A method and system for constructing a modular connector array for energy storage batteries
By mapping and connecting the topology of physical objects and digital twin objects, the constraint conflicts of the modular connector array of energy storage batteries are located, and the stable construction of the connector array is realized. This solves the problems of difficulty in locating constraint conflicts and lack of unified data association in the existing technology, and ensures the stability and efficiency of the construction process.
Patent Information
- Application Number
- CN202611194674.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-07
- Publication Date
- 2026-11-17
AI Technical Summary
In the construction of existing modular connector arrays for energy storage batteries, when the connection topology, installation space, and connection component attributes are handled separately, it is difficult to locate the specific connection object in the constraint conflict. Changes in local connection relationships cause repeated adjustments to the overall scheme, and the array construction data lacks a unified and correlated foundation.
By establishing a mapping relationship between physical objects and digital twin objects, terminal nodes and candidate connection edges are generated, connection topology is constructed and projected onto the installation space, candidate connector arrays are verified, constraint conflicts are located and local reconstruction is performed, and stable array construction data is formed.
Data consistency between connection interfaces and candidate connection edges is achieved, constraint conflicts are located to specific connector instances, and local reconstruction only affects connection relationships within the scope, ensuring the stability and consistency of array construction data.
Smart Images

Figure CN123116519A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of energy storage battery technology, and in particular to a method and system for constructing a modular connector array for energy storage batteries. Background Technology
[0002] The field of energy storage battery technology involves electrochemical energy storage units, battery modules, battery clusters, and related technologies such as their electrical connections, structural assembly, insulation protection, and operation management. It is mainly used for the storage, allocation, and release of electrical energy, and is widely applied in grid-side energy storage, power source-side energy storage, industrial and commercial energy storage, data center backup power, communication base stations, and energy storage for new energy vehicles. Among these, the traditional modular connector array construction method for energy storage batteries refers to the method of selecting connector unit specifications, planning their positions, arranging them in an array, ensuring polarity correspondence, connecting conductive components, configuring insulating components, and assembling and fixing them, all based on the electrical connection relationships between multiple energy storage battery modules. It typically employs technologies such as plug-in terminals, busbars, wire harnesses, connector housings, positioning structures, and insulation protection components to construct series, parallel, or hybrid connection structures between energy storage battery modules.
[0003] Existing energy storage battery module connection designs often rely on the number of modules, terminal positions, and series-parallel relationships to complete connector selection, spatial layout, and assembly verification separately. The spatial positions of the connection topology and component attributes are scattered across different design documents. When local connection relationships change, multiple design results need to be repeatedly adjusted. Electrical constraints and structural constraints lack a unified correlation, and verification results are difficult to pinpoint to specific connector instances or connection edges. Physical assembly deviations are also difficult to be fed back to the design data, making it difficult to trace the source of conflicts during array construction. Local anomalies can easily lead to repeated modifications to the overall solution. Summary of the Invention
[0004] This invention aims to provide a method and system for constructing modular connector arrays for energy storage batteries, in order to solve the problems of difficulty in locating specific connection objects due to the dispersed processing of connection topology, installation space, connection component attributes and construction constraints, repeated adjustments to the overall scheme caused by changes in local connection relationships, and lack of a unified and associated basis for array construction data.
[0005] To achieve the above objectives, the present invention provides a method for constructing a modular connector array for energy storage batteries, comprising the following steps: S1: Obtain object data and target electrical connection relationships of energy storage battery modules, connecting components and installation space, establish mapping relationships between physical objects and digital twin objects, and establish an array of digital twin objects; S2: Extract connection interfaces from the array digital twin object set and generate terminal nodes. Generate candidate connection edges based on the target electrical connection relationship and interface matching relationship. Construct a connection topology. Associate the construction constraints with the terminal nodes or the candidate connection edges to form a constraint graph. S3: Project the candidate connection edge onto the installation space, determine the connection path according to the constraint diagram, configure the connection component according to the connection path to form a connector instance, and generate a candidate connector array; S4: Verify the candidate connector array according to the constraint diagram. When there is a constraint conflict, determine the connector instance or candidate connection edge corresponding to the constraint conflict as the conflict object, and determine the influence range and boundary connection relationship according to the topological adjacency relationship of the conflict object. S5: When there is no constraint conflict, output the array construction data. When there is a constraint conflict, freeze the configuration of the connector instances outside the influence range, reproject the candidate connection edges within the influence range and configure the connection components, verify the reconstruction results and the boundary connection relationship, and output the array construction data after the constraint conflict is eliminated.
[0006] Furthermore, the object data is structured according to the entity object identifier, the twin object identifier, and the object attributes to form an object record. The object attributes consist of interface attributes and spatial attributes. A candidate binding relationship is established between the entity object identifier and the corresponding twin object identifier. Based on the interface attributes and the spatial attributes, a consistency check is performed between the entity object and the corresponding digital twin object. When both the interface attributes and the spatial attributes match, the candidate binding relationship is determined as the mapping relationship. When either attribute does not match, the candidate binding relationship is released, and the digital twin object corresponding to the entity object is re-determined based on the object record.
[0007] Further, the terminal nodes are generated according to the energy storage battery module, interface attributes, and polarity corresponding to the connection interface; for any two terminal nodes, when the two terminal nodes satisfy the target electrical connection relationship and the interface attributes match each other, the corresponding candidate connection edge is established; when any condition is not met, the connection between the two terminal nodes is excluded; the electrical constraints and structural constraints determined by the object data are bound to the corresponding terminal nodes or candidate connection edges, and the constraint diagram is formed according to the constraint object, constraint condition, and initial verification state.
[0008] Further, the coordinates of the terminal nodes corresponding to the candidate connection edges are mapped to the installation space, and spatial regions that conflict with the construction constraints are excluded according to the constraint diagram to form a candidate set of connection paths; the candidate set of connection paths is filtered according to the path geometric features and component adaptation relationships, and the candidate paths that satisfy the construction constraints are determined as the connection paths; the connection components are configured and the installation pose is determined according to the interface attributes and spatial attributes corresponding to the connection paths to form the connector instances; the connector instances are combined according to the connection topology to generate the candidate connector array.
[0009] Further, the terminal nodes, candidate connection edges, and connector instances corresponding to the candidate connector array are checked according to the constraints in the constraint diagram, and objects that do not meet the corresponding constraints are identified as conflict objects. Starting from the conflict object, objects with connection associations to the conflict object are identified step by step according to the topological adjacency relationship in the connection topology until there is no constraint transit relationship between the identified object and its adjacent objects. The area where the objects identified step by step are located is identified as the influence range. The candidate connection edge that is located within the influence range at one end and outside the influence range at the other end is identified as the boundary connection edge, and the boundary connection relationship is formed according to the interface correspondence at both ends of the boundary connection edge.
[0010] Furthermore, when the constraint conflict exists, the connector instances outside the influence range and the correspondence between the connector instances and the boundary connection edges are locked, and the candidate connection edges within the influence range are restored to the projection state; using the boundary connection relationship as a fixed constraint, the projection position of the candidate connection edges in the installation space and the connection path are redefined, and the connection components are configured according to the redefined connection path to form a reconstructed connector instance; structural constraint verification and electrical constraint verification are sequentially performed on the reconstructed connector instance and the boundary connection relationship. When both types of verification pass, the array construction data is output. When either verification fails, adjacent objects that have a constraint transit relationship with the object that failed the verification and are located outside the influence range are incorporated into the influence range, and local reconstruction is repeated for the expanded influence range.
[0011] Furthermore, after each re-execution of spatial projection and connection component configuration for the candidate connection edges within the influence range, the connector instances and boundary connection relationships within the influence range are re-verified based on the constraint graph. When constraint conflicts still exist, adjacent objects with constraint transitivity are incorporated into the influence range according to the topological adjacency relationship between the conflicting object and the boundary of the influence range, and spatial projection and connection component configuration are re-executed for the expanded influence range. When there are no constraint conflicts, the local reconstruction is terminated and the array construction data is output. When constraint conflicts still exist after the influence range is expanded to all connector instances of the candidate connector array, the candidate connection edges are regenerated and the connection topology is updated.
[0012] Furthermore, when there is no constraint conflict, a construction record is established according to the connector instance, and the corresponding terminal node, candidate connection edge, connection path, and installation pose of the connector instance in the installation space are written into the construction record; the connection order between each construction record is determined according to the connection topology, and the terminal correspondence between adjacent construction records is verified according to the target electrical connection relationship and the interface matching relationship; when the connection order and the interface correspondence are consistent with the candidate connector array, all construction records are aggregated into the array construction data.
[0013] Furthermore, each object record in the array digital twin object set is configured with an object category, topology association identifier, and space occupancy boundary; a connection index between the energy storage battery module and the connecting component is established based on the topology association identifier, and a space index between the connecting component and the installation space is established based on the space occupancy boundary; when generating the terminal node, the candidate connection edge, or the connector instance, the corresponding connection index and the space index are called, and the generated terminal node, candidate connection edge, or connector instance is associated with the corresponding entity object identifier and the twin object identifier.
[0014] Furthermore, a modular connector array construction system for energy storage batteries is provided. This system is applied to the method for constructing modular connector arrays for energy storage batteries, and includes a twin construction module, a topology construction module, an array generation module, a verification and positioning module, and a local reconstruction module. The twin construction module acquires object data and target electrical connection relationships of energy storage battery modules, connecting components and installation space, establishes a mapping relationship between physical objects and digital twin objects, and establishes an array of digital twin objects. The topology construction module extracts connection interfaces from the array digital twin object set and generates terminal nodes, generates candidate connection edges based on the target electrical connection relationship and interface matching relationship, constructs the connection topology, and associates the construction constraints with the terminal nodes or the candidate connection edges to form a constraint graph. The array generation module projects the candidate connection edges onto the installation space, determines the connection path according to the constraint diagram, configures the connection components according to the connection path to form a connector instance, and generates a candidate connector array. The verification and positioning module verifies the candidate connector array according to the constraint diagram. When there is a constraint conflict, the connector instance or candidate connection edge corresponding to the constraint conflict is identified as the conflict object, and the influence range and boundary connection relationship are determined according to the topological adjacency relationship of the conflict object. The local reconstruction module outputs array construction data when there is no constraint conflict, and when there is a constraint conflict, freezes the configuration of the connector instances outside the influence range, reprojects the candidate connection edges within the influence range and configures the connection components, verifies the reconstruction results and the boundary connection relationship, and outputs the array construction data after the constraint conflict is eliminated.
[0015] The beneficial effects of the technical solutions provided by the embodiments of the present invention include at least the following: By establishing a mapping relationship between physical objects and digital twin objects, the object data of energy storage battery modules, connecting components, and installation space are incorporated into the same array of digital twin objects, ensuring that connection interfaces, terminal nodes, and candidate connection edges have a consistent data foundation. By associating construction constraints with the connection topology and projecting candidate connection edges onto the installation space, a candidate connector array corresponding to the connector instance can be formed. During the verification process, constraint conflicts are located to specific connector instances or candidate connection edges. The scope of influence and boundary connection relationships are then determined based on topological adjacency relationships. Only the connection relationships within the scope of influence are reconstructed, keeping unaffected areas stable. Array construction data is output after conflict resolution. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a flowchart of the method of the present invention; Figure 2 This is a data flow diagram showing the recording and mapping relationships of the objects in this invention; Figure 3 A logic diagram is generated for the connection topology and constraint diagram of this invention; Figure 4 This is a flowchart illustrating the process of generating candidate connector arrays and locating constraint conflicts in this invention. Figure 5 This is a partial reconstruction feedback closed-loop diagram of the present invention; Figure 6 This is a diagram showing the module relationships of the connector array construction system of the present invention. Detailed Implementation
[0018] The following embodiments, based on the technical solutions described in the application documents, illustrate the implementation process of the method and system for constructing modular connector arrays for energy storage batteries. Object data describes the identifiable attributes and interrelationships of energy storage battery modules, connecting components, and installation space. Entity object identifiers uniquely indicate the corresponding entity object, twin object identifiers uniquely indicate the corresponding digital twin object, interface attributes describe the type, polarity, and adaptation relationship of the connection interface, and spatial attributes describe the position, orientation, and occupied boundaries of the object in the installation space. Target electrical connection relationships define the expected series, parallel, or mixed connection relationships between energy storage battery modules. Construction constraints define the conditions that terminal nodes, candidate connection edges, connection paths, and connector instances should meet in terms of electrical connection and spatial configuration. Constraint diagrams store the association between constraint objects, constraint conditions, and verification states. Array construction data carries the verified connector instances, connection order, connection path, and installation pose, and serves as the output result for subsequent array configuration and assembly. Example
[0019] Please see Figures 1 to 5 This embodiment provides a method for constructing a modular connector array for energy storage batteries. In this embodiment, object data of energy storage battery modules, connecting components, and installation space are used as initial inputs, and target electrical connection relationships are used as the basis for topology construction. Through mapping of physical objects to digital twin objects, generation of terminal nodes and candidate connection edges, determination of connection paths, verification of candidate connector arrays, and local reconstruction, array construction data is formed.
[0020] S1: Obtain object data and target electrical connection relationships of energy storage battery modules, connecting components and installation space, establish mapping relationships between physical objects and digital twin objects, and establish an array of digital twin objects.
[0021] S111: Read object data for energy storage battery modules, connection components, and installation space from local construction data or pre-built storage space. The object data must at least maintain basic correspondences between object categories, object attributes, and objects, with object attributes differentiated by interface attributes and spatial attributes. The interface attributes corresponding to the energy storage battery module characterize the connection conditions of the module terminals; the interface attributes corresponding to the connection component characterize the connection interfaces that the connection component can adapt to; and the spatial attributes corresponding to the installation space characterize the space range allowed for the placement of connector instances. After reading the object data, perform an integrity check on the object categories and object attributes. Records lacking object categories or object attributes are not included in subsequent mapping processing, and the process returns to the location where the object data was retrieved to obtain the corresponding content again.
[0022] S112, the object data is structured according to the entity object identifier, twin object identifier, and object attributes to form object records. Each object record uses the entity object identifier and twin object identifier as association fields, and interface attributes and spatial attributes as validation fields. For the energy storage battery module object record, the interface attribute corresponds to the connection interface and polarity of the module terminal, and the spatial attribute corresponds to the positional relationship of the energy storage battery module and module terminals in the installation space. For the connection component object record, the interface attribute corresponds to the interface type that the connection component can connect to, and the spatial attribute corresponds to the space boundary occupied by the connection component after configuration. For the installation space object record, the spatial attribute corresponds to the available area and the area already occupied by other objects.
[0023] S113: Establish a candidate binding relationship between the entity object identifier and the candidate digital twin object identifier, and perform consistency verification between the entity object and the corresponding digital twin object based on interface attributes and spatial attributes. The verification is performed in the order of interface attribute matching and spatial attribute matching. If the interface attributes do not match, the candidate binding relationship will not proceed to spatial attribute verification; after the interface attributes match, the spatial position, orientation, and occupied boundaries of the entity object and the digital twin object are compared. When both interface attributes and spatial attributes match, the candidate binding relationship is determined as a mapping relationship; when either attribute does not match, the candidate binding relationship is released, and the digital twin object corresponding to the entity object is re-determined based on the object record. The resulting mapping relationship uses the entity object identifier and the digital twin object identifier as the retrieval entry point, which is then used for subsequent generation of terminal nodes, candidate connection edges, and connector instances.
[0024] In S114, the object records that have passed the consistency check are aggregated into an array digital twin object set, and object category, topology association identifier, and space occupancy boundary are configured for each object record. The topology association identifier is used to record the connection relationships that can be established between the energy storage battery module and the connecting component, and the space occupancy boundary is used to record the spatial correspondence between the connecting component and the installation space. A connection index between the energy storage battery module and the connecting component is established based on the topology association identifier, and a spatial index between the connecting component and the installation space is established based on the space occupancy boundary. The array digital twin object set, the connection index, and the spatial index together serve as the data foundation for S2 and S3. The completeness of the output of S1 can be verified by checking whether each entity object identifier has a unique corresponding twin object identifier, and whether the connection index and spatial index can return the corresponding object record.
[0025] S2: Extract connection interfaces from the array of digital twin objects and generate terminal nodes. Generate candidate connection edges based on the target electrical connection relationship and interface matching relationship. Construct connection topology and associate construction constraints with terminal nodes or candidate connection edges to form a constraint graph.
[0026] S211: Based on the object category, filter energy storage battery module object records from the array digital twin object set, and extract connection interfaces from the corresponding object records. Each connection interface inherits the corresponding energy storage battery module, interface attributes, spatial attributes, and polarity, and generates a terminal node. The terminal node is associated with the entity object identifier and the twin object identifier of the energy storage battery module, enabling the terminal node to trace back to the corresponding entity object and digital twin object. After the terminal node is generated, determine the combination of energy storage battery modules that need to be electrically connected according to the target electrical connection relationship. Terminal node combinations not included in the target electrical connection relationship do not enter the candidate connection edge generation process.
[0027] S212, perform interface matching on any two terminal nodes indicated by the target electrical connection relationship. Interface matching is based on the interface attributes and polarity of the two terminal nodes. When the two terminal nodes satisfy the target electrical connection relationship and their interface attributes match, a candidate connection edge is established between the two terminal nodes; when either the target electrical connection relationship or the interface attribute matching condition is not met, the connection between the two terminal nodes is excluded. The candidate connection edge inherits the object identifier, interface attributes, and spatial position of the two terminal nodes, and records the retrieval entry point of the corresponding connected component. Multiple candidate connection edges together form a set of electrical connection relationships to be filtered.
[0028] S213: Construct a connection topology using terminal nodes as connection endpoints and candidate connection edges as endpoints to establish relationships. The connection topology records the adjacency relationships between terminal nodes and distinguishes between terminal nodes within the same energy storage battery module and terminal nodes between different energy storage battery modules. The connection topology does not directly determine the specific installation location of the connecting components; instead, it first determines the connection relationships that satisfy the target electrical connection relationship, providing a topological basis for the spatial projection in S3. After the connection topology is constructed, it checks each energy storage battery module against the target electrical connection relationship to see if a corresponding candidate connection edge exists. If no candidate connection edge is formed, the process returns to S212 to re-execute interface matching.
[0029] S214: Retrieve the construction constraints corresponding to the terminal nodes and candidate connection edges from the object data. Construction constraints are organized according to constraint objects, constraint conditions, and initial verification states. The constraint object points to the terminal node or candidate connection edge, the constraint condition limits the electrical connection and spatial configuration requirements of the corresponding object, and the initial verification state indicates that the corresponding object has not yet been verified by the candidate connector array. Bind the construction constraints to the corresponding terminal node or candidate connection edge to form a constraint graph. Each constraint item in the constraint graph can be traced back to the terminal node or candidate connection edge in the connection topology through the constraint object, and the verification state can be updated in S4.
[0030] S3. Project the candidate connection edge onto the installation space, determine the connection path according to the constraint diagram, configure the connection components according to the connection path to form a connector instance, and generate a candidate connector array.
[0031] S311: The available area and space boundary of the installation space are obtained by calling the spatial index, and the positions of the terminal nodes at both ends of the candidate connection edge in the installation space are obtained. The coordinates of the terminal nodes corresponding to the candidate connection edge are mapped to the installation space, using the positions of the two terminal nodes as the start and end points of the connection path. Based on the constraint diagram, spatial areas that conflict with the construction constraints are eliminated, and the spatial area between the start and end points that can be used to arrange the connection components is retained, forming a candidate set of connection paths. Each candidate path in the candidate set records the corresponding candidate connection edge, the start terminal node, the end terminal node, and the spatial area traversed.
[0032] S312, filter the candidate set of connection paths based on path geometry features and component adaptation relationships. Path geometry features are used to determine whether a candidate path is located within the allowed layout space area, and component adaptation relationships are used to determine whether the interface attributes and spatial attributes of the connecting components can match the corresponding candidate path and terminal node. First, candidate paths that cross space occupation boundaries or cannot connect two terminal nodes are excluded. Then, connecting components that can adapt to the remaining candidate paths are determined through connection indexes. When a candidate path meets the construction constraints and has a matching connecting component, the candidate path is determined as a connection path; when a candidate path conflicts with a space occupation boundary or does not have a matching connecting component, the corresponding candidate path is excluded from the candidate set of connection paths.
[0033] S313: Configure the connecting components and determine their installation pose based on the interface and spatial attributes corresponding to the connection path, forming a connector instance. The installation pose is determined by the position and orientation of the connection path in the installation space and corresponds to the spatial boundary occupied by the connecting components. The connector instance is associated with the entity object identifier, twin object identifier, corresponding candidate connection edge, and connection path of the connecting components, thus giving the connector instance simultaneous entity source, topology source, and spatial source. After forming the connector instance, check whether both ends of the connector instance correspond to the start terminal node and end terminal node of the connection path, respectively. If the correspondence is inconsistent, return to S312 to re-filter the connection path and connecting components.
[0034] S314: Combine connector instances according to the connection topology to generate a candidate connector array. The candidate connector array stores the connection order between connector instances, the candidate connection edge corresponding to each connector instance, the connection path, and the installation pose. After the candidate connector array is generated, a traceable association chain is formed between terminal nodes, candidate connection edges, connection paths, and connector instances. By checking whether each target candidate connection edge in the connection topology has a corresponding connector instance, and whether the connector instance is located within the allowable installation space area, it can be verified whether the output of S3 has the basis for entering S4 for verification.
[0035] S4. Verify the candidate connector array based on the constraint diagram. When there is a constraint conflict, the connector instance or candidate connection edge corresponding to the constraint conflict is identified as the conflict object, and the influence range and boundary connection relationship are determined according to the topological adjacency relationship of the conflict object.
[0036] S411, according to the constraints in the constraint diagram, verify the terminal nodes, candidate connection edges, and connector instances corresponding to the candidate connector array. The verification uses the constraint objects bound in the constraint diagram as the entry point, comparing the actual connection relationships, connection paths, and installation poses in the candidate connector array with the corresponding constraints. When the constraints are met, the verification status of the corresponding constraint item is updated to "passed"; when the constraints are not met, the verification status of the corresponding constraint item is updated to "conflict," and the connector instances or candidate connection edges that do not meet the corresponding constraints are identified as conflict objects. Constraint conflicts are jointly characterized by the constraint object, conflict condition, and conflict object to facilitate subsequent determination of the affected area.
[0037] S412: Starting with the conflicting object, determine the objects connected to it level by level according to the topological adjacency relationships in the connection topology. If the conflicting object is a candidate connection edge, first determine the terminal nodes at both ends of the candidate connection edge, then determine other candidate connection edges adjacent to the two terminal nodes and connector instances. If the conflicting object is a connector instance, first determine the terminal nodes at both ends based on the candidate connection edges associated with the connector instance, then extend along the connection topology to adjacent objects. Each extension checks whether there is a constraint transitivity relationship between the current object and adjacent objects. If a constraint transitivity relationship exists, the adjacent objects are included in the extension result; otherwise, the extension along the corresponding direction stops.
[0038] S413 defines the area occupied by each object in the installation space as the influence range. The influence range records both the included terminal nodes, candidate connection edges, and connector instances, as well as the spatial area of the corresponding object within the installation space. Candidate connection edges with one end within the influence range and the other end outside the influence range are defined as boundary connection edges, and boundary connection relationships are formed based on the interface correspondence at both ends of the boundary connection edges. Boundary connection relationships record the interface correspondence and topological connections that need to be maintained between objects within the influence range and external objects, serving as fixed constraints during local reconstruction in S5.
[0039] In S414, when all constraint checks are passed, it is determined that there is no constraint conflict, and the candidate connector array is sent to the direct output branch of S5. When at least one constraint has a conflict, it is determined that there is a constraint conflict, and the conflicting object, the scope of influence, and the boundary connection relationship are sent to the local reconstruction branch of S5. The judgment result and intermediate state formed by S4 can be verified by the consistency between the check status and the number of conflicting objects in the constraint diagram, as well as the spatial relationship between the two ends of the boundary connection edge being inside and outside the scope of influence.
[0040] S5: When there are no constraint conflicts, output the array construction data. When there are constraint conflicts, freeze the configuration of connector instances outside the influence range, reproject the candidate connection edges within the influence range and configure the connection components, check the reconstruction results and boundary connection relationships, and output the array construction data after the constraint conflicts are eliminated.
[0041] S511, when there are no constraint conflicts, a construction record is established according to the connector instance, and the corresponding terminal node, candidate connection edge, connection path, and installation pose of the connector instance in the installation space are written into the construction record. The connection order between each construction record is determined according to the connection topology, and the terminal correspondence between adjacent construction records is verified according to the target electrical connection relationship and interface matching relationship. When the connection order and terminal correspondence are consistent with the candidate connector array, all construction records are aggregated into array construction data. After the array construction data is output, the object source of each connector instance can be traced back through the entity object identifier and twin object identifier, and the corresponding topology relationship and spatial configuration can be traced back through the candidate connection edge and connection path.
[0042] S512, when constraint conflicts exist, locks connector instances outside the affected area and their correspondence with boundary connection edges, ensuring that the connection topology, connection paths, and installation poses outside the affected area remain unchanged during the current local reconstruction process. Candidate connection edges within the affected area are restored to their unprojected state, and the original connection paths and connector instance associations of the corresponding candidate connection edges are cleared, but terminal nodes, target electrical connection relationships, construction constraints, and boundary connection relationships are retained. This forms the local reconstruction input, preventing unconstrained conflict areas from participating in repeated configuration.
[0043] S513, using boundary connection relationships as fixed constraints, redetermines the projection positions and connection paths of candidate connection edges within the influence range in the installation space. During reprojection, the start and end points of the connection path are still determined by the terminal nodes at both ends of the candidate connection edge, and the interface relationships corresponding to the boundary connection edges remain unchanged. Based on the redetermined connection paths, connection components are configured to form a reconstructed connector instance, and the reconstructed connector instance is re-associated with the corresponding candidate connection edge, connection path, and object identifier. After the reconstructed connector instance is formed, it is spliced with the locked connector instances outside the influence range according to the boundary connection relationships to form a local reconstruction result.
[0044] S514 re-performs structural constraint checks and electrical constraint checks on the local reconstruction results and boundary connection relationships. The structural constraint check verifies whether the mounting pose, space occupancy boundary, and spatial relationship between the reconstructed connector instance and connector instances outside the influence range meet the corresponding conditions in the constraint diagram. The electrical constraint check verifies whether the candidate connection edges, terminal nodes, and boundary connection relationships corresponding to the reconstructed connector instance meet the target electrical connection relationship and interface matching relationship. When both types of checks pass, the local reconstruction results are written into the candidate connector array, and array construction data is formed according to S511.
[0045] In S515, if either the structural constraint check or the electrical constraint check fails, the object corresponding to the failed check is identified as a new conflict object, and adjacent objects that have constraint transitivity relationships with the new conflict object and are located outside the current influence range are incorporated into the influence range. The spatial projection of candidate connection edges and the configuration of connection components are re-executed on the expanded influence range. Each expansion uses the newly added conflict object and the updated boundary connection relationship as input for the next round, and each update is based on the objects that failed the check in this round and their corresponding constraints. Local reconstruction terminates when constraint conflicts are eliminated; if constraint conflicts still exist after the influence range has been expanded to all connector instances in the candidate connector array, the process returns to S2 to regenerate candidate connection edges and update the connection topology. This termination and rollback condition gives the local reconstruction process a defined cyclic boundary.
[0046] Through the above implementation process, the array of digital twin objects associates physical objects, digital twin objects, connection topology, and installation space in the same object chain. The constraint graph binds construction constraints to locatable terminal nodes or candidate connection edges. Each connector instance in the candidate connector array can trace back to the corresponding object record, candidate connection edge, and connection path. When a constraint conflict occurs, the verification results first form conflicting objects, and then form the scope of influence and boundary connection relationships along the topological adjacency relationship. Local reconstruction only processes objects within the scope of influence, and confirms whether the reconstruction results can be written back to the candidate connector array through structural constraint verification and electrical constraint verification. Example
[0047] Please see Figure 6 This embodiment provides a modular connector array construction system for energy storage batteries. The difference between this embodiment and Embodiment 1 is that Embodiment 1 describes the method execution process according to S1 to S5, while this embodiment uses a twin construction module, a topology construction module, an array generation module, a verification and positioning module, and a local reconstruction module to undertake the corresponding processing tasks, and uses the module output as the input of the next module, forming the same data processing chain and local reconstruction feedback chain as Embodiment 1.
[0048] The twin construction module receives object data and target electrical connection relationships from energy storage battery modules, connecting components, and installation spaces. It performs structured processing on the object data, establishes a mapping relationship between physical objects and digital twin objects, and outputs a set of array digital twin objects, connection indices, and spatial indices. The array digital twin object set output by the twin construction module is sent to the topology construction module, while the connection and spatial indices are simultaneously provided to the array generation module. If a candidate binding relationship fails the consistency check of interface attributes and spatial attributes, the twin construction module removes the candidate binding relationship and re-determines the corresponding digital twin object within the object record range. Object records that fail the check are not sent to subsequent modules.
[0049] The topology construction module extracts connection interfaces from the array digital twin object set and generates terminal nodes. Based on the target electrical connection relationships and interface matching relationships, it generates candidate connection edges, constructs the connection topology, and forms a constraint graph. The topology construction module sends the terminal nodes, candidate connection edges, connection topology, and constraint graph to the array generation module, while preserving the association between the terminal nodes and candidate connection edges and the entity object identifier and twin object identifier. If there are connection relationships in the target electrical connection relationships that cannot form candidate connection edges, the topology construction module returns to interface matching processing and does not output an incomplete connection topology to the array generation module.
[0050] The array generation module receives candidate connection edges, connection topology, constraint graph, connection index, and spatial index. It projects the candidate connection edges onto the installation space to form a candidate set of connection paths and determines the connection paths based on path geometric features, component adaptation relationships, and construction constraints. The array generation module configures connection components according to the connection paths to form connector instances, combines connector instances according to the connection topology, and outputs a candidate connector array. When a candidate path cannot satisfy the construction constraints or does not have a matching connection component, the array generation module excludes the corresponding candidate path and continues processing other candidate paths in the candidate set of connection paths. When there are no available connection paths for a candidate connection edge, the array generation module returns the unprojectable state of the corresponding candidate connection edge to the topology construction module.
[0051] The verification and positioning module receives the candidate connector array and constraint diagram, performs verification on the terminal nodes, candidate connection edges, and connector instances, and updates the verification status in the constraint diagram. When no constraint conflicts exist, the verification and positioning module sends the candidate connector array and conflict-free status to the local reconstruction module, which directly generates the array construction data. When constraint conflicts exist, the verification and positioning module outputs the conflicting object, its affected area, and boundary connection relationships, and sends the corresponding information to the local reconstruction module. The affected area is determined by the topological adjacency relationship of the conflicting object in the connection topology, and the boundary connection relationship is determined by the candidate connection edges that cross the boundary of the affected area.
[0052] When the local reconstruction module receives a conflict-free state, it forms a construction record according to the connector instances, verifies the connection order and terminal correspondence, and aggregates the array construction data. When it receives a constraint conflict state, the local reconstruction module locks the connector instance configuration outside the influence range, restores the candidate connection edges within the influence range to the unprojected state, and re-executes spatial projection and connection component configuration with the boundary connection relationship as a fixed constraint to form a reconstructed connector instance. The local reconstruction module performs structural constraint verification and electrical constraint verification on the reconstruction result and boundary connection relationship. If the verification passes, it outputs the array construction data; if the verification fails, it expands the influence range and repeats the local reconstruction. If constraint conflicts still exist after the influence range has been expanded to all connector instances, the local reconstruction module returns a connection topology update request to the topology construction module.
[0053] The object records, mapping relationships, connection indexes, spatial indexes, connection topologies, constraint diagrams, candidate connector arrays, conflicting objects, influence ranges, boundary connection relationships, local reconstruction results, and array construction data described in the above embodiments are used to illustrate the feasible implementation methods of the technical solutions described in this invention during the construction process of modular connector arrays for energy storage batteries. The data sources, processing order, judgment conditions, feedback paths, and module correspondences in the embodiments are not intended to limit this invention to a single implementation. Without departing from the scope of the technical solutions described in this invention, any equivalent substitutions, modifications, combinations, processing order adjustments, module correspondence replacements, equivalent transformations of field names, equivalent acceptance of execution entities, or equivalent changes in carrier forms that can be made by those skilled in the art should fall within the scope of protection of this patent, but may not extend to protected topics not recorded in the application documents, nor may they alter the substantive correspondence between technical objects through changes in name or number.
Claims
1. A method for constructing a modular connector array for energy storage batteries, characterized in that, The method includes: Acquire object data and target electrical connection relationships of energy storage battery modules, connecting components and installation space; establish mapping relationships between physical objects and digital twin objects; and establish an array of digital twin objects. The connection interfaces are extracted from the array of digital twin objects and terminal nodes are generated. Candidate connection edges are generated based on the target electrical connection relationship and interface matching relationship. A connection topology is constructed, and the construction constraints are associated with the terminal nodes or the candidate connection edges to form a constraint graph. Project the candidate connection edge onto the installation space, determine the connection path according to the constraint diagram, configure the connection component according to the connection path to form a connector instance, and generate a candidate connector array; The candidate connector array is verified based on the constraint diagram. When a constraint conflict exists, the connector instance or candidate connection edge corresponding to the constraint conflict is identified as the conflict object, and the influence range and boundary connection relationship are determined according to the topological adjacency relationship of the conflict object. When there is no constraint conflict, output the array construction data. When there is a constraint conflict, freeze the configuration of the connector instances outside the influence range, reproject the candidate connection edges within the influence range and configure the connection components, verify the reconstruction results and the boundary connection relationship, and output the array construction data after the constraint conflict is eliminated.
2. The method for constructing a modular connector array for energy storage batteries according to claim 1, characterized in that, The object data is structured according to the entity object identifier, the twin object identifier, and the object attributes to form an object record. The object attributes consist of interface attributes and spatial attributes. Establish a candidate binding relationship between the entity object identifier and the corresponding digital twin object identifier, and perform consistency verification between the entity object and the corresponding digital twin object based on the interface attribute and the spatial attribute; When both the interface attribute and the spatial attribute match, the candidate binding relationship is determined as the mapping relationship. When either attribute does not match, the candidate binding relationship is released, and the digital twin object corresponding to the entity object is re-determined based on the object record.
3. The method for constructing a modular connector array for energy storage batteries according to claim 1, characterized in that, The terminal node is generated according to the energy storage battery module, interface attributes, and polarity corresponding to the connection interface; For any two terminal nodes, when the two terminal nodes satisfy the target electrical connection relationship and the interface attributes match each other, the corresponding candidate connection edge is established; when either condition is not met, the connection between the two terminal nodes is excluded. The electrical and structural constraints determined by the object data are bound to the corresponding terminal nodes or candidate connection edges, and the constraint diagram is formed according to the constraint objects, constraint conditions, and initial verification states.
4. The method for constructing a modular connector array for energy storage batteries according to claim 3, characterized in that, Map the coordinates of the terminal nodes corresponding to the candidate connection edges to the installation space, and exclude spatial regions that conflict with the construction constraints according to the constraint diagram to form a candidate set of connection paths; The candidate set of connection paths is filtered based on the path geometry features and component adaptation relationships, and the candidate paths that satisfy the construction constraints are determined as the connection paths. Configure the connecting components and determine their installation poses according to the interface attributes and spatial attributes corresponding to the connection path to form the connector instance. Combine the connector instances according to the connection topology to generate the candidate connector array.
5. The method for constructing a modular connector array for energy storage batteries according to claim 1, characterized in that, The terminal nodes, candidate connection edges and connector instances corresponding to the candidate connector array are checked according to the constraints in the constraint diagram, and objects that do not meet the corresponding constraints are identified as conflict objects. Starting with the conflicting object, objects connected to the conflicting object are determined step by step according to the topological adjacency relationship in the connection topology, until there is no constraint transit relationship between the determined object and its adjacent objects. The area where the objects determined step by step are located is defined as the influence range. Candidate connecting edges with one end located within the influence range and the other end located outside the influence range are identified as boundary connecting edges, and the boundary connecting relationship is formed according to the interface correspondence between the two ends of the boundary connecting edges.
6. The method for constructing a modular connector array for energy storage batteries according to claim 5, characterized in that, When the constraint conflict exists, lock the connector instances outside the influence range and the correspondence between the connector instances and the boundary connection edges, and restore the candidate connection edges within the influence range to the state to be projected. Using the boundary connection relationship as a fixed constraint, the projection position of the candidate connection edge in the installation space and the connection path are redefined, and the connection component is configured according to the redefined connection path to form a reconfigurable connector instance; Structural constraint checks and electrical constraint checks are performed sequentially on the reconstructed connector instance and the boundary connection relationship. When both checks pass, the array construction data is output. When either check fails, adjacent objects that have a constraint transit relationship with the failed check object and are located outside the influence range are incorporated into the influence range, and local reconstruction is repeated for the expanded influence range.
7. The method for constructing a modular connector array for energy storage batteries according to claim 5, characterized in that, After each re-execution of spatial projection and connection component configuration for the candidate connection edges within the influence range, the connector instances and boundary connection relationships within the influence range are re-verified based on the constraint diagram. When the constraint conflict still exists, based on the topological adjacency relationship between the conflicting object and the boundary of the influence range, adjacent objects with constraint transitivity are incorporated into the influence range, and spatial projection and connection component configuration are re-executed on the expanded influence range; When there is no constraint conflict, the local reconstruction is terminated and the array construction data is output. When the influence range is extended to all connector instances of the candidate connector array and the constraint conflict still exists, the candidate connection edge is regenerated and the connection topology is updated.
8. The method for constructing a modular connector array for energy storage batteries according to claim 1, characterized in that, When there is no constraint conflict, a construction record is established according to the connector instance, and the corresponding terminal node, the candidate connection edge, the connection path and the installation pose of the connector instance in the installation space are written into the construction record. The connection order between each of the construction records is determined based on the connection topology, and the terminal correspondence between adjacent construction records is verified according to the target electrical connection relationship and the interface matching relationship. When the connection order and the interface correspondence are consistent with the candidate connector array, all the construction records are aggregated into the array construction data.
9. The method for constructing a modular connector array for energy storage batteries according to claim 2, characterized in that, Each object record in the array of digital twin objects is configured with an object category, topological association identifier, and space occupancy boundary; A connection index is established between the energy storage battery module and the connecting component based on the topology association identifier, and a space index is established between the connecting component and the installation space based on the space occupancy boundary. When generating the terminal node, the candidate connection edge, or the connector instance, the corresponding connection index and the spatial index are called, and the generated terminal node, candidate connection edge, or connector instance is associated with the corresponding entity object identifier and the twin object identifier.
10. A modular connector array construction system for energy storage batteries, the system being used to implement the modular connector array construction method for energy storage batteries as described in any one of claims 1-9, characterized in that, The system includes a twin construction module, a topology construction module, an array generation module, a verification and positioning module, and a local reconstruction module; The twin construction module acquires object data and target electrical connection relationships of energy storage battery modules, connecting components and installation space, establishes a mapping relationship between physical objects and digital twin objects, and establishes an array of digital twin objects. The topology construction module extracts connection interfaces from the array digital twin object set and generates terminal nodes, generates candidate connection edges based on the target electrical connection relationship and interface matching relationship, constructs the connection topology, and associates the construction constraints with the terminal nodes or the candidate connection edges to form a constraint graph. The array generation module projects the candidate connection edges onto the installation space, determines the connection path according to the constraint diagram, configures the connection components according to the connection path to form a connector instance, and generates a candidate connector array. The verification and positioning module verifies the candidate connector array according to the constraint diagram. When there is a constraint conflict, the connector instance or candidate connection edge corresponding to the constraint conflict is identified as the conflict object, and the influence range and boundary connection relationship are determined according to the topological adjacency relationship of the conflict object. The local reconstruction module outputs array construction data when there is no constraint conflict, and when there is a constraint conflict, freezes the configuration of the connector instances outside the influence range, reprojects the candidate connection edges within the influence range and configures the connection components, verifies the reconstruction results and the boundary connection relationship, and outputs the array construction data after the constraint conflict is eliminated.