A method and system for quantifying the uncertainty of drought water replenishment scheduling forecasting

By identifying hydrological state transition nodes and establishing state scheduling correlation chains, detecting state fluctuation sections, and tracking the transmission of water replenishment scheduling state offsets, the problem of uncertainty quantification in drought water replenishment scheduling forecasting is solved, and the accuracy and matching degree of forecast results are improved.

CN123117437APending Publication Date: 2026-11-17BUREAU OF HYDROLOGY CHANGJIANG WATER RESOURCES COMMISSION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611272578.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing drought water replenishment scheduling forecasting methods fail to effectively reflect the evolutionary relationship between continuous hydrological states, making the forecast results susceptible to local abnormal fluctuations and lacking a quantitative description of how forecast uncertainty spreads as hydrological states evolve.

Method used

By identifying hydrological state transition nodes, a state scheduling correlation chain between the hydrological state evolution sequence and the water replenishment scheduling process is established. State fluctuation sections are detected along the hydrological state evolution sequence, the offset transmission of water replenishment scheduling state is tracked, the constraint relationship between water replenishment scheduling state and scheduling water volume is established, and the water replenishment scheduling state is adjusted and the prediction distribution range is calibrated based on the prediction deviation correction amount.

Benefits of technology

It enables the quantitative expression of the uncertainty in drought water replenishment scheduling forecasts, improves the matching degree between forecast results and actual hydrological changes, avoids errors caused by single-node corrections, and enhances the pertinence and accuracy of forecast results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117437A_ABST
    Figure CN123117437A_ABST
Patent Text Reader

Abstract

This invention relates to the field of drought water replenishment scheduling technology, and particularly to a method and system for quantifying the uncertainty of drought water replenishment scheduling prediction. The method includes the following steps: identifying continuous hydrological time-series data and hydrological changes in a target area through hydrological monitoring terminals; identifying hydrological state transition nodes based on hydrological changes; dividing the hydrological state evolution sequence based on the hydrological state transition nodes and continuous hydrological time-series data, and establishing a state-schedule correlation chain between the hydrological state evolution sequence and the water replenishment scheduling process; detecting the magnitude of state evolution changes along the hydrological state evolution sequence, and identifying state fluctuation segments of hydrological state transitions based on the magnitude of changes; predicting the water replenishment scheduling state based on the state-schedule correlation chain, and determining the uncertainty change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment; this invention achieves the quantitative expression of the uncertainty in drought water replenishment scheduling prediction through drought water replenishment scheduling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of drought water replenishment scheduling technology, and in particular to a method and system for quantifying the uncertainty of drought water replenishment scheduling prediction. Background Technology

[0002] In existing drought water replenishment scheduling forecasting processes, hydrological conditions are influenced by multiple factors, including rainfall, evaporation, soil water storage capacity, surface runoff, and groundwater recharge. Hydrological conditions exhibit continuous evolution and dynamic changes. When hydrological conditions change continuously, water replenishment demand and water replenishment scheduling status also change accordingly. However, traditional forecasting methods typically use discrete time points or independent monitoring data as the basis for predictions, failing to adequately consider the evolutionary relationships between continuous hydrological conditions. This makes it difficult to reflect the transmission process of water replenishment scheduling status within continuous hydrological conditions, leading to forecast results that are easily affected by local anomalies. Most methods only provide a single predicted value or forecast range, and prediction errors are usually handled using overall correction or static error compensation methods. There is a lack of analysis on the propagation process of prediction errors within continuous hydrological conditions, and a lack of quantitative description of the diffusion of prediction uncertainty as hydrological conditions evolve. Summary of the Invention

[0003] Therefore, it is necessary to provide a method and system for quantifying the uncertainty of drought water replenishment scheduling forecasts in order to solve at least one of the above-mentioned technical problems.

[0004] To achieve the above objectives, a method for quantifying the uncertainty of drought water replenishment scheduling prediction includes the following steps: Step S1: Identify continuous hydrological time series data and hydrological changes in the target area through the hydrological monitoring terminal, and identify hydrological state transition nodes based on hydrological changes; divide the hydrological state evolution sequence based on the hydrological state transition nodes and continuous hydrological time series data, and establish a state scheduling association chain between the hydrological state evolution sequence and the water replenishment scheduling process. Step S2: Detect the magnitude of change in the state evolution along the hydrological state evolution sequence, identify the state fluctuation segment of the hydrological state transition based on the magnitude of change; predict the water replenishment scheduling state based on the state scheduling correlation chain, and determine the uncertain change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment. Step S3: Track the offset transmission of water replenishment scheduling status along the uncertainty change section, and determine the prediction uncertainty diffusion path based on the continuous offset status; establish the constraint relationship between water replenishment scheduling status and scheduling water volume based on the prediction uncertainty diffusion path, and determine the prediction deviation correction amount based on the constraint relationship; Step S4: Adjust the water replenishment scheduling status based on the prediction deviation correction amount, determine the prediction distribution range based on the water replenishment scheduling status, calibrate the prediction distribution range in combination with the uncertainty change section, and output the quantification result of the drought water replenishment scheduling prediction uncertainty.

[0005] The present invention also provides a system for quantifying the uncertainty of drought water replenishment scheduling prediction, used to execute the method for quantifying the uncertainty of drought water replenishment scheduling prediction as described above. The system includes: The hydrological state evolution division module is used to identify continuous hydrological time series data and hydrological changes in the target area through hydrological monitoring terminals, identify hydrological state transition nodes based on hydrological changes, divide the hydrological state evolution sequence based on hydrological state transition nodes and continuous hydrological time series data, and establish a state scheduling association chain between the hydrological state evolution sequence and the water replenishment scheduling process. The state fluctuation identification module is used to detect the magnitude of state evolution along the hydrological state evolution sequence, identify the state fluctuation segment of hydrological state transition based on the magnitude of the change, predict the water replenishment scheduling state based on the state scheduling association chain, and determine the uncertain change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment. The offset propagation tracking module is used to track the offset propagation of the water replenishment scheduling status along the uncertainty change section, determine the prediction uncertainty diffusion path based on the continuous offset status, establish the constraint relationship between the water replenishment scheduling status and the scheduled water volume based on the prediction uncertainty diffusion path, and determine the prediction deviation correction amount based on the constraint relationship. The uncertainty prediction module is used to adjust the water replenishment scheduling status based on the prediction deviation correction amount, determine the prediction distribution range based on the water replenishment scheduling status, calibrate the prediction distribution range in combination with the uncertainty change section, and output the quantification result of the drought water replenishment scheduling prediction uncertainty.

[0006] The beneficial effects of this invention are as follows: by identifying continuous hydrological time-series data and hydrological changes through hydrological monitoring terminals, and identifying hydrological state transition nodes, a hydrological state evolution sequence is constructed by combining continuous hydrological time-series data, so that the continuous hydrological state is transformed from discrete monitoring data into a state process with a continuous evolution relationship. Then, a state scheduling association chain is established between the hydrological state evolution sequence and the water replenishment scheduling process, so that the water replenishment scheduling state can maintain a corresponding relationship with the hydrological state evolution process. By identifying the state fluctuation sections and the offset of water replenishment scheduling status within the state fluctuation sections, the prediction uncertainty is concentrated on the sections where the hydrological state fluctuates significantly, avoiding treating all hydrological states as a unified object of uncertainty analysis and improving the targeting of uncertainty identification. By tracking the shift in water replenishment scheduling status, a path for the diffusion of prediction uncertainty is formed, and a constraint relationship between water replenishment scheduling status and scheduling water volume is established. This allows the prediction deviation to be analyzed along the continuous change process of water replenishment scheduling status, rather than being corrected based on a single node. As a result, the amount of prediction deviation correction can reflect the propagation process of prediction error in continuous hydrological conditions. The water replenishment scheduling status is adjusted based on the prediction deviation correction amount, and the predicted distribution range is calibrated in combination with the uncertainty change section to ensure that the output predicted distribution range is consistent with the uncertainty diffusion range. This realizes the quantitative expression of the uncertainty of drought water replenishment scheduling prediction and improves the matching degree between the water replenishment scheduling prediction results and the actual hydrological status changes. Attached Figure Description

[0007] Figure 1 A flowchart illustrating the steps of a method for quantifying the uncertainty of drought water replenishment scheduling prediction; Figure 2 A schematic diagram of a drought water replenishment scheduling and prediction uncertainty quantification system module; Figure 3 A schematic diagram illustrating the principle of quantifying the uncertainty in drought water replenishment scheduling prediction in one embodiment; The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0008] The technical method of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0009] Furthermore, the accompanying drawings are merely illustrative of the invention and are not necessarily drawn to scale. The same reference numerals in the drawings denote the same or similar parts, and therefore repeated descriptions of them will be omitted. Some block diagrams shown in the drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software, in one or more hardware modules or integrated circuits, or in different network and / or processor methods and / or microcontroller methods.

[0010] It should be understood that although the terms "first," "second," etc., may be used herein to describe various units, these units should not be limited by these terms. These terms are used merely to distinguish one unit from another. For example, without departing from the scope of the exemplary embodiments, a first unit may be referred to as a second unit, and similarly, a second unit may be referred to as a first unit. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.

[0011] To achieve the above objectives, please refer to Figures 1 to 3 A method for quantifying the uncertainty of drought water replenishment scheduling forecasts includes the following steps: All specific values ​​involved in this embodiment are exemplary parameters used to clearly illustrate the technical operation process and are not the only limitation of the present invention.

[0012] Step S1: Identify continuous hydrological time series data and hydrological changes in the target area through the hydrological monitoring terminal, and identify hydrological state transition nodes based on hydrological changes; divide the hydrological state evolution sequence based on the hydrological state transition nodes and continuous hydrological time series data, and establish a state scheduling association chain between the hydrological state evolution sequence and the water replenishment scheduling process. Step S2: Detect the magnitude of change in the state evolution along the hydrological state evolution sequence, identify the state fluctuation segment of the hydrological state transition based on the magnitude of change; predict the water replenishment scheduling state based on the state scheduling correlation chain, and determine the uncertain change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment. Step S3: Track the offset transmission of water replenishment scheduling status along the uncertainty change section, and determine the prediction uncertainty diffusion path based on the continuous offset status; establish the constraint relationship between water replenishment scheduling status and scheduling water volume based on the prediction uncertainty diffusion path, and determine the prediction deviation correction amount based on the constraint relationship; Step S4: Adjust the water replenishment scheduling status based on the prediction deviation correction amount, determine the prediction distribution range based on the water replenishment scheduling status, calibrate the prediction distribution range in combination with the uncertainty change section, and output the quantification result of the drought water replenishment scheduling prediction uncertainty.

[0013] In one embodiment, hydrological monitoring terminals are deployed within the target area. These terminals include water level monitoring equipment, flow rate monitoring equipment, rainfall monitoring equipment, soil moisture monitoring equipment, and evaporation monitoring equipment. Each monitoring device continuously collects hydrological information at uniform time intervals, forming continuous hydrological time-series data in chronological order. Based on the continuous hydrological time-series data, the changes in water level, flow rate, rainfall, soil moisture content, and evaporation at adjacent times are statistically analyzed. When the direction of change changes consistently across multiple consecutive monitoring times, or when the relationship between multiple hydrological indicators changes synchronously, the corresponding time is identified as a hydrological state transition node. The continuous hydrological time-series data between adjacent hydrological state transition nodes is considered a complete hydrological state. Multiple consecutive hydrological states are connected chronologically to form a hydrological state evolution sequence. Combining historical water replenishment records, a correspondence is established between each hydrological state and the corresponding water replenishment scheduling process. The water replenishment scheduling state, the amount of water allocated, and the state transition relationship are recorded according to the hydrological state evolution sequence, forming a state-schedule association chain between the hydrological state evolution sequence and the water replenishment scheduling process. This provides a continuous state association basis for subsequent water replenishment scheduling state prediction.

[0014] The variation amplitude of various hydrological indicators between adjacent hydrological state nodes is calculated along the hydrological state evolution sequence, and the trend of change in the hydrological state evolution process is determined by combining the change direction of multiple consecutive hydrological state nodes. Based on the change trend, the change in water deficit corresponding to each hydrological state transition node is statistically analyzed, and the superposition degree of water deficit change is cumulatively analyzed along the hydrological state evolution sequence. Regions with continuously developing water deficit are identified by the water storage and consumption rate, and regions that meet the preset spatial accumulation conditions are determined as water deficit accumulation zones. The water replenishment demand pattern is analyzed by combining the change in water replenishment demand corresponding to each hydrological state node within the water deficit accumulation zone. Based on the water replenishment demand pattern, the degree of response change in water replenishment demand with changes in hydrological state is calculated. When the degree of response change reaches a preset threshold, the corresponding location is determined as the critical region for the hydrological state to transition from a stable state to a fluctuating state, and is designated as a state fluctuation segment. The historical water replenishment scheduling state corresponding to the state fluctuation segment is obtained based on the state scheduling association chain. The water replenishment scheduling state is predicted based on the current hydrological state change trend, and the response deviation of the predicted water replenishment scheduling state relative to the hydrological state change trend is statistically analyzed. Regions with continuously changing response deviations are determined as uncertain change segments.

[0015] The water replenishment scheduling status corresponding to each hydrological state node is obtained along the uncertainty change section, and the changes in water replenishment scheduling status between adjacent hydrological state nodes are compared. The offset propagation of the water replenishment scheduling status in continuous hydrological state nodes is recorded. When the offset propagation of the water replenishment scheduling status remains consistent across multiple continuous hydrological state nodes, the corresponding area is identified as a continuous offset state, and a prediction uncertainty diffusion path is formed based on the continuous offset state. The changes in the scheduled water volume corresponding to each hydrological state node are statistically analyzed along the prediction uncertainty diffusion path, and the variation law of scheduled water volume with changes in water replenishment scheduling status is analyzed to establish the constraint relationship between water replenishment scheduling status and scheduled water volume. Based on the constraint relationship, the prediction deviation between the predicted water replenishment scheduling status and the scheduled water volume is calculated, and the corresponding prediction deviation correction amount is determined based on the prediction deviation.

[0016] The water replenishment scheduling status corresponding to each hydrological state node is adjusted based on the prediction deviation correction, and the predicted change range after the adjustment is analyzed. The coverage of the predicted change range along the uncertain change section within the continuous hydrological state nodes is statistically analyzed, and the coverage extension process of the predicted change range within the continuous hydrological state nodes is recorded. When the predicted change range stops expanding, the corresponding location is determined as the coverage termination position, and the boundary position corresponding to the predicted distribution range is determined by combining the coverage difference between the predicted change ranges on both sides of the coverage termination position. The predicted distribution range is calibrated based on the boundary position corresponding to the predicted distribution range to ensure consistency with the uncertain change section, thus obtaining the quantified result of the drought water replenishment scheduling prediction uncertainty.

[0017] Please refer to [link / reference needed] for further information. Figure 3 Based on continuous hydrological time-series data, a hydrological state evolution sequence is constructed, and hydrological state transition nodes are identified to establish a state-schedule correlation chain. State fluctuation segments are identified based on the magnitude of state changes, and uncertain change segments are determined in conjunction with water replenishment scheduling status. The offset transmission process of water replenishment scheduling status is traced along the uncertain change segments to form a prediction uncertainty diffusion path. A constraint relationship between water replenishment scheduling status and scheduling water volume is established, and prediction deviation correction is calculated. The prediction distribution range is calibrated, and the prediction interval, confidence level, and risk level are output as quantitative results of drought water replenishment scheduling prediction uncertainty.

[0018] Preferably, step S2 includes: The variation range between adjacent hydrological state nodes is obtained along the hydrological state evolution sequence, and the variation trend in the hydrological state evolution process is determined by combining the variation range. Based on the analysis of the trend, the degree of cumulative change corresponding to the hydrological state transition node is analyzed, and the area where the degree of cumulative change meets the preset conditions is identified as the state fluctuation segment. The water replenishment scheduling response relationship corresponding to the state fluctuation section is obtained based on the state scheduling association chain, and the water replenishment scheduling status within the state fluctuation section is predicted by combining the water replenishment scheduling response relationship. The response offset of the water replenishment scheduling status relative to the hydrological status change trend is detected along the state fluctuation section, and the uncertain change section is determined based on the response offset.

[0019] In one embodiment, the changes in water level, flow rate, soil moisture content, and evaporation between adjacent hydrological state nodes are calculated along the hydrological state evolution sequence. The direction of change of these changes in consecutive hydrological state nodes is also statistically analyzed. When multiple consecutive hydrological state nodes maintain the same direction of change, this direction is identified as the trend in the hydrological state evolution process. Based on this trend, the change in water deficit corresponding to each hydrological state transition node is statistically analyzed, and the degree of superposition of water deficit changes is cumulatively analyzed along the hydrological state evolution sequence. When the degree of superposition in multiple consecutive hydrological state nodes continuously increases and reaches a preset change condition, the corresponding region is identified as a state fluctuation segment.

[0020] By combining the state scheduling association chain to read historical water replenishment scheduling records corresponding to state fluctuation sections, the changing patterns of water replenishment scheduling corresponding to different hydrological state trends are analyzed, and the water replenishment scheduling response relationship between hydrological state and water replenishment scheduling within the state fluctuation section is established. Based on the current hydrological state change trend, the corresponding water replenishment scheduling response relationship is matched to obtain the water replenishment scheduling state corresponding to the state fluctuation section. The correspondence between the water replenishment scheduling state and the hydrological state change trend is compared, and the response offset of the water replenishment scheduling state in continuous hydrological state nodes is recorded. When the response offset remains continuously changing in multiple consecutive hydrological state nodes, the corresponding area is determined as an uncertain change section.

[0021] In another embodiment, it is assumed that the target watershed is divided into 15 hydrological state evolution sequences, with water level changes between adjacent hydrological state nodes of 0.18m, 0.26m, 0.37m, 0.45m, and 0.52m, and flow rate changes of 4.2m. 5.8 7.1 8.3 9.6 The soil moisture content varied by 1.5%, 2.3%, 3.2%, 4.1%, and 4.8%, respectively. The hydrological state nodes in segments 6 through 10 showed a consistent direction of change, thus segments 6 through 10 were identified as areas of sustained change. After statistically analyzing the corresponding water deficit changes, the cumulative overlap of segments 7 through 10 reached 18%, 31%, 49%, and 67%, respectively, thus segments 7 through 10 were identified as areas of fluctuating water state.

[0022] After retrieving the corresponding historical water replenishment records, the water replenishment scheduling volumes for sections 7 to 10 correspond to 2.1 × 2.8× 3.5× and 4.2× Based on this, a water replenishment scheduling response relationship is formed, and the current water replenishment scheduling status is predicted. The response offset between the water replenishment scheduling status and the hydrological status change trend is detected. The corresponding response offset values ​​for segments 7 to 10 are 0.09, 0.18, 0.35, and 0.57, respectively. Among them, segments 8 to 10 show a continuous increase, and segments 8 to 10 are identified as uncertain change segments.

[0023] Preferably, obtaining the variation range between adjacent hydrological state nodes along the hydrological state evolution sequence, and determining the trend of change during the hydrological state evolution process by combining the variation range includes: The variation amplitude between adjacent hydrological state nodes is obtained along the hydrological state evolution sequence, and the transmission state of the variation amplitude in continuous hydrological state nodes is recorded. Identify the direction of change between adjacent hydrological state nodes based on the continuous transmission of the magnitude of change, and determine the trend turning point in the hydrological state evolution process. Analyze the continuity of the change magnitude at the trend turning point in the hydrological state nodes before and after, and determine the continuous state of the hydrological state change direction based on the continuity. The changing trend of hydrological state during its evolution is determined by maintaining the continuous state based on the direction of change.

[0024] In one embodiment, the changes in water level, flow rate, soil moisture content, and evaporation between adjacent hydrological state nodes are calculated sequentially along the hydrological state evolution sequence. The continuous relationship between these changes is recorded according to the arrangement of the hydrological state nodes, forming a transmission state of the changes in magnitude among consecutive hydrological state nodes. The direction of change corresponding to adjacent changes is compared. When the change magnitude changes from a continuous increase to a continuous decrease, or from a continuous decrease to a continuous increase, the corresponding hydrological state node is determined as the position of change direction transition, and this position is used as the trend reversal point.

[0025] The stability of the change amplitude corresponding to multiple consecutive hydrological state nodes before and after the trend turning point is statistically analyzed. When the direction of change remains consistent across multiple consecutive hydrological state nodes, the corresponding direction of change is determined as a continuous stability state. Based on the distribution of each continuous stability state in the entire hydrological state evolution sequence, adjacent continuous stability states are connected in chronological order to form the change trend in the hydrological state evolution process.

[0026] Preferably, the cumulative degree of change corresponding to the hydrological state transition node is analyzed based on the change trend, and the area whose cumulative degree of change meets the preset conditions is identified as the state fluctuation segment, including: Based on the changing trend, obtain the water deficit change corresponding to each hydrological state transition node, and calculate the superposition degree of water deficit change along the hydrological state evolution sequence. Based on the superposition degree of water deficit changes, the water storage and consumption rate corresponding to different hydrological state transition nodes is analyzed, and the water deficit accumulation zone in the process of hydrological state evolution is determined according to the water storage and consumption rate. The degree of change in water replenishment demand with changes in hydrological conditions is detected along the water deficit accumulation zone, and the critical region where the hydrological state changes from a stable state to a fluctuating state is identified based on the degree of change in response. The critical region where the degree of response change reaches a preset threshold is defined as the state fluctuation zone.

[0027] In one embodiment, based on the changing trends in the hydrological state evolution process, a comprehensive analysis is conducted on the changes in rainfall, evaporation, soil moisture content, and surface runoff corresponding to each hydrological state transition node. The change in water deficit corresponding to each hydrological state transition node is calculated, and the cumulative process of the change in water deficit between adjacent hydrological state nodes is statistically analyzed according to the hydrological state evolution sequence to obtain the superposition degree of the change in water deficit.

[0028] By comparing the superposition of water deficit changes among consecutive hydrological state nodes, and analyzing the water consumption rate caused by the decrease in soil water storage and the decline in natural water supply per unit time, the corresponding area is identified as the water deficit accumulation zone when the water consumption rate of multiple consecutive hydrological state nodes continues to increase.

[0029] The changes in water replenishment demand at different hydrological state nodes within the water deficit accumulation zone are statistically analyzed. Combined with the patterns of these changes, the degree of response of water replenishment demand to hydrological state variations is analyzed. When the degree of response change shifts from slow to rapid, the corresponding location is identified as the critical region where the hydrological state transitions from a stable to a fluctuating state. The degree of response change at each hydrological state node within the critical region is compared. When the degree of response change reaches a preset threshold, the corresponding critical region is identified as the state fluctuation segment.

[0030] Preferably, the analysis of water storage and consumption rates corresponding to different hydrological state transition nodes based on the superposition degree of water deficit changes, and the determination of water deficit accumulation zones during the hydrological state evolution process based on water storage and consumption rates, include: Based on the superposition of water deficit changes, the water storage and consumption rate corresponding to different hydrological state transition nodes is calculated, and the variation characteristics of the water storage and consumption rate during the hydrological state evolution process are analyzed. Based on the changing characteristics of water consumption rate, the water consumption gradient corresponding to different regions is determined, and the concentrated water dissipation area is identified based on the water consumption gradient. The spatial accumulation range of water deficit changes is analyzed along the concentrated water dissipation area, and the area that reaches the preset spatial accumulation level is determined as the water deficit accumulation area.

[0031] In one embodiment, based on the superposition degree of water deficit changes corresponding to each hydrological state transition node and the time interval between two adjacent hydrological state nodes, the growth rate of water deficit changes per unit time is calculated, and this growth rate is used as the water storage and consumption rate of the corresponding hydrological state transition node. The water storage and consumption rates corresponding to adjacent hydrological state transition nodes are compared along the hydrological state evolution sequence, and the direction, magnitude, and continuity of the water storage and consumption rate in continuous hydrological state nodes are statistically analyzed to form the variation characteristics of the water storage and consumption rate during the hydrological state evolution process.

[0032] When the water consumption rate of multiple consecutive hydrological status nodes continues to increase at similar rates, the corresponding areas are classified as having the same water consumption gradient. When the rate of increase in water consumption rate changes significantly, the corresponding location is designated as the boundary of the water consumption gradient, with different gradients corresponding to different water consumption intensities. By comparing the distribution of water consumption rate within each water consumption gradient area, areas with consistently high and concentrated water consumption rates are identified as concentrated water dissipation zones. The spatial distribution of water deficit changes corresponding to each hydrological status node is statistically analyzed along these concentrated water dissipation zones. The continuous accumulation of water deficit changes between adjacent monitoring areas is analyzed. When the water deficit changes in adjacent areas accumulate continuously and the spatial accumulation range reaches a preset spatial accumulation level, the corresponding area is designated as a water deficit accumulation zone.

[0033] Preferably, based on the superposition degree of water deficit changes, the water storage and consumption rate corresponding to different hydrological state transition nodes is calculated, and the variation characteristics of the water storage and consumption rate during the hydrological state evolution process are analyzed, including: Based on the superposition of water deficit changes, the water storage and consumption rates corresponding to different hydrological state transition nodes are calculated, and the differences in water storage and consumption rates between adjacent hydrological state transition nodes are analyzed. The direction of change in water storage consumption rate is determined based on the difference in water storage consumption rate, and the hydrological state nodes where the water storage consumption rate changes direction are identified. The changes in the direction of water storage and consumption are analyzed at hydrological state nodes where the rate of water storage and consumption changes, and the characteristics of water storage and consumption changes in the process of hydrological state evolution are formed.

[0034] In one embodiment, based on the superposition of water deficit changes, the soil water loss, evapotranspiration and surface runoff loss in the time period corresponding to each hydrological state transition node are statistically analyzed, the water storage consumption rate corresponding to each hydrological state transition node is calculated, and a continuous water storage consumption rate sequence is formed by arranging them according to the hydrological state evolution sequence.

[0035] Calculate the difference in water storage and consumption rates between adjacent hydrological state transition nodes, and record the increase, decrease, and maintenance status of the difference in consecutive nodes. When the difference in rates of change of multiple consecutive nodes maintains the same direction, the corresponding direction of change is determined as the direction of water storage and consumption rate change; when the difference in rates of change changes from continuous increase to continuous decrease, or from continuous decrease to continuous increase, the corresponding hydrological state node is identified as the hydrological state node where the water storage and consumption rate has changed direction.

[0036] For hydrological state nodes where the water consumption rate changes direction, the water consumption rate before and after the change is continuously compared to analyze the changes in the direction of water consumption from increasing to decreasing or from decreasing to increasing. Combined with the continuous maintenance interval of the water consumption rate on both sides of the change node, the characteristics of water consumption change in the process of hydrological state evolution are formed.

[0037] Preferably, detecting the degree of change in water replenishment demand along the water deficit accumulation zone in response to changes in hydrological conditions, and identifying the critical region where the hydrological state transitions from a stable to a fluctuating state based on the degree of change in response, includes: Along the water deficit accumulation zone, the changes in water replenishment demand corresponding to different hydrological state nodes are obtained, and the relationship between the changes in hydrological state and the changes in water replenishment demand is analyzed. Based on the pattern of water replenishment demand, determine the degree of change in water replenishment demand in the water deficit accumulation area as hydrological conditions change, and identify the location of the water replenishment demand response shift based on the degree of change in response. The direction of water demand change corresponding to the change in hydrological state is analyzed along the location of the change in water demand response, and the location where the direction of water demand change changes is determined as the critical region of hydrological state change.

[0038] In one embodiment, the changes in water replenishment demand corresponding to each hydrological state transition node are statistically analyzed along the water deficit accumulation zone, and a correspondence between the changes in water replenishment demand and the changes in hydrological state is established according to the hydrological state evolution sequence. By combining the magnitude of changes in water replenishment demand among consecutive hydrological state nodes, the variation law of water replenishment demand with hydrological state changes is analyzed, and the response relationship of water replenishment demand in different hydrological state stages is determined. When the changes in hydrological state remain continuous while the changes in water replenishment demand increase synchronously, it is determined that the water replenishment demand maintains a stable response; when the changes in hydrological state remain continuous while the magnitude of the increase or decrease in water replenishment demand changes significantly, it is determined that the response of water replenishment demand has changed.

[0039] Based on the pattern of water replenishment demand, the degree of change in water replenishment demand in response to changes in hydrological conditions is continuously calculated along the water deficit accumulation zone, and the change process of the degree of change in response is analyzed at continuous hydrological state nodes. When the degree of change in response changes from continuously increasing to continuously decreasing, or from continuously decreasing to continuously increasing, the corresponding hydrological state node is identified as the location of the water replenishment demand response transition. Along the location of the water replenishment demand response transition, the direction of change in water replenishment demand corresponding to adjacent hydrological state nodes is continuously compared. When the direction of change in water replenishment demand changes from continuously increasing to continuously decreasing, or from continuously decreasing to continuously increasing, the corresponding location is determined as the critical region where the hydrological state transitions from a stable state to a fluctuating state.

[0040] Preferably, determining the degree of change in water demand response to hydrological changes within the water deficit accumulation area based on the water demand pattern, and identifying the location of water demand response transitions based on the degree of change, includes: Based on the pattern of water replenishment demand, obtain the soil moisture content corresponding to the water deficit accumulation area, and analyze the soil moisture release state corresponding to the soil moisture content. The soil moisture release rate is obtained along the soil moisture release state, and the soil moisture retention capacity is determined based on the soil moisture release rate. The water replenishment demand response changes are determined based on the soil moisture retention capacity. Based on the analysis of changes in water replenishment demand response, the response change process corresponding to different hydrological state nodes is analyzed, and the transition position in the response change process is determined as the transition position of water replenishment demand response.

[0041] In one embodiment, based on the water replenishment demand pattern, the soil moisture content at different locations within the water deficit accumulation zone is continuously monitored. Combined with the moisture content distribution at different depths of the soil profile, the soil moisture state corresponding to each hydrological state node is determined. When the shallow soil moisture content decreases rapidly while the deep soil moisture content changes little, it is determined that soil moisture is mainly released from the shallow layer. When both shallow and deep soil moisture contents decrease simultaneously, it is determined that the soil moisture release range is expanding into deeper layers, and the corresponding state is identified as the soil moisture release state. The soil water loss per unit time between consecutive hydrological state nodes is statistically analyzed along the soil moisture release state, the soil moisture release rate corresponding to each node is calculated, and the changes in the soil moisture release rate among consecutive nodes are analyzed.

[0042] When the soil moisture release rate continuously decreases and the variation range between adjacent nodes gradually diminishes, the soil is considered to still possess a strong soil moisture retention capacity; conversely, when the soil moisture release rate continuously increases or the variation range continuously widens, the soil moisture retention capacity is considered to weaken. Based on the soil moisture retention capacity at different stages, the response changes in water replenishment demand with changes in hydrological state are analyzed. When the soil moisture retention capacity is strong, the response changes in water replenishment demand remain relatively stable; when the soil moisture retention capacity weakens, the response changes in water replenishment demand gradually intensify. By comparing the changes in the response changes in water replenishment demand along continuous hydrological state nodes, when the response changes from continuous intensification to continuous weakening, or from continuous weakening to continuous intensification, the corresponding hydrological state node is identified as the location of the transition in the response changes in water replenishment demand.

[0043] Preferably, step S3 includes: The water replenishment scheduling status corresponding to different hydrological status nodes is obtained along the uncertain change section, and the offset and transmission of the water replenishment scheduling status in adjacent hydrological status nodes are detected. Identify continuous offset states based on offset propagation, and form a prediction uncertainty diffusion path based on continuous offset states; The water volume corresponding to the water replenishment scheduling state is analyzed along the diffusion path of prediction uncertainty, and the constraint relationship between the water replenishment scheduling state and the water volume is established. The prediction deviation correction is calculated based on the constraint relationship between the water replenishment scheduling status and the scheduled water volume.

[0044] In one embodiment, the water replenishment scheduling state corresponding to each hydrological state node is extracted along the uncertainty change section, and a continuous water replenishment scheduling state sequence is established according to the hydrological state evolution order. The change amplitude and direction of the water replenishment scheduling state between adjacent hydrological state nodes are compared to detect the offset transmission of the water replenishment scheduling state in continuous nodes. When the water replenishment scheduling states of multiple adjacent hydrological state nodes maintain the same offset direction, the offset transmission is determined as a continuous offset state; when the offset direction changes or the offset amplitude significantly weakens, the corresponding node is taken as the boundary position of the continuous offset state. Based on the extension range of the continuous offset state in continuous hydrological state nodes, a prediction uncertainty diffusion path is formed, and each hydrological state node passed through by the prediction uncertainty diffusion path is recorded.

[0045] The scheduled water volume corresponding to each hydrological state node is statistically analyzed along the diffusion path of prediction uncertainty, and the correspondence between changes in water replenishment scheduling status and changes in scheduled water volume is analyzed. When the water replenishment scheduling status maintains continuous shift, it is detected whether the scheduled water volume maintains the same direction of change.

[0046] When the water replenishment scheduling status changes but the magnitude of the change in the scheduled water volume does not change synchronously, or when the direction of the change in the scheduled water volume is inconsistent with the direction of the water replenishment scheduling status change, the corresponding relationship is determined as a constraint relationship. The prediction deviation correction is calculated based on the deviation between the predicted value corresponding to the water replenishment scheduling status and the actual change in the scheduled water volume. The prediction deviation correction is determined in correspondence with the magnitude of the water replenishment scheduling status change and the difference in the scheduled water volume change.

[0047] Of particular importance, step S4 includes: Adjust the water replenishment scheduling status corresponding to different hydrological status nodes based on the prediction deviation correction amount, and analyze the prediction change range after the water replenishment scheduling status adjustment. The coverage of the predicted change range in continuous hydrological state nodes is detected along the uncertain change section, and the boundary position corresponding to the predicted distribution range is determined based on the coverage. The predicted distribution range is calibrated based on the boundary location corresponding to the predicted distribution range, and the uncertainty quantification result of drought water replenishment scheduling prediction is output.

[0048] In one embodiment, based on the prediction deviation correction amount corresponding to each hydrological state node, the water replenishment scheduling state corresponding to the continuous hydrological state nodes is corrected node by node, and the change range of the water replenishment scheduling state before and after the correction is compared to determine the prediction change range corresponding to each hydrological state node. The prediction change ranges are arranged continuously according to the hydrological state evolution order, and the coverage of the prediction change range in the continuous hydrological state nodes is detected along the uncertainty change section. The coverage extension state of the prediction change range between adjacent hydrological state nodes is recorded.

[0049] When the predicted range of change maintains continuous coverage among multiple adjacent hydrological status nodes, it is determined to be in a continuous coverage state. When the predicted range of change stops extending at a certain hydrological status node, or when there is a coverage discontinuity between it and subsequent hydrological status nodes, the corresponding location is determined as the coverage termination point. The coverage difference of the predicted range of change before and after the coverage termination point is compared, and the boundary position corresponding to the predicted distribution range is determined based on the coverage termination point and the coverage difference.

[0050] Along the boundary position corresponding to the predicted distribution range, the predicted change range outside the boundary that exceeds the continuous coverage range is truncated, and the predicted change range within the boundary that has coverage gaps is filled in, so that the predicted distribution range maintains a continuous coverage state within the boundary, and the uncertainty quantification result of drought water replenishment scheduling prediction is formed based on the calibrated predicted distribution range.

[0051] Of particular importance is the detection of the coverage of the predicted change range along the uncertain change section within continuous hydrological state nodes, and the determination of the boundary location corresponding to the predicted distribution range based on the coverage, including: The coverage of the predicted change range in continuous hydrological state nodes is obtained along the uncertain change section, and the coverage extension process of the predicted change range in each hydrological state node is recorded. Based on the coverage extension process of the predicted change range in continuous hydrological state nodes, identify the coverage termination position corresponding to the cessation of the predicted change range expansion, and determine the coverage difference of the predicted change range on both sides of the coverage termination position. The boundary location corresponding to the predicted distribution range is determined based on the coverage termination location and coverage differences.

[0052] In one embodiment, the coverage of the predicted change range in each continuous hydrological state node is statistically analyzed along the uncertain change section, and the coverage extension process of the predicted change range between adjacent hydrological state nodes is recorded according to the hydrological state evolution order. When the predicted change range can continuously cover subsequent hydrological state nodes, the corresponding node is recorded as a continuously covered node; when the predicted change range only covers part of the hydrological state nodes, or the coverage range does not continue to extend to subsequent hydrological state nodes, the corresponding node is recorded as a coverage extension interruption node.

[0053] By combining the distribution of continuous coverage nodes and nodes with interrupted coverage extension, the coverage extension process of the predicted change range in continuous hydrological state nodes is analyzed. When the predicted change range maintains continuous extension in multiple consecutive hydrological state nodes, but subsequent nodes no longer maintain continuous coverage, the location corresponding to the cessation of the predicted change range expansion is identified as the coverage termination position. The predicted change ranges corresponding to adjacent hydrological state nodes before and after the coverage termination position are statistically analyzed. The differences in the number of covered nodes, continuous coverage length, and coverage extension range are compared to determine the coverage difference between the predicted change ranges on both sides of the coverage termination position. When continuous coverage is maintained before the coverage termination position while coverage is interrupted behind it, or when the difference in continuous coverage length before and after reaches a preset condition, the boundary position corresponding to the predicted distribution range is determined by combining the coverage termination position and the coverage difference.

[0054] The present invention also provides a system for quantifying the uncertainty of drought water replenishment scheduling prediction, used to execute the method for quantifying the uncertainty of drought water replenishment scheduling prediction as described above. The system includes: The hydrological state evolution division module 101 is used to identify continuous hydrological time series data and hydrological changes in the target area through the hydrological monitoring terminal, identify hydrological state transition nodes based on hydrological changes, divide the hydrological state evolution sequence based on the hydrological state transition nodes and continuous hydrological time series data, and establish a state scheduling association chain between the hydrological state evolution sequence and the water replenishment scheduling process. The state fluctuation identification module 102 is used to detect the change amplitude of state evolution along the hydrological state evolution sequence, identify the state fluctuation segment of hydrological state transition based on the change amplitude, predict the water replenishment scheduling state based on the state scheduling association chain, and determine the uncertain change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment. The offset propagation tracking module 103 is used to track the offset propagation of the water replenishment scheduling status along the uncertainty change section, determine the prediction uncertainty diffusion path based on the continuous offset status, establish the constraint relationship between the water replenishment scheduling status and the scheduled water volume based on the prediction uncertainty diffusion path, and determine the prediction deviation correction amount based on the constraint relationship. The uncertainty prediction module 104 is used to adjust the water replenishment scheduling status based on the prediction deviation correction amount, determine the prediction distribution range based on the water replenishment scheduling status, calibrate the prediction distribution range in combination with the uncertainty change section, and output the quantification result of the drought water replenishment scheduling prediction uncertainty.

[0055] The above description is merely a specific embodiment of the present invention, enabling those skilled in the art to understand or implement the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features of the invention herein.

Claims

1. A method for quantifying the uncertainty of drought water replenishment scheduling prediction, characterized in that, Includes the following steps: Step S1: Identify continuous hydrological time series data and hydrological changes in the target area through the hydrological monitoring terminal, and identify hydrological state transition nodes based on hydrological changes; divide the hydrological state evolution sequence based on the hydrological state transition nodes and continuous hydrological time series data, and establish a state scheduling association chain between the hydrological state evolution sequence and the water replenishment scheduling process. Step S2: Detect the magnitude of change in the state evolution along the hydrological state evolution sequence, identify the state fluctuation segment of the hydrological state transition based on the magnitude of change; predict the water replenishment scheduling state based on the state scheduling correlation chain, and determine the uncertain change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment. Step S3: Track the offset transmission of water replenishment scheduling status along the uncertainty change section, and determine the prediction uncertainty diffusion path based on the continuous offset status; establish the constraint relationship between water replenishment scheduling status and scheduling water volume based on the prediction uncertainty diffusion path, and determine the prediction deviation correction amount based on the constraint relationship; Step S4: Adjust the water replenishment scheduling status based on the prediction deviation correction amount, determine the prediction distribution range based on the water replenishment scheduling status, calibrate the prediction distribution range in combination with the uncertainty change section, and output the quantification result of the drought water replenishment scheduling prediction uncertainty.

2. The method of claim 1, wherein, Step S2 includes: The variation range between adjacent hydrological state nodes is obtained along the hydrological state evolution sequence, and the variation trend in the hydrological state evolution process is determined by combining the variation range. Based on the analysis of the trend, the degree of cumulative change corresponding to the hydrological state transition node is analyzed, and the area where the degree of cumulative change meets the preset conditions is identified as the state fluctuation segment. The water replenishment scheduling response relationship corresponding to the state fluctuation section is obtained based on the state scheduling association chain, and the water replenishment scheduling status within the state fluctuation section is predicted by combining the water replenishment scheduling response relationship. The response offset of the water replenishment scheduling status relative to the hydrological status change trend is detected along the state fluctuation section, and the uncertain change section is determined based on the response offset.

3. The method of claim 2, wherein, The variation range between adjacent hydrological state nodes is obtained along the hydrological state evolution sequence, and the trend of change in the hydrological state evolution process is determined by combining the variation range. The variation amplitude between adjacent hydrological state nodes is obtained along the hydrological state evolution sequence, and the transmission state of the variation amplitude in continuous hydrological state nodes is recorded. Identify the direction of change between adjacent hydrological state nodes based on the continuous transmission of the magnitude of change, and determine the trend turning point in the hydrological state evolution process. Analyze the continuity of the change magnitude at the trend turning point in the hydrological state nodes before and after, and determine the continuous state of the hydrological state change direction based on the continuity. The changing trend of hydrological state during its evolution is determined by maintaining the continuous state based on the direction of change.

4. The method for quantifying the uncertainty of drought water replenishment scheduling prediction according to claim 2, characterized in that, Based on the analysis of the changing trends, the cumulative degree of change corresponding to the hydrological state transition nodes is analyzed, and areas whose cumulative degree of change meets preset conditions are identified as state fluctuation segments, including: Based on the changing trend, obtain the water deficit change corresponding to each hydrological state transition node, and calculate the superposition degree of water deficit change along the hydrological state evolution sequence. Based on the superposition degree of water deficit changes, the water storage and consumption rate corresponding to different hydrological state transition nodes is analyzed, and the water deficit accumulation zone in the process of hydrological state evolution is determined according to the water storage and consumption rate. The degree of change in water replenishment demand with changes in hydrological conditions is detected along the water deficit accumulation zone, and the critical region where the hydrological state changes from a stable state to a fluctuating state is identified based on the degree of change in response. The critical region where the degree of response change reaches a preset threshold is defined as the state fluctuation zone.

5. The method for quantifying the uncertainty of drought water replenishment scheduling prediction according to claim 4, characterized in that, Based on the superposition of changes in water deficit, the water storage and consumption rates corresponding to different hydrological state transition nodes are analyzed, and the water deficit accumulation zones during the hydrological state evolution process are determined according to the water storage and consumption rates: Based on the superposition of water deficit changes, the water storage and consumption rate corresponding to different hydrological state transition nodes is calculated, and the variation characteristics of the water storage and consumption rate during the hydrological state evolution process are analyzed. Based on the changing characteristics of water consumption rate, the water consumption gradient corresponding to different regions is determined, and the concentrated water dissipation area is identified based on the water consumption gradient. The spatial accumulation range of water deficit changes is analyzed along the concentrated water dissipation area, and the area that reaches the preset spatial accumulation level is determined as the water deficit accumulation area.

6. The method for quantifying the uncertainty of drought water replenishment scheduling prediction according to claim 5, characterized in that, Based on the superposition of changes in water deficit, the water storage and consumption rates corresponding to different hydrological state transition nodes are calculated, and the characteristics of the changes in water storage and consumption rates during the hydrological state evolution process are analyzed, including: Based on the superposition of water deficit changes, the water storage and consumption rates corresponding to different hydrological state transition nodes are calculated, and the differences in water storage and consumption rates between adjacent hydrological state transition nodes are analyzed. The direction of change in water consumption rate is determined based on the difference in water consumption rate, and the hydrological state nodes where the water consumption rate changes direction are identified. The changes in the direction of water storage and consumption are analyzed at hydrological state nodes where the rate of water storage and consumption changes, and the characteristics of water storage and consumption changes in the process of hydrological state evolution are formed.

7. The method for quantifying the uncertainty of drought water replenishment scheduling prediction according to claim 4, characterized in that, The degree of change in water replenishment demand in response to changes in hydrological conditions is detected along the water deficit accumulation zone, and the critical region where the hydrological state transitions from a stable to a fluctuating state is identified based on the degree of change in response. Along the water deficit accumulation zone, the changes in water replenishment demand corresponding to different hydrological state nodes are obtained, and the relationship between the changes in hydrological state and the changes in water replenishment demand is analyzed. Based on the pattern of water replenishment demand, determine the degree of change in water replenishment demand in the water deficit accumulation area as hydrological conditions change, and identify the location of the water replenishment demand response shift based on the degree of change in response. The direction of water demand change corresponding to the change in hydrological state is analyzed along the location of the change in water demand response, and the location where the direction of water demand change changes is determined as the critical region of hydrological state change.

8. The method for quantifying the uncertainty of drought water replenishment scheduling prediction according to claim 7, characterized in that, Based on the pattern of water replenishment demand, determine the degree of change in water replenishment demand in the water deficit accumulation area in response to changes in hydrological conditions, and identify the locations of water replenishment demand response transitions based on the degree of change in response, including: Based on the pattern of water replenishment demand, obtain the soil moisture content corresponding to the water deficit accumulation area, and analyze the soil moisture release state corresponding to the soil moisture content. The soil moisture release rate is obtained along the soil moisture release state, and the soil moisture retention capacity is determined based on the soil moisture release rate. The water replenishment demand response changes are determined based on the soil moisture retention capacity. Based on the analysis of changes in water replenishment demand response, the response change process corresponding to different hydrological state nodes is analyzed, and the transition position in the response change process is determined as the transition position of water replenishment demand response.

9. The method for quantifying the uncertainty of drought water replenishment scheduling prediction according to claim 1, characterized in that, Step S3 includes: The water replenishment scheduling status corresponding to different hydrological status nodes is obtained along the uncertain change section, and the offset and transmission of the water replenishment scheduling status in adjacent hydrological status nodes are detected. Identify continuous offset states based on offset propagation, and form a prediction uncertainty diffusion path based on continuous offset states; The water volume corresponding to the water replenishment scheduling state is analyzed along the diffusion path of prediction uncertainty, and the constraint relationship between the water replenishment scheduling state and the water volume is established. The prediction deviation correction is calculated based on the constraint relationship between the water replenishment scheduling status and the scheduled water volume.

10. A system for quantifying the uncertainty of drought water replenishment scheduling and prediction, characterized in that, For executing the drought water replenishment scheduling prediction uncertainty quantification method as described in claim 1, the drought water replenishment scheduling prediction uncertainty quantification system comprises: The hydrological state evolution division module is used to identify continuous hydrological time series data and hydrological changes in the target area through hydrological monitoring terminals, identify hydrological state transition nodes based on hydrological changes, divide the hydrological state evolution sequence based on hydrological state transition nodes and continuous hydrological time series data, and establish a state scheduling association chain between the hydrological state evolution sequence and the water replenishment scheduling process. The state fluctuation identification module is used to detect the magnitude of state evolution along the hydrological state evolution sequence, identify the state fluctuation segment of hydrological state transition based on the magnitude of the change, predict the water replenishment scheduling state based on the state scheduling association chain, and determine the uncertain change segment based on the offset of the water replenishment scheduling state in the state fluctuation segment. The offset propagation tracking module is used to track the offset propagation of the water replenishment scheduling status along the uncertainty change section, determine the prediction uncertainty diffusion path based on the continuous offset status, establish the constraint relationship between the water replenishment scheduling status and the scheduled water volume based on the prediction uncertainty diffusion path, and determine the prediction deviation correction amount based on the constraint relationship. The uncertainty prediction module is used to adjust the water replenishment scheduling status based on the prediction deviation correction amount, determine the prediction distribution range based on the water replenishment scheduling status, calibrate the prediction distribution range in combination with the uncertainty change section, and output the quantification result of the drought water replenishment scheduling prediction uncertainty.