Integrated piezometer flexible inclinometer groundwater level and inclinometer monitoring method
By performing arc length correlation and synchronous data processing on the integrated monitoring benchmark data of flexible inclinometer and piezometer, the deviation problem in groundwater level calculation was solved, and more accurate water level displacement response discrimination and data correlation were achieved.
Patent Information
- Application Number
- CN202611617715.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-19
- Publication Date
- 2026-11-17
AI Technical Summary
In the existing technology, flexible inclinometers and piezometers are used as independent devices, which makes it easy for the groundwater level calculation results to include deviations caused by changes in the depth of the measuring points, and it is difficult to determine the temporal and depth relationships between water level changes and deep displacement changes.
By acquiring integrated monitoring benchmark data from the flexible inclinometer and piezometer, arc length correlation is performed to generate benchmark correlation data. Synchronous monitoring data is collected, current tilt angle data is extracted and chain-like recursion is performed to determine the current vertical projection depth of the piezometer. Pressure head conversion and attitude compensation are then performed to generate groundwater level monitoring results.
It improves the accuracy of groundwater level conversion, enhances the correlation between inclinometer and water level data, improves the ability to distinguish water level displacement response, and can identify the relationship between water level changes and deep displacement changes.
Smart Images

Figure CN123111384A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of geotechnical engineering monitoring technology, specifically to a method for integrated groundwater level and inclination monitoring using a flexible inclinometer with an integrated piezometer. Background Technology
[0002] Flexible inclinometers are commonly used for monitoring deep horizontal displacement in slopes, foundation pits, dams, landslides, and underground engineering. These devices typically deploy several inclinometer nodes along the borehole depth direction, collecting attitude change data through these nodes and then calculating displacement changes at different depths based on the node connection sequence. Piezometers are commonly used for monitoring groundwater levels or pore water pressure, converting collected pressure data into corresponding hydraulic head information. In long-term monitoring scenarios in geotechnical engineering, deep displacement changes and groundwater level changes often exhibit temporal and spatial correlations. Therefore, it is usually necessary to deploy both flexible inclinometers and piezometers simultaneously at the engineering site to obtain information on stratum deformation and groundwater pressure.
[0003] In existing monitoring methods, flexible inclinometers and piezometers are mostly used as independent devices, with separate data acquisition, calculation, and output. Even when piezometers are integrated into flexible inclinometers, the focus is usually on structural integration, shared power and communication, or saving installation space. Subsequent data processing still largely relies on separate methods: calculating displacement from inclinometer data and converting water level from piezometer pressure data. This approach does not adequately consider the bending that occurs during formation deformation, and the spatial position change of the piezometer along the flexible inclinometer chain. This results in the current vertical projection depth of the piezometer relative to the orifice or reference surface no longer being equivalent to the initial installation depth.
[0004] In the above situation, if the initial installation depth of the piezometer is still used as a fixed benchmark for pressure head conversion, the groundwater level calculation results are prone to include deviations caused by changes in the depth of the measuring point. At the same time, if the inclinometer displacement data and groundwater level data are only output as independent curves, it is difficult to determine the temporal and depth correspondence between water level changes and deep displacement changes, and it is also difficult to distinguish between water level change-leading displacement response, independent displacement change response, or synchronous change response.
[0005] Therefore, existing technologies still require a data processing method adapted to flexible inclinometers with integrated piezometers. This method should be able to establish an arc length correlation between the inclinometer node and the piezometer based on the inclinometer data and piezometer data obtained within the same sampling period. It should also determine the current vertical projection depth of the piezometer based on the current chain shape of the flexible inclinometer, and then perform pressure head conversion by combining the piezometer pressure data. Furthermore, it should be able to determine the time and depth correspondence between changes in groundwater level and changes in inclinometer displacement. Summary of the Invention
[0006] Based on the shortcomings of the prior art described above, the purpose of this invention is to provide a groundwater level and inclination monitoring method that integrates a flexible inclinometer with an integrated piezometer, in order to solve the above-mentioned technical problems.
[0007] To achieve the above objectives, the present invention provides the following technical solution: a flexible inclinometer integrating a piezometer and a groundwater level and inclinometer monitoring method, comprising: S1: Obtain integrated monitoring reference data of flexible inclinometer and piezometer, and generate reference correlation data of piezometer relative to flexible inclinometer by arc length correlation between inclinometer node reference and piezometer installation reference in integrated monitoring reference data; S2: Collect raw monitoring data from the flexible inclinometer and piezometer within the same sampling period, and perform time alignment and validity screening on the raw monitoring data to generate synchronous monitoring data; S3: Extract the current tilt angle data of the inclinometer nodes based on the synchronous monitoring data, and generate the current chain data of the flexible inclinometer by chain recursion along the connection sequence of the inclinometer nodes based on the current tilt angle data and the benchmark correlation data. S4: Locate the corresponding arc length position of the piezometer in the current chain data based on the benchmark correlation data, determine the current vertical projection depth of the piezometer, and generate the piezometer follow-up depth data based on the current vertical projection depth of the piezometer; S5: Extract piezometer pressure data from synchronous monitoring data, and generate attitude-compensated groundwater level by converting pressure head based on piezometer pressure data, piezometer follow-up depth data and benchmark correlation data. S6: Extract inclinometer displacement data based on the current chain data, and generate groundwater level monitoring results, inclinometer displacement monitoring results, and water level displacement response results by performing time and depth correspondence discrimination based on the attitude compensation groundwater level and inclinometer displacement data.
[0008] The present invention is further configured such that the step of generating reference correlation data for the piezometer relative to the flexible inclinometer by performing arc length correlation between the inclinometer node reference and the piezometer installation reference in the integrated monitoring reference data includes: Extract the inclinometer node reference, node attitude reference, initial chain reference, piezometer installation reference, piezometer installation depth reference, zero pressure reference, and head conversion reference from the integrated monitoring reference data; The inclinometer references are sorted according to the connection order of the inclinometer nodes in the flexible inclinometer to generate an inclinometer reference sequence. Based on the inclinometer node reference sequence, an arc length reference chain is established along the extension direction of the flexible inclinometer to generate inclinometer node arc length reference data. Map the piezometer installation datum to the arc length datum chain to generate piezometer installation arc length data; Based on the installation arc length data of the piezometer and the reference data of the arc length of the inclinometer node, the corresponding inclinometer node section is determined, and the arc length correspondence between the piezometer and the inclinometer node section is generated. The data on the arc length of the piezometer installation, the inclinometer node section, the corresponding relationship of the arc length, the piezometer installation depth benchmark, the zero pressure benchmark, and the head conversion benchmark are correlated and organized to generate benchmark correlation data.
[0009] The present invention is further configured such that, within the same sampling period, the raw monitoring data collected from the flexible inclinometer and piezometer, and the raw monitoring data are time-aligned and validity-screened to generate synchronous monitoring data, include: The flexible inclinometer and piezometer are synchronously sampled and triggered according to the preset sampling cycle, and a sampling cycle identifier is generated. Receive the original attitude data and node sampling identifier of the inclinometer returned by the flexible inclinometer, and receive the original pressure data and piezometer sampling identifier returned by the piezometer. Collect the original attitude data of the inclinometer node, node sampling identifier, original pressure data and piezometer sampling identifier into the original monitoring data. The original monitoring data is periodically aggregated according to the sampling period identifier to generate candidate monitoring data for the same period; Time-aligned monitoring data for the same period is generated by aligning candidate monitoring data based on node sampling identifiers and piezometer sampling identifiers. The time-aligned monitoring data is filtered for validity, and monitoring data with missing data, abnormal sampling status, abnormal range status, and abnormal node connection order are removed to generate valid monitoring data. The inclinometer data and piezometer data in the effective monitoring data are linked and organized according to the sampling cycle identifier to generate synchronous monitoring data.
[0010] The present invention is further configured such that extracting the current dip angle data of the inclinometer node based on synchronous monitoring data includes: Extract the original attitude data and sampling period identifier of the inclinometer node from the synchronous monitoring data; Based on the reference sequence of inclinometer nodes in the reference association data, the original attitude data of the inclinometer nodes is processed to generate node repositioning attitude data. Based on the node attitude reference in the reference association data, the node homing attitude data is corrected according to the attitude reference, and node corrected attitude data is generated. Based on the node correction attitude data, the tilt change information of the inclinometer node relative to the node attitude reference is extracted, and the current tilt angle data corresponding to the inclinometer node reference sequence and sampling period identifier is generated.
[0011] The present invention is further configured such that the step of generating the current chain data of the flexible inclinometer by chain recursion along the connection sequence of the inclinometer nodes based on the current tilt angle data and the reference correlation data includes: Extract the inclinometer node reference sequence, arc length reference chain, and initial chain reference from the reference correlation data; The first node of the inclinometer node reference sequence is used as the starting point for recursion. The recursion direction is determined according to the arrangement direction of the inclinometer node reference sequence. The arc length relationship between adjacent inclinometer nodes is determined according to the arc length reference chain. Map the current tilt angle data to the inclinometer node reference sequence, and recursively calculate the position of adjacent inclinometer nodes along the recursive direction according to the arc length relationship between nodes to generate the current spatial position data of the inclinometer nodes. Extract the vertical position of the inclinometer node from the current spatial position data of the inclinometer node, perform vertical projection conversion according to the first end datum of the arc length datum chain, and generate the current vertical projection depth of the inclinometer node; Extract the current lateral position and initial lateral position of the same inclinometer node from the current spatial position data of the inclinometer node and the initial chain datum, compare the current lateral position and the initial lateral position to generate the horizontal displacement data of the inclinometer node; The direction of the current node segment is determined based on the current spatial position data of adjacent inclinometer nodes. The initial segment direction of the corresponding node segment is determined based on the initial chain reference. The current node segment direction and the initial segment direction are compared to generate node bending state data. Based on the inclinometer node reference sequence, the current spatial position data of the inclinometer node, the current vertical projection depth of the inclinometer node, the horizontal displacement data of the inclinometer node, the node bending status data, and the sampling period identifier are associated at the node level to generate the current chain data of the flexible inclinometer.
[0012] The present invention is further configured such that locating the corresponding arc length position of the piezometer in the current chain data based on the reference correlation data includes: Extract the inclinometer node reference sequence, inclinometer node arc length reference data, piezometer installation arc length data, and the arc length correspondence between the piezometer and the inclinometer node section from the reference correlation data; The inclinometer node arc length reference data are sequentially organized according to the inclinometer node reference sequence to generate the inclinometer node arc length position sequence. The installation arc length data of the piezometer is matched with the arc length position sequence of the inclinometer nodes to determine the inclinometer node position or adjacent inclinometer node segment where the piezometer installation arc length position falls. When the installation arc length position of the piezometer falls into the position of the inclinometer node, the current chain data of the corresponding inclinometer node is extracted from the current chain data to generate the piezometer node positioning data; When the arc length position of the piezometer installation falls into the adjacent inclinometer node section, the segment position relationship of the piezometer in the adjacent inclinometer node section is determined according to the arc length correspondence. The current chain data of the inclinometer nodes at both ends of the adjacent inclinometer node section is extracted from the current chain data to generate the piezometer segment positioning data. The piezometer node location data or piezometer section location data is correlated and organized with the piezometer installation arc length data to generate piezometer arc length location data.
[0013] The present invention is further configured such that determining the current vertical projection depth of the piezometer and generating piezometer follow-up depth data based on the current vertical projection depth of the piezometer includes: Extract piezometer node positioning data or piezometer section positioning data from piezometer arc length positioning data; When the piezometer arc length positioning data includes piezometer node positioning data, the current chain data of the corresponding inclinometer node is extracted from the piezometer node positioning data, and the current vertical projection depth of the piezometer is determined based on the current chain data of the corresponding inclinometer node. When the piezometer arc length positioning data includes the piezometer segment positioning data, extract the current chain data of the inclinometer nodes at both ends of the adjacent inclinometer node segment and the segment position relationship of the piezometer within the adjacent inclinometer node segment from the piezometer segment positioning data; Based on the current chain data of the inclinometer nodes at both ends of the adjacent inclinometer node section, extract the current vertical projection depth of the inclinometer nodes at both ends; Based on the segmental position relationship of the piezometer within the adjacent inclinometer node segment, the current vertical projection depth of the two inclinometer nodes is processed by arc length interpolation to generate the current vertical projection depth of the piezometer. Extract the piezometer installation depth benchmark from the benchmark association data, and organize the current vertical projection depth of the piezometer and the piezometer installation depth benchmark to generate piezometer follow-up depth data.
[0014] The present invention is further configured such that the step of extracting piezometer pressure data based on synchronous monitoring data, and generating attitude-compensated groundwater level by converting pressure head based on piezometer pressure data, piezometer follow-up depth data, and benchmark correlation data includes: Extract the pressure sampling data and sampling cycle identifier corresponding to the piezometer from the synchronous monitoring data; Based on the piezometer installation benchmark and head conversion benchmark in the benchmark correlation data, benchmark matching is performed on the pressure sampling data to generate piezometer benchmark pressure data; Based on the zero-point reference in the reference data, the reference pressure data of the piezometer is zero-point corrected to generate the effective pressure data of the piezometer. Extract the current vertical projection depth of the piezometer from the piezometer's follow-up depth data, and correlate the current vertical projection depth of the piezometer with the effective pressure data of the piezometer in the same period to generate piezometer pressure-depth correlation data; Based on the head conversion benchmark, the pressure head of the piezometer pressure-depth correlation data is converted to pressure head to generate the current pressure head data of the piezometer. Based on the current pressure head data and the current vertical projection depth of the piezometer, an attitude-compensated groundwater level corresponding to the sampling cycle identifier is generated.
[0015] The present invention is further configured such that the step of extracting inclinometer displacement data based on the current chain data and performing time correspondence discrimination based on attitude-compensated groundwater level and inclinometer displacement data includes: Extract the inclinometer node identifier, inclinometer node horizontal displacement data, current vertical projection depth of the inclinometer node, and sampling period identifier from the current chain data; Based on the inclinometer node reference sequence, the horizontal displacement data of the inclinometer nodes and the current vertical projection depth of the inclinometer nodes are processed at the node level to generate inclinometer displacement data; Extract water level values, sampling period identifiers, and water level depth locations from attitude-compensated groundwater levels to generate groundwater level time-series data. Based on the sampling period identifier, the groundwater level time series data and inclinometer displacement data are periodically correlated to generate water level and displacement data with the same period. According to the sampling period sequence, the water level value and the horizontal displacement data of the inclinometer node in the same period data are identified to generate water level change segments and displacement change segments. Based on the sequential relationship between the water level change segment and the displacement change segment in the sampling period, time correspondence is determined, and time correspondence results are generated. The time correspondence results are correlated and organized with the water level values, water level depth locations, water level change segments, and sampling cycle identifiers in the groundwater level time series data to generate groundwater level monitoring results. The time correspondence results are correlated and organized with the inclinometer node identifier, the current vertical projection depth of the inclinometer node, the horizontal displacement data of the inclinometer node, the displacement change segment, and the sampling period identifier in the inclinometer displacement data to generate the inclinometer displacement monitoring results.
[0016] The present invention is further configured such that the step of generating the water level displacement response result by depth correspondence discrimination based on attitude-compensated groundwater level and inclinometer displacement data includes: Extract the attitude compensation groundwater depth position corresponding to the water level change segment and the current vertical projection depth of the inclinometer node corresponding to the displacement change segment from the same period data of water level displacement. Based on the current vertical projection depth of the inclinometer node corresponding to the displacement change segment, determine the deformation depth position corresponding to the inclinometer displacement change. Depth correspondence is determined based on the water level depth location and the deformation depth location, and depth correspondence results are generated. Based on the time correspondence and depth correspondence results, the response relationships of water level change segments and displacement change segments are collected to generate water level leading displacement response, synchronous change response or displacement independent change response. The water level leading displacement response, synchronous change response, or independent displacement change response are taken as the water level displacement response results.
[0017] This invention provides a method for integrated groundwater level and inclination monitoring using a flexible inclinometer and an integrated piezometer. The method acquires integrated monitoring reference data from the flexible inclinometer and piezometer, and performs arc-length correlation between the inclinometer node reference and the piezometer installation reference in the integrated monitoring reference data to generate reference correlation data for the piezometer relative to the flexible inclinometer. Raw monitoring data from the flexible inclinometer and piezometer are collected within the same sampling period, and the raw monitoring data is time-aligned and validity-filtered to generate synchronous monitoring data. Based on the synchronous monitoring data, the current inclination angle data of the inclinometer nodes is extracted, and the current inclination angle data and the reference correlation data are used to generate groundwater level and inclination monitoring data by performing a chain-like recursion along the connection sequence of the inclinometer nodes. The current chain-like data is used to locate the corresponding arc length position of the piezometer in the current chain-like data based on the benchmark correlation data, determine the current vertical projection depth of the piezometer, and generate piezometer follow-up depth data based on the current vertical projection depth of the piezometer; piezometer pressure data is extracted from synchronous monitoring data, and pressure head conversion is performed based on the piezometer pressure data, piezometer follow-up depth data, and benchmark correlation data to generate attitude-compensated groundwater level; inclinometer displacement data is extracted from the current chain-like data, and time and depth correspondence discrimination is performed based on attitude-compensated groundwater level and inclinometer displacement data to generate groundwater level monitoring results, inclinometer displacement monitoring results, and water level displacement response results. The beneficial effects include: 1. Improve the accuracy of groundwater level conversion: Determine the current vertical projection depth of the piezometer using the current chain data, and then perform head conversion by combining the pressure data, thereby reducing the deviation of the water level conversion benchmark caused by the bending of the flexible inclinometer; 2. Improve the correlation between inclinometer and water level data: Map the installation position of the piezometer to the arc length chain of the flexible inclinometer through benchmark correlation data, so that the inclinometer node data and the piezometer data correspond under the same spatial benchmark; 3. Improve the ability to distinguish water level displacement response: By distinguishing time and depth correspondences between attitude-compensated groundwater level and inclinometer displacement data, water level displacement response results can be generated, making it easier to identify the relationship between the two changes.
[0018] The above description is only an overview of the technical solution of this application. In order to better understand the technical means of this application and to implement it in accordance with the contents of the specification, and to make the above and other objects, features and advantages of this application more obvious and understandable, the following are specific embodiments of this application. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. In the drawings: Figure 1 The flowchart illustrates an exemplary embodiment of the present invention, showing a flexible inclinometer with integrated piezometer for groundwater level and inclinometer monitoring. Detailed Implementation
[0020] The embodiments of the present invention will be described below with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention and not for limiting the scope of protection of the present invention.
[0021] It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of the present invention. Therefore, the drawings only show the components related to the present invention and are not drawn according to the actual number, shape and size of the components in the actual implementation. In the actual implementation, the form, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.
[0022] In the following description, numerous details are explored to provide a more thorough explanation of embodiments of the invention. However, it will be apparent to those skilled in the art that embodiments of the invention may be practiced without these specific details. In other embodiments, well-known structures and devices are shown in block diagram form rather than in detail to avoid obscuring embodiments of the invention.
[0023] Example 1: A flexible inclinometer integrating a piezometer and groundwater level and inclinometer monitoring method, such as... Figure 1 As shown, it includes: S1: Obtain integrated monitoring reference data of flexible inclinometer and piezometer, and generate reference correlation data of piezometer relative to flexible inclinometer by arc length correlation between inclinometer node reference and piezometer installation reference in integrated monitoring reference data; S2: Collect raw monitoring data from the flexible inclinometer and piezometer within the same sampling period, and perform time alignment and validity screening on the raw monitoring data to generate synchronous monitoring data; S3: Extract the current tilt angle data of the inclinometer nodes based on the synchronous monitoring data, and generate the current chain data of the flexible inclinometer by chain recursion along the connection sequence of the inclinometer nodes based on the current tilt angle data and the benchmark correlation data. S4: Locate the corresponding arc length position of the piezometer in the current chain data based on the benchmark correlation data, determine the current vertical projection depth of the piezometer, and generate the piezometer follow-up depth data based on the current vertical projection depth of the piezometer; S5: Extract piezometer pressure data from synchronous monitoring data, and generate attitude-compensated groundwater level by converting pressure head based on piezometer pressure data, piezometer follow-up depth data and benchmark correlation data. S6: Extract inclinometer displacement data based on the current chain data, and generate groundwater level monitoring results, inclinometer displacement monitoring results, and water level displacement response results by performing time and depth correspondence discrimination based on the attitude compensation groundwater level and inclinometer displacement data.
[0024] The present invention is further configured such that the step of generating reference correlation data for the piezometer relative to the flexible inclinometer by performing arc length correlation between the inclinometer node reference and the piezometer installation reference in the integrated monitoring reference data includes: The integrated monitoring reference data extracts the inclinometer node reference, node attitude reference, initial chain reference, piezometer installation reference, piezometer installation depth reference, pressure zero-point reference, and head conversion reference. Specifically, during the installation and calibration phase, the integrated monitoring reference data is jointly formed by the flexible inclinometer control terminal, the piezometer acquisition terminal, and the installation recording interface. The flexible inclinometer control terminal provides the inclinometer node number, node communication address, node connection sequence, node spacing, and initial node attitude; the piezometer acquisition terminal provides the piezometer number, installation connection position, initial pressure reading, and pressure zero-point information; the installation recording interface provides the piezometer's assembly position relative to the flexible inclinometer, initial installation depth, and orifice depth reference. Data acquisition in this phase is typically performed once after equipment installation. The pressure zero-point reference can be obtained through a stable sampling window when the piezometer is in its initial static state, and the node attitude reference can be locked by the inclinometer node attitude data after the flexible inclinometer is fixed to the wall. The above data is then processed by unified execution units, node number verification, connection sequence verification, and reference time stamping to form a callable integrated monitoring reference data. This process ensures that subsequent arc length correlation, head conversion, and chain recursion all call the same set of benchmarks, avoiding inconsistent data sources caused by scattered storage of inclinometer benchmarks and pressure benchmarks. The inclinometer references are sorted according to the connection order of the inclinometer nodes in the flexible inclinometer to generate an inclinometer reference sequence. Specifically, after extracting the inclinometer references from the integrated monitoring reference data, the inclinometer nodes are sorted according to the node connection order field, node communication address order, and installation direction record. The inclinometer node corresponding to the first fixed section is used as the starting point of the sequence, and the remaining inclinometer nodes are arranged sequentially along the extension direction of the flexible inclinometer to generate the inclinometer reference sequence. If the node communication address order is inconsistent with the installation record order, the physical connection relationship in the installation record is used as the sorting basis, and the communication address is used as the node identity verification basis. During the sorting process, node records with duplicate numbers, missing numbers, and discontinuous connection relationships are removed, and inclinometer references that meet the physical connection order are retained. The inclinometer reference sequence output in this step is used for the subsequent arc length reference chain establishment. Each node in the sequence carries a node number, initial attitude, initial position reference, and connection relationship with adjacent nodes. An arc length reference chain is established along the extension direction of the flexible inclinometer based on the inclinometer node reference sequence, generating arc length reference data for the inclinometer nodes. Specifically, the first node of the inclinometer node reference sequence is used as the arc length zero point. The structural length or calibration length between adjacent nodes is read along the connection sequence of the inclinometer nodes, converting each inclinometer node into an arc length position on the flexible inclinometer. Let the inclinometer node reference sequence be... Adjacent nodes and The arc length between nodes is The position of the arc length of the first and second nodes is denoted as , No. The position of the arc length of each node is: ,in, Indicates the inclinometer node The cumulative arc length position along the extension direction of the flexible inclinometer. The data is derived from the segmental structural dimensions of the flexible inclinometer, factory calibration records, or installation calibration records. The inclinometer node numbers, arc length positions, inter-node arc lengths, and initial chain-like references are correlated to generate inclinometer node arc length reference data. This arc length reference chain is a one-dimensional chain coordinate system, independent of external spatial coordinate modeling, and can directly correspond to the serial structure of the flexible inclinometer. The piezometer installation datum is mapped to an arc length datum chain to generate piezometer installation arc length data. Specifically, the piezometer connection position, assembly direction, and installation offset relative to adjacent inclinometer nodes are extracted from the piezometer installation datum and mapped to the arc length datum chain. If the piezometer is fixed at a certain inclinometer node, the arc length position of that inclinometer node is used as the piezometer installation arc length position; if the piezometer is fixed between adjacent inclinometer nodes, the installation arc length position is determined based on its assembly distance relative to the previous inclinometer node. Assume the piezometer is installed at an inclinometer node... Within the subsequent node segments, relative to The assembly distance is The arc length position of the piezometer installation is: ,in, Indicates the arc length position of the piezometer installation. Indicates the inclinometer node The position of the arc length, This data originates from assembly records, installation scale records, or structural reserved interface dimensions. After mapping, [the data is then processed / adjusted]. The installation arc length of the piezometer is verified to ensure it is within the reference arc length chain. Once verified, the arc length data for the piezometer installation is generated. This data is used to subsequently locate the piezometer's follow-up depth position within the current chain data. Based on the piezometer installation arc length data and the inclinometer node arc length reference data, the corresponding inclinometer node segment is determined, generating the arc length correspondence between the piezometer and the inclinometer node segment; specifically, the piezometer installation arc length position... Perform sequential matching with the arc length position sequence of the inclinometer nodes in the baseline data. If If the arc length position of a certain inclinometer node is consistent with that of the inclinometer node, then a node correspondence relationship is generated between the piezometer and the node position consistent with that inclinometer node; if Located at adjacent inclinometer nodes and Between these points, a segment correspondence is generated between the piezometer and the adjacent inclinometer node segment. For each segment correspondence, the arc length ratio of the piezometer within that segment is recorded: ,in, This represents the relative arc length position of the piezometer within adjacent inclinometer node sections. The value is determined by the piezometer's installation arc length position and the arc length positions of the two end nodes. This ratio is not an empirical parameter, but a structural position parameter jointly determined by the installation datum and the arc length datum chain. The generated arc length correspondence includes the corresponding piezometer node, corresponding node section, section end node, and section position relationship, providing a positioning basis for subsequent determination of the vertical projection depth under the current chain shape. The installation arc length data of the piezometer, the inclinometer node segments, the corresponding arc length relationships, the piezometer installation depth benchmark, the pressure zero-point benchmark, and the head conversion benchmark are correlated and organized to generate benchmark correlation data. Specifically, the piezometer installation arc length position, the corresponding inclinometer node segment, the segment position relationship, the initial installation depth of the piezometer, the pressure zero-point benchmark, and the head conversion benchmark are correlated using the same piezometer number to generate benchmark correlation data. The benchmark correlation data includes at least the piezometer number, the piezometer installation arc length position, the corresponding inclinometer node segment of the piezometer, the piezometer segment position relationship, the piezometer installation depth benchmark, the pressure zero-point benchmark, and the head conversion benchmark. In a specific implementation scenario, if the inclinometer node arc length positions are 0m, 1m, 2m, and 3m respectively, and the piezometer installation arc length position is 1.25m, then the piezometer is located in the adjacent inclinometer node segments at 1m and 2m, and the segment position relationship is one-quarter of the arc length from the front node within that segment. After the current chain data is generated, the current vertical projection depth of the inclinometer nodes at both ends can be directly extracted based on the reference correlation data, and then the current vertical projection depth of the piezometer can be generated. Compared with the processing method of only saving the initial burial depth of the piezometer, this embodiment can establish a traceable data correlation between the piezometer installation position and the current chain shape of the flexible inclinometer, thereby providing a reference for attitude compensation groundwater level conversion.
[0025] The present invention is further configured such that, within the same sampling period, the raw monitoring data collected from the flexible inclinometer and piezometer, and the raw monitoring data are time-aligned and validity-screened to generate synchronous monitoring data, include: Synchronous sampling is triggered for the flexible inclinometer and piezometer according to a preset sampling period, generating a sampling period identifier. Specifically, a unified sampling clock is set in the data acquisition control unit, which sends synchronous sampling trigger commands to the inclinometer node link and the piezometer acquisition link according to the preset sampling period. The preset sampling period can be set to seconds, minutes, or hours as needed for the monitoring task. The sampling period identifier is generated by the sampling clock and an incrementing period number, used to mark the data batch formed under the same sampling trigger. The sampling period identifier does not participate in the measurement value calculation; its function is to provide a batch index for the original attitude data of the inclinometer node and the original pressure data of the piezometer. After sampling is triggered, both the flexible inclinometer link and the piezometer link write the sampling period identifier into the returned data frame, forming a common index for subsequent period aggregation, time alignment, and data filtering. The system receives raw attitude data and node sampling identifiers from the flexible inclinometer and raw pressure data and piezometer sampling identifiers from the piezometer. It then aggregates these data into raw monitoring data. Specifically, the flexible inclinometer returns raw attitude data for each inclinometer node via a bus interface. This raw attitude data may include triaxial acceleration sample values, tilt sensor sample values, or attitude sample values preliminarily converted at the node. The node sampling identifier includes the node address, node sequence number, data frame sequence number, and sampling period identifier. The piezometer returns raw pressure data through the same acquisition control unit or an independent pressure acquisition interface. This raw pressure data may include pressure sample values, pressure sampling status, and piezometer sampling identifiers. The piezometer sampling identifier includes the piezometer number, data frame sequence number, and sampling period identifier. The acquisition control unit writes the inclinometer node data and piezometer data into the same raw monitoring data buffer according to their data sources, forming raw monitoring data with the sampling period identifier as the primary index and the node sampling identifier and piezometer sampling identifier as sub-indexes. This collection method can retain the data source, sampling batch and node identity, which facilitates subsequent investigation of lost frames, incorrect frames and duplicate frames; The original monitoring data is periodically aggregated based on the sampling period identifier to generate candidate monitoring data for the same period. Specifically, data frames with the same sampling period identifier are read from the original monitoring data buffer, and the original attitude data of the inclinometer node and the original pressure data of the piezometer returned within the same sampling period are grouped into the same candidate data group. If an inclinometer node returns more than two data frames within the same sampling period, the data frame matching the current sampling period is retained according to the data frame sequence number in the node sampling identifier, and the duplicate frame is transferred to the exception buffer. If the sampling period identifier of the data frame returned by the piezometer is inconsistent with the current period, it is not temporarily included in the candidate data group for that period. After the period aggregation is completed, candidate monitoring data for the same period is generated. The candidate monitoring data for the same period includes at least the sampling period identifier, the inclinometer node candidate data set, and the piezometer candidate data. The processing result of this step is used to ensure that the subsequent alignment objects all come from the same synchronous sampling trigger, avoiding the mixing of data from adjacent sampling periods into the chain recursion and pressure head conversion. Time alignment is performed on candidate monitoring data within the same period based on node sampling identifiers and piezometer sampling identifiers to generate time-aligned monitoring data. Specifically, within the candidate monitoring data of the same period, the sampling batch, return order, and time offset of data frames are verified based on node sampling identifiers and piezometer sampling identifiers. Node sampling identifiers are used to confirm whether inclinometer node data belongs to the current sampling period, and piezometer sampling identifiers are used to confirm whether pressure data belongs to the same sampling period. Let the center trigger time of the current sampling period be... The time stamp of the inclinometer node data is as follows The piezometer data is time-stamped as Allow alignment of windows as Then it satisfies and Data is entered into time-aligned monitoring data. Alignment window is allowed. The clock accuracy, bus transmission delay, and sampling period settings derived from the sampling control unit can be determined during the equipment commissioning phase. For data frames without time stamps, equivalent alignment can be achieved using the data frame sequence number and sampling period identifier. Time-aligned monitoring data consists of inclinometer data and piezometer data that have completed alignment within the same period, providing input for subsequent validity screening. The time-aligned monitoring data undergoes validity screening, eliminating data with missing information, abnormal sampling status, abnormal range status, and abnormal node connection order, generating valid monitoring data. Specifically, validity screening is performed based on data integrity, sampling status, range status, and node connection order. Data integrity screening confirms whether all nodes in the inclinometer reference sequence have corresponding data frames, and whether the piezometer has corresponding pressure data frames. Sampling status screening confirms that no fault flags, reset flags, or communication error flags are returned from the node end or the piezometer end. Range status screening confirms that the original attitude data and original pressure data are within the sensor's calibrated range. Node connection order screening compares the node sampling identifiers in the time-aligned monitoring data with the inclinometer reference sequence in the reference association data, eliminating data with missing node order, misplaced node identity, and skipped node link order. For single non-critical node data that is temporarily missing, it can be marked as pending re-sampling. For data groups with missing piezometer pressure data, continuous missing inclinometer node links, or abnormal sampling status, an invalid period flag is output, and the data is not included in subsequent chain recursion and pressure-head conversion. After screening, data that meets the requirements for completeness, status, range, and connection sequence are retained to generate valid monitoring data; The inclinometer node data and piezometer data in the effective monitoring data are associated and organized according to the sampling cycle identifier to generate synchronous monitoring data. Specifically, using the sampling cycle identifier as an index, the inclinometer node data in the effective monitoring data are sorted according to the inclinometer node benchmark sequence in the benchmark associated data. Piezometer data in the same cycle is bound to the inclinometer node data set of that cycle to generate synchronous monitoring data. Synchronous monitoring data includes the sampling cycle identifier, inclinometer node attitude data arranged in node order, node sampling identifier, piezometer pressure data, and piezometer sampling identifier. In a specific implementation scenario, when the sampling cycle identifier is the tenth cycle, the inclinometer node benchmark sequence contains six nodes, the attitude data of the six nodes have all passed time alignment and validity screening, and the piezometer pressure data has also passed the same cycle verification. Then, the attitude data of the six nodes and the piezometer pressure data are organized into the synchronous monitoring data of the tenth cycle. If the attitude data of the third node is missing or the pressure data exceeds the range, then the cycle is marked as an invalid cycle or a supplementary sampling cycle. The synchronous monitoring data generated by this process can be directly transmitted to the current dip angle extraction, chain recursion and attitude compensation groundwater level conversion steps, so that the inclinometer chain and seepage pressure are under the same sampling cycle benchmark.
[0026] The present invention is further configured such that extracting the current dip angle data of the inclinometer node based on synchronous monitoring data includes: The original attitude data and sampling period identifier of the inclinometer nodes are extracted from the synchronous monitoring data. Specifically, after the acquisition and control unit completes the alignment and validity screening of data within the same period, the inclinometer node data set is read from the synchronous monitoring data. This inclinometer node data set originates from the inclinometer node acquisition interface inside the flexible inclinometer, and the data source can be a three-axis MEMS accelerometer, a dual-axis tilt sensor, or a node-end attitude sampling unit. Taking a three-axis MEMS accelerometer as an example, each inclinometer node returns a set of original attitude data, which includes the node number, three-axis acceleration sample value, node sampling status, and sampling period identifier. The sampling period identifier originates from the synchronous sampling trigger stage and is used to distinguish different sampling batches. This step extracts the original attitude data of the inclinometer nodes within the same period according to the sampling period identifier in the synchronous monitoring data, forming the current period attitude input data, which serves as the input object for subsequent node repositioning processing. This process ensures that the same set of current tilt data originates from the same sampling period, avoiding the mixing of node attitudes from different periods into the same chain recursion. Based on the inclinometer node reference sequence in the reference association data, the original attitude data of the inclinometer nodes undergoes node repositioning processing to generate node repositioning attitude data. Specifically, node repositioning processing involves rearranging the original attitude data of the inclinometer nodes according to the inclinometer node reference sequence determined during installation, so that the attitude data of each node returns to its fixed position in the flexible inclinometer chain structure. In this process, the inclinometer node reference sequence is read from the reference association data. This sequence is formed by the node connection order during installation and includes node number, node address, and node physical order. The node number and node address in the current cycle's attitude input data are verified for consistency. The original attitude data of nodes that pass the verification are written to the corresponding sequence positions. Missing nodes, duplicate nodes, and nodes outside the sequence are marked with a status flag; missing nodes are not included in the current tilt angle data generation process. After repositioning is completed, node repositioning attitude data is generated. This node repositioning attitude data uses the inclinometer node reference sequence as the sequential index, retains the original attitude sample values and sampling period identifiers, and provides a consistent data foundation for subsequent attitude reference correction. Based on the node attitude reference in the reference association data, the node homing attitude data is calibrated to generate node calibrated attitude data. Specifically, the node attitude reference originates from the initial calibration stage after installation and is used to record the reference attitude of each inclinometer node relative to the gravity direction and installation direction in its initial state. When calibrating the node homing attitude data, the node attitude reference of the corresponding node is read first, and then the current attitude sample value is converted to a coordinate direction consistent with the node attitude reference. Taking triaxial acceleration sampling as an example, let the node... The original acceleration vector for the current period is The node installation calibration matrix is as follows: Then the calibrated current attitude vector is: ,in, Derived from the node's factory calibration or installation calibration, used to eliminate differences in node installation orientation; This is the normalized current gravity direction vector. The initial attitude vector stored in the nodal attitude reference is denoted as... By placing the current attitude vector and the initial attitude vector under the same coordinate reference, node-corrected attitude data is formed. This correction process ensures that the attitude sampling values of different nodes have a consistent reference direction, avoiding the miscalculation of node installation angle differences into the current tilt angle change; Based on the node calibration attitude data, the tilt change information of the inclinometer nodes relative to the node attitude reference is extracted. Current tilt angle data corresponding to the inclinometer node reference sequence and sampling period identifier is generated. Specifically, the current attitude vector and corresponding node attitude reference of each inclinometer node are read from the node calibration attitude data, and the tilt change information of the node relative to the initial attitude is extracted. For the tilt change information of the initial attitude, the tilt change information is extracted based on the node... For example, the current attitude vector is The initial attitude vector is The current tilt angle of a node can be expressed as: ,in, Represents a node The dot product relationship is used to describe the change in tilt relative to the node attitude reference during the current sampling period, representing the angle change between the current and initial attitudes. If the flexible inclinometer uses dual-axis tilt output, the tilt changes along the principal inclinometer direction and the lateral direction are extracted separately to form the node's current tilt component. When generating the current tilt data, the node number, node sequence position, current tilt value, sampling period identifier, and node status identifier are associated and organized to form the current tilt data corresponding to the inclinometer node reference sequence. In a specific implementation scenario, the node reference sequence within a certain sampling period includes... to After all six nodes have completed their repositioning and attitude reference correction, they each output the current tilt angle value corresponding to that sampling period; if If the node status is abnormal, then the period... Tilt angle data is marked as invalid and not included in the chain recursion. This output data serves as input for subsequent chain recursion along the connection sequence of inclinometer nodes, ensuring that the current chain data is generated based on the same period, the same reference sequence, and the same attitude reference.
[0027] The present invention is further configured such that the step of generating the current chain data of the flexible inclinometer by chain recursion along the connection sequence of the inclinometer nodes based on the current tilt angle data and the reference correlation data includes: The inclinometer node reference sequence, arc length reference chain, and initial chain reference are extracted from the reference association data. Specifically, before the chain recursion begins, the data processing unit reads the inclinometer node reference sequence, arc length reference chain, and initial chain reference from the reference association data. The inclinometer node reference sequence is derived from the physical connection order of the inclinometer nodes determined during the installation phase, and is used to limit the arrangement order of the node recursion; the arc length reference chain is derived from the structural length or calibration length between adjacent inclinometer nodes, and is used to limit the segment length between adjacent nodes; the initial chain reference is derived from the initial calibration data after installation, and is used to record the initial spatial position, initial vertical position, and initial lateral position of the inclinometer nodes. This step also receives the current tilt angle data generated in the previous processing step. The current tilt angle data has been aligned according to the sampling period identifier and the inclinometer node reference sequence, and can be used as the attitude input for the current chain recursion. If there are node missing markers or node sequence abnormal markers in the current tilt angle data, a chain recursion abort marker is output for that sampling period to prevent abnormal node data from entering the subsequent recursion process. Using the first node of the inclinometer reference sequence as the starting point, the recursion direction is determined according to the arrangement direction of the inclinometer reference sequence. The arc length relationship between adjacent inclinometer nodes is determined based on the arc length reference chain. Specifically, based on the inclinometer reference sequence, the node closest to the fixed position at the beginning of the flexible inclinometer is determined as the starting point, and the arrangement direction of the inclinometer reference sequence from the beginning to the end is determined as the recursion direction. The arc length relationship between adjacent inclinometer nodes is read according to the arc length reference chain. The arc length relationship between nodes includes the adjacent node identifier and the corresponding segment length. Let the inclinometer reference sequence be... The starting point of the recursion is Adjacent nodes and The segment length is ,in, The data originates from the segmental structural dimensions or installation calibration records of the flexible inclinometer. Through this process, the starting point, direction, and distance between adjacent nodes of the chain recursion are determined by the reference correlation data, and the recursion path remains consistent with the physical connection relationship of the flexible inclinometer. The current dip angle data is mapped to the inclinometer node reference sequence. Based on the arc length relationship between nodes, the positions of adjacent inclinometer nodes are recursively extrapolated along the recursive direction to generate the current spatial position data of the inclinometer nodes. Specifically, the current dip angle data is read according to the inclinometer node reference sequence, and the nodes... The current tilt angle value is assigned to the adjacent segment. to The attitude input is as follows. If the current tilt angle data is a bidirectional tilt angle, the current spatial orientation of the segment is determined by the tilt angle in the main inclinometer direction and the lateral tilt angle; if the current tilt angle data is a unidirectional tilt angle, the lateral direction is defined by the inclinometer direction reference to form the current spatial orientation of the segment. Let the segment... to The current direction unit quantity is The current spatial position of the recursive starting point is Then the current spatial position of the next node can be formed by the following formula: ,in, Represents a node During the sampling period The corresponding current spatial location, Determined by the current inclination angle data at that node and the inclinometer reference direction. Read data segment by segment along the recursive direction. and This process sequentially generates the current spatial position data of all inclinometer nodes. This step converts discrete tilt angle data into continuous chain-like spatial position data, which forms the basis for subsequently determining the vertical projection depth, horizontal displacement, and piezometer follow-up depth of the inclinometer nodes. The vertical position of the inclinometer node is extracted from its current spatial position data. Vertical projection is then performed according to the first datum of the arc-length reference chain to generate the current vertical projection depth of the inclinometer node. Specifically, the current spatial position data of the inclinometer node includes both horizontal and vertical positions. Using the first datum of the arc-length reference chain as the vertical depth datum, the vertical coordinates are extracted from the current spatial position data of each inclinometer node and converted into the current vertical projection depth relative to the first datum. Let the node... The current spatial location is The first vertical reference position is Then the current vertical projection depth of the node can be expressed as: ,in, Represents a node The vertical projection depth corresponding to the current sampling period. If the system uses a downward-positive depth coordinate system, then... The depth is directly used as the current depth of the node; if spatial elevation coordinates are used, the current vertical projection depth of the node is formed after coordinate direction transformation. This process ensures that each inclinometer node in the current chain has a clear depth position, providing a depth benchmark for subsequent piezometer arc length positioning and depth correspondence determination; The current lateral position and initial lateral position of the same inclinometer node are extracted from the current spatial position data of the inclinometer node and the initial lateral position of the same inclinometer node from the initial chain reference. The current lateral position and the initial lateral position are then compared to generate the horizontal displacement data of the inclinometer node. Specifically, the current lateral position of the same inclinometer node is extracted from the current spatial position data of the inclinometer node, and the initial lateral position of the same inclinometer node is extracted from the initial chain reference. The two are then compared to generate the horizontal displacement data of the inclinometer node. Let the node... The current horizontal position is The initial horizontal position is Then the horizontal displacement of the node can be expressed as: ,in, Represents a node The horizontal displacement is relative to the initial conical reference. If the monitoring system presets the main inclination direction, the horizontal displacement can be further projected onto the main inclination direction to form the main direction displacement data. The current lateral position comes from the chain recursion result, and the initial lateral position comes from the initial chain reference. The two are correlated by the inclination node identifier, which can form node-level displacement results. The orientation of the current node segment is determined based on the current spatial position data of adjacent inclinometer nodes. The initial segment orientation of the corresponding node segment is determined based on the initial chain reference. The current node segment orientation and the initial segment orientation are compared to generate node bending state data. Specifically, the orientation of the current node segment is determined based on the current spatial position data of adjacent inclinometer nodes; the initial segment orientation is determined based on the initial spatial position of the same node segments in the initial chain reference. The current node segment orientation can be formed by the direction of the line connecting the current spatial positions of adjacent nodes, and the initial segment orientation can be formed by the direction of the line connecting the initial spatial positions of adjacent nodes. Let the current node segment orientation be... The initial segment direction is Then the bending angle of this section relative to the initial state can be expressed as: ,in, Indicates node segment to The amount of bending change. If If the bending change threshold is exceeded, the node segment is marked as a bending change segment. The preset bending change threshold is derived from the measurement resolution of the flexible inclinometer, the segment length, and the engineering monitoring level requirements. This process is used to record the local bending state in the current chain data, providing node segment information for subsequent identification of inclinometer displacement change segments and water level displacement response relationships. According to the inclinometer node reference sequence, the current spatial position data, current vertical projection depth, horizontal displacement data, bending status data, and sampling period identifier of each inclinometer node are associated at the node level to generate the current chain data of the flexible inclinometer. Specifically, according to the inclinometer node reference sequence, the current spatial position data, current vertical projection depth, horizontal displacement data, bending status data, and sampling period identifier of each inclinometer node are associated at the node level to generate the current chain data of the flexible inclinometer. The current chain data uses the sampling period identifier as the time index and the inclinometer node reference sequence as the node index, recording the spatial position, depth position, horizontal displacement, and bending status of each node in the current sampling period. In a specific implementation scenario, if the inclinometer node reference sequence contains... to The arc length between nodes is 1m, and the sampling period is... The following recursion yields , , Given the current vertical projection depth and horizontal displacement data, the depth, displacement, and bending status of the corresponding nodes are organized into current chain-like data according to the node order. Subsequent processing steps can extract the current vertical projection depth of the nodes at both ends of the corresponding arc length position of the piezometer from this current chain-like data to generate the current vertical projection depth of the piezometer; or extract the horizontal displacement data of the nodes to form the inclinometer displacement monitoring results.
[0028] The present invention is further configured such that locating the corresponding arc length position of the piezometer in the current chain data based on the reference correlation data includes: The inclinometer node reference sequence, inclinometer node arc length reference data, piezometer installation arc length data, and the arc length correspondence between the piezometer and the inclinometer node segment are extracted from the reference correlation data. Specifically, in the piezometer arc length positioning stage, the input objects include the reference correlation data generated in the previous steps and the current chain data. The reference correlation data comes from the installation and calibration stage and records the node sequence, node arc length position, piezometer installation arc length position, and the installation relationship of the piezometer relative to the inclinometer node segment of the flexible inclinometer. The current chain data comes from the chain recursion result of the current sampling period and records the current spatial position of the inclinometer node, the current vertical projection depth, horizontal displacement data, and sampling period identifier. The process begins by retrieving the inclinometer node reference sequence, inclinometer node arc length reference data, piezometer installation arc length data, and arc length correspondence from the reference association data, and then verifying the completeness of the retrieved results. Specifically, the inclinometer node reference sequence determines the physical arrangement order of the nodes; the inclinometer node arc length reference data determines the cumulative arc length position of each node in the extension direction of the flexible inclinometer; the piezometer installation arc length data indicates the installation position of the piezometer relative to the head end of the flexible inclinometer; and the arc length correspondence records the initial correspondence between the piezometer and the node or node segment. This step outputs verified positioning input data, providing a unified index for subsequent position matching. The inclinometer node arc length reference data is sequentially organized according to the inclinometer node reference sequence to generate the inclinometer node arc length position sequence. Specifically, the node arrangement order in the inclinometer node reference sequence is read, and the inclinometer node arc length reference data is rearranged according to this arrangement order to generate the inclinometer node arc length position sequence. Let the inclinometer node reference sequence be... The corresponding arc length position is Then the sequence of arc length positions of the inclinometer nodes can be expressed as: .in, Indicates the first Inclination nodes This indicates the cumulative arc length position of the inclinometer node along the extension direction of the flexible inclinometer. During the data processing, a sequence consistency check is performed on the arc length positions. If the arc length positions of adjacent nodes are reversed, duplicated, or missing, they are marked as arc length reference abnormalities and will not proceed to the subsequent matching process. This process enables the subsequent piezometer installation arc length data to be located on an ordered arc length chain.
[0029] The installation arc length data of the piezometer is matched with the arc length position sequence of the inclinometer nodes to determine the position of the inclinometer node or the adjacent inclinometer node segment in which the installation arc length of the piezometer falls; specifically, the installation arc length position of the piezometer is read from the installation arc length data. ,Will Match each item with the sequence of arc length positions of the inclinometer nodes. If Arc length position of a certain inclinometer node The difference is within the arc length positioning tolerance. If the position of the piezometer's installation arc length falls within the inclinometer node, then it is determined that the position falls within the inclinometer node. The node position; if Located at adjacent inclinometer nodes and If the arc length positions are between those positions, then the installation arc length position of the piezometer is determined to fall within the adjacent inclinometer node section. Arc length positioning tolerance Derived from the accuracy of the installation scale, the piezometer assembly and positioning, and the node arc length calibration, this data is used to handle minor deviations between the installation record and the arc length reference chain. For a given section, the relative arc length position of the piezometer within that section can be recorded: ,in, This indicates the relative position of the piezometer within adjacent inclinometer node sections, derived from the installation arc length and the arc length positions of the two end nodes. This intermediate value is used to subsequently determine the current vertical projection depth of the piezometer from the current chain data of the two end inclinometer nodes.
[0030] When the piezometer's installation arc length position falls within the inclinometer node position, the current chain data of the corresponding inclinometer node is extracted from the current chain data to generate piezometer node positioning data. Specifically, after determining that the piezometer's installation arc length position falls within a certain inclinometer node position, the current chain data of the corresponding node is extracted from the current chain data based on the inclinometer node's identifier. The current chain data of the corresponding node includes the node's current spatial position, current vertical projection depth, horizontal displacement data, node bending state data, and sampling period identifier. The corresponding inclinometer node identifier, the piezometer's installation arc length position, the current chain data of the inclinometer node, and the sampling period identifier are associated to generate piezometer node positioning data. This data indicates that the piezometer's current follow-up position is supported by a single inclinometer node position, and the current vertical projection depth of the piezometer can be directly determined using the current vertical projection depth of that inclinometer node. This process is applicable when the piezometer's installation interface coincides with the fixed position of the inclinometer node's shell or node end.
[0031] When the piezometer's installation arc length position falls within an adjacent inclinometer node segment, the segment position of the piezometer within the adjacent inclinometer node segment is determined based on the arc length correspondence. The current chain data of the inclinometer nodes at both ends of the adjacent inclinometer node segment is extracted from the current chain data to generate piezometer segment positioning data. Specifically, after determining that the piezometer's installation arc length position falls within an adjacent inclinometer node segment, the positional relationship between the front and rear inclinometer nodes and the piezometer segment of that segment is read based on the arc length correspondence. The segment positional relationship can be determined by the relative arc length position. This can also be represented by the installation offset of the piezometer relative to the front inclinometer node. Subsequently, the current chain data of the front and rear inclinometer nodes are extracted from the current chain data. The current chain data of both ends of the inclinometer node includes at least the current spatial position, the current vertical projection depth, and the sampling period identifier. The current chain data of the front and rear inclinometer nodes, the piezometer installation arc length position, the segment position relationship, and the sampling period identifier are correlated to generate piezometer segment positioning data. This data indicates that the current moving position of the piezometer is jointly determined by adjacent inclinometer node segments. Subsequently, arc length interpolation processing can be performed on the current vertical projection depth of the two ends of the node based on the segment position relationship. The piezometer node location data or piezometer segment location data is correlated and organized with the piezometer installation arc length data to generate piezometer arc length location data. Specifically, the generated piezometer node location data or generated piezometer segment location data is uniformly organized with the piezometer installation arc length data to generate piezometer arc length location data. The piezometer arc length location data includes at least the piezometer number, sampling period identifier, piezometer installation arc length position, location type, corresponding inclinometer node or adjacent inclinometer node segment, segment position relationship, and current chain data of the corresponding node. The location type is used to distinguish between node location and segment location; when locating a node, the current chain data of a single inclinometer node is recorded; when locating a segment, the current chain data of adjacent inclinometer nodes at both ends are recorded. For example, if the inclinometer node arc length positions are 0m, 1m, 2m, and 3m, and the piezometer installation arc length position is 2m, then node positioning data is generated. If the piezometer installation arc length position is 1.25m, then segment positioning data is generated within the 1m and 2m node sections, with the segment position being one-quarter of the arc length from the front node within that section. This piezometer arc length positioning data is passed to the subsequent piezometer current vertical projection depth generation step to form the follow-up depth data.
[0032] The present invention is further configured such that determining the current vertical projection depth of the piezometer and generating piezometer follow-up depth data based on the current vertical projection depth of the piezometer includes: The piezometer node positioning data or piezometer segment positioning data is extracted from the piezometer arc length positioning data. Specifically, in the piezometer follow-up depth generation stage, the input objects include the piezometer arc length positioning data, current chain data, and benchmark association data output from previous steps. The piezometer arc length positioning data is obtained by matching the piezometer installation arc length position with the flexible inclinometer arc length benchmark chain, and internally includes the positioning type, sampling period identifier, piezometer installation arc length position, corresponding inclinometer node or adjacent inclinometer node segment, segment position relationship, and corresponding node current chain data. During processing, the positioning type is read first. When the positioning type is node positioning, the piezometer node positioning data is extracted; when the positioning type is segment positioning, the piezometer segment positioning data is extracted. The piezometer node positioning data is used to describe the situation where the piezometer installation position coincides with the position of a certain inclinometer node, and the piezometer segment positioning data is used to describe the situation where the piezometer installation position is located between adjacent inclinometer nodes. This step completes the data diversion before the piezometer's follow-up depth calculation, so that the subsequent current vertical projection depth generation process can adopt the corresponding processing path according to the actual installation location; When the piezometer arc length positioning data includes piezometer node positioning data, the current chain data of the corresponding inclinometer node is extracted from the piezometer node positioning data, and the current vertical projection depth of the piezometer is determined based on the current chain data of the corresponding inclinometer node. Specifically, when the piezometer installation arc length position falls within the position of a certain inclinometer node, the corresponding inclinometer node identifier and the current chain data of that inclinometer node are read from the piezometer node positioning data. The current chain data already contains the current spatial position and current vertical projection depth of the inclinometer node in the current sampling period. Since the piezometer installation position corresponds to the position of the inclinometer node, the current vertical projection depth of the piezometer is taken as the current vertical projection depth of the inclinometer node. Let the corresponding inclinometer node be... ,node In the current sampling period The current vertical projection depth is The current vertical projection depth of the piezometer under the node positioning path is denoted as: ,in, This indicates the current vertical projection depth of the piezometer. The data source for this processing path is clear: the piezometer depth is updated synchronously with the current chain of the flexible inclinometer, providing a current depth benchmark for subsequent pressure head conversion. When the piezometer arc length positioning data includes piezometer segment positioning data, the current chain data of the inclinometer nodes at both ends of the adjacent inclinometer segment and the segment position relationship of the piezometer within the adjacent inclinometer segment are extracted from the piezometer segment positioning data. Specifically, when the piezometer installation arc length position falls within an adjacent inclinometer segment, the current chain data of the front inclinometer node, the rear inclinometer node, and the two end inclinometer nodes, and the piezometer segment position relationship are read from the piezometer segment positioning data. The segment position relationship is derived from the correspondence between the piezometer installation arc length position and the arc length positions of the two end inclinometer nodes, and is used to represent the relative position of the piezometer within that node segment. Let the front inclinometer node be... The rear tilting node is The relative arc length ratio of the piezometer in this section is: ; The value is formed by the installation arc length position and the arc length positions of the nodes at both ends of the segment, and its range is between the front-end node and the back-end node. The current chain data of the two end nodes extracted in this step includes at least the current vertical projection depth of the two end nodes and the sampling period identifier, to ensure that subsequent arc length interpolation processing uses data with the same sampling period; Based on the current chain data of the inclinometer nodes at both ends of the adjacent inclinometer node segment, the current vertical projection depth of the inclinometer nodes at both ends is extracted; specifically, the current vertical projection depth is extracted from the current chain data of the front inclinometer node. Extract the current vertical projection depth from the current chain data of the back-end inclinometer nodes. Before extraction, the consistency of the sampling period identifiers at both ends of the node is verified. If the sampling period identifiers are consistent, arc length interpolation processing is performed; if the sampling period identifiers are inconsistent, an anomaly marker is generated for the output depth, and the piezometer follow-up depth data of the current period is not included in the pressure head conversion. The current vertical projection depth at both ends is derived from the current chain recursion result of the flexible inclinometer, which can reflect the vertical position of adjacent inclinometer nodes relative to the first end reference under the current bending state. This step converts the segment positioning data into endpoint depth data that can participate in depth interpolation. Based on the segmental positional relationship of the piezometer within adjacent inclinometer nodes, the current vertical projection depth of the two inclinometer nodes is interpolated by arc length to generate the current vertical projection depth of the piezometer. Specifically, under the segmental positioning path, the current vertical projection depth of the two inclinometer nodes is interpolated by arc length according to the segmental positional relationship of the piezometer. Let the relative arc length ratio of the piezometer be... The current vertical projection depth of the front-end node is The current vertical projection depth of the backend node is The current vertical projection depth of the piezometer is formed according to the following rules: ,in, The proportion of the arc length position of the piezometer within the adjacent inclinometer node section is derived from the baseline correlation data; This represents the vertical projected depth of the piezometer at the corresponding arc length position during the current sampling period. This interpolation process is based on the chain-like connection relationship between adjacent inclinometer nodes of the flexible inclinometer, using the arc length position as the weight source. It can convert the piezometer's installation position into the dynamic vertical depth within the current chain. If adjacent inclinometer node segments are marked as bending sections, the current vertical projected depth is still interpolated according to the segment position relationship. Node bending status data is synchronously written into the result for subsequent result reliability verification. The piezometer installation depth benchmark is extracted from the benchmark association data. The current vertical projection depth of the piezometer and the piezometer installation depth benchmark are then correlated and organized to generate piezometer tracking depth data. Specifically, the piezometer installation depth benchmark is read from the benchmark association data. This reference, derived from the installation calibration record, indicates the installation depth of the piezometer relative to the head reference or orifice reference in its initial state. The current vertical projection depth of the piezometer is then considered. Reference for piezometer installation depth The corresponding data is processed to generate the change in depth as a function of motion: ,in, This represents the vertical depth offset of the piezometer caused by the current chain configuration change of the flexible inclinometer. The generated piezometer tracking depth data includes the piezometer number, sampling period identifier, positioning type, current vertical projected depth of the piezometer, piezometer installation depth reference, tracking depth change, and identifiers of the inclinometer nodes involved in the generation. In a specific implementation scenario, if the initial installation depth of the piezometer is 10.000m, and the current vertical projected depth of the piezometer corresponding to the current chain configuration is 9.982m, then the tracking depth change is −0.018m, and the subsequent pressure head conversion uses 9.982m as the current depth reference. This result is passed to the attitude compensation groundwater level generation step, enabling the pressure head conversion to use the actual vertical position of the piezometer under the current chain configuration.
[0033] The present invention is further configured such that the step of extracting piezometer pressure data based on synchronous monitoring data, and generating attitude-compensated groundwater level by converting pressure head based on piezometer pressure data, piezometer follow-up depth data, and benchmark correlation data includes: The pressure sampling data and sampling period identifier corresponding to the piezometer are extracted from the synchronous monitoring data. Specifically, in the attitude-compensated groundwater level generation stage, the input objects include synchronous monitoring data, piezometer follow-up depth data, and benchmark correlation data. The synchronous monitoring data is generated by the flexible inclinometer and piezometer within the same sampling period. The piezometer data comes from the pressure sensor acquisition interface and typically includes pressure sampling value, pressure sampling status, piezometer number, and sampling period identifier. During processing, the pressure sampling data corresponding to the piezometer is extracted from the synchronous monitoring data according to the piezometer number. Then, the sampling period identifier is used to confirm that the pressure sampling data is in the same sampling period as the current chain data and piezometer follow-up depth data. Data with abnormal pressure sampling status, missing pressure data, or inconsistent sampling period identifiers are not included in the pressure head conversion process, and a pressure sampling abnormality mark is output. Through this processing, the pressure data entering the subsequent conversion has a clear data source, sampling period, and piezometer identity. Based on the piezometer installation reference and head conversion reference in the reference association data, the pressure sampling data is matched to generate piezometer reference pressure data. Specifically, the piezometer installation reference and head conversion reference are read from the reference association data. The piezometer installation reference is used to determine the piezometer installation location, installation depth reference, and sensor type corresponding to the pressure sampling data. The head conversion reference is used to determine the depth direction, pressure type, medium density value method, and gravity acceleration value method used when converting pressure data to head. During processing, the piezometer number in the pressure sampling data is matched with the piezometer installation reference to confirm the piezometer installation object corresponding to the pressure sampling data; then the pressure sampling data is matched with the head conversion reference to determine whether the pressure sampling value should be processed according to gauge pressure data or absolute pressure data. After completing the reference matching, the piezometer reference pressure data is generated. This data includes the pressure sampling value, sampling period identifier, piezometer installation reference identifier, and head conversion reference identifier, providing a unified reference for subsequent zero-point correction. Based on the pressure zero-point reference in the reference correlation data, the piezometer reference pressure data is zero-point corrected to generate the effective piezometer pressure data. Specifically, the pressure zero-point reference originates from the initial calibration stage of the piezometer and is used to record the zero-point reading of the piezometer under reference conditions. During processing, the pressure zero-point reference is read from the reference correlation data, and the zero-point offset is subtracted from the pressure sample values in the piezometer reference pressure data to generate the effective piezometer pressure data. Let the pressure sample values in the piezometer reference pressure data be... The zero-point pressure reference is The effective pressure of the piezometer is The effective pressure of a gauge piezometer can be expressed as: When the pressure sampling value of the head conversion benchmark record is in absolute pressure form, the atmospheric pressure benchmark of the same period is first subtracted before zero-point correction. The corresponding formation rules are as follows: ,in, The data is derived from atmospheric pressure samples recorded in the head conversion benchmark or from an external pressure interface. This process converts the pressure samples into effective pressure data that can represent the effect of pore water pressure, reducing the impact of zero-point drift and pressure type differences on head conversion. The current vertical projection depth of the piezometer is extracted from the piezometer's tracking depth data. This current vertical projection depth is then correlated with the effective pressure data of the piezometer within the same period to generate piezometer pressure-depth correlation data. Specifically, the piezometer tracking depth data is obtained from the preceding arc length positioning and current chain processing, and includes the piezometer number, sampling cycle identifier, current vertical projection depth of the piezometer, and piezometer installation depth reference. During processing, the current vertical projection depth of the piezometer is extracted from the piezometer tracking depth data. Compare it with the effective pressure data from the piezometer. The piezometer is associated with the sampling period based on its serial number and sampling period identifier. If the current vertical projection depth of the piezometer matches the sampling period identifier of the effective pressure data, piezometer pressure-depth associated data is generated; otherwise, a period mismatch marker is output, and this period is not included in the attitude compensation groundwater level generation process. This step incorporates the piezometer depth change caused by the current chain shape of the flexible inclinometer into the pressure head conversion, thus establishing a periodic binding relationship between the pressure data and the current depth benchmark. Based on the head conversion benchmark, pressure head conversion is performed on the piezometer pressure-depth correlation data to generate the current pressure head data of the piezometer. Specifically, the water density and gravitational acceleration values required for the head conversion are retrieved from the head conversion benchmark. The water density can be a fixed density value or determined based on the piezometer temperature sampling or the temperature correction table in the head conversion benchmark; the gravitational acceleration can be a standard value or a calibration value from the installation area. Let the effective pressure of the piezometer be... The density of the water is The acceleration due to gravity is The current pressure head of the piezometer is The rules for the formation of pressure head are as follows: ,in, This indicates the head height corresponding to the pressure at the current position of the piezometer. The density settings or temperature correction rules are derived from the head conversion benchmark. The gravity acceleration setting is derived from the head conversion benchmark; the generated piezometer current pressure head data includes the piezometer number, sampling period identifier, effective pressure, and current pressure head. This step is a physical conversion of pressure head, and the conversion object has already undergone zero-point correction and same-period depth correlation in the previous steps; Based on the current pressure head data and vertical projection depth of the piezometer, an attitude-compensated groundwater level corresponding to the sampling cycle identifier is generated. Specifically, in a depth coordinate system with the head or orifice reference as the zero point and downward as the positive direction, the current vertical projection depth of the piezometer is read from the pressure-depth correlation data of the piezometer. Read the current pressure head from the current pressure head data of the piezometer. The two are combined according to the same sampling period to generate an attitude-compensated groundwater level. Its formation rule is as follows: ,in, This indicates posture compensation for groundwater level. Derived from piezometer depth data, The result is derived from the pressure head conversion. This formula uses the current vertical projection depth of the piezometer in the conversion, reflecting the actual vertical position of the piezometer after the change in the current chain shape of the flexible inclinometer. The generated attitude-compensated groundwater level includes the piezometer number, sampling period identifier, current vertical projection depth of the piezometer, current pressure head, and groundwater level depth. In a specific implementation scenario, if the current vertical projection depth of the piezometer is 9.982m and the pressure head is 1.200m in a certain sampling period, the attitude-compensated groundwater level depth is 8.782m; if the initial installation depth of 10.000m is still used, the corresponding water level depth is 8.800m. The difference between the two is due to the depth change caused by the current chain shape of the flexible inclinometer. This attitude-compensated groundwater level is transferred to subsequent time-correspondence and depth-correspondence discrimination steps to form a water level displacement response result with the inclinometer displacement data.
[0034] The present invention is further configured such that the step of extracting inclinometer displacement data based on the current chain data and performing time correspondence discrimination based on attitude-compensated groundwater level and inclinometer displacement data includes: The data processing unit extracts the inclinometer node identifier, horizontal displacement data, current vertical projection depth, and sampling period identifier from the current chain data. Specifically, in the water level-displacement time-correspondence processing stage, the data processing unit receives the current chain data output from the preceding chain recursion step. The current chain data uses the sampling period as the time index and the inclinometer node reference sequence as the node index, recording the current spatial position, current vertical projection depth, horizontal displacement data, and node status of each inclinometer node in the corresponding sampling period. During processing, the inclinometer node identifier, horizontal displacement data, current vertical projection depth, and sampling period identifier are read from the current chain data. The inclinometer node identifier is derived from the flexible inclinometer node communication address or installation number; the horizontal displacement data is derived from the comparison between the current spatial position and the initial chain reference; the current vertical projection depth is derived from the vertical position conversion after chain recursion; and the sampling period identifier is derived from the synchronous sampling trigger process. This step forms the inclinometer displacement extraction input data, enabling subsequent water level changes and displacement changes to correspond within the same sampling period. The horizontal displacement data and current vertical projection depth of the inclinometer nodes are processed at the node level according to the inclinometer node reference sequence to generate inclinometer displacement data. Specifically, the inclinometer node reference sequence is read from the reference association data, and the extracted horizontal displacement data and current vertical projection depth of the inclinometer nodes are sorted and positioned according to the inclinometer node reference sequence. During node-level processing, the horizontal displacement value, current vertical projection depth, sampling period identifier, and node status of each inclinometer node are written into the same node record based on the inclinometer node identifier. If an inclinometer node has missing data, an abnormal node status, or is inconsistent with the reference sequence, the node record is marked as an invalid node record and will not be used as a valid displacement node in subsequent segment identification. After processing, inclinometer displacement data is generated. This data is organized according to the structure of sampling period—inclinometer node—depth—displacement, which can directly support subsequent displacement segment identification and depth correspondence discrimination. Groundwater level time-series data is generated by extracting water level values, sampling cycle identifiers, and water level depth positions from the attitude-compensated groundwater level. Specifically, the attitude-compensated groundwater level is generated through a pressure head conversion step, and includes the piezometer number, sampling cycle identifier, current vertical projection depth of the piezometer, pressure head, and the attitude-compensated groundwater level depth position. During processing, the water level values and water level depth positions for each cycle are read according to the sampling cycle identifier and organized into groundwater level time-series data. The water level value is the result after pressure zero-point correction, head conversion, and follow-up depth compensation, and the water level depth position is the depth position relative to the head reference or orifice reference. The groundwater level time-series data records the water level value, change status, and corresponding depth position using the sampling cycle identifier as an index. Based on the sampling period identifier, groundwater level time-series data and inclinometer displacement data are periodically matched to generate water level and displacement data within the same period. Specifically, the sampling period identifier is used as a common index to perform periodic matching of groundwater level time-series data and inclinometer displacement data. For the same sampling period, the water level value, water level depth position, and horizontal displacement data and current vertical projection depth of all valid inclinometer nodes in that period are read and organized into water level and displacement data within the same period. If a period has missing water level data or all inclinometer displacement data is invalid, that period is marked as invalid. If some inclinometer nodes are invalid, the records of valid nodes are retained and node status markers are added to invalid nodes. The water level and displacement data within the same period generated in this step form a data group of water level status and inclinometer displacement status within the same period. Following the sampling cycle sequence, the water level values and horizontal displacement data of the inclinometer nodes within the same cycle are analyzed to identify change segments, generating water level change segments and displacement change segments. Specifically, water level and displacement data within the same cycle are read sequentially according to the sampling cycle, and water level and displacement change segments are identified separately. A water level change segment refers to the periodic interval where the water level value reaches a preset change condition within a continuous sampling cycle, and a displacement change segment refers to the periodic interval where the horizontal displacement data of one or adjacent inclinometer nodes reaches a preset change condition within a continuous sampling cycle. Let the first... The water level value for each sampling period is , No. The horizontal displacement of each inclinometer node is The water level change in adjacent cycles is The displacement change between adjacent periods is When within several consecutive sampling periods Reaching the water level change threshold At that time, water level change segments are generated; when there are several consecutive sampling periods... Reaching the displacement change threshold At that time, the displacement change segment of the node or its adjacent node group is generated. Water level change threshold. Derived from the piezometer water level conversion resolution and monitoring alarm limits, displacement change threshold The displacement resolution and engineering monitoring limits of the flexible inclinometer are used to determine the change segment identification. To reduce misjudgments of single-point jumps, the change segment identification requires that the change meets the continuous period condition. The number of continuous periods is determined by the sampling frequency and monitoring stability requirements. This step outputs water level change segments and displacement change segments. Each change segment includes the start sampling period, end sampling period, change direction, and change amplitude. Based on the sequential relationship between the water level change segment and the displacement change segment in terms of sampling period, time correspondence is determined, and a time correspondence result is generated. Specifically, the initial sampling period of the water level change segment and the initial sampling period of the displacement change segment are read, and their sequential relationship in terms of sampling period is compared to generate a time correspondence result. Let the initial period of the water level change segment be... The initial period of the displacement change segment is The time difference between the two is: ,in, This represents the response interval of displacement change relative to water level change, and the unit can be the number of sampling periods or actual time. If... If it is located within the preset synchronization window, the corresponding time result record will be a synchronous change; if If the change in water level is greater than the synchronization window but not greater than the maximum response window, the time-corresponding result is recorded as water level change preceding displacement change. If the displacement change segment precedes the water level change segment, or if there is no corresponding water level change segment within the maximum response window, the time-corresponding result is recorded as displacement change preceding or no water level correspondence. The synchronization window is derived from the sampling period length and data synchronization error, while the maximum response window is derived from the response time requirements of the monitored object and historical monitoring records. The time-corresponding result output in this step includes the water level change segment number, displacement change segment number, sequence relationship, response interval, and corresponding sampling period range. The time-correspondence results are correlated and organized with the water level values, water level depth locations, water level change segments, and sampling cycle identifiers in the groundwater level time series data to generate groundwater level monitoring results. Specifically, the generated time-correspondence results are correlated with the groundwater level time series data to form groundwater level monitoring results. During the correlation and organization, the water level change segment number and sampling cycle identifier are used as indexes to write the water level value, water level depth location, start and end cycles of the water level change segment, change direction, change amplitude, and time-correspondence results into the same water level monitoring record. If there is a time correspondence between the water level change segment and the displacement change segment, the corresponding displacement change segment number and response interval are recorded in the groundwater level monitoring results; if the water level change segment does not match the displacement change segment, it is recorded as no corresponding displacement change. The generated groundwater level monitoring results can retain the water level's own change information and its time relationship with the inclinometer displacement change. Subsequent depth correspondence determination can directly read the water level change segments and water level depth locations. The time-correspondence results are correlated and organized with the inclinometer node identifier, current vertical projection depth of the inclinometer node, horizontal displacement data of the inclinometer node, displacement change segment, and sampling period identifier in the inclinometer displacement data to generate inclinometer displacement monitoring results. Specifically, the generated time-correspondence results are correlated with the inclinometer displacement data at the node level to form inclinometer displacement monitoring results. During the correlation and organization, the displacement change segment number, inclinometer node identifier, and sampling period identifier are used as indexes to write the current vertical projection depth of the inclinometer node, horizontal displacement data, start and end periods of the displacement change segment, change direction, change amplitude, and time-correspondence results into the same displacement monitoring record. For displacement change segments jointly formed by adjacent inclinometer nodes, the range of inclinometer nodes participating in the change segment and the corresponding vertical projection depth range are recorded. In a specific implementation scenario, if a water level change segment starts at the 20th sampling period, and the displacement change segment of a group of inclinometer nodes starts at the 23rd sampling period, with the synchronization window set to 1 sampling period and the maximum response window set to 6 sampling periods, then... The time-corresponding results are recorded as water level changes preceding displacement changes. If the same data is used to generate water level results at a fixed installation depth, the starting period of the water level change segment may be too late or the change amplitude may be too small, resulting in unstable time-corresponding results. This is addressed by corresponding the attitude-compensated groundwater level and inclinometer displacement data in terms of sampling period.
[0035] The present invention is further configured such that the step of generating the water level displacement response result by depth correspondence discrimination based on attitude-compensated groundwater level and inclinometer displacement data includes: The data processing unit extracts the attitude-compensated groundwater level depth corresponding to the water level change segment and the current vertical projection depth of the inclinometer node corresponding to the displacement change segment from the water level displacement period data. Specifically, in the water level displacement response discrimination stage, the data processing unit receives the water level displacement period data, time correspondence results, groundwater level monitoring results, and inclinometer displacement monitoring results generated in the previous steps. The water level displacement period data uses the sampling period identifier as a unified index and includes the attitude-compensated groundwater level, inclinometer node horizontal displacement data, inclinometer node current vertical projection depth, water level change segment, and displacement change segment. During processing, the attitude-compensated groundwater level depth position within the corresponding sampling period range is first read according to the water level change segment number, and then the inclinometer node identifier and the corresponding inclinometer node current vertical projection depth are read according to the displacement change segment number. The attitude-compensated groundwater level depth position comes from the pressure head conversion result and the piezometer follow-up depth data, and the current vertical projection depth of the inclinometer node comes from the current chain data of the flexible inclinometer. After extraction, water level depth input data and displacement depth input data are generated as input objects for subsequent depth correspondence discrimination. Based on the current vertical projection depth of the inclinometer node corresponding to the displacement change segment, the deformation depth position corresponding to the inclinometer displacement change is determined. Specifically, the displacement change segment is usually formed by one inclinometer node or adjacent inclinometer nodes. During processing, based on the displacement change segment in the inclinometer displacement monitoring results, the set of inclinometer nodes participating in the change segment is read, and the current vertical projection depth of the inclinometer nodes in this set is organized as the deformation depth position. If the displacement change segment corresponds to only one inclinometer node, then the current vertical projection depth of that inclinometer node is used as the deformation depth position; if the displacement change segment corresponds to adjacent inclinometer nodes, then the current vertical projection depth of the shallowest inclinometer node and the current vertical projection depth of the deepest inclinometer node constitute the deformation depth interval. Let the set of inclinometer nodes participating in the displacement change segment be... ,node The current vertical projection depth is Then the deformation depth range can be expressed as: ,in, Used to record the positional range of displacement changes in the depth direction. Derived from the results of displacement change segment identification, This data is derived from the current chain-like data. The process converts node-level displacement changes into depth location data, facilitating spatial mapping with attitude-compensated groundwater levels. Depth correspondence is determined based on the water level depth location and deformation depth location, generating depth correspondence results; specifically, the attitude-compensated groundwater level depth location corresponding to the water level change segment is read from the water level depth input data. Read the deformation depth range from the deformation depth location. According to the preset depth range Perform depth correspondence determination. Derived from the spacing between inclinometer nodes, the installation and positioning error of the piezometer, and the monitoring resolution, it is used to limit the permissible range of water level and displacement changes in the depth direction. When the depth is within the extended range of the deformation depth interval, the generated depth correspondence result is valid; when When the deformation depth range is exceeded, the generated depth correspondence result will be "depth correspondence not valid". The depth correspondence relationship can be recorded by the following formula: ,in, This is the depth correspondence result. and These are the upper and lower boundaries of the deformation depth range, respectively. This step outputs the depth correspondence result, the corresponding water level change segment number, the corresponding displacement change segment number, and the depth deviation information for subsequent response relationship collection and retrieval. Based on the time and depth correspondence results, response relationships are aggregated for water level and displacement change segments, generating water level-leading displacement responses, synchronous change responses, or independent displacement change responses. Specifically, the response relationship aggregation uses the time and depth correspondence results as a joint criterion. The time correspondence results are derived from the sequential relationship between the water level and displacement change segments in the sampling period, while the depth correspondence results are derived from the spatial relationship between the water level depth and deformation depth. Let the time correspondence results be... ,in, This indicates that the water level change precedes the displacement change and the response interval is within the maximum response window. This indicates that the water level change and displacement change are within the synchronization window. This indicates that no valid time correspondence has been formed. The response relationship aggregation rule is: when and When, a water level leading displacement response is generated; when and When a synchronous change response is generated; when a displacement change segment exists and or At that time, an independent displacement change response is generated. The synchronization window is derived from the sampling period length and the system time synchronization error, while the maximum response window is derived from historical monitoring records and engineering monitoring requirements. This processing synthesizes the temporal sequence and depth correspondence into a response type, avoiding reliance on a single water level curve or a single displacement curve to form the result; The water level leading displacement response, synchronous change response, or independent displacement change response are used as the water level displacement response results. Specifically, the generated response type is associated with the water level change segment, displacement change segment, time correspondence result, depth correspondence result, attitude-compensated groundwater level depth location, and deformation depth location to form the water level displacement response result. The water level displacement response result includes the response type, associated water level change segment number, associated displacement change segment number, response interval, depth correspondence result, attitude-compensated groundwater level depth location, and deformation depth range. For example, if the attitude-compensated groundwater level depth location corresponding to a certain water level change segment is 8.80m, and the deformation depth range corresponding to the displacement change segment is 8.55m to 9.10m, with a depth correspondence range of 0.30m, the corresponding depth judgment is valid; if the water level change segment precedes the displacement change segment by three sampling periods, and these three sampling periods are within the maximum response window, then the water level leading displacement response is output. If the deformation depth range corresponding to the same displacement change segment is 12.00m to 12.50m, and the water level depth location does not fall within its extended range, then the displacement independent change response is output. The results can be transmitted to monitoring records, early warning classification, or manual review processes to form a joint monitoring record between groundwater level changes and inclinometer displacement changes.
[0036] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A flexible inclinometer integrated with a piezometer for monitoring groundwater level and inclination, characterized in that, include: S1: Obtain integrated monitoring reference data of flexible inclinometer and piezometer, and generate reference correlation data of piezometer relative to flexible inclinometer by arc length correlation between inclinometer node reference and piezometer installation reference in integrated monitoring reference data; S2: Collect raw monitoring data from the flexible inclinometer and piezometer within the same sampling period, and perform time alignment and validity screening on the raw monitoring data to generate synchronous monitoring data; S3: Extract the current tilt angle data of the inclinometer nodes based on the synchronous monitoring data, and generate the current chain data of the flexible inclinometer by chain recursion along the connection sequence of the inclinometer nodes based on the current tilt angle data and the benchmark correlation data. S4: Locate the corresponding arc length position of the piezometer in the current chain data based on the benchmark correlation data. When the piezometer installation arc length position falls into the position of the inclinometer node, determine the current vertical projection depth of the piezometer based on the current chain data of the corresponding inclinometer node. When the piezometer installation arc length position falls into the adjacent inclinometer node segment, extract the current vertical projection depth of the two inclinometer nodes based on the current chain data of the two inclinometer nodes at both ends of the adjacent inclinometer node segment. Perform arc length interpolation processing on the current vertical projection depth of the two inclinometer nodes according to the segment position relationship of the piezometer in the adjacent inclinometer node segment to generate the current vertical projection depth of the piezometer. Generate the piezometer follow-up depth data based on the current vertical projection depth of the piezometer. S5: Extract piezometer pressure data based on synchronous monitoring data, convert pressure head based on piezometer pressure data, piezometer follow-up depth data and benchmark correlation data to generate current piezometer pressure head data, and generate attitude compensation groundwater level corresponding to sampling cycle identifier based on current piezometer pressure head data and current vertical projection depth of piezometer. S6: Extract inclinometer displacement data based on the current chain data, and generate groundwater level monitoring results, inclinometer displacement monitoring results, and water level displacement response results by performing time and depth correspondence discrimination based on the attitude compensation groundwater level and inclinometer displacement data.
2. The integrated piezometer flexible inclinometer integrated groundwater level and inclinometer monitoring method according to claim 1, characterized in that, The baseline correlation between the inclinometer node baseline and the piezometer installation baseline in the integrated monitoring baseline data is performed by arc length correlation to generate baseline correlation data of the piezometer relative to the flexible inclinometer, including: Extract the inclinometer node reference, node attitude reference, initial chain reference, piezometer installation reference, piezometer installation depth reference, zero pressure reference, and head conversion reference from the integrated monitoring reference data; The inclinometer references are sorted according to the connection order of the inclinometer nodes in the flexible inclinometer to generate an inclinometer reference sequence. Based on the inclinometer node reference sequence, an arc length reference chain is established along the extension direction of the flexible inclinometer to generate inclinometer node arc length reference data. Map the piezometer installation datum to the arc length datum chain to generate piezometer installation arc length data; Based on the installation arc length data of the piezometer and the reference data of the arc length of the inclinometer node, the corresponding inclinometer node section is determined, and the arc length correspondence between the piezometer and the inclinometer node section is generated. The data on the arc length of the piezometer installation, the inclinometer node section, the corresponding relationship of the arc length, the piezometer installation depth benchmark, the zero pressure benchmark, and the head conversion benchmark are correlated and organized to generate benchmark correlation data.
3. The integrated piezometer flexible inclinometer integrated groundwater level and inclinometer monitoring method according to claim 1, characterized in that, Raw monitoring data from flexible inclinometers and piezometers are collected within the same sampling period. The raw monitoring data is then time-aligned and filtered for validity to generate synchronous monitoring data, including: The flexible inclinometer and piezometer are synchronously sampled and triggered according to the preset sampling cycle, and a sampling cycle identifier is generated. Receive the original attitude data and node sampling identifier of the inclinometer returned by the flexible inclinometer, and receive the original pressure data and piezometer sampling identifier returned by the piezometer. Collect the original attitude data of the inclinometer node, node sampling identifier, original pressure data and piezometer sampling identifier into the original monitoring data. The original monitoring data is periodically aggregated according to the sampling period identifier to generate candidate monitoring data for the same period; Time-aligned monitoring data for the same period is generated by aligning candidate monitoring data based on node sampling identifiers and piezometer sampling identifiers. The time-aligned monitoring data is filtered for validity, and monitoring data with missing data, abnormal sampling status, abnormal range status, and abnormal node connection order are removed to generate valid monitoring data. The inclinometer data and piezometer data in the effective monitoring data are linked and organized according to the sampling cycle identifier to generate synchronous monitoring data.
4. The integrated piezometer flexible inclinometer integrated groundwater level and inclinometer monitoring method according to claim 1, characterized in that, The current dip angle data of the inclinometer nodes extracted from the synchronous monitoring data includes: Extract the original attitude data and sampling period identifier of the inclinometer node from the synchronous monitoring data; Based on the reference sequence of inclinometer nodes in the reference association data, the original attitude data of the inclinometer nodes is processed to generate node repositioning attitude data. Based on the node attitude reference in the reference association data, the node homing attitude data is corrected according to the attitude reference, and node corrected attitude data is generated. Based on the node correction attitude data, the tilt change information of the inclinometer node relative to the node attitude reference is extracted, and the current tilt angle data corresponding to the inclinometer node reference sequence and sampling period identifier is generated.
5. The integrated groundwater level and inclination monitoring method using a flexible inclinometer with an integrated piezometer as described in claim 4, characterized in that, Based on the current tilt angle data and the reference correlation data, the current chain data of the flexible inclinometer is generated by chain recursion along the connection sequence of the inclinometer nodes. This includes: Extract the inclinometer node reference sequence, arc length reference chain, and initial chain reference from the reference correlation data; The first node of the inclinometer node reference sequence is used as the starting point for recursion. The recursion direction is determined according to the arrangement direction of the inclinometer node reference sequence. The arc length relationship between adjacent inclinometer nodes is determined according to the arc length reference chain. Map the current tilt angle data to the inclinometer node reference sequence, and recursively calculate the position of adjacent inclinometer nodes along the recursive direction according to the arc length relationship between nodes to generate the current spatial position data of the inclinometer nodes. Extract the vertical position of the inclinometer node from the current spatial position data of the inclinometer node, perform vertical projection conversion according to the first end datum of the arc length datum chain, and generate the current vertical projection depth of the inclinometer node; Extract the current lateral position and initial lateral position of the same inclinometer node from the current spatial position data of the inclinometer node and the initial chain datum, compare the current lateral position and the initial lateral position to generate the horizontal displacement data of the inclinometer node; The direction of the current node segment is determined based on the current spatial position data of adjacent inclinometer nodes. The initial segment direction of the corresponding node segment is determined based on the initial chain reference. The current node segment direction and the initial segment direction are compared to generate node bending state data. Based on the inclinometer node reference sequence, the current spatial position data of the inclinometer node, the current vertical projection depth of the inclinometer node, the horizontal displacement data of the inclinometer node, the node bending status data, and the sampling period identifier are associated at the node level to generate the current chain data of the flexible inclinometer.
6. The integrated groundwater level and inclination monitoring method using a flexible inclinometer with an integrated piezometer as described in claim 5, characterized in that, Based on the baseline correlation data, the position of the piezometer in the current chain data is located by the following arc length: Extract the inclinometer node reference sequence, inclinometer node arc length reference data, piezometer installation arc length data, and the arc length correspondence between the piezometer and the inclinometer node section from the reference correlation data; The inclinometer node arc length reference data are sequentially organized according to the inclinometer node reference sequence to generate the inclinometer node arc length position sequence. The installation arc length data of the piezometer is matched with the arc length position sequence of the inclinometer nodes to determine the inclinometer node position or adjacent inclinometer node segment where the piezometer installation arc length position falls. When the installation arc length position of the piezometer falls into the position of the inclinometer node, the current chain data of the corresponding inclinometer node is extracted from the current chain data to generate the piezometer node positioning data; When the arc length position of the piezometer installation falls into the adjacent inclinometer node section, the segment position relationship of the piezometer in the adjacent inclinometer node section is determined according to the arc length correspondence. The current chain data of the inclinometer nodes at both ends of the adjacent inclinometer node section is extracted from the current chain data to generate the piezometer segment positioning data. The piezometer node location data or piezometer section location data is correlated and organized with the piezometer installation arc length data to generate piezometer arc length location data.
7. The integrated groundwater level and inclination monitoring method using a flexible inclinometer with an integrated piezometer as described in claim 1, characterized in that, Based on synchronous monitoring data, piezometer pressure data is extracted. Then, pressure head is converted from the piezometer pressure data, piezometer homing depth data, and baseline correlation data to generate an attitude-compensated groundwater level, including: Extract the pressure sampling data and sampling cycle identifier corresponding to the piezometer from the synchronous monitoring data; Based on the piezometer installation benchmark and head conversion benchmark in the benchmark correlation data, benchmark matching is performed on the pressure sampling data to generate piezometer benchmark pressure data; Based on the zero-point reference pressure in the reference correlation data, the piezometer reference pressure data is zero-point corrected to generate the effective pressure data of the piezometer. Extract the current vertical projection depth of the piezometer from the piezometer's follow-up depth data, and correlate the current vertical projection depth of the piezometer with the effective pressure data of the piezometer in the same period to generate piezometer pressure-depth correlation data; Based on the head conversion benchmark, the pressure head of the piezometer pressure-depth correlation data is converted to pressure head to generate the current pressure head data of the piezometer. Based on the current pressure head data and the current vertical projection depth of the piezometer, an attitude-compensated groundwater level corresponding to the sampling cycle identifier is generated.
8. The integrated groundwater level and inclination monitoring method using a flexible inclinometer with an integrated piezometer as described in claim 1, characterized in that, Based on the current chain data, inclinometer displacement data is extracted. Time correspondence determination is performed based on the attitude-compensated groundwater level and inclinometer displacement data, including: Extract the inclinometer node identifier, inclinometer node horizontal displacement data, current vertical projection depth of the inclinometer node, and sampling period identifier from the current chain data; Based on the inclinometer node reference sequence, the horizontal displacement data of the inclinometer nodes and the current vertical projection depth of the inclinometer nodes are processed at the node level to generate inclinometer displacement data; Extract water level values, sampling period identifiers, and water level depth locations from attitude-compensated groundwater levels to generate groundwater level time-series data. Based on the sampling period identifier, the groundwater level time series data and inclinometer displacement data are periodically correlated to generate water level and displacement data with the same period. According to the sampling period sequence, the water level value and the horizontal displacement data of the inclinometer node in the same period data are identified to generate water level change segments and displacement change segments. Based on the sequential relationship between the water level change segment and the displacement change segment in the sampling period, time correspondence is determined, and time correspondence results are generated. The time correspondence results are correlated and organized with the water level values, water level depth locations, water level change segments, and sampling cycle identifiers in the groundwater level time series data to generate groundwater level monitoring results. The time correspondence results are correlated and organized with the inclinometer node identifier, the current vertical projection depth of the inclinometer node, the horizontal displacement data of the inclinometer node, the displacement change segment, and the sampling period identifier in the inclinometer displacement data to generate the inclinometer displacement monitoring results.
9. The integrated groundwater level and inclination monitoring method using a flexible inclinometer with an integrated piezometer as described in claim 8, characterized in that, The water level displacement response results generated based on the attitude-compensated groundwater level and inclinometer displacement data include: Extract the attitude compensation groundwater depth position corresponding to the water level change segment and the current vertical projection depth of the inclinometer node corresponding to the displacement change segment from the same period data of water level displacement. Based on the current vertical projection depth of the inclinometer node corresponding to the displacement change segment, determine the deformation depth position corresponding to the inclinometer displacement change. Depth correspondence is determined based on the water level depth location and the deformation depth location, and depth correspondence results are generated. Based on the time correspondence and depth correspondence results, the response relationships of water level change segments and displacement change segments are collected to generate water level leading displacement response, synchronous change response or displacement independent change response. The water level leading displacement response, synchronous change response, or independent displacement change response are taken as the water level displacement response results.
