Method, device and medium for judging icing galloping risk of catenary

By integrating icing, meteorological, and galloping data, multi-dimensional risk characteristics are constructed and weights are dynamically adjusted. This solves the real-time and accuracy problems of icing and galloping risk assessment in existing technologies, enabling refined and real-time hierarchical assessment of catenary icing and galloping risks, and improving the reliability of safe operation.

CN123117787APending Publication Date: 2026-11-17CHINA RAILWAY CONSTR ELECTRIFICATION BUREAU GRP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611289215.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the risk assessment of overhead contact line icing and galloping relies on a single icing thickness monitoring or a simple wind speed threshold alarm, resulting in poor real-time performance and low accuracy of risk assessment results, which cannot effectively prevent safety accidents.

Method used

By integrating icing data, meteorological data, and gobling data, a multi-dimensional risk characteristic is constructed. The weights are dynamically adjusted based on the duration of gobling, and a comprehensive risk index is calculated to achieve refined and real-time risk classification judgment.

Benefits of technology

It significantly improves the accuracy and reliability of assessing ice-covered galloping risks, providing reliable decision support for the safe operation of electrified railways and enabling timely and effective measures to prevent accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117787A_ABST
    Figure CN123117787A_ABST
Patent Text Reader

Abstract

This paper relates to a method, apparatus, equipment, and storage medium for assessing the risk of catenary icing and galloping. The method includes: real-time acquisition of multi-dimensional data such as icing data, meteorological data, and galloping data of the catenary, and calculating multi-dimensional risk characteristics for each. Subsequently, dynamic weights are calculated based on the duration of catenary galloping, and a comprehensive risk index is calculated through dynamic weight allocation. The risk level is determined based on the interval of the comprehensive risk index. This application achieves refined and real-time graded assessment of catenary galloping risk by integrating multi-dimensional characteristics such as icing, aerodynamic excitation, and structural dynamic response, and by introducing a weighting mechanism that dynamically adjusts with the driving time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This article relates to the field of safety monitoring technology for traction power supply in electrified railways, and in particular to a method, device, equipment, and medium for judging the risk of catenary icing and galloping. Background Technology

[0002] The overhead contact line is a critical infrastructure of electrified railways. In freezing winter weather, the contact wire and catenary are prone to large-scale low-frequency galloping under certain wind speeds after being covered with ice. This can lead to wire breakage, damage to the cantilever support, failure of the pantograph-catenary current collection system, or even serious safety accidents.

[0003] Currently, the assessment of the risk of ice galloping relies heavily on single ice thickness monitoring or simple wind speed threshold alarms, resulting in poor real-time performance and low accuracy of risk assessment results. Summary of the Invention

[0004] To address the aforementioned technical issues, this paper provides a method, apparatus, equipment, and medium for assessing the risk of ice-induced galloping of overhead contact lines.

[0005] Firstly, this article provides a method for assessing the risk of catenary icing and galloping, including: Acquire icing data, meteorological data, and galloping data of the overhead contact system; Based on the icing data, the meteorological data, the swirling data, and the first preset threshold, multi-dimensional risk characteristics are determined; The current weights corresponding to the multi-dimensional risk features are determined based on the duration of the overhead contact line's swaying and a second preset threshold. The current risk index of the overhead contact system is calculated based on the multi-dimensional risk characteristics and the current weights of each risk characteristic. The current risk index is compared with the preset index range corresponding to multiple preset risk levels, and the current risk level of the overhead contact line is determined among the multiple preset risk levels.

[0006] Optionally, the method further includes: The contact network is obtained with multiple risk levels determined over multiple cycles; each cycle corresponds to at least one risk level, and the multiple risk levels include the current risk level; Count the number of risk levels that fall within a preset range from the multiple risk levels; If the number of risk levels is greater than a third preset threshold, and the risk index calculated in at least some of the multiple cycles shows a downward trend, then the alarm for the target risk level determined in the previous cycle is lifted; the multiple cycles do not include the previous cycle, and the target risk level is higher than the maximum level within the preset risk level range.

[0007] Optionally, the first preset threshold includes a preset icing thickness, a preset wind speed, and a preset galloping threshold. The step of determining multi-dimensional risk characteristics based on the icing data, the meteorological data, the galloping data, and the first preset threshold includes: The icing hazard factor is determined based on the preset icing thickness and the current icing thickness in the icing data; The aerodynamic excitation coefficient is determined based on the preset wind speed and the current wind speed and current wind direction angle in the meteorological data. The dancing energy index is determined based on the preset dancing threshold and the dancing data; wherein, the multi-dimensional risk characteristics include the icing hazard coefficient, the aerodynamic excitation coefficient, and the dancing energy index.

[0008] Optionally, the second preset threshold includes a preset icing weight, a preset aerodynamic weight, a preset galloping weight, and a preset time gain coefficient. Determining the current weight corresponding to the multi-dimensional risk characteristics based on the galloping duration of the overhead contact line and the second preset threshold includes: The current dance weight corresponding to the dance energy index is determined based on the dance duration of the overhead contact line, the preset dance weight, and the preset time gain coefficient. Based on the current wading weight, the preset wading weight, and the preset icing weight, determine the current icing weight corresponding to the icing risk coefficient; Based on the current agitation weight, the preset agitation weight, and the preset aerodynamic weight, the current aerodynamic weight corresponding to the aerodynamic excitation coefficient is determined; wherein, the current weight includes the current agitation weight, the current icing weight, and the current aerodynamic weight, and the sum of the current agitation weight, the current icing weight, and the current aerodynamic weight is 1.

[0009] Optionally, the method further includes: The section where the overhead contact line is located is determined; the weather and topography vary in different sections. The first preset threshold is adjusted according to the section where the overhead contact line is located, so as to determine the multi-dimensional risk characteristics through the adjusted first preset threshold.

[0010] Optionally, the plurality of preset risk levels includes a first risk level, a second risk level, a third risk level, and a fourth risk level. After determining the current risk level of the overhead contact line from the plurality of preset risk levels, the method further includes: Implement the handling measures corresponding to the current risk level; wherein, the current risk level is the first risk level, the second risk level, the third risk level, or the fourth risk level; The handling measures corresponding to the first risk level are: setting the train to a state of alert and maintaining normal monitoring; the handling measures corresponding to the second risk level are: setting the train to a state of first warning, reducing the train speed to a first safety threshold, and initiating an icing warning; the handling measures corresponding to the third risk level are: setting the train to a state of second warning, reducing the train speed to a second safety threshold, and initiating emergency de-icing operations, wherein the second safety threshold is lower than the first safety threshold; and the handling measures corresponding to the fourth risk level are: setting the train to a state of crisis, cutting off the power supply to the overhead contact line and blocking the corresponding line.

[0011] Optionally, icing monitoring equipment, meteorological element monitoring equipment, and icing galloping monitoring equipment are deployed within the contact wire span, wherein the icing data includes the equivalent icing thickness of the contact wire obtained through the icing monitoring equipment; The meteorological data includes the current wind speed and the current wind direction angle obtained through meteorological element monitoring equipment, wherein the current wind direction angle is the angle between the wind direction and the contact line; The glare data includes the current glare amplitude and the current glare frequency; wherein the current glare amplitude and the current glare frequency are determined based on the image sequence of the contact wire and / or the catenary collected by the icing glare monitoring device, and are used to characterize the movement of feature points on the contact wire and / or the catenary, and the contact network includes the contact wire and the catenary.

[0012] Secondly, this paper provides a device for judging the risk of catenary icing and galloping, including: The acquisition unit is used to acquire icing data, meteorological data, and galloping data of the overhead contact line; The risk feature determination unit is used to determine multi-dimensional risk features based on the icing data, the meteorological data, the swirling data, and a first preset threshold. The weight determination unit is used to determine the current weight corresponding to the multi-dimensional risk characteristics based on the duration of the catenary's swaying and a second preset threshold. The risk index calculation unit is used to calculate the current risk index of the overhead contact line based on the multi-dimensional risk characteristics and the current weights of each dimension of risk characteristics. The assessment result generation unit is used to compare the current risk index with the preset index range corresponding to multiple preset risk levels, and determine the current risk level of the overhead contact line among the multiple preset risk levels.

[0013] Thirdly, this article provides an electronic device, including: Memory; Processor; and Computer programs; The computer program is stored in the memory and configured to be executed by the processor to implement the first aspect of the method as described above.

[0014] Fourthly, this document provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in the first aspect above.

[0015] The method for assessing the risk of catenary icing and galloping provided in this paper includes: real-time acquisition of multi-dimensional data such as icing data, meteorological data, and galloping data of the catenary, and calculation of multi-dimensional risk characteristics for each. Subsequently, dynamic weights are calculated based on the duration of catenary galloping, and a comprehensive risk index is calculated through dynamic weight allocation. The risk level is determined based on the interval in which the comprehensive risk index falls. This application achieves refined and real-time graded assessment of catenary galloping risk by integrating multi-dimensional characteristics such as icing, aerodynamic excitation, and structural dynamic response, and by introducing a weighting mechanism that dynamically adjusts with the driving time. Attached Figure Description

[0016] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this description and, together with the description, serve to explain the principles herein.

[0017] To more clearly illustrate the technical solutions in this document or the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, those skilled in the art can obtain other drawings based on these drawings without any creative effort.

[0018] Figure 1 This paper presents a flowchart illustrating a method for assessing the risk of ice accretion and galloping in overhead contact lines. Figure 2 This is a flowchart illustrating another method for assessing the risk of ice accretion and galloping of overhead contact lines provided in this article. Figure 3 This is a schematic diagram of a contact wire icing and galloping risk assessment device provided in this article; Figure 4 This is a schematic diagram of the structure of an electronic device provided in this article. Detailed Implementation

[0019] To better understand the objectives, features, and advantages outlined above, the solutions described herein will be further described below. It should be noted that, unless otherwise specified, the embodiments and features described herein can be combined with each other.

[0020] Many specific details are set forth in the following description in order to provide a full understanding of this document, but other practices may also be adopted in ways different from those described herein; obviously, the embodiments in the specification are only a part of the embodiments described herein, and not all of them.

[0021] Specifically, the assessment of icing and galloping risks in related technologies often relies on single icing thickness monitoring or simple wind speed threshold alarms, failing to comprehensively consider the dynamic coupling relationship between aerodynamic excitation and structural response. This results in delayed and inaccurate risk assessments, making it impossible to provide reliable quantitative basis for railway scheduling, speed-limited operation, or de-icing and melting measures.

[0022] To address the aforementioned technical issues, this paper presents a method for assessing the risk of catenary icing and galloping. By integrating multi-dimensional features such as post-icing characteristics, aerodynamic excitation, and structural dynamic response, and introducing a weighting mechanism that dynamically adjusts with galloping time, this method achieves refined and real-time hierarchical assessment of catenary galloping risk. This significantly improves the accuracy and reliability of early warnings, providing strong decision support for the safe operation of electrified railways in icy and snowy weather. Detailed explanations are provided through one or more of the following embodiments.

[0023] The contact wire icing and galloping risk assessment method provided in this paper is applicable to contact wire icing and galloping risk assessment scenarios. This method can be executed by a contact wire icing and galloping risk assessment device, which can be implemented in software and / or hardware and integrated into an electronic device. This electronic device can include, but is not limited to, mobile terminals such as smartphones, laptops, digital radio receivers, personal digital assistants (PDAs), tablet PCs, PMPs (portable multimedia players), in-vehicle terminals (e.g., in-vehicle navigation terminals), wearable devices, etc., as well as fixed terminals such as digital televisions, desktop computers, smart home devices, etc.

[0024] Figure 1 This paper provides a flowchart illustrating a method for assessing the risk of ice accretion and galloping in overhead contact lines, which specifically includes the following: Figure 1 The following steps are shown: S101. Obtain icing data, meteorological data, and galloping data of the overhead contact line.

[0025] The contact wire to be assessed for icing and galloping risks is identified, specifically a section of the contact wire. In one scenario, several devices are deployed within the key spans of the contact wire to collect multi-dimensional data, including icing data, meteorological data, and galloping data, in real time. This enables real-time and continuous monitoring of the contact wire's icing status, meteorological conditions, and galloping status, overcoming to some extent the shortcomings of delayed and inaccurate risk assessment results.

[0026] The contact network span is equipped with icing monitoring equipment, meteorological element monitoring equipment, and icing galloping monitoring equipment. The icing data includes the equivalent icing thickness of the contact line obtained by the icing monitoring equipment. The meteorological data includes the current wind speed and current wind direction angle obtained by the meteorological element monitoring equipment; the current wind direction angle is the angle between the wind direction and the contact line. The galloping data includes the current galloping amplitude and current galloping frequency. The current galloping amplitude and current galloping frequency are determined based on image sequences of the contact line and / or catenary collected by the icing galloping monitoring equipment, and are used to characterize the movement of feature points on the contact line and / or catenary. The contact network includes the contact line and the catenary.

[0027] In one scenario, icing monitoring equipment, meteorological element monitoring equipment, and icing galloping monitoring equipment are deployed within the overhead contact line span, and the distribution of the data acquisition equipment is not limited.

[0028] Specifically, the equivalent icing thickness (in mm) of the contact wire is obtained through icing monitoring equipment, thus generating icing data. The equivalent icing thickness refers to converting irregular icing on the contact wire into a regular icing thickness comparable to that of the catenary or contact wire. For example, for the catenary, irregular icing is idealized as a uniform cylindrical icing thickness. Other possible icing thickness scenarios are not limited.

[0029] Meteorological data is obtained by acquiring real-time wind speed (unit: m / s) and real-time wind direction angle through meteorological element monitoring equipment. The wind direction angle refers to the angle between the wind direction and the contact line. Other parameters included in the meteorological data are not limited, such as real-time ambient temperature and relative humidity.

[0030] Image sequences of the contact wire / catcher cable are acquired in real time using an icing and galloping monitoring device. For example, an image stream is continuously acquired at a preset frame rate of 10 fps. Then, natural feature points (such as dropper clamps) on the contact wire are selected within the initial image frames, and a tracking algorithm is used to obtain the pixel coordinate sequence of these feature points from the image stream. The pixel coordinate sequence is calibrated and transformed to obtain the actual displacement sequence, which is then used to calculate the galloping amplitude and frequency. The galloping data includes both the amplitude and frequency.

[0031] In one embodiment, real-time collected icing data, meteorological data, and cyclone data are subjected to time synchronization and filtering / denoising preprocessing to form multi-dimensional data with a unified time series.

[0032] S102. Determine multi-dimensional risk characteristics based on the icing data, the meteorological data, the swirling data, and the first preset threshold.

[0033] Based on icing data, meteorological data, jaywalking data, and a first preset threshold, multi-dimensional risk characteristics are calculated. Each dimension of data can be used to calculate one-dimensional risk characteristics, and multi-dimensional data can be used to calculate multi-dimensional risk characteristics. See the following embodiment for specific calculation methods.

[0034] The first preset threshold includes a preset icing thickness, a preset wind speed, and a preset swaying threshold.

[0035] Optionally, determining multi-dimensional risk characteristics based on the icing data, the meteorological data, the jaywalking data, and the first preset threshold includes: An icing hazard coefficient is determined based on the preset icing thickness and the current icing thickness in the icing data; an aerodynamic excitation coefficient is determined based on the preset wind speed and the current wind speed and current wind direction angle in the meteorological data; and a gobbling energy index is determined based on the preset gobbling threshold and the gobbling data. The multi-dimensional risk characteristics include the icing hazard coefficient, the aerodynamic excitation coefficient, and the gobbling energy index.

[0036] The icing risk factor is calculated based on the ratio of the current icing thickness to the preset icing thickness, as shown in formula (1). The preset icing thickness is the line design icing thickness (i.e., the design threshold).

[0037] I = min(1, d / d 0) Formula (1) In the formula, I represents the icing hazard coefficient, d represents the current icing thickness, and d0 represents the preset icing thickness. When d ≥ d0, I = 1, indicating that the icing thickness has reached or exceeded the design threshold, and the icing hazard level is saturated.

[0038] An aerodynamic excitation function is constructed based on wind speed and wind direction angle, as shown in formula (2). The meteorological data includes the current wind speed and current wind direction angle. The current aerodynamic excitation coefficient is calculated using the constructed aerodynamic excitation function.

[0039] W = (v / v cr ) • sin 2 (2θ) formula (2) In the formula, W represents the aerodynamic excitation coefficient, v represents the current wind speed, and v crThis represents the preset wind speed, which is the critical galloping wind speed in the area where the line is located (usually taken as 5-8 m / s), and θ represents the current wind direction angle, sin 2 (2θ) characterizes the effectiveness of the angle between the wind direction and the line on galloping excitation. For example, the excitation is strongest at a wind angle of 45° or 135°, with a value of 1, while the excitation is weakest at a wind angle of 0° or 90°, with a value of 0. When v ≥ v cr Furthermore, when the wind angle is close to 45° or 135°, W approaches 1.

[0040] Based on the amplitude and frequency of the dance, a normalized dance energy index is defined, as shown in formula (3). Subsequently, the current dance energy index is calculated based on the current amplitude and frequency of the dance data.

[0041] E = (A / A max ) • (f0 / f) formula (3) In the formula, E represents the dancing energy index, A represents the current dancing amplitude, and A max The preset galloping amplitude is the maximum allowable galloping amplitude for line safety (generally 0.5–1.0 m), f represents the current galloping frequency, and f0 represents the preset galloping frequency, which is also the fundamental frequency of the overhead contact line (usually 0.2–0.5 Hz). The preset galloping threshold includes both the preset galloping amplitude and the preset galloping frequency. Formula (3) demonstrates that the larger the galloping amplitude and the lower the galloping frequency (closer to the fundamental frequency), the more significant the galloping energy accumulation and the higher the galloping risk. When A = A max And when f = f0, E = 1.

[0042] Optionally, the method further includes: The section where the overhead contact line is located is determined; wherein, the weather and terrain of different sections are different; the first preset threshold is adjusted according to the section where the overhead contact line is located, so as to determine the multi-dimensional risk characteristics through the adjusted first preset threshold.

[0043] To adapt to the differences in meteorological and topographical conditions across different sections of the line, an adaptive mechanism for section parameters is implemented. Specifically, the section where the overhead contact line is located is determined, and the preset wind speed and / or preset galloping amplitude in the first preset threshold are adjusted according to the section type. The sections include windy mountain sections and open plain sections; other possible sections can be set as needed.

[0044] In one scenario, for the overhead contact line in windy mountainous areas, a first preset threshold is set outside the selectable range, i.e., the first preset threshold is lowered, or the lowest value within the selectable range is set as the first preset threshold. For example, the preset wind speed is lowered to 5 m / s (selectable range: 5–8 m / s), and the preset galloping amplitude is lowered to 0.4 m (selectable range: 0.5–1.0 m). For the overhead contact line in open plains areas, the first preset threshold is set within the selectable range, for example, the preset wind speed is set to 7 m / s, and the preset galloping amplitude is set to 0.8 m. Other possible configurations of parameters for different sections are not limited.

[0045] S103. Determine the current weight corresponding to the multi-dimensional risk feature based on the duration of the contact wire's movement and the second preset threshold.

[0046] The weight of the galloping energy index is dynamically adjusted based on the duration of the overhead contact line galloping to capture the trend of risk development from its inception to its deterioration. Subsequently, to ensure that the weight sum is always 1, the weights of the icing hazard coefficient and the aerodynamic excitation coefficient are adjusted according to the weight of the dynamically adjusted galloping energy index.

[0047] The second preset threshold includes a preset icing weight, a preset aerodynamic weight, a preset gyratory weight, and a preset time gain coefficient.

[0048] Optionally, determining the current weight corresponding to the multi-dimensional risk feature based on the duration of the overhead contact line's swaying and a second preset threshold includes: Based on the duration of the contact wire's galloping, the preset galloping weight, and the preset time gain coefficient, the current galloping weight corresponding to the galloping energy index is determined; based on the current galloping weight, the preset galloping weight, and the preset icing weight, the current icing risk coefficient corresponding to the current icing weight is determined; based on the current galloping weight, the preset galloping weight, and the preset aerodynamic weight, the current aerodynamic excitation coefficient corresponding to the current aerodynamic weight is determined; wherein, the current weight includes the current galloping weight, the current icing weight, and the current aerodynamic weight, and the sum of the current galloping weight, the current icing weight, and the current aerodynamic weight is 1.

[0049] The duration of the contact wire's galloping is obtained, and the current galloping weight of the contact wire in the time window is calculated based on the galloping duration, the preset galloping weight, and the preset time gain coefficient, as shown in formula (4). This galloping weight reflects the increasing importance of the dynamic response characteristics (i.e., the galloping energy index) of the contact wire as it gallops over time, i.e., the galloping weight increases dynamically with the duration of the galloping.

[0050] ω E = ω E0• (1 + α • t / T) Formula (4) In the formula, ω E Indicates the current dancing weight, ω E0 This represents the preset dance weights, for example, ω. E0 =0.2, α represents the preset time gain coefficient, with a value range of 0.1 to 0.5, t represents the duration of the dance, and T represents the time window, for example, T=60s.

[0051] Meanwhile, in order to ensure that the weights are always 1, the current icing weight and the current aerodynamic weight are reduced proportionally based on the current gyratory weight, as shown in formulas (5) and (6).

[0052] ω I = ω I0 • (1-ω E ) / (1-ω E0 )Formula (5) In the formula, ω I Indicates the current icing weight, ω I0 This represents the preset icing weight, for example, ω. I0 =0.4.

[0053] ω W = ω W0 • (1-ω E ) / (1-ω E0 )Formula (6) In the formula, ω W Indicates the current aerodynamic weight, ω W0 This represents the preset aerodynamic weights, for example, ω. W0 =0.4.

[0054] S104. Calculate the current risk index of the overhead contact line based on the multi-dimensional risk characteristics and the current weights of each dimension of risk characteristics.

[0055] The calculated dimensionless indicators (i.e., icing risk coefficient, aerodynamic excitation coefficient and gazing energy index) are used as real-time input feature vectors (denoted as X = [I, W, E]). The current risk index of the catenary is calculated according to the current weight of each indicator. The current risk index can also be understood as the comprehensive risk index, as shown in formula (7).

[0056] R = ω I •I + ω W •W + ω E •E formula (7) In the formula, R represents the current risk index.

[0057] S105. Compare the current risk index with the preset index range corresponding to multiple preset risk levels, and determine the current risk level of the overhead contact line among the multiple preset risk levels.

[0058] After calculating the risk index, the risk index is compared with the preset index range corresponding to multiple preset risk levels. The current risk level of the overhead contact system is determined among the multiple preset risk levels, and the current risk index is within the index range corresponding to the current risk level.

[0059] Subsequently, a judgment result is generated based on the current risk level and the current risk index, and the judgment result is sent to the dispatch center and the on-site maintenance terminal.

[0060] Optionally, the method further includes: The system acquires multiple risk levels determined over multiple cycles for the overhead contact system; each cycle corresponds to at least one risk level, and the multiple risk levels include the current risk level; the system counts the number of risk levels within a preset risk level range; if the number of risk levels is greater than a third preset threshold, and the risk index calculated in at least some of the multiple cycles shows a downward trend, then the alarm for the target risk level determined in the previous cycle is deactivated; the multiple cycles do not include the previous cycle, and the target risk level is higher than the maximum level within the preset risk level range.

[0061] In one embodiment, an anti-jitter mechanism is established to reduce misjudgments. Specifically, multiple risk levels determined by the overhead contact system over multiple cycles are acquired, with at least one risk level determined in each cycle, for example, each cycle being 5-10 seconds. The multiple risk levels include the current risk level. The number of cycles for anti-jitter judgment can be set according to user needs; for example, three risk levels from three cycles are acquired. Subsequently, the number of risk levels within a preset range is counted. For example, the preset range is no higher than the second risk level; that is, the number of the second and first risk levels among the multiple risk levels is counted and recorded as the number of levels. If the number of levels is greater than a third preset threshold, and the risk index calculated in at least some cycles over multiple cycles shows a downward trend, then the alarm for the target risk level determined in the previous cycle is automatically terminated, i.e., the risk alarm before contact is made. The multiple cycles do not include the previous cycle, and the target risk level is higher than the maximum level within the preset range. For example, if the risk level is no higher than Level II (i.e., the maximum level within the preset range) for three consecutive calculation cycles and the R value shows a downward trend, then the alarm for the next higher level (i.e., Level II) is automatically deactivated.

[0062] In one scenario, multiple risk levels are calculated for a given period, and the highest risk level among these multiple risk levels is taken as the risk level for that period.

[0063] The multiple preset risk levels include a first risk level, a second risk level, a third risk level, and a fourth risk level. The handling measure corresponding to the first risk level is: set to an alert state and maintain normal monitoring. The handling measure corresponding to the second risk level is: set to a first warning state, reduce the train speed to a first safety threshold, and activate an icing warning. The handling measure corresponding to the third risk level is: set to a second warning state, reduce the train speed to a second safety threshold, and activate emergency de-icing operations, wherein the second safety threshold is lower than the first safety threshold. The handling measure corresponding to the fourth risk level is: set to a crisis state, cut off the power supply to the overhead contact line, and block the corresponding line.

[0064] In one embodiment, multiple preset risk levels include a first risk level (denoted as Level I (low risk)), a second risk level (denoted as Level II (medium risk)), a third risk level (denoted as Level III (high risk)), and a fourth risk level (denoted as Level IV (extremely dangerous risk)). Each preset risk level has corresponding handling measures and preset indicator ranges. Level I indicator range: 0 ≤ R < 0.3; handling measure: set an alert status and maintain normal monitoring. Level II indicator range: 0.3 ≤ R < 0.6; handling measure: set an early warning status (i.e., the first early warning status), recommend speed limit operation (e.g., reducing train speed to a first safety threshold), and activate an icing warning. Level III indicator range: 0.6 ≤ R < 0.85; handling measure: set a severe early warning status (i.e., the second early warning status), recommend immediate speed limit or suspension of operation (e.g., reducing train speed to a second safety threshold), and notify emergency de-icing operations. Level IV index range: 0.85 ≤ R ≤ 1.0, handling measures: set an emergency state, there is a risk of equipment damage, the power supply to the contact network must be cut off immediately and the line blocked. The safety threshold can be set by the user according to their needs.

[0065] Optionally, after determining the current risk level of the overhead contact line from the plurality of preset risk levels, the method further includes: Implement the handling measures corresponding to the current risk level; wherein the current risk level is the first risk level, the second risk level, the third risk level, or the fourth risk level.

[0066] Once the current risk level is determined, the corresponding handling measures will be implemented. The current risk level can be classified as the first risk level, the second risk level, the third risk level, or the fourth risk level.

[0067] The comprehensive risk index is divided into levels I to IV, with each level clearly corresponding to differentiated handling suggestions such as normal monitoring, speed-limited operation, emergency de-icing and melting, and power cut-off, which can be directly connected to the dispatch and train control system.

[0068] In addition, when a galloping incident actually occurs, the optimal weighting coefficient can be recalculated using historical data for use on subsequent similar lines.

[0069] This paper presents a method for assessing the risk of ice accretion and galloping in overhead contact lines. It constructs three evaluation indicators—ice accretion hazard coefficient, aerodynamic instability excitation coefficient, and galloping energy index—based on three characteristics: ice thickness, wind speed and direction, and galloping amplitude and frequency. This establishes a multi-dimensional risk assessment system, overcoming the false alarm and false negative defects of the single threshold method and significantly improving the accuracy of risk assessment. Furthermore, this method dynamically adjusts the weight of the galloping energy index based on the duration of galloping, enabling it to sensitively capture the worsening trend of the risk and further enhancing the early warning capability and response timeliness for ice accretion and galloping risks.

[0070] In one embodiment, the icing thickness d0 = 10 mm, the fundamental frequency f0 = 0.3 Hz, and the maximum safe amplitude A are designed. max =0.6 m, critical wind speed v cr For a contact wire section with a speed of 6 m / s, the initial weight is set to ω. I0 =0.4、ω W0 =0.4、ω E0 =0.2, time gain coefficient α=0.3, time window T=60 s, calculation period is 5s.

[0071] Based on the above embodiments, in one scenario, during the initial stage of icing, the wind speed is unfavorable but the galloping is not obvious (initial galloping). Based on real-time collected data and the aforementioned preset threshold, the current risk level is determined to be Level II (medium risk). In this case, the dispatch center issues a speed limit warning, recommending that the train run at a speed below 160 km / h, and activates the enhanced icing monitoring mode. In another scenario, the icing continues to worsen, and the galloping significantly intensifies (late galloping). Based on real-time collected data and the aforementioned preset threshold, the current risk level is determined to be Level IV (extremely dangerous). In this case, the system automatically issues an emergency cut-off command to the dispatch center, notifying the train to stop immediately, cutting off power to the overhead contact line, and notifying the repair team.

[0072] Based on the above embodiments, Figure 2 This is a flowchart illustrating another method for assessing the risk of ice accretion and galloping in overhead contact lines, as provided in this article. Specifically, it includes, for example... Figure 2 The following steps are shown: (1) Data collection: ice thickness, meteorological data and swirling data; (2) Feature extraction: multi-dimensional risk features; (3) Risk level determination: high, medium or low; (4) Output risk report.

[0073] For a detailed explanation of the implementation of (1) to (4) above, please refer to the above embodiments, which will not be repeated here.

[0074] In addition, after acquiring the data, it is possible to determine whether the data is complete. If the data is incomplete, the data is re-acquired; if the data is complete, feature extraction is performed directly.

[0075] Based on the above embodiments, a contact wire icing and galloping risk assessment system is provided. In actual engineering, the assessment system includes multiple physical units, including a front-end acquisition unit, an edge computing unit, and a scheduling unit. The front-end acquisition unit is used to collect icing data, meteorological data, and galloping data in real time.

[0076] In one embodiment, the front-end acquisition unit includes a dual-light gimbal camera and an anemometer / wind vane. A monitoring point is set up every 500 meters, equipped with both the dual-light gimbal camera and the anemometer / wind vane. The dual-light gimbal camera (e.g., high-definition visible light and infrared thermal imaging) is fixed to the support column 6-8 meters above the ground. Its motorized zoom lens is aimed at the contact wire / catcher cable in the middle of adjacent spans to periodically acquire icing images (e.g., at 30-second intervals) and continuously acquire kinetic video streams (e.g., at a frame rate ≥10fps). The anemometer / wind vane is installed at the top of the support column to obtain wind speed and direction angle in real time. Subsequently, the front-end acquisition unit can also upload data to the interval data processing unit via 4G / 5G or a fiber optic ring network.

[0077] Edge computing units are deployed in substations or communication base stations to perform the aforementioned feature extraction, dynamic weighting, and real-time calculation of risk indices, and output the risk level in each calculation cycle.

[0078] The dispatching unit is the central platform, which aggregates risk information across the entire line, displays a risk heat map, and coordinates with the train operation control system to issue speed limit or stop commands.

[0079] Figure 3 This document presents a schematic diagram of a contact wire icing and galloping risk assessment device. The contact wire icing and galloping risk assessment device provided herein can execute the processing flow provided in the embodiments of the contact wire icing and galloping risk assessment method, such as... Figure 3 As shown, the overhead contact line icing and galloping risk assessment device 300 includes: Acquisition unit 301 is used to acquire icing data, meteorological data, and galloping data of the overhead contact line; The risk feature determination unit 302 is used to determine multi-dimensional risk features based on the icing data, the meteorological data, the swirling data, and the first preset threshold. The weight determination unit 303 is used to determine the current weight corresponding to the multi-dimensional risk feature based on the duration of the catenary's swaying and a second preset threshold. The risk index calculation unit 304 is used to calculate the current risk index of the overhead contact line based on the multi-dimensional risk characteristics and the current weights of each dimension of risk characteristics. The assessment result generation unit 305 is used to compare the current risk index with the preset index range corresponding to multiple preset risk levels, and determine the current risk level of the overhead contact line among the multiple preset risk levels.

[0080] Optionally, the overhead contact line icing and vibration risk assessment device 300 is also used for: The contact network is obtained with multiple risk levels determined over multiple cycles; each cycle corresponds to at least one risk level, and the multiple risk levels include the current risk level; Count the number of risk levels that fall within a preset range from the multiple risk levels; If the number of risk levels is greater than a third preset threshold, and the risk index calculated in at least some of the multiple cycles shows a downward trend, then the alarm for the target risk level determined in the previous cycle is lifted; the multiple cycles do not include the previous cycle, and the target risk level is higher than the maximum level within the preset risk level range.

[0081] The first preset threshold includes a preset icing thickness, a preset wind speed, and a preset swaying threshold.

[0082] Optionally, the risk characteristic determination unit 302 is used for: The icing hazard factor is determined based on the preset icing thickness and the current icing thickness in the icing data; The aerodynamic excitation coefficient is determined based on the preset wind speed and the current wind speed and current wind direction angle in the meteorological data. The dancing energy index is determined based on the preset dancing threshold and the dancing data; wherein, the multi-dimensional risk characteristics include the icing hazard coefficient, the aerodynamic excitation coefficient, and the dancing energy index.

[0083] The second preset threshold includes a preset icing weight, a preset aerodynamic weight, a preset gyratory weight, and a preset time gain coefficient.

[0084] Optionally, the weight determination unit 303 is used for: The current dance weight corresponding to the dance energy index is determined based on the dance duration of the overhead contact line, the preset dance weight, and the preset time gain coefficient. Based on the current wading weight, the preset wading weight, and the preset icing weight, determine the current icing weight corresponding to the icing risk coefficient; Based on the current agitation weight, the preset agitation weight, and the preset aerodynamic weight, the current aerodynamic weight corresponding to the aerodynamic excitation coefficient is determined; wherein, the current weight includes the current agitation weight, the current icing weight, and the current aerodynamic weight, and the sum of the current agitation weight, the current icing weight, and the current aerodynamic weight is 1.

[0085] Optionally, the overhead contact line icing and vibration risk assessment device 300 is also used for: The section where the overhead contact line is located is determined; the weather and topography vary in different sections. The first preset threshold is adjusted according to the section where the overhead contact line is located, so as to determine the multi-dimensional risk characteristics through the adjusted first preset threshold.

[0086] The multiple preset risk levels include a first risk level, a second risk level, a third risk level, and a fourth risk level.

[0087] Optionally, the overhead contact line icing and vibration risk assessment device 300 is also used for: Implement the handling measures corresponding to the current risk level; wherein, the current risk level is the first risk level, the second risk level, the third risk level, or the fourth risk level; The handling measures corresponding to the first risk level are: setting the train to a state of alert and maintaining normal monitoring; the handling measures corresponding to the second risk level are: setting the train to a state of first warning, reducing the train speed to a first safety threshold, and initiating an icing warning; the handling measures corresponding to the third risk level are: setting the train to a state of second warning, reducing the train speed to a second safety threshold, and initiating emergency de-icing operations, wherein the second safety threshold is lower than the first safety threshold; and the handling measures corresponding to the fourth risk level are: setting the train to a state of crisis, cutting off the power supply to the overhead contact line and blocking the corresponding line.

[0088] The contact wire span is equipped with icing monitoring equipment, meteorological element monitoring equipment and icing galloping monitoring equipment. The icing data includes the equivalent icing thickness of the contact wire obtained by the icing monitoring equipment. The meteorological data includes the current wind speed and the current wind direction angle obtained through meteorological element monitoring equipment, wherein the current wind direction angle is the angle between the wind direction and the contact line; The glare data includes the current glare amplitude and the current glare frequency; wherein the current glare amplitude and the current glare frequency are determined based on the image sequence of the contact wire and / or the catenary collected by the icing glare monitoring device, and are used to characterize the movement of feature points on the contact wire and / or the catenary, and the contact network includes the contact wire and the catenary.

[0089] Figure 3 The contact wire icing and dancing risk assessment device of the embodiment shown can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and will not be described again here.

[0090] Figure 4 This is a schematic diagram of an electronic device provided for this article. See below for details. Figure 4 This diagram illustrates a suitable structural schematic for implementing the electronic device 400 described herein. The electronic device 400 described herein may include, but is not limited to, mobile terminals such as mobile phones, laptops, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), in-vehicle terminals (e.g., in-vehicle navigation terminals), wearable electronic devices, and fixed terminals such as digital TVs, desktop computers, smart home devices, and so on. Figure 4 The electronic device shown is an example and should not impose any limitations on the functionality and scope of this article.

[0091] like Figure 4 As shown, the electronic device 400 may include a processing unit 401 (e.g., a central processing unit, a graphics processor, etc.) that can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 402 or a program loaded from a storage device 408 into a random access memory (RAM) 403 to implement the contact wire icing and galloping risk assessment method as described herein. The RAM 403 also stores various programs and data required for the operation of the electronic device 400. The processing unit 401, ROM 402, and RAM 403 are interconnected via a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.

[0092] Typically, the following devices can be connected to I / O interface 405: input devices 406 including, for example, touchscreens, touchpads, keyboards, mice, cameras, microphones, accelerometers, gyroscopes, etc.; output devices 407 including, for example, liquid crystal displays (LCDs), speakers, vibrators, etc.; storage devices 408 including, for example, magnetic tapes, hard disks, etc.; and communication devices 409. Communication device 409 allows electronic device 400 to communicate wirelessly or wiredly with other devices to exchange data. Although Figure 4An electronic device 400 with various devices is shown; however, it should be understood that it is not required to implement or possess all of the devices shown. More or fewer devices may be implemented or possessed alternatively.

[0093] In particular, according to embodiments herein, the processes described in the above-referenced flowcharts can be implemented as computer software programs. For example, embodiments herein include a computer program product comprising a computer program carried on a non-transitory computer-readable medium, the computer program containing program code for performing the methods shown in the flowcharts, thereby implementing the contact wire icing and galloping risk assessment method as described above. In such embodiments, the computer program can be downloaded and installed from a network via communication device 409, or installed from storage device 408, or installed from ROM 402. When the computer program is executed by processing device 401, it performs the functions defined in the methods herein.

[0094] It should be noted that the computer-readable medium described above can be a computer-readable signal medium, a computer-readable storage medium, or any combination thereof. A computer-readable storage medium can be, for example,—but not limited to—an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples of a computer-readable storage medium may include, but are not limited to: an electrical connection having one or more wires, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device. In this document, a computer-readable signal medium can include a data signal propagated in baseband or as part of a carrier wave, carrying computer-readable program code. Such propagated data signals can take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. A computer-readable signal medium can be any computer-readable medium other than a computer-readable storage medium, which can send, propagate, or transmit a program for use by or in connection with an instruction execution system, apparatus, or device. The program code contained on the computer-readable medium can be transmitted using any suitable medium, including but not limited to: wires, optical fibers, RF (radio frequency), etc., or any suitable combination thereof.

[0095] In some implementations, clients and servers can communicate using any currently known or future-developed network protocol such as HTTP (Hypertext Transfer Protocol) and can interconnect with digital data communication (e.g., communication networks) of any form or medium. Examples of communication networks include local area networks (“LANs”), wide area networks (“WANs”), the Internet (e.g., the Internet of Things), and peer-to-peer networks (e.g., ad hoc peer-to-peer networks), as well as any currently known or future-developed networks.

[0096] The aforementioned computer-readable medium may be included in the aforementioned electronic device; or it may exist independently and not assembled into the electronic device.

[0097] Optionally, when one or more of the above-described procedures are executed by the electronic device, the electronic device may also perform other steps described in the above embodiments.

[0098] Computer program code for performing the operations described herein may be written in one or more programming languages ​​or a combination thereof, including but not limited to object-oriented programming languages ​​such as Java, Smalltalk, and C++, as well as conventional procedural programming languages ​​such as the "C" language or similar programming languages. The program code may execute entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer may be connected to the user's computer via any type of network—including a local area network (LAN) or a wide area network (WAN)—or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0099] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments herein. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those indicated in the drawings. For example, two consecutively indicated blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts, may be implemented using a dedicated hardware-based system that performs the specified function or operation, or using a combination of dedicated hardware and computer instructions.

[0100] The units described herein can be implemented in software or hardware. The names of the units are not, in some cases, limiting to the unit itself.

[0101] The functions described above in this document can be performed at least in part by one or more hardware logic components. For example, exemplary types of hardware logic components that can be used, without limitation, include: field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), system-on-a-chip (SoCs), complex programmable logic devices (CPLDs), and so on.

[0102] In the context of this document, a machine-readable medium can be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, apparatus, or device. A machine-readable medium can be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium can be, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination of the foregoing. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.

[0103] It should be noted that, in this document, relational terms such as "first" and "second" are used to distinguish one entity or operation from another, without necessarily requiring or implying any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or gateway that comprises a list of elements does not include those elements, but also includes other elements not expressly listed, or elements inherent to such a process, method, article, or gateway. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or gateway that includes said element.

[0104] The above description provides specific embodiments of this document, enabling those skilled in the art to understand or implement it. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this document. Therefore, this document is not to be limited to the embodiments described herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for assessing the risk of ice-covered and galloping overhead contact lines, characterized in that, include: Acquire icing data, meteorological data, and galloping data of the overhead contact system; Based on the icing data, the meteorological data, the swirling data, and the first preset threshold, multi-dimensional risk characteristics are determined; The current weights corresponding to the multi-dimensional risk features are determined based on the duration of the overhead contact line's swaying and a second preset threshold. The current risk index of the overhead contact system is calculated based on the multi-dimensional risk characteristics and the current weights of each risk characteristic. The current risk index is compared with the preset index range corresponding to multiple preset risk levels, and the current risk level of the overhead contact line is determined among the multiple preset risk levels.

2. The method according to claim 1, characterized in that, The method further includes: The contact network is assigned multiple risk levels over multiple cycles; each cycle corresponds to at least one risk level, and the multiple risk levels include the current risk level. Count the number of risk levels that fall within a preset range from the multiple risk levels; If the number of risk levels is greater than a third preset threshold, and the risk index calculated in at least some of the multiple cycles shows a downward trend, then the alarm for the target risk level determined in the previous cycle is lifted; the multiple cycles do not include the previous cycle, and the target risk level is higher than the maximum level within the preset risk level range.

3. The method according to claim 1, characterized in that, The first preset threshold includes a preset icing thickness, a preset wind speed, and a preset galloping threshold. The step of determining multi-dimensional risk characteristics based on the icing data, the meteorological data, the galloping data, and the first preset threshold includes: The icing hazard factor is determined based on the preset icing thickness and the current icing thickness in the icing data; The aerodynamic excitation coefficient is determined based on the preset wind speed and the current wind speed and current wind direction angle in the meteorological data. The dancing energy index is determined based on the preset dancing threshold and the dancing data; wherein, the multi-dimensional risk characteristics include the icing hazard coefficient, the aerodynamic excitation coefficient, and the dancing energy index.

4. The method according to claim 3, characterized in that, The second preset threshold includes a preset icing weight, a preset aerodynamic weight, a preset galloping weight, and a preset time gain coefficient. Determining the current weight corresponding to the multi-dimensional risk characteristics based on the galloping duration of the overhead contact line and the second preset threshold includes: The current dance weight corresponding to the dance energy index is determined based on the dance duration of the overhead contact line, the preset dance weight, and the preset time gain coefficient. Based on the current wading weight, the preset wading weight, and the preset icing weight, determine the current icing weight corresponding to the icing risk coefficient; Based on the current agitation weight, the preset agitation weight, and the preset aerodynamic weight, the current aerodynamic weight corresponding to the aerodynamic excitation coefficient is determined; wherein, the current weight includes the current agitation weight, the current icing weight, and the current aerodynamic weight, and the sum of the current agitation weight, the current icing weight, and the current aerodynamic weight is 1.

5. The method according to claim 1, characterized in that, The method further includes: The section where the overhead contact line is located is determined; the weather and topography vary in different sections. The first preset threshold is adjusted according to the section where the overhead contact line is located, so as to determine the multi-dimensional risk characteristics through the adjusted first preset threshold.

6. The method according to claim 1, characterized in that, The plurality of preset risk levels includes a first risk level, a second risk level, a third risk level, and a fourth risk level. After determining the current risk level of the overhead contact line from the plurality of preset risk levels, the method further includes: Implement the handling measures corresponding to the current risk level; wherein, the current risk level is the first risk level, the second risk level, the third risk level, or the fourth risk level; The handling measures corresponding to the first risk level are: setting the train to a state of alert and maintaining normal monitoring; the handling measures corresponding to the second risk level are: setting the train to a state of first warning, reducing the train speed to a first safety threshold, and initiating an icing warning; the handling measures corresponding to the third risk level are: setting the train to a state of second warning, reducing the train speed to a second safety threshold, and initiating emergency de-icing operations, wherein the second safety threshold is lower than the first safety threshold; and the handling measures corresponding to the fourth risk level are: setting the train to a state of crisis, cutting off the power supply to the overhead contact line and blocking the corresponding line.

7. The method according to claim 1, characterized in that, The contact wire span is equipped with icing monitoring equipment, meteorological element monitoring equipment and icing galloping monitoring equipment, wherein the icing data includes the equivalent icing thickness of the contact wire obtained by the icing monitoring equipment; The meteorological data includes the current wind speed and the current wind direction angle obtained through meteorological element monitoring equipment, wherein the current wind direction angle is the angle between the wind direction and the contact line; The glare data includes the current glare amplitude and the current glare frequency; wherein the current glare amplitude and the current glare frequency are determined based on the image sequence of the contact wire and / or the catenary collected by the icing glare monitoring device, and are used to characterize the movement of feature points on the contact wire and / or the catenary, and the contact network includes the contact wire and the catenary.

8. A device for judging the risk of ice-covered and dancing contact wires, characterized in that, include: The acquisition unit is used to acquire icing data, meteorological data, and galloping data of the overhead contact line; The risk feature determination unit is used to determine multi-dimensional risk features based on the icing data, the meteorological data, the swirling data, and a first preset threshold. The weight determination unit is used to determine the current weight corresponding to the multi-dimensional risk characteristics based on the duration of the catenary's swaying and a second preset threshold. The risk index calculation unit is used to calculate the current risk index of the overhead contact line based on the multi-dimensional risk characteristics and the current weights of each dimension of risk characteristics. The assessment result generation unit is used to compare the current risk index with the preset index range corresponding to multiple preset risk levels, and determine the current risk level of the overhead contact line among the multiple preset risk levels.

9. An electronic device, characterized in that, include: Memory; processor; as well as Computer programs; The computer program is stored in the memory and configured to be executed by the processor to implement the contact wire icing and dancing risk assessment method as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the steps of the contact wire icing and dancing risk assessment method as described in any one of claims 1 to 7.