A method and system for integrated photovoltaic-storage-charging dual-feedback coordinated control including hybrid pumped storage

By constructing an AC/DC coupling energy deviation and performing two-stage optimization, the problem of uncoordinated resources between the DC and AC sides in the photovoltaic-storage-charging integrated system was solved, achieving stable DC bus voltage and low interactive power operation at the grid connection point, thus improving the system's robustness and resource utilization efficiency.

CN123121875APending Publication Date: 2026-11-17STATE GRID JIANGXI ELECTRIC POWER CO LTD RES INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611610498.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-19
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing integrated photovoltaic, energy storage and charging systems, the DC and AC side resources are not coordinated, and there is a lack of quantitative processing of photovoltaic prediction uncertainties, which makes it difficult to unify the DC bus voltage stability and grid connection point power balance.

Method used

A dual-feedback quantity is used to construct the AC/DC coupled energy deviation. Through two-stage sub-Bruker rolling optimization, the pumping unit, hydro-generator unit and adjustable charging load are prioritized for adjustment, and the energy storage battery is used as a compensation resource. The prediction uncertainty is handled by combining Wasserstein fuzzy set processing.

Benefits of technology

It achieves stable DC bus voltage, local photovoltaic power consumption, and low interactive power operation at the grid connection point, avoiding excessive battery cycling and improving the system's robustness and resource utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121875A_ABST
    Figure CN123121875A_ABST
Patent Text Reader

Abstract

This invention discloses a dual-feedback coordinated control method and system for integrated photovoltaic, energy storage, and charging systems, including a hybrid pumped storage system. The method includes: constructing dual-feedback quantities based on DC bus voltage deviation and AC grid connection point power deviation; generating evolutionary demands based on predicted photovoltaic power output, predicted charging load, and predicted DC load within the station, and superimposing AC / DC coupling energy deviations to obtain target evolutionary demands; calculating the dynamic reachability of pumping units, hydropower units, and adjustable charging loads, and projecting the target evolutionary demands onto the dynamic reachability range to obtain reconfiguration demands; performing a two-stage bibliometric rolling optimization with the reconfiguration demands as the tracking target, in the first stage optimizing non-battery resources and in the second stage releasing energy storage batteries and limiting the deviation of non-battery resources from the optimal solution; generating control commands for each resource and dynamic power reference values ​​for the grid connection point and issuing them for execution. This achieves multi-objective control of DC bus stability, local photovoltaic consumption, and low-interactive-power operation at the grid connection point.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of coordinated control technology for new energy power generation, electric vehicle charging stations and hybrid pumped storage power stations, and particularly relates to a dual-feedback coordinated control method and system for photovoltaic, energy storage and charging integrated with hybrid pumped storage. Background Technology

[0002] Integrated photovoltaic-storage-charging systems typically include photovoltaic power generation units connected to the DC bus, energy storage batteries, and a group of DC charging piles, connected to the AC grid via a bidirectional grid-connected converter. Hybrid pumped storage power stations, on the other hand, usually operate their generators and pumping units in an AC electrical system, with their engineering connection points located on the AC bus or grid connection point, rather than directly connected to the DC bus of the photovoltaic-storage-charging system. Traditional photovoltaic-storage-charging coordinated control methods treat energy storage batteries as the primary power balancing resource, failing to adequately consider the engineering realities of pumped storage power stations connected to the AC side. This leads to topological and control object mismatches between the DC-side and AC-side power balance equations.

[0003] When there is a surplus of photovoltaic power, the surplus power on the DC side is transmitted to the AC side via a bidirectional grid-connected converter and can be absorbed by pumped units. When there is a shortage of photovoltaic power, the power generation of the AC side hydropower units can reduce the power purchase demand at the grid connection point. Existing methods do not incorporate the above-mentioned AC side resources into the coordinated control framework, and lack a quantitative description and robust handling mechanism for the uncertainty of photovoltaic forecasting, making it difficult to achieve coordination and unity among multiple objectives such as DC bus voltage stability, grid connection point power minimization, and economical resource scheduling. Summary of the Invention

[0004] To address the technical shortcomings of existing integrated photovoltaic-storage-charging systems in terms of uncoordinated DC and AC side resources and lack of quantitative processing of prediction uncertainties, this invention provides an integrated photovoltaic-storage-charging dual-feedback coordinated control method and system including hybrid pumped storage.

[0005] In a first aspect, the present invention provides a dual-feedback coordinated control method for a hybrid pumped storage integrated photovoltaic-energy storage-charging system. The integrated photovoltaic-energy storage-charging system used in the method includes a DC side and an AC side. The photovoltaic power generation unit, energy storage battery, and charging pile group are connected to a DC bus. The DC bus is connected to an AC bus via a bidirectional grid-connected converter. The hybrid pumped storage power station is connected to the AC side. The method includes:

[0006] Collect operating status data and prediction data from both the DC and AC sides;

[0007] A dual feedback quantity is constructed using the DC bus voltage deviation and the AC grid connection point net exchange power deviation. An AC-DC coupled energy deviation is generated based on the dual feedback quantity. The AC-DC coupled energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale.

[0008] Evolutionary demand is generated based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station. The AC / DC coupling energy deviation is then superimposed on the evolutionary demand to obtain the target evolutionary demand.

[0009] The dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load within the current coordination cycle is calculated based on the operating status data. The target evolution requirement is projected onto the dynamic reachability interval formed by the dynamic reachability to obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state. The position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state.

[0010] Using the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary, a two-stage bibliometric rolling optimization is performed. Based on the optimization results, control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point are generated and issued for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed at zero, and optimization is performed with non-battery resources as the main regulating body. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which non-battery resources deviate from the optimal solution of the first stage to not exceed the preset tolerance band.

[0011] Secondly, the present invention provides a hybrid pumped storage integrated photovoltaic-storage-charging dual-feedback coordinated control system, the system comprising:

[0012] The acquisition module is configured to collect operating status data and prediction data from both the DC and AC sides.

[0013] The generation module is configured to construct a dual feedback quantity based on the DC bus voltage deviation and the AC grid connection point net exchange power deviation, and generate an AC-DC coupled energy deviation based on the dual feedback quantity. The AC-DC coupled energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale.

[0014] The superposition module is configured to generate evolution requirements based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station, and to superimpose the AC / DC coupling energy deviation onto the evolution requirements to obtain the target evolution requirements.

[0015] The projection module is configured to calculate the dynamic reachability of the pumping unit, hydro-generator unit, and adjustable charging load within the current coordination cycle based on the operating status data, project the target evolution requirement onto the dynamic reachability interval formed by the dynamic reachability, and obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state, and the position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state.

[0016] The optimization module is configured to perform a two-stage bibliometric rolling optimization with the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary. Based on the optimization results, it generates control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point and issues them for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed at zero, and the optimization is performed with non-battery resources as the main regulating body. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which the non-battery resources deviate from the optimal solution of the first stage does not exceed the preset tolerance band.

[0017] Thirdly, an electronic device is provided, comprising: at least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the at least one processor to perform the steps of the photovoltaic-storage-charging integrated dual-feedback coordinated control method of any embodiment of the present invention.

[0018] Fourthly, the present invention also provides a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor performs the steps of the photovoltaic-storage-charging integrated dual-feedback coordinated control method of any embodiment of the present invention.

[0019] The integrated photovoltaic-storage-charging dual-feedback coordinated control method and system containing hybrid pumped storage in this application has the following beneficial effects:

[0020] By constructing dual feedback quantities using DC bus voltage deviation and AC grid connection point net exchange power deviation, and generating AC-DC coupled energy deviation, the energy storage change of DC bus and the power deviation of AC grid connection point are unified to the same power scale. This eliminates feedback mismatch caused by bidirectional transmission efficiency asymmetry and solves the problem that the DC and AC side feedback quantities are independent and cannot be coordinated in existing methods.

[0021] By calculating the dynamic accessibility of pumping units, hydroelectric units, and adjustable charging loads within the current coordination cycle, the target evolution demand is projected onto the dynamic accessibility interval constituted by the dynamic accessibility to obtain the reconfiguration demand. The positive or negative sign of the reconfiguration demand indicates whether the system is in a state of photovoltaic surplus or photovoltaic deficiency. The position of the reconfiguration demand value relative to the dynamic accessibility interval determines the level within the state, so that non-battery resources respond first within the actual accessibility range, avoiding command failure due to resource unavailability.

[0022] By describing the uncertainties of photovoltaic and load forecasting with Wasserstein fuzzy sets and applying pluripotent bar chance constraints, the DC bus voltage, battery state of charge, and hydropower state satisfy the safety constraints with a probability not lower than the preset risk level in the forecast time domain. This overcomes the technical shortcomings of deterministic models, such as the inability to quantify forecast uncertainties and the constraint exceeding limits in extreme scenarios.

[0023] Through a two-stage bibliometric rolling optimization, the first stage prioritizes the use of non-battery resources (pumping units, hydropower units, and adjustable charging loads) to track reconfiguration needs. Energy storage batteries only participate in the second stage adjustment when the first stage is not feasible or the results do not meet the preset conditions. The deviation of non-battery resources from the optimal solution of the first stage is limited to a preset tolerance band, ensuring the priority adjustment status of pumped storage power stations, hydropower units, and charging loads. Energy storage batteries are only used as a post-compensation resource, avoiding excessive battery cycling.

[0024] By calculating the surplus and deficit residual power under the most unfavorable probability distribution, a dynamic power reference value for the AC grid connection point is generated. This ensures that the AC grid only interacts with minimum power when local resources and energy storage batteries cannot fully balance the power, thus achieving the unification of near-zero power operation at the grid connection point and full photovoltaic consumption. Attached Figure Description

[0025] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0026] Figure 1 A flowchart of a photovoltaic-storage-charging integrated dual-feedback coordinated control method including hybrid pumped storage is provided in an embodiment of the present invention;

[0027] Figure 2 This is a structural block diagram of a photovoltaic-storage-charging integrated dual-feedback coordinated control system with hybrid pumped storage provided in an embodiment of the present invention;

[0028] Figure 3This is a schematic diagram of the structure of an electronic device provided in an embodiment of the present invention. Detailed Implementation

[0029] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0030] Please see Figure 1 The diagram shows a flowchart of a dual-feedback coordinated control method for photovoltaic-storage-charging integration, which includes a hybrid pumped storage system.

[0031] like Figure 1 As shown, the integrated photovoltaic-storage-charging dual-feedback coordinated control method including hybrid pumped storage specifically includes the following steps:

[0032] Step S101: Collect operating status data and prediction data for both the DC and AC sides.

[0033] In this step, the operating status data includes the measured value of DC bus voltage, the measured value of net switching power at the AC grid connection point, the measured value of battery state of charge, and the measured value of hydropower status.

[0034] The predicted data includes predicted photovoltaic power generation, predicted charging load, and predicted DC load within the station.

[0035] Step S102: Construct a dual feedback quantity using the DC bus voltage deviation and the AC grid connection point net exchange power deviation, and generate an AC / DC coupling energy deviation based on the dual feedback quantity. The AC / DC coupling energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale.

[0036] In this step, the DC bus voltage deviation is calculated based on the measured DC bus voltage value and the preset DC bus voltage reference value. The expression is as follows:

[0037] ,

[0038] In the formula, The DC bus voltage deviation is the value in the k-th coordination cycle. This represents the measured value of the DC bus voltage during the k-th coordination cycle. This is the reference value for the DC bus voltage. This refers to the voltage deviation dead zone width.

[0039] The AC grid connection point power deviation is calculated based on the grid connection point power reference value and the power benchmark value, and the expression is:

[0040] ,

[0041] In the formula, The AC grid connection point power deviation during the k-th coordination cycle. This represents the measured net switching power at the AC grid connection point during the (k-1)th coordination cycle. This represents the measured net switching power at the AC grid connection point during the kth coordination cycle. This is a power reference value;

[0042] Using the DC bus voltage deviation and the AC grid connection point power deviation as dual feedback quantities, and generating the AC / DC coupling energy deviation based on the dual feedback quantities, the expression is as follows:

[0043] ,

[0044] ,

[0045] In the formula, The AC / DC coupling energy deviation in the k-th coordination cycle. The equivalent power is calculated by adjusting the deviation of the DC bus capacitor relative to the reference energy storage over the coordination period. To coordinate the duration of the control cycle, The conversion efficiency is the power transfer efficiency from the AC side to the DC side. The conversion efficiency is the power transfer efficiency from the DC side to the AC side. This is the equivalent capacitance of the DC bus. Here is the direction-dependent efficiency mapping function. The input power value of the mapping function. This is the positive part of the input power. This is the negative part of the input power.

[0046] Step S103: Generate evolution requirements based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station. Add the AC / DC coupling energy deviation to the evolution requirements to obtain the target evolution requirements.

[0047] In this step, the raw power demand for the current coordination period is calculated based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load within the station. The expression is as follows:

[0048] ,

[0049] In the formula, The original power demand for the k-th coordination period is... This represents the predicted photovoltaic power generation capacity for the kth coordination period. This is the predicted charging load value for the k-th coordination period. This represents the predicted DC load within the station during the k-th coordination period.

[0050] The evolutionary demand for the current coordination cycle is calculated based on the original power demand, expressed as follows:

[0051] ,

[0052] ,

[0053] ,

[0054] In the formula, For the evolutionary requirements of the k-th coordination cycle, The rate of change weighting coefficient. For acceleration weighting coefficients, Let be the rate of change of the original power demand in the k-th coordination period. Let be the derivative of the rate of change of the original power demand in the k-th coordination period. The original power demand for the (k-1)th coordination cycle, Let be the rate of change of the original power demand in the (k-1)th coordination period;

[0055] The AC / DC coupling energy deviation is superimposed on the evolution requirement to obtain the target evolution requirement, expressed as:

[0056] ,

[0057] In the formula, For the target evolution requirements of the kth coordination cycle, The superposition weighting coefficient for AC / DC coupling energy deviation. The AC / DC coupling energy deviation is the value of the k-th coordination cycle.

[0058] Step S104: Calculate the dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load within the current coordination cycle based on the operating status data. Project the target evolution requirement onto the dynamic reachability interval formed by the dynamic reachability to obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state. The position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state.

[0059] In this step, the dynamic achievable pumping capacity of the pumping unit within the current coordination period is calculated, expressed as:

[0060] ,

[0061] ,

[0062] In the formula, The dynamic reachability of the pumping unit in the k-th coordination cycle. This represents the maximum generating capacity of the hydroelectric generator unit. Let the power generation of the hydropower unit be the power output during the k-th coordination cycle. This is the upper limit of the pumping ramp. To coordinate the duration of the control cycle, The available transmission capacity of the bidirectional grid-connected converter in the k-th coordination cycle is... The indicator shows that the power generation condition is available. For the pumping safety factor, The conversion efficiency is the power transfer efficiency from the DC side to the AC side. This represents the maximum permissible value for the hydroelectric state. This represents the measured value of the hydropower state during the k-th coordination cycle. This is a saturation function used to limit the input value to between a lower bound of 0 and an upper bound of 1. This is the upper warning threshold for the hydropower state;

[0063] The dynamic achievable power generation capacity of the hydropower unit within the current coordination period is calculated using the following expression:

[0064] ,

[0065] ,

[0066] In the formula, The dynamic reachability of the hydropower unit in the k-th coordination cycle. The conversion efficiency is the power transfer efficiency from the AC side to the DC side. This represents the maximum generating capacity of the hydroelectric unit. Let the power generation of the hydropower unit be the power output during the k-th coordination cycle. This is the upper limit of the power generation ramp rate for hydroelectric generating units. The available input capacity of the bidirectional grid-connected converter. The indicator shows that the power generation condition is available. For power generation safety factor, This represents the minimum permissible value for the hydroelectric state. This is the lower limit warning threshold for hydropower status;

[0067] Calculate the dynamic achievable capacity of adjustable charging loads within the current coordination period, using the following expression:

[0068] ,

[0069] In the formula, The dynamic achievable capacity of the adjustable charging load in the k-th coordination cycle. The maximum allowable charging power of the charging pile group in the k-th coordination cycle. The actual charging power of the charging pile group during the k-th coordination cycle. This represents the maximum power change of the charging pile group within a unit coordination period. This represents the flexible charging capacity that can be increased during the k-th coordination cycle without violating the vehicle's off-site power requirements.

[0070] The dynamic achievable capacity of the adjustable charging load during the current coordination period is calculated using the following expression:

[0071] ,

[0072] In the formula, The dynamic achievable load reduction capability of the adjustable charging load in the k-th coordination cycle. Let be the minimum allowable charging power of the charging pile group in the k-th coordination cycle. The flexible charging amount that can be reduced in the k-th coordination cycle without violating the vehicle's off-site charging requirements;

[0073] The sum of the dynamic reachability of pumping and the dynamic reachability of charging with increased load is taken as the upper bound of the first dynamic reachability interval, and the sum of the dynamic reachability of power generation and the dynamic reachability of charging with decreased load is taken as the upper bound of the second dynamic reachability interval. The expression is as follows:

[0074] ,

[0075] ,

[0076] In the formula, Let be the dynamic reachable range of non-battery resources in the k-th coordination cycle under the photovoltaic surplus mode. The dynamic reachability interval of non-battery resources in the kth coordination cycle under photovoltaic insufficiency mode;

[0077] When the target evolution requirement is positive, it is projected onto the first dynamically reachable interval; when the target evolution requirement is negative, it is projected onto the second dynamically reachable interval to obtain the reconstruction requirement, expressed as:

[0078] ,

[0079] In the formula, Reconfiguration requirements for the kth coordination cycle For the target evolution requirements of the kth coordination cycle, For the k-th coordination cycle, the dynamic reachability interval for non-battery resources is defined as either the first dynamic reachability interval formed by the sum of the dynamic reachability of pumping and the dynamic reachability of charging load increase, or the second dynamic reachability interval formed by the sum of the dynamic reachability of power generation and the dynamic reachability of charging load decrease. It is a projection operator, which applies a projection operation to the target evolution requirement and then to the non-battery resource dynamic reachability interval of the k-th coordination period.

[0080] Step S105: Taking the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary, perform a two-stage bibliometric rolling optimization. Based on the optimization results, generate control commands for each regulation resource and dynamic power reference values ​​for the AC grid connection point and issue them for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed to zero, and optimization is performed with non-battery resources as the main regulation subject. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree of deviation of non-battery resources from the optimal solution of the first stage to not exceed the preset tolerance band.

[0081] In this step, a Brull bar chance constraint is applied to the two-stage Brull bar rolling optimization. The Brull bar chance constraint is constructed as follows:

[0082] Historical prediction error samples are received, including prediction errors of photovoltaic power generation capacity, charging load, and DC load within the station, forming the i-th error sample vector. ,in, Let be the prediction error of the photovoltaic power generation capacity of the i-th sample. Let be the charging load prediction error for the i-th sample. Let be the in-station DC load prediction error for the i-th sample. It is the transpose symbol;

[0083] Construct an empirical distribution using the most recent N prediction error samples:

[0084] ,

[0085] In the formula, For empirical distribution, The total number of samples, To focus on the i-th error sample vector Unit probability mass at a location;

[0086] With first-order Wasserstein distance To construct a Wasserstein fuzzy set for the metric, the expression is:

[0087] ,

[0088] ,

[0089] In the formula, For candidate probability distribution, To support the collection The set of probability measures on Let the radius of the fuzzy set be . As the radius base value, The degree of dispersion of the current prediction error. This is the adjustment coefficient;

[0090] With the aforementioned Wasserstein fuzzy set Based on this, the prediction time domain is... The step prediction applies a segmented bar opportunity constraint, wherein the segmented bar opportunity constraint includes a DC bus voltage opportunity constraint, a battery state of charge opportunity constraint, and a hydropower state of charge opportunity constraint, which respectively satisfy:

[0091] ,

[0092] ,

[0093] ,

[0094] In the formula, To find the supremum on the Wasserstein fuzzy set, For the probability measure under the candidate probability distribution, This is the lower limit of the DC bus voltage. This represents the upper limit of the DC bus voltage. and These are the lower and upper limits of the state of charge (SOC) of the energy storage battery, respectively. and These are the lower and upper limits of the hydrodynamic state, respectively. For DC bus voltage constraints, the value range is (0,1). The battery state of charge constraint has a value range of (0,1). The allowable risk level for the hydropower state constraint is defined, with a value range of (0,1). For the first Predicted DC bus voltage at time 10:00. For the first Predicted state of charge of the energy storage battery at any given time. For the first Predicted hydropower state at any given time.

[0095] Specifically, the difference between the target evolution requirement and the reconstruction requirement is calculated as the projection residual, expressed as:

[0096] ,

[0097] In the formula, The projected residual for the k-th coordination period, For the target evolution requirements of the kth coordination cycle, The reconfiguration requirement for the kth coordination cycle;

[0098] With the goal of minimizing the tracking error of the reconfiguration requirement, and using the dynamic reachability and mixed-integer operating condition constraints as boundaries, a first-stage sub-Bruker rolling optimization is performed under the sub-Bruker chance constraint to optimize the charging power of the energy storage battery. and discharge power With the value fixed at zero, find the optimal solution for non-battery resources. The non-battery resources include pumping units, hydroelectric generators, adjustable charging loads, and bidirectional grid-connected converters;

[0099] Determine whether the first stage of optimization is feasible, and whether the result of the first stage of optimization can bring the DC bus voltage and grid connection point power into the preset dead zone;

[0100] If the first stage optimization is feasible and the result of the first stage optimization can bring the DC bus voltage and grid connection point power into their respective preset dead zones, then the optimal solution of the first stage will be... As the output of non-battery resource control instructions for the current coordination cycle, skip the second phase;

[0101] If the first stage of optimization is not feasible, or the optimization result of the first stage cannot bring the DC bus voltage or grid connection point power into the preset dead zone, then the optimal solution of the first stage shall be adopted. As input, the second stage of the split-Brow bar rolling optimization is triggered, specifically by releasing the charging power variable of the energy storage battery. and the discharge power variable of the energy storage battery Apply tolerance constraints With the minimization of battery charge / discharge throughput as an additional objective, the second-stage optimization problem is solved under the tolerance constraints and the fractional bar chance constraints to obtain the optimal charge / discharge power of the battery. and updated non-battery resource control instructions, among which, To predict the step size index in the time domain, To preset the tolerance band width, It is an infinite norm. In the first phase of optimization, the... The optimal solution for non-battery resources at any given moment. For the second phase of optimization, the first Values ​​of control variables for non-battery resources at any given time;

[0102] Determine the mutually exclusive mode indicator based on the symbol of the reconstruction requirement. and ,in This is an indicator quantity for the photovoltaic surplus mode. This is an indicator of insufficient photovoltaic mode, when the reconfiguration demand is positive. and When the reconstruction requirement is negative , And satisfy ;

[0103] Calculate the signed power regulation of the battery ,in, To achieve the optimal charging power for the battery, This represents the optimal discharge power for the battery.

[0104] Using the mode indicator, the projection residual, and the battery signed adjustment power as inputs, the surplus residual power and the deficit residual power are calculated under the most unfavorable probability distribution, expressed as follows:

[0105] ,

[0106] ,

[0107] In the formula, To have surplus residual power, This represents the missing residual power. For candidate probability distribution, Let the expected value be the probability distribution. To find the supremum on the Wasserstein fuzzy set, To perform the positive part operation;

[0108] The dynamic power reference value for the AC grid-connected point is calculated based on the surplus residual power and the deficit residual power, and the expression is as follows:

[0109] ,

[0110] In the formula, This is the dynamic power reference value for the AC grid connection point during the k-th coordination cycle. The DC / AC conversion efficiency for transmission from the DC side to the AC side. Let be the surplus residual power in the k-th coordination cycle. The residual power deficit during the k-th coordination cycle;

[0111] The optimal control command for the non-battery resources, the optimal charging and discharging power of the battery, and the dynamic power reference value of the AC grid connection point are sent as output commands for the current coordination cycle to each execution device to complete the control of the current coordination cycle.

[0112] In summary, the method of this application collects data from both the DC and AC sides; constructs dual feedback quantities based on the DC bus voltage deviation and the AC grid connection point power deviation, and generates AC / DC coupled energy deviation; generates evolutionary demand based on the predicted photovoltaic power output, the predicted charging load, and the predicted DC load within the station, and superimposes the AC / DC coupled energy deviation to obtain the target evolutionary demand; calculates the dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load, and projects the target evolutionary demand onto the dynamic reachability range to obtain the reconfiguration demand; performs a two-stage sub-Blu-ray rolling optimization with the reconfiguration demand as the tracking target, the first stage of which optimizes non-battery resources, and the second stage releases energy storage batteries and limits the degree to which non-battery resources deviate from the optimal solution; generates control commands for each resource and dynamic power reference values ​​for the grid connection point and issues them for execution; and achieves multi-objective control of DC bus stability, local photovoltaic consumption, and low interactive power operation at the grid connection point.

[0113] Please see Figure 2 The diagram shows a structural block diagram of a hybrid pumped storage integrated photovoltaic-storage-charging dual-feedback coordinated control system according to this application.

[0114] like Figure 2 As shown, the integrated photovoltaic-storage-charging dual-feedback coordinated control system 200, which includes a hybrid pumped storage system, comprises an acquisition module 210, a generation module 220, a superposition module 230, a projection module 240, and an optimization module 250.

[0115] The system includes: an acquisition module 210 configured to collect operating status data and prediction data from both the DC and AC sides; a generation module 220 configured to construct a dual feedback quantity using the DC bus voltage deviation and the net exchange power deviation at the AC grid connection point, and to generate an AC / DC coupling energy deviation based on the dual feedback quantity, wherein the AC / DC coupling energy deviation is used to unify the energy storage changes of the DC bus and the power deviation at the AC grid connection point to the same power scale; an overlay module 230 configured to generate an evolutionary demand based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load within the station, and to overlay the AC / DC coupling energy deviation onto the evolutionary demand to obtain the target evolutionary demand; and a projection module 240 configured to calculate the dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load within the current coordination period based on the operating status data, and to project the target evolutionary demand onto the dynamic reachability... The dynamic reachability interval constituted by the capability yields the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus or photovoltaic deficit state. The position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus or photovoltaic deficit state. The optimization module 250 is configured to perform a two-stage sub-Blu-ray rolling optimization with the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary. Based on the optimization results, it generates control commands for each regulation resource and dynamic power reference values ​​for the AC grid connection point and issues them for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed to zero, and optimization is performed with non-battery resources as the main regulation subject. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which non-battery resources deviate from the optimal solution of the first stage to not exceed the preset tolerance band.

[0116] It should be understood that Figure 2 The modules and references described in the document Figure 1 The steps described in the text correspond to those in the method described above. Therefore, the operations, features, and corresponding technical effects described above also apply to the method described in the text. Figure 2 The various modules in the document will not be described in detail here.

[0117] In other embodiments, the present invention also provides a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor performs the integrated photovoltaic-storage-charging dual-feedback coordinated control method with hybrid pumped storage in any of the above method embodiments.

[0118] In one embodiment, the computer-readable storage medium of the present invention stores computer-executable instructions, which are configured as follows:

[0119] Collect operating status data and prediction data from both the DC and AC sides;

[0120] A dual feedback quantity is constructed using the DC bus voltage deviation and the AC grid connection point net exchange power deviation. An AC-DC coupled energy deviation is generated based on the dual feedback quantity. The AC-DC coupled energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale.

[0121] Evolutionary demand is generated based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station. The AC / DC coupling energy deviation is then superimposed on the evolutionary demand to obtain the target evolutionary demand.

[0122] The dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load within the current coordination cycle is calculated based on the operating status data. The target evolution requirement is projected onto the dynamic reachability interval formed by the dynamic reachability to obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state. The position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state.

[0123] Using the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary, a two-stage bibliometric rolling optimization is performed. Based on the optimization results, control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point are generated and issued for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed at zero, and optimization is performed with non-battery resources as the main regulating body. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which non-battery resources deviate from the optimal solution of the first stage to not exceed the preset tolerance band.

[0124] Computer-readable storage media may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application program required for at least one function; the data storage area may store data created based on the use of the integrated photovoltaic-storage-charging dual-feedback coordinated control system containing hybrid pumped storage. Furthermore, the computer-readable storage medium may include high-speed random access memory, and may also include memory, such as at least one disk storage device, flash memory device, or other non-volatile solid-state storage device. In some embodiments, the computer-readable storage medium may optionally include memory remotely disposed relative to a processor, which can be connected via a network to the integrated photovoltaic-storage-charging dual-feedback coordinated control system containing hybrid pumped storage. Examples of such networks include, but are not limited to, the Internet, corporate intranets, local area networks, mobile communication networks, and combinations thereof.

[0125] Figure 3 This is a schematic diagram of the structure of the electronic device provided in the embodiment of the present invention, such as... Figure 3As shown, the device includes a processor 310 and a memory 320. The electronic device may also include an input device 330 and an output device 340. The processor 310, memory 320, input device 330, and output device 340 can be connected via a bus or other means. Figure 3 Taking a bus connection as an example, the memory 320 is the computer-readable storage medium described above. The processor 310 executes various server functions and data processing by running non-volatile software programs, instructions, and modules stored in the memory 320, thereby implementing the hybrid pumped storage integrated photovoltaic-storage-charging dual-feedback coordinated control method described in the above embodiment. The input device 330 can receive input digital or character information and generate key signal inputs related to user settings and function control of the hybrid pumped storage integrated photovoltaic-storage-charging dual-feedback coordinated control system. The output device 340 may include a display screen or other display device.

[0126] The aforementioned electronic device can execute the method provided in the embodiments of the present invention, and has the corresponding functional modules and beneficial effects for executing the method. Technical details not described in detail in this embodiment can be found in the method provided in the embodiments of the present invention.

[0127] In one implementation, the above-described electronic device is applied in a hybrid pumped-storage integrated photovoltaic-storage-charging dual-feedback coordinated control system for a client application, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the at least one processor to:

[0128] Collect operating status data and prediction data from both the DC and AC sides;

[0129] A dual feedback quantity is constructed using the DC bus voltage deviation and the AC grid connection point net exchange power deviation. An AC-DC coupled energy deviation is generated based on the dual feedback quantity. The AC-DC coupled energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale.

[0130] Evolutionary demand is generated based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station. The AC / DC coupling energy deviation is then superimposed on the evolutionary demand to obtain the target evolutionary demand.

[0131] The dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load within the current coordination cycle is calculated based on the operating status data. The target evolution requirement is projected onto the dynamic reachability interval formed by the dynamic reachability to obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state. The position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state.

[0132] Using the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary, a two-stage bibliometric rolling optimization is performed. Based on the optimization results, control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point are generated and issued for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed at zero, and optimization is performed with non-battery resources as the main regulating body. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which non-battery resources deviate from the optimal solution of the first stage to not exceed the preset tolerance band.

[0133] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., including several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods of various embodiments or some parts of embodiments.

[0134] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for integrated photovoltaic-storage-charging dual-feedback coordinated control including hybrid pumped storage, characterized in that, The photovoltaic-storage-charging integrated system used in the method includes a DC side and an AC side. The photovoltaic power generation unit, energy storage battery, and charging pile group are connected to the DC bus. The DC bus is connected to the AC bus via a bidirectional grid-connected converter. The hybrid pumped storage power station is connected to the AC side. The method includes: Collect operating status data and prediction data from both the DC and AC sides; A dual feedback quantity is constructed using the DC bus voltage deviation and the AC grid connection point net exchange power deviation. An AC-DC coupled energy deviation is generated based on the dual feedback quantity. The AC-DC coupled energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale. Evolutionary demand is generated based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station. The AC / DC coupling energy deviation is then superimposed on the evolutionary demand to obtain the target evolutionary demand. The dynamic reachability of the pumping unit, hydropower unit, and adjustable charging load within the current coordination cycle is calculated based on the operating status data. The target evolution requirement is projected onto the dynamic reachability interval formed by the dynamic reachability to obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state. The position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state. Using the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary, a two-stage bibliometric rolling optimization is performed. Based on the optimization results, control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point are generated and issued for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed at zero, and optimization is performed with non-battery resources as the main regulating body. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which non-battery resources deviate from the optimal solution of the first stage to not exceed the preset tolerance band.

2. The integrated photovoltaic-storage-charging dual-feedback coordinated control method with hybrid pumped storage as described in claim 1, characterized in that, The operating status data includes the measured values ​​of DC bus voltage, the measured values ​​of net switching power at the AC grid connection point, the measured values ​​of battery state of charge, and the measured values ​​of hydropower status. The forecast data includes the forecast values ​​of photovoltaic power generation, charging load, and DC load within the station.

3. The integrated photovoltaic-storage-charging dual-feedback coordinated control method with hybrid pumped storage as described in claim 1, characterized in that, The construction of a dual feedback quantity based on the DC bus voltage deviation and the AC grid connection point net switching power deviation, and the generation of AC / DC coupling energy deviation based on the dual feedback quantity, includes: The DC bus voltage deviation is calculated based on the measured DC bus voltage value and the preset DC bus voltage reference value. The expression is as follows: , In the formula, The DC bus voltage deviation is the value in the k-th coordination cycle. This represents the measured value of the DC bus voltage during the k-th coordination cycle. This is the reference value for the DC bus voltage. This refers to the voltage deviation dead zone width. The AC grid connection point power deviation is calculated based on the grid connection point power reference value and the power benchmark value, and the expression is: , In the formula, The AC grid connection point power deviation during the k-th coordination cycle. This represents the measured net switching power at the AC grid connection point during the (k-1)th coordination cycle. This represents the measured net switching power at the AC grid connection point during the kth coordination cycle. This is a power reference value; Using the DC bus voltage deviation and the AC grid connection point power deviation as dual feedback quantities, and generating the AC / DC coupling energy deviation based on the dual feedback quantities, the expression is as follows: , , In the formula, The AC / DC coupling energy deviation in the k-th coordination cycle. The equivalent power is calculated by adjusting the deviation of the DC bus capacitor relative to the reference energy storage over the coordination period. To coordinate the duration of the control cycle, The conversion efficiency is the power transfer efficiency from the AC side to the DC side. The conversion efficiency is the power transfer efficiency from the DC side to the AC side. This is the equivalent capacitance of the DC bus. Here is the direction-dependent efficiency mapping function. The input power value is the value of the mapping function. This is the positive part of the input power. This is the negative part of the input power.

4. The integrated photovoltaic-storage-charging dual-feedback coordinated control method with hybrid pumped storage as described in claim 1, characterized in that, The process of generating evolutionary demand based on the predicted photovoltaic power generation, predicted charging load, and predicted DC load within the station, and then adding the AC / DC coupling energy deviation to the evolutionary demand to obtain the target evolutionary demand includes: The original power demand for the current coordination period is calculated based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load within the station. The expression is as follows: , In the formula, The original power demand for the k-th coordination period is... This represents the predicted photovoltaic power generation capacity for the kth coordination period. This represents the predicted charging load value for the k-th coordination period. This represents the predicted DC load within the station during the k-th coordination period. The evolutionary demand for the current coordination cycle is calculated based on the original power demand, expressed as follows: , , , In the formula, For the evolutionary requirements of the k-th coordination cycle, The rate of change weighting coefficient. For acceleration weighting coefficients, Let be the rate of change of the original power demand in the k-th coordination period. Let be the derivative of the rate of change of the original power demand in the k-th coordination period. The original power demand for the (k-1)th coordination cycle, Let be the rate of change of the original power demand in the (k-1)th coordination period; The AC / DC coupling energy deviation is superimposed on the evolution requirement to obtain the target evolution requirement, expressed as: , In the formula, For the target evolution requirements of the k-th coordination cycle, The superposition weighting coefficient for AC / DC coupling energy deviation. The AC / DC coupling energy deviation is the value of the k-th coordination cycle.

5. The integrated photovoltaic-storage-charging dual-feedback coordinated control method including hybrid pumped storage as described in claim 1, characterized in that, The step of calculating the dynamic reachability of the pumping unit, hydroelectric unit, and adjustable charging load within the current coordination cycle based on the operating status data, and projecting the target evolution requirement onto the dynamic reachability interval constituted by the dynamic reachability, yields the reconfiguration requirement, including: The dynamic achievable pumping capacity of the pumping unit within the current coordination period is calculated using the following expression: , , In the formula, The dynamic reachability of the pumping unit in the k-th coordination cycle. This represents the maximum generating capacity of the hydroelectric generator unit. Let the power generation of the hydropower unit be the power output during the k-th coordination cycle. This is the upper limit of the pumping ramp. To coordinate the duration of the control cycle, The available transmission capacity of the bidirectional grid-connected converter in the k-th coordination cycle is... The indicator shows that the power generation condition is available. For the pumping safety factor, The conversion efficiency is the power transfer efficiency from the DC side to the AC side. This represents the maximum permissible value for the hydroelectric state. This represents the measured value of the hydropower state during the k-th coordination cycle. This is a saturation function used to limit the input value to between a lower bound of 0 and an upper bound of 1. This is the upper warning threshold for the hydropower state; The dynamic achievable power generation capacity of the hydropower unit within the current coordination period is calculated using the following expression: , , In the formula, The dynamic reachability of the hydropower unit in the k-th coordination cycle. The conversion efficiency is the power transfer efficiency from the AC side to the DC side. This represents the maximum generating capacity of the hydroelectric generator unit. Let the power generation of the hydropower unit be the power output during the k-th coordination cycle. This is the upper limit of the power generation ramp rate for hydroelectric generating units. The available input capacity of the bidirectional grid-connected converter. The indicator shows that the power generation condition is available. For power generation safety factor, This represents the minimum permissible value for the hydroelectric state. This is the lower limit warning threshold for hydropower status; Calculate the dynamic achievable capacity of adjustable charging loads within the current coordination period, using the following expression: , In the formula, The dynamic achievable capacity of the adjustable charging load in the k-th coordination cycle. The maximum allowable charging power of the charging pile group in the k-th coordination cycle. The actual charging power of the charging pile group during the k-th coordination cycle. This represents the maximum power change of the charging pile group within a unit coordination period. This represents the flexible charging capacity that can be increased during the k-th coordination cycle without violating the vehicle's off-site power requirements. The dynamic achievable capacity of the adjustable charging load during the current coordination period is calculated using the following expression: , In the formula, The dynamic achievable load reduction capability of the adjustable charging load in the k-th coordination cycle. Let be the minimum allowable charging power of the charging pile group in the k-th coordination cycle. The flexible charging amount that can be reduced in the k-th coordination cycle without violating the vehicle's off-site charging requirements; The sum of the dynamic reachability of pumping and the dynamic reachability of charging with increased load is taken as the upper bound of the first dynamic reachability interval, and the sum of the dynamic reachability of power generation and the dynamic reachability of charging with decreased load is taken as the upper bound of the second dynamic reachability interval. The expression is as follows: , , In the formula, Let be the dynamic reachable range of non-battery resources in the k-th coordination cycle under the photovoltaic surplus mode. The dynamic reachability interval of non-battery resources in the kth coordination cycle under photovoltaic insufficiency mode; When the target evolution requirement is positive, it is projected onto the first dynamically reachable interval; when the target evolution requirement is negative, it is projected onto the second dynamically reachable interval to obtain the reconstruction requirement, expressed as: , In the formula, Reconfiguration requirements for the kth coordination cycle For the target evolution requirements of the k-th coordination cycle, For the k-th coordination cycle, the dynamic reachability interval for non-battery resources is defined as either the first dynamic reachability interval formed by the sum of the dynamic reachability of pumping and the dynamic reachability of charging load increase, or the second dynamic reachability interval formed by the sum of the dynamic reachability of power generation and the dynamic reachability of charging load decrease. It is a projection operator, which applies a projection operation to the target evolution requirement and then to the non-battery resource dynamic reachability interval of the k-th coordination period.

6. The integrated photovoltaic-storage-charging dual-feedback coordinated control method including hybrid pumped storage as described in claim 1, characterized in that, In the two-stage split-Bluer rolling optimization, a split-Bluer chance constraint is applied, which is constructed in the following manner: Historical prediction error samples are received, including photovoltaic power generation prediction errors, charging load prediction errors, and in-station DC load prediction errors, forming the i-th error sample vector. ,in, Let be the prediction error of the photovoltaic power generation capacity of the i-th sample. Let be the charging load prediction error for the i-th sample. Let be the in-station DC load prediction error for the i-th sample. It is the transpose symbol; Construct an empirical distribution using the most recent N prediction error samples: , In the formula, For empirical distribution, The total number of samples, To focus on the i-th error sample vector Unit probability mass at a location; With first-order Wasserstein distance To construct a Wasserstein fuzzy set for the metric, the expression is: , , In the formula, For candidate probability distribution, To support the collection The set of probability measures on Let the radius of the fuzzy set be . As the radius base value, The degree of dispersion of the current prediction error. This is the adjustment coefficient; With the aforementioned Wasserstein fuzzy set Based on this, the prediction time domain is... The step prediction applies a segmented bar opportunity constraint, wherein the segmented bar opportunity constraint includes a DC bus voltage opportunity constraint, a battery state of charge opportunity constraint, and a hydropower state of charge opportunity constraint, which respectively satisfy: , , , In the formula, To find the supremum on the Wasserstein fuzzy set, For the probability measure under the candidate probability distribution, This is the lower limit of the DC bus voltage. This represents the upper limit of the DC bus voltage. and These are the lower and upper limits of the state of charge (SOC) of energy storage batteries, respectively. and These are the lower and upper limits of the hydrodynamic state, respectively. For DC bus voltage constraints, the value range is (0,1). The battery state of charge constraint has a value range of (0,1). The allowable risk level for the hydropower state constraint is defined, with a value range of (0,1). For the first Predicted DC bus voltage at time 10:

00. For the first Predicted state of charge of the energy storage battery at any given time. For the first Predicted hydropower state at any given time.

7. The integrated photovoltaic-storage-charging dual-feedback coordinated control method with hybrid pumped storage as described in claim 6, characterized in that, The process of using the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary, performing a two-stage sub-Blu-ray rolling optimization, and generating control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point based on the optimization results, and issuing them for execution includes: The difference between the target evolution requirement and the reconstruction requirement is calculated as the projection residual, expressed as: , In the formula, The projected residual for the k-th coordination period, For the target evolution requirements of the k-th coordination cycle, The reconfiguration requirement for the kth coordination cycle; With the goal of minimizing the tracking error of the reconfiguration requirement, and using the dynamic reachability and mixed-integer operating condition constraints as boundaries, a first-stage sub-Bruker rolling optimization is performed under the sub-Bruker chance constraint to optimize the charging power of the energy storage battery. and discharge power With the value fixed at zero, find the optimal solution for non-battery resources. The non-battery resources include pumping units, hydroelectric generators, adjustable charging loads, and bidirectional grid-connected converters; Determine whether the first stage of optimization is feasible, and whether the result of the first stage of optimization can bring the DC bus voltage and grid connection point power into the preset dead zone; If the first stage optimization is feasible and the result of the first stage optimization can bring the DC bus voltage and grid connection point power into their respective preset dead zones, then the optimal solution of the first stage will be... As the output of non-battery resource control instructions for the current coordination cycle, skip the second phase; If the first stage of optimization is not feasible, or the optimization result of the first stage cannot bring the DC bus voltage or grid connection point power into the preset dead zone, then the optimal solution of the first stage shall be adopted. As input, the second stage of the split-Brow bar rolling optimization is triggered, specifically by releasing the charging power variable of the energy storage battery. and the discharge power variable of the energy storage battery Apply tolerance constraints With the minimization of battery charge / discharge throughput as an additional objective, the second-stage optimization problem is solved under the tolerance constraints and the fractional bar chance constraints to obtain the optimal charge / discharge power of the battery. and updated non-battery resource control instructions, among which, To predict the step size index in the time domain, To preset the tolerance band width, It is an infinite norm. In the first phase of optimization, the... The optimal solution for non-battery resources at any given moment. For the second phase of optimization, the first Values ​​of control variables for non-battery resources at any given time; Determine the mutually exclusive mode indicator based on the symbol of the reconstruction requirement. and ,in This is an indicator quantity for the photovoltaic surplus mode. This is an indicator of insufficient photovoltaic mode, when the reconfiguration demand is positive. and When the reconstruction requirement is negative , And satisfy ; Calculate the signed power regulation of the battery ,in, To achieve the optimal charging power for the battery, This represents the optimal discharge power for the battery. Using the mode indicator, the projection residual, and the battery signed adjustment power as inputs, the surplus residual power and the deficit residual power are calculated under the most unfavorable probability distribution, expressed as follows: , , In the formula, To provide surplus residual power, This represents the missing residual power. For candidate probability distribution, Let the expected value be the probability distribution. To find the supremum on the Wasserstein fuzzy set, To perform the positive part operation; The dynamic power reference value for the AC grid-connected point is calculated based on the surplus residual power and the deficit residual power, and the expression is as follows: , In the formula, This is the dynamic power reference value for the AC grid connection point during the k-th coordination cycle. The DC / AC conversion efficiency for transmission from the DC side to the AC side. Let be the surplus residual power in the k-th coordination cycle. The residual power deficit during the k-th coordination cycle; The optimal control command for the non-battery resources, the optimal charging and discharging power of the battery, and the dynamic power reference value of the AC grid connection point are sent as output commands for the current coordination cycle to each execution device to complete the control of the current coordination cycle.

8. A dual-feedback coordinated control system for photovoltaic-storage-charging integration, comprising a hybrid pumped storage system, characterized in that: The system includes: The acquisition module is configured to collect operating status data and prediction data from both the DC and AC sides. The generation module is configured to construct a dual feedback quantity based on the DC bus voltage deviation and the AC grid connection point net exchange power deviation, and generate an AC-DC coupled energy deviation based on the dual feedback quantity. The AC-DC coupled energy deviation is used to unify the energy storage change of the DC bus and the power deviation of the AC grid connection point to the same power scale. The superposition module is configured to generate evolution requirements based on the predicted photovoltaic power generation, the predicted charging load, and the predicted DC load in the station, and to superimpose the AC / DC coupling energy deviation onto the evolution requirements to obtain the target evolution requirements. The projection module is configured to calculate the dynamic reachability of the pumping unit, hydro-generator unit, and adjustable charging load within the current coordination cycle based on the operating status data, project the target evolution requirement onto the dynamic reachability interval formed by the dynamic reachability, and obtain the reconfiguration requirement. The positive or negative sign of the reconfiguration requirement is used to characterize whether the system is in a photovoltaic surplus state or a photovoltaic shortage state, and the position of the value of the reconfiguration requirement relative to the dynamic reachability interval is used to determine the level within the photovoltaic surplus state or photovoltaic shortage state. The optimization module is configured to perform a two-stage bibliometric rolling optimization with the reconfiguration requirement as the tracking target and the dynamic reachability as the constraint boundary. Based on the optimization results, it generates control commands for each regulating resource and dynamic power reference values ​​for the AC grid connection point and issues them for execution. In the first stage, the charging and discharging power of the energy storage battery is fixed at zero, and the optimization is performed with non-battery resources as the main regulating body. When the first stage does not meet the preset conditions, the second stage is executed, releasing the charging and discharging power variable of the energy storage battery to participate in the optimization, and limiting the degree to which the non-battery resources deviate from the optimal solution of the first stage does not exceed the preset tolerance band.

9. An electronic device, characterized in that, include: At least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the program is executed by the processor, it implements the method according to any one of claims 1 to 7.