A Virtual Load Measurement Method and System for Convenient On-Site Verification of Three-Phase Energy Meters

By employing a convenient on-site verification method for three-phase energy meters, real-time sampling of energy meter information, setting up a virtual load signal source, automatically identifying and correcting erroneous wiring, self-correcting clamp meters, and establishing an intelligent management platform, the problems of wiring confirmation, energy replenishment, and decreased clamp meter accuracy in on-site verification of power systems have been solved, achieving efficient and safe metering management.

CN123121472APending Publication Date: 2026-11-17SHENZHEN SINGHANG ELEC-TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511462001.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing power system field verification technologies are difficult to perform complete verification under power outage conditions, the correctness of metering device wiring is difficult to confirm, the calculation of electricity replenishment during meter replacement is complex and inaccurate, clamp meter accuracy decreases and requires factory calibration, and secondary circuit parameters are difficult to test, affecting metering accuracy and safety.

Method used

A convenient on-site verification method based on three-phase energy meters is adopted. By sampling energy meter information in real time, an energy replenishment confirmation certificate is generated, a virtual load signal source is set up for verification, incorrect wiring is automatically identified and replenished, clamp meter self-correction is implemented, an intelligent management platform is established, and the health status of the metering device is evaluated.

Benefits of technology

It enables complete verification under energized conditions, improves measurement accuracy and work efficiency, reduces safety hazards and maintenance costs, enhances the level of intelligent measurement management, and reduces on-site operation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121472A_ABST
    Figure CN123121472A_ABST
Patent Text Reader

Abstract

This invention provides a virtual load measurement method and system for convenient on-site verification of three-phase energy meters; it samples energy meter information data in real time during the metering process, automatically adjusts the calculation cycle according to load fluctuation characteristics, and automatically generates an energy replenishment confirmation; the convenient on-site calibrator is equipped with a virtual load signal source to perform virtual load signal generation and measurement verification; it performs intelligent identification of incorrect wiring and energy replenishment for incorrect wiring, and performs compound error event replenishment and event segment replenishment for multiple error events and multiple error events superimposed; it automatically detects clamp meter errors and performs error self-correction; it establishes an intelligent load measurement management platform, intelligently recommends the optimal replenishment scheme, assesses the health status of the metering device, and predicts potential system faults.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of precision measurement, intelligent analysis, and communication transmission technology, specifically to a virtual load measurement method and system for convenient on-site verification of three-phase energy meters. Background Technology

[0002] Currently, with the development of power systems, convenient on-site verification is becoming increasingly widespread. However, traditional electricity meter verification techniques in power system on-site metering suffer from the following prominent problems: Effective verification is difficult during power outages. When the metering device is in a power outage or no-load state, it is impossible to obtain load output signals, making it difficult to perform complete verification of the metering device, especially verifying the correctness of secondary circuit parameters and wiring. Furthermore, accurate calculation of electricity loss during meter replacement is difficult. During meter replacement, due to metering interruption, it is necessary to estimate and recalculate the electricity consumption during the replacement period. Traditional methods rely on manual estimation or simple average calculations, resulting in low accuracy. It is prone to causing metering deviations; the identification of incorrect wiring and the calculation of power compensation are complicated: there are various incorrect wiring situations in the field. Traditional calibrators can only identify the error type, but it is difficult to automatically calculate the power compensation. Manual calculation based on the error type and load characteristics is required; the accuracy of clamp meters decreases with the use time: clamp current transformers lose accuracy during use due to mechanical wear, clamp contamination, etc., affecting the measurement accuracy. Traditional methods require factory calibration, which affects work efficiency; the secondary circuit parameters of metering devices are difficult to test: it is difficult to accurately measure the impedance parameters of the PT and CT secondary circuits in the field, and it is difficult to assess the impact of the secondary circuit on the metering accuracy; Existing verification methods rely on actual loads, making it difficult to perform complete verification during power outages. This leads to difficulties in verifying the correct wiring of newly installed metering devices before power is restored, posing safety hazards. During meter replacement, the calculation of electricity consumption retroactively lacks automated tools, relying mainly on experience-based estimations, resulting in low accuracy and potential metering discrepancies between users and power companies. In cases of incorrect wiring, retroactive electricity calculations require complex calculations by professionals based on the error type and load characteristics, making on-site operation difficult and prone to errors. The problem of decreased clamp meter accuracy is difficult to resolve on-site, requiring return to the manufacturer for calibration, increasing maintenance costs and time. It is difficult to test the secondary circuit parameters of metering devices under no-load conditions, making it difficult to assess the long-term impact of the secondary circuit on metering accuracy. Therefore, it is necessary to propose a convenient on-site virtual load measurement method and system for three-phase energy meters to at least partially solve the problems existing in the current technology. Summary of the Invention

[0003] The summary of this invention introduces a series of simplified concepts, which will be further explained in detail in the detailed description section. The summary of this invention does not mean that it attempts to limit the key features and essential technical features of the claimed technical solution, nor does it mean that it attempts to determine the scope of protection of the claimed technical solution.

[0004] To at least partially solve the above problems, this invention provides a virtual load measurement method based on convenient on-site verification of three-phase energy meters, comprising: S100 samples electricity meter information data in real time during the metering process, automatically adjusts the calculation cycle according to load fluctuation characteristics, and automatically generates an electricity replenishment confirmation. The S200 portable field calibrator is equipped with a virtual load signal source for generating and measuring virtual load signals. The S300 performs intelligent identification of incorrect wiring and power recovery for incorrect wiring. It also performs composite error event recovery and event segment recovery for multiple error events and multiple error events superimposed on each other. The S400 automatically detects clamp meter errors and performs error self-correction; it establishes an intelligent management platform for load measurement, intelligently recommends the optimal compensation scheme, assesses the health status of metering devices, and predicts potential system failures.

[0005] Preferably, S100 includes: S101, real-time sampling of current data during the metering process, combined with voltage signals sampled from the junction box, to calculate the supplementary electricity consumption during the metering process; S102 automatically adjusts the calculation cycle according to the load fluctuation characteristics, and maintains calculation accuracy when the load fluctuation increases; S103: Based on the calculation results, automatically generate a power replenishment confirmation form according to the set specification template, and set up a Bluetooth printing output device to print the power replenishment confirmation form. The calculation of supplementary electricity consumption during the metering process includes: establishing a supplementary electricity consumption calculation model based on the current data during the metering process and the voltage signal sampled from the junction box: ΔE=(P0 / P-1)×ΔEp×K; where ΔE is the supplementary electricity consumption, P0 is the normal power value, P is the abnormal power value of the error event, ΔEp is the power change value of the error event over a segmented time, and K is the multiplier of the measuring transformer meter; based on the supplementary electricity consumption calculation model, the supplementary electricity consumption during the metering process is obtained by accumulating the time during the metering process.

[0006] Preferably, S200 includes: S201 uses a portable signal source module to output a load output signal that simulates the actual load. By adjusting the signal frequency, signal amplitude, and signal phase, it can simulate various load characteristics within the power factor range. S202 automatically identifies the wiring method of the three-phase energy meter measurement circuit for different wiring methods and configures the signal path, injecting the signal into the primary side or secondary circuit of the metering device; the wiring methods of the three-phase energy meter measurement circuit include: three-phase four-wire method and three-phase three-wire method; S203, by injecting a test signal into the secondary circuit, measures the voltage-current relationship, calculates the impedance parameters of the PT / CT secondary circuit, and evaluates the impact of the secondary circuit on the measurement accuracy; S204, establish a closed-loop calibration mechanism between the signal source output and the calibrator measurement, eliminate virtual load signal error, and construct a virtual load signal source; the virtual load signal error range is controlled within ±0.5%.

[0007] Preferably, S300 includes: S301, based on vector analysis, intelligently identifies and determines incorrect wiring in the three-phase energy meter's measuring circuit; incorrect wiring includes: 48 types of three-phase three-wire wiring and 96 types of three-phase four-wire wiring. S302 performs compound error event recovery for multiple error events and multiple error events superimposed on each other; S303 automatically segments continuous events according to the start and end times of the events and automatically calculates the supplementary power for each segment. Multiple error events include: electricity meter wiring error, undervoltage event, loss of voltage event, overvoltage event, and phase loss event; composite error event compensation is based on the superposition of multiple error event types and durations, and intelligently removes the duplicate metering data after superposition to compensate for electricity consumption; significantly improving the accuracy of electricity consumption compensation.

[0008] Preferably, S400 includes: The S401 automatically detects clamp meter errors and performs clamp meter self-correction by comparing the clamp meter measurement values ​​with the built-in standard source; clamp meter errors are corrected without replacing hardware. S402 monitors the jaw closure status and jaw cleanliness in real time, prompting users to perform jaw maintenance. S403, data cloud synchronous networking, enables real-time uploading, management and maintenance of test data, intelligent recommendation of the best follow-up solution, assessment of the health status of metering devices, and prediction of potential system failures; S403 includes: The S4031 enables real-time uploading, management, and maintenance of test data through Wi-Fi, Bluetooth, and mobile terminal networking. S4032 intelligently recommends the optimal supplementary load solution based on historical load data and current measurement results; S4033 analyzes multiple calibration data to assess the health status of the metering device and predict potential system failures.

[0009] This invention relates to a virtual load measurement system based on convenient on-site calibration of three-phase energy meters, comprising: The intelligent power consumption tracking system for meter replacement samples the power meter information data in real time during the metering process, automatically adjusts the calculation cycle according to the load fluctuation characteristics, and automatically generates a power consumption tracking confirmation. The virtual load measurement subsystem uses a portable field calibrator to set up a virtual load signal source for virtual load signal generation and measurement calibration. The intelligent identification subsystem for incorrect wiring performs intelligent identification of incorrect wiring and power recovery for incorrect wiring. It also performs composite error event recovery and event segment recovery for multiple error events and multiple error events superimposed on each other. The clamp meter self-correcting intelligent management subsystem automatically detects clamp meter errors and performs error self-correction; it establishes a load measurement intelligent management platform, intelligently recommends the optimal compensation scheme, assesses the health status of metering devices, and predicts potential system failures.

[0010] Preferably, the intelligent meter replacement power tracking system includes: The meter replacement power consumption model subsystem samples current data in real time during the metering process and combines it with the voltage signal sampled from the junction box to calculate the supplementary power consumption during the metering process. The load fluctuation adaptive subsystem automatically adjusts the calculation cycle according to the characteristics of load fluctuation, and maintains calculation accuracy when load fluctuations increase. The intelligent power replenishment confirmation subsystem automatically generates a power replenishment confirmation form according to the calculation results and the set standard template, and sets up a Bluetooth printing output device to print the power replenishment confirmation form; The calculation of supplementary electricity consumption during the metering process includes: establishing a supplementary electricity consumption calculation model based on the current data during the metering process and the voltage signal sampled from the junction box: ΔE=(P0 / P-1)×ΔEp×K; where ΔE is the supplementary electricity consumption, P0 is the normal power value, P is the abnormal power value of the error event, ΔEp is the power change value of the error event over a segmented time, and K is the multiplier of the measuring transformer meter; based on the supplementary electricity consumption calculation model, the supplementary electricity consumption during the metering process is obtained by accumulating the time during the metering process.

[0011] Preferably, the virtual load measurement subsystem includes: The signal source integrated subsystem uses a portable signal source module to output a load output signal that simulates the actual load. It adjusts the signal frequency, signal amplitude, and signal phase to simulate various load characteristics within the power factor range. The adaptive wiring subsystem automatically identifies the wiring method of the three-phase energy meter measurement circuit for different wiring methods and configures the signal path, injecting the signal into the primary side or secondary circuit of the metering device; the wiring methods of the three-phase energy meter measurement circuit include: three-phase four-wire method and three-phase three-wire method; The parameter measurement and calculation subsystem injects test signals into the secondary circuit, measures the voltage-current relationship, calculates the impedance parameters of the PT / CT secondary circuit, and evaluates the impact of the secondary circuit on the measurement accuracy. The virtual load calibration subsystem establishes a closed-loop calibration mechanism between the signal source output and the calibrator measurement, eliminates virtual load signal errors, and constructs a virtual load signal source; the virtual load signal error range is controlled within ±0.5%.

[0012] Preferably, the intelligent faulty wiring identification subsystem includes: The intelligent wiring identification subsystem uses vector analysis to intelligently identify and determine incorrect wiring in the three-phase energy meter's measuring circuit. Incorrect wiring includes 48 types of three-phase three-wire wiring and 96 types of three-phase four-wire wiring. The multi-event overlay and recovery subsystem performs complex error event recovery for multiple error events and multiple overlay error events; The automatic event segmentation subsystem automatically segments continuous events according to their start and end times and automatically calculates the supplementary power for each segment. Multiple error events include: electricity meter wiring error, undervoltage event, loss of voltage event, overvoltage event, and phase loss event; composite error event compensation is based on the superposition of multiple error event types and durations, and intelligently removes the duplicate metering data after superposition to compensate for electricity consumption; significantly improving the accuracy of electricity consumption compensation.

[0013] Preferably, the clamp meter self-correcting intelligent management subsystem includes: The clamp meter error automatic detection subsystem automatically detects clamp meter errors by comparing the clamp meter measurement values ​​with the built-in standard source and performs clamp meter self-correction; clamp meter errors are corrected without replacing hardware. The jaw status monitoring subsystem monitors the jaw closure status and jaw cleanliness in real time, prompting users to perform jaw maintenance. The intelligent load measurement management platform, with data cloud synchronization networking, enables real-time uploading, management, and maintenance of test data, intelligently recommends the optimal supplementary solution, assesses the health status of metering devices, and predicts potential system failures.

[0014] The intelligent load measurement management platform includes: The data cloud synchronization module enables real-time uploading, management, and maintenance of test data through Wi-Fi, Bluetooth, and mobile terminal networking. The intelligent power replenishment decision module intelligently recommends the optimal replenishment plan based on historical load data and current measurement results; The metering device health assessment module analyzes multiple calibration data to assess the health status of the metering device and predict potential system failures.

[0015] Compared with the prior art, the present invention has at least the following beneficial effects: This invention relates to a virtual load measurement method and system for convenient on-site verification of three-phase energy meters. This invention achieves complete verification under both energized and de-energized conditions: It enables the metering device to complete wiring correctness and secondary circuit parameter testing before power is supplied, eliminating safety hazards and improving work efficiency; it accurately calculates electricity consumption during meter replacement: through real-time sampling and intelligent calculation, the accuracy of electricity consumption recovery during meter replacement is improved, significantly reducing metering deviations; it simplifies the process of handling incorrect wiring: automatically identifying incorrect wiring types and calculating recovery electricity consumption simplifies the calculation work; it maintains stable measurement accuracy: the clamp meter's self-correction feature ensures that measurement accuracy remains within the specified range, eliminating the need for frequent factory calibration and reducing maintenance costs; it improves the level of intelligent metering management: through intelligent decision-making and data analysis, it achieves scientific and refined metering management, improving the service quality of power companies; and it reduces on-site operational risks: virtual load measurement technology reduces the frequency of operation in energized environments, improving on-site operational safety.

[0016] The virtual load measurement method and system for convenient on-site calibration of three-phase energy meters described in this invention, along with other advantages, objectives, and features of this invention, will be partly apparent from the following description and partly understood by those skilled in the art through study and practice of this invention. Attached Figure Description

[0017] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a structural diagram of the virtual load measurement system based on convenient on-site calibration of three-phase energy meters, as described in this invention.

[0018] Figure 2 This is a diagram of an embodiment of the virtual load measurement system based on convenient on-site calibration of three-phase energy meters as described in this invention.

[0019] Figure 3 This is a diagram of another embodiment of the virtual load measurement system based on convenient on-site verification of three-phase energy meters described in this invention. Detailed Implementation

[0020] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments, so that those skilled in the art can implement it based on the description; for example Figure 1-3 As shown, this invention provides a virtual load measurement method based on convenient on-site verification of three-phase energy meters, including: S100 samples electricity meter information data in real time during the metering process, automatically adjusts the calculation cycle according to load fluctuation characteristics, and automatically generates an electricity replenishment confirmation. The S200 portable field calibrator is equipped with a virtual load signal source for generating and measuring virtual load signals. The S300 performs intelligent identification of incorrect wiring and power recovery for incorrect wiring. It also performs composite error event recovery and event segment recovery for multiple error events and multiple error events superimposed on each other. The S400 automatically detects clamp meter errors and performs error self-correction; it establishes an intelligent management platform for load measurement, intelligently recommends the optimal compensation scheme, assesses the health status of metering devices, and predicts potential system failures.

[0021] In one embodiment, S100 includes: S101, real-time sampling of current data during the metering process, combined with voltage signals sampled from the junction box, to calculate the supplementary electricity consumption during the metering process; S102 automatically adjusts the calculation cycle according to the load fluctuation characteristics, and maintains calculation accuracy when the load fluctuation increases; S103: Based on the calculation results, automatically generate a power replenishment confirmation form according to the set specification template, and set up a Bluetooth printing output device to print the power replenishment confirmation form. The calculation of supplementary electricity consumption during the metering process includes: establishing a supplementary electricity consumption calculation model based on the current data during the metering process and the voltage signal sampled from the junction box: ΔE=(P0 / P-1)×ΔEp×K; where ΔE is the supplementary electricity consumption, P0 is the normal power value, P is the abnormal power value of the error event, ΔEp is the power change value of the error event over a segmented time, and K is the multiplier of the measuring transformer meter; based on the supplementary electricity consumption calculation model, the supplementary electricity consumption during the metering process is obtained by accumulating the time during the metering process.

[0022] 1.2 Implementation method for live meter replacement and power supply recovery Implementation steps: 1. The voltage line is clamped in the junction box, and the clamp meter is clamped on the shorted current line.

[0023] 2. Control (3 / Function Expansion) → Select (Replace Table and Supplement) to enter the Replace Table and Supplement interface.

[0024] 3. Select the input method, electricity billing mode, and on-site metering rate. Enter the meter number and confirm that the time is accurate.

[0025] 4. Control (F5) to start real-time power calculation.

[0026] 5. The system displays the load curve, cumulative power consumption, and estimated additional power consumption in real time.

[0027] 6. After the meter replacement is completed, pause the control (F5), and the system will automatically calculate the amount of electricity to be refunded or replenished during the meter replacement period.

[0028] 7. Control (F4) to count the electricity consumption during the meter replacement period and generate an electricity consumption supplement confirmation.

[0029] 8. Connect to a portable printer via Bluetooth and print the confirmation letter.

[0030] Technical principle: Real-time power calculation cycle: Set an adjustable power calculation cycle to adapt to different load fluctuations; Automatic power factor detection: Automatically identifies power factors within the detection range; Power consumption calculation error: ≤0.5% It supports multiple billing modes: single electricity price, time-of-use electricity price, and tiered electricity price.

[0031] In one embodiment, S200 includes: S201 uses a portable signal source module to output a load output signal that simulates the actual load. By adjusting the signal frequency, signal amplitude, and signal phase, it can simulate various load characteristics within the power factor range. S202 automatically identifies the wiring method of the three-phase energy meter measurement circuit for different wiring methods and configures the signal path, injecting the signal into the primary side or secondary circuit of the metering device; the wiring methods of the three-phase energy meter measurement circuit include: three-phase four-wire method and three-phase three-wire method; S203, by injecting a test signal into the secondary circuit, measures the voltage-current relationship, calculates the impedance parameters of the PT / CT secondary circuit, and evaluates the impact of the secondary circuit on the measurement accuracy; S204, establish a closed-loop calibration mechanism between the signal source output and the calibrator measurement, eliminate virtual load signal error, and construct a virtual load signal source; the virtual load signal error range is controlled within ±0.5%.

[0032] 1. Virtual Load Measurement Implementation Method 1.1 Example of Wiring Inspection During Power Outage Implementation steps: 1. Connect the signal source and the calibrator according to the configured wiring method: Three-phase four-wire connection: Connect signal sources AP1, BP1, and CP1 to the A, B, and C phase P1 ports of the primary side of the high-voltage metering device, connect AP2, BP2, and CP2 to the P2 port, and ground N; connect the secondary side voltages A, B, C, and N to the main unit voltage test terminals, and connect IA, IB, and IC through the main unit current clamp. Three-phase three-wire connection: Connect the signal sources AP1, BP1, CP1, AP2, and CP2 to the A, B, and C phase P1 ports and the A and C phase P2 ports on the primary side of the transformer, respectively; connect the secondary side voltages ABC to the main unit voltage test terminals A, N, and C, and connect IA and IC through the main unit current clamp.

[0033] 2. Control System → (3 / Function Expansion) → (Power Outage Cable Check), enter the power outage cable check interface.

[0034] 3. Control (F2) to select the corresponding wiring method (three-phase three-wire or three-phase four-wire).

[0035] 4. Control (F1) to start the line check. The system will automatically output a virtual load signal and perform measurements.

[0036] 5. The system automatically analyzes the wiring correctness and displays a vector diagram and error type.

[0037] 6. Control the storage and saving of the trace results.

[0038] Technical principle: The operating voltage range of the switching power supply includes 57.7V to 480V; the voltage range includes 40-480V. Current range: Terminal input current includes: 5A, 1A; Clamp meter input current includes: 5A, 20A, 100A, 500A, 1000A, 1500A, using flexible clamp meter, one-time overload; Signal frequency: Adjustable to simulate the actual power grid frequency; Power factor: Adjustable to simulate different load characteristics; Partial measurement index parameter table:

[0039] 1.2 Impedance Test Example Implementation steps: 1. Connect according to the wiring instructions: PT mode: Connect AP1 and the common terminal (N is the common terminal in three-phase four-wire mode, and BP1 is the common terminal in three-phase three-wire mode) to the secondary circuit; CT method: Connect AP1 and AP2 to the secondary circuit, and do the same for the other two.

[0040] 2. Control (System) → (3 / Function Expansion) → (Impedance Test) to enter the impedance test interface.

[0041] 3. Control (F1) selects the wiring type (PT or CT), (F2) selects the test method.

[0042] 4. Control (confirm) to start the test. The system will automatically output test signals and measure the response.

[0043] 5. The system automatically calculates the impedance parameters of the PT secondary circuit (100Ω 8KΩ) or CT secondary circuit (0.2Ω 50Ω).

[0044] 6. Control (store) and save impedance data.

[0045] Technical principle: According to the transformer ratio measurement error table:

[0046] Secondary circuit impedance measurement error:

[0047] Signal amplitude: Automatically adjusted according to the characteristics of the secondary circuit.

[0048] In one embodiment, S300 includes: S301, based on vector analysis, intelligently identifies and determines incorrect wiring in the three-phase energy meter's measuring circuit; incorrect wiring includes: 48 types of three-phase three-wire wiring and 96 types of three-phase four-wire wiring. S302 performs compound error event recovery for multiple error events and multiple error events superimposed on each other; S303 automatically segments continuous events according to the start and end times of the events and automatically calculates the supplementary power for each segment. Multiple error events include: electricity meter wiring error, undervoltage event, loss of voltage event, overvoltage event, and phase loss event; composite error event compensation is based on the superposition of multiple error event types and durations, and intelligently removes the duplicate metering data after superposition to compensate for electricity consumption; significantly improving the accuracy of electricity consumption compensation.

[0049] 1.3 Implementation Method for Intelligent Identification and Power Compensation Calculation of Incorrect Wiring 1.3.1 Identification of incorrect wiring Implementation steps: 1. Use the (2 / Check Line) key to enter the Check Line example page; 2. Control (↑↓) to select the power factor (generally choose one greater than 0.5L); 3. The system automatically identifies the wiring status and displays a vector diagram and error type; 4. Control (store) and save the trace results; Technical principle: Identify 48 common wiring errors in three-phase three-wire systems and 96 common wiring errors in three-phase four-wire systems; The system combines automatic power factor detection with preset selection. 1.3.2 Power Supply Compensation Calculation Implementation steps: 1. Enter the power recovery instance module; 2. Generate an event statistics table, read all alarm events from the meter via RS485, and sort them by cumulative time; 3. Select the alarm event type that needs to be updated (undervoltage, loss of voltage, overvoltage, phase loss, etc.), and click (OK) to check the box; 4. Read table events, and read detailed parameters such as start and end times and power changes of selected events; 5. Check the wiring to confirm the type of current wiring error; 6. Power replenishment calculation: The system automatically calculates the correction factor and the replenishment power. 7. Store and save the supplementary calculation results; Technical principle: Automatic segmentation based on multiple events, and automatic segmentation and calculation based on the start and end times of the events; automatic calculation of average power factor based on historical settlement data.

[0050] In one embodiment, S400 includes: The S401 automatically detects clamp meter errors and performs clamp meter self-correction by comparing the clamp meter measurement values ​​with the built-in standard source; clamp meter errors are corrected without replacing hardware. S402 monitors the jaw closure status and jaw cleanliness in real time, prompting users to perform jaw maintenance. S403, data cloud synchronous networking, enables real-time uploading, management and maintenance of test data, intelligent recommendation of the best follow-up solution, assessment of the health status of metering devices, and prediction of potential system failures; S403 includes: The S4031 enables real-time uploading, management, and maintenance of test data through Wi-Fi, Bluetooth, and mobile terminal networking. S4032 intelligently recommends the optimal supplementary load solution based on historical load data and current measurement results; S4033 analyzes multiple verification data to assess the health status of the metering device and predict potential system failures. By evaluating the metering error value, signal response speed, and parameter fluctuation amplitude data under various load conditions in different operating cycles of the metering device, and comparing the historical verification baseline of historical load data with multiple verification data, the hidden deviations and abnormal fluctuation patterns in the verification data are screened out, and the random error interference of a single verification is eliminated. The health status of metering devices is assessed from three dimensions: hardware, software, and environmental adaptation. The hardware dimension assesses the sensor sensitivity decay and circuit component aging of the three-phase energy meter. The software dimension verifies calculation accuracy deviations. The environmental dimension analyzes the long-term impact of temperature, humidity, and electromagnetic interference on the device. A multi-level health assessment system (good, warning, abnormal) is established to obtain the metering device's health status assessment results. Based on the metering device's health status assessment results, machine learning fault tree analysis tools are used to analyze potential fault types and predict potential system faults. Targeted maintenance plans are output in advance. Based on potential system faults, historical load data and current measurement results are combined with potential faults to optimize follow-up plans, reducing the error between generated and actual follow-up data, and intelligently recommending the optimal follow-up plan. Potential fault types include: three-phase energy meter signal transmission interruption and three-phase energy meter metering accuracy exceeding tolerance. This significantly reduces metering inaccuracies and system downtime caused by sudden faults.

[0051] 1.4 Clamp Meter Self-Correction Implementation Method Implementation steps: 1. Turn on the instrument, connect the A, B, and C three-phase clamp meters to the clamp meter ports of the instrument, and place it flat on the table; 2. Control (self-test) → Enter password → (2) Enter clamp meter error correction interface; 3. Control (F1) to select the clamp meter type (5A, 100A, 500A, etc.), and press (OK) to start the correction; 4. The system automatically performs error detection and correction, a process that takes approximately 3 minutes; 5. After the correction is complete, use the control (exit) key to return to the main interface; Technical principle: Error detection accuracy: ±0.05% Correction range: ±2% (e.g., for 5A clamp meters) Corrected accuracy: 0.2 class (5A clamp meter) It can perform self-calibration using internal standards without the need for an external standard source.

[0052] This invention relates to a virtual load measurement system based on convenient on-site calibration of three-phase energy meters, comprising: The intelligent power consumption tracking system for meter replacement samples the power meter information data in real time during the metering process, automatically adjusts the calculation cycle according to the load fluctuation characteristics, and automatically generates a power consumption tracking confirmation. The virtual load measurement subsystem uses a portable field calibrator to set up a virtual load signal source for virtual load signal generation and measurement calibration. The intelligent identification subsystem for incorrect wiring performs intelligent identification of incorrect wiring and power recovery for incorrect wiring. It also performs composite error event recovery and event segment recovery for multiple error events and multiple error events superimposed on each other. The clamp meter self-correcting intelligent management subsystem automatically detects clamp meter errors and performs error self-correction; it establishes a load measurement intelligent management platform, intelligently recommends the optimal compensation scheme, assesses the health status of metering devices, and predicts potential system failures.

[0053] In one embodiment, the intelligent meter replacement power tracking system includes: The meter replacement power consumption model subsystem samples current data in real time during the metering process and combines it with the voltage signal sampled from the junction box to calculate the supplementary power consumption during the metering process. The load fluctuation adaptive subsystem automatically adjusts the calculation cycle according to the characteristics of load fluctuation, and maintains calculation accuracy when load fluctuations increase. The intelligent power replenishment confirmation subsystem automatically generates a power replenishment confirmation form according to the calculation results and the set standard template, and sets up a Bluetooth printing output device to print the power replenishment confirmation form; The calculation of supplementary electricity consumption during the metering process includes: establishing a supplementary electricity consumption calculation model based on the current data during the metering process and the voltage signal sampled from the junction box: ΔE=(P0 / P-1)×ΔEp×K; where ΔE is the supplementary electricity consumption, P0 is the normal power value, P is the abnormal power value of the error event, ΔEp is the power change value of the error event over a segmented time, and K is the multiplier of the measuring transformer meter; based on the supplementary electricity consumption calculation model, the supplementary electricity consumption during the metering process is obtained by accumulating the time during the metering process.

[0054] In one embodiment, the virtual load measurement subsystem includes: The signal source integrated subsystem uses a portable signal source module to output a load output signal that simulates the actual load. It adjusts the signal frequency, signal amplitude, and signal phase to simulate various load characteristics within the power factor range. The adaptive wiring subsystem automatically identifies the wiring method of the three-phase energy meter measurement circuit for different wiring methods and configures the signal path, injecting the signal into the primary side or secondary circuit of the metering device; the wiring methods of the three-phase energy meter measurement circuit include: three-phase four-wire method and three-phase three-wire method; The parameter measurement and calculation subsystem injects test signals into the secondary circuit, measures the voltage-current relationship, calculates the impedance parameters of the PT / CT secondary circuit, and evaluates the impact of the secondary circuit on the measurement accuracy. The virtual load calibration subsystem establishes a closed-loop calibration mechanism between the signal source output and the calibrator measurement, eliminates virtual load signal errors, and constructs a virtual load signal source; the virtual load signal error range is controlled within ±0.5%.

[0055] In one embodiment, the intelligent faulty wiring identification subsystem includes: The intelligent wiring identification subsystem uses vector analysis to intelligently identify and determine incorrect wiring in the three-phase energy meter's measuring circuit. Incorrect wiring includes 48 types of three-phase three-wire wiring and 96 types of three-phase four-wire wiring. The multi-event overlay and recovery subsystem performs complex error event recovery for multiple error events and multiple overlay error events; The automatic event segmentation subsystem automatically segments continuous events according to their start and end times and automatically calculates the supplementary power for each segment. Multiple error events include: electricity meter wiring error, undervoltage event, loss of voltage event, overvoltage event, and phase loss event; composite error event compensation is based on the superposition of multiple error event types and durations, and intelligently removes the duplicate metering data after superposition to compensate for electricity consumption; significantly improving the accuracy of electricity consumption compensation.

[0056] In one embodiment, the clamp meter self-correcting intelligent management subsystem includes: The clamp meter error automatic detection subsystem automatically detects clamp meter errors by comparing the clamp meter measurement values ​​with the built-in standard source and performs clamp meter self-correction; clamp meter errors are corrected without replacing hardware. The jaw status monitoring subsystem monitors the jaw closure status and jaw cleanliness in real time, prompting users to perform jaw maintenance. The intelligent load measurement management platform, with data cloud synchronization networking, enables real-time uploading, management, and maintenance of test data, intelligently recommends the optimal supplementary solution, assesses the health status of metering devices, and predicts potential system failures.

[0057] Real-time monitoring of the jaw closure status and cleanliness, prompting users to perform jaw maintenance includes: embedding two sets of miniature pressure sensors inside the jaws at the closed position, and installing a laser displacement sensor at the jaw body connecting shaft; the pressure sensors collect the contact pressure value during closure in real time, and the laser displacement sensor simultaneously captures the jaw opening and closing gap, collaboratively determining that if the pressure at the jaw closure position is greater than or equal to a set pressure threshold, and the jaws are closed without gap, then the jaw closure status is normal; if there are foreign objects in the jaws, causing the jaw closure gap to widen, then the jaw closure status is determined to be abnormal; avoiding misjudgment by a single sensor; a miniature high-definition camera is integrated on one side of the jaw laser displacement sensor. A ring-shaped fiber optic waveguide illumination strip is set along the edge of the jaws. One end of the ring-shaped fiber optic waveguide illumination strip is positioned around the laser emission port of the laser displacement sensor. Locally scattered light from the laser beam emitted from the laser emission port enters the ring-shaped fiber optic waveguide illumination strip from one end, adjusting the brightness around the jaws. A camera captures images of the jaw surface, and a microprocessor identifies and monitors oil stains, debris, and other residues on the jaws. When abnormal closure or insufficient cleanliness occurs, an audible and visual alarm is immediately triggered, and an alarm signal is sent. Data information is transmitted wirelessly to prompt the user to perform jaw maintenance, significantly improving the operational safety and stability of the clamping device.

[0058] Implementation of Intelligent Management Platform for Load Measurement Implementation steps: 1. The instrument connects to the mobile terminal via WIFI or Bluetooth: Bluetooth connection: Control (System) → (6 / Connect Platform APP Running Device), the platform APP running device runs the field calibration instrument terminal APP to scan and connect to the device; WIFI connection: The instrument creates a WIFI hotspot, and the platform APP runs the APP after the device connects to it to exchange data; 2. View real-time measurement data, historical records, and analysis reports on your mobile device; 3. Remote control, parameter setting, and data export are performed via the APP; 4. Test data is automatically uploaded to the backend management software, generating standardized reports; 5. The back-end software is integrated with the marketing system to achieve data sharing and business collaboration; Technical principles: Significantly reduced data synchronization latency; supports simultaneous connection of multiple instruments; encrypted data transmission to maintain information security; integration with various marketing systems; The intelligent load measurement management platform includes: a data cloud synchronization module, which enables real-time uploading of test data for management and maintenance via WIFI, Bluetooth, and mobile terminal networking; an intelligent power compensation decision module, which intelligently recommends the optimal compensation scheme based on historical load data and current measurement results; and a metering device health assessment module, which analyzes multiple calibration data to assess the health status of the metering device and predict potential system failures. By assessing the metering error value, signal response speed, and parameter fluctuation amplitude data under various load conditions in different operating cycles of the metering device, and comparing it with the historical calibration baseline of historical load data and multiple calibration data, the platform filters out hidden deviations and abnormal fluctuation patterns in the calibration data, and eliminates the interference of random errors from a single calibration. The health status of metering devices is assessed from three dimensions: hardware, software, and environmental adaptation. The hardware dimension assesses the sensor sensitivity decay and circuit component aging of the three-phase energy meter. The software dimension verifies calculation accuracy deviations. The environmental dimension analyzes the long-term impact of temperature, humidity, and electromagnetic interference on the device. A multi-level health assessment system (good, warning, abnormal) is established to obtain the metering device's health status assessment results. Based on the metering device's health status assessment results, machine learning fault tree analysis tools are used to analyze potential fault types and predict potential system faults. Targeted maintenance plans are output in advance. Based on potential system faults, historical load data and current measurement results are combined with potential faults to optimize follow-up plans, reducing the error between generated and actual follow-up data, and intelligently recommending the optimal follow-up plan. Potential fault types include: three-phase energy meter signal transmission interruption and three-phase energy meter metering accuracy exceeding tolerance. This significantly reduces metering inaccuracies and system downtime caused by sudden faults.

[0059] Although embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the specification and embodiments. They can be applied to various fields suitable for the present invention. Other modifications can be easily made by those skilled in the art. Therefore, without departing from the general concept defined by the claims and their equivalents, the present invention is not limited to the specific details and illustrations shown and described herein.

Claims

1. A virtual load measurement method based on convenient on-site verification of three-phase energy meters, characterized in that, include: S100 samples electricity meter information data in real time during the metering process, automatically adjusts the calculation cycle according to load fluctuation characteristics, and automatically generates an electricity replenishment confirmation. The S200 portable field calibrator is equipped with a virtual load signal source for generating and measuring virtual load signals. The S300 performs intelligent identification of incorrect wiring and power recovery for incorrect wiring. It also performs composite error event recovery and event segment recovery for multiple error events and multiple error events superimposed on each other. The S400 automatically detects clamp meter errors and performs error self-correction; it establishes an intelligent management platform for load measurement, intelligently recommends the optimal compensation scheme, assesses the health status of metering devices, and predicts potential system failures.

2. The virtual load measurement method based on convenient on-site verification of three-phase energy meters according to claim 1, characterized in that, S100 includes: S101, real-time sampling of current data during the metering process, combined with voltage signals sampled from the junction box, to calculate the supplementary electricity consumption during the metering process; S102 automatically adjusts the calculation cycle according to the load fluctuation characteristics, and maintains calculation accuracy when the load fluctuation increases; S103: Based on the calculation results, automatically generate a power replenishment confirmation form according to the set specification template, and set up a Bluetooth printing output device to print the power replenishment confirmation form.

3. The virtual load measurement method based on convenient on-site verification of three-phase energy meters according to claim 1, characterized in that, S200 includes: S201 uses a portable signal source module to output a load output signal that simulates the actual load. By adjusting the signal frequency, signal amplitude, and signal phase, it can simulate various load characteristics within the power factor range. S202 automatically identifies the wiring method of the three-phase energy meter measurement circuit for different wiring methods and configures the signal path, injecting the signal into the primary side or secondary circuit of the metering device; the wiring methods of the three-phase energy meter measurement circuit include: three-phase four-wire method and three-phase three-wire method; S203, by injecting a test signal into the secondary circuit, measures the voltage-current relationship, calculates the impedance parameters of the PT / CT secondary circuit, and evaluates the impact of the secondary circuit on the measurement accuracy; S204. Establish a closed-loop calibration mechanism between the signal source output and the calibrator measurement to eliminate virtual load signal errors and construct a virtual load signal source.

4. The virtual load measurement method based on convenient on-site verification of three-phase energy meters according to claim 1, characterized in that, The S300 includes: S301, based on vector analysis, intelligently identifies and determines incorrect wiring in the three-phase energy meter's measuring circuit; incorrect wiring includes: 48 types of three-phase three-wire wiring and 96 types of three-phase four-wire wiring. S302 performs compound error event recovery for multiple error events and multiple error events superimposed on each other; S303 automatically segments continuous events based on the start and end times of the events and automatically calculates the supplementary power for each segment.

5. The virtual load measurement method based on convenient on-site verification of three-phase energy meters according to claim 1, characterized in that, The S400 includes: The S401 automatically detects clamp meter errors and performs clamp meter self-correction by comparing the clamp meter measurement values ​​with the built-in standard source; clamp meter errors are corrected without replacing hardware. S402 monitors the jaw closure status and jaw cleanliness in real time, prompting users to perform jaw maintenance. S403, a data cloud synchronous network, enables real-time uploading, management, and maintenance of test data, intelligently recommends the optimal follow-up solution, assesses the health status of metering devices, and predicts potential system failures.

6. A virtual load measurement system based on convenient on-site calibration of three-phase energy meters, characterized in that, include: The intelligent power consumption tracking system for meter replacement samples the power meter information data in real time during the metering process, automatically adjusts the calculation cycle according to the load fluctuation characteristics, and automatically generates a power consumption tracking confirmation. The virtual load measurement subsystem uses a portable field calibrator to set up a virtual load signal source for virtual load signal generation and measurement calibration. The intelligent identification subsystem for incorrect wiring performs intelligent identification of incorrect wiring and power recovery for incorrect wiring. It also performs composite error event recovery and event segment recovery for multiple error events and multiple error events superimposed on each other. The clamp meter self-correcting intelligent management subsystem automatically detects clamp meter errors and performs error self-correction; it establishes a load measurement intelligent management platform, intelligently recommends the optimal compensation scheme, assesses the health status of metering devices, and predicts potential system failures.

7. The virtual load measurement system based on convenient on-site calibration of three-phase energy meters according to claim 6, characterized in that, The meter replacement intelligent power tracking system includes: The meter replacement power consumption model subsystem samples current data in real time during the metering process and combines it with the voltage signal sampled from the junction box to calculate the supplementary power consumption during the metering process. The load fluctuation adaptive subsystem automatically adjusts the calculation cycle according to the characteristics of load fluctuation, and maintains calculation accuracy when load fluctuations increase. The intelligent power replenishment confirmation subsystem automatically generates a power replenishment confirmation form according to the calculation results and the set template, and sets up a Bluetooth printing output device to print the power replenishment confirmation form.

8. The virtual load measurement system based on convenient on-site calibration of three-phase energy meters according to claim 6, characterized in that, The virtual load measurement subsystem includes: The signal source integrated subsystem uses a portable signal source module to output a load output signal that simulates the actual load. It adjusts the signal frequency, signal amplitude, and signal phase to simulate various load characteristics within the power factor range. The adaptive wiring subsystem automatically identifies the wiring method of the three-phase energy meter measurement circuit for different wiring methods and configures the signal path, injecting the signal into the primary side or secondary circuit of the metering device; the wiring methods of the three-phase energy meter measurement circuit include: three-phase four-wire method and three-phase three-wire method; The parameter measurement and calculation subsystem injects test signals into the secondary circuit, measures the voltage-current relationship, calculates the impedance parameters of the PT / CT secondary circuit, and evaluates the impact of the secondary circuit on the measurement accuracy. The virtual load calibration subsystem establishes a closed-loop calibration mechanism between the signal source output and the calibrator measurement, eliminates virtual load signal errors, and constructs a virtual load signal source.

9. The virtual load measurement system based on convenient on-site calibration of three-phase energy meters according to claim 6, characterized in that, The intelligent wiring error identification subsystem includes: The intelligent wiring identification subsystem uses vector analysis to intelligently identify and determine incorrect wiring in the three-phase energy meter's measuring circuit. Incorrect wiring includes 48 types of three-phase three-wire wiring and 96 types of three-phase four-wire wiring. The multi-event overlay and recovery subsystem performs complex error event recovery for multiple error events and multiple overlay error events; The event automatic segmentation subsystem automatically segments continuous events according to the start and end times of the events and automatically calculates the supplementary power for each segment.

10. The virtual load measurement system based on convenient on-site calibration of three-phase energy meters according to claim 6, characterized in that, The clamp meter self-correcting intelligent management subsystem includes: The clamp meter error automatic detection subsystem automatically detects clamp meter errors by comparing the clamp meter measurement values ​​with the built-in standard source and performs clamp meter self-correction; clamp meter errors are corrected without replacing hardware. The jaw status monitoring subsystem monitors the jaw closure status and jaw cleanliness in real time, prompting users to perform jaw maintenance. The intelligent load measurement management platform, with data cloud synchronization networking, enables real-time uploading, management, and maintenance of test data, intelligently recommends the optimal supplementary solution, assesses the health status of metering devices, and predicts potential system failures.