A method for manufacturing steel structure parts that facilitates material locating during stacking and covering.

By using 3D labeling and dynamic layout adjustments, combined with a missing parts feedback mechanism, the problem of overlapping and missing parts labels in steel structure production has been solved, improving material sourcing efficiency and production continuity.

CN123118296APending Publication Date: 2026-11-17SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611499733.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In steel structure production, parts markings are easily covered, making it difficult to find materials. The disconnect between production planning and execution leads to missing parts, affecting the construction period and efficiency.

Method used

The part names are labeled using a three-dimensional identification method. Combined with dynamic adjustment of layout and material cutting order, a missing parts feedback mechanism is established to ensure that parts are classified, zoned, and stacked, and that information is traceable.

Benefits of technology

It enables rapid identification of parts even after they are stacked, avoiding duplicate material cutting and missing parts, ensuring the supply of critical parts, and improving material finding efficiency and production continuity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123118296A_ABST
    Figure CN123118296A_ABST
Patent Text Reader

Abstract

This application relates to the field of steel structure component manufacturing technology, and discloses a method for manufacturing steel structure components that facilitates material locating when stacked and covered. The steps include technical preparation, raw material management, layout and cutting, and component management. It ensures that even when components are stacked, their identities can still be quickly and accurately identified through side markings, fundamentally solving the long-standing industry pain point of "difficulty in finding components" after stacking. This saves time and effort in component locating, is convenient and efficient, and avoids repeated cutting due to missing components. It is highly adaptable to steel structure production scenarios with complex component types, varying specifications, and large production batches. It ensures priority supply of urgently needed and critical components, effectively avoiding the accumulation of non-urgent components while urgently needed components are missing, preventing assembly work stoppages due to missing components, and ensuring that the overall project schedule remains unaffected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the field of steel structure parts manufacturing technology, specifically relating to a method for manufacturing steel structure parts that facilitates material locating during stacking and covering. Background Technology

[0002] In modern steel structure projects such as large industrial plants, commercial complexes, and bridges, the structures are becoming increasingly complex, resulting in a wide variety of components with diverse specifications, large production volumes, and numerous types. Traditional steel structure fabrication processes typically focus on optimizing individual processes, such as cutting and welding, while exhibiting significant shortcomings in the systematic management of the entire production process.

[0003] Firstly, parts management is rudimentary and labeling methods are inadequate. According to relevant standards for parts labeling in the steel structure industry, such as the "General Process for Labeling Steel Components," it is stipulated that "the name of the project, the number of the plate, and the specifications of the plate should be marked in the middle of the main material plate after cutting, according to the layout drawing, and then stored in categories." Therefore, in the current production of steel structure parts, the parts are only labeled on their length × width surfaces after cutting. As a result, when parts are stacked, the surface labels are easily covered up. This is especially true in scenarios where parts are complex, have different specifications, and are produced in large batches. Stacking a large number of parts is common, and when the labels are covered up, workers cannot quickly identify the parts stacked underneath. This leads to a significant expenditure of manpower and resources to "find the materials" during subsequent assembly, and even duplicate cutting, resulting in low efficiency and high costs.

[0004] Secondly, there is a disconnect in information flow and a lack of coordination between production planning and execution: production planning / schedule planning is disconnected from execution processes such as material preparation and manufacturing. Layout and material preparation only consider material utilization and are not linked to the actual project progress. This easily leads to the accumulation of non-urgent parts while urgently needed parts are missing. Moreover, there is a lack of rapid and accurate feedback and handling mechanisms for missing parts. Often, the problem is only discovered when the assembly process needs the part, which causes assembly work to stop and seriously affects the overall schedule. At the same time, unreasonable layout order will further aggravate the accumulation of parts on the manufacturing site, making it even more difficult to find materials. Summary of the Invention

[0005] To address or partially address the problems existing in related technologies, this application provides a method for manufacturing steel structure parts that facilitates material retrieval when stacked and covered. This method ensures that even when parts are stacked, their identities can still be quickly and accurately identified through side markings, saving time and effort in material retrieval, making it convenient and efficient, and avoiding the situation of repeated material cutting due to missing parts. It is highly adaptable to steel structure production scenarios with complex parts, varying specifications, and large production batches; it can ensure the priority supply of urgently needed and critical parts, avoid assembly work stoppages due to missing parts, and ensure that the overall project schedule is not affected.

[0006] This application provides a method for manufacturing steel structure parts that facilitates material sourcing during stacking and covering, comprising the following steps: S1. Technical preparation: Develop a construction schedule, detailed drawing plan, quality inspection plan, and material management procedures; S2. Raw material management: Re-inspect incoming raw materials, and after they pass the inspection, classify and stack them according to their material and thickness, and establish a stacking ledger to record material information. S3. Layout and Cutting: According to the work schedule and production progress, the layout and cutting order is dynamically adjusted. When cutting, the layout drawing is executed, and the cut parts are marked in three dimensions. The three-dimensional marking includes marking the part name on the surface of the part in the length × width direction and at least one surface in the thickness direction. S4. Parts Management: According to the work schedule and part names, the parts after cutting are classified and stacked, and a missing parts feedback mechanism is established. The missing parts feedback mechanism is used to accurately find missing parts or replenish them in a timely manner.

[0007] In one alternative, in step S1, the quality inspection plan includes acceptance standards and data for a "three-inspection system" of self-inspection, mutual inspection, and special inspection.

[0008] In one alternative, in step S1, the material management procedure includes standards for classifying raw materials based on material and plate thickness, and specific requirements for three-dimensional identification of parts after cutting.

[0009] In one alternative, in step S2, the material information recorded in the stacking ledger includes at least the material grade, specifications, furnace batch number, and storage location.

[0010] In one alternative, step S3, the dynamic adjustment of layout and cutting sequence includes: prioritizing the cutting of urgently needed and critical parts according to the project schedule and production progress.

[0011] In one alternative, in step S3, the three-dimensional identification includes identifying the part name on the surface of the part in the length × width direction and on at least two adjacent surfaces in the thickness direction.

[0012] In one alternative, in step S3, the three-dimensional marking is done by any one of the following methods: writing with a paint pen, pasting a label, or printing.

[0013] In one alternative, in step S4, when classifying and stacking the cut parts according to the schedule and part names, the parts are stacked in zones according to component type, and all parts of the same component are stacked in the same area.

[0014] In one alternative, in step S4, the missing parts feedback mechanism includes: when a missing part is found, promptly feeding back the name and demand information of the missing part to initiate a precise material retrieval program based on the stacking ledger and part identification, or to initiate a part replenishment program.

[0015] The beneficial effects of this application are: 1. By using a three-dimensional identification method to label the names of parts, it is possible to ensure that even if the parts are stacked, the labels on their sides are still visible. Workers can quickly and accurately identify the parts by the side labels without having to flip the stacked parts one by one. This fundamentally solves the long-standing industry pain point of "difficulty in finding materials" after parts are stacked, making material finding time-saving, labor-saving, convenient and efficient, and avoiding the situation of repeatedly cutting materials because the parts cannot be found. It is highly adaptable to steel structure production scenarios with complex parts, different specifications and large production batches. 2. By dynamically adjusting the layout and material cutting sequence according to the project schedule and production progress, we can ensure the priority supply of urgently needed and critical parts, effectively avoid the accumulation of non-urgent parts and the lack of urgently needed parts, and thus avoid the assembly work being suspended due to the lack of parts, ensuring that the overall project schedule is not affected. 3. By classifying and zoning parts, the search area is narrowed from the entire workshop to specific component areas, further improving the efficiency of finding parts; by establishing a missing parts feedback mechanism, it is possible to accurately find missing parts or replenish them in a timely manner.

[0016] It should be understood that the above general description and the following detailed description are exemplary and explanatory only, and do not limit this application. Attached Figure Description

[0017] To more clearly illustrate the technical solutions of the embodiments of this application, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 This is a flowchart illustrating the process of this application. Detailed Implementation

[0019] The specific embodiments of this application will be further described in detail below with reference to the accompanying drawings and examples. The following examples are used to illustrate this application, but are not intended to limit the scope of this application. Similarly, the following examples are only some embodiments of this application, not all embodiments. All other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0020] In the description of this application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.

[0021] In this application, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0022] To address the aforementioned problems, this application proposes improvements and innovations, including the following embodiments.

[0023] In one implementation, see Figure 1 This application provides a method for manufacturing steel structure parts that facilitates material sourcing during stacking and covering, comprising the following steps: S1. Technical Preparation: At this stage, the focus is on top-level design, formulating a detailed schedule plan, and clarifying the task nodes for each stage; conducting drawing review and refinement to ensure manufacturing feasibility; formulating a quality inspection plan and acceptance standards and documents that include self-inspection, mutual inspection, and special inspection; and formulating material management procedures that include standards for classifying raw materials based on material and plate thickness, as well as specific requirements for three-dimensional marking of parts after cutting.

[0024] S2. Raw Material Management: All incoming raw materials must pass a re-inspection. Subsequently, they are classified according to two key parameters: material and plate thickness, and stacked in designated areas. At the same time, a stacking ledger is established to dynamically record information such as the material's grade, specifications, furnace batch number, and storage location, so as to achieve traceability of material information and reduce unnecessary handling.

[0025] S3. Layout and Cutting: This stage is crucial in connecting the project schedule and execution. Based on the project schedule and production progress, the layout and cutting order is dynamically adjusted. That is, during layout, while controlling material waste, the cutting order must be dynamically adjusted according to the project schedule and actual production progress. Priority is given to cutting urgently needed and critical parts, thus ensuring the priority supply of urgently needed and critical parts. This effectively avoids the accumulation of non-urgent parts and the lack of urgently needed parts, thereby avoiding assembly work stagnation due to missing parts and ensuring that the overall project schedule is not affected.

[0026] During material cutting, the layout drawing must be strictly followed, and each part after cutting is 3D-labeled. This 3D labeling includes marking the part's name on its length x width surface and on the surfaces of two adjacent thickness directions. In other words, in addition to the conventional markings on the length x width surfaces, clear part name markings are mandatory in the thickness direction as well. This ensures that even if the length x width markings are obscured by stacking, the side markings remain visible. Workers can quickly and accurately identify parts without having to flip through the stack, fundamentally solving the long-standing industry pain point of "difficulty in finding parts" after stacking. This makes finding parts time-saving, labor-saving, convenient, and efficient, avoiding repeated cutting due to missing parts. It is highly adaptable to steel structure production scenarios with complex parts, varying specifications, and large production batches. In practical applications, 3D labeling can be done using paint pens, labels, or inkjet printing. In addition to the part name, the label content can also include the component number, material, and specifications.

[0027] Furthermore, by marking the part name on the surfaces of two adjacent thickness directions, it can be ensured that the marking on at least one side of the part remains visible, regardless of whether the parts are stacked horizontally with the bottom facing down or stacked vertically with one side facing down, making it convenient to find the parts.

[0028] S4. Parts Management: Based on the work schedule and part names, the parts after cutting are reclassified and stacked. During stacking, they are stacked in zones according to component type, and all parts of the same component are stacked in the same area, making the logistics status clear at a glance. The material search range is narrowed from the entire workshop to a specific component area, further improving the material search efficiency. At the same time, a missing parts feedback mechanism is established, which is used to accurately find missing parts or replenish them in a timely manner.

[0029] In some implementations, step S4 includes the following missing parts feedback mechanism: when a missing part is found, the name and demand information of the missing part are promptly fed back to initiate a precise material finding program based on the stacking ledger and part identification, or to initiate a part replenishment program, thereby forming a closed-loop management of problem handling and ensuring the continuous operation of the production line.

[0030] Specifically, taking the fabrication of steel components for a large and complex industrial plant as an example, the steel components of this project include various components such as steel columns, steel beams, and supports, with more than 500 types of parts and a total steel consumption of about 8,000 tons. It is a typical steel structure project with complex parts, different specifications, and large production batches.

[0031] S1. Technical Preparation After the project is launched, a primary network schedule is first developed, dividing the entire production task into several batches according to component type, and specifying the completion time nodes for each batch of components such as columns, beams, and supports. For example, the cutting of steel column parts from GZ-1 to GZ-10 is completed on days 1-5, the assembly and welding of steel columns from GZ-1 to GZ-10 are completed on days 6-10, and so on.

[0032] A BIM-based detailed design team was established to conduct clash checks and process optimization on the design drawings, check for spatial conflicts between the connection nodes of each component, optimize the weld layout to reduce welding deformation, and confirm the cutting dimensions and beveling forms of each part.

[0033] The quality department has developed a "Project Quality Inspection Plan," which clearly defines the quality acceptance standards for the entire process, from material cutting to welding. This plan includes a "three-inspection system" acceptance standard and documentation: Self-inspection: After completing each process, operators conduct an initial inspection of their work results according to the quality inspection standards and record the self-inspection data; Mutual inspection: Based on the successful self-inspection, operators in the next process inspect the workpieces transferred from the previous process, and only accept them after confirming they meet the requirements; Specialized inspection: Dedicated quality inspectors conduct a comprehensive professional inspection of the products produced in each process according to the prescribed sampling ratio and inspection items, using professional techniques, methods, and equipment, and complete inspection record forms. All inspection records are archived according to component number to achieve quality traceability.

[0034] At the same time, the "Regulations for the Management of Project Materials and Parts" were issued. The regulations clearly stipulate that raw materials should be classified and stored according to their material (such as Q345B, Q235B) or plate thickness (such as 20mm, 25mm, 30mm, etc.) after entering the site. The regulations also stipulate that parts after cutting should be three-dimensionally marked, specifically by using methods such as writing with paint pens, pasting labels, or printing to mark the part name on the surface in the length × width direction and on the surfaces in two adjacent thickness directions.

[0035] S2, Raw Material Management After a batch of Q345B steel plates arrives at the site, the quality inspector takes samples for re-inspection according to specifications. Only after confirming that the samples are qualified can the warehousing procedures be completed. The warehouse manager then hoists the steel plates of different specifications to designated areas for stacking based on their material (e.g., Q345B) and thickness (e.g., 20mm, 25mm, 30mm). For example, 20mm thick Q345B steel plates are stacked in "Area B - 20mm stack," 25mm thick Q345B steel plates in "Area B - 25mm stack," and 30mm thick Q345B steel plates in "Area B - 30mm stack." A clear sign is placed at each stack, indicating the material, thickness, and other information.

[0036] Subsequently, the warehouse manager enters detailed information for each batch of steel plates into the "Material Stacking Ledger," including material grade (e.g., Q345B), specifications (e.g., 20mm×2500mm×12000mm), storage location (e.g., B-zone -20mm stack), furnace batch number, quantity, date of receipt, supplier, and other information. This stacking ledger can be entered and managed using an Excel spreadsheet or an ERP (Enterprise Resource Planning) system, and is dynamically updated daily with material issuance and consumption data to ensure real-time traceability of material information and achieve consistency between the ledger and the physical inventory.

[0037] S3, Layout and Cutting After communicating with the production scheduler, the CNC cutting team found that according to the original layout, a batch of non-urgent connecting plates would be cut first. Therefore, the layout technicians selected the list of urgently needed parts for the current batch based on the schedule and dynamically adjusted the layout and cutting order.

[0038] In this embodiment, the production scheduler determined that the most urgently needed component was the "GZ-1" steel column, located in the core load-bearing area of ​​the factory building, with the tightest installation schedule. Therefore, the layout technicians prioritized the layout of all components of the "GZ-1" steel column, including the flanges, webs, and stiffening ribs, in the CNC layout software, setting the cutting priority of the "GZ-1" steel column components to the highest level. While ensuring that material utilization was not lower than the specifications, these urgently needed components were prioritized for inclusion in the current cutting plan.

[0039] During material preparation, CNC cutting machine operators strictly follow the new layout diagram to perform the cutting operation. Afterwards, the operators mark each cut part with three-dimensional markings. For example, "GZ-1-Flange Plate" is marked on the large surface in the length x width direction of the "GZ-1-Flange Plate" part, and also on its two adjacent 20mm thick sides. This way, even if the "GZ-1-Flange Plate" part is subsequently stacked horizontally under a pile of plates, or stacked vertically with one side facing down between piles of plates, at least one side of the marking remains exposed and clearly visible. Workers can accurately identify and quickly locate the part without having to flip through the stacked parts one by one.

[0040] In practical applications, 3D marking can be done using methods such as writing with paint pens, label pasting, and inkjet printing. For parts with a large thickness (e.g., thickness ≥ 20 mm), white paint pens can be used for writing, resulting in clear and durable lettering. For parts with a small thickness (e.g., thickness < 20 mm), label pasting can be used, which is convenient, practical, and efficient. In addition, for projects with large batches and high requirements, inkjet printing can be used to achieve automated marking, which is highly efficient and saves time and labor.

[0041] S4, Parts Management After the parts are cut and pass quality inspection, they are transported to the assembly workshop by transfer workers. The assembly workshop is divided into several zones according to the type of components, such as "steel column component zone", "steel beam component zone", and "support component zone". The "steel column component zone" can be further divided into sub-zones according to the steel column number, such as "GZ-1 zone", "GZ-2 zone", and "GZ-3 zone".

[0042] According to the three-dimensional markings on the parts, the transfer workers transport each component to the corresponding component area in the assembly workshop, and stack all the component parts of the same component (such as the flange plate, web plate, stiffening ribs, etc. of the "GZ-1" steel column) in the "GZ-1 area".

[0043] During the assembly process, the assemblers collect parts according to the assembly drawings of the "GZ-1" steel column and assemble them. When the assemblers find that a certain part (for example, the missing "GZ-1-stiffening rib-05") is in short supply, they immediately activate the missing parts feedback mechanism: First, the assemblers promptly report the name and demand information of the missing part to their supervisor through the workshop management system (such as production management software, walkie-talkie or paper documents), including the part name "GZ-1-stiffening rib-05", the component to which it belongs "GZ-1", the required quantity, and the demand time. Secondly, upon receiving information about missing parts, the production supervisor first checks the cutting records and material stacking ledger to determine if the part has already been cut. If it has, based on the stacking position and 3D marking information recorded in the ledger, personnel are organized to accurately locate the part within the "GZ-1 area." Since the part also has markings in the thickness direction, even if it is covered by other parts, workers can quickly identify it through the side markings. If it is verified that the part has not yet been cut, the production supervisor immediately issues a precise replenishment instruction to the CNC cutting team. The CNC cutting team prioritizes the layout of the "GZ-1-Stiffening Rib-05" part, sets the cutting priority of the "GZ-1-Stiffening Rib-05" part to the highest level, and includes the "GZ-1-Stiffening Rib-05" part in the next batch of cutting plans to quickly replenish the part. Subsequently, the part is marked, inspected, and stacked according to the normal process before being delivered to the assembly process.

[0044] Through this missing parts feedback mechanism, when the stock of a certain part is insufficient, the missing part problem can be discovered, responded to, and handled immediately, and the missing part can be quickly found or replenished. This avoids the situation in the traditional model where the missing part is only discovered when the assembly process stops, ensuring the continuous operation of the assembly work and ensuring that the overall project schedule is not affected.

[0045] Compared to the traditional model, the implementation of the above process effectively solved the problems of chaotic parts management, difficulty in finding materials, duplicate material cutting, and assembly work stoppages caused by missing parts in the steel component fabrication projects of large and complex industrial plants. The material finding time was reduced by more than 80%, the situation of assembly work stoppages due to missing parts was avoided, the overall production efficiency of the project was improved by more than 15%, and significant economic and management benefits were achieved.

[0046] Finally, it should be noted that although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of this application, all of which should be included within the protection scope of this application.

Claims

1. A method for manufacturing steel structure parts that facilitates material locating during stacking and covering, characterized in that, At least the following steps are included: S1. Technical preparation: Develop a construction schedule, detailed drawing plan, quality inspection plan, and material management procedures; S2. Raw material management: Re-inspect incoming raw materials, and after they pass the inspection, classify and stack them according to their material and thickness, and establish a stacking ledger to record material information. S3. Layout and Cutting: According to the work schedule and production progress, the layout and cutting order is dynamically adjusted. When cutting, the layout drawing is executed, and the cut parts are marked in three dimensions. The three-dimensional marking includes marking the part name on the surface of the part in the length × width direction and at least one surface in the thickness direction. S4. Parts Management: According to the work schedule and part names, the parts after cutting are classified and stacked, and a missing parts feedback mechanism is established. The missing parts feedback mechanism is used to accurately find missing parts or replenish them in a timely manner.

2. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 1, is characterized in that: In step S1, the quality inspection plan includes the "three-inspection system" acceptance standards and data of self-inspection, mutual inspection, and special inspection.

3. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 1 or 2, is characterized in that: In step S1, the material management procedure includes standards for classifying raw materials based on material and plate thickness, as well as specific requirements for three-dimensional marking of parts after cutting.

4. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 1, is characterized in that: In step S2, the material information recorded in the stacking ledger includes at least the material grade, specifications, furnace batch number, and storage location.

5. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 1, is characterized in that: In step S3, the dynamic adjustment of layout and cutting sequence includes: according to the project schedule and production progress, prioritizing the cutting of urgently needed and critical parts.

6. The method for manufacturing steel structural parts that facilitate material locating during stacking and covering, as described in claim 1 or 5, is characterized in that: In step S3, the three-dimensional identification includes marking the part name on the surface of the part in the length × width direction and on at least two adjacent surfaces in the thickness direction.

7. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 6, is characterized in that: In step S3, the three-dimensional marking is made by any one of the following methods: writing with a paint pen, pasting a label, or printing.

8. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 1, is characterized in that: In step S4, when classifying and stacking the cut parts according to the work schedule and part names, the parts are stacked in zones according to component type, and all parts of the same component are stacked in the same area.

9. The method for manufacturing steel structure parts that facilitate material locating during stacking and covering, as described in claim 1 or 8, is characterized in that: In step S4, the missing parts feedback mechanism includes: when a missing part is found, promptly feeding back the name and demand information of the missing part to initiate a precise material retrieval program based on the stacking ledger and part identification, or to initiate a part replenishment program.