A System and Method for Identifying Permanent Layers in Intermittent Subgrade Compaction Based on Paved Boundaries
By using a permanent layer identification system for intermittent roadbed compaction based on the actual paving boundary, a triple judgment logic of space, time and settlement is adopted to generate a permanent layer ID, which solves the problem of incorrect layer attribution in the existing technology. It realizes accurate layer identification and compaction monitoring under intermittent paving conditions caused by land acquisition and resettlement, and is suitable for long-interruption construction scenarios.
Patent Information
- Application Number
- CN202611585821.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-14
- Publication Date
- 2026-11-17
AI Technical Summary
Existing intelligent compaction monitoring technology cannot accurately identify the compaction layer under intermittent paving conditions caused by land acquisition and resettlement, resulting in incorrect layer assignment and affecting the accuracy of compaction monitoring data and project quality. In particular, when the construction interruption lasts for more than 24 hours, the existing technology cannot solve the problem of accurate layer identification.
A permanent layer identification system for intermittent roadbed compaction based on paved boundaries is adopted. Through spatial, temporal and settlement triple judgment logic, a permanent layer ID is generated. Relying on the actual measurement data of the paver, the system abandons the traditional fixed elevation layer logic and achieves accurate layer assignment of the compaction trajectory, including layer initialization, compaction point acquisition, spatial judgment, temporal verification and settlement feature verification.
Under conditions of long-term interrupted construction, the accuracy rate of layer identification reached 95.7%, which solved the systematic failure problem of traditional layering algorithms under discontinuous construction, ensured the accuracy of compaction monitoring data and the value of project acceptance, and reduced the quality risks of roadbed settlement and cracking.
Smart Images

Figure CN123115877A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of digital construction technology for roadbed engineering, specifically to a permanent layer identification system and method for intermittent roadbed compaction based on the actual paving boundary. It is applicable to compaction construction under intermittent paving conditions caused by land acquisition and relocation, without relying on design elevation and fixed layer thickness. Background Technology
[0002] Existing intelligent compaction monitoring technologies, such as the invention patent with publication number CN121363155A, focus on the real-time calculation of compaction indices and the identification of undercompacted zones. They generate compaction maturity cloud maps by inverting material stiffness through the acquisition of roller dynamic response signals (vibration acceleration). The technical contribution of this solution lies in improving the real-time performance and accuracy of compaction assessment. However, its technical premise is always based on the assumption that "the current compaction layer is known." The spatial positioning information in this solution is only used to map compaction indices to spatial coordinates to generate cloud maps and has never been used to solve the problem of determining layer attribution.
[0003] However, under extremely discontinuous construction conditions caused by delays in land acquisition and resettlement, the shortest single paving length is only tens of meters, and the construction interruption time can reach tens of days. The actual paving thickness can deviate from the design value by up to 6 cm. At this time, the premise that "the current compaction layer is known" simply does not exist: the layers paved in different batches and at different times cannot be accurately distinguished, and cross-layer statistical errors such as "the third layer being mistakenly identified as the first layer" often occur, with a layer identification accuracy rate of less than 30%. Due to incorrect layer division, the number of compaction passes counted by the system can deviate from the actual number of passes by up to ±3 passes, rendering all compaction monitoring data meaningless. For adjacent construction sections paved several days apart, the overlapping area cannot achieve differentiated layer statistics, becoming a high-risk factor for roadbed settlement and cracking.
[0004] It is important to note that the aforementioned problem of incorrect layer assignment cannot be solved by existing compaction monitoring technologies, including CN121363155A, simply by optimizing algorithms or increasing sensor accuracy. The root cause lies in the fact that existing technologies assume that subgrade layering must strictly adhere to design elevations. This technical bias leads to all intelligent compaction systems basing their data statistics on fixed design layers. When the actual paving thickness deviates from the design value by more than 3 cm, or when construction is interrupted for more than 24 hours, the design layering itself can no longer reflect the actual layering on site. At this point, regardless of the accuracy of the compaction calculation, the output data loses its engineering reference value due to incorrect assignment. This defect is inherent in the underlying layering logic of existing technologies and cannot be resolved through their own improvement methods.
[0005] For a long time, there has been a technical inertia in this field that the stratification must be based on the design elevation. All intelligent compaction systems have used the design stratification as the basis for data statistics and have never proposed the technical idea of using the actual paving operation unit as the basis for stratification.
[0006] In summary, there is currently no specific stratum identification technology in the industry that is designed for intermittent paving conditions and is completely independent of design elevation and fixed layer thickness. This inherent deficiency has become a core bottleneck for the application of intelligent compaction technology in fragmented construction scenarios: without accurate stratum attribution, any compaction monitoring data is of no value for project acceptance in intermittent construction scenarios. Summary of the Invention
[0007] This invention addresses the gaps in existing technologies by providing a permanent layer identification system and method for intermittent roadbed compaction based on actual paving boundaries. It completely abandons the traditional fixed-elevation layering logic, generating permanent layers based on a single actual paving operation. Through spatial, temporal, and settlement-based triple judgment logic, it achieves accurate layer assignment of compaction trajectories, solving the industry pain points of layer misalignment and distorted layering statistics under long-interrupted construction. It provides an accurate preliminary layering data foundation for various compaction quality control measures.
[0008] To achieve the above objectives, the present invention adopts the following technical solution: The intermittent subgrade compaction permanent layer identification method based on paved boundaries does not rely on design elevation and fixed layer thickness. It takes a single independent paving operation as the smallest layer unit, and the layer benchmark is generated solely from the paver's measured data. The method includes the following steps: a. Layer initialization and permanent storage: Each time the paver starts an independent paving operation, it generates a globally unique permanent layer ID, collects paving data to generate the closed polygonal spatial boundary and initial three-dimensional paving surface of the layer, and the layer information is encrypted and permanently stored so as not to be lost due to construction interruption; b. Compaction point acquisition: The roller only acquires the three-dimensional coordinates and trajectory data of the compaction operation points in real time, and does not acquire dynamic response signals; c. Spatial priority determination: Traverse all permanently stored historical layer boundaries, and determine the paving space range to which the compaction point belongs by using the point-within-polygon algorithm, and preliminarily determine the layer affiliation; d. Time sequence verification: Verify whether the compaction time is later than the paving end time of the corresponding layer. If not, it is judged as an invalid trajectory and filtered out. e. Settlement characteristic verification: Calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer, and exclude the historical compaction trajectory of the lower layer according to the three-level progressive logic of spatial coarse screening, time false detection, and settlement layer determination; if the real-time settlement is less than 0 and the settlement rate is greater than 0.5mm / pass, it is determined to be a local replenishment area and a sub-layer is generated. f. Stratification Result Output: Based on the final determined stratum attribution, output the statistical data of compaction points and stratum boundary information corresponding to each stratum.
[0009] Step a further includes: when the paver restarts after paving has been interrupted for more than a preset threshold, a new permanent layer ID is automatically generated, and the overlap boundary between the old and new layers is recorded. The overlapping area belongs to the layer that was paved later.
[0010] In step c, if the compaction point falls within the overlapping area of multiple layers, it belongs to the layer with the latest paving time.
[0011] In step e, if 0 < real-time settlement ≤ 1.1 times the theoretical compaction thickness of the layer, it is determined to be an effective compaction trajectory of the current layer; if real-time settlement > 1.1 times the theoretical compaction thickness of the layer, it is determined to be a historical trajectory of the lower layer and filtered.
[0012] The method employs a permanent layer identification system for intermittent subgrade compaction based on paved boundaries. This system addresses the problem of cross-layer misjudgment in compaction data caused by the failure of fixed-elevation layering. It uses a single independent paving operation as the smallest layer unit, dynamically dividing layers without relying on design elevation and fixed layer thickness. Layer references are generated solely from measured data from the paver, and no dynamic response signals are collected at the compaction end. This includes: The paver data acquisition terminal is installed on the paver to collect the paving loose thickness, three-dimensional paving elevation and paving operation trajectory in real time; and to generate a globally unique permanent layer ID for each independent paving operation, and synchronously generate the closed polygon space boundary and initial three-dimensional paving surface corresponding to each independent paving operation. The data acquisition terminal for the rolling mill is installed on the rolling mill and is only used to collect the three-dimensional coordinates and travel trajectory data of the rolling operation point in real time. It does not collect dynamic response signals such as vibration acceleration. The local data synchronization module is used to enable real-time interaction of layer data between the paver and the compactor; The edge computing terminal has a built-in permanent stratigraphic database and is configured with the following modules according to a three-level progressive logic of spatial coarse screening, temporal spurious removal, and settlement stratigraphy: The permanent layer storage module is used to encrypt and store the permanent layer ID, spatial boundary and initial three-dimensional paving surface of all historical layers, and the data will not be lost due to construction interruption or equipment restart; The spatial priority determination module is used to determine the paving space range to which the compaction point belongs by using the point-within-a-polygon algorithm, and to preliminarily determine the layer affiliation. The time sequence verification module is used to verify whether the compaction time is later than the paving end time of the corresponding layer, and to filter out compaction trajectories with invalid time logic. The settlement feature verification module is used to calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer, exclude the historical compaction trajectory of the lower layer, and identify the local supplementary material sub-layer. The layered output module is used to output the statistical data of compaction points and the layer boundary information corresponding to each layer based on the final determined layer assignment results.
[0013] The paver data acquisition terminal includes an array of laser thickness sensors and an RTK differential Beidou positioning module. When the paver restarts after paving has been interrupted for more than a preset threshold, the system automatically generates a new permanent layer ID and records the overlap boundary between the old and new layers. The overlapping area belongs to the layer that was paved later.
[0014] The preset threshold is determined based on the initial setting time of the material in the corresponding layer. It is set to 30 minutes for water-stabilized layers and 24 hours for roadbed filling layers. If the threshold is exceeded, the paved material cannot form a continuous whole with the previous paving, so a new permanent layer ID is automatically generated. The system supports automatic identification and recall of historical layers within 30 days of interruption.
[0015] The spatial priority determination module's determination logic is as follows: iterate through all stored historical layer closed polygon spatial boundaries. If the compaction point falls within only one layer, it is initially assigned to that layer. If it falls within the overlapping area of multiple layers, it is assigned to the layer with the latest paving time. It does not split the statistics according to the area ratio to avoid statistical chaos caused by splitting the overlapping area data, and adapts to the management needs of rapid on-site construction.
[0016] The judgment logic of the settlement feature verification module is as follows: calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer. If 0 < real-time settlement ≤ 1.1 times the theoretical compaction thickness of the layer, it is determined to be an effective compaction trajectory of the current layer. If the real-time settlement > 1.1 times the theoretical compaction thickness of the layer, it is determined to be a historical trajectory of the lower layer and filtered. The 1.1 times coefficient is used to cover the settlement fluctuation caused by local paving protrusions and uneven compaction, and to balance the missed judgment rate of the current layer trajectory and the misjudgment rate of the lower layer trajectory.
[0017] The present invention has the following technical effects: 1. Breaking through the dependence on design elevation, solving the failure problem of layering algorithm from the root: The layer boundary is completely determined by the actual paving operation and is not affected by the deviation of paving thickness. Even if the actual paving thickness deviates from the design value by 6cm, the layer identification remains accurate, which completely solves the systemic failure problem of traditional layer height algorithm under discontinuous construction. This effect cannot be achieved by existing compaction monitoring system through its own improvement.
[0018] 2. Adapting to long-term interruption conditions and filling the technological gap in the scenario: The layer information is permanently stored, and the accuracy of layer identification during subsequent construction after a 15-day interruption reaches 95.7%, which is far higher than the 27.4% of traditional algorithms. For the first time, intelligent compaction technology has engineering acceptance value in the fragmented construction mode caused by land acquisition and relocation.
[0019] 3. Three-level progressive judgment to ensure recognition accuracy in complex scenarios: Through spatial, temporal and settlement triple verification and step-by-step filtering, it not only avoids misjudgment in overlapping areas of single spatial judgment, but also solves the problem of historical trajectory interference after long interruption, and the layer recognition accuracy is stable at over 95%.
[0020] 4. Clear rules for overlap zones eliminate blind spots in quality control: The overlap boundaries between new and old paving sections are automatically identified and uniformly assigned to the subsequent paving layer, solving the problem of chaotic overlap zone statistics in traditional layered schemes and reducing the quality risks of uneven settlement of the roadbed. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the overall system architecture of the present invention; Figure 2 This is a flowchart illustrating the process of determining the layer location of the compaction trajectory according to the present invention. Figure 3 This is a schematic diagram comparing the layer boundaries of the present invention with those of traditional solutions; Detailed Implementation
[0022] Example 1
[0023] A permanent layer identification system for intermittent subgrade compaction based on paved boundaries is used to solve the problem of cross-layer misjudgment in compaction data caused by the failure of fixed-elevation layering. The system uses a single independent paving operation as the smallest layer unit, dynamically dividing layers without relying on design elevation and fixed layer thickness. The layer reference is generated solely from the paver's measured data, and no dynamic response signals are collected at the compaction end. Figure 1 As shown, it includes: The paver data acquisition terminal is installed on the paver to collect the paving loose thickness, three-dimensional paving elevation and paving operation trajectory in real time; and to generate a globally unique permanent layer ID for each independent paving operation, and synchronously generate the closed polygon space boundary and initial three-dimensional paving surface corresponding to each independent paving operation. The data acquisition terminal for the rolling mill is installed on the rolling mill and is only used to collect the three-dimensional coordinates and travel trajectory data of the rolling operation point in real time. It does not collect dynamic response signals such as vibration acceleration. The local data synchronization module is used to enable real-time interaction of layer data between the paver and the compactor; The edge computing terminal has a built-in permanent stratigraphic database and is configured with the following modules according to a three-level progressive logic of spatial coarse screening, temporal spurious removal, and settlement stratigraphy: The permanent layer storage module is used to encrypt and store the permanent layer ID, spatial boundary and initial three-dimensional paving surface of all historical layers, and the data will not be lost due to construction interruption or equipment restart; The spatial priority determination module is used to determine the paving space range to which the compaction point belongs by using the point-within-a-polygon algorithm, and to preliminarily determine the layer affiliation. The time sequence verification module is used to verify whether the compaction time is later than the paving end time of the corresponding layer, and to filter out compaction trajectories with invalid time logic. The settlement feature verification module is used to calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer, exclude the historical compaction trajectory of the lower layer, and identify the local supplementary material sub-layer. The layered output module is used to output the statistical data of compaction points and the layer boundary information corresponding to each layer based on the final determined layer assignment results.
[0024] The paver data acquisition terminal includes an array of laser thickness sensors and an RTK differential Beidou positioning module. When the paver restarts after paving has been interrupted for more than a preset threshold, the system automatically generates a new permanent layer ID and records the overlap boundary between the old and new layers. The overlapping area belongs to the layer that was paved later.
[0025] The preset threshold is determined based on the initial setting time of the material in the corresponding layer. It is set to 30 minutes for water-stabilized layers and 24 hours for roadbed filling layers. If the threshold is exceeded, the paved material cannot form a continuous whole with the previous paving, so a new permanent layer ID is automatically generated. The system supports automatic identification and recall of historical layers within 30 days of interruption.
[0026] The spatial priority determination module's determination logic is as follows: iterate through all stored historical layer closed polygon spatial boundaries. If the compaction point falls within only one layer, it is initially assigned to that layer. If it falls within the overlapping area of multiple layers, it is assigned to the layer with the latest paving time. It does not split the statistics according to the area ratio to avoid statistical chaos caused by splitting the overlapping area data, and adapts to the management needs of rapid on-site construction.
[0027] The judgment logic of the settlement feature verification module is as follows: calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer. If 0 < real-time settlement ≤ 1.1 times the theoretical compaction thickness of the layer, it is determined to be an effective compaction trajectory of the current layer. If the real-time settlement > 1.1 times the theoretical compaction thickness of the layer, it is determined to be a historical trajectory of the lower layer and filtered. The 1.1 times coefficient is used to cover the settlement fluctuation caused by local paving protrusions and uneven compaction, and to balance the missed judgment rate of the current layer trajectory and the misjudgment rate of the lower layer trajectory.
[0028] Example 2
[0029] A method for identifying permanent layers in intermittent roadbed compaction based on paved boundaries, using the system described in Example 1, does not rely on design elevation and fixed layer thickness. It uses a single independent paving operation as the smallest layer unit, and the layer reference is generated solely from measured data from the paver. Figure 2 As shown, it includes the following steps: a. Layer initialization and permanent storage: Each time the paver starts an independent paving operation, it generates a globally unique permanent layer ID, collects paving data to generate the closed polygonal spatial boundary and initial three-dimensional paving surface of the layer, and the layer information is encrypted and permanently stored so as not to be lost due to construction interruption; b. Compaction point acquisition: The roller only acquires the three-dimensional coordinates and trajectory data of the compaction operation points in real time, and does not acquire dynamic response signals; c. Spatial priority determination: Traverse all permanently stored historical layer boundaries, and determine the paving space range to which the compaction point belongs by using the point-within-polygon algorithm, and preliminarily determine the layer affiliation; d. Time sequence verification: Verify whether the compaction time is later than the paving end time of the corresponding layer. If not, it is judged as an invalid trajectory and filtered out. e. Settlement characteristic verification: Calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer, and exclude the historical compaction trajectory of the lower layer according to the three-level progressive logic of spatial coarse screening, time-based false detection, and settlement layer determination; if the real-time settlement is less than 0 and the settlement rate is greater than 0.5 mm / pass, it is determined as a local replenishment area and a sub-layer is generated. Here, the settlement rate refers to the change in real-time settlement of the compaction point per compaction pass. f. Stratification Result Output: Based on the final determined stratum attribution, output the statistical data of compaction points and stratum boundary information corresponding to each stratum.
[0030] Step a further includes: when the paver restarts after paving has been interrupted for more than a preset threshold, a new permanent layer ID is automatically generated, and the overlap boundary between the old and new layers is recorded. The overlapping area belongs to the layer that was paved later.
[0031] In step c, if the compaction point falls within the overlapping area of multiple layers, it belongs to the layer with the latest paving time.
[0032] In step e, if 0 < real-time settlement ≤ 1.1 times the theoretical compaction thickness of the layer, it is determined to be an effective compaction trajectory of the current layer; if real-time settlement > 1.1 times the theoretical compaction thickness of the layer, it is determined to be a historical trajectory of the lower layer and filtered.
[0033] Example 3
[0034] The following section, using the actual construction of the Qin-Shen Expressway new construction project from K123+400 to K123+650 as an example, details the specific implementation process of this invention under the condition of intermittent construction caused by land acquisition and resettlement.
[0035] 1. Project Overview: Construction Section: K123+400~K123+650, total length 250m. Structural Layer: Roadbed filling, designed compaction thickness 24cm, loose paving thickness 30cm, loose paving coefficient 1.25. Construction Conditions: Due to land acquisition and resettlement, the construction surface will be delivered in three phases, with paving completed in three stages: First Phase: May 10, 2026, paving K123+400~K123+450, with a 10-day interruption after completion. Second Phase: May 20, 2026, paving K123+448~K123+550, with a 5-day interruption after completion. Third Phase: May 25, 2026, paving K123+550~K123+650. 2. Implementation steps: Step 1: First Paving Layer Initialization At 9:00 AM on May 10, 2026, the paver screed lowered and began moving, and the system automatically initiated the layer initialization process: A globally unique permanent layer ID was generated: QSHS-XSQ-20260510-001; the loose paving thickness was collected using a 20Hz array laser thickness sensor, with a measured average loose paving thickness of 29.5cm, and the theoretical compaction thickness was calculated to be 23.6cm; the paving trajectory was collected using a 50Hz BeiDou RTK sensor, generating a closed polygonal spatial boundary corresponding to mileage K123+400~K123+450; the initial three-dimensional paving surface for this layer was generated using Kriging interpolation; all layer information was encrypted and stored permanently on the edge terminals and the project platform, and pushed in real-time to the edge terminals of the three rollers via the LoRa local area network. At 3:00 PM that day, construction was interrupted because the adjacent section had not yet been delivered for construction, and the system automatically saved all layer data and compaction progress.
[0036] Step 2: First Compaction Layer Determination Compaction operations began at 10:00 AM on May 10th. The roller collected the 3D coordinates of the compaction trajectory points at a frequency of 50Hz. The system determined the layer assignment using a three-level progressive logic: spatial coarse screening, time-based false detection, and settlement layer determination: Spatial Priority Determination: The compaction point falls within the range of K123+400~K123+450, initially belonging to layer 001; Time Sequence Verification: The compaction time of 10:15 is later than the paving end time of 9:45 for this layer, so the time logic is valid; Settlement Characteristic Verification: The measured real-time settlement was 12.1cm, meeting the determination condition of 0 < settlement ≤ 23.6 × 1.1 = 25.96cm, thus determining it as a valid compaction trajectory for this layer; After the determination, this trajectory point was included in the compaction pass count statistics for layer 001.
[0037] Step 3: Second paving layer generation after a 10-day interruption. At 8:00 AM on May 20, 2026, the paver restarted. Because the interruption time exceeded the preset threshold of 24 hours for the subgrade fill layer, the system automatically generated a new permanent layer ID: QSHS-XSQ-20260520-001. The spatial boundary corresponds to the mileage K123+448~K123+550. The system automatically identified the overlap area K123+448~K123+450 with layer 001 and assigned it to layer 002, which was paved later, according to the rules. The system automatically loaded all the data of the historical layer 001 without manual reconfiguration.
[0038] Step 4: Second Compaction Layer Judgment Compaction operations began at 9:30 AM on May 20th. The system made judgments for different areas separately: Overlapping area (K123+448~K123+450): The compaction points simultaneously fell within the boundaries of layer 001 and layer 002. According to the rules, it belonged to layer 002, which was paved later. After passing time and settlement verification, it was counted in the compaction pass count for layer 002. Additional compaction area of the constructed section (K123+400~K123+448): The compaction points only fell within the boundary of layer 001. Both time and settlement verifications passed, and it was accurately counted in the additional compaction pass count for layer 001. No cross-layer misjudgment occurred.
[0039] Step 5: After a 5-day interruption, the third paving and compaction took place on May 25, 2026. The third paving generated layer ID: QSHS-XSQ-20260525-001, corresponding to mileage K123+550~K123+650. During the compaction process, the system accurately distinguished the trajectory data of the three independent layers, with clear attribution of overlapping areas and no statistical confusion.
[0040] 3. Implementation Results: This pilot project involved three construction interruptions of 10 days and 5 days respectively. The system's layer identification accuracy rate was 98.2%, and the statistical error for the number of compaction passes was ±0.29 passes. Twelve points were manually excavated for verification, and the deviation between the system's layer data and the measured values was less than 0.5 cm, completely resolving the management problem of "chaos in one section after construction" during land acquisition and resettlement construction. Comparison data with the same road section using the traditional fixed elevation layering algorithm (e.g.) Figure 3 As shown in the figure, after a 10-day interruption of construction, the accuracy rate of layer identification was only 29.3%, the maximum deviation of the number of compaction passes was 3.1 passes, and the consistency with the results of manual excavation was less than 38%, making the data completely unusable for quality control. After adopting the solution of this invention, the consistency with the results of manual verification reached 97.9%, and the data can be directly used as the basis for quality acceptance.
[0041] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for identifying permanent layers in intermittently compacted subgrade based on paved boundaries, characterized in that, Without relying on design elevation and fixed layer thickness, using a single independent paving operation as the smallest layer unit, the layer reference is generated solely from the actual measured data of the paver, including the following steps: a. Layer initialization and permanent storage: Each time the paver starts an independent paving operation, it generates a globally unique permanent layer ID, collects paving data to generate the closed polygonal spatial boundary and initial three-dimensional paving surface of the layer, and the layer information is encrypted and permanently stored so as not to be lost due to construction interruption; b. Compaction point acquisition: The roller only acquires the three-dimensional coordinates and trajectory data of the compaction operation points in real time, and does not acquire dynamic response signals; c. Spatial priority determination: Traverse all permanently stored historical layer boundaries, and determine the paving space range to which the compaction point belongs by using the point-within-a-polygon algorithm, and preliminarily determine the layer affiliation; d. Time sequence verification: Verify whether the compaction time is later than the paving end time of the corresponding layer. If not, it is judged as an invalid trajectory and filtered out. e. Settlement characteristic verification: Calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer, and exclude the historical compaction trajectory of the lower layer according to the three-level progressive logic of spatial coarse screening, time-based false detection, and settlement layer determination; if the real-time settlement is less than 0 and the settlement rate is greater than 0.5 mm / pass, it is determined as a local replenishment area and a sub-layer is generated. Here, the settlement rate refers to the change in real-time settlement of the compaction point per compaction pass. f. Stratification Result Output: Based on the final determined stratum attribution, output the statistical data of compaction points and stratum boundary information corresponding to each stratum.
2. The method for identifying permanent layers of intermittently compacted subgrade based on paved boundaries according to claim 1, characterized in that, Step a further includes: when the paver restarts after paving has been interrupted for more than a preset threshold, a new permanent layer ID is automatically generated, and the overlap boundary between the old and new layers is recorded. The overlapping area belongs to the layer that was paved later.
3. The method for identifying permanent layers of intermittently compacted subgrade based on paved boundaries according to claim 1, characterized in that, In step c, if the compaction point falls within the overlapping area of multiple layers, it belongs to the layer with the latest paving time.
4. The method for identifying permanent layers of intermittently compacted subgrade based on paved boundaries according to claim 1, characterized in that, In step e, if 0 < real-time settlement ≤ 1.1 times the theoretical compaction thickness of the layer, it is determined to be an effective compaction trajectory of the layer; if real-time settlement > 1.1 times the theoretical compaction thickness of the layer, it is determined to be a historical trajectory of the lower layer and filtered.
5. A system for identifying permanent layers in intermittently compacted subgrade based on paved boundaries, used to perform the method described in any one of claims 1 to 4, characterized in that, The system addresses the issue of misjudgment of compaction data across layers caused by the failure of fixed-elevation stratification. It uses a single, independent paving operation as the smallest stratification unit, dynamically dividing layers without relying on design elevation or fixed layer thickness. Layer references are generated solely from measured data from the paver, and no dynamic response signals are collected at the compaction end. This includes: The paver data acquisition terminal is installed on the paver to collect the paving loose thickness, three-dimensional paving elevation and paving operation trajectory in real time; and to generate a globally unique permanent layer ID for each independent paving operation, and synchronously generate the closed polygon space boundary and initial three-dimensional paving surface corresponding to each independent paving operation. The data acquisition terminal for the rolling mill is installed on the rolling mill and is only used to collect the three-dimensional coordinates and travel trajectory data of the rolling operation point in real time. It does not collect dynamic response signals such as vibration acceleration. The local data synchronization module is used to enable real-time interaction of layer data between the paver and the compactor; The edge computing terminal has a built-in permanent stratigraphic database and is configured with the following modules according to a three-level progressive logic of spatial coarse screening, temporal spurious removal, and settlement stratigraphy: The permanent layer storage module is used to encrypt and store the permanent layer ID, spatial boundary and initial three-dimensional paving surface of all historical layers, and the data will not be lost due to construction interruption or equipment restart; The spatial priority determination module is used to determine the paving space range to which the compaction point belongs by using the point-within-a-polygon algorithm, and to preliminarily determine the layer affiliation. The time sequence verification module is used to verify whether the compaction time is later than the paving end time of the corresponding layer, and to filter out compaction trajectories with invalid time logic. The settlement feature verification module is used to calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer, exclude the historical compaction trajectory of the lower layer, and identify the local supplementary material sub-layer. The layered output module is used to output the statistical data of compaction points and the layer boundary information corresponding to each layer based on the final determined layer assignment results.
6. The intermittent subgrade compaction permanent layer identification system based on paved boundaries according to claim 5, characterized in that: The paver data acquisition terminal includes an array of laser thickness sensors and an RTK differential Beidou positioning module. When the paver restarts after paving has been interrupted for more than a preset threshold, the system automatically generates a new permanent layer ID and records the overlap boundary between the old and new layers. The overlapping area belongs to the layer that was paved later.
7. The intermittent subgrade compaction permanent layer identification system based on paved boundaries according to claim 6, characterized in that: The preset threshold is determined based on the initial setting time of the material in the corresponding layer. It is set to 30 minutes for water-stabilized layers and 24 hours for roadbed filling layers. If the threshold is exceeded, the paved material cannot form a continuous whole with the previous paving, so a new permanent layer ID is automatically generated. The system supports automatic identification and recall of historical layers within 30 days of interruption.
8. The intermittent subgrade compaction permanent layer identification system based on paved boundaries according to claim 5, characterized in that: The judgment logic of the spatial priority determination module is as follows: traverse all stored historical closed polygon spatial boundaries. If the compaction point falls within the range of only one layer, it is initially assigned to that layer; if it falls within the overlapping range of multiple layers, it is assigned to the layer with the latest paving time, without splitting the statistics according to the area ratio.
9. The intermittent subgrade compaction permanent layer identification system based on paved boundaries according to claim 5, characterized in that: The judgment logic of the settlement feature verification module is as follows: calculate the real-time settlement of the compaction point relative to the initial paving surface of the corresponding layer. If 0 < real-time settlement ≤ 1.1 times the theoretical compaction thickness of the layer, it is determined to be an effective compaction trajectory of the current layer. If the real-time settlement > 1.1 times the theoretical compaction thickness of the layer, it is determined to be a historical trajectory of the lower layer and filtered. The coefficient of 1.1 times is used to cover the settlement fluctuation caused by local paving protrusions and uneven compaction, and to balance the missed judgment rate of the current layer trajectory and the misjudgment rate of the lower layer trajectory.