A Method for Predicting Hysteresis Crystallization on the Wall of a Type II Lithium Bromide Heat Pump Generator

By establishing a dual-zone unsteady heat and mass transfer model and a crystal nucleation induction time algorithm, the risk of wall crystallization in lithium bromide heat pump generators can be monitored and predicted in real time. This solves the problem of unpredictable wall hysteresis crystallization in existing technologies, and enables stable operation and cost savings for the unit.

CN123116631APending Publication Date: 2026-11-17HIT HARBIN INST OF TECH KINT TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611470263.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies cannot effectively predict and prevent delayed crystallization on the walls of Class II lithium bromide heat pump generators, leading to crystal deposition in heat exchange tubes and blockage of flow channels, unplanned unit shutdowns, and inability to adapt to the complex operating conditions of frequent heat source disturbances in industry.

Method used

By establishing a dual-zone unsteady-state heat and mass transfer algorithm model for the generator solution bulk and the liquid film on the heat exchange tube wall, and combining the lithium bromide solution temperature-saturation solubility physical property database and the crystal nucleation induction time algorithm, the supersaturation state of the liquid film on the tube wall is monitored and predicted in real time, and an early warning signal is output and pre-regulation control is performed.

Benefits of technology

It enables early identification and prevention of delayed crystallization on the wall, avoiding crystal deposition and flow channel blockage in heat exchange tubes, ensuring continuous operation of the unit, and reducing unplanned downtime and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_369
    Figure SMS_369
  • Figure QLYQS_59
    Figure QLYQS_59
  • Figure QLYQS_60
    Figure QLYQS_60
Patent Text Reader

Abstract

This invention discloses a method for predicting delayed crystallization on the wall surface of a type II lithium bromide heat pump generator, belonging to the technical field of type II lithium bromide heat pumps. The method involves collecting key operating parameters of the generator, identifying step disturbances in the driving heat source, and extracting disturbance characteristics; constructing a dual-zone unsteady heat and mass transfer model of the solution bulk and the liquid film on the heat exchange tube wall, and solving for the temperature and concentration evolution data of the micro-regions of the liquid film on the tube wall; determining the supersaturation state of the liquid film micro-regions by combining a pre-stored physical property database, and obtaining supersaturation characteristic information; determining the basic risk level based on the degree of supersaturation using a crystal nucleus generation induction time algorithm, and correcting it to obtain the final crystallization risk level, thereby outputting an early warning signal and a pre-regulation control command for the unit. This invention abandons the traditional static threshold protection method of the tank bulk solution, realizing early prediction of the risk of crystallization in the liquid film on the tube wall, and intervening and regulating before a large number of crystal nuclei are generated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of lithium bromide heat pump technology, and in particular, a method for predicting delayed crystallization on the wall of a lithium bromide heat pump generator. Background Technology

[0002] Type II lithium bromide absorption heat pumps utilize low-temperature waste heat from industrial processes to enhance heat energy quality. The lithium bromide solution inside the generator operates at a high concentration near crystallization, making it highly sensitive to disturbances in the heat source and heat load. In actual industrial operation, the temperature and flow rate of the driving heat source frequently experience abrupt disturbances. Due to the unit's thermal inertia and solution mass transfer lag, the thin liquid film region on the generator's heat exchanger tube wall will experience localized supersaturation before the main solution, leading to the gradual formation of crystal nuclei. Crystallization failure only manifests after a certain lag time. Existing monitoring and protection methods primarily rely on static thresholds for the temperature and concentration of the mainstream solution in the generator tank. These methods cannot obtain the true state of the micro-regions of the liquid film on the tube wall, cannot quantify the risk of delayed crystallization caused by disturbances, and cannot predict the potential time window for crystallization. Protection is often triggered only after crystallization has already occurred, easily leading to crystal deposition and flow channel blockage in the heat exchanger tubes, resulting in unplanned unit shutdowns. Therefore, a method for predicting the risk of delayed crystallization on the generator wall of Type II lithium bromide heat pumps is urgently needed. Summary of the Invention

[0003] Purpose of the invention: To provide a second-type lithium bromide heat pump generator wall hysteresis crystallization prediction method to solve the above-mentioned problems existing in the prior art.

[0004] Technical solution: A method for predicting delayed crystallization on the wall of a type II lithium bromide heat pump generator, comprising the following steps: S1: Obtain the main solution temperature of the type II lithium bromide heat pump generator System vacuum Heat source temperature and drive heat source flow ; Based on the temperature of the heat source and drive heat source flow Identify step disturbance events driving the heat source and extract disturbance characteristic parameters; S2: Establish a two-zone unsteady heat and mass transfer algorithm model between the generator solution bulk and the liquid film on the heat exchange tube wall; Temperature of the main solution System vacuum The disturbance characteristic parameters are input into the dual-zone unsteady heat and mass transfer algorithm model to calculate the real-time liquid film temperature of the liquid film micro-region on the pipe wall after disturbance. Real-time concentration of liquid film Evolutionary data over time; S3: Obtain a pre-stored database of lithium bromide solution temperature-saturation solubility properties, wherein the database stores different system vacuum levels. The corresponding bulk solution temperature at different temperatures and critical saturation solubility ; Based on the real-time temperature of the liquid film Real-time concentration of liquid film and critical saturation solubility The solution temperature-saturation solubility property database of lithium bromide solution is compared to determine whether the micro-region of the liquid film on the tube wall has entered a supersaturated state, and the onset time of supersaturation is recorded. and the concentration difference of the supersaturated liquid film ; S4: Based on the oversaturation start time Liquid film supersaturation concentration difference and real-time temperature of the liquid film The crystal nucleus generation induction time algorithm is called to calculate the crystal nucleus generation induction time. Based on the supersaturation concentration difference Determine the basic crystallization risk level, and then utilize the crystal nucleation induction time. The basic crystallization risk level is revised to obtain the final crystallization risk level; S5: Based on the crystallization risk level, output a pre-warning signal and a pre-adjustment control command for the unit to complete the prediction of the risk of delayed crystallization on the wall of the second type of lithium bromide heat pump generator.

[0005] Furthermore, based on the temperature of the heat source and drive heat source flow The method for identifying step disturbance events driving the heat source and extracting disturbance characteristic parameters is as follows: Step 1: Obtain the steady-state temperature of the driving heat source under normal operating conditions and driving heat source steady-state flow ; Step 2: Calculate the temperature of the heat source respectively Driven heat source flow With the steady-state temperature of the driving heat source under normal operation , driving the steady-state flow of the heat source The relative change difference is used to determine the amplitude of the disturbance temperature. and disturbance flow amplitude ; Step 3: When the heat source temperature and drive heat source flow The relative rate of change exceeds the temperature steady-state fluctuation threshold. Or the steady-state fluctuation threshold of flow ; Step 4: Record the start time of the disturbance If the temperature steady-state fluctuation threshold Or the steady-state fluctuation threshold of flow The state is maintained continuously for a duration greater than the minimum disturbance duration threshold. If the temperature steady-state fluctuation threshold is reached, then a step disturbance event is determined to have occurred, driving the heat source to generate a step disturbance event; if the temperature steady-state fluctuation threshold is reached... Flow steady-state fluctuation threshold The duration of the state is less than the minimum disturbance duration threshold. It is determined to be transient noise and will not trigger the subsequent prediction process; Step 5: Once the step disturbance event is determined to be valid, extract the disturbance characteristic parameters, including: disturbance temperature amplitude. Disturbance flow amplitude and duration of disturbance The duration of the disturbance It is equal to the difference between the end time of the disturbance and the start time of the disturbance.

[0006] Furthermore, the method for establishing a two-zone unsteady heat and mass transfer algorithm model for the generator solution bulk and the liquid film on the heat exchanger tube wall is as follows: Step 1: Obtain the solution circulation flow rate of the generator. Steady-state concentration of dilute solution at the generator inlet Steady-state concentration of concentrated solution at generator outlet and the density of lithium bromide solution ; Step 2: Based on the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Steady-state concentration of concentrated solution at generator outlet and the density of lithium bromide solution Calculate the vapor from the solution evaporation , ; Step 3: Establish the boundary conditions for the driving heat source. ; Step 4: Obtain the specific heat capacity of the heat source fluid Driven heat source hot water density Calculate the heating power of the heat source based on the boundary conditions of the driving heat source. , ; Step 5: Obtaining the specific heat capacity of lithium bromide solution Equipment inherent constants, unit thermal inertia coefficient Heat loss due to heat dissipation from the generator housing ; According to the heating power of the heat source Specific heat capacity of lithium bromide solution Equipment inherent constants, unit thermal inertia coefficient Heat loss due to heat dissipation from the generator housing Calculate the total mass of the solution in the generator. , ; in, This refers to the evaporative heat absorption power. Step Six: Based on the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Lithium bromide solution density , solution evaporation vapor and the total mass of the solution in the generator Calculate the real-time concentration of the main body , ; Step 7: Establish a micro-region sub-model of the liquid film on the pipe wall; Obtaining the liquid film thermal time constant heat transfer coefficient of pipe wall Liquid film heat transfer area and the total mass of the liquid film on the tube wall ; Based on the liquid film thermal time constant heat transfer coefficient of pipe wall Liquid film heat transfer area and the total mass of the liquid film on the tube wall Calculate the real-time temperature of the liquid film , ; Obtaining the liquid film mass transfer hysteresis time constant ; Based on the liquid film mass transfer hysteresis time constant Calculate the concentration of liquid film mass transfer , .

[0007] Furthermore, the method for determining whether the micro-region of the liquid film on the pipe wall has entered a supersaturated state is as follows: The saturated solubility of lithium bromide in aqueous solution varies with temperature and system pressure. For each time step t, the real-time temperature of the liquid film at that moment is considered. System vacuum Using an index, the lithium bromide-water property database was queried to obtain the critical saturation solubility at the liquid film on the pipe wall under this operating condition. , ; Not supersaturated, no risk of crystallization; When the liquid film microregion enters a supersaturated state, it meets the thermodynamic conditions for crystallization.

[0008] Furthermore, the initial time of oversaturation The method of obtaining it is as follows: Time-step comparison to identify the start time of oversaturation , Discrete-time series output by S2 Time-by-time traversal and judgment: 1) All moments before the disturbance occurs: It is in a normal, non-supersaturated state; 2) From Start scanning backwards to find the first one that satisfies the condition. The moment at which the oversaturation begins is recorded. , If throughout the full duration, always If no oversaturation is detected, the current crystallization prediction process will be terminated directly, and the oversaturation start time will not be output. and the concentration difference of the supersaturated liquid film The jump ends; once the oversaturation start time is found... Continue calculating the concentration difference.

[0009] Furthermore, the supersaturated concentration difference of the liquid film The method of obtaining it is as follows: Calculate the concentration difference of the liquid film supersaturation ; Oversaturation start time Then, the supersaturation concentration difference at each time step: ; Represents the degree of oversaturation; Record the start time of oversaturation Initial oversaturation difference at time ; Record the maximum oversaturation difference within the oversaturation range. .

[0010] Furthermore, the final method for generating the crystallization risk level is as follows: Step 1: Based on the maximum supersaturation concentration difference in the supersaturation range Real-time temperature of the liquid film at the initial moment of supersaturation Calculate the nucleation induction time , ; Where A and B are both correction constants for the crystallization of lithium bromide solution; according to Basic Level 1 Low Risk; Basic Level 2 Medium Risk; Based on the basic level three high risk, the basic crystallization risk level is determined; Step 2: Based on the nucleus generation induction time Make corrections: Basic Level 1 Low Risk, When The risk level was revised to Level II, medium risk. Basic Level 2 Medium Risk, when The risk level was revised to Level 1 Low Risk. The risk level was revised to Level 3 (high risk). Basic Level 3 High Risk, when Maintain the original basic risk level and output the final crystallization risk level.

[0011] Furthermore, the method for obtaining the correction constants A and B for the crystallization of lithium bromide solution is as follows: Multiple sets of step heat source disturbances of different amplitudes are applied under high concentration conditions near crystallization. Record the maximum supersaturation difference of the liquid film in each group of experiments. The absolute temperature of the liquid film at the initial moment of supersaturation and measured nucleation induction time ; Perform a logarithmic transformation on the formula. ; by For independent variable, A univariate linear regression is performed on the dependent variable, and the slope B is obtained from the regression. The intercept is taken as the exponent to obtain A.

[0012] Furthermore, the method for outputting advance warning signals and unit pre-adjustment control commands based on the aforementioned crystallization risk level is as follows: When the final crystallization risk level is Level 1 low risk, a low risk advance warning signal is output, only the operating status is recorded, the original operating conditions of the unit are maintained, and the unit parameters are continuously monitored. When the final crystallization risk level is Level 2 (medium risk), a medium risk early warning signal is output, alarm events are recorded, a pre-adjustment control command is output, and a mild adjustment operation is performed to increase the generator solution circulation flow rate or slightly reduce the driving heat source temperature. When the final crystallization risk level is level three (high risk), a high-risk early warning signal is output, triggering an audible and visual alarm and uploading the alarm information to the upper-level monitoring system. A pre-adjustment control command is output to increase the solution circulation flow rate and reduce the heating capacity of the driving heat source.

[0013] Furthermore, the advance warning signals include human-machine interface display signals, event log storage signals, and host computer communication message signals; the pre-adjustment control commands are digital commands that the unit controller can recognize.

[0014] Beneficial Effects: This application abandons the traditional protection logic that relies solely on the static thresholds of the temperature and concentration of the main solution in the generator tank. Instead, it solves for the unmeasurable micro-regional time-series parameters of the liquid film on the pipe wall using a dual-zone unsteady-state heat and mass transfer model. Combined with a physical property database and a crystal nucleation induction time algorithm, it completes the crystallization risk assessment. Experimental data shows that, facing strong heat source step disturbances, this scheme requires only 3 seconds for disturbance identification and a total response time of 20 seconds, earlier than the 43-second crystal nucleation induction time. This allows it to output early warning and pre-regulation commands before a large number of crystal nuclei are generated. Traditional schemes wait approximately 130 seconds for the main parameters to reach the threshold before taking action, by which time crystal deposition has already occurred on the pipe wall. This application intervenes and regulates at the nascent stage of crystallization failure, overcoming the judgment lag caused by heat and mass inertia and suppressing crystallization from the source.

[0015] This application establishes a graded risk assessment system based on supersaturation level combined with crystal nucleation induction time correction, corresponding to differentiated early warning outputs and pre-regulation control strategies: low risk involves only monitoring and recording, medium risk involves mild regulation, and high risk involves enhanced intervention. Experimental results show that under high crystallization risk and strong disturbance conditions, after implementing active pre-regulation, no crystallized scale forms on the tube walls, and the unit can maintain continuous operation without triggering an emergency shutdown. Compared with existing technologies, this avoids the problem of crystallization blockage in heat exchange tube bundles, eliminates the need for chemical cleaning after shutdown, reduces maintenance time and material losses, effectively improves the operational reliability of Class II lithium bromide heat pump units, and adapts to the complex actual conditions of frequent heat source disturbances in industrial sites. Detailed Implementation

[0016] In the following description, numerous specific details are set forth in order to provide a more thorough understanding of the invention. However, it will be apparent to those skilled in the art that the invention can be practiced without one or more of these details. In other instances, certain technical features well-known in the art have not been described in order to avoid obscuring the invention.

[0017] Obtain the main solution temperature of the type II lithium bromide heat pump generator System vacuum Heat source temperature and drive heat source flow ; Based on the temperature of the heat source and drive heat source flow Identify step disturbance events driving the heat source and extract disturbance characteristic parameters; in, Data is collected by temperature sensors located inside the generator tank; Data is collected by a vacuum pressure transmitter; Temperature data is collected by a temperature sensor installed on the driving heat source pipeline; The parameters are collected by a flow sensor installed on the driving heat source pipeline; the above parameters are read in real time by the unit's DCS control system at a sampling period of 1-5 seconds. Based on the collected operating parameters, a step disturbance event is identified and judged. If the step disturbance event is determined to be true, the disturbance characteristic parameters are extracted and sent to the subsequent calculation process; if it is determined to be transient noise, the prediction process is directly terminated.

[0018] The system completes real-time acquisition of key operating parameters of the unit, distinguishes between normal steady-state fluctuations and step disturbances with crystallization risk, filters instantaneous noise from field measurements, and only initiates subsequent predictive calculations when a valid disturbance event is identified, thereby reducing the computing power consumption of the controller.

[0019] A two-zone unsteady heat and mass transfer algorithm model is established between the generator solution bulk and the liquid film on the heat exchange tube wall. Temperature of the main solution System vacuum The disturbance characteristic parameters are input into the dual-zone unsteady heat and mass transfer algorithm model to calculate the real-time liquid film temperature of the liquid film micro-region on the pipe wall after disturbance. Real-time concentration of liquid film Evolutionary data over time; in, and This is the time-series calculation result output from the time-step iterative solution of the dual-zone unsteady heat and mass transfer algorithm model; the remaining basic parameters required for the model solution will be explained in subsequent modeling sub-steps. The bulk solution temperature obtained in S1 is... System vacuum The perturbation feature parameters are used as boundary conditions of the model. A fixed computation time step is set to carry out iterative solutions and output discrete time series. .

[0020] The heat and mass transfer coupling relationship between the main solution of the generator and the thin liquid film micro-region on the tube wall is established to overcome the limitation that the on-site hardware cannot directly obtain the temperature and concentration of the liquid film micro-region on the tube wall. The dynamic time series data of the liquid film position temperature and concentration after the disturbance occurs are output to provide a calculation data source for subsequent supersaturation state identification.

[0021] Acquire a pre-stored database of lithium bromide solution temperature-saturation solubility properties, wherein the database stores different system vacuum levels. The corresponding bulk solution temperature at different temperatures and critical saturation solubility ; Based on the real-time temperature of the liquid film Real-time concentration of liquid film and critical saturation solubility The solution temperature-saturation solubility property database of lithium bromide solution is compared to determine whether the micro-region of the liquid film on the tube wall has entered a supersaturated state, and the onset time of supersaturation is recorded. and the concentration difference of the supersaturated liquid film ; in, At the current moment , The index is obtained by querying the locally pre-stored lithium bromide-water property database on the controller; It is obtained by traversing and searching the discrete time series output by S2 at each time step; According to the formula The calculation is obtained. The local pre-stored property database is invoked, and the process is completed step-by-step. and The comparison identifies the onset time of oversaturation. And calculate the supersaturation concentration difference. If no oversaturation occurs throughout the process, the prediction process will be terminated immediately.

[0022] Based on the physical property database, the saturation state of the liquid film micro-region is dynamically determined, the time node when the liquid film on the pipe wall first enters supersaturation after disturbance is located, and the supersaturation margin of the liquid film is quantified; the process is directly terminated under no supersaturation condition to avoid the controller from executing invalid calculations.

[0023] Based on the start time of oversaturation Liquid film supersaturation concentration difference and real-time temperature of the liquid film The crystal nucleus generation induction time algorithm is called to calculate the crystal nucleus generation induction time. Based on the supersaturation concentration difference Determine the basic crystallization risk level, and then utilize the crystal nucleation induction time. The basic crystallization risk level is revised to obtain the final crystallization risk level; in, The calculation was performed by substituting the values ​​into the formula for calculating the induction time of crystal nucleation, using the maximum supersaturation concentration difference within the supersaturation range. Real-time temperature of the liquid film at the initial moment of supersaturation The calculation involves the use of a lithium bromide solution crystallization correction constant, which will be explained in a subsequent sub-step. The maximum supersaturation concentration difference within the supersaturated range is selected. Real-time temperature of the liquid film at the initial moment of supersaturation Substitute into the nucleation induction time algorithm to solve ;in accordance with Classify the risk level of basic crystallization, and then through Complete the risk level correction and output the final crystallization risk level.

[0024] Instead of relying solely on supersaturation concentration for risk assessment, the method introduces the nucleation induction time to characterize the rate of heterogeneous nucleation on the wall, and performs a secondary correction on the basic risk level. This reduces misjudgments caused by relying solely on concentration thresholds, making the crystallization risk assessment more closely reflect the actual physical process.

[0025] Based on the crystallization risk level, a pre-warning signal and a pre-adjustment control command for the unit are output to complete the prediction of the risk of delayed crystallization on the wall of the second type of lithium bromide heat pump generator.

[0026] The crystallization risk calculated by the algorithm is transformed into signals and control commands that can be recognized by the human-machine interface, the upper-level monitoring, and the unit controller, so as to complete the early warning and active pre-adjustment before the crystallization failure actually occurs, thus protecting the heat exchange tube bundle.

[0027] Based on the temperature of the heat source and drive heat source flow The method for identifying step disturbance events driving the heat source and extracting disturbance characteristic parameters is as follows: Obtain the steady-state temperature of the driving heat source under normal operating conditions. and driving heat source steady-state flow ; Calculate the temperature of the heat source separately Driven heat source flow With the steady-state temperature of the driving heat source under normal operation , driving the steady-state flow of the heat source The relative change difference is used to determine the amplitude of the disturbance temperature. and disturbance flow amplitude ; When the heat source temperature and drive heat source flow The relative rate of change exceeds the temperature steady-state fluctuation threshold. Or the steady-state fluctuation threshold of flow ; Record the start time of the disturbance If the temperature steady-state fluctuation threshold Or the steady-state fluctuation threshold of flow The state is maintained continuously for a duration greater than the minimum disturbance duration threshold. If the temperature steady-state fluctuation threshold is reached, then a step disturbance event is determined to have occurred, driving the heat source to generate a step disturbance event; if the temperature steady-state fluctuation threshold is reached... Flow steady-state fluctuation threshold and The duration of the state is less than the minimum disturbance duration threshold. It is determined to be transient noise and will not trigger the subsequent prediction process; Once a step disturbance event is determined to be valid, disturbance characteristic parameters are extracted. These parameters include: disturbance temperature amplitude. Disturbance flow amplitude and duration of disturbance The duration of the disturbance It is equal to the difference between the end time of the disturbance and the start time of the disturbance.

[0028] in, and The calibration was performed by reading the parameters on the unit's nameplate and combining them with the historical dataset of the unit's steady-state operation. and The difference between the real-time parameters and the steady-state reference is obtained through calculation. and Collect historical datasets of the unit's steady-state operation and take the 95th percentile of the average difference of relative fluctuation samples; Recorded by the unit controller system clock; The longest duration during which the liquid film supersaturation did not occur, taken from historical data, was recorded. Subtract the start time of the disturbance from the end time of the disturbance Calculated.

[0029] Establish a steady-state benchmark for disturbance identification and quantify the amplitude of heat source disturbances; distinguish between normal small fluctuations of the unit and risky step disturbances, and filter short-time pulse noise from the sensor from the time dimension; extract complete disturbance feature parameters to provide time-varying boundary input for the dual-zone model.

[0030] The method for establishing a two-zone unsteady heat and mass transfer algorithm model between the generator solution bulk and the liquid film on the heat exchange tube wall is as follows: Obtain the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Steady-state concentration of concentrated solution at generator outlet and the density of lithium bromide solution ; Based on the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Steady-state concentration of concentrated solution at generator outlet and the density of lithium bromide solution Calculate the vapor from the solution evaporation , ; Establish the boundary conditions for the driving heat source. ; Obtain the specific heat capacity of the heat source fluid Driven heat source hot water density Calculate the heating power of the heat source based on the boundary conditions of the driving heat source. , ; Obtaining the specific heat capacity of lithium bromide solution Equipment inherent constants, unit thermal inertia coefficient Heat loss due to heat dissipation from the generator housing ; According to the heating power of the heat source Specific heat capacity of lithium bromide solution Equipment inherent constants, unit thermal inertia coefficient Heat loss due to heat dissipation from the generator housing Calculate the total mass of the solution in the generator. , ; in, This refers to the evaporative heat absorption power. Based on the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Lithium bromide solution density , solution evaporation vapor and the total mass of the solution in the generator Calculate the real-time concentration of the main body , ; Establish a micro-region sub-model of the liquid film on the pipe wall; Obtaining the liquid film thermal time constant heat transfer coefficient of pipe wall Liquid film heat transfer area and the total mass of the liquid film on the tube wall ; Based on the liquid film thermal time constant heat transfer coefficient of pipe wall Liquid film heat transfer area and the total mass of the liquid film on the tube wall Calculate the real-time temperature of the liquid film , ; Obtaining the liquid film mass transfer hysteresis time constant ; Based on the liquid film mass transfer hysteresis time constant Calculate the concentration of liquid film mass transfer , .

[0031] in, Data is collected by the flow meter in the generator solution pipeline; and Data are collected by an online concentration detection device; if no online detection device is available, manual sampling and testing are used. and Search the lithium bromide-water working material properties database; Calculated using the corresponding formula; and Consult the property table of the heat source medium; Calculated step-by-step using the heat source power formula; , , , , , Obtained through prototype hot calibration tests; Extract geometric parameters from the generator equipment machining drawings; , The solution is obtained through iterative analysis of energy and material differential equations.

[0032] The amount of steam evaporated by the generator was calculated, and a time-varying boundary of the step heat source was constructed to convert temperature and flow disturbances into heating power input. The energy and material balance relationship of the bulk solution was established, and the heat and mass transfer kinetic equations of the micro-region of the liquid film on the pipe wall were constructed to characterize the hysteresis effect of the liquid film relative to the bulk solution and solve for the liquid film time series parameters that cannot be directly measured.

[0033] The method for determining whether the liquid film micro-region on the tube wall has entered a supersaturated state is as follows: The saturated solubility of lithium bromide in aqueous solution varies with temperature and system pressure. For each time step t, the real-time temperature of the liquid film at that moment is considered. System vacuum Using an index, the lithium bromide-water property database was queried to obtain the critical saturation solubility at the liquid film on the pipe wall under this operating condition. , ; Not supersaturated, no risk of crystallization; When the liquid film microregion enters a supersaturated state, it meets the thermodynamic conditions for crystallization.

[0034] Oversaturation start time The method of obtaining it is as follows: Time-step comparison to identify the start time of oversaturation , Discrete-time series output by S2 Time-by-time traversal and judgment: 1) All moments before the disturbance occurs: It is in a normal, non-supersaturated state; 2) From Start scanning backwards to find the first one that satisfies the condition. The moment at which the oversaturation begins is recorded. , If throughout the full duration, always If no oversaturation is detected, the current crystallization prediction process will be terminated directly, and the oversaturation start time will not be output. and the concentration difference of the supersaturated liquid film The jump ends; once the oversaturation start time is found... Continue calculating the concentration difference.

[0035] Furthermore, the supersaturated concentration difference of the liquid film The method of obtaining it is as follows: Calculate the concentration difference of the liquid film supersaturation ; Oversaturation start time Then, the supersaturation concentration difference at each time step: ; Represents the degree of oversaturation; Record the start time of oversaturation Initial oversaturation difference at time ; Record the maximum oversaturation difference within the oversaturation range. .

[0036] The critical saturation solubility under corresponding operating conditions is dynamically obtained step by step over time, and the supersaturation thermodynamic conditions of the liquid film micro-region are judged. The moment of the first supersaturation is accurately located, and the supersaturation margin is quantitatively characterized, providing a quantitative basis for risk level classification.

[0037] The final method for generating the crystallization risk level is as follows: Step 1: Based on the maximum supersaturation concentration difference in the supersaturation range Real-time temperature of the liquid film at the initial moment of supersaturation Calculate the nucleation induction time , ; Where A and B are both correction constants for the crystallization of lithium bromide solution; according to Basic Level 1 Low Risk; Basic Level 2 Medium Risk; Based on the basic level three high risk, the basic crystallization risk level is determined; Step 2: Based on the nucleus generation induction time Make corrections: Basic Level 1 Low Risk, When The risk level was revised to Level II, medium risk. Basic Level 2 Medium Risk, when The risk level was revised to Level 1 Low Risk. The risk level was revised to Level 3 (high risk). Basic Level 3 High Risk, when Maintain the original basic risk level and output the final crystallization risk level.

[0038] The method for obtaining the correction constants A and B for the crystallization of lithium bromide solution is as follows: Multiple sets of step heat source disturbances of different amplitudes are applied under high concentration conditions near crystallization. Record the maximum supersaturation difference of the liquid film in each group of experiments. The absolute temperature of the liquid film at the initial moment of supersaturation and measured nucleation induction time ; Perform a logarithmic transformation on the formula. ; by For independent variable, A univariate linear regression is performed on the dependent variable, and the slope B is obtained from the regression. The intercept is taken as the exponent to obtain A.

[0039] in, The supersaturated concentration difference of the liquid film within the supersaturated range. The maximum value, and the timing output of S3. get; The absolute temperature of the liquid film at the initial moment of supersaturation is equal to... The converted Kelvin temperature; The nucleation induction time is obtained from the prototype test; A and B are obtained by logarithmic transformation and univariate linear regression fitting through multiple sets of step disturbance crystallization calibration tests on the prototype. Initial values ​​for engineering debugging can be taken as 5-15s for A and 200-500s for B; (The formula calculation is incomplete). It needs to be converted to Kelvin absolute temperature.

[0040] By calibrating the prototype, the nucleation correction constant adapted to the target unit is obtained, eliminating the deviation between the theoretical model and the engineering prototype; risk classification and correction are completed by combining the degree of supersaturation and the rate of nucleation, avoiding misjudgment caused by simple concentration classification.

[0041] The method for outputting advance warning signals and unit pre-adjustment control commands based on the crystallization risk level is as follows: When the final crystallization risk level is Level 1 low risk, a low risk advance warning signal is output, only the operating status is recorded, the original operating conditions of the unit are maintained, and the unit parameters are continuously monitored. When the final crystallization risk level is Level 2 (medium risk), a medium risk early warning signal is output, alarm events are recorded, a pre-adjustment control command is output, and a mild adjustment operation is performed to increase the generator solution circulation flow rate or slightly reduce the driving heat source temperature. When the final crystallization risk level is level three (high risk), a high-risk early warning signal is output, triggering an audible and visual alarm and uploading the alarm information to the upper-level monitoring system. A pre-adjustment control command is output to increase the solution circulation flow rate and reduce the heating capacity of the driving heat source.

[0042] The early warning signals include human-machine interface display signals, event log storage signals, and host computer communication message signals; the pre-adjustment control commands are digital commands that the unit controller can recognize.

[0043] It enables tiered early warning and intervention: low-risk areas are monitored without intervention, medium-risk areas are subject to mild adjustments, and high-risk areas are subject to enhanced intervention and audible and visual alarms; it also enables multi-channel output of early warning information, and control commands can be directly recognized and executed by the unit controller, thus connecting the algorithm calculation to the field execution link.

[0044] Examples and Comparative Examples This invention uses the same prototype of a type II lithium bromide absorption heat pump for experimental calibration, and the calibration of the prototype yields the correction constant for the crystallization of lithium bromide solution. , The system sampling period is set to 2 seconds; the unit's steady-state reference is: , Temperature steady-state fluctuation threshold ; Flow steady-state fluctuation threshold Minimum disturbance duration threshold The unit initially operated under high-concentration conditions close to crystallization.

[0045] Example 1 (Level 1 Low-Risk Operating Condition) The heat source is driven to generate a step disturbance, and the disturbance temperature amplitude is... Disturbance flow amplitude Duration of disturbance .

[0046] First, the event was identified as a valid step disturbance, and the disturbance characteristic parameters were extracted and fed into the dual-zone unsteady-state heat and mass transfer algorithm model. The model iteratively solved and output the time-series data of liquid film temperature and concentration. The physical property database was called to compare the data step by step to determine that the liquid film micro-region had become supersaturated, and the start time of supersaturation was obtained. Maximum supersaturation concentration difference in the supersaturation range Substituting the maximum supersaturation concentration difference and the absolute temperature of the liquid film at the initial moment of supersaturation... Calculate the nucleus generation induction time ;in accordance with The basic crystallization risk level was determined to be Level 1, low risk. The risk level will not be upgraded, and the final crystallization risk level will remain at Level 1 (low risk). A Level 1 low-risk early warning signal will be output, and only event log entries will be made. The unit will continue to be monitored under its original operating conditions without any adjustment actions.

[0047] Test results: After the disturbance ended, the liquid film on the pipe wall was only briefly supersaturated, and the induction time for crystal nucleation was long. No crystallization occurred on the pipe wall after this disturbance, and the unit maintained stable operation.

[0048] Example 2 (Level 2 Medium-Risk Operating Condition) Driven by a step disturbance in the heat source, the disturbance temperature amplitude Disturbance flow amplitude Duration of disturbance .

[0049] Effective step disturbances are identified, and their characteristic parameters are extracted and fed into the model. The dual-region model outputs the liquid film temperature and concentration time series. It determines whether the liquid film microregion has entered supersaturation and identifies the maximum supersaturation concentration difference in the supersaturation region. Substitute parameters to calculate the nucleation induction time. The basic crystallization risk level is Level 2, Medium Risk; meets the requirements. Maintain a level 2 medium risk as the final crystallization risk level. Output a medium risk early warning, record alarm events, issue pre-adjustment instructions, increase the generator solution circulation flow rate, and perform gentle adjustment operations.

[0050] Test results: After pre-adjustment intervention, the supersaturation of the liquid film quickly subsided, no crystals formed on the wall, and the unit could continue to work normally.

[0051] Example 3 (Level 3 High-Risk Operating Condition) Driven by a step disturbance in the heat source, the disturbance temperature amplitude Disturbance flow amplitude Duration of disturbance .

[0052] Identify valid step disturbances and extract disturbance feature parameters; perform iterative solutions using a dual-zone model, outputting liquid film time-series parameters; determine if the liquid film has entered supersaturation, and determine the maximum supersaturation concentration difference within the supersaturation range. ; Calculate the induction time for crystal nucleation. The basic crystallization risk level is determined to be Level 3 High Risk. No downgrading is performed for Level 3 High Risk, and the final crystallization risk level remains Level 3 High Risk. A high-risk early warning is output, triggering audible and visual alarms and uploading alarm messages to the host computer; control commands are issued to increase the solution circulation flow rate while simultaneously reducing the heating capacity of the driving heat source.

[0053] Experimental results: Active intervention was completed before a large number of crystal nuclei were generated, the supersaturation margin of the liquid film decreased rapidly, avoiding crystal deposition on the heat exchange tube wall and preventing unplanned shutdowns of the unit.

[0054] Comparative example (existing technology, relying solely on the static threshold protection of bulk solution temperature-concentration). The disturbance conditions are exactly the same as those in Example 3: disturbance temperature amplitude Disturbance flow amplitude Duration of disturbance The entire prediction and pre-adjustment process of this invention is shut down, and the traditional protection logic of the industry is enabled. The trigger condition of the traditional protection logic is: only when the measured concentration of the main solution at the generator tank reaches the preset crystallization protection threshold will an alarm be output and a shutdown protection be executed; this protection logic does not consider the state of the liquid film micro-region on the heat exchange tube wall at all, and has no disturbance identification, no dual-region model calculation, and no nucleation induction time evaluation.

[0055] Experimental Phenomena and Data Recording: After the disturbance was applied, due to the hysteresis effect of heat and mass transfer, the thin liquid film micro-region on the heat exchanger tube wall rapidly entered a highly supersaturated state, reaching supersaturation in 18 seconds. Crystal nuclei began to form heterogeneously on the tube wall surface and gradually grew. However, the main solution at the generator tank exhibited significant thermo-mass inertia, and the rate of increase in the main solution concentration lagged far behind that of the liquid film on the tube wall. The time interval from the occurrence of supersaturation of the liquid film to the main solution concentration reaching the protection threshold was 112 seconds. During this long 112-second window, the protection system did not issue any alarms, and the controller did not perform any intervention or adjustment. When the main parameters finally reached the protection threshold, obvious lithium bromide crystal deposits had appeared on the inner wall of the heat exchanger tubes, and some flow channels had become partially blocked. After the protection logic was triggered, the unit was forced to perform an emergency shutdown. Upon shutdown and disassembly, a layer of lithium bromide crystal scale was observed adhering to the inner wall of the heat exchanger tube bundle. The unit could only be put back into operation after manual chemical cleaning. This disturbance directly caused an unplanned shutdown of the unit, and also resulted in maintenance time and material losses.

[0056] Comparative Analysis: Existing traditional protection schemes rely solely on measuring points on the main body of the generator tank for judgment, which is significantly delayed due to the inertia of the solution's thermal mass. Crystallization risk has already developed in the micro-regions of the tube wall, and crystal nuclei have already formed and grown, but the main measuring points have not yet reached the protection threshold. The protection system is essentially "blind," only able to passively respond after crystallization has developed to a certain extent and the main parameters have changed. This is a post-fault protection measure, unable to provide proactive risk intervention. In contrast, the technical solution of this invention can identify disturbances immediately after they occur. By directly solving the temporal state of the liquid film micro-regions on the tube wall using a dual-zone model, it identifies high crystallization risk in the early stages, when the liquid film has just entered supersaturation and crystal nuclei have not yet grown in large numbers. It immediately issues pre-adjustment control commands to proactively eliminate supersaturation conditions without waiting for changes in the main solution parameters, thus suppressing crystal nuclei formation conditions at the source. This avoids crystallization and scaling on the heat exchange tubes and blockage of the flow channels, while maintaining continuous operation of the unit without shutdown, eliminating unplanned downtime and subsequent cleaning and maintenance costs.

[0057]

[0058] The experimental data comparison shows that the existing traditional protection scheme relies solely on the static threshold of the main solution in the generator tank for protection, and cannot perceive the true state of the micro-regions of the liquid film on the tube wall. Under the same strong disturbance conditions, the liquid film on the tube wall becomes supersaturated in 18 seconds, meeting the conditions for crystal nucleation. However, the traditional scheme lacks disturbance recognition and early warning output. It cannot monitor the maximum concentration difference of the supersaturated liquid film, nor can it assess the induction time for crystal nucleation. It requires waiting for about 130 seconds for the concentration of the main solution to reach the protection threshold. The protection action is seriously delayed compared to the crystallization development process, ultimately causing crystal deposition on the heat exchange tube wall, local blockage of the flow channel, and unplanned unit shutdown. Additional chemical cleaning is also required, resulting in time and material losses.

[0059] This proposed solution can identify step disturbances within 3 seconds of their occurrence and issue a high-risk warning and intervention command only 2 seconds after liquid film supersaturation. The total response time is only 20 seconds, earlier than the 43-second crystal nucleation induction time, proactively eliminating supersaturation conditions before a large number of crystal nuclei form. It eliminates the need to wait for changes in the main solution parameters, suppressing crystallization at its source, achieving proactive protection, preventing pipe wall scaling and blockage, ensuring continuous unit operation, eliminating downtime and maintenance costs, and significantly improving the safety and stability of unit operation.

[0060] The preferred embodiments of the present invention have been described in detail above. However, the present invention is not limited to the specific details in the above embodiments. Within the scope of the technical concept of the present invention, various equivalent transformations can be made to the technical solutions of the present invention, and these equivalent transformations all fall within the protection scope of the present invention.

Claims

1. A method for predicting delayed crystallization on the wall surface of a second-type lithium bromide heat pump generator, characterized in that, Includes the following steps, S1: Obtain the main solution temperature of the type II lithium bromide heat pump generator System vacuum Heat source temperature and drive heat source flow ; Based on the temperature of the heat source and drive heat source flow Identify step disturbance events driving the heat source and extract disturbance characteristic parameters; S2: Establish a two-zone unsteady heat and mass transfer algorithm model between the generator solution bulk and the heat exchange tube wall liquid film; Temperature of the main solution System vacuum The disturbance characteristic parameters are input into the dual-zone unsteady heat and mass transfer algorithm model to calculate the real-time liquid film temperature in the micro-region of the liquid film on the pipe wall after disturbance. Real-time concentration of liquid film Evolutionary data over time; S3: Obtain a pre-stored database of lithium bromide solution temperature-saturation solubility properties, wherein the database stores different system vacuum levels. The corresponding bulk solution temperature at different temperatures and critical saturation solubility ; Based on the real-time temperature of the liquid film Real-time concentration of liquid film and critical saturation solubility The solution temperature-saturation solubility property database of lithium bromide solution is compared to determine whether the micro-region of the liquid film on the tube wall has entered a supersaturated state, and the onset time of supersaturation is recorded. and the concentration difference of the supersaturated liquid film ; S4: Based on the oversaturation start time Liquid film supersaturation concentration difference and real-time temperature of the liquid film The crystal nucleus generation induction time algorithm is called to calculate the crystal nucleus generation induction time. Based on the supersaturation concentration difference Determine the basic crystallization risk level, and then utilize the crystal nucleation induction time. The basic crystallization risk level is revised to obtain the final crystallization risk level; S5: Based on the crystallization risk level, output a pre-warning signal and a pre-adjustment control command for the unit to complete the prediction of the risk of delayed crystallization on the wall of the second type of lithium bromide heat pump generator.

2. The method for predicting delayed crystallization on the wall surface of a second type of lithium bromide heat pump generator according to claim 1, characterized in that, Based on the temperature of the heat source and drive heat source flow The method for identifying step disturbance events driving the heat source and extracting disturbance characteristic parameters is as follows: Step 1: Obtain the steady-state temperature of the driving heat source under normal operating conditions and driving heat source steady-state flow ; Step 2: Calculate the temperature of the heat source respectively Driven heat source flow With the steady-state temperature of the driving heat source under normal operation , driving the steady-state flow of the heat source The relative change difference is used to determine the amplitude of the disturbance temperature. and disturbance flow amplitude ; Step 3: When the heat source temperature and drive heat source flow The relative rate of change exceeds the temperature steady-state fluctuation threshold. Or the steady-state fluctuation threshold of flow ; Step 4: Record the start time of the disturbance If the temperature steady-state fluctuation threshold Or the steady-state fluctuation threshold of flow The state is maintained continuously for a duration greater than the minimum disturbance duration threshold. If so, it is determined that a step disturbance event has occurred that drives the heat source; If the temperature steady-state fluctuation threshold steady-state fluctuation threshold of flow The duration of the state is less than the minimum disturbance duration threshold. It is determined to be transient noise and will not trigger the subsequent prediction process; Step 5: Once the step disturbance event is determined to be valid, extract the disturbance characteristic parameters, including: disturbance temperature amplitude. Disturbance flow amplitude and duration of disturbance The duration of the disturbance It is equal to the difference between the end time of the disturbance and the start time of the disturbance.

3. The method for predicting delayed crystallization on the wall surface of a second type of lithium bromide heat pump generator according to claim 2, characterized in that, The method for establishing a two-zone unsteady heat and mass transfer algorithm model between the generator solution bulk and the liquid film on the heat exchange tube wall is as follows: Step 1: Obtain the solution circulation flow rate of the generator. Steady-state concentration of dilute solution at the generator inlet Steady-state concentration of concentrated solution at generator outlet and the density of lithium bromide solution ; Step 2: Based on the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Steady-state concentration of concentrated solution at generator outlet and the density of lithium bromide solution Calculate the vapor from the solution evaporation , ; Step 3: Establish the boundary conditions for the driving heat source. ; Step 4: Obtain the specific heat capacity of the heat source fluid Driven heat source hot water density Calculate the heating power of the heat source based on the boundary conditions of the driving heat source. , ; Step 5: Obtaining the specific heat capacity of lithium bromide solution Equipment inherent constants, unit thermal inertia coefficient Heat loss due to heat dissipation from the generator housing ; According to the heating power of the heat source Specific heat capacity of lithium bromide solution Equipment inherent constants, unit thermal inertia coefficient Heat loss due to heat dissipation from the generator housing Calculate the total mass of the solution in the generator. , ; in, This refers to the evaporative heat absorption power. Step Six: Based on the solution circulation flow rate of the generator Steady-state concentration of dilute solution at the generator inlet Lithium bromide solution density , solution evaporation vapor and the total mass of the solution in the generator Calculate the real-time concentration of the main body , ; Step 7: Establish a micro-region sub-model of the liquid film on the pipe wall; Obtaining the liquid film thermal time constant heat transfer coefficient of pipe wall Liquid film heat transfer area and the total mass of the liquid film on the tube wall ; Based on the liquid film thermal time constant heat transfer coefficient of pipe wall Liquid film heat transfer area and the total mass of the liquid film on the tube wall Calculate the real-time temperature of the liquid film , ; Obtaining the liquid film mass transfer hysteresis time constant ; Based on the liquid film mass transfer hysteresis time constant Calculate the concentration of liquid film mass transfer , 。 4. The method for predicting delayed crystallization on the wall of a second type of lithium bromide heat pump generator according to claim 1, characterized in that, The method for determining whether the liquid film micro-region on the tube wall has entered a supersaturated state is as follows: The saturated solubility of lithium bromide in aqueous solution varies with temperature and system pressure. For each time step t, the real-time temperature of the liquid film at that moment is considered. System vacuum Using an index, the lithium bromide-water property database was queried to obtain the critical saturation solubility at the liquid film on the pipe wall under this operating condition. , ; Not supersaturated, no risk of crystallization; When the liquid film microregion enters a supersaturated state, it meets the thermodynamic conditions for crystallization.

5. The method for predicting delayed crystallization on the wall of a second type of lithium bromide heat pump generator according to claim 4, characterized in that, Oversaturation start time The method of obtaining it is as follows: Time-step comparison to identify the onset of oversaturation , Discrete-time series output by S2 Time-by-time traversal and judgment: 1) All moments before the disturbance occurs: It is in a normal, non-supersaturated state; 2) From Start scanning backwards to find the first one that satisfies the condition. The moment at which the oversaturation begins is recorded. , If throughout the full duration, always If no oversaturation is detected, the current crystallization prediction process will be terminated directly, and the oversaturation start time will not be output. and the concentration difference of the supersaturated liquid film The jump ends; once the oversaturation start time is found... Continue calculating the concentration difference.

6. The method for predicting delayed crystallization on the wall of a second type of lithium bromide heat pump generator according to claim 5, characterized in that, Liquid film supersaturation concentration difference The method of obtaining it is as follows: Calculate the concentration difference of the liquid film supersaturation ; Oversaturation start time Then, the supersaturation concentration difference at each time step: ; Represents the degree of oversaturation; Record the start time of oversaturation Initial oversaturation difference at time ; Record the maximum oversaturation difference within the oversaturation range. .

7. The method for predicting delayed crystallization on the wall of a second type of lithium bromide heat pump generator according to claim 6, characterized in that, The final method for generating the crystallization risk level is as follows: Step 1: Based on the maximum supersaturation concentration difference in the supersaturation range Real-time temperature of the liquid film at the initial moment of supersaturation Calculate the nucleation induction time , ; Where A and B are both correction constants for the crystallization of lithium bromide solution; according to Basic Level 1 Low Risk; Basic Level 2 Medium Risk; Based on the basic level three high risk, the basic crystallization risk level is determined; Step 2: Based on the induction time of crystal nucleus formation Make corrections: Basic Level 1 Low Risk, When The risk level was revised to Level II, medium risk. Basic Level 2 Medium Risk, when The risk level was revised to Level 1 Low Risk. The risk level was revised to Level 3 (high risk). Basic Level 3 High Risk, when Maintain the original basic risk level and output the final crystallization risk level.

8. The method for predicting delayed crystallization on the wall surface of a second type of lithium bromide heat pump generator according to claim 7, characterized in that, The method for obtaining the correction constants A and B for the crystallization of lithium bromide solution is as follows: Multiple sets of step heat source disturbances of different amplitudes are applied under high concentration conditions near crystallization. Record the maximum supersaturation difference of the liquid film in each group of experiments. The absolute temperature of the liquid film at the initial moment of supersaturation and measured nucleation induction time ; Perform a logarithmic transformation on the formula. ; by For independent variable, A univariate linear regression is performed on the dependent variable, and the slope B is obtained from the regression. The intercept is taken as the exponent to obtain A.

9. The method for predicting delayed crystallization on the wall of a second type of lithium bromide heat pump generator according to claim 1, characterized in that, The method for outputting advance warning signals and unit pre-adjustment control commands based on the crystallization risk level is as follows: When the final crystallization risk level is Level 1 low risk, a low risk advance warning signal is output, only the operating status is recorded, the original operating conditions of the unit are maintained, and the unit parameters are continuously monitored. When the final crystallization risk level is Level 2 (medium risk), a medium risk early warning signal is output, alarm events are recorded, a pre-adjustment control command is output, and a mild adjustment operation is performed to increase the generator solution circulation flow rate or slightly reduce the driving heat source temperature. When the final crystallization risk level is level three (high risk), a high-risk early warning signal is output, triggering an audible and visual alarm and uploading the alarm information to the upper-level monitoring system. A pre-adjustment control command is output to increase the solution circulation flow rate and reduce the heating capacity of the driving heat source.

10. The method for predicting delayed crystallization on the wall of a second type of lithium bromide heat pump generator according to claim 9, characterized in that, The early warning signals include human-machine interface display signals, event log storage signals, and host computer communication message signals; the pre-adjustment control commands are digital commands that the unit controller can recognize.