the surrounding rock, so that the penetration depth of the grout in the microfissures reaches 1 to 2 times the diameter of the tension anchor bolt, so that the radial thickness of the infiltrated and solidified rock ring is sufficient to change the failure mode of the anchor bolt under tension from interface peeling to conical failure of the rock mass relying on the infiltrated and solidified rock ring.
[0016] The technical solution of this invention involves drilling anchor holes at a designed depth in the surrounding rock and cleaning the hole walls of the anchoring section to expose and keep the openings of micro-fractures in the hole wall dry and clean, providing a penetration channel for grout to enter the micro-fractures. By injecting low-viscosity modified resin grout into the anchor holes, a grout section to be penetrated is formed within the anchoring section. Due to the low viscosity and good flow and permeability of the low-viscosity modified resin grout, the grout possesses the basic conditions for entering the micro-fractures in the hole wall. The grout section to be penetrated is sealed into a closed cavity by forming seals at both ends. Pulsed osmotic pressure is then applied to the closed cavity, allowing the grout to obtain continuous penetration power through repeated pressure cycles, thus overcoming the capillary resistance of the micro-fractures and repeatedly penetrating into the anchoring section. The grout is trapped in the micro-fractures of the borehole wall during the depressurization phase due to its own viscous resistance and the capillary effect of the micro-fractures, thus achieving a gradual and cumulative deep penetration of the grout into the micro-fractures. Subsequently, by removing the pulsed penetration pressure and discharging the unpenetrated dynamic grout from the anchor hole, the grout that has penetrated into the micro-fractures is solidified in the surrounding rock, forming a permeable and solidified rock ring on the borehole wall of the anchoring section, which is integrated with the surrounding rock. This extends the bonding range between the anchoring end and the surrounding rock from the surface of the borehole wall to the rock mass within a certain depth range outside the borehole wall. Finally, by injecting anchoring structural adhesive into the anchor hole that has formed the permeable and solidified rock ring and inserting tension anchor bolts, the tensile force on the anchor bolts is transmitted to the deep part of the surrounding rock through the anchoring structural adhesive and the permeable and solidified rock ring. Because the solidified rock ring is integrally bonded to the surrounding rock and its radial thickness is significantly greater than that of a simple interfacial bonding layer, the failure surface of the anchor bolt under tension no longer develops along the borehole wall interface, but instead shifts to the interior of the surrounding rock. The failure mode changes from interfacial peeling to cone-shaped failure of the rock mass relying on the solidified rock ring, fully utilizing the tensile strength of the surrounding rock itself, thereby significantly improving the bearing capacity of the tensile anchoring end of the rock mass. Furthermore, this application does not involve destructive treatments such as blasting or splitting of the surrounding rock, avoiding additional disturbance and damage, and the construction process is simple and highly reliable. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.
[0018] Figure 1 The flowchart illustrates the construction method for enhancing the tensile anchoring end of rock mass provided by this invention.
[0019] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0021] It should be noted that if the embodiments of the present invention involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of the components in a specific posture. If the specific posture changes, the directional indicators will also change accordingly.
[0022] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the use of "and / or" or "and / or" throughout the text includes three parallel solutions. For example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.
[0023] It should be understood that the specific embodiments described herein are merely illustrative of this application and are not intended to limit this application. The technical solutions of this application will be clearly and completely described below in conjunction with the embodiments thereof. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0024] The main solution of this application is as follows: Anchor holes are drilled in the surrounding rock at the designed depth; the hole walls of the anchoring section are cleaned; low-viscosity modified resin grout is injected into the anchor holes to form a grout section to be permeated within the anchoring section; seals are formed at both ends of the grout section to be permeated, sealing it into a closed cavity; pulsed permeation pressure is applied to the closed cavity, causing the grout to repeatedly permeate into the micro-cracks of the anchoring section hole wall during pressure cycling; the pulsed permeation pressure is removed, and the unpermeated flowing grout in the anchor holes is discharged, allowing the grout that has permeated into the micro-cracks to solidify in the surrounding rock; a permeated and solidified rock ring is formed on the anchoring section hole wall, integral with the surrounding rock; anchoring structural adhesive is injected into the anchor holes forming the permeated and solidified rock ring, and tension anchor bolts are implanted to complete the anchoring construction.
[0025] Currently, when inserting tension anchors into rock masses, the common practice is to drill anchor holes, remove rock cuttings, directly inject cement mortar or anchoring adhesive into the holes, and then insert the anchors, relying on the interfacial bond between the adhesive and the hole wall to withstand tensile forces. However, drilling anchor holes creates numerous micro-fractures in the surrounding rock mass. The high viscosity of cement mortar and anchoring adhesive makes it difficult for these materials to penetrate these micro-fractures. The adhesive only adheres to the surface of the hole wall, and when the anchor is under tension, it breaks off along the hole wall interface, resulting in overall peeling away. The strength of the surrounding rock itself is not utilized, leading to low tensile bearing capacity at the anchor end. Therefore, how to enable the adhesive to penetrate the micro-fractures in the hole wall and bond with the surrounding rock to improve the tensile bearing capacity of the anchor end is a pressing problem that needs to be solved.
[0026] This application first cleans the borehole wall of the anchoring section to open the permeation channels of micro-fractures, then repeatedly infiltrates the micro-fractures with low-viscosity modified resin slurry under pulsed permeation pressure, and after slurry discharge and solidification, forms a permeation-solidified rock ring that is integrated with the surrounding rock on the borehole wall of the anchoring section. Finally, anchoring structural adhesive is injected into the inner side of the permeation-solidified rock ring and tension anchors are implanted, extending the bonding range between the anchors and the surrounding rock from the surface of the borehole wall to the interior of the surrounding rock. This overcomes the technical defect of interface peeling failure caused by the bonding material only adhering to the surface of the borehole wall, and improves the bearing capacity of the tensile anchoring end of the rock mass.
[0027] It should be noted that the surrounding rock refers to the rock mass around the anchor hole that is disturbed by excavation or drilling and bears the anchoring load; the anchoring section refers to the section in which the anchor bolt is embedded in the rock mass to transmit the anchoring force to the surrounding rock; the tension anchor bolt refers to a rod-shaped load-bearing member embedded in the anchoring section of the rock mass to mainly bear axial tensile force, which may include steel bars, threaded steel bars, anchor rods, etc., but this embodiment does not limit this. The anchor hole refers to a hole pre-drilled in the surrounding rock for injecting grout and installing the anchor bolt. The anchor hole has an anchoring section wall facing the bottom of the hole and an opening facing outwards.
[0028] It should be noted that the executing entity in this embodiment can be construction equipment such as drilling rigs, grouting pumps, and pulse pressurization devices, or it can be construction personnel operating the corresponding construction equipment. This embodiment does not limit this. The following uses construction equipment as the executing entity as an example to describe this embodiment and the following embodiments.
[0029] Based on this, this application proposes a construction method for raising the tensile anchoring end of the rock mass according to the first embodiment. Please refer to... Figure 1 , Figure 1 This is a flowchart illustrating the first embodiment of the construction method for raising the tensile anchoring end of the rock mass according to this application. The construction method for raising the tensile anchoring end of the rock mass includes steps S10 to S60: Step S10: Drill the anchor hole in the surrounding rock at the designed depth, clean the hole wall of the anchoring section, and then inject low viscosity modified resin slurry into the anchor hole so that the slurry forms a slurry section to be penetrated in the anchoring section. It should be noted that the design depth refers to the drilling depth of the anchor hole determined according to the anchoring force design requirements, engineering geological conditions, and construction drawings. It should ensure that the length of the anchoring section meets the tensile bearing capacity requirements. Hole cleaning refers to the process of removing drill cuttings, dust, and other residues from the anchor hole, aiming to expose the clean borehole wall of the anchoring section. Low-viscosity modified resin grout refers to a modified resin-based grouting material with a lower initial viscosity, which can penetrate into the micro-fractures of the rock mass under pressure. The grout section to be infiltrated refers to the section within the anchoring section that is static, in a flow state, and is used for subsequent pressure infiltration.
[0030] When drilling anchor holes, down-the-hole drills or rotary drills can be selected according to the lithology of the surrounding rock. The diameter of the anchor hole should be larger than the diameter of the tension anchor to meet the working space requirements for subsequent grouting and anchor insertion. This embodiment does not limit this.
[0031] In a first feasible implementation, the step of cleaning the hole wall of the anchoring section in step S10 may include step S11: Step S11: Use high-pressure gas to blow away the residue in the anchor hole, and then use a steel brush to repeatedly brush along the wall of the anchoring section hole, so that the micro-crack openings of the anchoring section hole wall are exposed and kept dry and clean, forming a penetration channel for grout to enter.
[0032] It should be noted that the high-pressure gas can be compressed air, generated by an air compressor and blown out the residue from the bottom of the hole to the opening through an air duct. The steel brush can be installed at the end of the drill rod or on a dedicated cleaning brush, rotating with the drill rod and moving axially back and forth along the hole wall. Since rock powder and mud cake generated during drilling can clog the microfracture openings, high-pressure gas alone is insufficient for complete removal. Therefore, after high-pressure gas rinsing, a steel brush is used to repeatedly scrub, peeling off the rock powder and mud cake adhering to the hole wall, exposing the microfracture openings, while keeping the hole wall dry to prevent moisture from forming a water film at the fracture openings and hindering the entry of slurry.
[0033] In this embodiment, the residue inside the anchor hole is blown away with high-pressure gas, and the wall of the anchoring section is brushed back and forth with a steel brush. This exposes the micro-fracture openings of the anchoring section and keeps them dry and clean. Since the rock powder and mud cake blocking the micro-fracture openings are removed, and the hole wall is in a dry state, a seepage channel for grout to enter is formed. This avoids the problem that the grout cannot enter the micro-fractures due to the micro-fracture openings being blocked, and lays the foundation for the subsequent grout to seep into the micro-fractures and form a seepage solidified rock ring.
[0034] In a second feasible implementation, step S10, which involves injecting low-viscosity modified resin slurry into the anchor hole, may include: calculating the injection volume of the slurry based on the volume of the anchoring section and the set penetration depth; injecting the slurry according to the injection volume, such that the static liquid level of the slurry is located at the upper third of the depth of the anchor hole, so that the section of slurry to be penetrated completely covers the hole wall of the anchoring section.
[0035] It should be noted that the set penetration depth refers to the design depth of the grout penetrating into the surrounding rock mass based on the bearing capacity target, which can be determined by engineering requirements. The grout injection volume consists of two parts: one part is the volume of the grout section to be penetrated, and the other part is the volume of grout expected to enter the micro-fractures within the set penetration depth range. The latter part can be estimated based on the permeability of the surrounding rock measured by on-site water pressure tests, or based on the surrounding rock fracture rate obtained from borehole core sampling and borehole television statistics. For example, for an anchor hole with a diameter of 40 mm and an anchoring section length of 1500 mm, the volume of the grout section to be penetrated is approximately 1.3 liters; when the set penetration depth is 50 mm and the surrounding rock fracture rate obtained from on-site water pressure tests is 2.5%, the expected grout volume to penetrate into the micro-fractures is approximately 0.5 liters; after considering pipeline losses and borehole wall adsorption losses, the grout injection volume is determined to be approximately 2.0 liters. In the above data, the anchor hole diameter and anchorage section length are from the construction records, the surrounding rock fissure ratio is obtained from the on-site water pressure test, and the loss is determined according to the on-site test injection situation. This embodiment does not limit the specific values.
[0036] Additionally, the static liquid level being located at the upper third of the anchor hole depth means that after grouting is completed and before the application of seepage pressure, the liquid level formed by the grout under its own weight within the anchor hole is at the upper third of the total anchor hole depth, that is, the grout fills approximately two-thirds of the anchor hole depth from the bottom upwards. This setting ensures that the section of grout to be seeped completely covers the hole wall of the anchoring section, and also leaves space for sealing at the upper end of the section of grout to be seeped.
[0037] In this embodiment, the injection volume of grout is calculated based on the volume of the anchoring section and the set penetration depth, and grout is injected according to this injection volume, so that the static liquid level of the grout is located at the upper third of the anchor hole depth. Since the injection volume is pre-calculated and determined according to the micro-fracture filling volume corresponding to the set penetration depth, the situation of insufficient injection volume leading to insufficient penetration or excessive injection volume leading to grout waste is avoided. Furthermore, the grout section to be penetrated completely covers the hole wall of the anchoring section, so that the subsequent applied penetration pressure can act on the entire hole wall of the anchoring section, and grout can penetrate everywhere on the hole wall of the anchoring section. This ensures that the finally formed permeable solidified rock ring is continuous and radially uniform along the entire length of the anchoring section, thereby improving the overall anchoring performance of the anchoring section.
[0038] In a third feasible embodiment, the low-viscosity modified resin slurry is a modified epoxy resin slurry containing a diluent and a penetration promoter, with an initial viscosity of no more than 500 mPa·s and an initial setting time no less than the duration of all pressure cycles of the pulsed osmotic pressure, so as to ensure that the slurry maintains a permeable flow dynamic throughout the entire osmotic pressure process.
[0039] It should be noted that reactive or non-reactive diluents can be used to reduce the viscosity of the epoxy resin; penetration enhancers can be selected that reduce the surface tension of the grout and improve its wettability to the rock. The combination of these two enhances the fluidity of the grout in microfractures. The initial viscosity can be measured using a rotational viscometer when the grout is prepared, for example, at 25 degrees Celsius as specified in GB / T 2794. The initial setting time can be determined using the inverted cup method or the penetration resistance method, i.e., the time from the completion of grout preparation until the grout loses its fluidity. The duration of all pressure cycles in a pulsed osmotic pressure test refers to the total time elapsed from the start of the first pressure cycle to the completion of the last pressure cycle.
[0040] For example, the modified epoxy resin slurry used in the experiment was prepared from 100 parts epoxy resin, 20 parts diluent, 3 parts penetration accelerator, and an appropriate amount of curing agent. After preparation, the measured initial viscosity was 380 mPa·s, and the initial setting time was 45 minutes. When the pressure cycle was 4 times and each cycle lasted about 2 minutes, the total pressure cycle time was about 8 minutes, which was less than the initial setting time. The slurry maintained a permeable flow state throughout the entire osmotic pressure process. The above viscosity and initial setting time data were obtained by laboratory testing according to the above test method.
[0041] In this embodiment, by limiting the initial viscosity of the low-viscosity modified resin slurry to no more than 500 mPa·s, the slurry is made capable of entering the microcracks in the pore wall. By setting the initial setting time of the slurry to no less than the duration of all pressure cycles of the pulsed osmotic pressure, the slurry is prevented from prematurely setting and clogging the microcracks before the end of the osmotic pressure process. Since the slurry maintains a permeable flow dynamic throughout the entire osmotic pressure process, it is ensured that the slurry can continuously penetrate into the microcracks throughout the entire pressure cycle, so that the penetration depth reaches the set value, thereby ensuring that the radial thickness of the permeated and solidified rock ring meets the bearing requirements.
[0042] The above are only three feasible implementation methods of step S10 provided in this embodiment. This embodiment does not limit the specific implementation method of step S10.
[0043] Step S20: Seals are formed at both ends of the section of slurry to be permeated, thus sealing the section of slurry to be permeated into a closed cavity; It should be noted that sealing refers to a closed structure that blocks the flow of grout between the section to be permeated and the rest of the anchor hole. A sealed cavity is a closed space formed by the seals at both ends of the grout-permeable section and the anchor hole wall, containing only the grout. Only within this sealed cavity can the grout withstand the permeation pressure and transmit it to the micro-fractures in the hole wall; if the ends are not sealed, the applied pressure will push the grout away axially along the anchor hole, and the pressure cannot effectively act on the micro-fractures in the hole wall.
[0044] In one feasible implementation, step S20 may include: forming radially expanded annular sealing bands that fit against the anchor hole wall at the lower and upper ends of the slurry section to be permeated; wherein the annular sealing band at the lower end is located below the slurry surface and the annular sealing band at the upper end is located above the slurry surface, so as to seal the slurry section to be permeated into the sealed cavity.
[0045] It should be noted that the annular sealing strip refers to an annular sealing structure that is continuous circumferentially and radially expands along the anchor hole wall and tightly adheres to the hole wall. It can be achieved by a radially expandable bag or a sealing ring that expands upon contact with water or slurry; this embodiment does not limit this. Radial expansion refers to the process of the annular sealing strip expanding radially outward along the anchor hole until it adheres to the hole wall. The lower annular sealing strip is located below the slurry surface, i.e., in the section between the slurry section to be penetrated and the bottom of the hole, and is used to seal the lower end of the slurry section; the upper annular sealing strip is located above the slurry surface, i.e., in the section between the slurry section to be penetrated and the hole opening, and is used to seal the upper end of the slurry section.
[0046] In this embodiment, by forming radially expanding annular sealing bands at the lower and upper ends respectively, which fit the anchor hole wall, the two ends of the grout section to be permeated are separated from the rest of the anchor hole, thereby sealing the grout section to be permeated into a closed cavity. This allows the grout to withstand the permeation pressure and transmit the pressure to the micro-cracks in the hole wall, providing the necessary pressure-bearing conditions for pressure-driven grout permeation.
[0047] Furthermore, in another feasible embodiment, the lower annular sealing strip is located between the slurry section to be permeated and the bottom of the hole, and the upper annular sealing strip is located between the slurry section to be permeated and the orifice. During the entire process of applying the pulsed permeation pressure, the annular sealing strips at both ends are kept in a radially fitted state, so that the permeation pressure only acts on the hole wall of the anchoring section covered by the slurry section to be permeated.
[0048] It should be noted that maintaining radial adhesion throughout the entire process of applying pulsed osmotic pressure means that the annular sealing strip remains tightly adhered to the borehole wall without detaching or depressurizing during the pressure loading and unloading cycles. To achieve this state, the annular sealing strip can be pre-expanded before pressurization and its expansion pressure can be kept constant. Alternatively, the expansion pressure of the annular sealing strip can be compensated synchronously with the increase in osmotic pressure during pressurization, ensuring that the adhesion pressure of the sealing strip is always greater than the grout pressure. This embodiment does not limit this approach. In this way, the osmotic pressure only acts on the borehole wall of the anchored section covered by the grout to be permeated. The grout only enters the surrounding rock from the micro-fractures in the borehole wall of this section and will not flow axially along the borehole wall to the borehole opening or bottom section.
[0049] In this embodiment, by defining the lower annular sealing strip as located between the slurry section to be penetrated and the bottom of the hole, and the upper annular sealing strip as located between the slurry section to be penetrated and the hole opening, and maintaining the radial fit of the two annular sealing strips throughout the entire process of applying pulsed osmotic pressure, the slurry cannot flow axially along the hole wall due to the obstruction of the two annular sealing strips, thus avoiding pressure loss and slurry waste caused by slurry axial loss along the hole wall. This ensures that the osmotic pressure only acts on the hole wall of the anchoring section covered by the slurry section to be penetrated, thereby ensuring that the osmotic pressure is concentrated and effectively used to drive the slurry to penetrate into the micro-cracks of the hole wall, making the penetration area precisely correspond to the designed anchoring section, and improving the penetration efficiency and slurry utilization rate.
[0050] Step S30: Apply pulsed osmotic pressure to the sealed cavity to allow the slurry to repeatedly seep into the micro-cracks in the hole wall of the anchoring section during pressure cycling. It should be noted that pulsed osmotic pressure refers to cyclical pressure that is repeatedly loaded and unloaded according to a certain pattern, rather than constant static pressure. A pressure cycle refers to a complete process of pressurization, holding, and depressurization. Microfractures refer to tiny fissures in the rock mass surrounding the borehole wall in the anchoring section, formed by drilling disturbance, tectonic activity, etc., and serve as channels for grout to seep into the surrounding rock. Under pulsed osmotic pressure, the grout gains permeability during the pressurization and holding phases of each cycle and continues to seep deeper into the microfractures. During the depressurization phase, it remains within the microfractures due to its own viscous resistance and the capillary action of the microfractures, preventing it from being drawn back. Simultaneously, the microfractures in the borehole wall repeatedly open and rebound under cyclic loading and unloading, creating a pump-like effect that propels the grout further into deeper areas in subsequent cycles, thus gradually increasing the permeation depth through accumulation.
[0051] In a first feasible implementation, step S30 may include: setting the peak value of the pulsed permeation pressure to 0.6 to 0.8 times the allowable grouting pressure of the surrounding rock, so that the grout can obtain permeation power while avoiding splitting and damaging the surrounding rock.
[0052] It should be noted that the allowable grouting pressure of the surrounding rock refers to the maximum grouting pressure that the surrounding rock can withstand without splitting or damaging it. This pressure can be determined based on field water pressure tests or calculated according to relevant specifications based on parameters such as the uniaxial compressive strength of the surrounding rock, the integrity of the rock mass, and the burial depth. The peak value of the pulsed seepage pressure is set to 0.6 to 0.8 times the allowable grouting pressure of the surrounding rock. 0.6 times is taken as the lower limit to ensure sufficient seepage force for the grout; 0.8 times is taken as the upper limit to leave a safety margin and prevent the pressure peak from approaching or reaching the splitting pressure, which could lead to splitting and damage of the surrounding rock. For example, if the allowable grouting pressure of the surrounding rock determined by a field water pressure test in a certain test section is 2.0 MPa, then the peak value of the pulsed seepage pressure can be selected between 1.2 MPa and 1.6 MPa. In this embodiment, 1.4 MPa is used, which is 0.7 times the allowable grouting pressure. The above allowable grouting pressure data were obtained from actual field water pressure tests.
[0053] In this embodiment, by setting the peak value of the pulsed permeation pressure to 0.6 to 0.8 times the allowable grouting pressure of the surrounding rock, the grout obtains sufficient permeation power during the pressurization stage to overcome the capillary resistance of the micro-fractures. At the same time, since the peak pressure is lower than the fracturing pressure of the surrounding rock and leaves a safety margin, the problem of excessive pressure fracturing and damaging the surrounding rock, resulting in new fractures and weakening the integrity of the surrounding rock is avoided. Thus, the original structure of the surrounding rock is protected while ensuring the permeation effect, thus balancing permeation efficiency and surrounding rock stability.
[0054] In a second feasible implementation, step S30 may include: applying the pulsed osmotic pressure in a pressure cycle, the number of pressure cycles being 3 to 5, and the single pressure holding time being 30 seconds, so that the slurry continuously penetrates into the microcracks during the pressure holding stage and remains in the microcracks without being drawn back during the pressure release stage.
[0055] It should be noted that the holding time refers to the duration during which the pressure is maintained at its peak value in each pressure cycle. Within a 30-second holding time, the grout propagates deeper into the microfractures under continuous pressure. If the holding time is too short, the grout will not have fully penetrated before pressure is released, resulting in low penetration efficiency. If the holding time is too long, grout penetration tends to stagnate, unnecessarily increasing the construction period. Limiting the number of pressure cycles to 3 to 5 is because the penetration depth increases with the number of cycles, but the rate of increase gradually decreases. Too few cycles result in insufficient penetration depth, and after 5 cycles, the increase in penetration depth becomes insignificant, making further increases in the number of cycles less beneficial. During the pressure release phase, the grout remains retained instead of being drawn back in because the grout itself has viscous resistance, and the grout that has already penetrated is held in place by the capillary action of the microfractures. The elastic rebound of the rock mass on the borehole wall after pressure release is insufficient to completely expel the grout.
[0056] In this embodiment, by applying pulsed osmotic pressure in 3 to 5 pressure cycles with a single pressure holding time of 30 seconds, the grout gains the power to continuously penetrate into the micro-fractures during the pressure holding stage, and remains in the micro-fractures during the pressure release stage without being drawn back. Since each cycle continues to advance based on the penetration depth of the previous cycle, the penetration depth increases cumulatively with the number of cycles, thereby ensuring that the grout reaches a sufficient penetration depth to guarantee the radial thickness of the rock ring. At the same time, controlling the number of cycles and the pressure holding time within a reasonable range avoids the impact of excessive pressure and long-term operation on the construction period and surrounding rock, thus balancing the penetration effect and construction efficiency.
[0057] In a third feasible implementation, the number of pressure cycles can be adjusted according to the degree of fissure development in the surrounding rock, so that the penetration depth of the grout in the micro-fissures reaches 1 to 2 times the diameter of the tension anchor bolt, so that the radial thickness of the infiltrated and solidified rock ring is sufficient to change the failure mode of the anchor bolt under tension from interface peeling to conical failure of the rock mass relying on the infiltrated and solidified rock ring.
[0058] It should be noted that the degree of fracture development in the surrounding rock refers to the number, aperture, and connectivity of fractures within the rock. This can be graded and evaluated based on the RQD value obtained from core drilling, borehole video recordings, or water pressure test results. A higher degree of fracture development allows for easier grout penetration, requiring fewer cycles to reach the set penetration depth; conversely, a lower degree of fracture development requires more cycles. Penetration depth refers to the radial distance the grout travels from the borehole wall of the anchoring section into the surrounding rock, corresponding to the radial thickness of the solidified rock annulus. A penetration depth of 1 to 2 times the diameter of the tensioned anchor bolt ensures sufficient radial thickness of the solidified rock annulus. This allows the failure surface to shift from the borehole wall interface to the interior of the surrounding rock when the anchor bolt is under tension, transforming the failure mode from interface stripping to cone-shaped failure of the rock mass relying on the solidified rock annulus.
[0059] In this embodiment, by adjusting the number of pressure cycles according to the degree of fissure development in the surrounding rock, the penetration depth of the grout in the micro-fissures reaches 1 to 2 times the diameter of the tensile anchor bolt. Since the radial thickness of the permeable solidified rock ring increases with the increase of the penetration depth, and the failure surface of the anchor bolt under tension must pass through the permeable solidified rock ring to extend into the depth of the surrounding rock, when the radial thickness of the permeable solidified rock ring is sufficient, the interface peeling failure is suppressed, and the failure mode is transformed into the conical failure of the rock mass relying on the permeable solidified rock ring. Thus, the tensile strength of the surrounding rock itself is incorporated into the anchor bearing capacity system, which significantly improves the tensile bearing performance of the anchor end.
[0060] The above are only three feasible implementation methods of step S30 provided in this embodiment. This embodiment does not limit the specific implementation method of step S30.
[0061] Step S40: Remove the pulsed seepage pressure, discharge the unpermeable grout from the anchor hole, and allow the grout that has penetrated the micro-fractures to solidify in the surrounding rock. It should be noted that non-permeable fluid grout refers to grout that remains within the anchor hole cavity after the application of osmotic pressure and has not entered the micro-fractures. Releasing this grout after depressurization aims to restore space within the anchor hole cavity, creating space for subsequent injection of anchoring adhesive and insertion of tension anchors. If not removed, the grout will solidify, forming a solid column within the anchor hole, preventing anchor insertion and depriving the anchoring adhesive of its containment space. Grout that has permeated into the micro-fractures and solidifies within the surrounding rock refers to the grout that, after a certain period of curing, transforms from a fluid state to a solid state, forming a strong bond with the surrounding rock.
[0062] In one feasible implementation, step S40 may include: after removing the pulsed permeation pressure, pumping the still-flowing grout from the orifice to the outside of the hole, so that only the grout that has penetrated into the micro-fractures remains in the anchor hole; allowing it to stand and cure until the grout solidifies; and forming a radially continuous permeation-cured rock ring that is integrated with the surrounding rock on the hole wall of the anchoring section.
[0063] It should be noted that drainage can be performed by inserting a drainage pipe into the borehole to the grout surface, and then using negative pressure or pumping to extract the flowing grout. During drainage, normal pressure should be maintained inside the anchor hole, and no reverse pressure should be applied to avoid drawing back the grout that has already seeped into the micro-fractures. Static curing refers to the natural curing of the grout that has seeped into the micro-fractures after depressurization and drainage. The curing time is determined based on the curing characteristics of the grout and the ambient temperature. Radial continuity means that the permeated and cured rock ring is continuously distributed along the circumference of the anchoring section borehole wall without gaps. Integration with the surrounding rock means that the cured grout forms a strong mechanical bond with the micro-fracture walls of the surrounding rock, becoming part of the surrounding rock.
[0064] In this embodiment, after the pulsed osmotic pressure is removed, the grout, which is still in a state of flow, is pumped out of the hole, leaving only the grout that has penetrated into the micro-cracks inside the anchor hole. Then, it is left to cure until the grout solidifies. Since the anchor hole cavity is restored after the flowable grout is discharged, space is left for the subsequent injection of anchoring structural adhesive and the implantation of tension anchors. At the same time, after the grout that has penetrated into the micro-cracks solidifies, a radially continuous, integrated permeable and solidified rock ring is formed on the hole wall of the anchoring section. This allows the bond between the anchoring end and the surrounding rock to extend from the surface of the hole wall to the interior of the surrounding rock, thereby providing a structural basis for improving the bearing capacity of the anchoring end.
[0065] The above is only one possible implementation of step S40 provided in this embodiment. This embodiment does not limit the specific implementation of step S40.
[0066] Step S50: A permeable solidified rock ring is formed on the wall of the anchoring section hole, which is integrated with the surrounding rock. It should be noted that the permeable and solidified rock ring refers to the ring-shaped solidified rock mass layer that surrounds the borehole wall of the anchoring section and is integral with the surrounding rock, formed after the grout penetrates into the micro-fractures of the anchoring section borehole wall and solidifies. The radial thickness of the permeable and solidified rock ring is the penetration depth of the grout, and it is continuously distributed along the entire length of the anchoring section, cementing and strengthening the surrounding rock within a certain depth range around the borehole wall of the anchoring section. The permeable and solidified rock ring is located on the outer periphery of the borehole wall of the anchoring section and is integral with the surrounding rock.
[0067] Step S60: Inject anchoring structural adhesive into the anchor hole that forms the permeable and solidified rock ring and insert the tension anchor to complete the anchoring construction.
[0068] It should be noted that anchoring structural adhesive refers to the structural adhesive used to bond and fix tension anchors to the wall of the anchor hole. Epoxy-based structural adhesives can be used, possessing high bonding and curing strength. When injecting the anchoring structural adhesive, it can be continuously poured from the bottom of the hole to the opening until it is full. When inserting the tension anchor, insert the anchor into the anchor hole to the designed position and keep it centered, so that the anchor is completely covered by the anchoring structural adhesive. After the anchoring structural adhesive cures, the anchor is connected to the permeated and cured rock ring through the adhesive, and the tensile force on the anchor is transmitted sequentially to the deep part of the surrounding rock through the anchoring structural adhesive and the permeated and cured rock ring.
[0069] This embodiment provides a construction method for enhancing the tensile strength of rock mass anchorage ends. First, anchor holes are drilled in the surrounding rock at the designed depth. The hole walls of the anchorage section are cleaned. Then, low-viscosity modified resin grout is injected into the anchor holes, forming a grout section to be penetrated within the anchorage section. The hole cleaning process exposes the micro-fracture openings, and the low-viscosity modified resin grout provides the grout with the fluidity to enter the micro-fractures. Next, seals are formed at both ends of the grout section to be penetrated, enclosing it as a closed cavity to prevent grout from flowing axially along the hole wall when pressure is applied. Finally, the closed cavity is subjected to… Pulsed osmotic pressure is applied to allow the grout to repeatedly penetrate the micro-fractures in the anchoring section hole wall under pressure circulation, achieving cumulative deep penetration of the grout. Subsequently, the pulsed osmotic pressure is released, and the unpenetrated fluid grout in the anchor hole is discharged, allowing the grout that has penetrated into the micro-fractures to solidify in the surrounding rock, forming a permeable and solidified rock ring on the anchoring section hole wall that is integrated with the surrounding rock, extending the bonding range between the anchoring end and the surrounding rock into the interior of the surrounding rock. Finally, anchoring structural adhesive is injected into the anchor hole that has formed the permeable and solidified rock ring, and tension anchor bolts are implanted, allowing the tensile force on the anchor bolts to be transmitted to the deep part of the surrounding rock through the anchoring structural adhesive and the permeable and solidified rock ring.
[0070] In summary, this embodiment, through the combined effects of hole cleaning, low-viscosity modified resin slurry, sealed cavity, pulsed osmotic pressure, slurry discharge curing, and osmotic curing rock ring, allows the slurry to repeatedly penetrate into the micro-cracks in the hole wall of the anchoring section and solidify to form an osmotic curing rock ring that is integrated with the surrounding rock. This overcomes the technical defect of interface peeling failure caused by the bonding material only adhering to the surface of the hole wall. It changes the failure mode of the anchoring end from interface peeling to the conical failure of the rock mass relying on the osmotic curing rock ring, thereby improving the tensile bearing capacity of the rock mass anchoring end.
[0071] The second embodiment (comparative test example) was conducted in a tunnel engineering test section to verify the implementation effect of the construction method of this application. The surrounding rock of the test section was moderately weathered sandstone, with a measured uniaxial compressive strength of 42 MPa (data obtained from indoor uniaxial rock compression tests). The allowable grouting pressure of the surrounding rock was determined to be 2.0 MPa by on-site water pressure tests. The diameter of the test anchor holes was 40 mm, the length of the anchorage section was 1500 mm, and the tension anchors were all made of 32 mm diameter HRB400 threaded steel bars.
[0072] The preparation methods for each group of specimens are as follows: Comparative Example 1 uses conventional anchoring construction methods: after cleaning the holes with high-pressure air, anchoring structural adhesive is directly injected into the anchor holes and tension anchors are inserted. After curing, tests are conducted on a total of 3 anchors.
[0073] Comparative Example 2: After cleaning the holes with high-pressure air and scrubbing with a steel brush, the same low-viscosity modified resin slurry as in Example 1 was injected into the anchor holes. The slurry was continuously injected for 5 minutes at a static pressure of 0.5 MPa. Then, the slurry was drained and cured. The anchoring structural adhesive was then injected and the tension anchor bolts were installed. After curing, the anchor holes were tested. A total of 3 anchors were tested.
[0074] Example 1 adopts the construction method of the first embodiment of this application: After cleaning the hole, inject the same low viscosity modified resin slurry as Comparative Example 2 (measured initial viscosity 380 mPa·s, initial setting time 45 minutes). After forming a closed cavity with annular closed bands at both ends, apply 4 pressure cycles with a peak pressure of 1.4 MPa (0.7 times the allowable grouting pressure), with a single pressure holding time of 30 seconds. After depressurization, pump out the dynamic slurry, let it stand to cure, then inject the anchoring structural adhesive and insert tension anchors. After curing, test 3 anchors in total.
[0075] Experimental and Data Acquisition Methods: After 7 days of curing, each specimen underwent an axial pull-out test according to the specifications for anchor pull-out tests in the "Technical Specification for Rock and Soil Anchors and Shotcrete Support Engineering" (GB 50086-2015). A through-hole hydraulic jack was used to apply axial tension to the anchor bolts, with loading in stages of 10% of the estimated ultimate load, each stage held for 5 minutes. The hydraulic pressure of the jack was collected by a calibrated pressure sensor and converted into a load value. Anchor head displacement was measured using a dial gauge. The ultimate pull-out bearing capacity was defined as the load at which the anchor head displacement did not converge and the load no longer increased. The penetration depth was obtained after the test by cutting the anchorage section and measuring the staining range of the tracer added to the grout. The average value of three measuring points was taken for each group. All data in the above groups are the average values of the measured values of three specimens. Table 1 shows the measured results for each group of specimens.
[0076] Table 1. Measured results of ultimate tensile strength and failure mode of specimens in each group.
[0077] As shown in Table 1, in Comparative Example 1, the anchoring adhesive failed to penetrate the micro-cracks in the borehole wall, and the failure mode was typical interface peeling, with an ultimate pull-out bearing capacity of 231 kN. In Comparative Example 2, static pressure grouting was used, and the grout penetration depth was only 16 mm, which is about 0.5 times the diameter of the anchor bolt, not reaching the 1 to 2 times diameter range set in this application. The failure mode was still mainly interface peeling, and the ultimate pull-out bearing capacity was 268 kN, which is 16.0% higher than that of Comparative Example 1. In Example 1, the average grout penetration depth reached 51 mm, which is about 1.6 times the diameter of the anchor bolt, falling into the 1 to 2 times diameter range. The failure mode changed to cone-shaped failure of the rock mass around the anchor hole, and the ultimate pull-out bearing capacity reached 402 kN, which is 74.0% higher than that of Comparative Example 1 and 50.0% higher than that of Comparative Example 2. The test results show that the construction method of this application, by using pulsed osmotic pressure to allow the grout to penetrate deep into the micro-cracks of the borehole wall and form a permeable solidified rock ring, can change the failure mode of the anchoring end from interface peeling to rock mass cone failure, significantly improving the tensile bearing capacity of the anchoring end.
[0078] Furthermore, to verify the selection criteria for the number of pressure cycles, 3, 4, and 5 pressure cycles were applied to the test section with the same peak pressure and holding time, respectively, and the average penetration depth of the slurry was measured as shown in Table 2. The penetration depth data in Table 2 were also obtained by cutting the anchoring section and measuring the tracer staining range, and the average value of 3 measuring points was taken for each group.
[0079] Table 2. Measured results of pressure cycle number and average penetration depth
[0080] Table 2 shows that the penetration depth increases with the number of pressure cycles, but the increase decreases: from 3 to 4 cycles, the penetration depth increases by 13 mm, while from 4 to 5 cycles, it only increases by 12 mm. For the moderately weathered sandstone in this test section, 4 pressure cycles are sufficient to achieve a penetration depth of 1.6 times the anchor bolt diameter, falling within the target range of 1 to 2 times the diameter. When the surrounding rock fissures are relatively developed, the number of cycles can be reduced to 3, while when the surrounding rock is relatively dense, the number of cycles can be increased to 5. Therefore, adjusting the number of pressure cycles within the range of 3 to 5 cycles according to the degree of fissure development in the surrounding rock can ensure that the required penetration depth is achieved while avoiding ineffective operations, thus balancing penetration effect and construction efficiency.
[0081] In summary, this application, through the synergistic effect of steps such as hole cleaning, end sealing, pulsed osmotic pressure, and slurry discharge and solidification, forms a osmotic solidified rock ring that is integrated with the surrounding rock on the hole wall of the anchoring section. This changes the failure mode of the anchoring end under tension from interface peeling to conical failure of the rock mass. Compared with conventional anchoring construction methods, the ultimate pull-out bearing capacity is increased by 74.0%, significantly improving the bearing capacity of the rock mass tensile anchoring end.
[0082] The above description is merely an exemplary embodiment of this application and does not limit the scope of this application. Any equivalent structural transformations made based on the technical concept of this application and the contents of the application specification and drawings, or direct / indirect applications in other related technical fields, are included within the protection scope of this application.
Claims
1. A construction method for enhancing the tensile anchoring end of rock mass, used to implant tension anchors in the anchoring section of the rock mass, wherein an anchoring hole is pre-drilled in the anchoring section, the anchoring hole having an anchoring section wall facing the bottom of the hole and an opening facing outwards, characterized in that, The construction method includes the following steps: The anchor hole is drilled in the surrounding rock at the designed depth. The hole wall of the anchoring section is cleaned. Then, a low-viscosity modified resin slurry is injected into the anchor hole so that the slurry forms a slurry section to be penetrated in the anchoring section. A seal is formed at both ends of the section of slurry to be permeated, thereby sealing the section of slurry to be permeated into a closed cavity; A pulsed osmotic pressure is applied to the sealed cavity, causing the slurry to repeatedly seep into the micro-cracks in the hole wall of the anchoring section during pressure cycling. The pulsed seepage pressure is released, and the unpermeable grout in the anchor hole is discharged, allowing the grout that has penetrated the micro-fractures to solidify in the surrounding rock. A permeable and solidified rock ring is formed on the borehole wall of the anchoring section, which is integrated with the surrounding rock. Anchoring structural adhesive is injected into the anchor hole that forms the permeable and solidified rock ring, and the tension anchor is implanted to complete the anchoring construction.
2. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 1, characterized in that, The steps for cleaning the hole wall of the anchoring section include: The residue inside the anchor hole is blown away with high-pressure gas, and then the wall of the anchoring section is brushed repeatedly with a steel brush to expose the micro-cracks in the wall of the anchoring section and keep it dry and clean, forming a penetration channel for the slurry to enter.
3. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 1, characterized in that, The step of injecting low-viscosity modified resin slurry into the anchor hole includes: The injection volume of the grout is calculated based on the volume of the anchoring section and the set penetration depth; Grouting is performed according to the injection volume, so that the static liquid level of the grout is located at the upper third of the depth of the anchor hole, so that the section of grout to be penetrated completely covers the hole wall of the anchoring section.
4. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 1, characterized in that, The step of applying pulsed osmotic pressure to the sealed cavity includes: The peak value of the pulsed osmotic pressure is set to 0.6 to 0.8 times the allowable grouting pressure of the surrounding rock, so that the grout can obtain osmotic power while avoiding splitting and damaging the surrounding rock.
5. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 4, characterized in that, The pulsed osmotic pressure is applied in a pressure cycle, with the number of pressure cycles being 3 to 5 times and the single pressure holding time being 30 seconds, so that the slurry continuously penetrates into the microcracks during the pressure holding stage and remains in the microcracks without being drawn back during the pressure release stage.
6. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 1, characterized in that, The step of forming a seal at both ends of the section of slurry to be permeated includes: Annular sealing bands that expand radially and fit against the wall of the anchor hole are formed at the lower and upper ends of the slurry section to be permeated; wherein the annular sealing band at the lower end is located below the slurry surface and the annular sealing band at the upper end is located above the slurry surface, so as to seal the slurry section to be permeated into the sealed cavity.
7. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 6, characterized in that, The lower annular sealing strip is located between the section of slurry to be permeated and the bottom of the hole, and the upper annular sealing strip is located between the section of slurry to be permeated and the orifice. During the entire process of applying the pulsed osmotic pressure, the two annular sealing strips are kept in radial contact, so that the osmotic pressure is only applied to the wall of the anchoring section covered by the section of slurry to be permeated.
8. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 1, characterized in that, The steps for draining the unpermeated flowing grout from the anchor hole include: After the pulsed seepage pressure is released, the grout, which is still in a flow state, is pumped out of the hole from the orifice, so that only the grout that has seeped into the microcracks remains in the anchor hole. Allow to stand and cure until the slurry solidifies; A radially continuous, integrated permeable solidified rock ring is formed on the borehole wall of the anchoring section.
9. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 3, characterized in that, The low-viscosity modified resin slurry is a modified epoxy resin slurry containing diluent and penetration promoter. Its initial viscosity is not greater than 500 mPa·s, and its initial setting time is not less than the duration of all pressure cycles of the pulsed osmotic pressure, so as to ensure that the slurry maintains a permeable flow dynamic throughout the entire osmotic pressure process.
10. The construction method for lifting the tensile anchoring end of the rock mass as described in claim 5, characterized in that, The number of pressure cycles is adjusted according to the degree of fissure development in the surrounding rock, so that the penetration depth of the grout in the micro-fissures reaches 1 to 2 times the diameter of the tension anchor bolt, so that the radial thickness of the infiltrated and solidified rock ring is sufficient to change the failure mode of the anchor bolt under tension from interface peeling to cone-shaped failure of the rock mass relying on the infiltrated and solidified rock ring.