A method for rapid start-up and warm-up of a multi-electric aircraft engine
By coordinating the dual-start generator control of the multi-electric aero-engine, dynamic decoupling of the high and low pressure shafts is achieved, solving the problems of long start-up time and low warm-up efficiency of traditional aero-engines. This enables rapid start-up and efficient warm-up, improving overall operational economy and responsiveness.
Patent Information
- Application Number
- CN202611579694.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-17
AI Technical Summary
Existing rapid start-up and warm-up technologies for aero engines are limited by the high-low pressure shaft coupling relationship, making it difficult to achieve rapid warm-up and low thrust conditions simultaneously. Furthermore, traditional lubricating oil heating is inefficient, resulting in long start-up times, high fuel consumption, and heavy burden on the braking system, which cannot meet the rapid response requirements of modern aero engines.
It adopts a multi-electric aero-engine architecture, with dual generators driving the high and low pressure shafts respectively, achieving independent speed control and power distribution. It utilizes Joule heating and mechanical frictional heat to heat the lubricating oil in synergy, and combined with dynamic decoupling control of the high-pressure shaft and the low-pressure shaft, it achieves rapid start-up and efficient warm-up.
It significantly shortens start-up time, increases lubricating oil warm-up rate, resolves the contradiction between warm-up efficiency and thrust control in traditional technologies, reduces fuel consumption and braking system burden, and improves overall operating economy and dynamic response capability.
Smart Images

Figure CN123109870A_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of aero-engine technology, and specifically relates to a method for rapid start-up and warm-up of a multi-electric aero-engine. Background Technology
[0002] Rapid start-up and efficient warm-up of aero-engines are core technical aspects ensuring combat effectiveness and flight safety. Rapid start-up capability directly impacts combat response speed, while the warm-up process is crucial for reducing uneven thermal expansion, improving lubricating oil stability, and completing performance self-checks—a prerequisite for reliable engine operation. Traditional mechanical-hydraulic aero-engines have long start-up and warm-up times, severely limiting aircraft combat effectiveness. Forcibly shortening or eliminating warm-up would cause inconsistent temperature changes between the cooling compressor and the hot-end turbine at the combustion chamber, leading to deviations in rotor-stator clearance from the optimal range, affecting engine thrust and operational stability. Simultaneously, the lubricating oil pump speed is controlled by engine conditions; low lubricating oil temperature and high viscosity result in poor lubrication, easily leading to reduced bearing life and increased vibration. Therefore, developing solutions that eliminate or significantly shorten start-up and warm-up times is an important direction for improving the overall effectiveness of flight engine systems in the future.
[0003] In the field of engine warm-up, CN202310380380.5 proposes an adaptive warm-up method based on usage scenarios. This method combines combat / training modes with cold / hot start states, adaptively matching four warm-up strategies and utilizing different engine speed dwell times to achieve rapid warm-up. In training mode, this method allows the engine to take off at a lower than maximum capacity, and in hot weather, it can shorten warm-up time by leveraging high temperatures. However, it still suffers from excessively long warm-up times during frequent combat operations in cold weather. Patent ZL202210623146.6 constructs an automatic warm-up system containing five entry conditions (all must be met) and three exit conditions (any one must be met). It manages the warm-up process through a preset speed-time control plan, but does not specify the specific control logic and parameters. It is worth noting that conventional rapid warm-up relies on high engine speeds to increase the hot-end temperature, but the increased thrust associated with high speeds will exacerbate the burden on the braking system, affecting aircraft operational safety. To address the aforementioned technical bottlenecks, this patent innovatively proposes a warm-up method based on decoupled control of a dual-shaft starter-generator, breaking through the limitations of traditional single-shaft drive and achieving rapid start-up, efficient warm-up, and temperature maintenance in low-temperature environments.
[0004] Technically, existing engine warm-up technologies are limited by the coupling relationship between the high-pressure and low-pressure shafts, making it difficult to simultaneously achieve rapid warm-up and low-thrust operation through single-shaft speed control. If the warm-up speed is too low, the core engine's temperature rise rate is insufficient, leading to prolonged warm-up time. Conversely, increasing the speed to shorten the warm-up time results in significant thrust from the high-pressure shaft driving the low-pressure shaft, placing a burden on the aircraft's braking system. While CN202310380380.5 and ZL202210623146.6 optimize the warm-up process through scenario-based speed adjustment and automatic control strategies, respectively, both are based on single-shaft (high-pressure shaft) speed control logic. Essentially, they are similar to the traditional warm-up method of maintaining an idle state for aero engines, failing to overcome the control bottleneck of high-pressure and low-pressure shaft coordination and decoupling.
[0005] In terms of cost: the existing warm-up solutions are somewhat inadequate in cost control. While traditional idle-speed warm-up can maintain low thrust, it takes a long time and increases fuel consumption; increasing the speed can shorten the time, but it requires more thrust, placing higher demands on the braking system and indirectly increasing the redundant design costs of the take-off and landing system. Furthermore, the existing solutions rely on component friction to heat the lubricating oil, resulting in low heating efficiency, prolonged start-up and warm-up times, and limiting overall operating economy.
[0006] In terms of efficiency: Due to the coupling relationship between the high and low pressure shafts, existing technologies present a fundamental contradiction between warm-up speed and thrust control, making it difficult to simultaneously achieve both warm-up efficiency and thrust control objectives. For example, traditional idle warm-up requires sacrificing time to achieve a low thrust state, while single-shaft control strategies, although able to adjust speed, cannot achieve dynamic decoupling and distribution of power between the high and low pressure shafts. The warm-up process is forced to find a balance between thrust control and efficiency improvement. Furthermore, the inefficient mode of lubricating oil relying on friction heating further limits the overall efficiency of start-up and warm-up, making it difficult to meet the rapid response requirements of modern aero engines. Summary of the Invention
[0007] To address the aforementioned problems, this application provides a rapid start-up and warm-up method for a multi-electric aero-engine. The multi-electric aero-engine includes a high-pressure shaft, a low-pressure shaft, a first generator driven by the high-pressure shaft, and a second generator driven by the low-pressure shaft. Both the first and second generators are capable of switching between starter mode and generator mode. The method includes a start-up phase and a warm-up phase.
[0008] The startup phase includes:
[0009] S1. In response to the start command, control the first generator and the second generator to enter the starter mode simultaneously, and output torque to the high-voltage shaft and the low-voltage shaft respectively, so that the speed of the high-voltage shaft and the speed of the low-voltage shaft increase synchronously.
[0010] S2. Adjust the lubricating oil flow path so that the lubricating oil flows through the first generator and / or the second generator, and use the Joule heat and mechanical friction heat generated during the operation of the generator to heat the lubricating oil together, thereby increasing the lubricating oil heating rate.
[0011] S3. When the high-pressure shaft reaches the preset ignition speed, fuel is supplied to the combustion chamber and ignited. After successful ignition, the fuel supply is gradually increased according to a predetermined pattern to improve the turbine power output, while maintaining or increasing the output power of the first generator, so that the high-pressure shaft continues to accelerate under the combined drive of the turbine power and the output power of the first generator.
[0012] S4. When the high-voltage shaft speed reaches the preset idle speed, the start-up is determined to be complete; wherein, during the process of the high-voltage shaft accelerating to the idle speed, the first generator remains connected to the high-voltage shaft and continuously outputs power without disconnecting;
[0013] The warm-up phase includes:
[0014] S5. Control the first generator to maintain starter mode, control the second generator to switch to generator mode, and continue to supply fuel to the combustion chamber to increase the speed of the high-pressure shaft;
[0015] S6. Power is extracted from the low-pressure shaft by the second generator to limit the speed of the low-pressure shaft to the idle speed level, thereby limiting the fan speed and maintaining the overall thrust at a level close to the idle thrust level. At the same time, at least a portion of the power extracted by the second generator is supplied to the first generator to maintain or continue to increase the speed of the high-pressure shaft, so that the high-pressure shaft is in a preset large state speed range and the low-pressure shaft is at the idle speed level, forming a power redistribution between the high-pressure shaft and the low-pressure shaft, thereby accelerating the heating of the hot-end components of the core machine under the condition that the overall thrust is close to the idle thrust.
[0016] Preferably, during the start-up phase, after the low-pressure shaft speed rises to a preset speed, the second generator is controlled to reduce its output power or switch to generator mode, extracting power from the low-pressure shaft and feeding it back to the airborne power supply and / or the first generator, while maintaining the low-pressure shaft speed within a preset aerodynamic stability speed range to ensure the aerodynamic stability of the entire machine.
[0017] Preferably, during the start-up phase, the rotational speed of the low-pressure shaft is monitored in real time. When it is determined that the rotational speed of the low-pressure shaft is close to the resonant speed range, the second generator is controlled to briefly increase the output torque, driving the low-pressure shaft to quickly cross the resonant speed range.
[0018] Preferably, during the initial period of the starting phase, both the first and second starter generators are controlled to output maximum torque to increase the Joule heat of the starter generators and accelerate the lubricating oil heating rate; the ignition speed is 20% to 30% of the design speed of the high-voltage shaft; the characteristic speed corresponding to the disengagement speed of the conventional starter motor during the acceleration process of the high-voltage shaft is about 60% of the design speed; and the idle speed is about 80% of the design speed.
[0019] Preferably, the adjustment of the lubricating oil flow path in step S2 includes: first introducing the lubricating oil into the heat exchange flow path of the first generator and / or the second generator to raise its temperature, and then supplying the lubricated parts of the bearing cavity, gearbox and accessory transmission system with the heated lubricating oil.
[0020] Preferably, during the warm-up phase, the maximum operating speed range is 82% to 100% of the design speed of the high-pressure shaft, while the low-pressure shaft is maintained at the idle speed of the design speed; and the low-pressure shaft speed is limited by the power extracted by the second generator, so that the deviation ΔT between the overall thrust and the idle thrust is less than 5%.
[0021] Preferably, during the warm-up phase, the high-pressure shaft is driven by the combined power of the motor and turbine output from the first generator, allowing the high-pressure shaft to maintain a high speed and a combustion chamber outlet temperature lower than that required by conventional warm-up methods, while utilizing the higher airflow velocity within the core engine at high speed to accelerate component heat exchange rates; and the fuel supply to the combustion chamber increases at a rate higher than the fuel supply pattern at idle, in order to coordinate with the output power of the first generator to jointly increase the high-pressure shaft speed.
[0022] Preferably, the warm-up phase further includes: real-time detection of the temperature of the hot-end components of the core engine and / or the lubricating oil temperature; when the temperature reaches the preset warm-up completion criterion, the warm-up phase is exited and the normal control pattern is restored; in a low-temperature environment, if the temperature is lower than the preset lower limit, the high-pressure shaft is kept in the maximum speed range and the second generator is kept in the power generation mode to maintain the temperature of the hot-end components and lubricating oil of the engine.
[0023] A multi-electric aero-engine includes a high-pressure shaft, a low-pressure shaft, a high-pressure compressor and a high-pressure turbine driven by the high-pressure shaft, a fan and a low-pressure turbine driven by the low-pressure shaft, a combustion chamber, and a rapid start-up and warm-up control system. The control system includes a first generator, a second generator, a converter, an oil flow path regulating device, a sensor array, and a controller. The first generator is drive-connected to the high-pressure shaft, and the second generator is drive-connected to the low-pressure shaft. Both are connected to an onboard power source via the converter and can switch between starter mode and generator mode. The oil flow path regulating device is used to allow oil to flow through the first generator and / or the second generator. The sensor array is used to collect high-pressure shaft speed, low-pressure shaft speed, hot-end component temperature, and oil temperature. The controller is configured to perform the steps of the method according to any one of claims 1 to 8.
[0024] Compared to existing technologies, the advantages of this invention are as follows: 1) Overcoming the contradiction between warm-up efficiency and thrust control. Traditional technologies require a trade-off between warm-up efficiency and thrust control, while this invention, through decoupled control of dual generators, independently adjusts the high-voltage shaft's high speed (rapid warm-up) and the low-voltage shaft's low speed (low thrust), simultaneously achieving rapid core engine warm-up and overall low thrust, solving the problem of the incompatibility under traditional control strategies. 2) Improving the lubricating oil heating rate. Traditional lubricating oil heating relies on mechanical frictional heat with low efficiency. This invention integrates generator Joule heat and mechanical frictional heat, significantly shortening the lubricating oil heating time through the synergistic effect of dual heat sources. 3) Dual-shaft start-up, shortening start-up time. Traditional start-up relies on a single power source, resulting in a slow rate of increase in dual-shaft speed. This invention, through simultaneous dual-shaft start-up and increased start-up speed, significantly shortens the start-up time and improves dynamic response capability. Attached Figure Description
[0025] Figure 1 This is a comparison diagram of engine starting procedures (left: conventional, right: this application);
[0026] Figure 2 This is a comparison diagram of engine warm-up operations (left: conventional, right: this application). Detailed Implementation
[0027] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions in the embodiments of this application will be described in more detail below with reference to the accompanying drawings. In the drawings, the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The described embodiments are only some, not all, of the embodiments of this application. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this application, and should not be construed as limiting this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application. The embodiments of this application will be described in detail below with reference to the accompanying drawings.
[0028] This invention addresses the problems of slow low-temperature start-up and long warm-up time in aero-engines by proposing a rapid start-up and warm-up method based on a multi-electric architecture with coordinated control of dual starter generators. Two starter generators drive the high- and low-pressure shafts respectively, achieving independent control and dynamic power distribution between the two shafts. This architecture can simultaneously increase the speed of both shafts during the start-up phase and flexibly adjust the speed distribution during the warm-up phase, effectively shortening the start-up and warm-up times. The decoupled control of the dual motors significantly improves the engine's state adjustment range, enabling short-time start-up and rapid warm-up. The rapid start-up method and warm-up strategy will be described below.
[0029] Figure 1 The image illustrates the traditional aircraft engine starting process (left) and the starting process of this patent (right). In the traditional process, after the start command is issued, the turbine starter first rotates the high-pressure shaft, then ignites and engages the turbine. Once the speed reaches the disengagement speed, the starter disengages, and the turbine drives the engine alone to idle speed, completing the start-up. This patent's starting process, through optimized operation, such as using two motors to simultaneously rotate the high and low-pressure shafts in the initial stage and continuously rotating the high-pressure shaft to idle speed (without disengagement), increases the speed rise rate and effectively shortens the start-up time. The specific starting process of this patent is as follows:
[0030] Upon receiving the start command, both generators simultaneously enter starter mode, supplying power to the high-voltage and low-voltage shaft motors. At this time, both motors output maximum torque, rapidly increasing the speeds of both the high-voltage and low-voltage shafts. Simultaneously, the lubricating oil flow path is adjusted to allow it to flow through the generators. Since the heat generated by the motor is approximately proportional to the square of the torque, the high torque output results in high heat generation, causing a rapid increase in lubricating oil temperature and accelerating the lubricating oil preheating process.
[0031] When the engine speed reaches the ignition threshold (approximately 20%-30% N2), fuel supply and ignition begin. After successful ignition, the turbine power kicks in, gradually increasing fuel to boost turbine output and drive the high-pressure shaft to accelerate. Fuel supply must be strictly controlled to avoid irreversible damage caused by overheating or turbine erosion due to excessive fuel supply. Simultaneously, the high-pressure shaft motor power is increased to maintain torque output at high speeds, working in conjunction with the turbine to rapidly accelerate the high-pressure shaft. Furthermore, the low-pressure shaft motor power can be selectively reduced or switched to generator mode to extract energy from the low-pressure shaft and feed it back to the power supply or high-pressure shaft motor, reducing the power load. However, it is crucial to maintain the low-pressure shaft speed within an appropriate range to ensure overall aerodynamic stability. When the low-pressure shaft speed is detected to be approaching the resonance zone, the motor speed can be briefly increased to actively cross the resonance threshold.
[0032] When the speed reaches the conventional disengagement speed (approximately 60% of N1), power is continuously supplied to the high-voltage shaft motor to increase its power until it reaches its maximum value. When the high-voltage shaft speed reaches the idle speed standard (approximately 80% of N1), the start-up is considered complete.
[0033] Figure 2 The image illustrates the conventional engine warm-up operation (left) and the warm-up operation of this patent (right). The conventional method involves continuous operation at idle speed, allowing components to heat up slowly. This patent, however, uses decoupled control of two motors to increase the high-pressure shaft speed while maintaining low thrust (idle thrust), accelerating the heating rate of high-pressure components and promoting warm-up. Details are as follows (…). Figure 2 right):
[0034] After startup, the system enters a rapid warm-up phase. The high-pressure shaft motor continues to operate in starter mode, while the low-pressure shaft motor switches to generator mode. Thereafter, fuel is supplied at a relatively high rate, continuously powering the high-pressure shaft motor and increasing its speed. Simultaneously, the low-pressure shaft motor starts generating electricity, extracting power from the low-pressure shaft. On one hand, the low-pressure shaft generator limits its speed, thus limiting fan speed and maintaining engine thrust at a low level (below idle thrust). On the other hand, the power generated by the low-pressure shaft generator can also replenish the high-pressure shaft motor, improving the high-pressure shaft's condition.
[0035] When the core engine speed is high (e.g., 90%), it enters a rapid warm-up mode. At this time, the high-pressure shaft is driven by both the motor and turbine. Due to the motor's involvement, the turbine's power demand is lower, and the combustion chamber temperature is lower than in a traditional engine. Simultaneously, the high speed results in a high air velocity within the core engine, accelerating component heat exchange and shortening warm-up time. During this process, the engine rapidly undergoes warm-up: the compressor blades shorten their clearance due to centrifugal stretching, followed by the stator casing and rotor discs (compressor disc, turbine disc), which gradually heat up. Because the stator has a low heat capacity and is in direct contact with the working fluid (compressed air or fuel gas), heat transfer is rapid, and its expansion and deformation rate is fast, while the rotor discs heat up and deform more slowly. Therefore, the stator casing heats up faster than the rotor discs, and the clearance widens. When the stator temperature rises (before the rotor disc temperature reaches the target value), the stator-to-stator clearance is at its maximum. At this point, the high-pressure shaft motor power can be reduced, fuel supply increased, and turbine power can replace the motor. Once the rotor disc temperature reaches the target value, warm-up is complete, and the engine maintains a rapid warm-up mode with the high-pressure shaft at a high setting and the low-pressure shaft at a low setting. In addition, the warm-up end conditions can be set based on experience, such as the temperature of a certain characteristic point reaching a threshold, or the warm-up time reaching a target value.
[0036] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for rapid start-up and warm-up of a multi-electric aircraft engine, characterized in that, The multi-electric aero-engine includes a high-pressure shaft, a low-pressure shaft, a first generator drivenly connected to the high-pressure shaft, and a second generator drivenly connected to the low-pressure shaft. Both the first generator and the second generator can switch between starter mode and generator mode. The method includes a startup phase and a warm-up phase: The startup phase includes: S1. In response to the start command, control the first generator and the second generator to enter the starter mode simultaneously, and output torque to the high-voltage shaft and the low-voltage shaft respectively, so that the speed of the high-voltage shaft and the speed of the low-voltage shaft increase synchronously. S2. Adjust the lubricating oil flow path so that the lubricating oil flows through the first generator and / or the second generator, and use the Joule heat and mechanical friction heat generated during the operation of the generator to heat the lubricating oil together, thereby increasing the lubricating oil heating rate. S3. When the high-pressure shaft reaches the preset ignition speed, fuel is supplied to the combustion chamber and ignited. After successful ignition, the fuel supply is gradually increased according to a predetermined pattern to improve the turbine power output, while maintaining or increasing the output power of the first generator, so that the high-pressure shaft continues to accelerate under the combined drive of the turbine power and the output power of the first generator. S4. When the high-voltage shaft speed reaches the preset idle speed, the start-up is determined to be complete; wherein, during the process of the high-voltage shaft accelerating to the idle speed, the first generator remains connected to the high-voltage shaft and continuously outputs power without disconnecting; The warm-up phase includes: S5. Control the first generator to maintain starter mode, control the second generator to switch to generator mode, and continue to supply fuel to the combustion chamber to increase the speed of the high-pressure shaft; S6. Power is extracted from the low-pressure shaft by the second generator to limit the speed of the low-pressure shaft to the idle speed level, thereby limiting the fan speed and maintaining the overall thrust at a level close to the idle thrust level. At the same time, at least a portion of the power extracted by the second generator is supplied to the first generator to maintain or continue to increase the speed of the high-pressure shaft, so that the high-pressure shaft is in a preset large state speed range and the low-pressure shaft is at the idle speed level, forming a power redistribution between the high-pressure shaft and the low-pressure shaft, thereby accelerating the heating of the hot-end components of the core machine under the condition that the overall thrust is close to the idle thrust.
2. The rapid start-up and warm-up method for a multi-electric aero-engine according to claim 1, characterized in that, During the start-up phase, after the low-pressure shaft speed rises to the preset speed, the second generator is controlled to reduce its output power or switch to generator mode, extracting power from the low-pressure shaft and feeding it back to the airborne power supply and / or the first generator, while maintaining the low-pressure shaft speed within the preset aerodynamic stability speed range to ensure the aerodynamic stability of the entire machine.
3. The rapid start-up and warm-up method for a multi-electric aircraft engine according to claim 1 or 2, characterized in that, During the startup phase, the rotational speed of the low-pressure shaft is monitored in real time. When it is determined that the rotational speed of the low-pressure shaft is close to the resonant speed range, the second generator is controlled to increase the output torque for a short period of time, driving the low-pressure shaft to quickly cross the resonant speed range.
4. The rapid start-up and warm-up method for a multi-electric aero-engine according to claim 1, characterized in that, During the initial period of the starting phase, both the first and second generators are controlled to output maximum torque in order to increase the Joule heat of the generators and accelerate the lubricating oil heating rate. The ignition speed is 20% to 30% of the design speed of the high-voltage shaft; the characteristic speed of the high-voltage shaft during acceleration, corresponding to the disengagement speed of a conventional starter, is about 60% of the design speed; and the idle speed is about 80% of the design speed.
5. The rapid start-up and warm-up method for a multi-electric aero-engine according to claim 1, characterized in that, The adjustment of the lubricating oil flow path in step S2 includes: first introducing the lubricating oil into the heat exchange flow path of the first generator and / or the second generator to raise its temperature, and then supplying the lubricated parts of the bearing cavity, gearbox and accessory transmission system with the heated lubricating oil.
6. The rapid start-up and warm-up method for a multi-electric aero-engine according to claim 1, characterized in that, During the warm-up phase, the maximum operating speed range is 82% to 100% of the design speed of the high-pressure shaft, while the low-pressure shaft is maintained at the idle speed of the design speed. Furthermore, the low-pressure shaft speed is limited by extracting power from the second generator, so that the deviation ΔT between the overall thrust and the idle thrust is less than 5%.
7. The rapid start-up and warm-up method for a multi-electric aero-engine according to claim 1, characterized in that, During the warm-up phase, the high-pressure shaft is driven by the combined power of the motor and turbine output from the first generator. This allows the high-pressure shaft to maintain a high speed with less turbine power than required in a conventional warm-up process, and the combustion chamber outlet temperature to be lower than in a conventional warm-up process. At the same time, the higher airflow velocity within the core engine at high speed accelerates the heat exchange rate of the components. Furthermore, the fuel supply to the combustion chamber increases at a rate higher than the fuel supply pattern at idle speed, in order to coordinate with the output power of the first generator to jointly increase the speed of the high-pressure shaft.
8. The rapid start-up and warm-up method for a multi-electric aero-engine according to claim 1, characterized in that, The warm-up phase also includes: real-time detection of the temperature of the hot-end components of the core engine and / or the lubricating oil temperature; when the temperature reaches the preset warm-up completion criterion, the warm-up phase is exited and the normal control pattern is restored; in a low-temperature environment, if the temperature is lower than the preset lower limit, the high-pressure shaft is kept in the maximum speed range and the second generator is kept in the power generation mode to maintain the temperature of the hot-end components and lubricating oil of the engine.
9. A multi-electric aircraft engine, characterized in that, The system includes a high-pressure shaft, a low-pressure shaft, a high-pressure compressor and a high-pressure turbine driven by the high-pressure shaft, a fan and a low-pressure turbine driven by the low-pressure shaft, a combustion chamber, and a rapid start-up and warm-up control system. The control system includes a first generator, a second generator, a converter, an oil flow path regulating device, a sensor group, and a controller. The first generator is driven to the high-pressure shaft, and the second generator is driven to the low-pressure shaft. Both are connected to the onboard power supply through the converter and can switch between starter mode and generator mode. The oil flow path regulating device is used to allow oil to flow through the first generator and / or the second generator. The sensor group is used to collect the high-pressure shaft speed, the low-pressure shaft speed, the hot-end component temperature, and the oil temperature. The controller is configured to perform the steps of the method according to any one of claims 1 to 8.
Citation Information
Patent Citations
A method and system for automatically performing warm-up of an aircraft engine
CN114876647B
Quick warm-up control method and device for ensuring reliable work of aero-engine
CN116291898A