An Automated Process Management Method and System for Intelligent Manufacturing Equipment

By calculating and correcting the deviation in operating time of intelligent manufacturing equipment, and combining it with equipment status adjustment process management, the impact of changes in equipment operating status on process management is resolved, achieving more efficient task collaboration and adaptive adjustment of equipment status.

CN123113731APending Publication Date: 2026-11-17JIANGSU AODU INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611275843.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional automated process management methods for intelligent manufacturing equipment struggle to reflect changes in equipment operating status and the coordination between upstream and downstream collaborative scheduling when equipment is continuously involved in production for extended periods. This results in equipment operating time deviating from normal levels, impacting the linkage and adaptability of process management.

Method used

By acquiring the actual and standard operating times of the equipment, the task operating time deviation sequence is calculated, the excessive operating time deviation values ​​are screened, and the sequence is clustered into local operating time degradation sequences. The operating time deviation trend curve is corrected by combining the spindle vibration frequency and motor stator temperature. The single-cycle operating time decay rate is calculated, the tolerance time of the guide car and the quality inspection station is determined, and the linkage scheduling parameters of the equipment are adjusted.

Benefits of technology

It enables timely adjustment of the timing relationship between task placement, material feeding, and quality inspection when the equipment operating status changes, reducing the impact of equipment time deviation on upstream and downstream collaborative processes and improving the linkage and scheduling adaptability of automated process management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123113731A_ABST
    Figure CN123113731A_ABST
Patent Text Reader

Abstract

This invention relates to the field of process management technology, specifically to an automated process management method and system for intelligent manufacturing equipment. The invention transforms historical deviations in equipment operating time into trend information that can be used for scheduling decisions. This trend is then corrected by considering the current equipment degradation status, enabling process management to reflect changes in the current operating capacity of the equipment, rather than solely relying on fixed process nodes. Therefore, when a cumulative time deviation is predicted for subsequent tasks, the upstream material feeding margin and downstream quality inspection continuation margin can be simultaneously measured. Based on this, the time relationships between task placement, work scheduling, guided vehicle material feeding, and quality inspection continuation can be adjusted, thereby reducing the transmission impact of equipment time degradation on upstream and downstream collaborative processes and improving the linkage and scheduling adaptability of automated process management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of process management technology, and in particular to an automated process management method and system for intelligent manufacturing equipment. Background Technology

[0002] The automated process management method for intelligent manufacturing equipment refers to the method of managing the process execution process and equipment collaboration process formed when intelligent manufacturing equipment participates in production operations. First, it is necessary to clarify the process links that the equipment needs to go through in different operation stages. Then, based on the task source, equipment status and process requirements, the flow logic of the process is determined. Finally, with the help of process modeling, equipment communication, data acquisition and business rule configuration, the method manages the initiation, flow, recording and maintenance of the relevant processes of the equipment.

[0003] Traditional automated process management methods for intelligent manufacturing equipment, while capable of managing the initiation, flow, recording, and maintenance of equipment-related processes, suffer from limitations. When equipment operates continuously for extended periods, and upstream material feeding and downstream quality inspection require synchronized coordination, process adjustments often rely on predetermined task rules. This makes it difficult to promptly reflect the scheduling impact caused by equipment operating time gradually deviating from normal operating conditions, resulting in a loose connection between equipment operating status changes and upstream / downstream collaborative scheduling. Furthermore, when equipment already exhibits a trend of deteriorating operating time, continuing to assign tasks and schedule material feeding and quality inspection according to the original process rhythm can easily cause localized equipment time deviations to gradually propagate to collaborative links such as guide vehicle waiting and delayed quality inspection follow-ups. This results in a difficulty in adjusting process management results in response to equipment degradation. Summary of the Invention

[0004] The purpose of this invention is to address the shortcomings of existing technologies by proposing an automated process management method and system for intelligent manufacturing equipment.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: an automated process management method for intelligent manufacturing equipment, comprising the following steps: Obtain the actual operating time and standard operating time of the equipment within each historical task cycle, and calculate the task operating time deviation sequence; Filter the out-of-limit running time deviation values ​​in the task running time deviation sequence, cluster the out-of-limit running time deviation values ​​into multiple local running time degradation sequences, and fit the running time deviation continuous change trend curve with reference to each local running time degradation sequence; The spindle vibration frequency and motor stator temperature of the working equipment in the current task operation cycle are obtained and compared with the preset attenuation feature library. The operation time deviation trend curve is corrected according to the comparison results. The single cycle operation time attenuation rate is calculated according to the corrected operation time deviation trend curve. The system acquires the operating status parameters of the guide vehicle and the operation status parameters of the quality inspection station within the current task cycle. Based on the operating status parameters of the guide vehicle, it calculates the arrival tolerance time of the guide vehicle and the quality inspection station's continuity tolerance time. Based on the single-cycle operation time decay rate, it determines the predicted cumulative operation time offset. The guide vehicle is an upstream associated device that supplies materials to the operating equipment, and the quality inspection station is a downstream associated device that receives materials from the operating equipment. Based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, the scheduling parameters for the linkage of the work equipment are determined, and the process management results are obtained.

[0006] A further aspect of the present invention includes obtaining the actual operating time and standard operating time of the equipment within each historical task operation cycle, and calculating the task operation time deviation sequence, which includes: Obtain the start time and end time of the operation of the working equipment for each historical task cycle within the current monitoring window, calculate the difference between the end time and the start time of the operation of the working equipment, and obtain the actual operation time of the working equipment. The system obtains the work type label, operation mode instruction, load material weight, and joint torque value of the work equipment. Based on the load material weight and joint torque value, the work load level is determined. The work type label, operation mode instruction, and work load level are combined as the running time query index. The running time query index is compared with the benchmark index item in the preset standard running time database. The system retrieves the standard running time of the work equipment corresponding to the benchmark index item with the same characters as the running time query index from the preset standard running time database. Obtain the actual running time of the operating equipment and the standard running time of the operating equipment for each historical task running cycle, calculate the difference between the actual running time and the standard running time of each operating equipment to obtain the task running time deviation value, arrange the task running time deviation values ​​in chronological order, and generate the task running time deviation sequence.

[0007] A further aspect of the present invention includes: filtering out the excessive running time deviation values ​​in the task running time deviation sequence; clustering the excessive running time deviation values ​​into multiple local running time degradation sequences; and fitting a running time deviation continuous change trend curve with reference to each local running time degradation sequence, including: Obtain the task execution time deviation value of each group of adjacent task execution time deviation values ​​in the task execution time deviation sequence, calculate the difference between each group of adjacent task execution time deviation values ​​to obtain the change in adjacent execution deviation, obtain the task acquisition time interval, calculate the ratio of each adjacent execution deviation change to the task acquisition time interval to obtain the local execution time change rate, filter the task execution time deviation values ​​in the task execution time deviation sequence whose local execution time change rate is greater than the preset execution time change rate threshold to obtain the over-limit execution time deviation value, obtain the time arrangement order of each over-limit execution time deviation value in the task execution time deviation sequence, cluster and segment the over-limit execution time deviation values ​​with continuous time arrangement order, and remove the over-limit execution time deviation values ​​with discontinuous time arrangement order to establish multiple local execution time degradation sequences; Obtain the end-of-run time deviation value and the beginning-of-run time deviation value of each of the local run time degradation sequences, calculate the difference between the end-of-run time deviation value and the beginning-of-run time deviation value to obtain the change in the run time deviation of the sequence, obtain the continuous run time of the local run time degradation sequence, calculate the ratio of the change in the run time deviation of each sequence to the continuous run time to obtain the local run time degradation rate, filter the preset run time degradation rate interval into which each local run time degradation rate falls, and obtain the run time degradation mode set according to the run time degradation rate interval; Based on the aforementioned operation time degradation mode, the fitting order and fitting constraints of the corresponding local operation time degradation sequence are determined. Polynomial fitting is performed on the excess operation time deviation value in each local operation time degradation sequence to generate multiple local fitting curves. The difference between the fitted value of each local fitting curve and the corresponding excess operation time deviation value is calculated to obtain the occasional operation time fluctuation parameter. Each local fitting curve is spliced ​​together and the occasional operation time fluctuation parameter is removed to construct the continuous change trend curve of operation time deviation.

[0008] A further aspect of the present invention includes obtaining the spindle vibration frequency and motor stator temperature of the operating equipment during the current task cycle and comparing them with a preset attenuation feature library; correcting the continuous change trend curve of the running time deviation based on the comparison result; and calculating the single-cycle running time attenuation rate based on the corrected continuous change trend curve of the running time deviation, which includes: The system acquires the spindle vibration frequency and motor stator temperature of the working equipment during the current task cycle. It also acquires multiple standard attenuation parameter groups from a preset attenuation feature library, as well as the standard spindle vibration frequency and standard motor stator temperature contained in each standard attenuation parameter group. The system calculates the absolute difference between the spindle vibration frequency and each standard spindle vibration frequency to obtain the frequency deviation. The system calculates the absolute difference between the motor stator temperature and each standard motor stator temperature to obtain the temperature deviation. The system calculates the ratio of each frequency deviation to the corresponding standard spindle vibration frequency to obtain the frequency deviation rate. The system calculates the ratio of each temperature deviation to the corresponding standard motor stator temperature to obtain the temperature deviation rate. The system calculates the sum of the frequency deviation rate and temperature deviation rate corresponding to the same standard attenuation parameter group, which is used as the attenuation distance obtained by comparing the spindle vibration frequency and motor stator temperature with the preset attenuation feature library. Finally, the system acquires the physical attenuation type of the working equipment corresponding to the minimum attenuation distance. The system acquires the load reduction operation marker and the ambient temperature change indication of the operating equipment in the current task operation cycle. Based on the physical attenuation type of the operating equipment, the load reduction operation marker and the ambient temperature change indication, the system corrects the continuous change trend curve of the operation time deviation and generates the corrected continuous change trend curve of the operation time deviation. Obtain the current system time, extract the tangent slope of the trend curve of the corrected running time deviation at the current system time, and obtain the single-cycle running time decay rate.

[0009] A further aspect of the present invention includes obtaining the guide car's operating status parameters and the quality inspection station's operational status parameters within the current task's operating cycle; calculating the guide car's arrival tolerance time based on the guide car's operating status parameters; calculating the quality inspection station's continuity tolerance time based on the quality inspection station's operational status parameters; and determining the predicted cumulative operating time offset based on the single-cycle operating time decay rate. The system acquires the operating status parameters of the guide vehicle and the operation status parameters of the quality inspection station within the current task cycle. The guide vehicle operating status parameters include the remaining time of the guide vehicle task, the time of the guide vehicle battery replenishment, and the time of the guide vehicle's baseline arrival at the station. The quality inspection station operation status parameters include the available time of the quality inspection station, the number of workpieces in the queue waiting for inspection at the quality inspection station, and the reserved time for maintenance at the quality inspection station. The system reads the real-time road conditions, the length of the road segment, and the vehicle speed in the workshop during the current task cycle. It calculates the sum of the guide vehicle's baseline arrival at the station, the remaining time of the guide vehicle task, and the time of the guide vehicle battery replenishment to obtain the latest allowed arrival time of the guide vehicle. It calculates the ratio of the real-time road segment length to the real-time vehicle speed to obtain the estimated travel time of the guide vehicle. It calculates the difference between the latest allowed arrival time of the guide vehicle and the estimated travel time of the guide vehicle to obtain the guide vehicle's arrival tolerance time. Obtain the standard time for single-piece quality inspection, calculate the product of the number of workpieces in the queue to be inspected at the quality inspection station and the standard time for single-piece quality inspection, and obtain the estimated queuing time for quality inspection. Obtain the maximum allowable delay time for production orders, calculate the sum of the available idle time of the quality inspection station and the maximum allowable delay time for production orders, and subtract the maintenance reserved time of the quality inspection station to obtain the latest allowable continuation time for quality inspection. Calculate the difference between the latest allowable continuation time for quality inspection and the estimated queuing time for quality inspection to obtain the quality inspection continuation tolerance time. The number of remaining task operation cycles of the operating equipment is obtained, and the product of the single cycle operation time decay rate and the number of remaining task operation cycles of the operating equipment is calculated to obtain the predicted cumulative operation time offset.

[0010] A further aspect of the present invention, wherein determining the operation equipment linkage scheduling parameters based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, and obtaining the process management results includes: The difference between the arrival tolerance time of the guide vehicle and the predicted cumulative running time offset is calculated to obtain the guide vehicle running time offset margin. The difference between the quality inspection continuity tolerance time and the predicted cumulative running time offset is calculated to obtain the quality inspection running time offset margin. When the guide vehicle running time offset margin or the quality inspection running time offset margin is greater than or equal to a preset margin threshold, the corresponding guide vehicle or quality inspection station is determined to be in normal status. When the guide vehicle running time offset margin or the quality inspection running time offset margin is less than the preset margin threshold, the corresponding guide vehicle and quality inspection station are extracted as abnormal operation nodes. The system obtains the planned operating time of the operating equipment, the task deployment density of the operating equipment, and the scheduling base time of the operating equipment. It also obtains the guide car delivery time and downstream quality inspection continuation time corresponding to the abnormal operation node. The system calculates the product of the planned operating time of the operating equipment and the single-cycle operating time attenuation rate to obtain the operating time extension compensation. The system calculates the sum of the planned operating time of the operating equipment and the operating time extension compensation to obtain the updated task operating time. The system calculates the product of the task deployment density of the operating equipment and the single-cycle operating time attenuation rate to obtain the density reduction. The system calculates the difference between the task deployment density of the operating equipment and the density reduction to obtain the updated task deployment density. The system calculates the sum of the scheduling base time of the operating equipment and the predicted cumulative operating time offset to obtain the updated scheduling base time. The system calculates the sum of the guide car delivery time and the predicted cumulative operating time offset to obtain the updated guide car delivery time. The system calculates the sum of the downstream quality inspection continuation time and the predicted cumulative operating time offset to obtain the updated downstream quality inspection continuation time. By combining the updated task execution time, the updated task deployment density, the updated scheduling baseline time, the updated guide car feeding time, and the updated downstream quality inspection continuation time, the operation equipment linkage scheduling parameters are obtained. The operation equipment linkage scheduling parameters are used as the process management result to execute task allocation, guide car scheduling, and quality inspection station scheduling of intelligent manufacturing equipment in the automated process management process.

[0011] An automated process management system for intelligent manufacturing equipment, the system comprising: The time consumption deviation calculation module obtains the actual running time and standard running time of the operating equipment within each historical task running cycle, and calculates the task running time consumption deviation sequence. The time consumption degradation fitting module filters out the excessive time consumption deviation values ​​in the task operation time consumption deviation sequence, clusters and divides the excessive time consumption deviation values ​​into multiple local time consumption degradation sequences, and fits the continuous change trend curve of the operation time consumption deviation with reference to each local time consumption degradation sequence. The attenuation curve correction module obtains the spindle vibration frequency and motor stator temperature of the working equipment in the current task operation cycle and compares them with the preset attenuation feature library. Based on the comparison results, it corrects the continuous change trend curve of the running time deviation and calculates the single-cycle running time attenuation rate based on the corrected continuous change trend curve of the running time deviation. The tolerance time calculation module acquires the guide car's operating status parameters and the quality inspection station's operating status parameters within the current task cycle. It calculates the guide car's arrival tolerance time based on the guide car's operating status parameters, calculates the quality inspection station's continuity tolerance time based on the quality inspection station's operating status parameters, and determines the predicted cumulative operating time offset based on the single-cycle operating time decay rate. The guide car is an upstream associated device that supplies materials to the operating equipment, and the quality inspection station is a downstream associated device that receives materials from the operating equipment. The linkage scheduling determination module determines the linkage scheduling parameters of the work equipment based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, and obtains the process management results.

[0012] Compared with the prior art, the advantages and positive effects of the present invention are as follows: This invention transforms historical deviations in equipment operating time into trend information that can be used for scheduling decisions. It then corrects this trend by incorporating the current equipment degradation status, enabling process management to reflect changes in the current operating capacity of the equipment, rather than relying solely on fixed process nodes. Therefore, when a cumulative time deviation is predicted for subsequent tasks, the invention can simultaneously measure upstream material feeding margins and downstream quality inspection margins, adjusting the time relationships between task assignment, work scheduling, guided vehicle material feeding, and quality inspection continuation accordingly. This reduces the impact of equipment time degradation on upstream and downstream collaborative processes, enhancing the linkage and scheduling adaptability of automated process management. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the steps of the method of the present invention; Figure 2 This is a flowchart illustrating the steps and principles of the method of the present invention. Figure 3 This is a block diagram of the system of the present invention. Detailed Implementation

[0014] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0015] Please see Figure 1-2 This invention provides a technical solution, an automated process management method for intelligent manufacturing equipment, comprising the following steps: S1: Obtain the actual operating time and standard operating time of the equipment within each historical task cycle, and calculate the task operating time deviation sequence, including: Obtain the start time and end time of the operation of the working equipment for each historical task cycle within the current monitoring window, calculate the difference between the end time and the start time of the operation of the working equipment, and obtain the actual operation time of the working equipment. The term "operating equipment" refers to intelligent manufacturing equipment that performs processing, assembly, or handling actions. The "historical task operation cycle" refers to the time range from the start to the end of the same task. The "current monitoring window" refers to several historical task operation cycles selected consecutively according to the task acquisition time. The operating equipment controller records the start time of the operating equipment when the task start signal is generated and the end time of the operating equipment when the task end feedback is generated. Both the start and end times of the operating equipment are in year-month-day-hour-minute-second-millisecond format. Then, the start and end times of the operating equipment are mapped according to the task number, operating equipment number, and historical task operation cycle number. The time format is converted to a second-level timestamp for use in time consumption calculation, while the original year-month-day-hour-minute-second-millisecond format is retained. The actual operating time of the operating equipment is calculated as: Operating equipment end time - Operating equipment start time = Actual operating time of the operating equipment.

[0016] The system acquires the work type label, operation mode command, load material weight, and joint torque value of the operating equipment. Based on the load material weight and joint torque value, it determines the work load level. The work type label, operation mode command, and work load level are combined as a runtime query index. This index is compared to the baseline index item in the preset standard runtime database. The system retrieves the standard runtime of the operating equipment corresponding to the baseline index item with matching characters from the preset standard runtime database. The standard runtime of the operating equipment in the preset standard runtime database is pre-set based on the baseline operating status of the operating equipment under different work types, operation modes, and work load levels. The work load level is determined by the load material weight and joint torque value. The standard runtime can be obtained by collecting historical runtime data when the operating equipment performs the same work type, operation mode, and work load level task under normal operating conditions, and combining this with the equipment's production cycle time or standard operating condition runtime calibration. This ensures that each set of work type label, operation mode command, and work load level corresponds to a baseline index item and its standard runtime. The job type label refers to the field in the task record that identifies the processing, assembly, or handling content; the operation mode instruction refers to the operating mode field issued by the work equipment controller; the load material weight refers to the material weight collected by the weighing sensor; and the joint torque value refers to the torque value fed back by the joint actuator. Load material weight is recorded in kilograms, and joint torque value is recorded in Newton-meters, both arranged according to the collection time within the current historical task operation cycle. A collection interval where the difference between adjacent collection points in five consecutive collection points does not exceed 5% of the rated range is considered a stable collection interval for load material weight and joint torque value. The median load material weight and median joint torque value within the stable collection interval are used to determine the job load level. The job load level is set from job load level records already registered in the preset standard time consumption database. Each job load level record corresponds to a load material weight range and a joint torque value range. When the load material weight falls within the load material weight range corresponding to a certain job load level record, and the joint torque value falls within the joint torque value range corresponding to the same job load level record, the name of that job load level record is used as the job load level. The operation time query index consists of the job type label, The operation mode command and workload level are concatenated in the following order: operation type label first, operation mode command in the middle, and workload level last. The concatenated characters are consistent with the character format of the baseline index item in the preset standard time consumption database. The preset standard time consumption database is set by the historical operation records of the operating equipment under the baseline operating state. The baseline operating state refers to the operating state with no fault-free shutdown mark, the weight of the load material within the rated range, and the joint torque value within the rated range. The historical operating time under the same operation type label, the same operation mode command, and the same workload level is arranged in ascending order of value. The median of the historical operating time is taken and then checked for consistency with the equipment production cycle time or standard operating time. If the absolute value of the difference between the two does not exceed 5% of the equipment production cycle time or standard operating time, the median of the historical operating time is written into the corresponding benchmark index item. If the absolute value of the difference between the two exceeds 5% of the equipment production cycle time or standard operating time, the equipment production cycle time or standard operating time is written into the corresponding benchmark index item. The operating time query index is compared character by character with the benchmark index item in the preset standard operating time database. The benchmark index item with consistent characters is associated with the time converted into a second-level value and used in subsequent calculations to obtain the standard operating time of the operating equipment.

[0017] Obtain the actual running time and standard running time of the equipment for each historical task running cycle, calculate the difference between the actual running time and the standard running time of each equipment to obtain the task running time deviation value, arrange the task running time deviation values ​​in chronological order, and generate the task running time deviation sequence. The actual running time and standard running time of the equipment are correlated according to the same historical task running cycle, the same equipment, and the same running time query index. The actual running time of the equipment comes from the time difference between the start and end times of the equipment operation, while the standard running time comes from the benchmark index item in the preset standard running time database. Then, the second-level conversion values ​​of the two times are read and the time deviation is formed. The actual running time of the equipment - the standard running time of the equipment = the task running time deviation value. The task running time deviation value corresponding to each historical task running cycle is arranged from earliest to latest according to the task collection time. If the task collection time is the same, it is arranged according to the order of task number generation, thus generating a task running time deviation sequence.

[0018] S2: Filter the excessive runtime deviation values ​​in the task runtime deviation sequence, cluster the excessive runtime deviation values ​​into multiple local runtime degradation sequences, and fit a continuous change trend curve of runtime deviation based on each local runtime degradation sequence, including: Obtain the task execution time deviation value of each group of adjacent task execution time deviation values ​​in the task execution time deviation sequence, calculate the difference between each group of adjacent task execution time deviation values ​​to obtain the change in adjacent execution deviation, obtain the task acquisition time interval, calculate the ratio of each adjacent execution deviation change to the task acquisition time interval to obtain the local execution time change rate, filter the task execution time deviation values ​​in the task execution time deviation sequence whose local execution time change rate is greater than the preset execution time change rate threshold to obtain the over-limit execution time deviation value, obtain the time arrangement order of each over-limit execution time deviation value in the task execution time deviation sequence, cluster and segment the over-limit execution time deviation values ​​with continuous time arrangement, and remove the over-limit execution time deviation values ​​with discontinuous time arrangement to establish multiple local execution time degradation sequences; In the task execution time deviation sequence, adjacent task execution time deviation values ​​are paired according to time order, with the previous task execution time deviation value and the next task execution time deviation value forming a set of deviation data pairs; the difference between the next task execution time deviation value and the previous task execution time deviation value equals the change in adjacent execution deviation; the difference between the next task acquisition time and the previous task acquisition time equals the task acquisition time interval; and the difference between the adjacent execution deviation and the task acquisition time interval equals the local execution time change rate. The preset execution time change rate threshold is set by the baseline execution records under the same job type label, the same operation mode instruction, and the same job load level in the current monitoring window. First, the historical local execution time change rate in the baseline execution records is calculated one by one, and then sorted by value from smallest to largest. The historical local operation time change rate at the 95th percentile position is written into the preset operation time change rate threshold. When the local operation time change rate is greater than the preset operation time change rate threshold, the operation time deviation value of the next task is regarded as the over-limit operation time deviation value. When the local operation time change rate is equal to or less than the preset operation time change rate threshold, the operation time deviation value of the next task is not regarded as the over-limit operation time deviation value. The over-limit operation time deviation values ​​are numbered according to the time arrangement order in the task operation time deviation sequence. The consecutive numbers mean that the difference between adjacent numbers is equal to 1, and the discontinuous numbers mean that the difference between adjacent numbers is greater than 1. The over-limit operation time deviation values ​​with consecutive numbers are classified into the same cluster segment, and the over-limit operation time deviation values ​​with discontinuous numbers are removed, thus establishing multiple local operation time degradation sequences.

[0019] Obtain the end-of-line running time deviation value and the beginning-of-line running time deviation value for each local running time degradation sequence. Calculate the difference between the end-of-line running time deviation value and the beginning-of-line running time deviation value to obtain the change in the sequence running time deviation. Obtain the continuous running time of the local running time degradation sequence. Calculate the ratio of the change in the sequence running time deviation to the continuous running time to obtain the local running time degradation rate. Filter the preset running time degradation rate intervals into which each local running time degradation rate falls, and obtain the running time degradation mode set according to the running time degradation rate interval. The running time degradation modes include a smooth running time degradation mode, an increasing running time degradation mode, and an accelerated running time degradation mode. The earliest out-of-limit running time deviation value in the time sequence of the local running time degradation sequence is used as the first-end running time deviation value, and the latest out-of-limit running time deviation value in the time sequence is used as the last-end running time deviation value. The last-end running time deviation value minus the first-end running time deviation value equals the change in the sequence running time deviation. The task acquisition time corresponding to the last-end running time deviation value minus the task acquisition time corresponding to the first-end running time deviation value equals the continuous running time. The change in the sequence running time deviation ÷ the continuous running time equals the local running time degradation rate. The preset running time degradation rate range is set by the historical local running time degradation rate of the operating equipment under the same job type label, the same operating mode instruction, and the same job load level. The historical local running time degradation rates are sorted from smallest to largest, and the historical local running time degradation rate at the 33rd percentile is used as the reference value. The runtime degradation rate is used as the first degradation rate boundary, and the historical local runtime degradation rate at the 66th percentile is used as the second degradation rate boundary. When the local runtime degradation rate is less than the first degradation rate boundary, a smooth runtime degradation pattern is used as the runtime degradation pattern, corresponding to the historical low one-third interval. When the local runtime degradation rate is not less than the first degradation rate boundary and is less than the second degradation rate boundary, an increasing runtime degradation pattern is used as the runtime degradation pattern, corresponding to the historical median one-third interval. When the local runtime degradation rate is not less than the second degradation rate boundary, an accelerated runtime degradation pattern is used as the runtime degradation pattern, corresponding to the historical high one-third interval. The runtime degradation pattern is obtained by using this method.

[0020] Based on the degradation mode of running time, the fitting order and fitting constraints of the corresponding local running time degradation sequence are determined. Polynomial fitting is performed on the excess running time deviation value within each local running time degradation sequence to generate multiple local fitting curves. The difference between the fitted value of each local fitting curve and the corresponding excess running time deviation value is calculated to obtain the sporadic running time fluctuation parameter. Each local fitting curve is then concatenated, and the sporadic running time fluctuation parameter is removed to construct a continuous trend curve of running time deviation. The specific process of polynomial fitting for the excess running time deviation value within each local running time degradation sequence is as follows: the first-order polynomial corresponding to the smooth running time degradation mode is used as the first operation... The fitting order of the running time consumption is determined by taking the quadratic polynomial corresponding to the incremental running time consumption degradation mode as the second running time consumption fitting order and the cubic polynomial corresponding to the accelerated running time consumption degradation mode as the third running time consumption fitting order. The corresponding running time consumption fitting order is selected according to the running time consumption degradation mode corresponding to each local running time consumption degradation sequence. The time arrangement order is used as the fitting horizontal sequence and each excess running time consumption deviation value is used as the fitting vertical sequence. The polynomial coefficients are determined according to the corresponding running time consumption fitting order and the local running time consumption degradation rate. The fitting value corresponding to each time arrangement order is calculated according to the polynomial coefficients. Each fitting value is connected according to the time arrangement order to obtain multiple local fitting curves. Polynomial fitting is performed in MATLAB software. MATLAB receives the local runtime degradation sequence, time order, overrun time deviation value, local runtime degradation rate, and runtime degradation mode. The time order is converted into a fitted horizontal sequence, and the overrun time deviation value is converted into a fitted vertical sequence. The fitted horizontal and vertical sequences correspond to each other with the same index. The gradual runtime degradation mode corresponds to a first-order polynomial with two polynomial coefficients; the increasing runtime degradation mode corresponds to a second-order polynomial with three polynomial coefficients; and the accelerated runtime degradation mode corresponds to a third-order polynomial with four polynomial coefficients. The polynomial coefficients are obtained by first generating candidate polynomial coefficients according to the fitting order of runtime, and then substituting these candidate polynomial coefficients into the fitted horizontal sequence to obtain the fitted value. The fitted value minus the overrun time deviation value equals the fitted residual. The sum of the squares of all fitted residuals is the sum of the squared residuals, and the candidate polynomial coefficient with the smallest sum of squared residuals is used in the fitting. Constraint verification; when the local running time degradation rate is greater than 0 and the subsequent fitted value is greater than or equal to the previous fitted value, the candidate polynomial coefficients are used as the polynomial coefficients of the corresponding local running time degradation sequence; when the local running time degradation rate is greater than 0 and the subsequent fitted value is less than the previous fitted value, the next candidate polynomial coefficient with the smaller sum of squared residuals is read; after substituting the polynomial coefficients into each time arrangement order, each fitted value is obtained, and the fitted values ​​are connected in time arrangement order to form a local fitted curve; fitted value - corresponding over-limit running time deviation The difference is equal to the fluctuation parameter of occasional operation time. Occasional operation time fluctuation parameters are sorted in ascending order of absolute value. The absolute value of the occasional operation time fluctuation parameter at the 95th percentile of the sorted list is used as the fluctuation elimination threshold. When the absolute value of the occasional operation time fluctuation parameter is greater than the fluctuation elimination threshold, the corresponding over-limit operation time deviation value is not included in the curve stitching. When the absolute value of the occasional operation time fluctuation parameter is equal to or less than the fluctuation elimination threshold, the corresponding over-limit operation time deviation value is included in the curve stitching to construct a curve showing the continuous change trend of operation time deviation.

[0021] S3: Obtain the spindle vibration frequency and motor stator temperature of the operating equipment during the current task cycle and compare them with the preset attenuation feature library. Based on the comparison results, correct the continuous change trend curve of the running time deviation. Calculate the single-cycle running time attenuation rate based on the corrected continuous change trend curve of the running time deviation, including: The system acquires the spindle vibration frequency and motor stator temperature of the operating equipment during the current task cycle. It also acquires multiple standard attenuation parameter groups from a preset attenuation feature library, along with the standard spindle vibration frequency and standard motor stator temperature contained within each standard attenuation parameter group. The system calculates the absolute difference between the spindle vibration frequency and each standard spindle vibration frequency to obtain the frequency deviation. Similarly, it calculates the absolute difference between the motor stator temperature and each standard motor stator temperature to obtain the temperature deviation. The system then calculates the ratio of each frequency deviation to the corresponding standard spindle vibration frequency to obtain the frequency deviation rate. Finally, it calculates the ratio of each temperature deviation to the corresponding standard motor stator temperature to obtain the temperature deviation rate. The sum of the frequency deviation rate and temperature deviation rate corresponding to the same standard attenuation parameter group is used as the attenuation distance obtained by comparing the spindle vibration frequency and motor stator temperature with the preset attenuation feature library. The system then acquires the physical attenuation type of the operating equipment corresponding to the minimum attenuation distance. The physical attenuation types of the operating equipment include spindle vibration-dominated attenuation type, motor temperature-dominated attenuation type, and vibration-temperature composite attenuation type. The spindle vibration frequency refers to the dominant vibration frequency of the spindle of the working equipment during the current task cycle. The spindle vibration frequency is collected by a vibration sensor installed at the spindle location and recorded in Hertz. The motor stator temperature refers to the temperature at the stator location of the motor. The motor stator temperature is collected by a temperature sensor installed at the stator location and recorded in Celsius. The spindle vibration frequency and motor stator temperature during the current task cycle are arranged according to sampling time. When the absolute value of the difference between the current sample value and the previous sample value is greater than 30% of the previous sample value, the current sample value is used as a sudden change sample value. When the absolute value of the difference between the current sample value and the previous sample value is equal to or less than 30% of the previous sample value, the current sample value is used as a comparison sample value. The preset attenuation feature library is generated from the physical attenuation records of the working equipment. The dominant attenuation type of spindle vibration corresponds to historical attenuation records where the spindle vibration frequency deviation rate is greater than the motor stator temperature deviation rate. The dominant attenuation type of motor temperature corresponds to... Historical attenuation records where the stator temperature deviation rate is greater than the spindle vibration frequency deviation rate; historical attenuation records where the absolute value of the difference between the spindle vibration frequency deviation rate and the motor stator temperature deviation rate corresponding to the vibration-temperature composite attenuation type does not exceed 10%; the standard spindle vibration frequency under each working equipment physical attenuation type is obtained from the median spindle vibration frequency in the same historical attenuation records, and the standard motor stator temperature is obtained from the median motor stator temperature in the same historical attenuation records; absolute spindle vibration frequency - standard spindle vibration frequency = frequency deviation; absolute motor stator temperature - standard motor stator temperature = temperature deviation; frequency deviation ÷ standard spindle vibration frequency = frequency deviation rate; temperature deviation ÷ standard motor stator temperature = temperature deviation rate; frequency deviation rate + temperature deviation rate = attenuation distance; attenuation distances are sorted from smallest to largest, and the working equipment physical attenuation type corresponding to the attenuation distance ranked first is used as the current working equipment physical attenuation type.

[0022] The process involves acquiring the load reduction operation marker and ambient temperature change indication of the working equipment during the current task cycle, and then correcting the continuous change trend curve of the operating time deviation based on the physical attenuation type of the working equipment, the load reduction operation marker, and the ambient temperature change indication to generate a corrected continuous change trend curve of the operating time deviation. Specifically, when the physical attenuation type of the working equipment is dominated by shaft vibration, the frequency deviation rate is used as the curve correction parameter. When the physical attenuation type is dominated by motor temperature, the temperature deviation rate is used as the curve correction parameter. When the physical attenuation type is a combination of vibration and temperature attenuation, the attenuation distance is used as the curve correction parameter. The curve correction parameters are adjusted based on the load reduction operation marker and ambient temperature change indication, and then superimposed onto each curve fitting value of the continuous change trend curve of the operating time deviation. Finally, the superimposed curve fitting values ​​are reconnected according to the time sequence to generate the corrected continuous change trend curve of the operating time deviation. The load reduction operation flag refers to the load reduction status recorded by the work equipment controller within the current task operation cycle. The load reduction operation flag is read from the operation instruction record of the current task operation cycle, and indicates either load reduction or no load reduction. The ambient temperature change indicator refers to the change in workshop ambient temperature between before the task starts and during the task operation phase. The ambient temperature change indicator is obtained by converting the temperature acquisition values ​​before the task starts and during the task operation phase collected by the workshop ambient temperature sensor. The difference between the ambient temperature acquisition value during the task operation phase and the temperature acquisition value before the task starts equals the ambient temperature change. If the ambient temperature change is greater than... At 2 degrees Celsius, temperature rise serves as an indicator of ambient temperature change; when the ambient temperature change is not less than -2 degrees Celsius and not greater than 2 degrees Celsius, stability serves as an indicator of ambient temperature change; when the ambient temperature change is less than -2 degrees Celsius, temperature drop serves as an indicator of ambient temperature change. When the physical attenuation type of the working equipment is dominated by shaft vibration, the frequency deviation rate serves as a curve correction parameter; when the physical attenuation type of the working equipment is dominated by motor temperature, the temperature deviation rate serves as a curve correction parameter; when the physical attenuation type of the working equipment is a combined vibration and temperature attenuation type, the attenuation distance serves as a curve correction parameter. When the load operation marker indicates "load reduced," the curve correction parameter minus the preset correction value corresponding to the load reduction operation marker equals the curve correction parameter after the first processing. When the load reduction operation marker indicates "load not reduced," the curve correction parameter equals the curve correction parameter after the first processing. When the ambient temperature change indicator indicates "heating," the curve correction parameter after the first processing plus the preset correction value corresponding to the "heating" indicator equals the curve correction parameter after the second processing. When the ambient temperature change indicator indicates "stable," the curve correction parameter after the first processing equals the curve correction parameter after the second processing. When the ambient temperature change indicator indicates "cooling," the curve correction parameter after the first processing minus the preset correction value corresponding to the "cooling" indicator equals the curve correction parameter after the second processing. Correction value = Curve correction parameter after secondary processing; The correction value corresponding to the preset load reduction operation mark is obtained from the average change of the operation time deviation of the historical task operation cycle with load reduction, the correction value corresponding to the preset temperature rise indicator is obtained from the average change of the operation time deviation of the historical task operation cycle with temperature rise, and the correction value corresponding to the preset temperature drop indicator is obtained from the average change of the operation time deviation of the historical task operation cycle with temperature drop; Curve fitting value + second-level correction value corresponding to the curve correction parameter after secondary processing = superimposed curve fitting value. The superimposed curve fitting values ​​are connected in chronological order to generate the continuous change trend curve of the corrected operation time deviation.

[0023] Obtain the current system time, extract the tangent slope of the trend curve of the continuous change of the corrected running time deviation at the current system time, and obtain the single-cycle running time decay rate; The current system time refers to the current moment given by the workshop master clock, and the current system time is in the format of year, month, day, hour, minute, second, and millisecond. After mapping the current system time to the time arrangement order of the corrected running time deviation continuous change trend curve, the previous and next curve fitting values ​​adjacent to the current system time are found. When the current system time is within the existing time range of the corrected running time deviation continuous change trend curve, the two curve fitting values ​​adjacent to the current system time are used to extract the tangent slope. The second curve fitting value - the previous curve fitting value = the change in the curve fitting value adjacent to the current system time. The time arrangement order corresponding to the second curve fitting value - the time arrangement order corresponding to the previous curve fitting value = the time arrangement order interval adjacent to the current system time. The change in the curve fitting value adjacent to the current system time ÷ the time arrangement order interval adjacent to the current system time = the tangent slope. The tangent slope is used as the single-cycle running time decay rate.

[0024] S4: Obtain the guide car's operating status parameters and the quality inspection station's operational status parameters within the current task cycle. Calculate the guide car's arrival tolerance time based on the guide car's operating status parameters, calculate the quality inspection continuity tolerance time based on the quality inspection station's operational status parameters, and determine the predicted cumulative operating time offset based on the single-cycle operating time decay rate, including: The system acquires the operating status parameters of the guided vehicle and the work status parameters of the quality inspection station within the current task cycle. The guided vehicle operating status parameters include the remaining time of the guided vehicle task, the time spent on battery refueling, and the base arrival time of the guided vehicle. The quality inspection station work status parameters include the available idle time of the quality inspection station, the number of workpieces in the queue waiting for inspection at the quality inspection station, and the reserved maintenance time for the quality inspection station. The system reads the real-time road conditions, the road segment length, and the vehicle speed in the workshop during the current task cycle. It calculates the sum of the base arrival time of the guided vehicle, the remaining time of the guided vehicle task, and the battery refueling time to obtain the latest allowed arrival time of the guided vehicle. It calculates the ratio of the real-time road segment length to the real-time vehicle speed to obtain the estimated travel time of the guided vehicle. It calculates the difference between the latest allowed arrival time and the estimated travel time of the guided vehicle to obtain the arrival tolerance time of the guided vehicle. Here, the guided vehicle is the upstream associated equipment that supplies materials to the working equipment, and the quality inspection station is the downstream associated equipment that receives materials from the working equipment. The guide car is an upstream associated device that supplies materials to the working equipment, and the quality inspection station is a downstream associated device that receives materials from the working equipment. The remaining task time for the guide car refers to the time required for the guide car to complete the current feeding task. The battery replenishment time for the guide car refers to the time required for the guide car to replenish its battery within the current task cycle. The baseline arrival time for the guide car refers to the time it takes for the guide car to arrive at the working equipment under baseline road conditions. The remaining task time, battery replenishment time, and baseline arrival time for the guide car are read from the guide car scheduling record, which is generated after the guide car receives the feeding task. The available idle time of the quality inspection station refers to the time until the quality inspection station can receive the next workpiece. The number of workpieces in the queue for inspection at the quality inspection station refers to the number of workpieces waiting to be inspected. The reserved maintenance time for the quality inspection station refers to the reserved maintenance time for the quality inspection station. The available idle time of the quality inspection station, the number of workpieces in the queue for inspection at the quality inspection station, and the reserved maintenance time for the quality inspection station are recorded in the quality inspection station's operating status record. The operation status record of the quality inspection station is formed by the queue record and maintenance reservation record of the quality inspection station; the real-time road condition section length is read from the workshop path record, and the real-time road condition vehicle speed is read from the guide vehicle driving record; the remaining time of the guide vehicle task, the time of guide vehicle battery replenishment, the time of guide vehicle baseline arrival, the idle and available time of the quality inspection station, and the reserved maintenance time of the quality inspection station are all recorded in their original hours, minutes, and seconds, and converted into second-level values ​​for ratio and difference calculations. The queue of the quality inspection station is also recorded. The number of workpieces is recorded as an integer, the real-time road section length is recorded in meters, and the real-time road vehicle speed is recorded in meters per second; the guide vehicle's baseline arrival time + the guide vehicle's remaining task time + the guide vehicle's battery refueling time = the guide vehicle's latest allowed arrival time; the real-time road section length ÷ the real-time road vehicle speed = the guide vehicle's estimated journey time; the guide vehicle's latest allowed arrival time - the guide vehicle's estimated journey time = the guide vehicle's arrival tolerance time, thus obtaining the guide vehicle's arrival tolerance time.

[0025] Obtain the standard time for single-piece quality inspection, calculate the product of the number of workpieces in the queue waiting for inspection at the quality inspection station and the standard time for single-piece quality inspection to obtain the estimated queuing time for quality inspection, obtain the maximum allowable delay time for production orders, calculate the sum of the available idle time of the quality inspection station and the maximum allowable delay time for production orders, and subtract the reserved time for maintenance of the quality inspection station to obtain the latest allowable continuation time for quality inspection, calculate the difference between the latest allowable continuation time for quality inspection and the estimated queuing time for quality inspection to obtain the tolerance time for quality inspection continuation; The standard time for single-piece quality inspection refers to the baseline time for a quality inspection station to complete the inspection of one workpiece. This standard time is read from the standard operation record of the quality inspection station, which is formed by the historical inspection times for the same quality inspection station and the same workpiece type. The historical inspection times are sorted from smallest to largest, and the median is written into the standard time for single-piece quality inspection. The maximum allowable delay time for a production order refers to the maximum acceptable delay time for a production order within scheduling constraints. This maximum allowable delay time for a production order is read from the production order scheduling record. The number of workpieces in the inspection queue at a quality inspection station is determined by the work status record of the quality inspection station. The reading process retrieves the available idle time and reserved maintenance time of the quality inspection station, using the time records already read within the current task cycle. Each time record retains its original hour, minute, and second values ​​and is converted to second-level values ​​for multiplication, summation, and difference calculations. The number of workpieces in the queue waiting for inspection at the quality inspection station × the standard time for single-piece quality inspection = the estimated queuing time for quality inspection. The available idle time of the quality inspection station + the maximum allowable delay time for production orders - the reserved maintenance time for quality inspection station = the latest allowed continuation time for quality inspection. The latest allowed continuation time for quality inspection - the estimated queuing time for quality inspection = the quality inspection continuation tolerance time, thus obtaining the quality inspection continuation tolerance time.

[0026] Obtain the number of remaining task operation cycles of the operating equipment, calculate the product of the single cycle operation time decay rate and the number of remaining task operation cycles of the operating equipment, and obtain the predicted cumulative operation time offset. The remaining task operation cycle count of the working equipment refers to the number of task operation cycles that the current working equipment has not yet completed in the current task batch. The remaining task operation cycle count of the working equipment is obtained from the task scheduling record of the working equipment. The task scheduling record of the working equipment is registered according to the current working equipment, the current task batch, and the number of uncompleted tasks. The number of uncompleted tasks corresponds to the remaining task operation cycle count of the working equipment. The single cycle operation time decay rate is the value extracted from the current system time using the corrected operation time deviation continuous change trend curve. The single cycle operation time decay rate × the remaining task operation cycle count of the working equipment = the predicted cumulative operation time offset, thus obtaining the predicted cumulative operation time offset.

[0027] S5: Based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, determine the scheduling parameters for the operation equipment linkage, and obtain the process management results including: The difference between the arrival tolerance time of the guide car and the predicted cumulative running time offset is calculated to obtain the guide car running time offset margin. The difference between the quality inspection continuity tolerance time and the predicted cumulative running time offset is calculated to obtain the quality inspection running time offset margin. When the guide car running time offset margin or the quality inspection running time offset margin is greater than or equal to the preset margin threshold, the corresponding guide car or quality inspection station is determined to be in normal status. When the guide car running time offset margin or the quality inspection running time offset margin is less than the preset margin threshold, the corresponding guide car and quality inspection station are extracted as abnormal operation nodes. The guide car running time offset margin refers to the remaining time margin after deducting the predicted cumulative running time offset from the guide car's arrival tolerance time. The quality inspection running time offset margin refers to the remaining time margin after deducting the predicted cumulative running time offset from the quality inspection continuity tolerance time. The preset margin threshold refers to the boundary value in the scheduling rules for determining whether a guide car or quality inspection station has entered an abnormal operation node. The preset margin threshold is set by the historical scheduling records of the same workshop. First, historical scheduling records where no guide car waiting or quality inspection station waiting occurred are read. Then, the running time offset margin in the historical scheduling records is calculated. After sorting the running time offset margins from smallest to largest, the running time offset margin at the 5th percentile of the sorted values ​​is written into the preset margin threshold. The preset margin threshold retains the original values. Hours, minutes, and seconds are recorded and converted to second-level values ​​for comparison; the guide car arrival tolerance time minus the predicted cumulative running time offset equals the guide car running time offset margin; the quality inspection continuity tolerance time minus the predicted cumulative running time offset equals the quality inspection running time offset margin; when the guide car running time offset margin is greater than or equal to the preset margin threshold, the guide car status is normal and is used as the guide car judgment criterion; when the guide car running time offset margin is less than the preset margin threshold, the guide car is considered an abnormal operation node; when the quality inspection running time offset margin is greater than or equal to the preset margin threshold, the quality inspection station status is normal and is used as the quality inspection station judgment criterion; when the quality inspection running time offset margin is less than the preset margin threshold, the quality inspection station is considered an abnormal operation node, and abnormal operation nodes are extracted.

[0028] The system obtains the planned operating time of the operating equipment, the task deployment density of the operating equipment, and the scheduling base time of the operating equipment. It also obtains the guide car delivery time and downstream quality inspection continuation time corresponding to abnormal operation nodes. The system calculates the product of the planned operating time of the operating equipment and the single-cycle operating time attenuation rate to obtain the operating time extension compensation. The system calculates the sum of the planned operating time of the operating equipment and the operating time extension compensation to obtain the updated task operating time. The system calculates the product of the task deployment density of the operating equipment and the single-cycle operating time attenuation rate to obtain the density reduction. The system calculates the difference between the task deployment density of the operating equipment and the density reduction to obtain the updated task deployment density. The system calculates the sum of the scheduling base time of the operating equipment and the predicted cumulative operating time offset to obtain the updated scheduling base time. The system calculates the sum of the guide car delivery time and the predicted cumulative operating time offset to obtain the updated guide car delivery time. The system calculates the sum of the downstream quality inspection continuation time and the predicted cumulative operating time offset to obtain the updated downstream quality inspection continuation time. The planned operating time of the work equipment refers to the planned task time set in the work equipment scheduling record. The work equipment task deployment density refers to the number of tasks deployed to the work equipment per unit scheduling time. The work equipment scheduling base time refers to the planned start time in the work equipment scheduling record. The planned operating time, work equipment task deployment density, and work equipment scheduling base time are read from the work equipment scheduling record. The guide car delivery time is read from the guide car dispatch record corresponding to the abnormal work node. The downstream quality inspection continuation time is read from the quality inspection station scheduling record corresponding to the abnormal work node. The planned operating time of the work equipment retains the original hour, minute, and second records and is converted to second-level values ​​for multiplication and summation calculations. The work equipment task deployment density is recorded according to the number of tasks per unit scheduling time. The work equipment scheduling base time, guide car delivery time, and downstream quality inspection continuation time are recorded according to the year, month, day, hour, and minute. Record in seconds; Planned operating time of the work equipment × Single-cycle operating time attenuation rate = Operating time extension compensation; Planned operating time of the work equipment + Operating time extension compensation = Updated task operating time; Task deployment density of the work equipment × Single-cycle operating time attenuation rate = Density load reduction; Task deployment density of the work equipment - Density load reduction = Updated task deployment density; Scheduled base time of the work equipment + Predicted cumulative operating time offset = Updated scheduling base time; Guide car feeding time + Predicted cumulative operating time offset = Updated guide car feeding time; Downstream quality inspection continuation time + Predicted cumulative operating time offset = Updated downstream quality inspection continuation time, thus obtaining the updated task operating time, updated task deployment density, updated scheduling base time, updated guide car feeding time, and updated downstream quality inspection continuation time.

[0029] By combining the updated task execution time, updated task deployment density, updated scheduling base time, updated guide car delivery time, and updated downstream quality inspection connection time, the working equipment linkage scheduling parameters are obtained. The working equipment linkage scheduling parameters are used as the process management result to execute task allocation, guide car scheduling, and quality inspection station scheduling of intelligent manufacturing equipment in the automated process management process. The scheduling parameters for coordinated operation equipment refer to the set of coordinated time and task density parameters formed by the work equipment, guided vehicles, and quality inspection stations under the same task batch. Updated task operation time, updated task deployment density, updated scheduling base time, updated guided vehicle delivery time, and updated downstream quality inspection follow-up time are grouped together according to the correspondence between the work equipment, guided vehicles, and quality inspection stations. The correspondence is determined by the current task batch of the work equipment, the guided vehicle delivery task number, and the quality inspection station follow-up task number. When the three numbers are consistent, they belong to the same coordinated scheduling record. Within the same coordinated scheduling record, tasks are grouped together... Data is written into the fields of running time, task deployment density, scheduling base time, guide car delivery time, and downstream quality inspection follow-up time. The task running time field can save the original hour, minute, and second records and the second-level conversion value. The scheduling base time field, guide car delivery time field, and downstream quality inspection follow-up time field are saved in year, month, day, hour, minute, and second format. The updated task running time, updated task deployment density, updated scheduling base time, updated guide car delivery time, and updated downstream quality inspection follow-up time are combined to form the work equipment linkage scheduling parameters, which serve as the process management result.

[0030] Please see Figure 3 An automated process management system for intelligent manufacturing equipment, the system comprising: The time consumption deviation calculation module obtains the actual running time and standard running time of the operating equipment within each historical task running cycle, and calculates the task running time consumption deviation sequence. The time consumption degradation fitting module filters out the excessive time consumption deviation values ​​in the task operation time consumption deviation sequence, clusters and divides the excessive time consumption deviation values ​​into multiple local time consumption degradation sequences, and fits the continuous change trend curve of the operation time consumption deviation with reference to each local time consumption degradation sequence. The attenuation curve correction module obtains the spindle vibration frequency and motor stator temperature of the working equipment in the current task operation cycle and compares them with the preset attenuation feature library. Based on the comparison results, it corrects the continuous change trend curve of the running time deviation and calculates the single-cycle running time attenuation rate based on the corrected continuous change trend curve of the running time deviation. The tolerance time calculation module obtains the guide car's operating status parameters and the quality inspection station's operating status parameters within the current task cycle. It calculates the guide car's arrival tolerance time based on the guide car's operating status parameters, calculates the quality inspection continuity tolerance time based on the quality inspection station's operating status parameters, and determines the predicted cumulative operating time offset based on the single-cycle operating time decay rate. Here, the guide car is the upstream associated equipment that supplies materials to the operating equipment, and the quality inspection station is the downstream associated equipment that receives materials from the operating equipment. The linkage scheduling determination module determines the linkage scheduling parameters of the work equipment based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, and obtains the process management results.

[0031] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention in any other way. Any person skilled in the art may make changes or modifications to the above-disclosed technical content to create equivalent embodiments that can be applied to other fields. However, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the protection scope of the present invention.

Claims

1. An automated process management method for intelligent manufacturing equipment, characterized in that, Includes the following steps: Obtain the actual operating time and standard operating time of the equipment within each historical task cycle, and calculate the task operating time deviation sequence; Filter the out-of-limit running time deviation values ​​in the task running time deviation sequence, cluster the out-of-limit running time deviation values ​​into multiple local running time degradation sequences, and fit the running time deviation continuous change trend curve with reference to each local running time degradation sequence; The spindle vibration frequency and motor stator temperature of the working equipment in the current task operation cycle are obtained and compared with the preset attenuation feature library. The operation time deviation trend curve is corrected according to the comparison results. The single cycle operation time attenuation rate is calculated according to the corrected operation time deviation trend curve. The system acquires the operating status parameters of the guide vehicle and the operation status parameters of the quality inspection station within the current task cycle. Based on the operating status parameters of the guide vehicle, it calculates the arrival tolerance time of the guide vehicle and the quality inspection station's continuity tolerance time. Based on the single-cycle operation time decay rate, it determines the predicted cumulative operation time offset. The guide vehicle is an upstream associated device that supplies materials to the operating equipment, and the quality inspection station is a downstream associated device that receives materials from the operating equipment. Based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, the scheduling parameters for the linkage of the work equipment are determined, and the process management results are obtained.

2. The automated process management method for intelligent manufacturing equipment according to claim 1, characterized in that, The step of obtaining the actual operating time and standard operating time of the equipment within each historical task cycle, and calculating the task operating time deviation sequence includes: Obtain the start time and end time of the operation of the working equipment for each historical task cycle within the current monitoring window, calculate the difference between the end time and the start time of the operation of the working equipment, and obtain the actual operation time of the working equipment. The system obtains the work type label, operation mode instruction, load material weight, and joint torque value of the work equipment. Based on the load material weight and joint torque value, the work load level is determined. The work type label, operation mode instruction, and work load level are combined as the running time query index. The running time query index is compared with the benchmark index item in the preset standard running time database. The system retrieves the standard running time of the work equipment corresponding to the benchmark index item with the same characters as the running time query index from the preset standard running time database. Obtain the actual running time of the operating equipment and the standard running time of the operating equipment for each historical task running cycle, calculate the difference between the actual running time and the standard running time of each operating equipment to obtain the task running time deviation value, arrange the task running time deviation values ​​in chronological order, and generate the task running time deviation sequence.

3. The automated process management method for intelligent manufacturing equipment according to claim 2, characterized in that, The process involves filtering out excessive runtime deviation values ​​from the runtime deviation sequence, clustering these excessive runtime deviation values ​​into multiple local runtime degradation sequences, and fitting a runtime deviation trend curve based on each local runtime degradation sequence. Obtain the task execution time deviation value of each group of adjacent task execution time deviation values ​​in the task execution time deviation sequence, calculate the difference between each group of adjacent task execution time deviation values ​​to obtain the change in adjacent execution deviation, obtain the task acquisition time interval, calculate the ratio of each adjacent execution deviation change to the task acquisition time interval to obtain the local execution time change rate, filter the task execution time deviation values ​​in the task execution time deviation sequence whose local execution time change rate is greater than the preset execution time change rate threshold to obtain the over-limit execution time deviation value, obtain the time arrangement order of each over-limit execution time deviation value in the task execution time deviation sequence, cluster and segment the over-limit execution time deviation values ​​with continuous time arrangement order, and remove the over-limit execution time deviation values ​​with discontinuous time arrangement order to establish multiple local execution time degradation sequences; Obtain the end-of-run time deviation value and the beginning-of-run time deviation value of each of the local run time degradation sequences, calculate the difference between the end-of-run time deviation value and the beginning-of-run time deviation value to obtain the change in the run time deviation of the sequence, obtain the continuous run time of the local run time degradation sequence, calculate the ratio of the change in the run time deviation of each sequence to the continuous run time to obtain the local run time degradation rate, filter the preset run time degradation rate interval into which each local run time degradation rate falls, and obtain the run time degradation mode set according to the run time degradation rate interval; Based on the aforementioned operation time degradation mode, the fitting order and fitting constraints of the corresponding local operation time degradation sequence are determined. Polynomial fitting is performed on the excess operation time deviation value in each local operation time degradation sequence to generate multiple local fitting curves. The difference between the fitted value of each local fitting curve and the corresponding excess operation time deviation value is calculated to obtain the occasional operation time fluctuation parameter. Each local fitting curve is spliced ​​together and the occasional operation time fluctuation parameter is removed to construct the continuous change trend curve of operation time deviation.

4. The automated process management method for intelligent manufacturing equipment according to claim 3, characterized in that, The process of acquiring the spindle vibration frequency and motor stator temperature of the operating equipment during the current task cycle and comparing them with a preset attenuation feature library, correcting the continuous change trend curve of the running time deviation based on the comparison results, and calculating the single-cycle running time attenuation rate based on the corrected continuous change trend curve of the running time deviation includes: The system acquires the spindle vibration frequency and motor stator temperature of the working equipment during the current task cycle. It also acquires multiple standard attenuation parameter groups from a preset attenuation feature library, as well as the standard spindle vibration frequency and standard motor stator temperature contained in each standard attenuation parameter group. The system calculates the absolute difference between the spindle vibration frequency and each standard spindle vibration frequency to obtain the frequency deviation. The system calculates the absolute difference between the motor stator temperature and each standard motor stator temperature to obtain the temperature deviation. The system calculates the ratio of each frequency deviation to the corresponding standard spindle vibration frequency to obtain the frequency deviation rate. The system calculates the ratio of each temperature deviation to the corresponding standard motor stator temperature to obtain the temperature deviation rate. The system calculates the sum of the frequency deviation rate and temperature deviation rate corresponding to the same standard attenuation parameter group, which is used as the attenuation distance obtained by comparing the spindle vibration frequency and motor stator temperature with the preset attenuation feature library. Finally, the system acquires the physical attenuation type of the working equipment corresponding to the minimum attenuation distance. The system acquires the load reduction operation marker and the ambient temperature change indication of the operating equipment in the current task operation cycle. Based on the physical attenuation type of the operating equipment, the load reduction operation marker and the ambient temperature change indication, the system corrects the continuous change trend curve of the operation time deviation and generates the corrected continuous change trend curve of the operation time deviation. Obtain the current system time, extract the tangent slope of the trend curve of the corrected running time deviation at the current system time, and obtain the single-cycle running time decay rate.

5. The automated process management method for intelligent manufacturing equipment according to claim 4, characterized in that, The steps of obtaining the guide vehicle's operating status parameters and the quality inspection station's operational status parameters within the current task cycle, calculating the guide vehicle's arrival tolerance time based on the guide vehicle's operating status parameters, calculating the quality inspection continuity tolerance time based on the quality inspection station's operational status parameters, and determining the predicted cumulative operating time offset based on the single-cycle operating time decay rate include: The system acquires the operating status parameters of the guide vehicle and the operation status parameters of the quality inspection station within the current task cycle. The guide vehicle operating status parameters include the remaining time of the guide vehicle task, the time of the guide vehicle battery replenishment, and the time of the guide vehicle's baseline arrival at the station. The quality inspection station operation status parameters include the available time of the quality inspection station, the number of workpieces in the queue waiting for inspection at the quality inspection station, and the reserved time for maintenance at the quality inspection station. The system reads the real-time road conditions, the length of the road segment, and the vehicle speed in the workshop during the current task cycle. It calculates the sum of the guide vehicle's baseline arrival at the station, the remaining time of the guide vehicle task, and the time of the guide vehicle battery replenishment to obtain the latest allowed arrival time of the guide vehicle. It calculates the ratio of the real-time road segment length to the real-time vehicle speed to obtain the estimated travel time of the guide vehicle. It calculates the difference between the latest allowed arrival time of the guide vehicle and the estimated travel time of the guide vehicle to obtain the guide vehicle's arrival tolerance time. Obtain the standard time for single-piece quality inspection, calculate the product of the number of workpieces in the queue to be inspected at the quality inspection station and the standard time for single-piece quality inspection, and obtain the estimated queuing time for quality inspection. Obtain the maximum allowable delay time for production orders, calculate the sum of the available idle time of the quality inspection station and the maximum allowable delay time for production orders, and subtract the maintenance reserved time of the quality inspection station to obtain the latest allowable continuation time for quality inspection. Calculate the difference between the latest allowable continuation time for quality inspection and the estimated queuing time for quality inspection to obtain the quality inspection continuation tolerance time. The number of remaining task operation cycles of the operating equipment is obtained, and the product of the single cycle operation time decay rate and the number of remaining task operation cycles of the operating equipment is calculated to obtain the predicted cumulative operation time offset.

6. The automated process management method for intelligent manufacturing equipment according to claim 5, characterized in that, The process management results obtained by determining the scheduling parameters for the operation equipment based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset include: The difference between the arrival tolerance time of the guide vehicle and the predicted cumulative running time offset is calculated to obtain the guide vehicle running time offset margin. The difference between the quality inspection continuity tolerance time and the predicted cumulative running time offset is calculated to obtain the quality inspection running time offset margin. When the guide vehicle running time offset margin or the quality inspection running time offset margin is greater than or equal to a preset margin threshold, the corresponding guide vehicle or quality inspection station is determined to be in normal status. When the guide vehicle running time offset margin or the quality inspection running time offset margin is less than the preset margin threshold, the corresponding guide vehicle and quality inspection station are extracted as abnormal operation nodes. The system obtains the planned operating time of the operating equipment, the task deployment density of the operating equipment, and the scheduling base time of the operating equipment. It also obtains the guide car delivery time and downstream quality inspection continuation time corresponding to the abnormal operation node. The system calculates the product of the planned operating time of the operating equipment and the single-cycle operating time attenuation rate to obtain the operating time extension compensation. The system calculates the sum of the planned operating time of the operating equipment and the operating time extension compensation to obtain the updated task operating time. The system calculates the product of the task deployment density of the operating equipment and the single-cycle operating time attenuation rate to obtain the density reduction. The system calculates the difference between the task deployment density of the operating equipment and the density reduction to obtain the updated task deployment density. The system calculates the sum of the scheduling base time of the operating equipment and the predicted cumulative operating time offset to obtain the updated scheduling base time. The system calculates the sum of the guide car delivery time and the predicted cumulative operating time offset to obtain the updated guide car delivery time. The system calculates the sum of the downstream quality inspection continuation time and the predicted cumulative operating time offset to obtain the updated downstream quality inspection continuation time. By combining the updated task execution time, the updated task deployment density, the updated scheduling baseline time, the updated guide car feeding time, and the updated downstream quality inspection continuation time, the operation equipment linkage scheduling parameters are obtained. The operation equipment linkage scheduling parameters are used as the process management result to execute task allocation, guide car scheduling, and quality inspection station scheduling of intelligent manufacturing equipment in the automated process management process.

7. The automated process management method for intelligent manufacturing equipment according to claim 2, characterized in that, The standard operating time of the operating equipment in the preset standard time database is preset according to the baseline operating status of the operating equipment under different operation types, operation modes and load levels. The load level is determined by the weight of the load material and the joint torque value. The standard operating time can be obtained by collecting the historical operating time of the operating equipment when performing the same operation type, operation mode and load level task under normal operation, and combining it with the equipment production cycle or standard working condition time calibration, so that each set of operation type label, operation mode instruction and load level corresponds to a baseline index item and its standard operating time.

8. The automated process management method for intelligent manufacturing equipment according to claim 3, characterized in that, The operation time degradation modes include a smooth operation time degradation mode, an incremental operation time degradation mode, and an accelerated operation time degradation mode. The process of polynomial fitting for the excess running time deviation value within each local running time degradation sequence is as follows: the first-order polynomial corresponding to the smooth running time degradation mode is used as the first running time fitting order, the second-order polynomial corresponding to the increasing running time degradation mode is used as the second running time fitting order, and the third-order polynomial corresponding to the accelerated running time degradation mode is used as the third running time fitting order. The corresponding running time fitting order is selected according to the running time degradation mode corresponding to each local running time degradation sequence. The time arrangement order is used as the fitting horizontal sequence, and each excess running time deviation value is used as the fitting vertical sequence. The polynomial coefficients are determined according to the corresponding running time fitting order and the local running time degradation rate. The fitting value corresponding to each time arrangement order is calculated according to the polynomial coefficients. Each fitting value is connected according to the time arrangement order to obtain multiple local fitting curves.

9. The automated process management method for intelligent manufacturing equipment according to claim 4, characterized in that, The physical attenuation types of the operating equipment include spindle vibration-dominated attenuation type, motor temperature-dominated attenuation type, and vibration-temperature composite attenuation type. The process of correcting the continuous change trend curve of the operating time deviation based on the physical attenuation type of the operating equipment, the load reduction operation marker, and the operating environment temperature change indication, and generating the corrected continuous change trend curve of the operating time deviation, is as follows: When the physical attenuation type of the operating equipment is the main shaft vibration-dominated attenuation type, the frequency deviation rate is used as the curve correction parameter; when the physical attenuation type of the operating equipment is the motor temperature-dominated attenuation type, the temperature deviation rate is used as the curve correction parameter; when the physical attenuation type of the operating equipment is the vibration-temperature composite attenuation type, the attenuation distance is used as the curve correction parameter. The curve correction parameters are increased or decreased according to the load reduction operation marker and the operating environment temperature change indication, and the increased or decreased curve correction parameters are superimposed on each curve fitting value of the continuous change trend curve of the operating time deviation. The superimposed curve fitting values ​​are then reconnected in chronological order to generate the corrected continuous change trend curve of the operating time deviation.

10. An automated process management system for intelligent manufacturing equipment, characterized in that, The system includes: The time consumption deviation calculation module obtains the actual running time and standard running time of the operating equipment within each historical task running cycle, and calculates the task running time consumption deviation sequence. The time consumption degradation fitting module filters out the excessive time consumption deviation values ​​in the task operation time consumption deviation sequence, clusters and divides the excessive time consumption deviation values ​​into multiple local time consumption degradation sequences, and fits the continuous change trend curve of the operation time consumption deviation with reference to each local time consumption degradation sequence. The attenuation curve correction module obtains the spindle vibration frequency and motor stator temperature of the working equipment in the current task operation cycle and compares them with the preset attenuation feature library. Based on the comparison results, it corrects the continuous change trend curve of the running time deviation and calculates the single-cycle running time attenuation rate based on the corrected continuous change trend curve of the running time deviation. The tolerance time calculation module acquires the guide car's operating status parameters and the quality inspection station's operating status parameters within the current task cycle. It calculates the guide car's arrival tolerance time based on the guide car's operating status parameters, calculates the quality inspection station's continuity tolerance time based on the quality inspection station's operating status parameters, and determines the predicted cumulative operating time offset based on the single-cycle operating time decay rate. The guide car is an upstream associated device that supplies materials to the operating equipment, and the quality inspection station is a downstream associated device that receives materials from the operating equipment. The linkage scheduling determination module determines the linkage scheduling parameters of the work equipment based on the arrival tolerance time of the guide vehicle, the quality inspection continuity tolerance time, and the predicted cumulative operating time offset, and obtains the process management results.