A method and system for axial force-displacement collaborative tracking control of foundation pit servo support based on optimal deformation curve
By using servo-support preloading and ground parameter inversion, combined with multi-population genetic algorithm optimization, the axial force is dynamically adjusted to achieve deformation and stress coordination in foundation pit construction. This solves the problems of single control target and insufficient prediction in existing technologies, and improves the safety and intelligence of foundation pit construction.
Patent Information
- Application Number
- CN202611376513.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-17
AI Technical Summary
Existing servo support systems in foundation pit engineering suffer from limitations such as a single control target, inability to adapt to dynamic changes in the retaining structure during phased excavation, and lack of prediction of geological parameter fluctuations, leading to uncoordinated deformation and stress, and a tendency to overshoot and overload.
A servo support axial force-displacement collaborative tracking control method based on the optimal deformation curve is adopted. The servo support preload is used to activate the stratum resistance. The stratum parameters are inverted by combining the elastic foundation beam model and the collaborative multi-population genetic algorithm. The optimal deformation curve is dynamically determined. The support axial force is adjusted according to the target axial force difference. Multiple dynamic safety factors are calculated simultaneously for closed-loop control.
It achieves global optimal coordination between deformation and stress during foundation pit construction, improves the safety and controllability of construction, overcomes the shortcomings of passive amplitude limitation and fixed target lack of prediction, and improves the level of intelligent construction in complex geological and sensitive environments.
Smart Images

Figure CN123113871A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of construction control technology for foundation pit engineering, and in particular to a method, system and equipment for axial force-displacement collaborative tracking control of foundation pit servo support based on the optimal deformation curve. Background Technology
[0002] Foundation pit engineering is developing towards ultra-deep, ultra-large, and sensitive environments, and the requirements for deformation control have increased from centimeter-level to millimeter-level. Servo support systems effectively solve the problems of axial force loss and poor deformation control in traditional support systems by monitoring the deformation of the retaining structure and the axial force of the support in real time, and dynamically adjusting the axial force by a controller-driven hydraulic or electric servo cylinder. It is now widely used in deep and large foundation pit projects.
[0003] Existing servo support systems employ a human-machine collaboration model in practical applications: control targets and strategies are pre-set by engineers based on experience and specifications. The system uses a displacement-priority dual-control method for closed-loop feedback adjustment, increasing axial force when the monitored displacement approaches a warning value and maintaining the current axial force when the displacement stabilizes. However, this approach has the following drawbacks: First, the control target is singular, passively limiting the range based solely on whether the axial force or displacement exceeds the limit. Single axial force control can easily lead to excessive deformation of the retaining structure, while single displacement control can easily lead to overload of the support axial force. Simple dual control also cannot achieve optimal coordination between deformation and stress. Second, fixed target values or only manual adjustments in stages cannot adapt to the dynamic evolution of the exposed height of the retaining structure and the unloading range of the soil during the phased excavation of the foundation pit. Third, relying on real-time feedback for post-event adjustments lacks anticipation of disturbances such as excavation unloading and geological parameter fluctuations, easily leading to deformation overshoot.
[0004] Therefore, there is an urgent need for a servo support adjustment method based on a globally optimal objective, dynamic adaptation, and axial force-displacement depth coordination. Summary of the Invention
[0005] This invention provides a method, system, and device for axial force-displacement coordinated tracking control of foundation pit servo support based on optimal deformation curve, in order to solve the problems of passive amplitude limiting and fixed target difficulty in adapting to step-by-step excavation of servo support.
[0006] In a first aspect, embodiments of the present invention provide a method for coordinated tracking control of axial force and displacement of foundation pit servo support based on optimal deformation curve, comprising:
[0007] For the current excavation step of the foundation pit, after excavation to a preset depth, preloading is applied to the servo supports corresponding to the current excavation step to induce pre-deformation of the retaining structure. After the pre-deformation stabilizes, a method combining an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm is used to invert the soil parameters, obtaining inverted soil parameters. Based on the inverted soil parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step is determined. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined. Based on the optimal deformation curve, the target axial force corresponding to each servo support is determined. The difference between the standard axial force and the current axial force generates an axial force adjustment sequence, and the axial force of the corresponding servo support is adjusted according to the axial force adjustment sequence. After the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize, the dynamic safety factors for heave resistance, surge resistance, seepage resistance, and retaining structure fracture resistance are calculated based on the current excavation depth and on-site monitoring data. The current safety status of the foundation pit is determined according to the current value and rate of change of each dynamic safety factor, and corresponding instructions are generated according to the current safety status of the foundation pit. When each dynamic safety factor meets the preset safety conditions corresponding to the current excavation depth, control information allowing entry into the next excavation step is generated.
[0008] Optionally, the preset constraints include at least: the curve shape is smooth without inflection points, the axial force of the steel support does not exceed the limit, and the top boundary conditions; the optimization objective is to minimize the maximum deformation value of the curve.
[0009] Optionally, after the pre-deformation tends to stabilize, a method combining the elastic foundation beam model and the collaborative multi-population genetic optimization algorithm is used to invert the stratum parameters to obtain the inverted stratum parameters. This includes: after the pre-deformation tends to stabilize, establishing an elastic foundation beam model, using the unit width retaining structure as the vertically arranged elastic foundation beam, equating the servo support to the elastic bearing, equating the soil in the pit below the current excavation face to the foundation spring distributed along the depth, and using the water and soil pressure outside the pit as the lateral load acting on the elastic foundation beam, and establishing equilibrium equations; discretizing the elastic foundation beam along the depth direction into multiple The calculation unit establishes discrete equilibrium equations for the areas above and below the excavation face at the current excavation depth, respectively, and solves them to obtain the calculated horizontal displacement of each node of the retaining structure. The error between the measured horizontal displacement and the calculated horizontal displacement at each monitoring depth is used as the fitness evaluation basis, and the stratum parameters, including the soil internal friction angle, cohesion and horizontal resistance parameters, are iteratively searched. When the average error between the calculated deformation curve and the measured deformation curve of the retaining structure obtained by inversion is less than the preset inversion error threshold, the stratum parameters corresponding to the current iteration are determined as the inverted stratum parameters.
[0010] Optionally, based on the inverted geological parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step is determined. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined. This includes: based on the inverted geological parameters, retaining structure parameters, and the initial state of the current excavation step, determining the deformation control equation of the retaining structure corresponding to the current excavation step according to the geological conditions, and the general solution form corresponding to the retaining structure deformation control equation; and based on the retaining structure deformation control equation and the corresponding general solution form, determining the optimal deformation curve corresponding to the current excavation step based on preset constraints and optimization objectives.
[0011] Optionally, based on the current value and rate of change of each dynamic safety factor, the current safety state of the foundation pit is determined, and corresponding control instructions are generated based on the current safety state of the foundation pit, including: obtaining the current value, first-order rate of change, and / or second-order rate of change of each dynamic safety factor with excavation depth; based on the current value, first-order rate of change, and / or second-order rate of change of each dynamic safety factor, classifying the development state of the dynamic safety factor into at least four states: high safety reserve and accelerating decline, high safety reserve and decelerating decline, decreasing safety reserve and accelerating decline, and decreasing safety reserve and decelerating decline; when any dynamic safety factor enters the state of decreasing safety reserve and accelerating decline, a corresponding control instruction is generated.
[0012] Optionally, when any dynamic safety factor enters a state of decreasing and accelerating safety reserve, a construction early warning message and corresponding instructions are generated, including: when any dynamic safety factor enters a state of decreasing and accelerating safety reserve, based on the foundation pit safety status judgment standard, and according to the current excavation depth, the first-order rate of change and / or the second-order rate of change of each dynamic safety factor, corresponding control instructions are generated; wherein, the foundation pit safety status judgment standard is a set of quantitative rule tables for determining corresponding control measures based on the range of change of dynamic safety factor and its rate at different excavation depths.
[0013] Secondly, embodiments of the present invention provide a foundation pit servo support axial force-displacement collaborative tracking control system based on an optimal deformation curve. The system is used to execute the foundation pit servo support axial force-displacement collaborative tracking control method based on an optimal deformation curve as described in any embodiment of the present invention. It includes: a support module, used to apply preloading to the servo support corresponding to the current excavation step after excavation to a preset depth, causing pre-deformation of the retaining structure; an inversion module, used to invert the stratum parameters using a combination of an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm after the pre-deformation tends to stabilize, obtaining inverted stratum parameters; and a determination module, used to determine the deformation control equation of the retaining structure corresponding to the current excavation step based on the inverted stratum parameters, retaining structure parameters, and the initial state of the current excavation step, and to determine the current... The system includes: an optimal deformation curve corresponding to the previous excavation step; an adjustment module for determining the target axial force for each servo support based on the optimal deformation curve, generating an axial force adjustment sequence based on the difference between the target axial force and the current axial force, and adjusting the axial force of the corresponding servo support according to the axial force adjustment sequence; a calculation module for calculating the dynamic safety factor against heave, the dynamic safety factor against sudden surge, the dynamic safety factor against seepage, and the dynamic safety factor against fracture of the retaining structure based on the current excavation depth and on-site monitoring data after the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize; a generation module for determining the current safety state of the foundation pit based on the current value and rate of change of each of the dynamic safety factors, and generating corresponding instructions based on the current safety state of the foundation pit; and a control module for generating control information allowing entry into the next excavation step when all of the dynamic safety factors meet the preset safety conditions corresponding to the current excavation depth.
[0014] Optionally, the determining module is specifically used to: determine the deformation control equation of the retaining structure corresponding to the current excavation step and the general solution form corresponding to the deformation control equation of the retaining structure according to the inverted stratum parameters, retaining structure parameters and the initial state of the current excavation step; and determine the optimal deformation curve corresponding to the current excavation step based on the deformation control equation of the retaining structure and the corresponding general solution form, and based on preset constraints and optimization objectives.
[0015] Thirdly, embodiments of the present invention provide an electronic device, the electronic device comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to execute the axial force-displacement collaborative tracking control method for foundation pit servo support based on optimal deformation curve as described in any embodiment of the present invention.
[0016] Fourthly, embodiments of the present invention provide a computer-readable storage medium storing computer instructions, which are used to cause a processor to execute the axial force-displacement cooperative tracking control method for foundation pit servo support based on optimal deformation curve as described in any embodiment of the present invention.
[0017] This invention, through servo-support preloading to actively compact the gap between the retaining wall and the stratum and activate the stratum resistance, combines an elastic foundation beam model with a collaborative multi-population genetic algorithm to obtain real stratum parameters, thereby dynamically determining the optimal deformation curve for the current excavation step. This upgrades the control target from fixed limits to dynamic trajectory guidance. The support axial force is adjusted sequentially based on the difference between the target axial force and the current axial force, and after stabilization, four types of dynamic safety factors—resistance to heave, heave, seepage, and fracture—are calculated simultaneously. These factors, combined with their values and rates of change, are used for state determination and closed-loop management. This achieves global synergistic optimization of deformation and stress, overcoming the shortcomings of existing technologies such as passive amplitude limiting, fixed targets, and lack of prediction. It significantly improves the safety, controllability, and intelligence level of step-by-step excavation of foundation pits in complex geological and sensitive environments.
[0018] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of the present invention, nor is it intended to limit the scope of the invention. Other features of the invention will become readily apparent from the following description. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 A flowchart of a method for coordinated tracking control of axial force and displacement of foundation pit servo support based on optimal deformation curve provided in Embodiment 1 of the present invention;
[0021] Figure 2 This is a flowchart of formation parameter inversion provided in Embodiment 2 of the present invention;
[0022] Figure 3 This is a diagram illustrating the effect of multiple iterations of formation parameter optimization provided in Embodiment 2 of the present invention.
[0023] Figure 4 This is a curve showing the change in the anti-kick safety factor provided in Embodiment 2 of the present invention;
[0024] Figure 5This is a framework diagram of a foundation pit servo support axial force-displacement collaborative tracking control system based on the optimal deformation curve, provided in Embodiment 3 of the present invention. Detailed Implementation
[0025] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0026] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0027] Example 1:
[0028] Figure 1 This is a flowchart of a method for coordinated tracking control of axial force and displacement of foundation pit servo support based on optimal deformation curve, provided in Embodiment 1 of the present invention. This embodiment is applicable to event reporting planning and multi-source data acquisition. This method can be executed by a foundation pit servo support axial force and displacement coordinated tracking control system based on optimal deformation curve. Figure 1 As shown, the method includes:
[0029] S110. For the current excavation step of the foundation pit, after excavating to a preset depth, preloading is applied to the servo supports corresponding to the current excavation step to induce pre-deformation of the retaining structure. S120. After the pre-deformation stabilizes, the ground parameters are inverted using a combination of an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm to obtain inverted ground parameters. S130. Based on the inverted ground parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation for the retaining structure corresponding to the current excavation step is determined. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined. S140. Based on the optimal deformation curve, the target axial force corresponding to each servo support is determined. An axial force adjustment sequence is generated based on the difference between the target axial force and the current axial force, and the axial force of the corresponding servo support is adjusted according to the axial force adjustment sequence. S150. After the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize, based on the current excavation depth and on-site monitoring data, calculate the dynamic safety factors for heave resistance, surge resistance, seepage resistance, and retaining structure fracture resistance, respectively. S160. Determine the current safety status of the foundation pit based on the current value and rate of change of each of the aforementioned dynamic safety factors, and generate corresponding instructions based on the current foundation pit safety status. S170. When all of the aforementioned dynamic safety factors meet the preset safety conditions corresponding to the current excavation depth, generate control information allowing entry into the next excavation step.
[0030] In this embodiment, servo-supported preloading actively compacts the gap between the retaining wall and the stratum, activating the stratum resistance. Combined with an elastic foundation beam model and a collaborative multi-population genetic algorithm, real stratum parameters are obtained through inversion, dynamically determining the optimal deformation curve for the current excavation step. This upgrades the control target from fixed limits to dynamic trajectory guidance. The support axial force is adjusted sequentially based on the difference between the target axial force and the current axial force. After stabilization, four types of dynamic safety factors—resistance to heave, heave, seepage, and fracture—are calculated simultaneously. These factors, along with their values and rates of change, are used for state determination and closed-loop management. This achieves global synergistic optimization of deformation and stress, overcoming the shortcomings of existing technologies such as passive amplitude limiting, fixed targets, and lack of prediction. It significantly improves the safety, controllability, and intelligence level of step-by-step excavation of foundation pits in complex geological and sensitive environments.
[0031] Example 2:
[0032] The technical solution in this embodiment is a further refinement based on the above embodiments.
[0033] In step S110, for the current excavation step of the foundation pit, after excavation to a preset depth, a preload is applied to the servo support corresponding to the current excavation step to cause the retaining structure to pre-deform.
[0034] The foundation pit is excavated in stages, each stage being called an excavation step. This invention cyclically executes a control process for each step. The current excavation step is the ongoing excavation stage. The preset depth is the depth corresponding to the current excavation bottom elevation set in the construction organization design. When this depth is reached, the installation of servo supports is triggered and preloading is implemented. The servo support consists of a steel support body and a hydraulic / electric servo cylinder / servo head, with a built-in axial force sensor and controller, which can monitor and automatically and accurately adjust the axial force in real time. Preloading, or pre-jacking, refers to the active application of a large initial axial thrust by the servo system after the support is installed and before further excavation, so that the support exerts force in advance rather than being passively stressed. The retaining structure refers to the underground continuous wall, used for soil and water retention. Pre-deformation refers to the small, controllable displacement of the retaining structure into the pit under the action of pre-jacking axial force, actively creating advance to activate the strata and compact the gaps.
[0035] Specifically, in the step-by-step excavation, excavation stops after each step reaches the preset depth. Servo steel supports are installed at the corresponding positions on the retaining structure (ground wall). One end is reliably connected to the ground wall via a waler connector, and the other end is connected to the servo cylinder / servo head, forming a complete servo support system. The design axial force and ultimate axial force of this support are extracted from the design documents. The design axial force is the standard value of the working axial force under normal operating conditions, and the ultimate axial force is the maximum bearing capacity allowed by the support material and structure; exceeding this limit will result in yielding, instability, or failure. The preloaded axial force is determined to be 1.5 to 2.0 times the design axial force, and limited to no more than 2 / 3 of the ultimate axial force. This 2 / 3 limit is derived from the support system's stress safety factor being greater than 1.5. The intersection of these two conditions is taken as the actual pre-jacking axial force value, ensuring both a strong pre-jacking effect and preventing overloading of the support.
[0036] The servo control system is activated, and the hydraulic / electric servo cylinders extend rapidly, quickly increasing the axial force to the pre-loaded axial force. This provides strong pre-jacking to the retaining structure, allowing the retaining wall to work synergistically with the surrounding strata, activating the strata's resistance potential and bringing the strata into a working state ahead of time. Simultaneously, the retaining wall is pressed against the surrounding strata, compacting and eliminating any existing small gaps, ensuring a tight fit between the retaining wall and the strata and eliminating construction voids. Under the pre-jacking force, the retaining structure undergoes small, controllable pre-deformation into the pit. The magnitude is small and the direction is definite, reserving a favorable deformation baseline for subsequent excavation and unloading, and establishing the initial stress state. This initial stress state refers to the sum of deterministic mechanical states exhibited by the support system after the pre-jacking operation of the current excavation step is completed, which can serve as the starting point for subsequent control processes. It is a comprehensive mechanical state quantity, rather than a single displacement or force value.
[0037] In this embodiment, by preloading the servo support, the retaining structure is made to undergo controllable pre-deformation, actively compacting the gap between the wall and soil and activating the stratum resistance, so that the support is stressed in advance, establishing a definite initial stress and deformation baseline, suppressing the development of harmful deformation, and providing reliable initial conditions for subsequent stratum parameter inversion and optimal deformation curve solution, thereby improving the initiative and accuracy of control.
[0038] In step S120, after the pre-deformation tends to stabilize, the formation parameters are inverted using a combination of an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm, resulting in inverted formation parameters, including:
[0039] S121. After the pre-deformation tends to stabilize, an elastic foundation beam model is established. The unit width retaining structure is used as the elastic foundation beam set vertically. The servo support is equivalent to the elastic support. The soil in the pit below the current excavation surface is equivalent to the foundation spring distributed along the depth. The water and soil pressure outside the pit is used as the lateral load acting on the elastic foundation beam. The equilibrium equation is established.
[0040] In this context, the unit width of the retaining structure refers to a 1-meter-wide section of the diaphragm wall as the calculation object. Since the longitudinal direction of the excavation pit is much larger than the transverse direction, it can be treated as a plane strain, with consistent deformation along the wall length; therefore, the unit width can represent the overall mechanical behavior. The vertically installed elastic foundation beam is an abstract representation of the unit width retaining structure as a vertical beam with an axis consistent with the excavation depth. It has a bending stiffness EI and undergoes elastic deformation under stress, with the beam laterally supported by the spring-like structure of the soil within the pit. An elastic support is a mechanically abstract element whose supporting force is proportional to its compressive deformation, similar to a spring. A servo support can be equivalent to an elastic support because the support itself has axial stiffness; the constraint force it provides is related to the displacement of the retaining wall at that point. ,in, y represents the equivalent axial stiffness of the servo steel support, which physically means the axial force required to produce a unit axial compression (or elongation) of the support, usually expressed in kN / mm or MN / m; y represents the horizontal displacement of the enclosure structure at the location of the servo steel support, expressed in mm or m.
[0041] The current excavation face refers to the bottom elevation of the current excavation step, above which is the cantilever section and below which is the embedded section. The soil within the pit refers to the soil below the excavation face on the inner side of the pit, providing lateral constraint to the embedded section of the retaining wall. The foundation springs distributed along the depth represent the action of the soil within the pit as a continuously distributed spring. The stiffness at each depth is determined by the horizontal resistance coefficient m of the soil at that depth. The spring stiffness varies with depth, generally increasing with depth. The force provided by the spring = k(y) × y, where y is the horizontal displacement of the retaining structure at that depth, in mm or m. The physical meaning refers to the actual horizontal deformation of the retaining wall towards the inside (or outside) of the pit at the current depth position. It is an unknown quantity obtained by solving the equilibrium equation of the elastic foundation beam, varying with depth x. k(y) represents the equivalent stiffness of the soil spring at that depth, with units of kN / m² or MN / m³. Physically, it represents the magnitude of the reaction force required by the soil at that depth to resist a unit displacement of the retaining structure. It varies with depth and is usually related to the displacement y itself (non-linear), but in the "m-method," it is simplified to vary linearly only with depth. Where z is the depth from the current excavation face, and m is the proportional coefficient of the horizontal resistance coefficient of the foundation soil. To calculate the width. Additionally, the symbol k(y) is used to emphasize that stiffness is a function of depth z (because z and displacement y are both in the depth coordinate system), not that stiffness changes with the magnitude of displacement. The force provided by the spring refers to the elastic resistance exerted by the soil on the retaining structure at that depth, measured in kN / m or MN / m, i.e., the force per unit height. Physically, when the retaining structure experiences displacement y, the soil spring is compressed (or stretched), and the spring attempts to return to its original shape, generating a resistance force against the retaining structure in the opposite direction to the displacement. The magnitude of this force is proportional to the displacement of the retaining wall at that depth and is opposite in direction to resist deformation; that is, its direction always points in the direction that prevents deformation.
[0042] External soil and water pressure refers to the lateral pressure exerted on the retaining wall by the soil and groundwater outside the foundation pit. It includes: earth pressure, generated by the weight of the soil; and water pressure, generated by the groundwater level. Together, these are called soil and water pressure, denoted as [insert suffix here]. This refers to the lateral load acting on the retaining wall. The equilibrium equation is a fourth-order ordinary differential equation describing the balance between the elastic resistance generated by the bending of the retaining wall itself on a micro-segment, the elastic resistance of the soil within the pit to the retaining wall (soil spring force), and the water and soil pressure outside the pit. This equation is the mathematical expression of the elastic foundation beam model. Specifically, after the pre-top axial force is applied, the horizontal displacement at the top of the retaining wall, the deep horizontal displacement, and the servo support axial force are monitored at 10-15 minute intervals, and displacement-time curves are plotted. When the deformation rate is ≤0.5mm / h and decreasing for three consecutive monitoring periods, the cumulative displacement does not exceed 80% of the design limit, the servo axial force fluctuation is <1% of the ultimate axial force, and these conditions persist for ≥24 hours, the pre-deformation of the retaining wall is considered to be stable.
[0043] Specifically, after the pre-deformation stabilizes, an elastic foundation beam model is established. The unit width of the diaphragm wall or pile bank, typically 1m, is taken as the research object and considered as a vertically placed elastic foundation beam. The vertical direction is consistent with the excavation depth of the foundation pit. The flexural stiffness is EI, where E is the elastic modulus of the wall concrete and I is the moment of inertia of the wall section per unit width. Where b is the unit width and t is the wall thickness. The retaining structure undergoes elastic deformation under stress. Each servo steel support is equivalent to an elastic bearing; that is, the node corresponding to the actual installation depth of the servo steel support in the elastic foundation beam is marked as an elastic bearing. On the wall section below the current excavation face, the effect of the soil in the pit on the retaining wall is equivalent to a series of springs continuously distributed along the depth direction. On the outer side of the entire beam (the side outside the pit), the soil and water pressure outside the pit is applied as a lateral load. Lateral loads can be calculated using Rankine's active earth pressure theory, assuming that the earth pressure is a linearly distributed function. Taking a small segment dx on the retaining wall, based on the static equilibrium conditions (i.e., zero resultant force and zero resultant moment), a fourth-order ordinary differential equation is derived:
[0044] ;
[0045] Where E is the elastic modulus of the concrete in the wall, in kN / m². I is the moment of inertia of the wall section per unit width, measuring the geometric properties of the section's resistance to bending deformation; the thicker the section, the larger I is, and the stronger the bending resistance, in meters. 4 EI represents the flexural stiffness of the retaining structure, in kN·m². y represents the horizontal displacement of the retaining structure, i.e., the actual horizontal deformation of the retaining wall towards the inside (or outside) of the pit at the current depth; it is a function y(x) varying along depth x, and is also the unknown quantity to be solved in the equation; its unit is m or mm. x represents the coordinate along the depth direction of the retaining structure, with the ground or top of the retaining wall as the origin and vertically downward as the positive direction; its unit is m. Let y be the fourth derivative of displacement y with respect to depth x, representing the distributed load effect on the beam, i.e., the bending effect; in the bending theory of beams, the bending moment... shear force Distributed load The unit is . The elastic resistance generated by the bending of the retaining wall itself. k is the soil resistance coefficient, that is, the elastic support stiffness of the soil in the pit to the retaining wall at this depth, which represents the magnitude of the reaction force required by the soil to resist the unit displacement of the retaining structure. Above the excavation surface, the soil has been removed, so k=0; below the excavation surface, it is calculated according to the m method. y is the deformation of the retaining wall in the foundation pit, and ky is the elastic resistance of the soil in the pit to the retaining wall, that is, k(y)×y.
[0046] This represents the soil and water pressure outside the pit, expressed in kN / m². The soil and water pressure can be assumed to have a linear distribution. Specifically, for homogeneous soil layers, the Rankine active earth pressure intensity is... ,in γ is the active earth pressure coefficient, and γ is the soil weight. The hydrostatic pressure increases linearly with depth z. Below the groundwater level, the hydrostatic pressure... It also increases linearly. This represents the depth of the groundwater level. The combined water and soil pressure from both factors is... It is still a linear function of depth, that is... The linear function form is simple, facilitating analytical solutions to differential equations (quintic polynomial or exponential function form), and also providing convenience for subsequent finite difference discretization. Here, A is the slope, representing the rate of increase of soil pressure with depth, in kN / m³. Physically, A comprehensively reflects the effects of soil weight, active earth pressure coefficient, and water weight. B is the intercept, representing the soil pressure value at the ground surface (z=0), in kN / m². Typically, B equals the ground surcharge. Multiply by the active earth pressure coefficient (if there is surcharge on the ground); otherwise, B = 0. Specifically, A and B can be calculated based on soil parameters and groundwater level. First, determine the active earth pressure coefficient: ;in, This is the internal friction angle of the soil. Calculations are made above the groundwater level (…). Water and soil pressure = ;at this time , Calculate the area below the groundwater level (z≥ The water and soil pressure, of which the soil pressure component is , This refers to buoyancy. The water pressure component is... .sum = + Even after sorting, it is still... The form is simply the slope. and intercept Unlike the above, in practical applications, if the soil layers are layered or the groundwater level changes, different A and B values can be used for different segments, while maintaining linearity within each segment.
[0047] S122. Discretize the elastic foundation beam into multiple calculation units along the depth direction. For the current excavation depth, establish discrete equilibrium equations for the area above the excavation surface and the area below the excavation surface respectively, and solve them to obtain the calculated horizontal displacement of each node of the retaining structure.
[0048] The depth direction refers to the vertical direction, with the ground or top of the wall as the origin, and downward as positive, consistent with the excavation depth direction of the foundation pit. A calculation unit can refer to several small segments into which the elastic foundation beam is divided along the depth direction. Each segment is a beam element, with an element length typically ranging from 0.5 to 1 meter; each element has two nodes, namely the two ends. The current excavation depth refers to the elevation position of the bottom of the foundation pit after the completion of the current excavation step, denoted as... The area above the excavation surface refers to the area from the top of the wall (x=0) to the current excavation bottom surface (x=0). In this section, the soil has been removed, there are no soil springs, only elastic supports. The area below the excavation surface refers to the area from the current excavation bottom surface (x= The section from the bottom of the wall (x=H) contains soil and is equipped with continuously distributed soil springs. Each node of the retaining structure refers to the connection point between each calculation unit, and is also the location where supports, soil springs, and loads are applied. Each node has one horizontal displacement degree of freedom. Calculating horizontal displacement refers to obtaining the horizontal displacement value of each node by solving the discrete equilibrium equations. This constitutes the entire deformation curve. The discrete form of the equilibrium equations refers to the system of algebraic equations established at each computational element and node after discretizing the continuous fourth-order differential equilibrium equations of the elastic foundation beam along the depth direction using the finite element method.
[0049] ;
[0050] Where E is the elastic modulus of the enclosure material (concrete). I is the moment of inertia of the wall section per unit width. EI is the bending stiffness of the enclosure, y is the horizontal displacement of the enclosure (a function of depth x), and x or z is the depth coordinate, with the ground as the origin and downward as positive. The fourth derivative of displacement with respect to depth represents the distributed load effect caused by bending. This represents the bottom elevation (excavation depth) of the current excavation step. m is the proportional coefficient of the horizontal resistance coefficient of the foundation soil (m-method parameter). When calculating the width of the enclosure structure, take the unit width. =1m. Water and soil pressure outside the pit.
[0051] Specifically, the total depth H of the enclosure wall is divided into n elements, each with a length l = H / n. Starting from the top of the wall (x = 0), there are nodes 0, 1, 2, ..., n, for a total of n+1 nodes. Each node has two degrees of freedom: horizontal displacement. and corner Each node corresponds to a depth coordinate. =i⋅l, where i is the node number. Based on the depth of the node, determine whether the element is above or below the excavation face. If all elements are located at x≤ If the element is above the excavation face, and there are no soil springs within the element, then the equilibrium equation uses the first section. If all elements are located at x≥ If the element spans the excavation face (i.e., part above and part below), a node is inserted at the excavation face location within that element, subdividing the original element into two sub-elements, each belonging to one of the two categories mentioned above. For each element, based on the category of equilibrium equations used, the element stiffness matrix and equivalent nodal load vector are derived using the principle of virtual work or the Galerkin method.
[0052] For elements above the excavation face, the element stiffness matrix adopts the standard Euler-Bernoulli beam element matrix. This matrix corresponds to the nodal displacement vector. Where i and j are the two endpoint numbers of a beam element, i being the start node number and j being the end node number. Equivalent nodal load vector { } Depend on Integrating, we obtain {Y}, which is the total degree of freedom vector, containing the horizontal displacements and rotations of all nodes, arranged in node number order. If there are n+1 nodes in total, i.e., nodes 0 to n, and each node has 2 degrees of freedom, then: {Y} = For elements below the excavation surface, the element stiffness matrix is the sum of the beam element stiffness matrix and the soil spring additional stiffness matrix. = + The additional stiffness matrix of the soil spring is m. (x- Integrating along the element length yields The equivalent nodal load vector is also derived from... The points are obtained through integration.
[0053] Assemble the 4×4 stiffness matrices of all elements according to their nodal degrees of freedom (two degrees of freedom per node) to form the global stiffness matrix [K]. Simultaneously, assemble the equivalent nodal load vectors of all elements into the global load vector {F}. At the support locations, simplify the supports to elastic supports, and superimpose the support stiffness onto the horizontal displacement degrees of freedom of the corresponding nodes. Introducing boundary conditions, the top of the wall (node 0), typically a free end (unconstrained), is the horizontal displacement of node 0 at the top of the wall. =0 (fixed). The wall base (node n) is usually assumed to be a free end or hinged support, and its location needs to be determined based on the embedment depth. Support locations are at the nodes where each steel support is located, with the support stiffness superimposed in the horizontal displacement direction. The solution is obtained using Gaussian elimination or conjugate gradient method: [K]{Y}={F}; This yields the horizontal displacements of all nodes. , ,..., and corner , ,..., This yields a continuous deformation curve, which is the forward-modeled deformation curve under this set of soil parameters. Furthermore, within each element, the cubic Hermite shape function can be used to interpolate the nodal displacements and rotations to obtain the horizontal displacement at any depth x, resulting in a continuous deformation curve.
[0054] S123. Using the error between the measured horizontal displacement and the calculated horizontal displacement at each monitoring depth as the fitness evaluation basis, iteratively search the formation parameters, including soil internal friction angle, cohesion and horizontal resistance parameters.
[0055] Here, each monitoring depth refers to the depth coordinates corresponding to each node. The measured horizontal displacement refers to the horizontal displacement value of the retaining structure at that depth, actually measured by monitoring equipment such as on-site inclinometers. The calculated horizontal displacement refers to the displacement obtained using an elastic foundation beam model, given a set of stratum parameters (c, ...). Under the conditions of m), the horizontal displacement value at the corresponding depth is calculated. Fitness evaluation criteria can refer to the quantitative indicators used in genetic algorithms (GA) to judge the quality of each individual (i.e., a set of formation parameters); the smaller the error, the higher the fitness, and the greater the probability that the individual will be selected for inheritance. Internal friction angle of soil (m) Shear strength (°) is one of the parameters reflecting the shear strength of soil. Cohesion (c) is a parameter reflecting the bond strength between soil particles, measured in kPa. Horizontal resistance-related parameters mainly refer to the proportionality coefficient (m) of the foundation soil's horizontal resistance coefficient, measured in kN / m. 4 Soil spring stiffness is a core parameter used to describe the soil’s ability to resist horizontal deformation and is used to describe the soil spring stiffness in the elastic foundation beam model.
[0056] Specifically, Figure 2 This is a flowchart of a formation parameter inversion provided in Embodiment 2 of the present invention, as follows: Figure 2 As shown, the genetic algorithm population is initialized, and the population size q and subpopulation size are set. Crossover probability Probability of mutation Selection strategy and parameters, crossover strategy and parameters, maximum number of restarts Start counting Termination strategy: predetermined computational load, number of optimal solutions, or quality of newly obtained solutions. Multiple sets of initial soil parameters (c, ...) are randomly generated. Each group (m, m) is considered an individual, and all individuals constitute the initial population. For each individual (a set of parameters), the elastic foundation beam model is invoked to calculate the calculated horizontal displacement curve of the retaining structure along the depth at the current excavation depth. In the elastic foundation beam model, the relationship between the soil resistance parameter k and the three inversion parameters is not a simple single mapping, but rather influences different terms in the equilibrium equation through different physical mechanisms. m is the horizontal resistance coefficient of the foundation soil, which directly determines the stiffness of the equivalent spring of the soil below the excavation surface. In the "m method," the soil resistance k varies linearly with depth. Where z is the depth measured from the Earth's surface. This represents the current excavation depth. Let z be the depth below the excavation surface, i.e., the starting point of the spring action; therefore, for any depth z below the excavation surface, the stratum resistance k(z) is given by... The only certainty is the internal friction angle. The cohesion c does not appear directly in k, but rather influences the load terms on the right-hand side of the equilibrium equation through the theory of active earth pressure. Regarding the water and soil pressure on the outside of the foundation pit retaining wall. The Rankine active earth pressure formula is usually used to calculate: sandy soil (c=0). = ;in, γ is the active earth pressure coefficient, and γ′ is the effective unit weight of the soil. Cohesive soil (c 0), When the calculated value is negative, it is taken as zero (tensile stress zone). Furthermore, water pressure is superimposed separately. = , This represents the depth of the groundwater level. Therefore, And c affects the active earth pressure coefficient The cohesion term alters the load distribution in the equilibrium equations. .
[0057] For a set of candidate parameters, the complete operation of substituting them into the equilibrium equation is: According to Calculate the active earth pressure coefficient ,according to Calculate the active earth pressure at each depth using c. ;according to Calculate the soil resistance k(z) below the excavation face. Substituting k(z) into the equilibrium equations and using the finite element method of the rod system, the calculated deformation curve of the retaining wall is obtained. For each individual, calculate the average error between the calculated displacement and the measured displacement across all monitoring points:
[0058] ;
[0059] in, The normalization scale can be the maximum measured deformation value. ε is the average error percentage, a dimensionless index used to measure the overall deviation between the calculated deformation curve and the measured deformation curve, and is the basis for determining the termination of the inversion. N is the total number of monitoring points, the number of inclinometer tube nodes arranged along the depth of the retaining wall. For example, if there is one monitoring point every 1m, and there are 20 monitoring points in total, then N=20. To calculate the horizontal displacement. This represents the measured horizontal displacement. This is a normalization scale, a reference value used to normalize the absolute error between the calculated and measured horizontal displacements. It is typically taken as the maximum measured deformation value or range, making the error percentage meaningful. For example, if the maximum measured deformation is 30 mm, then... =30mm.
[0060] The fitness function is defined as the reciprocal of the error. In other words, the smaller the error, the higher the fitness, indicating that the parameters of that set are better. Fitness is used as the selection criterion to perform standard genetic operations (selection, crossover, and mutation) on the current subpopulation. Selection: Based on fitness, superior individuals are selected using roulette wheel selection or tournament selection. Crossover: The selected individuals are processed according to crossover probability. Swap some parameters, such as swapping 'c'. Given the values of m, generate a new individual. Mutation: Apply mutation probability to the new individual. Randomly fine-tuning parameter values increases population diversity. After each subpopulation evolves independently to a preset number of generations, the individual with the highest fitness from each subpopulation is extracted and stored in the optimal solution set. and niche core set The subpopulations are then reordered from highest to lowest fitness value. Based on the niche kernel set, candidate individuals located within the identified niches undergo fitness reduction (lowering their fitness values) to prevent multiple subpopulations from concentrating on searching the same locally optimal region. Subpopulations are then reinitialized (preserving niche kernel information) to guide the search towards the less explored parameter space.
[0061] S124. When the average error between the calculated deformation curve and the measured deformation curve of the retaining structure obtained by inversion is less than the preset inversion error threshold, the formation parameters corresponding to the current iteration are determined as the inverted formation parameters.
[0062] Specifically, the calculated average error ε is compared with a preset inversion error threshold (5%). If it is less than ε, the iteration stops, and the set of parameters (c, ...) is output. The result is taken as m. If it is greater than or equal to the value, the algorithm returns to the cooperative multi-population GA algorithm and continues to perform operations such as selection, crossover, mutation, niche fitness reduction, and re-initialization to generate a new generation of candidate parameters and enter the next iteration. If the accuracy requirement is not met but the maximum number of iterations or the maximum number of restarts has been reached, the algorithm returns to the value. If so, then the current optimal solution will be forced to be output. For example, Figure 3 This is a diagram illustrating the effect of multiple iterations of formation parameter optimization provided in Embodiment 2 of the present invention. Soil parameters were inverted during the excavation of a foundation pit, and deformation was calculated based on the inverted parameters and discrete equilibrium equations. The calculation results are as follows: Figure 3As shown in the figure. The results show that the average errors of the optimal solutions 1, 2, and 3 obtained by the cooperative multi-population GA algorithm are 16.3%, 6.1%, and 4.6%, respectively. After several iterations, the minimum error can be reduced to within 5%. The inversion calculation method has a good fitting ability to the actual deformation, which indirectly verifies the reliability of the inversion parameters.
[0063] In this embodiment, multi-population parallel search and niche fitness reduction techniques are used to effectively escape local optima and dynamically perceive the real changes in stratum parameters caused by excavation unloading; the soil internal friction angle, cohesion and horizontal resistance parameters that fit the current working conditions are obtained, which greatly improves the matching accuracy between the calculation model and the actual stress and deformation law; it provides reliable data support for the subsequent establishment of deformation control equations and improves the confidence and adaptability of the control strategy.
[0064] In step S130, based on the inverted geological parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step is determined. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined, including:
[0065] S131. Based on the inverted stratum parameters, retaining structure parameters, and the initial state of the current excavation step, determine the retaining structure deformation control equation corresponding to the current excavation step and the general solution form corresponding to the retaining structure deformation control equation according to the stratum conditions.
[0066] The retaining structure parameters refer to the structural properties of the retaining wall itself, including bending stiffness (EI), cross-sectional dimensions, and material elastic modulus. The initial state of the current excavation step refers to the initial mechanical and geometric conditions of the retaining structure after preloading and inversion in this step, including deformation shape, support axial force distribution, excavation depth, and wall top boundary conditions; it is the starting point for solving the deformation control equations. The retaining structure deformation control equations are differential equations based on an elastic foundation beam model, describing the deformation law of the retaining wall under given soil parameters, structural parameters, and load conditions; they are the mathematical basis for solving the optimal deformation curve. The current excavation step refers to the ongoing excavation stage in the step-by-step excavation process. After each step, the exposed height, support position, and unloading range change, thus requiring dynamic updates to the equations. Soil conditions refer to the overall state and mechanical properties of the soil and rock mass surrounding the retaining structure and below the pit bottom that affect the stress-deformation characteristics of the support system, including soil type. The general solution form refers to the general expression of all possible solutions of the equation without considering boundary conditions. It contains several undetermined constants, the number of which is equal to the order of the equation. By substituting the general solution into the boundary conditions and constraints determined by the initial state of the current excavation step and the position of the lowest support, the undetermined constants can be uniquely determined, and the specific analytical expression of the deformation curve under specific working conditions can be obtained.
[0067] Specifically, obtain inverted stratigraphic parameters c, m; retaining structure parameters EI, cross-sectional dimensions, material properties; and the initial state of the current excavation step: current excavation depth. The displacement and rotation of the top of the retaining wall are usually assumed to be y=0, θ=0 at the top concrete support; the positions of each servo support. and current axial force; distribution of water and soil pressure outside the pit. ,Depend on Calculations for c and groundwater level. The governing equation form is selected based on geological conditions: For soft soil geology, the geological resistance is very weak, and can be ignored, simplifying the governing equation to... This method is suitable for situations where soft soil has a weak constraint on the diaphragm wall and the spring effect is negligible. For other geological conditions with certain formation resistance, the formation resistance term is retained, and the governing equations are in complete form. ,in (Below the excavation face) or determined according to the actual distribution. Based on the type of equation selected, write the general solution form. For simplified equations that do not consider soil resistance (soft soil), the soil and water pressure is usually linearly distributed. =Ax+B, then the general solution is a fifth-degree polynomial:
[0068] ;
[0069] Since the top boundary conditions (y=0 at x=0, bending moment M=0, shear force V=0) can eliminate the constant term, the final form is: For the complete equation considering soil resistance (non-soft soil), the solution takes the form of a general solution plus a particular solution. For linear distributed loads, the solution takes the form of: ;in, a and b can be directly calculated from the load and k. Based on the initial state of the current excavation step, determine the boundary conditions of the differential equation: top (x=0, at the first concrete support), y=0 (displacement is zero), M=0, V=0, bending moment. shear force At the bottom (deep below the excavation face), displacement and rotation are usually assumed to approach zero, or determined based on the embedment conditions. At each servo support, the relationship between the support reaction force and displacement is F = .
[0070] S132. Based on the deformation control equation of the retaining structure and the corresponding general solution form, and based on the preset constraints and optimization objectives, determine the optimal deformation curve corresponding to the current excavation step.
[0071] Among them, the preset constraints refer to the mandatory restrictions that must be met when solving for the optimal curve, including: the curve shape is smooth and has no inflection points ( <0), axial force of steel support not exceeding the limit (≤2 / 3 of the ultimate axial force), top boundary conditions, etc. The optimization objective refers to the desired optimal performance index under the premise of satisfying constraints, i.e., minimizing the maximum deformation value of the curve (min). The optimal deformation curve refers to the unique deformation curve obtained through multi-objective optimization under given governing equations, constraints, and optimization objectives, which satisfies all conditions and minimizes the maximum deformation. The undetermined parameters in its mathematical expression are uniquely determined. Specifically, the undetermined parameters are identified from the general solution of the governing equations. For example, for the simplified equations of soft soil, the undetermined parameters are C and D (two in total); for the complete equations, the undetermined parameters are A, B, C, and D (four in total). Once the values of these variables are determined, the deformation curve y(x) is uniquely determined. The objective function is a mathematical expression that measures the quality of candidate solutions; the optimization direction is to maximize or minimize the objective function value. The maximum displacement value of the entire deformation curve is denoted as: The optimization goal is to minimize J, thereby obtaining the curve shape that is most conducive to controlling deformation.
[0072] The preset constraints are as follows: Constraint 1: Top boundary condition, i.e., y=0 at x=0. =0, =0 (at the concrete support), the above conditions have been used to eliminate some undetermined parameters, and the remaining parameters still need to be satisfied. Constraint 2: The curve shape is smooth, without inflection points, and without abrupt changes, i.e., the second derivative is... For all x, the curve bends only to one side throughout its entire length, without bending in the opposite direction or twisting. Mathematically, this is expressed as a negative second derivative with no sign change. The physical meaning of this is: the bending moment does not change direction, and there will be no repeated tension and compression; the shear force changes gradually, and the axial force of the steel support will not change abruptly or fluctuate drastically. Constraint 3: The axial force of each steel support shall not exceed 2 / 3 of the ultimate axial force, that is, at the position of each steel support... Place, ,in, To support stiffness, To support the ultimate axial force.
[0073] Using constraints 2 and 3 as inequality constraints and constraint 1 as an equality constraint, and with the optimization objective as the objective function, a mathematical optimization problem is established. This problem seeks a set of undetermined parameters that minimize the maximum displacement of the entire deformation curve, while satisfying the three constraints: the top boundary conditions of the retaining wall, a smooth deformation curve without inflection points, and the axial force of the steel supports not exceeding limits. The feasible region is defined as the set of all decision variable values that satisfy all constraints; specifically, it is the parameter space region consisting of all (C,D) or (A,B,C,D) values that simultaneously satisfy the top boundary conditions, smooth deformation curve without inflection points, and safe axial force of the supports. Only solutions within this region are engineering-acceptable. The optimal solution is the set of decision variable values that maximize the objective function within the feasible region; that is, the set of undetermined parameters that minimizes the maximum deformation J. , Substituting this into the general solution yields the optimal deformation curve. A local optimum minimizes the objective function value within a neighborhood of the feasible region, but not necessarily within the entire feasible region. A global optimum minimizes the objective function value within the entire feasible region. Since constraints may cause the objective function to exhibit multimodality, the solution should strive to find the global optimum, i.e., the parameter combination that truly minimizes the maximum deformation. Mathematical analysis or numerical optimization methods (such as sequential quadratic programming, genetic algorithms, etc.) can be used to solve the above optimization problem, escaping local optima and obtaining the global optimum for the undetermined parameters. Solution strategies include: due to constraint 2 ( <0) represents a functional constraint, which typically requires discretizing the curve into multiple points and applying inequality constraints at each point. Sequential quadratic programming (SQP), interior-point methods, and genetic algorithms can be used, and this approach is particularly suitable for nonlinear constraints on complete equations. For the fifth-degree polynomial form of soft soil, we can... The expression <0 is transformed into a linear inequality, and the minimum value of J is directly found within the feasible region. Substituting the undetermined parameters obtained from the solution back into the general solution expression, the mathematical analytical expression of the optimal deformation curve corresponding to the current excavation step is obtained. The curve has the following characteristics: continuous, smooth, and without inflection points. <0); All support axial forces are within the safe range (≤2 / 3 of the ultimate axial force); The maximum deformation value is the smallest among all feasible curves.
[0074] In this embodiment, the control target is upgraded from a fixed limit to a dynamic equation solution. Mathematical optimization ensures the continuity of the deformation pattern of the retaining structure and the safety of the support stress. A globally optimal deformation trajectory adapted to the current excavation step is generated, realizing refined control over the overall deformation pattern of the retaining structure along the depth. The dynamically generated optimal curve fundamentally solves the problem of mismatch between fixed targets and dynamic working conditions, and realizes the coordinated global optimization of deformation and stress.
[0075] In step S140, the target axial force corresponding to each servo support is determined based on the optimal deformation curve. An axial force adjustment sequence is generated based on the difference between the target axial force and the current axial force, and the axial force of the corresponding servo support is adjusted according to the axial force adjustment sequence. The target axial force can refer to the ideal axial force value that each servo support should achieve, calculated based on the optimal deformation curve. The current axial force can refer to the actual axial force value borne by the servo support at the current moment, measured in real time by a built-in sensor. The axial force adjustment sequence can refer to the order and magnitude of implementing the total difference in steps according to a certain proportion; specifically, it can be divided into four steps: the first step adjusts 40% of the difference, the second step 30%, the third step 20%, and the fourth step 10%. Axis force adjustment can refer to the operation of the servo system actually changing the support axial force through the extension and retraction of hydraulic / electric servo cylinders. Specifically, the analytical expression of the optimal deformation curve is obtained. The curve is a continuous function of depth x (such as a fifth-degree polynomial or an exponential function). Determine the installation depth of each servo support. Given the number and location of servo supports already installed in the current excavation step, denoted as the depth of the i-th support. To check the support stiffness, each servo support has its own axial stiffness. (Unit: kN / mm), this value is determined by the geometry and material properties of the support and can be obtained from design data. Calculate the target axial force and the optimal curve for the displacement value at the support depth. Multiplying by the support stiffness, we obtain the theoretical target axial force:
[0076] = ⋅ ;
[0077] This axial force value represents the axial force that the support should withstand under optimal deformation. Record the target axial force for all supports: Repeat the above calculation for all installed servo supports to obtain a set of target axial force values. , ,..., The target axial force may be less than the current pre-loaded axial force. Since the pre-loaded axial force is 1.5 to 2.0 times the design axial force, and the optimal curve aims for minimal deformation with a smaller displacement, the corresponding axial force may also be smaller. Therefore, subsequent adjustments usually involve releasing (i.e., reducing) the axial force. For each servo support, the current axial force is read. The difference is calculated by measuring it in real time by the sensor: ;like <0 indicates that the axial force needs to be released (reduced). If A value greater than 0 indicates that an increase in axial force is required. Based on the generated axial force adjustment sequence, a four-step gradient release strategy can be adopted to prevent excessively rapid unloading of the foundation pit from damaging the retaining structure. Specifically, the ratio is 40% of the difference released in the first step, i.e., 0.4. The second step is to release 30% of the difference, i.e., 0.3. The third step is to release 20% of the difference, i.e., 0.2. The fourth step is to release 10% of the difference, i.e., 0.1. After four steps, the final result is achieved. The servo control system adjusts step by step according to the sequence, executing the following process: First, it sends a command to the servo cylinder to change the axial force from... Adjust to +0.4 During adjustment, monitor the axial force sensor feedback in real time to ensure precise positioning. Wait for stabilization, pausing briefly (e.g., several seconds to several minutes) to allow the retaining structure and ground to adapt to the new stress state. The second step is to continue adjustment until... +0.7 The third step is to adjust to... +0.9 Step four, adjust to After each adjustment, the system automatically maintains the current axial force and waits for the next instruction. The entire process is completed automatically by the PLC or embedded controller without manual intervention. After the four adjustments are completed, the actual axial force of each support is read again to confirm that the deviation from the target axial force is within the allowable range, such as ±2%. If the deviation is too large, fine-tuning can be performed.
[0078] In this embodiment, the axial force of each support target is determined based on the optimal deformation curve, and the force is adjusted step by step according to the difference with the current axial force. The optimal deformation is converted into an executable command, achieving optimal synergy between force and deformation. Step-by-step gradient adjustment avoids shocks, disturbances, or instability caused by a one-time adjustment, ensuring smooth and safe operation. It is automatically executed by the servo system, achieving fast and accurate closed-loop control, reducing human error, and improving response speed.
[0079] In step S150, after the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize, based on the current excavation depth and on-site monitoring data, the dynamic safety factors for heave resistance, surge resistance, seepage resistance, and retaining structure fracture resistance are calculated, including:
[0080] Based on the current excavation depth and the position of the lowest support, the dynamic safety factor against heave is determined according to the circular arc sliding stability analysis relationship. The field monitoring data refers to data collected in real time by sensors installed in the excavation pit, mainly including the horizontal displacement of the retaining wall (inclinometer), support axial force, groundwater levels inside and outside the pit, pore water pressure, and earth pressure. The dynamic safety factor against heave characterizes the stability of the soil at the bottom of the pit against upward heave (kickback) under excavation unloading and support action. The heave stability of the lowest support is verified according to the circular arc sliding mode; a larger safety factor indicates greater safety. The position of the lowest support refers to the position of the support closest to the current excavation face among all the servo steel supports installed in the current excavation step, and it dynamically moves downward as the excavation depth increases. The stability analysis relationship for circular arc sliding is as follows: Using the lowest support as the center (or the center located within its horizontal plane), a circular arc slip surface is constructed through a point below the wall toe or pit bottom. The soil and structure above the slip surface are considered as the sliding body. A balance is established between the anti-slip moment and the sliding moment. The dynamic safety factor against uplift is equal to the ratio of the sum of the anti-slip moments to the sum of the sliding moments. In specific calculations, the servo support adjusts the axial force from its current value to the target value using a four-step gradient adjustment sequence (40%, 30%, 20%, 10%), confirming that the deviation between the actual axial force and the target axial force is within the allowable range (e.g., ±2%). After adjustment, the retaining structure undergoes a brief deformation adjustment under the new stress state. Deformation is continuously monitored. When the deformation rate drops below a threshold (e.g., the deformation increment is less than 0.5 mm for two consecutive hours), the deformation is considered to have stabilized, and the system has reached a new mechanical equilibrium. The current excavation depth h and the latest readings of all monitoring data are recorded. According to the "Technical Standard for Foundation Pit Engineering" (DG / TJ 08-61-2018), the heave stability of the lowest support is verified using a circular arc sliding model at the current excavation depth: The depth of the lowest support is determined, and a circular arc slip surface is drawn through a point below the wall toe or pit bottom, centered on this point. The ratio of the resisting moment to the sliding moment on the slip surface is the heave safety factor. The resisting moment is contributed by the soil cohesion *c* and the internal friction angle on the slip surface, while the sliding moment is contributed by the self-weight of the sliding soil and external loads. The constraint effect of the reaction force of the lowest support is considered during the calculation. The current excavation depth *h* is used to determine the range of the slip surface and the geometry of the sliding body. The larger *h* is, the larger the sliding moment and the lower the safety factor.
[0081] The dynamic safety factor against sudden inrush is determined based on the current excavation depth, the geometry of the foundation pit, the shear strength of the soil layer at the bottom of the pit, the location of the confined aquifer, and the real-time confined aquifer head pressure. The dynamic safety factor against sudden inrush is a quantitative indicator characterizing the stability of the confined aquifer below the bottom of the foundation pit against upward breakthrough (sudden inrush) under hydraulic pressure. The analysis considers the dimensions of the foundation pit and the shear strength of the soil layer at the bottom; a larger safety factor indicates greater safety. The geometric dimensions of the foundation pit, as defined in the formula, mainly include its length and width (or equivalent radius). , The shear strength of the soil layer at the bottom of the pit refers to the shear strength of the soil layer between the bottom of the pit and the top of the confined aquifer, and is characterized by two shear strength parameters: effective cohesion c′ and effective internal friction angle. The location of a confined aquifer refers to its spatial position in the vertical direction, primarily characterized by two quantities: the depth of the top surface of the confined aquifer (distance from the ground surface), and the derived value t = the distance from the top surface of the confined aquifer to the bottom of the retaining structure. Real-time confined aquifer head pressure refers to the head pressure within the confined aquifer, i.e., the pressure value converted from the confined aquifer head height.
[0082] Specifically, based on the methods in the "Technical Standard for Foundation Pit Engineering" (DG / TJ 08-61-2018), and considering the dimensions of the foundation pit and the shear strength of the soil at the bottom, a heave resistance analysis is performed. The calculation method is as follows:
[0083] ;
[0084] in, The dynamic safety factor for resisting sudden inrush is given. t is the distance (in meters) from the top surface of the confined aquifer to the bottom of the retaining structure, which changes dynamically with the excavation depth. The pressure head of the confined water (kPa) is calculated by obtaining real-time confined water level information on-site. , denoted as , where is the characteristic dimension of the excavation pit in two directions, such as half of the long and short sides, or the distance (m) from the center of the excavation pit to either side. D is a characteristic depth (upper limit of integration) (m) within the vertical distance from the top surface of the confined aquifer to the bottom of the retaining structure. z is the integration variable, representing the depth coordinate (m). The saturated unit weight (kN / m³) of the soil at the bottom of the pit represents the natural unit weight of the soil underwater and reflects the soil's own weight. is the specific weight of water (usually taken as 10 kN / m³), the unit weight of pressurized water. The effective internal friction angle of the soil. The effective cohesion of the soil (kPa). Passive earth pressure coefficient, and Related to the calculation of shear resistance of the passive zone soil. coefficient of earth pressure at rest, and Related It is used to calculate the shear resistance of soil under static lateral pressure. The net pressure of the pressurized water (kPa) is the remaining water pressure after deducting the weight of the overlying soil.
[0085] The dynamic safety factor for seepage resistance is determined based on the seepage path length that varies with the current excavation depth and the real-time groundwater head difference between inside and outside the pit.
[0086] The dynamic safety factor against seepage is a quantitative indicator characterizing the stability of the soil under the influence of the difference in water head inside and outside the foundation pit, ensuring that seepage will not lead to seepage failures such as soil erosion or piping. It is determined by comparing the ratio of the critical hydraulic gradient to the actual hydraulic gradient; a larger safety factor indicates greater safety. The seepage path length (L) refers to the total length of the shortest seepage path from the high water level outside the foundation pit, down along the outside of the retaining structure, around the bottom of the retaining structure, and then up along the inside to the bottom of the pit. The real-time groundwater head difference between the inside and outside of the pit is the difference in water head between the groundwater level outside and inside the pit, which represents the driving force of seepage. Specifically, the formula for calculating the dynamic safety factor against seepage is as follows: ;in, To provide a dynamic safety factor against seepage, ; . It is the total length of the vertical segment of the seepage path, that is, the sum of the length components along the vertical direction in the seepage path, which varies with the excavation depth. It is the total length of the horizontal segment of the seepage path, that is, the sum of the length components along the horizontal direction in the seepage path. The real-time groundwater head difference between the inside and outside of the pit is obtained through observation wells inside and outside the pit. i represents the actual seepage hydraulic gradient of the soil at the bottom of the pit, which is the ratio of the head difference to the shortest seepage path length. The conversion factor is used to convert the vertical section of the seepage path to the horizontal section. It is 1.5 for single-row curtain walls and 2.0 for multi-row curtain walls. The critical hydraulic gradient of the soil at the bottom of the pit is the hydraulic gradient at which soil particles are about to be lifted by water and cause soil flow / piping. ρ is the relative density of soil particles at the bottom of the pit, which is the ratio of soil particle density to water density, typically 2.65~2.75. e is the natural void ratio of the soil at the bottom of the pit, which is the ratio of pore volume to soil particle volume.
[0087] The current bending moment of the retaining structure is determined based on the measured horizontal displacement of the retaining structure, and the dynamic safety factor against fracture is determined according to the ratio between the design ultimate bending moment of the retaining structure and the current bending moment. The dynamic safety factor against fracture is a quantitative indicator characterizing the stability of the retaining wall (base wall) against cross-sectional fracture under bending moment. It is obtained by comparing the design ultimate bending moment of the base wall with the actual calculated bending moment; a larger safety factor indicates greater safety. The measured horizontal displacement of the retaining structure refers to the horizontal displacement data at various points along the depth direction collected in real time by inclinometers installed within the retaining wall. The current bending moment of the retaining structure refers to the actual bending moment value of each cross-section along the depth of the retaining structure, calculated based on the measured horizontal displacement curve using the moment-curvature relationship of an elastic beam. The design ultimate bending moment of the retaining structure refers to the maximum bending moment value that the cross-section can withstand, determined by the reinforcement design, cross-sectional dimensions, and material strength of the retaining structure (diaphragm wall). This value is determined during the design phase and represents the upper limit of the retaining structure's bending capacity. Specifically, the measured horizontal displacement of the retaining structure is obtained. , combined Calculate the current bending moment value of the enclosure structure. Dynamic safety factor against breakage. The calculation formula is as follows: Where M is the current bending moment of the enclosure structure; Design the ultimate bending moment for the enclosure structure.
[0088] In this embodiment, after the axial force adjustment is completed and the deformation is stable, four types of dynamic safety factors—anti-heave, anti-surge, anti-seepage, and anti-fracture—are calculated simultaneously. This covers the main instability modes of the foundation pit, constructs a multi-dimensional dynamic safety status characterization system, fills the monitoring blind spots of potential risks such as deep sliding and sudden water pressure changes, and provides a complete and reliable quantitative basis for graded early warning and scientific decision-making.
[0089] In step S160, the current safety state of the foundation pit is determined based on the current value and rate of change of each dynamic safety factor, and a corresponding instruction is generated based on the current safety state of the foundation pit, including: obtaining the current value, first-order rate of change, and / or second-order rate of change of each dynamic safety factor with respect to the excavation depth; wherein, the current value may refer to the value F(h) of a certain dynamic safety factor at the current excavation depth h. The first-order rate of change may refer to the first derivative of the safety factor with respect to the excavation depth. This represents the rate at which the safety factor changes with depth (how fast it decreases). A negative value indicates a decrease, and a positive value indicates an increase. The second rate of change can be referred to as the second derivative of the safety factor with respect to the excavation depth. This indicates the trend (acceleration or deceleration) of the first-order rate of change. Negative values indicate an accelerating decrease, while positive values indicate a decelerating decrease. Specifically, it reads the current values of the four dynamic safety factors. , , , Where h is the current excavation depth. The system maintains a database showing how each safety factor varies with the excavation depth. , ,..., ,in =h represents the current depth. The first-order rate of change is calculated using the finite difference method. It can be used to characterize the rate of decrease of the safety factor at the current excavation depth. <0 indicates a decrease. >0 indicates an increase. The second-order rate of change is calculated using the second-order difference method. It can be used to characterize the changing trend of the rate of decline. <0 indicates an accelerating descent (getting faster and faster). >0 indicates a deceleration (gradually slower). For each of the four safety factors, the triplet {F(h)} is obtained. , }
[0090] Based on the current value, first-order rate of change and / or second-order rate of change of each dynamic safety factor, the development state of the dynamic safety factor is divided into at least four states: high safety reserve and accelerating decline, high safety reserve and decelerating decline, low safety reserve and accelerating decline, and low safety reserve and decelerating decline.
[0091] The safety reserve level refers to the margin between the current value of the safety factor and the critical threshold (such as the minimum allowable value according to regulations). It is divided into two levels: high safety reserve (F is much greater than the threshold) and decreasing safety reserve (F is close to the threshold). The decreasing state can be characterized by the trend of safety factor change jointly represented by the first and second order rates of change. It is divided into accelerated decrease, i.e. <0 and <0, the descent is accelerating, and the descent is decelerating, i.e. <0 and >0, the decline slows down. The development status is classified into four categories based on a combination of two dimensions: safety reserve level and decline state: high safety reserve and accelerating decline, high safety reserve and decelerating decline, decreasing safety reserve and accelerating decline, and decreasing safety reserve and decelerating decline. Specifically, a safety factor threshold can be pre-set based on specifications or engineering experience. For example, 1.5. If F(h) > If F(h) ≤ This indicates a decrease in safety reserves. If <0 and A slope less than 0 indicates an increasingly steep curve, signifying an accelerating descent. <0 and A value >0 indicates that the slope of the curve is becoming increasingly gentle, signifying a decelerating descent. The four possible combinations of states are: F(h) > , <0 indicates a high safety margin and a rapidly decreasing risk level, at which point the risk is manageable. F(h)> , >0 indicates a high safety margin and a decelerated descent state, which is relatively safe. F(h)≤ , <0 indicates a decreasing and accelerating safety reserve. While the safety margin remains relatively large, the rapid rate of decline poses a risk of loss of control, necessitating on-site intervention and control measures. F(h)≤ , A value greater than 0 indicates a decreasing and decelerating safety reserve. While the rate of decrease in the safety factor slows, the safety reserve value is low, requiring close monitoring of the site conditions. If no control measures are implemented on-site, a plan must be promptly determined to prevent risk events from occurring. For example... Figure 4 This is a curve showing the change in the anti-kick safety factor provided in Embodiment 2 of the present invention, as shown in the figure. Figure 4 As shown, the curve The curve corresponds to a state where the safety (coefficient) reserve is relatively high and is decreasing rapidly. Corresponding to a state of high safety (factor) reserve and deceleration, the curve The curve corresponds to a decreasing and accelerating decline in the safety (coefficient) reserve. This corresponds to a decreasing and decelerating safety (coefficient) reserve. When any dynamic safety factor enters a state of decreasing and accelerating safety reserve, a control command is automatically generated. Construction early warning information refers to alarm prompts generated in this state, such as audible and visual alarms, SMS messages, and monitoring pop-ups; control commands refer to on-site action orders automatically generated based on preset safety judgment standards. Specifically, the depth range is determined based on the ratio of the current excavation depth h to the total depth H, the safety status judgment standard table is consulted, and control countermeasures and rectification measures are read based on the safety factor F and the first and second order rates of change, and commands are automatically generated and issued on-site.
[0092] In this embodiment, the current value, first-order and second-order rates of change of each safety factor with excavation depth are obtained through the finite difference method. The development state is divided into four types. When the safety reserve is decreasing and accelerating, a control command is automatically generated. This achieves a leap from numerical alarm to trend warning, identifying the risk deterioration trend before the danger occurs, and realizing early risk warning, hierarchical control and intelligent closed-loop management.
[0093] Optionally, when any dynamic safety factor enters a state of reduced safety margin and accelerated decline, construction warning information and corresponding control instructions are generated, including: when any dynamic safety factor enters a state of reduced safety margin and accelerated decline, generating corresponding control instructions based on the foundation pit safety state judgment criteria, according to the current excavation depth and the first-order change rate and / or second-order change rate of each dynamic safety factor; wherein the foundation pit safety state judgment criteria is a set of quantitative rule tables that determine corresponding control measures according to the variation ranges of the dynamic safety factor and its rate under different excavation depths. Specifically, the foundation pit safety state judgment criteria based on the dynamic safety factor is shown in Tables 1 to 3, and Table 1 is the foundation pit safety state judgment criteria when the normalized depth is 0<h / H<0.3:
[0094] Table 1
[0095]
[0096] Table 2 is the foundation pit safety state judgment criteria when the normalized depth is 0.3≤h / H<0.7:
[0097] Table 2
[0098]
[0099] Table 3 is the foundation pit safety state judgment criteria when the normalized depth is 0.7≤h / H<1:
[0100] Table 3
[0101]
[0102] Wherein, the threshold value of 1.5 is the minimum safety factor requirement for stability checks against heave, seepage resistance and the like specified in the Technical Specification for Retaining and Protection of Building Foundation Pits, and first-level foundation pits usually require ≥ 1.35~1.5; it is the reference line for sufficient safety margin. When F≥1.5, the safety margin is considered sufficient and in the normal controllable range. The threshold value of 1.2 is a commonly used warning line in engineering practice, which is between the minimum specification value and the safety value, and is the warning line for reduced safety margin. When F<1.2, the safety margin is considered to be significantly insufficient, and work stoppage or emergency measures must be taken. -4 and -8 are empirical thresholds for judging whether the first-order change rate F' is a rapid decline. In the shallow layer (0 < h / H < 0.3), the safety factor itself is relatively high, and the soil mass has strong self-stability capacity, allowing a relatively large fluctuation of the safety factor, and a value ≤-8 is regarded as a rapid decline. In the deep layer (0.3≤h / H<1), as the excavation deepens, the safety factor has approached the critical value, and the safety margin is extremely low. At this time, even a small decline rate will quickly approach the instability interval, so a value ≤-4 is regarded as a rapid decline.
[0103] The foundation pit safety state judgment criterion is pre-constructed in the following manner: (1) Determine the threshold boundaries of the safety factor. According to the minimum safety factors for each safety grade specified in the provisions of the current national and industrial codes such as "Technical Specification for Retaining and Protection of Building Foundation Pits" JGJ 120-2012 for the stability checking computations of pit bottom heave, embedded stability, and overall sliding stability, for example, the anti-heave safety factor of a first-grade foundation pit shall not be less than 1.8, and the embedded stability safety factor shall not be less than 1.25, combined with the value range of the safety factor corresponding to the safety grade of the foundation pit (first grade / second grade / third grade), determine the classification lower limit of higher safety reserve and reduced safety reserve, such as 1.5, and the upper limit of the dangerous state, such as 1.2; and in the later stage of excavation, that is, when the normalized depth h / H ≥ 0.7, due to the change of the stability checking mode, the above boundaries can be shifted downward as a whole by a preset offset (such as 0.2~0.3) to form the adaptive threshold for this depth section. (2) Calibrate the critical value of rate change. For the target foundation pit project, by establishing a numerical simulation model of the whole process of foundation pit excavation, for example, using finite element software to establish a numerical model serving for foundation pit excavation analysis, calculate the change curve of each dynamic safety factor F(h) with the excavation process under different excavation depths; perform discrete difference on this curve to obtain the first-order rate of change and the sample sequence of the second-order rate of change F''(h). Count the historical monitoring data of this foundation pit project and multiple completed foundation pits under similar geological conditions, and extract several excavation steps before the safety factor falls below the code limit and the typical magnitude, based on which the absolute value threshold of the first-order rate of change for rapid drop is calibrated | |: for the shallow section, that is, 0<h / H<0.3, it can be 8, and for the middle-deep section, that is, 0.3≤h / H<1, it can be 4; and F''<0 is taken as the judgment condition for accelerated decline. (3) Establish state-measurement mapping rules. Taking the normalized excavation depth h / H, the current value of safety factor F, the first-order rate of change , the second-order rate of change As a four-dimensional index, based on the risk acceptance criteria for foundation pit engineering, each index is mapped to control measures: including no measures, encrypted monitoring and on-site inspection, organizing multi-party joint on-site inspection, suspending construction and holding on-site special meetings, immediately stopping work and holding expert meetings to determine emergency plans, etc., and forming specific rectification measures suggestions, such as adding temporary supports, surcharge counter-pressure in the pit, adjusting the axial force of servo supports, backfilling outside the pit, water filling inside the pit, etc. (4) Typical working condition back-calculation verification and correction. Select several representative typical foundation pit engineering cases, input the F(h) curve obtained from their monitoring into the above mapping rules for back-calculation, and verify the consistency between the control level output by the rules and the actual engineering disposal records; for cases with missed or false reports, adjust the threshold boundaries in (1)~(2) until the rule table can trigger the corresponding level of control instructions at least one excavation step before the occurrence of danger in all verified cases, thereby forming the final quantitative rule table. For example, assume that the system monitors the anti-heave safety factor The triggering condition of reduced and accelerated reserve descent has been met. Based on the ratio h / H of the current excavation depth h to the total depth H, the depth range is determined. Based on this depth range, the corresponding foundation pit safety status assessment standard table is consulted. According to the safety factor F and the first and second rate of change, the corresponding control measures and specific rectification measures columns are directly retrieved, and instructions are automatically generated and issued to the site.
[0104] In this embodiment, by pre-setting quantitative rule tables for different excavation depths, corresponding control instructions are automatically generated based on the current value of each dynamic safety factor and the first and second order rates of change. The safety status judgment is expanded from a single limit value to a trend quantitative classification that includes the rate of change, realizing the forward-looking identification and precise graded control of the risk deterioration trend, effectively avoiding the sudden occurrence of dangers, and further improving the safety controllability and intelligent decision-making level of complex foundation pit projects.
[0105] In step S170, when all the dynamic safety factors meet the preset safety conditions corresponding to the current excavation depth, control information allowing entry into the next excavation step is generated. The preset safety conditions are, in the foundation pit safety status judgment criteria based on dynamic safety factors, the conditions that allow continued construction without triggering a warning / work stoppage within a certain depth range and safety factor range, as required by F. , The numerical boundary set is used to answer the question of whether the current excavation pit allows for the excavation of the next layer. Control information is a digital command signal generated by the monitoring host (or PLC controller) to drive the servo support system and excavator interlocking circuit. Specifically, it may include sending an unlock command to the servo pump station; sending a work permission signal to the excavator control system; and sending a reset / shutdown signal to the on-site audible and visual alarm. The next excavation step refers to the planned next layer of earthwork excavation cycle after the current excavation layer is completed, i.e., the next layer depth, such as continuing to excavate downwards by 0.5m to 1.0m. In sequential operations, this is the stage goal of excavating the foundation pit to the upper part after completing the current depth.
[0106] Specifically, at the current excavation depth h, data such as support axial force, wall displacement, and groundwater level are collected in real time using sensors. The current values of the four dynamic safety factors are then calculated using the aforementioned formula. Simultaneously, their first-order rates of change are calculated using discrete difference methods. and second-order rate of change Locate the depth range h / H and determine the corresponding safety condition assessment standard table for the foundation pit. For the current depth range, preset the corresponding safety condition requirements F, , The boundaries are as follows, assuming the current h / H = 0.5, taking the anti-uplift coefficient as an example: Condition A (high safety margin and non-accelerated descent): F ≥ 1.5 and ( ≥−4 or (−4≤F<0 and ≥0); Condition B (reserves decrease but are controlled): 1.2≤F<1.5 and ≥0 or (−4≤) <0 and ≥0) or ( <0 and ≥−4). Each of the four safety factors is evaluated individually; only when all of them fall within the current depth range, and the corresponding F, F′, and F′ safety conditions are set accordingly, will the outcome be determined. When the conditions are within the boundary, the condition is considered met. If all conditions are met, the system generates the following control information: sends a 24V high-level signal to the excavator interlocking circuit (allowing start); sends a "maintain current axial force and fine-tune according to plan" instruction to the servo system; and pushes a "allow next excavation step" prompt to the on-site display screen. If any condition is not met, the control information changes to: the excavator interlocking relay remains open, and the machine cannot move; the servo system immediately locks the current support axial force and enters a pressure-holding state; simultaneously, according to the foundation pit safety status judgment standard table, the corresponding control instructions, such as conducting on-site inspections, are pushed out synchronously, requiring a rectification plan to be submitted within 24 hours. Only when the allow flag in the control information is true and feedback is sent to the central control and dispatch system will the face begin to excavate downwards in layers. During the excavation process, the system continues to repeat the above process in vertical steps, such as 0.5m intervals, to achieve a linkage safety logic that prioritizes stopping work over proceeding if the conditions are not met.
[0107] In this embodiment, at the current excavation depth, the four dynamic safety factors are checked one by one to see if they meet the preset safety conditions. Only when all conditions are met is control information generated to allow entry into the next excavation step generated, and linked with the excavator interlocking circuit. The multi-dimensional safety assessment results are transformed into the hard interlocking logic of the construction machinery, eliminating the subjective interference of human judgment. This ensures that the foundation pit can only continue to be excavated under an absolutely safe and controlled state, realizing a rigid safety guarantee mechanism that will not excavate if the conditions are not met.
[0108] Example 3:
[0109] Figure 5 This is a framework diagram of an axial force-displacement coordinated tracking control system for a foundation pit servo support based on an optimal deformation curve, provided in Embodiment 3 of the present invention. The system is used to execute the axial force-displacement coordinated tracking control method for a foundation pit servo support based on an optimal deformation curve as described in any embodiment of the present invention. Figure 5 As shown, the system includes:
[0110] The support module 210 is used to preload the servo supports corresponding to the current excavation step after excavation reaches a preset depth, causing pre-deformation of the retaining structure. The inversion module 220 is used to invert the soil parameters after the pre-deformation stabilizes, using a combination of an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm to obtain inverted soil parameters. The determination module 230 is used to determine the deformation control equation of the retaining structure corresponding to the current excavation step based on the inverted soil parameters, retaining structure parameters, and the initial state of the current excavation step. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, it determines the optimal deformation curve corresponding to the current excavation step. The adjustment module 240 is used to determine the target axial force corresponding to each servo support based on the optimal deformation curve. The axial force adjustment sequence is generated based on the difference between the target axial force and the current axial force, and the axial force of the corresponding servo support is adjusted according to the axial force adjustment sequence; the calculation module 250 is used to calculate the dynamic safety factor against heave, the dynamic safety factor against sudden surge, the dynamic safety factor against seepage, and the dynamic safety factor against fracture of the retaining structure based on the current excavation depth and on-site monitoring data after the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize; the generation module 260 is used to determine the current safety status of the foundation pit based on the current value and rate of change of each of the dynamic safety factors, and generate corresponding instructions based on the current safety status of the foundation pit; the control module 270 is used to generate control information allowing entry into the next excavation step when each of the dynamic safety factors meets the preset safety conditions corresponding to the current excavation depth.
[0111] Optionally, the determining module 230 is specifically used for:
[0112] Based on the inverted stratum parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step and the general solution form of the deformation control equation of the retaining structure are determined according to the stratum conditions. Based on the deformation control equation of the retaining structure and the corresponding general solution form, and based on the preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined.
[0113] The foundation pit servo support axial force-displacement collaborative tracking control system based on the optimal deformation curve provided in the embodiments of the present invention can execute the foundation pit servo support axial force-displacement collaborative tracking control method based on the optimal deformation curve provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0114] Example 4:
[0115] This invention provides an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to execute the real-time voiceprint anti-counterfeiting and authentication method for a large-model-based voice agent as described in any embodiment of this invention.
[0116] In some embodiments, a real-time voiceprint anti-spoofing and authentication method for a large-model-based voice agent can be implemented as a computer program. The computer program for implementing the method of the present invention can be written using any combination of one or more programming languages. In the context of the present invention, a computer-readable storage medium stores computer instructions that, when executed by a processor, implement the real-time voiceprint anti-spoofing and authentication method for a large-model-based voice agent provided by the present invention.
[0117] It should be understood that the various forms of processes shown above can be used, with steps reordered, added, or deleted. For example, the steps described in this invention can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution of this invention can be achieved, and this is not limited herein.
[0118] The specific embodiments described above do not constitute a limitation on the scope of protection of this invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.
Claims
1. A foundation pit servo support axial force-displacement cooperative tracking control method based on an optimal deformation curve, characterized in that, include: For the current excavation step of the foundation pit, after excavation to the preset depth, preloading is applied to the servo support corresponding to the current excavation step to cause pre-deformation of the retaining structure; After the pre-deformation tends to stabilize, the formation parameters are inverted by combining the elastic foundation beam model with the collaborative multi-population genetic optimization algorithm to obtain the inverted formation parameters. Based on the inverted stratum parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step is determined. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined. Based on the optimal deformation curve, the target axial force corresponding to each servo support is determined. An axial force adjustment sequence is generated according to the difference between the target axial force and the current axial force. The axial force of the corresponding servo support is adjusted according to the axial force adjustment sequence. After the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize, the dynamic safety factor against heave, the dynamic safety factor against sudden surge, the dynamic safety factor against seepage, and the dynamic safety factor against fracture of the retaining structure are calculated based on the current excavation depth and on-site monitoring data. Based on the current value and rate of change of each dynamic safety factor, the current safety status of the foundation pit is determined, and corresponding instructions are generated based on the current safety status of the foundation pit. When all the dynamic safety factors meet the preset safety conditions corresponding to the current excavation depth, control information is generated to allow entry into the next excavation step.
2. A method according to claim 1, characterized in that The preset constraints include at least the following: the curve shape is smooth without inflection points, the axial force of the steel support does not exceed the limit, and the top boundary conditions. The optimization objective is to minimize the maximum deformation value of the curve.
3. A method according to claim 1, characterized in that After the pre-deformation stabilizes, a method combining an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm is used to invert the formation parameters, obtaining the inverted formation parameters, including: After the pre-deformation tends to stabilize, an elastic foundation beam model is established. The unit width retaining structure is used as the elastic foundation beam set vertically. The servo support is equivalent to the elastic support. The soil in the pit below the current excavation surface is equivalent to the foundation spring distributed along the depth. The water and soil pressure outside the pit is used as the lateral load acting on the elastic foundation beam, and the equilibrium equation is established. The elastic foundation beam is discretized into multiple calculation units along the depth direction. For the current excavation depth, discrete equilibrium equations are established for the area above the excavation surface and the area below the excavation surface, respectively. The calculated horizontal displacement of each node of the retaining structure is obtained by solving these equations. The error between the measured horizontal displacement and the calculated horizontal displacement at each monitoring depth is used as the fitness evaluation basis to iteratively search for formation parameters, including soil internal friction angle, cohesion and horizontal resistance. When the average error between the calculated deformation curve and the measured deformation curve of the retaining structure obtained by inversion is less than the preset inversion error threshold, the formation parameters corresponding to the current iteration are determined as the inverted formation parameters.
4. The method of claim 1, wherein, Based on the inverted geological parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step is determined. Based on the retaining structure deformation control equation and preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined, including: Based on the inverted stratum parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step and the general solution form of the deformation control equation of the retaining structure are determined according to the stratum conditions. Based on the deformation control equation of the retaining structure and the corresponding general solution, and based on the preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined.
5. The method of claim 1, wherein, Based on the current value and rate of change of each of the aforementioned dynamic safety factors, the current safety status of the foundation pit is determined, and corresponding control commands are generated based on the current safety status of the foundation pit, including: The current value, first-order rate of change, and / or second-order rate of change of each dynamic safety factor as a function of excavation depth are obtained respectively. Based on the current value, first-order rate of change and / or second-order rate of change of each dynamic safety factor, the development state of the dynamic safety factor is divided into at least four states: high safety reserve and accelerating decline, high safety reserve and decelerating decline, low safety reserve and accelerating decline, and low safety reserve and decelerating decline. When any dynamic safety factor enters a state where the safety reserve decreases and accelerates its decline, a corresponding control instruction is generated.
6. A method according to claim 5, wherein, When any dynamic safety factor enters a state of decreasing safety reserve and accelerating decline, a construction early warning message and corresponding instructions are generated, including: When any dynamic safety factor enters a state of decreasing safety reserve and accelerating decline, based on the foundation pit safety status judgment standard, a corresponding control instruction is generated according to the current excavation depth, the first-order rate of change and / or the second-order rate of change of each dynamic safety factor. The safety status determination standard for the foundation pit is a set of quantitative rule tables that determine the corresponding control measures based on the dynamic safety factor and its rate of change at different excavation depths.
7. A foundation pit servo support axial force-displacement cooperative tracking control system based on an optimal deformation curve, characterized in that, The system is used to execute the axial force-displacement collaborative tracking control method for foundation pit servo support based on the optimal deformation curve as described in any one of claims 1-6, including: The support module is used to preload the servo support corresponding to the current excavation step of the foundation pit after excavation to a preset depth, so as to cause the retaining structure to pre-deform. The inversion module is used to invert the formation parameters after the pre-deformation tends to stabilize, using a combination of an elastic foundation beam model and a collaborative multi-population genetic optimization algorithm, to obtain the inverted formation parameters. The determination module is used to determine the deformation control equation of the retaining structure corresponding to the current excavation step based on the inverted stratum parameters, retaining structure parameters and the initial state of the current excavation step, and to determine the optimal deformation curve corresponding to the current excavation step based on the retaining structure deformation control equation, preset constraints and optimization objectives. The adjustment module is used to determine the target axial force corresponding to each servo support based on the optimal deformation curve, generate an axial force adjustment sequence according to the difference between the target axial force and the current axial force, and adjust the axial force of the corresponding servo support according to the axial force adjustment sequence. The calculation module is used to calculate the dynamic safety factor against heave, the dynamic safety factor against sudden surge, the dynamic safety factor against seepage, and the dynamic safety factor against fracture of the retaining structure based on the current excavation depth and on-site monitoring data after the servo support axial force adjustment is completed and the deformation of the retaining structure tends to stabilize. The generation module is used to determine the current safety status of the foundation pit based on the current value and rate of change of each of the dynamic safety factors, and to generate corresponding instructions based on the current safety status of the foundation pit. The control module is used to generate control information that allows entry into the next excavation step when all the dynamic safety factors meet the preset safety conditions corresponding to the current excavation depth.
8. The system of claim 7, wherein, The determining module is specifically used for: Based on the inverted stratum parameters, retaining structure parameters, and the initial state of the current excavation step, the deformation control equation of the retaining structure corresponding to the current excavation step and the general solution form of the deformation control equation of the retaining structure are determined according to the stratum conditions. Based on the deformation control equation of the retaining structure and the corresponding general solution, and based on the preset constraints and optimization objectives, the optimal deformation curve corresponding to the current excavation step is determined.
9. An electronic device, comprising: include: At least one processor; as well as A memory communicatively connected to the at least one processor; wherein, The memory stores a computer program that can be executed by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to perform the axial force-displacement collaborative tracking control method for foundation pit servo support based on the optimal deformation curve as described in any one of claims 1-6.
10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer instructions that cause a processor to execute the axial force-displacement collaborative tracking control method for foundation pit servo support based on the optimal deformation curve as described in any one of claims 1-6.