Controlled Deployment Method of In-situ Filling Performance Monitoring Device in Downhole Goaf
By setting a guiding and locking mechanism on the inner side of the underground retaining wall, the controlled deployment of the in-situ filling performance monitoring device was realized, which solved the problems of the authenticity of monitoring data and equipment safety in the underground goaf area, and ensured the authenticity of the monitoring data and the safety of the device.
Patent Information
- Application Number
- CN202611583202.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies make it difficult to deploy in-situ backfill performance monitoring devices in underground goaf areas, as they cannot ensure the authenticity of monitoring data and the safety of equipment while avoiding personnel safety risks and device damage.
By setting a deployment position inside the retaining wall and establishing a guiding moving mechanism between this position and the target monitoring position in the goaf, the monitoring device is fixed by a locking mechanism, and the remote release mechanism releases the lock, allowing the device to move along the guiding moving mechanism to the target position, and is precisely positioned by a limiting mechanism to achieve monitoring.
This allows for the pre-installation of equipment in a safe area underground, avoiding personnel entering dangerous areas, reducing the risk of equipment damage, and ensuring the authenticity and representativeness of monitoring data.
Smart Images

Figure CN123109766A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of mine backfilling technology, and more specifically, to a controlled deployment method for an in-situ backfill performance monitoring device in an underground goaf. Background Technology
[0002] Backfilling mining technology is a crucial aspect of mining operations. To understand the mechanical response and evolution of backfill materials during underground operation, in-situ backfill performance monitoring devices are typically used to continuously monitor relevant performance parameters of the backfill material during the filling, consolidation, and service stages, providing fundamental data support for backfill mix optimization and safe production.
[0003] In conventional monitoring deployments, the stress environments of backfill materials in underground roadways differ significantly from those in goaf areas. Constrained by the surrounding rock of the roadways, monitoring data acquired within the roadways often fails to accurately reflect the actual loading and evolution state of the backfill materials in the goaf. Therefore, to obtain representative in-situ monitoring data, it is generally desirable to deploy in-situ backfill performance monitoring devices at target monitoring locations within the underground goaf.
[0004] However, in actual underground backfilling operations, the deployment of monitoring devices faces strict limitations imposed by the working environment. Goaf areas pose safety hazards such as roof collapses and falling rocks, making manual deployment by construction personnel a significant personal safety risk. Furthermore, if the monitoring devices are placed at the target location in the goaf before the retaining wall is sealed, they will be exposed to the harsh environment for an extended period before formal backfilling, making them susceptible to structural damage or functional failure due to falling rocks, leading to monitoring failure.
[0005] In summary, the deployment of existing in-situ monitoring devices faces mutually constraining engineering challenges: objectively, monitoring devices are required to be placed inside the goaf to ensure data accuracy, but in practice, this is limited by factors such as the difficulty for personnel to enter the goaf and the vulnerability of the devices to damage if placed in advance. Existing technologies struggle to achieve an effective balance between the representativeness of the monitoring location, the safety and integrity of the monitoring equipment, and the safety of personnel during operations.
[0006] In view of the above, this application is hereby submitted. Summary of the Invention
[0007] The purpose of this application is to provide a controlled deployment method for an in-situ filling performance monitoring device in an underground goaf. The deployment method achieves spatiotemporal separation between the pre-installation timing and the final placement location of the monitoring device through a status confirmation and remote controlled release mechanism. While taking into account personnel operation and equipment safety, it obtains in-situ monitoring data of the goaf with good authenticity and representativeness.
[0008] In order to achieve the above-mentioned objectives of this application, the following technical solution is adopted: In a first aspect, this application provides a controlled deployment method for an in-situ filling material performance monitoring device in a goaf area, comprising: Before the retaining wall of the goaf is closed, a deployment position is set on the inner side of the retaining wall, and a guide moving mechanism is set between the deployment position and the target monitoring position in the goaf to form a target monitoring path; the in-situ filling performance monitoring device is installed on the guide moving mechanism; The in-situ filling performance monitoring device is locked in the deployment position by a locking mechanism, and a remote release mechanism connected to the locking mechanism is provided to lead the monitoring cable connected to the in-situ filling performance monitoring device and the remote release mechanism to the outside of the retaining wall. After the retaining wall is closed and before the filling operation begins, the deployment status information is obtained; the deployment status information is used to reflect the status of the guiding moving mechanism, the in-situ filling body performance monitoring device, and the target monitoring path; Determine whether the deployment status information meets the preset release conditions; If so, the locking mechanism is released by the remote release mechanism, allowing the in-situ filling performance monitoring device to move from the deployment position to the target monitoring position along the guide moving mechanism; The in-situ filling material performance monitoring device is positioned by a limiting mechanism set at the target monitoring position; In-situ monitoring of the in-situ filling material performance is performed using a positioning-completed in-situ filling material performance monitoring device to collect filling material performance parameters, and the filling material performance parameters are transmitted through the monitoring cable.
[0009] In an optional implementation, the deployment location is situated within an accessible area of the alleyway inside the retaining wall; and / or, The target monitoring location is located in an inaccessible area within the goaf; and / or, The guiding movement mechanism includes at least one of a guide rail, a slide rail, a guide groove, and a slide track; and / or, The in-situ filling material performance monitoring device cooperates with the guiding and moving mechanism through a sliding bearing structure located at its bottom; and / or, The limiting mechanism includes at least one of a stop block, a limiting element, and a mechanical locking element; and / or, The performance parameters of the filling material include at least one of stress, temperature, pore water pressure, matrix suction, water content, and displacement; and / or, The remote release mechanism is a mechanical release mechanism; the mechanical release mechanism includes at least one of wire rope, cable and linkage mechanism.
[0010] In an optional embodiment, the guiding moving mechanism is provided with an inclination angle toward the target monitoring position, so that after the in-situ filling performance monitoring device is released from the locking mechanism, it moves along the guiding moving mechanism toward the goaf under its own gravity.
[0011] In an optional implementation, obtaining deployment status information specifically includes: The deployment status information is obtained through the status detection unit; The state detection unit includes a visual inspection device and / or a strain detection device.
[0012] In an optional embodiment, the visual inspection device is provided with an independent light source and / or a drip-proof structure; The visual inspection device is used to acquire at least one of the following image information: A. Whether the guiding moving mechanism is deformed, broken, or displaced; B. Whether the in-situ filling material performance monitoring device has any structural abnormalities; C. Whether there are obstacles along the target monitoring path.
[0013] In an optional embodiment, the in-situ filling performance monitoring device includes a load-bearing frame structure; The strain detection device is installed on the load-bearing frame structure and is used to detect the deformation information of the in-situ filling performance monitoring device.
[0014] In an optional implementation, after determining whether the deployment status information meets the preset release conditions, the method further includes: If not, maintain the locked state of the locking mechanism and suspend the controlled deployment; Adjustments and / or rearrangements are made to address deployment anomalies, and the process returns to the step of obtaining deployment status information.
[0015] In an optional embodiment, a data acquisition device is provided on the outer side of the retaining wall; The transmission of the infill performance parameters via the monitoring cable specifically includes: The performance parameters of the filling material are transmitted to the data acquisition instrument via the monitoring cable.
[0016] Secondly, this application provides a controlled deployment system for an in-situ filling material performance monitoring device in an underground goaf, applied to the retaining wall of the goaf, the controlled deployment system comprising: A guiding moving mechanism is positioned between the deployment location inside the retaining wall and the target monitoring location within the goaf area, forming a target monitoring path; An in-situ filling material performance monitoring device is installed on the guide moving mechanism and connected to a monitoring cable; A locking mechanism, disposed at the deployment location, is used to lock the in-situ filling material performance monitoring device at the deployment location; The status detection unit is used to acquire deployment status information after the retaining wall is closed. The deployment status information is used to reflect the status of the guiding moving mechanism, the in-situ filling body performance monitoring device, and the target monitoring path. A remote release mechanism is connected to the locking mechanism and led to the outside of the retaining wall; the remote release mechanism is configured to: when the deployment status information determines that the preset release conditions are met, release the locking mechanism, so that the in-situ filling performance monitoring device can move from the deployment position to the target monitoring position along the guide moving mechanism; A limiting mechanism is provided at the target monitoring position to position the in-situ filling material performance monitoring device that has reached the target monitoring position.
[0017] In an optional embodiment, the guiding moving mechanism is provided with an inclination angle toward the target monitoring position; The in-situ filling performance monitoring device is configured to move along the guide moving mechanism towards the goaf under its own gravity after the locking mechanism is released.
[0018] In an optional embodiment, the guiding movement mechanism includes at least one of a guide rail, a slide rail, a guide groove, and a slide track; and / or, The in-situ filling material performance monitoring device cooperates with the guiding and moving mechanism through a sliding bearing structure located at its bottom; and / or, The limiting mechanism includes at least one of a stop block, a limiting element, and a mechanical locking element; and / or, The remote release mechanism is a mechanical release mechanism, including at least one of wire rope, cable and linkage mechanism.
[0019] In an optional implementation, the state detection unit includes a visual inspection device and / or a strain detection device; The visual inspection device is equipped with an independent light source and / or a drip-proof structure; The in-situ filling material performance monitoring device includes a load-bearing frame structure, and the strain detection device is mounted on the load-bearing frame structure.
[0020] In an optional embodiment, a data acquisition device is installed on the outside of the retaining wall; the monitoring cable passes through the retaining wall and is connected to the data acquisition device.
[0021] Compared to existing technologies, this application establishes a deployment location on the inside of the retaining wall before its closure, and creates a guiding movement mechanism between this deployment location and the target monitoring location within the goaf. This allows the entire preliminary deployment operation to be completed within a relatively safe, accessible internal area. This method effectively avoids construction personnel directly entering the goaf, which is prone to rockfalls and roof collapses, eliminating personal safety risks during manual deployment. Simultaneously, by using a locking mechanism to fix the in-situ backfill performance monitoring device in a safe standby position, rather than pre-deploying it within the goaf, the exposure time of the equipment in harsh environments is significantly reduced, effectively lowering the probability of it being destroyed by falling rocks and ensuring the physical safety of the equipment.
[0022] After the retaining wall is closed and before the formal filling operation begins, by acquiring the status information of the guiding movement mechanism, monitoring devices, and target monitoring path, and by assessing the preset release conditions, it is possible to confirm that the path is unobstructed and the equipment is intact before any substantial movement is carried out. This pre-confirmation mechanism greatly reduces the risk of deployment failure caused by blind release. When the conditions are met, the operator uses the remote release mechanism outside the retaining wall to unlock it, allowing the monitoring device to slide smoothly and controllably along the guiding movement mechanism into the goaf. This series of coordinated actions cleverly separates the installation preparation time from the final placement time on the timeline.
[0023] Once the in-situ backfill performance monitoring device reaches the target location, it works in conjunction with a limiting mechanism to achieve precise physical positioning, preventing unexpected deviations during subsequent backfilling operations. This allows the monitoring device to ultimately and stably penetrate into the core area of the backfill material where it is actually in service to collect data. This overcomes the limitations of previous methods, which restricted measurements to the edges of roadways due to safety constraints, and eliminates data distortion caused by strong constraints from the surrounding rock. Consequently, it ensures that the backfill performance parameters transmitted through the monitoring cable possess extremely high authenticity, objectivity, and engineering representativeness.
[0024] This controlled deployment system utilizes a guiding movement mechanism between the inside of the retaining wall and the target location in the goaf, along with a locking mechanism, to ensure that the in-situ backfill performance monitoring device can be securely locked in a relatively safe deployment position from the outset. This spatial layout and physical locking structure design directly eliminates the need for construction personnel to venture into the dangerous goaf for on-site placement, thus eliminating the risks of roof collapse and falling rocks. Simultaneously, it avoids the risk of the monitoring device being subjected to long-term harsh environmental impacts due to premature placement in the goaf, significantly improving the survival rate and operational safety of the physical equipment.
[0025] The status detection unit and remote release mechanism configured in the system form a tight, controlled deployment linkage mechanism. After the retaining wall is closed, the status detection unit can promptly obtain status information on the movement path, the mechanism, and the monitoring equipment itself, ensuring that the lock is released remotely only when the overall environment meets the preset release conditions. This hardware collaborative design effectively avoids the movement obstruction or irreversible deployment failure that may be caused by blind release in complex downhole environments, greatly enhancing the fault tolerance and reliability of engineering deployment.
[0026] After the in-situ backfill performance monitoring device smoothly slides along the guide mechanism, the system uses a limiting mechanism to physically stop and spatially position it. This structure ensures that the monitoring device can stably and accurately remain at the optimal target monitoring position inside the goaf, preventing unexpected displacement caused by the impact of the backfill slurry. This precise deep positioning method completely breaks through the traditional engineering constraints of only being able to compromise and measure at the edge of the roadway, eliminates the interference caused by the strong constraints of surrounding rock stress, and enables the monitoring data led out by the monitoring cable to truly and objectively reflect the actual service status of the backfill in the goaf, possessing extremely high representativeness. Attached Figure Description
[0027] To more clearly illustrate the technical solutions in the specific embodiments of this application or the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0028] Figure 1 This is a flowchart illustrating the controlled deployment method of the in-situ filling performance monitoring device in the underground goaf area according to Embodiment 1 of this application. Figure 2 A schematic diagram of the in-situ filling material performance monitoring device in its deployment position (standby state); Figure 3 A schematic diagram of the in-situ filling material performance monitoring device in the target monitoring position (deployment completed); Figure 4 A simplified structural diagram of an in-situ filling material performance monitoring device; Figure 5 This is a graph of triaxial stress monitoring data obtained by the in-situ filling material performance monitoring device in Experiment Example 2 of this application; Figure 6 This is a graph of pore water pressure monitoring data obtained by the in-situ filling performance monitoring device in Experimental Example 2 of this application; Figure 7This is a graph of matrix suction monitoring data obtained by the in-situ filling performance monitoring device in Experimental Example 2 of this application; Figure 8 This is a graph showing the temperature, humidity, and conductivity monitoring data obtained by the in-situ filling material performance monitoring device in Experiment Example 2 of this application.
[0029] Key component symbols: 100-Controlled deployment system; 1-Guiding movement mechanism; 2-In-situ filling material performance monitoring device; 21-Sliding bearing structure; 22-Bearing frame structure; 3-Locking mechanism; 4-Status detection unit; 41-Camera display system; 5-Remote release mechanism; 6-Limit mechanism; 7-Monitoring cable; 8-Data acquisition instrument; 91-Deployment position; 92-Target monitoring position; 200-Retaining wall; 300-Goaf; 400-Roadway; 500-Pillar; 600-Surface; 700-Underground; 800-Filling slurry conveying pipeline; 900-Filling slurry outlet. Detailed Implementation
[0030] The embodiments of this application will be described in detail below with reference to examples. However, those skilled in the art will understand that the following examples are for illustrative purposes only and should not be considered as limiting the scope of this application. Unless otherwise specified in the examples, conventional conditions or conditions recommended by the manufacturer shall apply. Reagents or instruments whose manufacturers are not specified are all commercially available conventional products.
[0031] Example 1 refer to Figure 1 This application provides a controlled deployment method for an in-situ backfill performance monitoring device in an underground goaf area, which addresses the engineering contradiction of personnel being unable to enter the goaf during backfilling operations and the monitoring equipment being easily damaged by falling rocks. The specific implementation process includes: Step S100: Before the retaining wall of the goaf is closed, a deployment position is set on the inner side of the retaining wall, and a guide moving mechanism is set between the deployment position and the target monitoring position in the goaf to form a target monitoring path; the in-situ filling performance monitoring device is installed on the guide moving mechanism.
[0032] During on-site construction, before the retaining wall of the goaf is officially closed, operators set up a temporary deployment position in a safe and accessible area inside the retaining wall. Subsequently, between the deployment position and the target monitoring position set inside the goaf, a guiding moving mechanism (such as a slide rail, guide groove, etc.) with guiding function is laid, thereby forming a clear target monitoring path in space.
[0033] At this point, the in-situ filling performance monitoring device is slidably or rolled onto the guide moving mechanism, giving it the basic conditions to move along the path.
[0034] Step S200: Lock the in-situ filling performance monitoring device at the deployment position using the locking mechanism, and set up a remote release mechanism connected to the locking mechanism to lead the monitoring cable connected to the in-situ filling performance monitoring device and the remote release mechanism to the outside of the retaining wall.
[0035] In order to achieve delayed control of deployment timing, after the device is installed, the in-situ filling material performance monitoring device is securely locked in the deployment position by a preset locking mechanism (such as mechanical buckle, limit pin, etc.) to prevent it from slipping prematurely.
[0036] Simultaneously, a remote release mechanism connected to the locking mechanism is provided, and the monitoring cable connecting the in-situ filling performance monitoring device and the remote release mechanism are safely led to the outer area of the retaining wall. With this configuration, construction personnel can evacuate to the outside of the retaining wall, which offers higher security, after the retaining wall is closed, while the device itself remains in a protected standby area.
[0037] Step S300: After the retaining wall is closed and before the filling operation begins, obtain deployment status information; the deployment status information is used to reflect the status of the guiding moving mechanism, the in-situ filling body performance monitoring device, and the target monitoring path.
[0038] Based on this, before the large-scale filling operation begins after the retaining wall closure is completed, relevant detection methods are used to obtain information reflecting the deployment status of the downhole environment and equipment. It should be noted that "deployment status information" refers to various physical feedbacks that comprehensively reflect the current deployment conditions, typically including data such as whether the guiding moving mechanism has deformed or broken, whether the in-situ filling performance monitoring device has structural abnormalities, and whether there are obstructions or falling rocks on the target monitoring path.
[0039] Step S400: Determine whether the deployment status information meets the preset release conditions.
[0040] In step S500, if so, the locking mechanism is released by the remote release mechanism, allowing the in-situ filling performance monitoring device to move from the deployment position to the target monitoring position along the guide moving mechanism.
[0041] Based on the obtained deployment status information, determine whether it meets the pre-set release conditions (e.g., no obstacles on the path and the integrity of the device structure).
[0042] If the judgment result is yes (i.e., the preset release condition is met), the operator or control system can release the locking constraint of the locking mechanism on the device by pulling or triggering the remote release mechanism outside the retaining wall. After the lock is released, the in-situ filling performance monitoring device, under the action of driving force (such as its own weight or external traction), smoothly slides along the guide moving mechanism from the relatively safe deployment position to the target monitoring position deep in the goaf.
[0043] Step S600: The in-situ filling performance monitoring device that has reached the target monitoring position is positioned by a limiting mechanism set at the target monitoring position; Step S700: In-situ monitoring is performed using the in-situ filling performance monitoring device after positioning to collect filling performance parameters, and the filling performance parameters are transmitted through the monitoring cable.
[0044] Once the in-situ backfill performance monitoring device reaches the target monitoring position, it is stopped and spatially positioned by a pre-fixed limiting mechanism (such as a rigid stop) to ensure that it will not deviate unexpectedly when subsequently impacted by the backfill slurry. Finally, the in-situ backfill performance monitoring device, having achieved precise positioning, is activated to continuously collect backfill performance parameters during the backfilling process and service phase. These parameters are then transmitted in real-time to a receiving terminal outside the retaining wall via the monitoring cable, thereby obtaining highly representative and accurate mine engineering data unaffected by roadway boundary effects.
[0045] In summary, this embodiment, by pre-positioning the monitoring device at a location within the retaining wall and using a guiding movement mechanism, combined with a remote release mechanism that locks and guides the device to the outside, enables personnel to pre-install the equipment in a safe area, preventing unauthorized entry into the dangerous goaf. It also significantly reduces the exposure time of the monitoring device in the goaf environment to prevent damage. Before the filling operation, controlled release is performed based on status information analysis, ensuring the reliability of the movement path and the equipment, and avoiding blind deployment. The monitoring device is ultimately guided into position and precisely positioned by a limiting mechanism, overcoming the limitations of conventional roadway edge deployment. This not only considers personnel safety and equipment survival rate but also ensures that the acquired in-situ monitoring data is sufficiently authentic and representative.
[0046] Example 2 refer to Figure 2 Based on the aforementioned embodiments, this embodiment provides a controlled deployment method for an in-situ filling body performance monitoring device in an underground goaf.
[0047] In some implementations, the deployment location is situated in an accessible area within the inner lane of the retaining wall.
[0048] In some implementations, the target monitoring location is located in an inaccessible area within the goaf.
[0049] To completely resolve the engineering conflict between personnel safety and the accuracy of monitoring data, the deployment location is explicitly set within an accessible area inside the retaining wall's inner side roadway. Here, "accessible area" refers to a safe space that has undergone support treatment, poses no risk of roof collapse, and allows construction personnel to perform assembly and debugging operations. Conversely, the target monitoring location is precisely planned within an inaccessible area of the goaf. This area is strictly off-limits to personnel due to the risk of rockfall and collapse, but it is the only core area for obtaining accurate service data of the backfill material, unaffected by the constraints of the surrounding rock.
[0050] In some embodiments, the guiding movement mechanism includes at least one of a guide rail, a slide rail, a guide groove, and a slide track.
[0051] In some embodiments, the in-situ filling performance monitoring device cooperates with the guiding movement mechanism via a sliding bearing structure disposed at its bottom.
[0052] To establish a reliable transport channel between the two isolated areas, the guiding and moving mechanism can employ at least one of the following: guide rails, slide rails, guide channels, and chutes, depending on the local conditions. These rigid or semi-rigid structures are pre-laid on the base plate, defining the linear or curved trajectory of the movement. To reduce movement resistance and prevent jamming, the bottom of the in-situ filling material performance monitoring device is specifically equipped with a sliding bearing structure (e.g., roller assembly, friction slider, or tracked bearing plate). This sliding bearing structure is matched with the guiding and moving mechanism in cross-sectional shape, thereby achieving smooth and stable movement of the device without derailment.
[0053] In some embodiments, the limiting mechanism includes at least one of a stop, a limiting member, and a mechanical locking member.
[0054] In the positioning stage after the device reaches the target monitoring position, the limiting mechanism used in this embodiment includes at least one of a stop block, a limiting component, and a mechanical locking component.
[0055] This limiting mechanism is used to mechanically stop the device when it slides to the endpoint. To avoid rigid collisions, in actual engineering implementation, flexible cushioning materials can also be used (such as a large sponge or rubber pad placed in front of the limiting mechanism at the target monitoring position) to effectively absorb the kinetic energy when the device slides to the endpoint and avoid damage to the device.
[0056] Furthermore, in terms of resisting the fluid impact during subsequent filling slurry injection, the load-bearing frame structure of the in-situ filling performance monitoring device typically employs a steel structure with a large self-weight (e.g., an overall self-weight of not less than 50 kg); simultaneously, combined with Figure 2 and Figure 3 In the downhole operation shown, the filling slurry does not fall directly from above the monitoring device. Instead, it falls from a distant filling slurry outlet and, relying on its strong viscosity, slowly and horizontally flows across the bottom of the goaf to the device's location. Therefore, the monitoring device's substantial structural weight, combined with the backward blocking effect of the limiting mechanism, can reliably resist the fluid impact caused by the horizontal flow of the filling slurry, ensuring the device maintains absolute constancy in its three-dimensional spatial coordinates.
[0057] In some embodiments, the performance parameters of the filling body include at least one of stress, temperature, pore water pressure, matrix suction, water content, and displacement.
[0058] In some embodiments, the remote release mechanism is a mechanical release mechanism; the mechanical release mechanism includes at least one of wire rope, cable and linkage mechanism.
[0059] Furthermore, due to the objective constraints of high humidity and unstable power supply in the downhole environment, the remote release mechanism is preferably a purely physical force-transmitting mechanical release mechanism, specifically employing at least one of wire rope, cable, and linkage mechanisms. This purely mechanical structure can easily penetrate retaining walls and is unaffected by power outages; operators can instantly release the lock by applying physical pulling or pushing force from a safe area. Once the device is safely in place, its built-in sensor matrix begins continuous monitoring, specifically collecting at least one of the following performance parameters of the filling material: stress, temperature, pore water pressure, matrix suction, water content, and displacement. This provides multi-dimensional and highly representative in-situ data for analyzing the consolidation evolution of the filling material.
[0060] In some embodiments, the guiding moving mechanism is provided with an inclination angle toward the target monitoring position, so that after the locking mechanism is released, the in-situ filling performance monitoring device moves along the guiding moving mechanism toward the goaf under its own gravity.
[0061] In actual engineering implementation, the specific value of this tilt angle can be, for example, 5°, 8°, 10°, 15°, 25°, 35°, 45°, etc.
[0062] Specifically, for the complex filling conditions downhole where it is difficult to provide stable power, the guide moving mechanism is not laid out completely horizontally during installation, but rather follows or is artificially set at an angle that tilts towards the target monitoring position.
[0063] The angle setting causes the entire target monitoring path to exhibit a gradually decreasing downward slope from the inside of the retaining wall towards the interior of the goaf. Based on the principle of inclined plane mechanics, the in-situ filling performance monitoring device located on the guiding moving mechanism will generate a continuous downward sliding force due to its own weight. During the deployment phase, this sliding force is balanced by the mechanical jamming of the locking mechanism, keeping the device stationary.
[0064] When the deployment status is confirmed to be correct and the predetermined filling time is reached, the operator releases the lock via a remote release mechanism. At the moment of unlocking, the original balanced static state is broken. After losing the locking constraint, the in-situ filling performance monitoring device overcomes the frictional resistance along the way entirely by the downward force generated by its own gravity, and automatically slides relative to the goaf along the guide moving mechanism.
[0065] This gravity-assisted sliding deployment method with a specific tilt angle eliminates the need for additional drive equipment such as winch traction and push rod pushing, effectively avoiding the risk of deployment failure due to power outages or electrical faults underground. Utilizing basic physical gravity, it achieves a smooth and controlled lowering of the device, significantly enhancing the system's robustness and practicality in harsh mining environments. In actual engineering implementation, the specific value of this tilt angle can be adaptively calculated and adjusted based on the overall weight of the monitoring device and the coefficient of friction between its contact surface and the guide mechanism, ensuring that the device can smoothly initiate sliding without causing destructive impact to the terminal limiting structure due to excessive acceleration.
[0066] Example 3 refer to Figure 2 Based on the aforementioned embodiments, this embodiment provides a controlled deployment method for an in-situ filling body performance monitoring device in an underground goaf.
[0067] Step S300, obtaining deployment status information, specifically includes: The deployment status information is obtained through a status detection unit. The status detection unit includes a visual inspection device and / or a strain detection device.
[0068] Specifically, after the retaining wall is closed and before the formal filling operation begins, the physical state inside the goaf becomes a "black box" because personnel have been evacuated to a safe area. To avoid the monitoring device hitting obstacles or being incorrectly lowered in a damaged state due to blind release, the system is equipped with a dedicated status detection unit to obtain deployment status information.
[0069] The status detection unit is intended to serve as an information acquisition and exploration channel for operators, and its implementation includes visual inspection devices and / or strain detection devices.
[0070] The maximum effective strain measurement range of the above-mentioned strain detection device can be, for example, 1000με, 3000με, 5000με, 10000με, etc.
[0071] When using a visual inspection device, it is typically installed at the bottom of the goaf, inside the retaining wall, or in a suitable location that allows for a top-down / level view of the entire target monitoring path. The visual inspection device uses optical imaging components to continuously capture images or video of the in-situ filling performance monitoring device, the guide movement mechanism, and the movement path between them. By transmitting these optical images back to the safe area in real time, operators or image recognition systems can visually observe whether the guide path is unobstructed, whether there are large pieces of fallen rock blocking the way, and whether there are obvious physical fractures on the surface of the mechanism.
[0072] When a strain gauge is used, it is directly attached to or embedded in the surface of the physical structure requiring close monitoring (such as the frame of the monitoring device). The strain gauge utilizes the strain effect of metallic or semiconductor materials to monitor minute deformations of the structure in real time during deployment. If, during standby, the monitoring device is subjected to an unexpected impact from falling rocks from the underground roof, the strain gauge will immediately capture the abrupt strain data caused by the structural stress and convert it into an electrical signal, which is then transmitted back. If this value exceeds the elastic limit threshold of the material, it objectively indicates that irreversible damage has occurred to the equipment structure.
[0073] In practical engineering applications, visual inspection devices and strain detection devices can be configured separately to simplify system architecture and reduce costs; more preferably, they can be configured in combination. In the combined configuration, the system employs a cross-validation rule with the visual inspection device as the primary component and the strain detection device as the secondary component. Specifically, visual information serves as the primary qualitative judgment basis, providing verification of the macroscopic unobstructedness of the target path and the appearance of the equipment; strain information serves as an auxiliary verification method, providing verification of the microscopic health of the equipment itself. Through this "primary-secondary combination" logic, the two form complementary verification, effectively filtering out misjudgments that may be caused by the failure of a single strain element (not due to external force damage), providing a more scientific, comprehensive, and objective decision-making basis for whether to execute the unlocking and release action.
[0074] In some implementations, this embodiment further optimizes the configuration structure of the front-end sensor and its detection target system. Specifically, since the underground goaf area is not only completely dark without lighting, but also prone to dripping and water spraying from rock fissures or construction pipelines, it is often impossible to obtain effective images if only conventional camera equipment is placed.
[0075] To overcome the aforementioned environmental interference, the visual inspection device is specifically designed with an independent light source and / or a drip-proof structure. The independent light source can be an integrated explosion-proof LED spotlight or an infrared supplementary light array, used to actively project an illumination beam into the goaf area, eliminating blind spots. The drip-proof structure can be located directly above or around the lens of the visual inspection device, and can take the form of a waterproof baffle, a transparent protective cover, or a hydrophobic isolation lens. This structure effectively guides the flow of dripping water from above, preventing water droplets from directly adhering to and obstructing the imaging lens, thereby ensuring the continuous acquisition of high-definition environmental images.
[0076] Having acquired the hardware foundation for obtaining clear images, the visual inspection device does not blindly capture images, but rather focuses on acquiring optical image information covering key risk points, specifically including one or more of the following combinations: The visual inspection device is used to acquire at least one of the following image information: A. Check whether the guiding mechanism is deformed, broken, or displaced. By capturing the geometric contour of the guiding mechanism, determine whether it has lost its original linear guiding ability due to pressure from the top plate or initial impact from falling rocks.
[0077] B. Check for structural abnormalities in the in-situ filling material performance monitoring device. Observe the appearance of the device in standby mode to confirm whether its frame has been damaged or whether its core components have fallen off.
[0078] C. Are there any obstacles along the target monitoring path? Scan the space around the guide mechanism and directly in front of it to check for any obstructions such as rocks or debris that could cause the device to jam or overturn.
[0079] By comprehensively analyzing the three image information items A, B, and C mentioned above, operators or backend image recognition systems can gain a three-dimensional and intuitive understanding of the physical integrity of the "guide path, monitoring equipment, and forward travel space." Only when the path is confirmed to be unobstructed and the structure to be normal can the preset release conditions be met, thereby avoiding serious engineering accidents such as equipment entering the site in a damaged state or getting stuck midway.
[0080] In some embodiments, the in-situ filling performance monitoring device includes a load-bearing frame structure; the strain detection device is disposed on the load-bearing frame structure and is used to detect the deformation information of the in-situ filling performance monitoring device.
[0081] To survive in the harsh conditions at the edge of the goaf to be filled, the in-situ filling performance monitoring device features a specially designed load-bearing frame structure. This load-bearing frame structure is typically constructed by welding metal profiles (such as angle steel or channel steel) with high yield strength into a cage-like or polyhedral skeleton. It not only provides a unified mounting base for precision sensing elements such as internal stress, temperature, and pore water pressure, but also serves as the first physical barrier against external impacts.
[0082] During the deployment period, even though the device remains inside or at the edge of the retaining wall, the possibility of accidental impact or compression cannot be completely ruled out. To accurately assess the structural health of the device, strain monitoring devices are specifically installed on the load-bearing frame structure. In practice, strain monitoring devices (such as resistance strain gauges, vibrating wire surface strain gauges, etc.) can be tightly attached using specialized adhesives, or fixed to the surface of critical stress nodes or main load-bearing beams of the load-bearing frame structure using bolts, spot welding, or other methods.
[0083] When the supporting frame structure is subjected to external forces such as falling rocks or equipment sliding and bumping, resulting in minute mechanical deformations that are difficult to detect with the naked eye, the strain detection device attached to it can synchronously generate a strain response, detect and output the corresponding deformation information (i.e., strain data). By comparing and analyzing the deformation information collected in real time with the elastic deformation safety threshold of the frame material, operators or control terminals can quantitatively and objectively determine whether the in-situ filling performance monitoring device has experienced plastic yielding or structural fracture. If the deformation information shows a sharp increase in value and cannot rebound, it objectively indicates that the device has experienced structural abnormality, thus providing reliable data support for whether to perform a release action, effectively avoiding monitoring failure caused by the equipment being "discontinued with damage".
[0084] It needs to be further clarified that the determination of whether the deployment status information meets the preset release conditions in this embodiment does not rely solely on a single theoretical quantitative threshold, but rather on a composite judgment criterion that aligns with the harsh working conditions downhole. Specifically, the preset release conditions include a comprehensive judgment of both the external physical state and the internal performance state: Firstly, the external physical state assessment relies primarily on visual inspection, supplemented by strain detection. In practical engineering applications, visual inspection devices are the most effective and reliable core method for intuitively and qualitatively determining whether the target monitoring path is unobstructed and whether the guiding movement mechanism and the outer frame of the device are intact. The deformation information acquired by the strain detection device is mainly used as an auxiliary verification method to provide a reference when vision is limited, thereby effectively avoiding misjudgments of "equipment damage" caused by the system due to the failure of a single strain detection element without external force.
[0085] Secondly, the internal performance status is determined based on data self-checking. Judging the equipment's integrity includes not only the structural integrity of the external supporting frame but also the functional integrity of the various sensors mounted on the in-situ filling performance monitoring device. During the locked standby phase, the system uses an external data acquisition unit to continuously read base data from internal vibrating wire stress sensors, pore water pressure sensors, and matrix suction sensors. If the initial monitoring data returned by each sensor is stable and conforms to the reasonable base numerical characteristics expected before the filling operation (e.g., exhibiting the characteristics described later), then the system is considered to be in good working order. Figures 5 to 8 If the data trend is stable in the initial stage, it can be determined that the internal sensing components are working normally.
[0086] In summary, the system determines that the current deployment status fully meets the preset release conditions only when the external physical state indicates that the path is unobstructed and the structure is undamaged, and the internal performance state indicates that the initial self-test data of each sensor is normal. This composite judgment logic based on engineering practice overcomes the limitation of conventional pre-operation checks being difficult to quantify, significantly improving the scientific nature and fault tolerance of controlled release decisions.
[0087] In some implementation methods, even with meticulous pre-planning at the actual underground filling site, uncontrollable physical changes may still occur within the goaf during the standby time window between the retaining wall closure and formal filling. These changes could include roof collapse, floor bulging due to ground pressure manifestation, or unexpected impacts on the monitoring device itself. Therefore, conditional assessment of the deployment status information obtained in the early stages is particularly crucial.
[0088] After determining whether the deployment status information meets the preset release conditions, step S400 further includes: Step S800: If not, maintain the locked state of the locking mechanism and suspend the controlled deployment.
[0089] When the judgment result indicates that the current state does not meet the preset safety release conditions (for example, visual images show that the guide rail in front is broken or there are large rocks blocking the way, or strain data shows that the device frame has been severely twisted and deformed), intervention and control must be taken immediately.
[0090] Specifically, the locking mechanism of this application is logically configured as a "default locking (normally closed)" safety mechanism. That is, in actual engineering applications, even without a clear abnormality detection signal, as long as the external operator does not actively issue and execute an unlocking / release command, the in-situ filling performance monitoring device will always be forcibly constrained to a locked state, thus decisively suspending the entire controlled deployment process. This physical interlocking mechanism of "absolutely no release unless satisfied or actively operated" completely eliminates the risk of blind slippage caused by erroneous triggering of automated control signals, ensuring that the device can remain absolutely safe in its initial deployment position protected by a retaining wall when facing known dangers or unclear conditions ahead.
[0091] Furthermore, to further ensure the effectiveness of this safety judgment mechanism, the state detection unit (such as the visual inspection device and its supporting camera display system) in this embodiment is designed to operate completely independently from the in-situ filling material performance monitoring device and its supporting data acquisition system in terms of hardware wiring and signal transmission. The image / strain signal acquisition process of state detection and the in-situ performance data acquisition process do not interfere with or affect each other. This complete decoupling at the physical level ensures that the state detection unit can work stably even under harsh working conditions without being affected by the load of the main monitoring system, providing a highly reliable decision-making basis for manually issuing the final controlled release command.
[0092] After adjusting and / or rearranging the deployment in case of anomalies, return to the step of obtaining deployment status information. Specifically, after adjusting or rearranging the deployment in case of anomalies, return to step S300 to obtain the deployment status information again.
[0093] After suspending controlled deployment, construction personnel or maintenance teams can take targeted intervention measures within or at the edge of the safe zone based on the information they have regarding the abnormal status. The so-called "adjustment or rearrangement of deployment anomalies" specifically encompasses partial replacement or repair of damaged guide movement mechanisms, clearing obstacles from intrusion paths, recalibrating skewed track inclinations, or, if necessary, replacing the entire performance monitoring device of the damaged in-situ filling body.
[0094] It should be noted that the "adjustment or rearrangement for deployment anomalies" mentioned in this application refers to targeted investigation, repair, and calibration actions taken manually or mechanically outside the retaining wall or in a safe area when the status detection unit monitors and determines that there are anomalies in the guide movement mechanism, monitoring device, or movement path (such as guide rail deformation, path obstruction by falling rocks, or device structural damage). Specifically, depending on the type of anomaly, the implementation methods may include: when falling rocks or foreign objects are detected obstructing the target monitoring path, the obstacles are cleared locally using remote cleaning tools or by engineers entering the area under safe conditions; when the guide movement mechanism is detected to have undergone partial displacement or slight deformation, it is corrected or replaced; when the in-situ filling performance monitoring device is detected to have undergone structural anomalies due to impact, it is reinforced and corrected on-site, or directly replaced with a brand new monitoring device in the safe area inside the retaining wall. Only after all the above adjustments or rearrangements are completed can the system have the basis to perform status detection and release condition judgment again.
[0095] After the physical repairs and adjustments described above are completed, the deployment process does not jump directly to the release phase. Instead, it triggers a secondary verification mechanism. This involves using front-end sensors to acquire real-time deployment status information and reassessing the conditions to confirm whether previous vulnerabilities have been completely eliminated and whether the current state truly meets the preset release conditions. If the assessment result is still negative, the pause and adjustment process is repeated until the reassessment confirms that the security release requirements are fully met. Only then is the lock finally released, thus constructing a reliable deployment security closed loop across both logical architecture and engineering operations.
[0096] In some embodiments, a data acquisition device is installed on the outer side of the retaining wall; Step S700, which involves transmitting the performance parameters of the filling material via the monitoring cable, specifically includes: Step S710: The performance parameters of the filling body are transmitted to the data acquisition instrument via the monitoring cable.
[0097] It should be noted that during underground backfilling operations, the internal environment of the goaf becomes extremely harsh with the injection of backfill slurry. This includes not only high-concentration mud and water, but also the heat of hydration released during the consolidation of the backfill slurry and significant expansion pressure. To ensure the safe analysis and long-term storage of monitoring data, a data acquisition instrument is specifically installed on the outer side of the retaining wall. Here, "outer side of the retaining wall" refers to the external roadway area protected by the backfill retaining wall. This area is properly supported, unaffected by the intrusion of backfill slurry, and is a safe zone that allows personnel to inspect it at any time.
[0098] In this system architecture, a stable and reliable data link is established between the in-situ backfill performance monitoring device, which is located deep within the goaf, and the data acquisition instrument in the external safe area. Specifically, the transmission of the backfill performance parameters through the monitoring cable includes the following closed-loop data flow: After precise positioning, the in-situ backfill performance monitoring device, located deep within the goaf, continuously senses the physical and mechanical changes of the surrounding backfill slurry and the solidified backfill, converting these changes into electrical signals in real time. These signals, carrying backfill performance parameters such as stress, temperature, and pore water pressure, are continuously and without attenuation transmitted to the receiving port of the data acquisition instrument along the pre-laid monitoring cable that is safely led out from the retaining wall.
[0099] The data acquisition instrument typically incorporates a signal conditioning module, an analog-to-digital converter, and a large-capacity non-volatile storage module. It is responsible for filtering, amplifying, and decoding the weak signals collected via cables, converting them into intuitive engineering physical quantities and automatically recording them. This front-end and back-end separation with direct physical cable connection allows construction and technical personnel to operate the data acquisition instrument safely and easily from outside the retaining wall without stepping into the dangerous goaf area. It enables real-time reading or periodic downloading of in-situ monitoring data of the deep backfill material in the goaf at various service stages, providing the most accurate and continuous basic data support for optimizing the mine's backfill mix and evaluating its safety.
[0100] Example 4 This application provides a controlled deployment system for an in-situ filling material performance monitoring device in an underground goaf, which is applied to the retaining wall of the goaf.
[0101] Combination Figures 2-4 Before providing a detailed description of the specific structure of the controlled deployment system of this application, we will first provide a comprehensive description of the overall engineering geological environment and macroscopic spatial layout of the system.
[0102] The controlled deployment system described in this application is applied to underground mining spaces extending from the surface to deep underground. In underground areas, to maintain the stability of the surrounding rock strata and stopes, supporting pillars are typically maintained, and roadways for personnel and equipment are excavated. After mining operations are completed, goaf areas with risks of roof collapse and rockfall are formed, requiring backfilling. Backfilling operations require the construction of retaining walls within the roadways connecting to the goaf. Generally, the interior of the retaining wall includes the high-risk goaf and a portion of the safe roadways; the exterior of the retaining wall consists of a portion of the safe roadways. Workers can only operate within the safe roadways. For backfilling operations, a top-down backfill slurry delivery pipeline is installed underground, with a backfill slurry outlet extending above the goaf at its end.
[0103] In the aforementioned underground macro-engineering environment, the controlled deployment system of this application spans both safe and hazardous areas. Specifically, the system is deployed in a relatively safe roadway area inside the retaining wall, while the target monitoring location is located in the core area deep within the high-risk goaf inside the retaining wall. A guiding movement mechanism is laid across the area between the deployment location and the target monitoring location, forming a clear target monitoring path. During the initial standby phase, the in-situ filling performance monitoring device is securely locked in its deployment location within the roadway via a locking mechanism. To monitor the path within the goaf while the retaining wall is closed and isolated, the system is equipped with a status detection unit (in actual deployment, this unit's visual detection device can work with an external camera display system to transmit and display the optical image of the goaf in real time to the safe area of the roadway). When the status confirms that the release conditions are met, the operator operates a remote release mechanism within the roadway to unlock the device, allowing the in-situ filling performance monitoring device to slide controlled along the guiding movement mechanism to the depths of the goaf, where it is stopped and positioned at the target monitoring location by a preset limiting mechanism. When the filling slurry outlet begins to pour slurry into the goaf, the in-situ filling body performance monitoring device, which has been positioned, can monitor the filling body in situ and transmit the collected performance parameters in real time to the data acquisition instrument placed in the safe area of the roadway through the monitoring cable passing through the retaining wall, thereby completing the safe and controlled deployment and in-situ data acquisition of the entire process.
[0104] Specifically, the controlled deployment system includes: A guiding moving mechanism is positioned between the deployment location inside the retaining wall and the target monitoring location within the goaf area, forming a target monitoring path.
[0105] An in-situ filling material performance monitoring device is installed on the guide moving mechanism and connected to a monitoring cable.
[0106] The main body of the guiding moving mechanism is positioned between a relatively safe deployment location inside the retaining wall and a target monitoring location deep within the goaf, constructing a linear or specifically curved target monitoring path on the rugged and complex underground floor. The in-situ filling performance monitoring device, as the core load for performing the front-end sensing task, is movably mounted on the guiding moving mechanism in a sliding or rolling manner. Its tail end is connected to a flexible monitoring cable for establishing a long-term physical link for data backhaul.
[0107] It should be noted that, as a core component for performing front-end sensing tasks, the in-situ filling material performance monitoring device integrates a multi-dimensional sensing matrix to achieve comprehensive monitoring of the mechanical and physical environment of the filling material. Inside the in-situ filling material performance monitoring device, one or more sensors can be configured to acquire the performance parameters of the filling material. Specifically, this sensor matrix includes a vibrating wire stress sensor, a pore water pressure sensor, a matrix suction sensor, and a temperature-humidity-conductivity integrated sensor. These sensors are integrated within the supporting frame structure and are connected to an external data acquisition instrument via a unified data bus or the monitoring cables. The physical parameters collected by multiple in-situ mechanical monitoring devices located at different target positions are transmitted via the data acquisition instrument and the downhole data acquisition station, and finally uploaded to the surface mechanical information database and the cloud data analysis unit. Through this multi-parameter, systematic monitoring structure design, the in-situ filling material performance monitoring device can stably and comprehensively acquire multi-dimensional evolution data of the filling material during the filling, consolidation, and service stages after controlled sliding into place.
[0108] A locking mechanism is provided at the deployment location to lock the in-situ filling body performance monitoring device at the deployment location.
[0109] To control the timing of the device's entry, a locking mechanism is fixedly installed at the deployment location. During the system's standby phase, this locking mechanism securely locks the in-situ filling performance monitoring device at the deployment location through mechanical jamming or anchoring, protecting it from direct impact from the internal environment of the goaf during the retaining wall closure construction.
[0110] The status detection unit is used to acquire deployment status information after the retaining wall is closed. The deployment status information is used to reflect the status of the guide moving mechanism, the in-situ filling body performance monitoring device, and the target monitoring path.
[0111] After the closed structure is completed and the system is in a "blind zone" state, to prevent slippage failure caused by falling rocks, this system integrates a status detection unit. This status detection unit activates after the retaining wall is closed and is responsible for feeding back internal deployment status information to the outside. In specific implementations, this status detection unit can employ optical camera components or mechanical strain sensing components to objectively reflect the overall status, such as whether the guiding movement mechanism is deformed or broken, whether the in-situ filling performance monitoring device is damaged, and whether there are falling rocks obstructing the target monitoring path.
[0112] A remote release mechanism is connected to the locking mechanism and led to the outside of the retaining wall; the remote release mechanism is configured to: when the deployment status information determines that the preset release conditions are met, release the locking mechanism, so that the in-situ filling performance monitoring device can move from the deployment position to the target monitoring position along the guide moving mechanism.
[0113] At the control and execution level, the system is equipped with a remote release mechanism directly connected to the locking mechanism. This remote release mechanism (e.g., a high-strength traction cable or a remote-controlled actuator) is led from the internal locking end to the outer safe area of the retaining wall. The triggering logic of the remote release mechanism is strictly configured such that: only when an external operator or the control motherboard, based on the deployment status information returned by the status detection unit, clearly determines that the current environment and equipment meet the preset safe release conditions, can the remote release mechanism be operated outside the retaining wall. After the action is executed, the locking mechanism is released, the in-situ filling performance monitoring device loses its constraint, and smoothly slides along the guide moving mechanism from the deployment position to the target monitoring position.
[0114] A limiting mechanism is provided at the target monitoring position to position the in-situ filling material performance monitoring device that has reached the target monitoring position.
[0115] When the device reaches its destination, a limiting mechanism (such as a rigid intercepting column or mechanical slot) located at the target monitoring position activates, reliably positioning the in-situ filling performance monitoring device through physical collision and obstruction. This limiting structure effectively resists the impact fluid force generated when subsequent filling slurry is poured, ensuring that the monitoring device remains stably in a representative core area, thereby guaranteeing the objectivity and accuracy of in-situ continuous monitoring data.
[0116] In summary, this controlled deployment system utilizes a guide movement mechanism, a locking mechanism, and a remote release mechanism extending to the outside to achieve controlled, delayed sliding of the equipment before filling, allowing personnel to pre-install it in a safe area. This effectively protects personnel from the risk of roof collapse and reduces the probability of equipment being damaged by falling rocks. Furthermore, the introduction of a status detection unit ensures the path and equipment remain unobstructed before the release action, eliminating the risk of failure caused by blind deployment. Finally, with the precise constraint of the limit mechanism, the monitoring device is stably fixed in the core area of the goaf, effectively overcoming the engineering defects of measurement distortion at the roadway edge and providing closed-loop physical system support for obtaining accurate and representative in-situ monitoring data.
[0117] In some embodiments, the guiding moving mechanism is provided with an inclination angle toward the target monitoring position; the in-situ filling performance monitoring device is configured to move along the guiding moving mechanism toward the goaf under its own gravity after the locking mechanism is released.
[0118] To ensure the smooth lowering of the monitoring device in an underground environment without an external power source, the guiding and moving mechanism in this system is specifically designed with a specific inclination angle towards the target monitoring location within the goaf during installation. This inclination angle results in a downhill path for the system. The overall mass of the in-situ filling performance monitoring device, its bottom friction coefficient, and this inclination angle are matched and configured so that, after the locking mechanism is released, the in-situ filling performance monitoring device can overcome the frictional resistance along the path by relying on the downward sliding force generated by its own gravity, and automatically slide in a controlled manner along the guiding and moving mechanism towards the goaf.
[0119] In some embodiments, the guiding movement mechanism includes at least one of a guide rail, a slide rail, a guide groove, and a slide track.
[0120] In some embodiments, the in-situ filling performance monitoring device cooperates with the guiding movement mechanism via a sliding bearing structure disposed at its bottom.
[0121] In some embodiments, the limiting mechanism includes at least one of a stop, a limiting member, and a mechanical locking member.
[0122] In some embodiments, the remote release mechanism is a mechanical release mechanism, including at least one of wire rope, cable, and linkage mechanism.
[0123] To reduce sliding friction and prevent derailment, the in-situ filling material performance monitoring device forms a precise guiding fit with the guiding movement mechanism through a sliding bearing structure (such as a load-bearing roller or a wear-resistant slider) fixedly installed at its bottom. At the end of the target monitoring position, the sliding device is physically stopped and finally positioned by a fixedly installed limiting mechanism (including at least one of a stop, a limiting element, and a mechanical locking element).
[0124] In addition, the remote release mechanism used to transmit unlocking commands across safe and dangerous zones adopts a purely mechanical release mechanism, specifically including at least one of wire rope, cable and linkage mechanism, to completely eliminate the risk of unlocking failure caused by power failure or signal shielding.
[0125] At the final convergence point of the data link, a dedicated data acquisition device is installed in the outer safety area of the retaining wall.
[0126] In some embodiments, the state detection unit includes a visual inspection device and / or a strain detection device; The visual inspection device is equipped with an independent light source and / or a drip-proof structure; The in-situ filling material performance monitoring device includes a load-bearing frame structure, and the strain detection device is mounted on the load-bearing frame structure.
[0127] To address the harsh working conditions of underground drilling, characterized by darkness and frequent water dripping, the visual inspection device is equipped with an independent light source (such as an explosion-proof LED spotlight) to actively illuminate the path ahead, and features a drip-proof structure (such as a waterproof deflector) to prevent water droplets from obscuring the camera lens. For equipment health monitoring, the in-situ filling material performance monitoring device is externally encased in a rigid load-bearing frame structure. This frame not only withstands rockfall impacts, but its main load-bearing beams are also fitted with strain detection devices. When the device experiences an accidental collision, the minute deformations of the load-bearing frame structure will be precisely captured by the strain detection devices, thus quantitatively reflecting the true health status of the equipment.
[0128] In some embodiments, a data acquisition device is installed on the outside of the retaining wall; the monitoring cable passes through the retaining wall and is connected to the data acquisition device.
[0129] The monitoring cable passes through a pre-reserved hole in the retaining wall inside the goaf and is directly connected to the data acquisition instrument. This arrangement allows multi-dimensional performance parameters from deep underground to be continuously transmitted back to the safe area for engineers to access and store in real time.
[0130] The present invention will be further illustrated below with specific experimental examples. However, it should be understood that these experimental examples are only for more detailed illustration and should not be construed as limiting the present invention in any way.
[0131] Experimental Example 1 This experimental example is used to verify the technical effectiveness of the controlled deployment method of this application in "ensuring personnel safety" and "improving equipment survival rate" in actual underground filling operations. Two filling areas with similar geological conditions and goaf spatial morphology in a certain mine were selected for deployment testing and comparison with historical data.
[0132] Verification of personnel safety and equipment survival rate: In this experimental example, using the controlled deployment method of this application, 10 in-situ backfill performance monitoring devices were deployed in a safe area inside the retaining wall before the goaf was sealed, and the devices were locked at their deployment locations. The entire deployment process achieved zero personnel risk, completely eliminating the life safety threats faced by construction personnel entering the goaf, and safeguarding the safety red line of mine production.
[0133] Comparative Example 1 This comparative example is based on statistical analysis of historical traditional engineering application data from the mine, used to verify the "equipment survival rate". Previously, without a controlled deployment system, the traditional manual pre-deployment method required construction workers to risk their lives by directly entering the goaf to pre-deploy the in-situ backfill performance monitoring device at the target location. This operation not only faced extremely high safety hazards and was often resisted by construction workers, but also resulted in an extremely low equipment survival rate.
[0134] Survival rate comparison results: Historical statistics show that in blasting mining environments, monitoring devices placed in advance inside the goaf will suffer severe structural damage and communication interruption due to direct impact from falling rocks on the roof after only 1 to 2 days of exposure and standby before filling. The equipment survival rate is only 60%.
[0135] In contrast, the 10 devices in the controlled standby state inside the retaining wall in Experiment 1 all communicated normally and started operating after their status was confirmed to be correct and they were controlled to slide to the target position, achieving a 100% equipment survival rate. This proposed solution significantly reduces the economic losses from equipment damage under harsh working conditions, while prioritizing the safety of personnel.
[0136] Experimental Example 2 This experimental example is used to verify the technical effectiveness of the controlled deployment method of this application in "obtaining the authenticity and representativeness of in-situ monitoring data".
[0137] Considering the economic cost of the guiding and moving mechanism and the feasibility of underground transport, the in-situ filling performance monitoring device that successfully slid to the core position inside the goaf (about 2m away from the edge of the roadway retaining wall, which ensures the practical value of the equipment deployment and effectively avoids the strong constraint zone near the surrounding rock wall) in Experiment Example 1 was selected to continuously collect multi-dimensional parameters during the hydration and consolidation process of the filling.
[0138] Comparative Example 2 This comparative example is used to verify the "data distortion caused by the constraint of the surrounding rock in the roadway". In the traditional compromise safety deployment scheme, in order to avoid personnel risks, monitoring devices of the same model are directly fixed and deployed in the edge area of the roadway inside the retaining wall (closely wrapped by the surrounding rock of the roadway) to collect synchronous stress change data.
[0139] Data representativeness comparison results: The vertical stress evolution curves were recorded within 28 days after the filling slurry reached the roof. The results showed that in Experiment 2 (2m into the goaf), the vertical stress recorded by the monitoring device gradually increased with consolidation settlement, reaching a stable peak stress of 345 kPa on the 28th day. The curve trend conformed to the standard consolidation evolution law of full-coverage load in filling bodies. However, in Comparative Example 2 (the roadway edge area), due to the "arch effect" and strong lateral constraint of the hard surrounding rock, most of the load generated by the roof subsidence was absorbed and distributed, resulting in a peak stress of only 212 kPa measured by the monitoring device on the 28th day. Data comparison indicates that if conventional measurements are only conducted at the roadway edge for safety reasons, the obtained stress data will have a numerical error of approximately 38.55% compared to the actual load conditions in the goaf (distortion, calculated as (345-212) / 345×100%).
[0140] Actual multidimensional monitoring data acquisition and display: like Figures 5-8 As shown, the in-situ monitoring device, deployed deep into the goaf using the controlled deployment method of this application, successfully and continuously acquired multidimensional performance parameters of the filling body throughout the consolidation cycle, including triaxial stress (…). Figure 5 ), pore water pressure ( Figure 6 ), matrix suction ( Figure 7 ) and the temperature-humidity-conductivity composite curve ( Figure 8 ).from Figure 8 The monitoring curves show that the data fully records the physicochemical evolution characteristics of the infill body throughout its entire life cycle, clearly capturing the trend changes from the acceleration phase (e.g., 0-7 days), deceleration phase (e.g., 8-28 days), to the final stable phase (e.g., 28-60 days). The rich and continuous measured data fully demonstrate that the controlled deployment method of this application effectively eliminates interference from strong surrounding rock constraints, and possesses strong engineering practical value in obtaining authentic and highly representative in-situ monitoring data while ensuring zero personnel risk and safe equipment placement.
[0141] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. A method of controlled deployment of an in-situ pack performance monitoring device in a subterranean void, the method comprising: include: Before the retaining wall of the goaf is closed, a deployment position is set on the inner side of the retaining wall, and a guide moving mechanism is set between the deployment position and the target monitoring position in the goaf to form a target monitoring path; the in-situ filling performance monitoring device is installed on the guide moving mechanism; The in-situ filling performance monitoring device is locked in the deployment position by a locking mechanism, and a remote release mechanism connected to the locking mechanism is provided to lead the monitoring cable connected to the in-situ filling performance monitoring device and the remote release mechanism to the outside of the retaining wall. After the retaining wall is closed and before the filling operation begins, the deployment status information is obtained; the deployment status information is used to reflect the status of the guiding moving mechanism, the in-situ filling body performance monitoring device, and the target monitoring path; Determine whether the deployment status information meets the preset release conditions; If so, the locking mechanism is released by the remote release mechanism, allowing the in-situ filling performance monitoring device to move from the deployment position to the target monitoring position along the guide moving mechanism; The in-situ filling material performance monitoring device is positioned by a limiting mechanism set at the target monitoring position; In-situ monitoring of the in-situ filling material performance is performed using a positioning-completed in-situ filling material performance monitoring device to collect filling material performance parameters, and the filling material performance parameters are transmitted through the monitoring cable.
2. The method of controlled deployment of the in-situ pack performance monitoring device in the underground gobs as claimed in claim 1, wherein, The deployment location is within an accessible area of the alleyway inside the retaining wall; and / or... The target monitoring location is located in an inaccessible area within the goaf; and / or, The guiding movement mechanism includes at least one of a guide rail, a slide rail, a guide groove, and a slide track; and / or, The in-situ filling material performance monitoring device cooperates with the guiding and moving mechanism through a sliding bearing structure located at its bottom; and / or, The limiting mechanism includes at least one of a stop block, a limiting element, and a mechanical locking element; and / or, The performance parameters of the filling material include at least one of stress, temperature, pore water pressure, matrix suction, water content, and displacement; and / or, The remote release mechanism is a mechanical release mechanism; the mechanical release mechanism includes at least one of wire rope, cable, and linkage mechanism; and / or, The guiding moving mechanism is provided with an inclination angle towards the target monitoring position, so that after the locking mechanism is released, the in-situ filling performance monitoring device moves along the guiding moving mechanism towards the goaf under its own gravity. And / or, The acquisition of deployment status information specifically includes: acquiring the deployment status information through a status detection unit; The state detection unit includes a visual inspection device and / or a strain detection device.
3. The method of controlled deployment of the in-situ pack performance monitoring device in the underground gobs as claimed in claim 2, wherein, The visual inspection device is equipped with an independent light source and / or a drip-proof structure; The visual inspection device is used to acquire at least one of the following image information: A. Whether the guiding moving mechanism is deformed, broken, or displaced; B. Whether the in-situ filling material performance monitoring device has any structural abnormalities; C. Whether there are obstacles along the target monitoring path.
4. The method of controlled deployment of the in-situ pack performance monitoring device in the underground gobs as claimed in claim 2, wherein, The in-situ filling material performance monitoring device includes a load-bearing frame structure; The strain detection device is installed on the load-bearing frame structure and is used to detect the deformation information of the in-situ filling performance monitoring device.
5. The method of controlled deployment of the in-situ pack performance monitoring device in the underground gobs as claimed in claim 1, wherein, After determining whether the deployment status information meets the preset release conditions, the method further includes: If not, maintain the locked state of the locking mechanism and suspend the controlled deployment; Adjustments and / or rearrangements are made to address deployment anomalies, and the process returns to the step of obtaining deployment status information.
6. The method of controlled deployment of the in-situ pack performance monitoring device in the underground gobs of claim 1, wherein, A data acquisition device is installed on the outside of the retaining wall; The transmission of the infill performance parameters via the monitoring cable specifically includes: The performance parameters of the filling material are transmitted to the data acquisition instrument via the monitoring cable.
7. A controlled deployment system for an in-situ filling material performance monitoring device in an underground goaf, characterized in that, A retaining wall applied in a goaf area, the controlled deployment system includes: A guiding moving mechanism is positioned between the deployment location inside the retaining wall and the target monitoring location within the goaf area, forming a target monitoring path; An in-situ filling material performance monitoring device is installed on the guide moving mechanism and connected to a monitoring cable; A locking mechanism, disposed at the deployment location, is used to lock the in-situ filling material performance monitoring device at the deployment location; The status detection unit is used to acquire deployment status information after the retaining wall is closed. The deployment status information is used to reflect the status of the guiding moving mechanism, the in-situ filling body performance monitoring device, and the target monitoring path. A remote release mechanism is connected to the locking mechanism and led to the outside of the retaining wall; the remote release mechanism is configured to: when the deployment status information determines that the preset release conditions are met, release the locking mechanism, so that the in-situ filling performance monitoring device can move from the deployment position to the target monitoring position along the guide moving mechanism; A limiting mechanism is provided at the target monitoring position to position the in-situ filling material performance monitoring device that has reached the target monitoring position.
8. The controlled deployment system as described in claim 7, characterized in that, The guiding moving mechanism is provided with an inclination angle toward the target monitoring position; the in-situ filling performance monitoring device is configured to move along the guiding moving mechanism toward the goaf under its own gravity after the locking mechanism is released; and / or, The guiding movement mechanism includes at least one of a guide rail, a slide rail, a guide groove, and a slide track; and / or, The in-situ filling material performance monitoring device cooperates with the guiding and moving mechanism through a sliding bearing structure located at its bottom; and / or, The limiting mechanism includes at least one of a stop block, a limiting element, and a mechanical locking element; and / or, The remote release mechanism is a mechanical release mechanism, including at least one of wire rope, cable and linkage mechanism.
9. The controlled deployment system as described in claim 7, characterized in that, The state detection unit includes a visual detection device and / or a strain detection device; The visual inspection device is equipped with an independent light source and / or a drip-proof structure; The in-situ filling material performance monitoring device includes a load-bearing frame structure, and the strain detection device is mounted on the load-bearing frame structure.
10. The controlled deployment system as described in claim 7, characterized in that, A data acquisition device is installed on the outside of the retaining wall; the monitoring cable passes through the retaining wall and is connected to the data acquisition device.