Test method for overall sealing performance of nuclear power plant containment
By conducting an overall containment tightness test at a low reference pressure and combining the results of local tightness tests, the test results at the design pressure were calculated and derived, thus solving the problems of destructiveness and long construction period of traditional high-pressure tests and achieving safe and efficient tightness assessment.
Patent Information
- Application Number
- CN202611469169.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-20
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional nuclear power plant containment integrity tests are conducted under high design pressures, which are highly destructive and have long testing periods.
The overall sealing test was conducted at a low reference pressure. Combined with the results of the local sealing test, the overall sealing test results at a high design pressure were derived by calculation, thus avoiding high pressure damage and shortening the test period.
Under the premise of not damaging the containment structure, the test results under the design pressure were obtained through calculation and derivation, which avoided the risk of high pressure failure, shortened the test period and saved costs.
Smart Images

Figure CN123111602A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of nuclear engineering technology, and in particular to a method for testing the overall sealing performance of the containment vessel of a nuclear power plant. Background Technology
[0002] The containment vessel is the last line of defense in a nuclear power plant to prevent the release of fission products into the surrounding environment. It serves to contain the nuclear island system equipment and protect the pressure boundary of the primary coolant circuit. Its strength and sealing performance directly affect the containment vessel's radioactive containment capacity. Therefore, nuclear power plants regularly conduct containment performance and strength tests during commissioning and operation to verify whether it meets the requirements.
[0003] Containment tightness testing can be divided into overall tightness testing and partial tightness testing. Overall tightness testing is a Class A test, used to detect the overall leakage rate of the containment under accident conditions. The test cycle is during the commissioning phase, the first commercial operation, and once every ten years. Specifically, the process of Class A testing is as follows: the entire pressure boundary of the containment is closed, and dry air is used to pressurize it to the design pressure in stages; after the internal pressure and temperature and humidity stabilize, the design pressure value is maintained, and parameters are continuously collected using the absolute pressure method to calculate the overall leakage rate of the containment.
[0004] In traditional technologies, Class A tests need to be conducted under high design pressures, which can be destructive to the containment. Furthermore, since Class A tests specify an upper limit on the rate of pressure increase within the containment, conducting Class A tests at design pressures involves a long testing period. Summary of the Invention
[0005] Therefore, it is necessary to provide a test method for determining the overall sealing performance of the nuclear power plant containment under low pressure, addressing the aforementioned technical problems.
[0006] In a first aspect, this application provides a method for testing the overall containment tightness of a nuclear power plant, including:
[0007] An overall sealing test was conducted on the target containment at a reference pressure to obtain the first overall leakage rate; the reference pressure mentioned above is the non-destructive rated test pressure for the overall sealing test of the containment.
[0008] Obtain the first local leakage rate of the target containment at the reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure.
[0009] Based on the first overall leakage rate and the first local leakage rate, the first liner leakage rate of the steel liner of the target containment under the reference pressure is calculated, and based on the first liner leakage rate, the second liner leakage rate of the steel liner under the design pressure is calculated.
[0010] Based on the aforementioned second liner leakage rate and second local leakage rate, the overall sealing performance test results of the target containment vessel under the aforementioned design pressure are determined.
[0011] In one embodiment, obtaining the first local leakage rate of the target containment at a reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test, includes:
[0012] A partial sealing test was conducted on the target containment vessel under the aforementioned design pressure to obtain the second local leakage rate;
[0013] Obtain the first extrapolation coefficient corresponding to the above local sealing test; the first extrapolation coefficient is used to characterize the relationship between local leakage rates under different pressures;
[0014] The first local leakage rate is calculated based on the second local leakage rate and the first extrapolation coefficient.
[0015] In one embodiment, obtaining the first local leakage rate of the target containment at a reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test, includes:
[0016] Local sealing tests were conducted on the target containment vessel under the aforementioned reference pressure and design pressure, respectively, to obtain the first local leakage rate and the second local leakage rate.
[0017] In one embodiment, the aforementioned local sealing test includes a gate sealing test and a mechanical penetration isolation valve sealing test; the aforementioned first local leakage rate includes the personnel gate leakage rate and equipment gate leakage rate corresponding to the aforementioned gate sealing test, and the leakage rate of each isolation valve corresponding to the aforementioned mechanical penetration isolation valve sealing test; the aforementioned isolation valve includes at least one of a butterfly valve, a hard-seal ball valve, a hard-seal gate valve, and a hard-seal gate valve.
[0018] In one embodiment, the first local leakage rate includes a first personnel gate leakage rate and a first equipment gate leakage rate, and the second local leakage rate includes a second personnel gate leakage rate and a second equipment leakage rate; obtaining the first local leakage rate of the target containment under the reference pressure corresponding to the local sealing test, and the second local leakage rate under the design pressure corresponding to the local sealing test, includes:
[0019] The above-mentioned gate sealing test was carried out on the target containment under the above-mentioned design pressure to obtain the leakage rate of the second personnel gate and the leakage rate of the second equipment gate.
[0020] Obtain the third extrapolation coefficient corresponding to the personnel gate and the fourth extrapolation coefficient corresponding to the equipment gate; the third extrapolation coefficient is used to characterize the relationship between the leakage rates of the personnel gate under different pressures, and the fourth extrapolation coefficient is used to characterize the relationship between the leakage rates of the equipment gate under different pressures.
[0021] Based on the aforementioned second personnel gate leakage rate and the aforementioned third extrapolation coefficient, the aforementioned first personnel gate leakage rate is calculated;
[0022] Based on the leakage rate of the second equipment gate and the fourth extrapolation coefficient, the leakage rate of the first equipment gate is calculated.
[0023] In one embodiment, the first local leakage rate includes a first leakage rate corresponding to each of the isolation valves; the second local leakage rate includes a second leakage rate corresponding to each of the isolation valves.
[0024] The acquisition of the first local leakage rate corresponding to the local sealing test at the aforementioned reference pressure and the second local leakage rate corresponding to the local sealing test at the design pressure includes:
[0025] Under the aforementioned design pressure, the target containment vessel was subjected to a sealing test of the aforementioned mechanical penetration isolation valves to obtain the second leakage rate corresponding to each of the aforementioned isolation valves.
[0026] For each isolation valve, a fifth extrapolation coefficient corresponding to the isolation valve is obtained, and a first leakage rate corresponding to the isolation valve is calculated based on the second leakage rate corresponding to the isolation valve and the fifth extrapolation coefficient. The fifth extrapolation coefficient is used to characterize the relationship between the leakage rates of the corresponding isolation valves under different pressures.
[0027] In one embodiment, the calculation of the first liner leakage rate of the steel liner of the target containment vessel at the reference pressure, based on the first overall leakage rate and the first local leakage rate, includes:
[0028] The difference between the first overall leakage rate and the first local leakage rate is calculated.
[0029] The result obtained from the above difference calculation is determined as the first lining leakage rate.
[0030] In one embodiment, the calculation of the second lining leakage rate of the steel lining under the design pressure based on the first lining leakage rate includes:
[0031] Based on the above design pressure, reference pressure, and atmospheric pressure, the second extrapolation coefficient is determined.
[0032] Based on the aforementioned second extrapolation coefficient and the aforementioned first lining leakage rate, the aforementioned second lining leakage rate is determined.
[0033] In one embodiment, the second extrapolation coefficient is determined based on the following method:
[0034] Determine the first ratio between the design pressure and the atmospheric pressure, and perform a logarithmic transformation on the first ratio to obtain the first transformation result;
[0035] Determine a second ratio between the aforementioned reference pressure and the aforementioned atmospheric pressure, and perform a logarithmic transformation on the aforementioned second ratio to obtain a second transformation result;
[0036] The square root of the ratio between the first transformation result and the second transformation result is used to obtain the second extrapolation coefficient.
[0037] Secondly, this application also provides a nuclear power plant containment overall sealing performance testing device, comprising:
[0038] The test module is used to conduct an overall sealing test on the target containment under a reference pressure to obtain the first overall leakage rate; the reference pressure is the non-destructive rated test pressure for the overall sealing test of the containment.
[0039] The local leakage rate acquisition module is used to acquire the first local leakage rate of the target containment under the reference pressure corresponding to the local sealing test, and the second local leakage rate under the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure.
[0040] The lining leakage rate calculation module is used to calculate the first lining leakage rate of the steel lining of the target containment under the reference pressure based on the first overall leakage rate and the first local leakage rate, and to calculate the second lining leakage rate of the steel lining under the design pressure based on the first lining leakage rate.
[0041] The test result determination module is used to determine the overall sealing test results of the target containment under the design pressure based on the second liner leakage rate and the second local leakage rate.
[0042] Thirdly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to perform the following steps:
[0043] An overall sealing test was conducted on the target containment at a reference pressure to obtain the first overall leakage rate; the reference pressure mentioned above is the non-destructive rated test pressure for the overall sealing test of the containment.
[0044] Obtain the first local leakage rate of the target containment at the reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure.
[0045] Based on the first overall leakage rate and the first local leakage rate, the first liner leakage rate of the steel liner of the target containment under the reference pressure is calculated, and based on the first liner leakage rate, the second liner leakage rate of the steel liner under the design pressure is calculated.
[0046] Based on the aforementioned second liner leakage rate and second local leakage rate, the overall sealing performance test results of the target containment vessel under the aforementioned design pressure are determined.
[0047] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, performs the following steps:
[0048] An overall sealing test was conducted on the target containment at a reference pressure to obtain the first overall leakage rate; the reference pressure mentioned above is the non-destructive rated test pressure for the overall sealing test of the containment.
[0049] Obtain the first local leakage rate of the target containment at the reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure.
[0050] Based on the first overall leakage rate and the first local leakage rate, the first liner leakage rate of the steel liner of the target containment under the reference pressure is calculated, and based on the first liner leakage rate, the second liner leakage rate of the steel liner under the design pressure is calculated.
[0051] Based on the aforementioned second liner leakage rate and second local leakage rate, the overall sealing performance test results of the target containment vessel under the aforementioned design pressure are determined.
[0052] Fifthly, this application also provides a computer program product, including a computer program that, when executed by a processor, performs the following steps:
[0053] An overall sealing test was conducted on the target containment at a reference pressure to obtain the first overall leakage rate; the reference pressure mentioned above is the non-destructive rated test pressure for the overall sealing test of the containment.
[0054] Obtain the first local leakage rate of the target containment at the reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure.
[0055] Based on the first overall leakage rate and the first local leakage rate, the first liner leakage rate of the steel liner of the target containment under the reference pressure is calculated, and based on the first liner leakage rate, the second liner leakage rate of the steel liner under the design pressure is calculated.
[0056] Based on the aforementioned second liner leakage rate and second local leakage rate, the overall sealing performance test results of the target containment vessel under the aforementioned design pressure are determined.
[0057] The aforementioned method for testing the overall containment tightness of nuclear power plants involves conducting an overall tightness test at a lower reference pressure that does not damage the containment. Combined with the results of local tightness tests at the reference pressure, the overall leakage rate at the lower pressure is calculated and derived. By using the numerical conversion relationship between the lining leakage rates at high and low pressures and the results of local tightness tests at the design pressure, the overall tightness test results at the higher design pressure are calculated and derived. In other words, the overall tightness test is conducted only at a lower pressure, and the test results at the design pressure are obtained through calculation and derivation. This avoids damage to the containment and potential risks caused by high-pressure test conditions. Furthermore, conducting the test at a lower pressure shortens the test period and saves test costs. Attached Figure Description
[0058] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0059] Figure 1 This is a flowchart illustrating a method for testing the overall containment tightness of a nuclear power plant in one embodiment;
[0060] Figure 2 This is a flowchart illustrating the overall containment tightness test procedure for a nuclear power plant in one embodiment;
[0061] Figure 3 This is a structural block diagram of a nuclear power plant containment integral sealing test apparatus in one embodiment;
[0062] Figure 4 This is an internal structural diagram of a computer device in one embodiment;
[0063] Figure 5 This is a diagram of the internal structure of a computer device in another embodiment. Detailed Implementation
[0064] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0065] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.
[0066] In one embodiment, such as Figure 1 As shown, a method for testing the overall containment tightness of a nuclear power plant is provided. This embodiment illustrates the method using a terminal as an example. It is understood that this method can also be applied to a server, and further to a system including both a terminal and a server, and implemented through interaction between the terminal and the server. In this embodiment, the method includes the following steps:
[0067] Step 102: Conduct an overall sealing test on the target containment vessel under reference pressure to obtain the first overall leakage rate.
[0068] The aforementioned reference pressure is the non-destructive rated test pressure for the overall containment sealing test. That is, conducting the containment sealing test at this reference pressure will not damage the containment. Furthermore, the value of this reference pressure can be set according to requirements during the actual test.
[0069] In some embodiments, the present application pre-configures an overall sealing test procedure and a partial sealing test procedure. Since the sealing test procedure here is the same as that in the conventional technology, it will not be described in detail.
[0070] In this embodiment of the application, after conducting an overall sealing test on the target containment vessel under a reference pressure based on a pre-configured overall sealing test procedure, the aforementioned first overall leakage rate can be obtained.
[0071] Step 104: Obtain the first local leakage rate of the target containment under the reference pressure corresponding to the local sealing test, and the second local leakage rate under the design pressure corresponding to the local sealing test.
[0072] The design pressure mentioned above is higher than the reference pressure.
[0073] In some of these embodiments, the aforementioned design pressure refers to the pressure at which the target containment vessel is located under accident conditions. Typically, the design pressure is set to a high value, but the specific value can be set based on the test requirements.
[0074] In some embodiments, the local leakage rates under different pressures can be converted using coefficients. This application can determine the aforementioned first local leakage rate and second local leakage rate in various ways.
[0075] In one exemplary embodiment, the first local leakage rate and the second local leakage rate can be determined based on the following:
[0076] A partial sealing test was conducted on the target containment vessel under design pressure to obtain the second local leakage rate;
[0077] Obtain the first extrapolation coefficient corresponding to the local sealing test; wherein the first extrapolation coefficient is used to characterize the relationship between local leakage rates under different pressures;
[0078] The first local leakage rate is calculated based on the second local leakage rate and the first extrapolation coefficient.
[0079] Optionally, this application can obtain the local leakage rate (i.e., the second local leakage rate) of the target containment under the design pressure by conducting a local sealing test on the target containment under the design pressure based on a local sealing test procedure, and then calculate and derive the local leakage rate (i.e., the first local leakage rate) of the target containment under the reference pressure based on a first extrapolation coefficient.
[0080] Optionally, the extrapolation coefficient mentioned above is equal to the square root of the ratio of the design pressure difference to the reference pressure difference; by multiplying the leakage rate at the low reference pressure by the corresponding extrapolation coefficient, the equivalent leakage rate at the design pressure can be obtained.
[0081] The above method calculates the local leakage rate at the reference pressure, eliminating the need to conduct a local sealing test again at the reference pressure and avoiding repeated tests at low pressure, thus effectively reducing test costs.
[0082] In another exemplary embodiment, the first local leakage rate and the second local leakage rate described above can be determined based on the following:
[0083] Local sealing tests were conducted on the target containment vessel under reference pressure and design pressure, respectively, to obtain the first local leakage rate and the second local leakage rate.
[0084] Alternatively, this application can also obtain the corresponding local leakage rate by conducting local sealing tests on the target containment under reference pressure and design pressure, based on a local sealing test procedure.
[0085] The above method can ensure the accuracy of the results in determining the local leakage rate.
[0086] In some embodiments, the local sealing test includes a gate sealing test (i.e., a Class B test) and a mechanical penetration isolation valve sealing test (i.e., a Class C test). The Class B test is used to detect the leakage rate of electrical penetrations, personnel gates, and equipment gates, and the test cycle is during the commissioning phase, the first commercial operation, and each major overhaul. The Class C test is used to detect the leakage rate of containment mechanical penetration isolation valves, and the test cycles are 1C, 3C, and 6C (where C is a refueling cycle). In specific implementation, the Class A test is performed only after all Class B and Class C tests have been completed and the sealing performance has been determined to be qualified.
[0087] Optionally, in this embodiment of the application, if the first local leakage rate obtained by the local sealing test meets the requirements under the above-mentioned reference pressure, the overall sealing test described in step 102 is then performed. If it is determined that the first local leakage rate or the second local leakage rate does not meet the requirements, the execution of the above-mentioned overall leakage rate test process needs to be suspended, and the relevant personnel are notified to repair or perform other treatments on the target containment vessel.
[0088] Optionally, in this application, after conducting a gate sealing test on the aforementioned target containment, the leakage rate of personnel gates and equipment gates under the corresponding pressure can be obtained; after conducting a mechanical penetration isolation valve sealing test on the aforementioned target containment, the leakage rate of each isolation valve under the corresponding pressure can be obtained, wherein the isolation valve may include at least one of a butterfly valve, a hard-seal ball valve, a hard-seal gate valve, and a hard-seal gate valve.
[0089] For example, the first local leakage rate includes the first personnel gate leakage rate and the first equipment gate leakage rate corresponding to the gate sealing test, and the first leakage rate of each isolation valve corresponding to the mechanical penetration isolation valve sealing test; the second local leakage rate includes the second personnel gate leakage rate and the second equipment gate leakage rate corresponding to the gate sealing test, and the second leakage rate of each isolation valve corresponding to the mechanical penetration isolation valve sealing test.
[0090] It should be noted that the leakage rates of personnel gates, equipment gates, and various isolation valves mentioned above can each correspond to different extrapolation coefficients. When converting leakage rates under different pressures based on the above method, it is necessary to use their respective extrapolation coefficients.
[0091] For example, the first extrapolation coefficient includes a third extrapolation coefficient corresponding to the personnel gate, a fourth extrapolation coefficient corresponding to the equipment gate, and a fifth extrapolation coefficient corresponding to each isolation valve (it should be noted that the value of the fifth extrapolation coefficient corresponding to each isolation valve is different). The third extrapolation coefficient is used to characterize the relationship between the leakage rates of the personnel gate under different pressures, the fourth extrapolation coefficient is used to characterize the relationship between the leakage rates of the equipment gate under different pressures, and the fifth extrapolation coefficient is used to characterize the relationship between the leakage rates of the corresponding isolation valves under different pressures.
[0092] Step 106: Based on the first overall leakage rate and the first local leakage rate, calculate the first liner leakage rate of the steel liner of the target containment under the reference pressure, and based on the first liner leakage rate, calculate the second liner leakage rate of the steel liner under the design pressure.
[0093] In some embodiments, after determining the overall leakage rate and local leakage rate of the target containment at the reference pressure, this application can calculate the leakage rate of the steel liner of the target containment. Since there is a proportional relationship between the liner leakage rates at different pressures, after obtaining the liner leakage rate at the reference pressure, this application can convert it to the design pressure based on this proportional relationship (i.e., the second extrapolation coefficient). Combined with the local leakage rate at the design pressure, the overall leakage rate at the design pressure can be calculated and derived.
[0094] In one exemplary embodiment, calculating the first liner leakage rate of the steel liner of the target containment vessel at the reference pressure based on the first overall leakage rate and the first local leakage rate includes:
[0095] The difference between the first overall leakage rate and the first local leakage rate is calculated.
[0096] The result obtained from the above difference calculation is determined as the first lining leakage rate.
[0097] Optionally, since the first partial leakage rate already includes the leakage rate of personnel gates, equipment gates, and each isolation valve, the first partial leakage rate can be obtained by subtracting it from the first overall leakage rate to obtain the first lining leakage rate under the reference pressure.
[0098] In one exemplary embodiment, calculating the second lining leakage rate of the steel lining under the design pressure based on the first lining leakage rate includes:
[0099] Based on the above design pressure, reference pressure, and atmospheric pressure, the second extrapolation coefficient is determined.
[0100] Based on the aforementioned second extrapolation coefficient and the aforementioned first lining leakage rate, the aforementioned second lining leakage rate is determined.
[0101] Optionally, in this embodiment of the application, based on historical overall leakage rate data obtained from overall sealing tests of the target containment vessel under different pressures prior to the current overall sealing test, the relationship between the overall leakage rates under different pressures is derived through simulation calculations and other methods to obtain the above-mentioned extrapolation coefficients.
[0102] Optionally, the product of the second extrapolation coefficient and the first lining leakage rate can be used to determine the second lining leakage rate.
[0103] In one exemplary embodiment, the second extrapolation coefficient is determined based on the following:
[0104] Determine the first ratio between the design pressure and the atmospheric pressure, and perform a logarithmic transformation on the first ratio to obtain the first transformation result;
[0105] Determine a second ratio between the aforementioned reference pressure and the aforementioned atmospheric pressure, and perform a logarithmic transformation on the aforementioned second ratio to obtain a second transformation result;
[0106] The square root of the ratio between the first transformation result and the second transformation result is used to obtain the second extrapolation coefficient.
[0107] Optionally, the atmospheric pressure mentioned above refers to the atmospheric pressure of the area where the target containment is located, which is measured in real time; the logarithmic transformation mentioned above is a logarithmic transformation with a constant e as the base; and the square root operation is an arithmetic square root operation.
[0108] Step 108: Based on the second liner leakage rate and the second local leakage rate, determine the overall sealing test results of the target containment under the design pressure.
[0109] Optionally, since the second local leakage rate already includes the leakage rate of personnel gates, equipment gates, and each isolation valve under the design pressure, after deriving the second lining leakage rate under the design pressure, the overall sealing test result under the design pressure, i.e., the overall leakage rate, can be obtained based on the second lining leakage rate and the second local leakage rate.
[0110] In one exemplary embodiment, determining the overall sealing performance test results of the target containment vessel under the design pressure based on the second liner leakage rate and the second local leakage rate includes:
[0111] The above-mentioned second lining leakage rate and the above-mentioned second local leakage rate are summed, and the summation result is determined as the above-mentioned overall sealing test result.
[0112] It should be noted that steps 106 and 108 above in this application are both data derivation and calculation processes, and do not involve actual testing of the target containment vessel.
[0113] In the aforementioned method for testing the overall containment tightness of nuclear power plants, an overall tightness test is conducted at a lower reference pressure that does not damage the containment. The results of a local tightness test at the reference pressure are then used to calculate and derive the overall leakage rate at the lower pressure. By using the numerical conversion relationship between the lining leakage rates at high and low pressures and the results of the local tightness test at the design pressure, the overall tightness test results at the higher design pressure are calculated and derived. In other words, the overall tightness test is conducted only at a lower pressure, and the test results at the design pressure are obtained through calculation and derivation. This avoids damage to the containment and potential risks caused by high-pressure test conditions. Furthermore, conducting the test at a lower pressure shortens the test period and saves on test costs.
[0114] In one exemplary embodiment, such as Figure 2 As shown in the embodiment of this application, a specific process for an exemplary nuclear power plant containment overall sealing test is provided, including:
[0115] Step 201, based on the pre-configured nuclear power plant containment valve sealing test procedure, at the design pressure A Class B test (i.e., gate sealing test) was conducted to measure the leakage rate of the personnel gate. (i.e., leakage rate of the second personnel gate) and leakage rate of the equipment gate. (i.e., leakage rate of the second equipment gate);
[0116] Step 202: Extrapolation coefficient based on personnel gate leakage rate (i.e., the third extrapolation coefficient) and the extrapolation coefficient of the equipment gate. (i.e., the fourth extrapolation coefficient), the reference pressure is calculated respectively. Leakage rate of personnel access gate (i.e., leakage rate of the first personnel gate) and leakage rate of the equipment gate. (i.e., leakage rate of the first equipment gate).
[0117] Specifically, the leakage rate of the first personnel gate is calculated based on the leakage rate of the second personnel gate and the third extrapolation coefficient; the leakage rate of the first equipment gate is calculated based on the leakage rate of the second equipment gate and the fourth extrapolation coefficient, and the calculation method is as follows:
[0118]
[0119] For example, when the reference pressure The design pressure is 0.05 MPa.g (relative pressure). Extrapolation coefficient of personnel gate at 0.42 MPa.a (absolute pressure) The extrapolation coefficient of the equipment gate is 32.04. It is 44.37.
[0120] Step 203: Based on the pre-configured nuclear power plant containment mechanical penetration isolation valve sealing test procedure, at the design pressure A Class C test was conducted to measure the leakage rate of each isolation valve. (i.e., the second leakage rate);
[0121] Step 204: For each isolation valve, based on the extrapolation coefficient corresponding to the isolation valve... The reference pressure is calculated using the fifth extrapolation factor. Leakage rate of the lower isolation valve (i.e., the first leakage rate), calculated as follows:
[0122]
[0123] For example, when the reference pressure The design pressure is 0.05 MPa.g. When the pressure is 0.42 MPa, the extrapolation coefficient of the butterfly valve is 27.02, the extrapolation coefficient of the hard-seal ball valve is 47.90, the extrapolation coefficient of the hard-seal gate valve is 37.26, and the extrapolation coefficient of the hard-seal gate valve is 28.86.
[0124] It should be noted that this application does not restrict the execution order of the steps described in 201-202 and 203-204 above.
[0125] Optionally, after obtaining the corresponding leakage rate in steps 201 and 203, it is necessary to determine whether the leakage rate meets the requirements of the target containment. If it does, the subsequent step 205 can be executed. If it does not meet the requirements, the subsequent step 205 will not be executed. Instead, relevant personnel will be notified to conduct subsequent anomaly checks or maintenance.
[0126] Step 205: Based on the pre-configured nuclear power plant containment performance test procedure, at a reference pressure A Class A test was conducted to measure the overall leakage rate. (i.e., the first overall leakage rate);
[0127] Step 206: At reference pressure Below, using the overall leakage rate Subtract the leakage rate of personnel gates Leakage rate of equipment gates and the leakage rate of each isolation valve , obtain reference pressure Leakage rate of the lower containment steel liner (i.e., the first lining leakage rate), calculated as follows:
[0128]
[0129] Step 207: Based on the extrapolation coefficient of the containment steel liner The design pressure is calculated using the second extrapolation factor. Leakage rate of the lower containment steel liner (i.e., the leakage rate of the second lining), calculated as follows:
[0130]
[0131] Optionally, the extrapolation coefficient of the containment steel liner The calculation method is as follows:
[0132]
[0133] in, The actual atmospheric pressure in the area where the target containment vessel is located.
[0134] Step 208: Design pressure Below, the leakage rate of the containment steel liner will be... Leakage rate of each personnel gate Leakage rate of each equipment gate and the leakage rate of each isolation valve Add them together to get the design pressure. Overall leakage rate (i.e., the second overall leakage rate), calculated as follows:
[0135]
[0136] In this embodiment, by using a combination of theoretical analysis and experimentation, the overall sealing performance test of the nuclear power plant containment is conducted at a lower reference pressure. Combined with the results of the local sealing performance test at a higher design pressure, the overall leakage rate at a higher design pressure can be calculated and derived, thus avoiding the potential risks associated with high-pressure test conditions and reducing the risk of containment damage.
[0137] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.
[0138] Based on the same inventive concept, this application also provides a nuclear power plant containment overall sealing test apparatus for implementing the above-mentioned nuclear power plant containment overall sealing test method. The solution provided by this apparatus is similar to the solution described in the above-described method. Therefore, the specific limitations of one or more embodiments of the nuclear power plant containment overall sealing test apparatus provided below can be found in the limitations of the nuclear power plant containment overall sealing test method described above, and will not be repeated here.
[0139] In one exemplary embodiment, such as Figure 3 As shown, a nuclear power plant containment overall sealing performance testing device is provided, comprising: a testing module 302, a local leakage rate acquisition module 304, an inner lining leakage rate calculation module 306, and a test result determination module 308, wherein:
[0140] Test module 302 is used to conduct an overall sealing test on the target containment under a reference pressure to obtain a first overall leakage rate; the reference pressure is the non-destructive rated test pressure for the overall sealing test of the containment.
[0141] The local leakage rate acquisition module 304 is used to acquire the first local leakage rate of the target containment under the reference pressure corresponding to the local sealing test, and the second local leakage rate under the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure;
[0142] The lining leakage rate calculation module 306 is used to calculate the first lining leakage rate of the steel lining of the target containment under the reference pressure based on the first overall leakage rate and the first local leakage rate, and to calculate the second lining leakage rate of the steel lining under the design pressure based on the first lining leakage rate.
[0143] The test result determination module 308 is used to determine the overall sealing test results of the target containment vessel under the design pressure based on the second liner leakage rate and the second local leakage rate.
[0144] In one embodiment, the aforementioned local leakage rate acquisition module 304 is specifically used for:
[0145] A partial sealing test is conducted on the target containment vessel under the aforementioned design pressure to obtain a second local leakage rate; a first extrapolation coefficient corresponding to the aforementioned partial sealing test is obtained; the aforementioned first extrapolation coefficient is used to characterize the relationship between local leakage rates under different pressures; based on the aforementioned second local leakage rate and the aforementioned first extrapolation coefficient, the aforementioned first local leakage rate is calculated.
[0146] In one embodiment, the aforementioned local leakage rate acquisition module 304 is specifically used for:
[0147] Local sealing tests were conducted on the target containment vessel under the aforementioned reference pressure and design pressure, respectively, to obtain the first local leakage rate and the second local leakage rate.
[0148] In one embodiment, the aforementioned local sealing test includes a gate sealing test and a mechanical penetration isolation valve sealing test; the aforementioned first local leakage rate includes the personnel gate leakage rate and equipment gate leakage rate corresponding to the aforementioned gate sealing test, and the leakage rate of each isolation valve corresponding to the aforementioned mechanical penetration isolation valve sealing test; the aforementioned isolation valve includes at least one of a butterfly valve, a hard-seal ball valve, a hard-seal gate valve, and a hard-seal gate valve.
[0149] In one embodiment, the first local leakage rate includes the first personnel gate leakage rate and the first equipment gate leakage rate, and the second local leakage rate includes the second personnel gate leakage rate and the second equipment gate leakage rate; the local leakage rate acquisition module 304 is specifically used for:
[0150] Under the aforementioned design pressure, the target containment vessel was subjected to the aforementioned gate sealing test to obtain the aforementioned second personnel gate leakage rate and the aforementioned second equipment gate leakage rate; a third extrapolation coefficient corresponding to the personnel gate and a fourth extrapolation coefficient corresponding to the equipment gate were obtained; the aforementioned third extrapolation coefficient was used to characterize the relationship between the personnel gate leakage rates under different pressures, and the aforementioned fourth extrapolation coefficient was used to characterize the relationship between the equipment gate leakage rates under different pressures; based on the aforementioned second personnel gate leakage rate and the aforementioned third extrapolation coefficient, the aforementioned first personnel gate leakage rate was calculated; based on the aforementioned second equipment gate leakage rate and the aforementioned fourth extrapolation coefficient, the aforementioned first equipment gate leakage rate was calculated.
[0151] In one embodiment, the first local leakage rate includes the first leakage rate corresponding to each of the isolation valves; the local leakage rate acquisition module 304 is specifically used for:
[0152] Under the aforementioned design pressure, the target containment vessel is subjected to a sealing test of the aforementioned mechanical penetration isolation valves to obtain the second leakage rate corresponding to each isolation valve. For each isolation valve, a fifth extrapolation coefficient corresponding to the isolation valve is obtained, and based on the second leakage rate corresponding to the isolation valve and the fifth extrapolation coefficient, the first leakage rate corresponding to the isolation valve is calculated. The fifth extrapolation coefficient is used to characterize the relationship between the leakage rates of the corresponding isolation valves under different pressures.
[0153] In one embodiment, the aforementioned lining leakage rate calculation module 306 is specifically used for:
[0154] The difference between the first overall leakage rate and the first local leakage rate is calculated; the result of the above difference calculation is determined as the first lining leakage rate.
[0155] In one embodiment, the aforementioned lining leakage rate calculation module 306 is specifically used for:
[0156] Based on the aforementioned design pressure, reference pressure, and atmospheric pressure, a second extrapolation coefficient is determined; based on the aforementioned second extrapolation coefficient and the aforementioned first lining leakage rate, the aforementioned second lining leakage rate is determined.
[0157] In one embodiment, the second extrapolation coefficient is determined based on the following method:
[0158] A first ratio between the design pressure and the atmospheric pressure is determined, and a logarithmic transformation is performed on the first ratio to obtain a first transformation result; a second ratio between the reference pressure and the atmospheric pressure is determined, and a logarithmic transformation is performed on the second ratio to obtain a second transformation result; the square root operation is performed on the ratio between the first transformation result and the second transformation result to obtain the second extrapolation coefficient.
[0159] In one embodiment, the above-mentioned test result determination module 308 is specifically used for:
[0160] The above-mentioned second lining leakage rate and the above-mentioned second local leakage rate are summed, and the summation result is determined as the above-mentioned overall sealing test result.
[0161] Each module in the aforementioned nuclear power plant containment overall sealing test device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the computer device's memory as software, so that the processor can call and execute the corresponding operations of each module.
[0162] In one exemplary embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be as follows: Figure 4 As shown, the computer device includes a processor, memory, input / output (I / O) interfaces, and a communication interface. The processor, memory, and I / O interfaces are connected via a system bus, and the communication interface is also connected to the system bus via the I / O interfaces. The processor provides computational and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides the environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The database stores data from nuclear power plant containment vessel tightness tests. The I / O interfaces are used for information exchange between the processor and external devices. The communication interface is used for communication with external terminals via a network connection. When the computer program is executed by the processor, it implements a method for nuclear power plant containment vessel tightness tests.
[0163] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 5 As shown, the computer device includes a processor, memory, input / output interfaces, a communication interface, a display unit, and an input device. The processor, memory, and input / output interfaces are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interfaces. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The input / output interfaces are used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When the computer program is executed by the processor, it implements a method for testing the overall containment tightness of a nuclear power plant. The display unit is used to form a visually visible image and can be a display screen, a projection device, or a virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.
[0164] Those skilled in the art will understand that Figure 4 and 5 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.
[0165] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program that, when executed by the processor, implements the steps in the above-described method embodiments.
[0166] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon that, when executed by a processor, implements the steps in the above method embodiments.
[0167] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the above method embodiments.
[0168] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of the relevant data must comply with relevant regulations.
[0169] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.
[0170] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0171] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.
Claims
1. A method for testing the overall sealing performance of a nuclear power plant containment vessel, characterized in that, The method includes: An overall sealing test is conducted on the target containment at a reference pressure to obtain the first overall leakage rate; the reference pressure is the non-destructive rated test pressure for the overall sealing test of the containment. Obtain the first local leakage rate of the target containment vessel at the reference pressure corresponding to the local sealing test, and the second local leakage rate at the design pressure corresponding to the local sealing test; the design pressure is higher than the reference pressure; Based on the first overall leakage rate and the first local leakage rate, calculate the first liner leakage rate of the steel liner of the target containment under the reference pressure, and based on the first liner leakage rate, calculate the second liner leakage rate of the steel liner under the design pressure. Based on the second liner leakage rate and the second local leakage rate, the overall sealing test results of the target containment vessel under the design pressure are determined.
2. The method according to claim 1, characterized in that, The step of obtaining the first local leakage rate of the target containment vessel corresponding to the local sealing test at the reference pressure, and the second local leakage rate corresponding to the local sealing test at the design pressure, includes: A partial sealing test was conducted on the target containment vessel under the design pressure to obtain the second local leakage rate; Obtain a first extrapolation coefficient corresponding to the local sealing test; the first extrapolation coefficient is used to characterize the relationship between local leakage rates under different pressures. The first local leakage rate is calculated based on the second local leakage rate and the first extrapolation coefficient.
3. The method according to claim 1, characterized in that, The step of obtaining the first local leakage rate of the target containment vessel corresponding to the local sealing test at the reference pressure, and the second local leakage rate corresponding to the local sealing test at the design pressure, includes: Local sealing tests were conducted on the target containment vessel under the reference pressure and the design pressure, respectively, to obtain the first local leakage rate and the second local leakage rate.
4. The method according to any one of claims 1 to 3, characterized in that, The local sealing test includes a gate sealing test and a mechanical penetration isolation valve sealing test; the first local leakage rate includes the personnel gate leakage rate and equipment gate leakage rate corresponding to the gate sealing test, and the leakage rate of each isolation valve corresponding to the mechanical penetration isolation valve sealing test; the isolation valve includes at least one of a butterfly valve, a hard-seal ball valve, a hard-seal gate valve, and a hard-seal gate valve.
5. The method according to claim 4, characterized in that, The first local leakage rate includes the first personnel gate leakage rate and the first equipment gate leakage rate; the second local leakage rate includes the second personnel gate leakage rate and the second equipment gate leakage rate. The step of obtaining the first local leakage rate of the target containment vessel corresponding to the local sealing test at the reference pressure, and the second local leakage rate corresponding to the local sealing test at the design pressure, includes: The gate sealing test was conducted on the target containment under the design pressure to obtain the leakage rate of the second personnel gate and the leakage rate of the second equipment gate. Obtain the third extrapolation coefficient corresponding to the personnel gate and the fourth extrapolation coefficient corresponding to the equipment gate; the third extrapolation coefficient is used to characterize the relationship between the leakage rates of the personnel gate under different pressures, and the fourth extrapolation coefficient is used to characterize the relationship between the leakage rates of the equipment gate under different pressures. The leakage rate of the first personnel gate is calculated based on the leakage rate of the second personnel gate and the third extrapolation coefficient. The leakage rate of the first equipment gate is calculated based on the leakage rate of the second equipment gate and the fourth extrapolation coefficient.
6. The method according to claim 4, characterized in that, The first local leakage rate includes a first leakage rate corresponding to each of the isolation valves; the second local leakage rate includes a second leakage rate corresponding to each of the isolation valves. The step of obtaining the first local leakage rate of the target containment vessel corresponding to the local sealing test at the reference pressure, and the second local leakage rate corresponding to the local sealing test at the design pressure, includes: Under the design pressure, a sealing test of the mechanical penetration isolation valves was conducted on the target containment to obtain a second leakage rate corresponding to each isolation valve. For each isolation valve, a fifth extrapolation coefficient corresponding to the isolation valve is obtained, and a first leakage rate corresponding to the isolation valve is calculated based on the second leakage rate corresponding to the isolation valve and the fifth extrapolation coefficient; the fifth extrapolation coefficient is used to characterize the relationship between the leakage rates of the corresponding isolation valves under different pressures.
7. The method according to claim 1, characterized in that, The calculation of the first liner leakage rate of the steel liner of the target containment vessel under the reference pressure, based on the first overall leakage rate and the first local leakage rate, includes: Calculate the difference between the first overall leakage rate and the first local leakage rate; The result obtained by calculating the difference is determined as the first lining leakage rate.
8. The method according to claim 1, characterized in that, The calculation of the second lining leakage rate of the steel lining under the design pressure based on the first lining leakage rate includes: Based on the design pressure, reference pressure, and atmospheric pressure, determine the second extrapolation coefficient; The second lining leakage rate is determined based on the second extrapolation coefficient and the first lining leakage rate.
9. The method according to claim 8, characterized in that, The second extrapolation coefficient is determined in the following manner: Determine a first ratio between the design pressure and the atmospheric pressure, and perform a logarithmic transformation on the first ratio to obtain a first transformation result; A second ratio between the reference pressure and the atmospheric pressure is determined, and a logarithmic transformation is performed on the second ratio to obtain a second transformation result; The second extrapolation coefficient is obtained by taking the square root of the ratio between the first transformation result and the second transformation result.
10. The method according to claim 1, characterized in that, The determination of the overall sealing performance test results of the target containment vessel under the design pressure based on the second liner leakage rate and the second local leakage rate includes: The second lining leakage rate and the second local leakage rate are summed, and the summation result is determined as the overall sealing test result.