A hierarchical collaborative scheduling method and device for a multi-type battery hybrid energy storage system

By constructing a hierarchical optimization scheduling model and a closed-loop feedback mechanism, the optimal power allocation ratio of the battery pack is dynamically calculated, which solves the problem of resource allocation imbalance in multi-type battery hybrid energy storage systems under load fluctuations and electricity price changes, and realizes efficient energy storage system management and extended battery pack life.

CN123121591APending Publication Date: 2026-11-17HUANENG DONGJIAKOU (QINGDAO) THERMAL POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611197120.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-07
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing hybrid battery energy storage systems fail to autonomously calculate and dynamically adjust the output distribution ratio of each energy storage module based on real-time operating conditions, and lack closed-loop feedback correction capabilities. This results in the energy storage system being unable to effectively smooth out peak loads and fill valleys when load fluctuates and electricity prices change, leading to resource allocation imbalances and accelerated battery pack wear.

Method used

A hierarchical optimization scheduling model is constructed. By collecting parameters such as load demand, battery pack state of charge and health status, the optimal output allocation ratio of aluminum-air, hydrogen fuel and lead-lithium battery packs is dynamically calculated, and a closed-loop feedback mechanism is used to correct it in real time to achieve coordinated scheduling of each battery pack.

Benefits of technology

It improves the resource utilization efficiency of multi-type battery hybrid energy storage systems, extends the service life of battery packs, reduces the overall energy costs for power generation and consumption enterprises, and ensures power supply reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121591A_ABST
    Figure CN123121591A_ABST
Patent Text Reader

Abstract

The application discloses a layered collaborative scheduling method and device of a multi-type battery hybrid energy storage system, collects various operation parameters of a power consumption side, calculates a prediction value, sets corresponding priority weight coefficients for multi-type battery groups, constructs a layered scheduling target function, and solves to obtain an optimal output distribution ratio of each battery group in a current scheduling period; based on the current being in a power consumption peak period or a power consumption valley period, a peak scheduling mode and a valley scheduling mode are correspondingly divided, the valley period preferentially utilizes a first energy storage power supply group to complete power conversion, and a second energy storage power supply group is charged for energy storage; the peak period sends an output instruction to each type of battery group according to the optimal output distribution ratio, collaboratively supplies power for the power consumption side, and finally adopts a period rolling sampling mode to cyclically execute an overall scheduling process. The application fully adapts to the differentiated working characteristics of multi-type heterogeneous batteries, and effectively improves the peak load shifting and valley filling accuracy, operation stability and resource utilization efficiency of the hybrid energy storage system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power system energy storage technology, specifically relating to a hierarchical collaborative scheduling method and device for a multi-type battery hybrid energy storage system. Background Technology

[0002] The inherent mismatch between supply and demand timing between the generation and consumption sides has long existed in the operation of the power system. For the generation side / power generation companies, conventional power sources such as coal-fired units are constrained by start-up and shutdown, and typically cannot be shut down during the off-peak electricity demand period from 11 PM to 6 AM the next day. This results in low unit utilization efficiency, high cost per unit of electricity generated, and increased pressure on pollution control for pollutants such as carbon dioxide and sulfur dioxide due to continuous operation. For the consumption side / electricity users, especially high-energy-consuming industrial users, production loads are concentrated during peak electricity demand periods, where peak electricity prices are significantly higher than off-peak prices. Although the power grid guides users to smooth out peak demand and fill off-peak periods through time-of-use pricing policies, users without their own energy storage facilities cannot effectively transfer peak loads to off-peak periods with lower electricity prices, thus failing to effectively reduce their own electricity costs.

[0003] To address the aforementioned issues, existing solutions involve installing an energy storage device at both the generation and consumption ends. Specifically, the output of the generation unit is connected to both the energy storage and consumption units. The energy storage unit consists of a primary energy storage module (aluminum-air battery pack, hydrogen fuel cell pack) and a secondary energy storage module (lead-lithium battery pack) connected sequentially. A separate energy storage module is then installed at the consumption end, connected to the secondary energy storage module via the power grid. While this approach does create a hardware-level energy storage layout with a "conversion on the generation side and buffering on the consumption side," a deeper analysis reveals several practical problems. These include: (I) Most existing hybrid energy storage solutions only specify the electrical connection topology between energy storage modules, without clarifying the output distribution of each energy storage unit under different operating conditions or defining the decision-making basis for the charge-discharge ratio. In short, existing solutions focus on solving the basic problem of "having the ability to store electrical energy" in energy storage systems, but fail to solve the core problem of "how to optimize and regulate" energy storage systems. The energy storage resource allocation scheme of such systems relies entirely on fixed operating modes preset by human experience, which is difficult to adapt to dynamic changes in operating conditions such as load fluctuations, time-of-use pricing, and battery health degradation. In actual operation, it is easy to produce unbalanced operating conditions such as insufficient charging capacity during off-peak hours, insufficient discharge power during peak hours, or some energy storage units continuously operating under heavy load while the rest are idle.

[0004] (II) The electrochemical characteristics of the three types of energy storage units—aluminum-air batteries, hydrogen fuel cells, and lead-acid batteries—differ significantly. Aluminum-air batteries are metal-air primary power sources with advantages such as high theoretical specific energy and low raw material costs. However, the metal anode is continuously consumed during discharge, making electrochemical reversible charging impossible. The output power of hydrogen fuel cells is limited by the gas production rate of the hydrogen production unit and the remaining hydrogen storage capacity, resulting in a lag effect in power response and an upper limit to usable capacity. Lead-acid batteries support bidirectional charge-discharge cycles, but frequent deep charge-discharge cycles can easily induce plate sulfation, causing rapid capacity decay. Existing hybrid energy storage systems mostly adopt a fixed cascaded architecture, failing to fully consider the inherent differences in response speed, usable capacity limit, and state of health (SOH) among the three types of batteries. This makes it difficult to achieve differentiated and dynamic output allocation, and long-term operation can easily lead to accelerated wear of individual energy storage units, restricting the overall peak-shaving capability and service life of the system.

[0005] (III) Existing energy storage dispatching schemes generally lack closed-loop feedback correction mechanisms. Energy storage dispatching strategies rely heavily on pre-load forecasting and electricity price period determination, but these inputs are inherently uncertain in actual grid operation scenarios. If the dispatching strategy adopts an open-loop operation mode, with parameters set once and not dynamically adjusted, the energy storage system's output will fail to meet real-time demand when there is a significant deviation between the load forecast and the actual load. This can easily lead to problems such as over-discharge of battery packs and waste of surplus energy, ultimately making it difficult to guarantee the peak-shaving and valley-filling effects and operational economy of the energy storage system.

[0006] In summary, existing technical solutions mainly address the structural problem of "how to connect" multiple types of batteries in hybrid energy storage. There is no method that can autonomously calculate and dynamically adjust the output distribution ratio of each energy storage module based on real-time operating conditions, and also possess closed-loop feedback correction capabilities. This is precisely the problem that this invention aims to solve. Summary of the Invention

[0007] The purpose of this invention is to overcome the shortcomings of existing technologies that only have energy storage structures and lack scheduling methods, and to provide a multi-battery energy storage collaborative scheduling power supply system and its scheduling method. This method constructs a hierarchical optimization scheduling model, dynamically calculating the optimal output allocation ratio among aluminum-air battery packs, hydrogen fuel cell packs, and lead-lithium battery packs based on multiple parameters such as real-time collected load demand, state of charge (SOC) and state of health (SOH) of each battery pack, electricity price periods, and hydrogen storage capacity. A closed-loop feedback mechanism is used to correct prediction deviations in real time, thereby improving the resource utilization efficiency of the multi-type battery hybrid energy storage system, extending the service life of the battery packs, and reducing the overall energy costs for power generation and consumption companies while ensuring power supply reliability.

[0008] To achieve the above objectives, the present invention adopts the following technical solution: In a first aspect, the present invention provides a hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system, characterized in that the steps include: S1: Collect the operating parameters of the electricity consumption side, combine historical load data and the operating parameters, use sliding window weighting and time period addition to predict the load demand in the next scheduling cycle, and calculate and generate the predicted value; S2: Set corresponding priority weight coefficients for multiple types of heterogeneous battery packs, construct a hierarchical scheduling objective function, and calculate the optimal output allocation ratio of each type of heterogeneous battery pack in the current scheduling cycle; S3: Based on the operating parameters, determine whether the current period is a low-electricity consumption period or a high-electricity consumption period, and divide the scheduling mode into low-electricity mode and high-electricity mode. S4: During the off-peak electricity consumption period, the electrical energy output from the power generation side is preferentially converted through the primary energy storage power group and then charged and stored in the secondary energy storage power group; during the peak electricity consumption period, based on the optimal output allocation ratio, output allocation instructions are issued to each type of battery group according to the optimal output allocation ratio, so that they can jointly supply power to the electricity consumption side. S5: When executing the power allocation command, continuously monitor the deviation between the actual output power and the predicted value, compare the deviation with a preset threshold, and selectively correct the weight coefficients in the hierarchical scheduling objective function based on the comparison results, and iterate the energy storage power allocation ratio; S6: After completing the energy storage output scheduling and correction within the current scheduling cycle, jump to S1 and start the scheduling process for the next sampling cycle, and execute cyclically.

[0009] Furthermore, in S1, the operating parameters include: the current load demand P_L on the electricity demand side, the remaining available capacity C_AL of the aluminum-air battery pack, the remaining available capacity C_H2 of the hydrogen fuel cell pack, and the current hydrogen storage capacity M_H2 of the water electrolysis device; it also includes the state of charge SOC_i and the health status SOH_i of the lead-lithium battery pack and the electricity storage device at the electricity demand side; as well as the current grid time-of-use price period flag T_flag and the ambient temperature θ.

[0010] Furthermore, in S1, the calculation of the predicted value is specifically performed using the following formula:

[0011] In the formula, P_(t-1), P_(t-2), and P_(t-3) are the actual load values ​​of the first three sampling periods, w1, w2, and w3 are the weighting coefficients of the sliding window, P_avg_T is the average load level of the same type of electricity price period in history, and k_T is the corresponding time period correction coefficient; where w1+w2+w3=1, the closer to the current time, the greater the weight; and then the predicted value is calculated. .

[0012] Furthermore, in S2, the multi-type heterogeneous battery packs include: aluminum-air battery packs, hydrogen fuel cell packs, and lead-lithium battery packs; the construction of the hierarchical scheduling objective function to calculate the optimal output allocation ratio of each heterogeneous battery pack in the current scheduling cycle is specifically calculated using the following formula:

[0013] In the formula, x = (α1, α2, α3) is the output distribution ratio vector to be solved, and α1, α2, and α3 correspond to the output ratios of the aluminum-air battery pack, the hydrogen fuel cell pack, and the lead-lithium battery pack, respectively; where α1+α2+α3=1 and 0≤αi≤αi_max are satisfied; f_cost(x) is the comprehensive energy cost function, f_loss(x) is the battery pack loss function, f_dev(x) is the supply-demand deviation function, and λ1, λ2, and λ3 are the corresponding weighting coefficients; Then, by using a constrained optimization algorithm to solve the objective function F(x), the optimal allocation ratio x that minimizes F(x) is obtained. .

[0014] Furthermore, S4 specifically includes: The time-of-use pricing flag T_flag of the current power grid is used to determine whether it is a low-consumption or high-consumption period; The issuance and execution of the power distribution command specifically involves issuing the power distribution command to the power conversion and equalization control circuits corresponding to each energy storage power source, adjusting the duty cycle of each branch conversion circuit by the multi-channel equalization controller, and then connecting to the power grid transmission channel after being processed by a bidirectional converter and inverter boost, and finally transmitting it to the power consumption side.

[0015] Furthermore, in S5, the step of selectively correcting the weight coefficients in the hierarchical scheduling objective function based on the comparison results specifically includes: When the deviation is less than the preset threshold, the current output allocation ratio is maintained until the end of the current scheduling cycle; When the deviation exceeds the preset threshold, the weight coefficients in the hierarchical scheduling objective function are automatically corrected, the optimization calculation in S2 is re-executed, the corrected allocation ratio is obtained and redistributed, and this process is repeated iteratively until the deviation is within the preset threshold range.

[0016] Secondly, the present invention also provides a hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system, characterized in that it includes a power generation unit, an energy storage unit, an energy consumption unit, a multi-source information acquisition unit, a collaborative scheduling control unit, and a power conversion and multi-path equalization control circuit, wherein... The power generation unit has its output terminal connected to the energy storage unit and the power consumption unit. The energy storage unit, with its output end connected to the power consumption unit, consists of a primary energy storage module and a secondary energy storage module connected in sequence. The power consumption unit is equipped with a power consumption end power storage module that interfaces with the secondary power storage module. The secondary power storage module and the power consumption end power storage module are connected through a power grid transmission channel. The multi-source information acquisition unit is responsible for capturing in real time the load requirements of the power-consuming unit, the remaining capacity of the aluminum-air battery pack and the hydrogen fuel cell pack, the state of charge and health status of the lead-lithium battery pack and the power-consuming end energy storage module, the hydrogen storage capacity of the water electrolysis unit, the current electricity price period, and the ambient temperature parameters. The collaborative scheduling unit is responsible for communicating with the multi-source information acquisition unit, acquiring all acquired parameters, and then running a hierarchical optimization scheduling algorithm to calculate the optimal output allocation instruction for each energy storage module in the current scheduling cycle. The power conversion and multi-channel equalization control circuit is used to receive the optimal output allocation command and adjust the DC / DC conversion circuits of each branch through the internal multi-channel equalization controller to realize the issuance and execution of the output command.

[0017] Furthermore, the primary energy storage module includes an aluminum-air battery pack and a hydrogen fuel cell pack arranged in parallel; the secondary energy storage module includes a lead-lithium battery pack.

[0018] Thirdly, the present invention also provides an electronic device, characterized in that it comprises: Processor, communication interface, memory, and communication bus; The processor, communication interface, and memory communicate with each other via a communication bus. The memory is used to store computer programs and collected power operation parameters; When the processor executes the computer program stored in the memory, it implements the hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system as described above, or the hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system as described above.

[0019] Fourthly, the present invention also provides a computer-readable storage medium including a computer program, characterized in that, when the computer program processor executes, it implements the hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system as described in any one of the preceding claims, or the hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system as described in any one of the preceding claims.

[0020] A further improvement of this invention lies in the addition of two technical components: multi-source information acquisition and collaborative scheduling control, based on existing hardware technology. By capturing multiple parameters in real time, such as the load demand of power-consuming units, the state of charge (SOC) and state of health (SOH) of each battery pack, electricity price periods, and hydrogen storage capacity, the collaborative scheduling control obtains these parameters and then runs a hierarchical optimization scheduling algorithm to calculate the optimal output allocation command for each energy storage module in the current scheduling cycle. This command is then issued and executed through the power conversion and balancing control circuit.

[0021] Compared with existing technologies, the present invention has the following beneficial effects: By constructing a hierarchical optimization scheduling model, based on multiple parameters such as real-time collected load demand, state of charge (SOC) and state of health (SOH) of each battery pack, electricity price period, and hydrogen storage capacity, the optimal output allocation ratio among aluminum-air battery packs, hydrogen fuel cell packs, and lead-lithium battery packs is dynamically calculated. The prediction deviation is corrected in real time through a closed-loop feedback mechanism, thereby improving the resource utilization efficiency of the multi-type battery hybrid energy storage system, extending the service life of the battery packs, and reducing the overall energy cost for power generation and power consumption companies while ensuring power supply reliability. Attached Figure Description

[0022] Figure 1 This is a diagram of the overall architecture of a multi-battery energy storage collaborative scheduling power supply system, which is disclosed in this invention as a hierarchical collaborative scheduling method and device for a multi-type battery hybrid energy storage system. Figure 2 This is a flowchart of a multi-battery energy storage collaborative scheduling control method for a hierarchical collaborative scheduling method and device for a multi-type battery hybrid energy storage system disclosed in this invention; Figure 3 This is a power conversion and multi-path equalization control circuit structure diagram of a hierarchical collaborative scheduling method and device for a multi-type battery hybrid energy storage system disclosed in this invention. Detailed Implementation

[0023] To further understand the content of this invention, the invention will be described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the embodiments are merely illustrative and not limiting of the invention.

[0024] In this embodiment, as Figure 2 As shown, this invention provides a hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system, the steps of which include: S1: Collect the operating parameters of the power consumption side, combine historical load data and the operating parameters, use sliding window weighting and time period addition to predict the load demand in the next scheduling cycle, and calculate and generate the predicted value.

[0025] Specifically, the collaborative scheduling control unit performs sampling according to a preset period, for example, once every 5 minutes; The system collects the current load demand P_L of the power-consuming unit; the remaining available capacity C_Al of the aluminum-air battery pack; the remaining available capacity C_H2 of the hydrogen fuel cell pack; and the current hydrogen storage capacity M_H2 of the water electrolysis unit; the state of charge SOC_i and health status SOH_i of the lead-lithium battery pack and the power-consuming energy storage module (i represents the battery pack number); the current time-of-use electricity price period flag T_flag; and the ambient temperature θ.

[0026] The collaborative scheduling control unit combines historical load data and currently collected parameters, and uses a sliding window weighted average plus time period correction to predict the load demand in the next scheduling cycle, obtaining the predicted value P_pred, calculated as follows: P_pred = w1·P_(t-1) + w2·P_(t-2) + w3·P_(t-3) + k_T · P_avg_T In the formula, P_(t-1), P_(t-2), and P_(t-3) are the actual load values ​​of the first three sampling periods, respectively; w1, w2, and w3 are the weighting coefficients of the sliding window, satisfying w1+w2+w3=1, with greater weights closer to the current time; P_avg_T is the average load level of historically similar electricity price periods, and k_T is the corresponding period correction coefficient. The predicted value calculated in this way is more accurate than simply setting a fixed threshold, better reflecting the trend of load changes and providing a basis for subsequent allocation decisions.

[0027] S2: Set corresponding priority weight coefficients for multiple types of heterogeneous battery packs, construct a hierarchical scheduling objective function, and calculate the optimal output allocation ratio of each type of heterogeneous battery pack in the current scheduling cycle.

[0028] Specifically, the heterogeneous battery packs described in this invention include: aluminum-air battery packs, hydrogen fuel cell packs, and lead-lithium battery packs. Preferably, the aluminum-air battery pack consists of 380-400 aluminum-air battery cells connected in series. Each battery cell weighs approximately 1 ton and has an output voltage of approximately 1.2V DC. The 380-400 cells connected in series, after being inverted, can generate 380V AC power. The theoretical power generation of the entire pack is approximately 3.04 million to 3.2 million kilowatt-hours.

[0029] The collaborative scheduling control unit assigns a corresponding priority weight coefficient to each type of battery pack based on the differences in technical characteristics among the three types of heterogeneous battery packs, and constructs the following hierarchical scheduling objective function F(x) to solve for the optimal power output allocation ratio of each battery pack in the current scheduling cycle: F(x) = λ1·f_cost(x) + λ2·f_loss(x) + λ3·f_dev(x) In the formula, x = (α1, α2, α3) is the output allocation ratio vector to be solved, where α1, α2, and α3 correspond to the output ratios of the aluminum-air battery pack, hydrogen fuel cell pack, and lead-lithium battery pack, respectively, satisfying α1+α2+α3=1 and 0≤αi≤αi_max; f_cost(x) is the comprehensive energy cost function, which measures the generation and purchase costs corresponding to different allocation ratios under the current electricity price period; f_loss(x) is the battery pack loss function, which measures the impact of different allocation ratios on the cycle life of each battery pack, with a penalty weight applied to the deep charge and discharge of the lead-lithium battery pack to prevent it from being excessively damaged; f_dev(x) is the supply-demand deviation function, which measures the difference between the total output after allocation and the predicted load P_pred in step S2; λ1, λ2, and λ3 are the corresponding weight coefficients, which can be preset according to the actual management objectives of the power generation company and the power consumption company (such as cost priority or lifespan priority), or can be adjusted by the operators. The collaborative scheduling control unit uses a constrained optimization algorithm (e.g., sequential quadratic programming) to solve for the objective function F(x), obtaining the optimal allocation ratio x that minimizes F(x). .

[0030] The above optimization solution process is preferentially executed periodically by the embedded processor in the collaborative scheduling control unit. The solution period is consistent with the sampling period described in S1 above to ensure the real-time performance of the scheduling decision.

[0031] S3: Based on the operating parameters, determine whether the current period is a low-electricity consumption period or a high-electricity consumption period, and divide the scheduling mode into low-electricity mode and high-electricity mode.

[0032] S4: During the off-peak electricity consumption period, the electrical energy output from the power generation side is preferentially converted through the primary energy storage power group and then charged and stored in the secondary energy storage power group; during the peak electricity consumption period, based on the optimal output allocation ratio, output allocation instructions are issued to each type of battery group according to the optimal output allocation ratio, so that they can jointly supply power to the electricity consumption side.

[0033] Specifically, based on the electricity price period flag T_flag in the operating parameters; In the off-peak mode (T_flag indicates the current off-peak electricity consumption period), the coordinated scheduling control unit prioritizes the electricity output from the power generation unit, which is then converted by the primary energy storage module (aluminum-air battery pack and hydrogen fuel cell pack) and used to charge the secondary energy storage module (lead-lithium battery pack). Simultaneously, hydrogen production is scheduled based on the surplus capacity of the water electrolysis unit, and stored concurrently to prepare for the output of the hydrogen fuel cell pack during peak periods. Furthermore, surplus electricity from the power generation unit is fed into the water electrolysis unit to produce hydrogen. The produced hydrogen is stored in a storage medium and then fed into the input of the hydrogen fuel cell pack for power generation. The byproduct oxygen can be sold.

[0034] In peak mode (T_flag indicates that the current electricity consumption period is peak), the optimal allocation ratio x obtained by the collaborative scheduling control unit in the above steps is... =(α1 , α2 , α3 The system sends output commands to the aluminum-air battery pack, hydrogen fuel cell pack, and lead-lithium battery pack in proportion, and all three supply power to the power-consuming unit together, which not only meets the load demand, but also distributes the output of each battery pack in a relatively reasonable manner.

[0035] This invention prioritizes transferring electrical energy from a primary energy storage power source to a secondary energy storage power source during off-peak hours, while simultaneously coordinating hydrogen production and storage via water electrolysis. During peak hours, multiple batteries work together to provide power. This approach helps power generation companies reduce generation costs and alleviate the pressure of pollution control, while also helping electricity consumers reduce peak electricity purchase costs.

[0036] S5: When executing the power allocation command, continuously monitor the deviation between the actual output power and the predicted value, compare the deviation with a preset threshold, and selectively correct the weight coefficients in the hierarchical scheduling objective function based on the comparison results, and iterate the energy storage output allocation ratio.

[0037] Specifically, such as Figure 3 As shown, the coordinated dispatch control unit sends the predetermined power allocation command to the power conversion and equalization control circuits corresponding to each energy storage module. The multi-channel equalization controller adjusts the PWM duty cycle of each branch DC / DC conversion circuit to achieve precise proportional distribution of the output power of the three branches of aluminum-air battery pack, hydrogen fuel cell pack, and lead-lithium battery pack. After processing by bidirectional DC / DC converter and inverter boost unit, the power is connected to the grid transmission channel and finally sent to the power consumption unit.

[0038] The present invention constructs the hierarchical scheduling objective function, which takes into account three factors: energy cost, battery loss and supply-demand deviation. It also adds a penalty weight specifically for deep charge and discharge of lead-lithium battery packs to avoid the battery packs from being damaged too quickly due to a fixed allocation ratio. This helps to extend the overall service life of the energy storage system and reduce equipment replacement and maintenance costs.

[0039] S6: After completing the energy storage output scheduling and correction within the current scheduling cycle, jump to S1 and start the scheduling process for the next sampling cycle, and execute cyclically.

[0040] Specifically, during the execution of instructions, the collaborative scheduling control unit continuously monitors the deviation ΔP = |P_real - P_pred| between the actual system output power P_real and the predicted target value P_pred in step S1, and compares this deviation with a preset threshold ΔP_th. If ΔP is less than the threshold, the current allocation ratio will be maintained until the end of the current scheduling cycle. If ΔP is greater than the threshold, it indicates a deviation between the current load forecast or allocation strategy and the actual situation. The collaborative scheduling control unit will automatically correct the weight coefficients in the objective function F(x) (for example, by increasing the weight λ3 of the f_dev(x) term), re-execute the optimization solution in step S2, obtain the corrected allocation ratio, and redistribute it. This process is repeated iteratively until the deviation converges to within the threshold range. After the scheduling and correction of this round of scheduling is completed, the collaborative scheduling control unit returns to step S1 and enters the next sampling cycle; this cycle continues to achieve continuous dynamic scheduling of the multi-battery energy storage system.

[0041] This invention employs a closed-loop feedback correction mechanism based on a deviation threshold, which automatically adjusts the allocation strategy and re-solves the problem when load forecasting deviates. Compared to the open-loop, one-time allocation method in existing technologies, this mechanism is significantly more capable of handling uncertainties in actual operating conditions, and its peak-shaving and valley-filling effects are more stable.

[0042] like Figure 1 As shown, in a second aspect, the present invention also provides a hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system, characterized in that it includes a power generation unit, an energy storage unit, an energy consumption unit, a multi-source information acquisition unit, a collaborative scheduling control unit, and a power conversion and multi-path equalization control circuit. (Note:) Figure 1 Solid lines represent electrical energy flow; dashed lines represent information / control flow. The power generation unit has its output terminal connected to the energy storage unit and the power consumption unit. The energy storage unit, with its output end connected to the power consumption unit, consists of a primary energy storage module and a secondary energy storage module connected in sequence. The primary energy storage module includes an aluminum-air battery pack and a hydrogen fuel cell pack arranged in parallel. The secondary energy storage module includes a lead-lithium battery pack (preferably a long-lasting, high-capacity lead-lithium battery pack, taking into account both bidirectional charge-discharge capability and cycle life). The power consumption unit is equipped with a power consumption end power storage module that interfaces with the secondary power storage module. The secondary power storage module and the power consumption end power storage module are connected through a power grid transmission channel. The multi-source information acquisition unit is responsible for capturing in real time the load requirements of the power-consuming unit, the remaining capacity of the aluminum-air battery pack and the hydrogen fuel cell pack, the state of charge and health status of the lead-lithium battery pack and the power-consuming end energy storage module, the hydrogen storage capacity of the water electrolysis unit, the current electricity price period, and the ambient temperature parameters. The collaborative scheduling control unit is responsible for communicating with the multi-source information acquisition unit, acquiring all acquired parameters, and then running a hierarchical optimization scheduling algorithm to calculate the optimal output allocation instruction for each energy storage module in the current scheduling cycle. The power conversion and multi-channel equalization control circuit is used to receive the optimal output allocation command and adjust the DC / DC conversion circuits of each branch through the internal multi-channel equalization controller to realize the issuance and execution of the output command.

[0043] This invention achieves real-time dynamic power distribution among three types of batteries: aluminum-air battery packs, hydrogen fuel cell packs, and lead-lithium battery packs, through a multi-source information acquisition module and a collaborative allocation control unit. Compared to existing technologies that only disclose fixed physical connection relationships, this invention clearly explains "how to allocate and based on what criteria," enabling adaptive adjustments based on changes in operating conditions such as load fluctuations and electricity price shifts, thus ensuring full utilization of energy storage resources.

[0044] like Figure 3As shown, to enable the aforementioned scheduling method and device to be implemented, this invention also includes a supporting power conversion and equalization control circuit. The aluminum-air battery pack and the hydrogen fuel cell pack, after passing through their respective DC / DC converters and current sampling circuits, are connected to a multi-channel equalization controller. The multi-channel equalization controller receives output allocation commands α1, α2, and α3 from the collaborative scheduling control unit, and achieves precise control of the output power of the two primary power supply branches by adjusting the PWM duty cycle of each branch. The output of the equalization controller is used to manage the charging and discharging of the secondary energy storage module (lead-lithium battery pack) via a bidirectional DC / DC converter. The output of the lead-lithium battery pack is then converted into 380V AC by an inverter boost unit, and further boosted to 110kV or even 220kV high-voltage AC, finally connected to the power grid transmission channel. With this circuit structure, the optimal output allocation ratio can be accurately calculated and executed at the hardware level, making the aforementioned hierarchical collaborative scheduling method and device feasible.

[0045] Thirdly, the present invention also provides an electronic device, characterized in that it comprises: Processor, communication interface, memory, and communication bus; The processor, communication interface, and memory communicate with each other via a communication bus. The memory is used to store computer programs and collected power operation parameters; When the processor executes the computer program stored in the memory, it implements the hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system as described above, or the hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system as described above.

[0046] Fourthly, the present invention also provides a computer-readable storage medium including a computer program, characterized in that, when the computer program processor executes, it implements the hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system as described in any one of the preceding claims, or the hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system as described in any one of the preceding claims.

[0047] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the specific implementation of the present invention. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system, characterized in that the steps include: include: S1: Collect the operating parameters of the electricity consumption side, combine historical load data and the operating parameters, use sliding window weighting and time period addition to predict the load demand in the next scheduling cycle, and calculate and generate the predicted value; S2: Set corresponding priority weight coefficients for multiple types of heterogeneous battery packs, construct a hierarchical scheduling objective function, and calculate the optimal output allocation ratio of each type of heterogeneous battery pack in the current scheduling cycle; S3: Based on the operating parameters, determine whether the current period is a low-electricity consumption period or a high-electricity consumption period, and divide the scheduling mode into low-electricity mode and high-electricity mode. S4: During the off-peak electricity consumption period, the electrical energy output from the power generation side is preferentially converted through the primary energy storage power group and then charged and stored in the secondary energy storage power group; during the peak electricity consumption period, based on the optimal output allocation ratio, output allocation instructions are issued to each type of battery group according to the optimal output allocation ratio, so that they can jointly supply power to the electricity consumption side. S5: When executing the power allocation command, continuously monitor the deviation between the actual output power and the predicted value, compare the deviation with a preset threshold, and selectively correct the weight coefficients in the hierarchical scheduling objective function based on the comparison results, and iterate the energy storage power allocation ratio; S6: After completing the energy storage output scheduling and correction within the current scheduling cycle, jump to S1 and start the scheduling process for the next sampling cycle, and execute cyclically.

2. The hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system according to claim 1, characterized in that, In S1, the operating parameters include: the current load demand P_L on the electricity demand side, the remaining available capacity C_AL of the aluminum-air battery pack, the remaining available capacity C_H2 of the hydrogen fuel cell pack, and the current hydrogen storage capacity M_H2 of the water electrolysis device; it also includes the state of charge SOC_i and the health status SOH_i of the lead-lithium battery pack and the electricity storage device at the electricity demand side; as well as the current grid time-of-use price period flag T_flag and the ambient temperature θ.

3. The hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system according to claim 1, characterized in that, In S1, the calculation of the predicted value is specifically performed using the following formula: In the formula, P_(t-1), P_(t-2), and P_(t-3) are the actual load values ​​of the first three sampling periods, w1, w2, and w3 are the weighting coefficients of the sliding window, P_avg_T is the average load level of the same type of electricity price period in history, and k_T is the corresponding time period correction coefficient; where w1+w2+w3=1, the closer to the current time, the greater the weight; and then the predicted value is calculated. .

4. The hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system according to claim 1, characterized in that, In S2, the multi-type heterogeneous battery packs include: aluminum-air battery packs, hydrogen fuel cell packs, and lead-lithium battery packs; the construction of the hierarchical scheduling objective function, calculating the optimal output allocation ratio of each heterogeneous battery pack in the current scheduling cycle, is specifically performed using the following calculation formula: In the formula, x = (α1, α2, α3) is the output distribution ratio vector to be solved, and α1, α2, and α3 correspond to the output ratios of the aluminum-air battery pack, the hydrogen fuel cell pack, and the lead-lithium battery pack, respectively; where α1+α2+α3=1 and 0≤αi≤αi_max are satisfied; f_cost(x) is the comprehensive energy cost function, f_loss(x) is the battery pack loss function, f_dev(x) is the supply-demand deviation function, and λ1, λ2, and λ3 are the corresponding weighting coefficients; Then, by using a constrained optimization algorithm to solve the objective function F(x), the optimal allocation ratio x that minimizes F(x) is obtained. .

5. The hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system according to claim 1, characterized in that, S4 specifically includes: The time-of-use pricing flag T_flag of the current power grid is used to determine whether it is a low-consumption or high-consumption period; The issuance and execution of the power distribution command specifically involves issuing the power distribution command to the power conversion and equalization control circuits corresponding to each energy storage power source, adjusting the duty cycle of each branch conversion circuit by the multi-channel equalization controller, and then connecting to the power grid transmission channel after being processed by a bidirectional converter and inverter boost, and finally transmitting it to the power consumption side.

6. The hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system according to claim 1, characterized in that, In S5, the step of selectively correcting the weight coefficients in the hierarchical scheduling objective function based on the comparison results specifically includes: When the deviation is less than the preset threshold, the current output allocation ratio is maintained until the end of the current scheduling cycle; When the deviation exceeds the preset threshold, the weight coefficients in the hierarchical scheduling objective function are automatically corrected, the optimization calculation in S2 is re-executed, the corrected allocation ratio is obtained and redistributed, and this process is repeated iteratively until the deviation is within the preset threshold range.

7. A hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system, characterized in that, It includes a power generation unit, a power storage unit, a power consumption unit, a multi-source information acquisition unit, a coordinated dispatch control unit, and a power conversion and multi-path equalization control circuit, among which, The power generation unit has its output terminal connected to the energy storage unit and the power consumption unit. The energy storage unit, with its output end connected to the power consumption unit, consists of a primary energy storage module and a secondary energy storage module connected in sequence. The power consumption unit is equipped with a power consumption end power storage module that interfaces with the secondary power storage module. The secondary power storage module and the power consumption end power storage module are connected through a power grid transmission channel. The multi-source information acquisition unit is responsible for capturing in real time the load requirements of the power-consuming unit, the remaining capacity of the aluminum-air battery pack and the hydrogen fuel cell pack, the state of charge and health status of the lead-lithium battery pack and the power-consuming end energy storage module, the hydrogen storage capacity of the water electrolysis unit, the current electricity price period, and the ambient temperature parameters. The collaborative scheduling unit is responsible for communicating with the multi-source information acquisition unit, acquiring all acquired parameters, and then running a hierarchical optimization scheduling algorithm to calculate the optimal output allocation instruction for each energy storage module in the current scheduling cycle. The power conversion and multi-channel equalization control circuit is used to receive the optimal output allocation command and adjust the DC / DC conversion circuits of each branch through the internal multi-channel equalization controller to realize the issuance and execution of the output command.

8. The hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system according to claim 7, characterized in that, The primary energy storage module includes an aluminum-air battery pack and a hydrogen fuel cell pack arranged in parallel; the secondary energy storage module includes a lead-lithium battery pack.

9. An electronic device, characterized in that, include: Processor, communication interface, memory, and communication bus; The processor, communication interface, and memory communicate with each other via a communication bus. The memory is used to store computer programs and collected power operation parameters; When the processor executes the computer program stored in the memory, it implements the hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system as described in any one of claims 1 to 6, or the hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system as described in any one of claims 7 to 8.

10. A computer-readable storage medium comprising a computer program, characterized in that, When the computer program processor executes, it implements the hierarchical collaborative scheduling method for a multi-type battery hybrid energy storage system as described in any one of claims 1 to 6, or the hierarchical collaborative scheduling device for a multi-type battery hybrid energy storage system as described in any one of claims 7 to 8.