A two-stage solid-state transformer graded flexible start-up method and device

By dividing the startup process of a two-stage solid-state transformer into uncontrolled charging, small pulse voltage building-up, and soft bypass voltage boosting stages, a three-stage buffer boosting mechanism is constructed, which solves the problem of current surge during startup and improves safety and equipment lifespan.

CN123122223APending Publication Date: 2026-11-17TBEA TECH INVESTMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611494326.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing two-stage solid-state transformer startup technology uses direct power-on and overall forced voltage regulation, which can easily generate large inrush currents, leading to damage to power devices, contact devices and capacitors, posing significant safety issues.

Method used

The startup process of a two-stage solid-state transformer is divided into an uncontrolled charging stage, a small pulse voltage build-up stage, and a soft bypass voltage boost stage. A three-stage buffer voltage boost mechanism is constructed through the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass voltage boost stage to achieve a smooth rise in DC bus capacitor voltage and low-voltage DC side output voltage, avoiding current surges and impacts.

Benefits of technology

It effectively reduces the electrical stress on power devices, capacitors, and contactors, extends equipment lifespan, and improves startup safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123122223A_ABST
    Figure CN123122223A_ABST
Patent Text Reader

Abstract

This application discloses a graded flexible start-up method and apparatus for a two-stage solid-state transformer, including controlling the two-stage solid-state transformer to sequentially enter an uncontrolled charging stage, a small pulse voltage build-up stage, a soft bypass voltage boost stage, a rectifier module unlocked operation stage, and a converter module unlocked operation stage based on a preset start-up strategy. This application constructs a three-stage buffer voltage boost mechanism through the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass voltage boost stage, achieving a smooth rise in the DC bus capacitor voltage and the low-voltage DC side output voltage from zero to the rated value, thereby improving the start-up safety of the two-stage solid-state transformer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of solid-state transformer start-up control technology, and in particular to a two-stage solid-state transformer graded flexible start-up method and device. Background Technology

[0002] Two-stage solid-state transformers (SSTs), as a new generation of intelligent power electronic conversion devices, overcome the shortcomings of traditional power frequency transformers, such as large size, heavy weight, low voltage regulation accuracy, and lack of power quality management capabilities. They possess multiple advantages, including voltage level transformation, electrical isolation, bidirectional power flow, harmonic suppression, and reactive power compensation, making them core equipment for next-generation data centers, supercharging piles, flexible AC / DC distribution networks, and new energy consumption systems. Currently, mainstream two-stage solid-state transformers adopt a topology of front-stage CHB cascaded H-bridge rectification and rear-stage DAB dual active bridge isolated DC-DC conversion. The front-stage CHB module realizes the rectification and conversion of high-voltage AC power, while the rear-stage DAB module realizes the isolated conversion of DC power. The topology is modular and highly scalable.

[0003] Existing two-stage solid-state transformer startup technologies mostly adopt a direct power-on and overall forced voltage regulation startup method. In the initial stage of power-on, direct grid connection on the AC side can easily generate a large inrush current. This inrush current can cause power devices, contact devices, and capacitors to be subjected to excessive current stress and be easily damaged, resulting in startup failure of the two-stage solid-state transformer. This poses a significant safety problem in the startup process of two-stage solid-state transformers. Summary of the Invention

[0004] The main purpose of this application is to provide a two-stage solid-state transformer staged flexible start-up method and device, which aims to solve the problem that the existing two-stage solid-state transformer start-up technology adopts a start-up method of direct power-on and overall forced voltage regulation, which is prone to generating large inrush currents and can easily damage the power devices, contact devices and capacitors in the two-stage solid-state transformer, resulting in significant safety issues during the start-up process of the two-stage solid-state transformer.

[0005] To achieve the above objectives, this application proposes a two-stage solid-state transformer graded flexible start-up method. The two-stage solid-state transformer includes multiple rectifier modules, multiple converter modules, and multiple DC bus capacitors connected in series. The high-voltage DC output terminal of each rectifier module is connected to the high-voltage DC input terminal of one converter module and one DC bus capacitor. The two-stage solid-state transformer graded flexible start-up method includes: Based on a preset startup strategy, the two-stage solid-state transformer is controlled to sequentially enter the uncontrolled charging stage, the small pulse voltage building stage, and the soft bypass voltage boost stage. During the uncontrolled charging phase, multiple rectifier modules are controlled to start synchronously to perform uncontrolled charging on the corresponding DC bus capacitors, and the uncontrolled charging phase ends when the capacitor voltages of multiple DC bus capacitors all reach a preset charging threshold. During the small pulse voltage building-up phase, a control strategy is employed to start multiple conversion modules by starting with a preset initial duty cycle and gradually increasing the duty cycle with a preset increment. The small pulse voltage building-up phase ends when both the secondary and primary voltages of the multiple conversion modules reach the preset voltage regulation condition. During the soft bypass boosting stage, the multiple rectifier modules are bypassed one by one according to the preset bypass voltage regulation rate until the capacitor voltages of the multiple DC bus capacitors all reach the preset rated voltage range, at which point the soft bypass boosting stage ends.

[0006] In one embodiment, after controlling the two-stage solid-state transformer to sequentially enter the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass voltage boost stage based on a preset startup strategy, the method further includes: The two-stage solid-state transformer is controlled to sequentially enter the rectifier module unlocking operation stage and the converter module unlocking operation stage; During the rectifier module unlocking operation phase, the power and voltage of the multiple rectifier modules are adjusted in real time, and when the average voltage of each phase module on the DC side of the multiple rectifier modules reaches the first preset operating condition, the converter module unlocking operation phase is entered. During the unlocking and operation phase of the conversion module, the output voltage of the low-voltage DC side of the multiple conversion modules is adjusted, and when the output voltage of the low-voltage DC side of the multiple conversion modules reaches the second preset operating condition, the two-stage solid-state transformer is started.

[0007] In one embodiment, the two-stage solid-state transformer graded flexible start-up method further includes: During the startup process of the two-stage solid-state transformer, the electrical parameters and status parameters of the two-stage solid-state transformer are acquired in real time. When the electrical parameters and / or the status parameters exceed the preset normal operating range, the two-stage solid-state transformer is controlled to enter a fault state.

[0008] In one embodiment, the conversion module includes a high-frequency isolation transformer; The control strategy of starting with a preset initial duty cycle and gradually increasing the duty cycle with a preset increment, controls the startup of multiple transformation modules, including: The preset initial duty cycle is gradually increased from zero to the preset target duty cycle by a preset increment to drive the high-frequency isolation transformer; When the secondary voltage of the high-frequency isolation transformer reaches the preset voltage condition, the secondary voltage of the high-frequency isolation transformer is controlled to follow the primary voltage based on open-loop zero-phase shift control. When the secondary and primary voltages of the high-frequency isolation transformer reach the preset voltage stabilization conditions, the small pulse voltage build-up phase ends.

[0009] In one embodiment, bypassing the plurality of rectifier modules one by one according to a preset bypass voltage regulation rate includes: Scan the status of multiple rectifier modules and classify them into normal state rectifier modules and fault state rectifier modules; Based on the number of rectifier modules in fault condition, the preset theoretical number of soft bypass modules is corrected to obtain the actual number of soft bypass modules; The rectifier modules in normal state are sorted in real time according to the capacitor voltage of the corresponding connected straight bus capacitor, and then sorted from high to low to select the number of rectifier modules corresponding to the actual number of soft bypass modules. Based on the preset bypass voltage regulation rate, the selected rectifier modules are bypassed module by module until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range, thus ending the soft bypass boost stage.

[0010] In one embodiment, the step of bypassing the selected rectifier modules one by one based on a preset bypass voltage regulation rate includes: Based on the preset bypass voltage regulation rate, the normal state rectifier module with the highest ranking among the selected rectifier modules is soft bypassed in sequence. The capacitor voltages of the current multiple DC bus capacitors are obtained, and if the capacitor voltages of the multiple DC bus capacitors are not within the preset rated voltage range, the next sorted normal state rectifier module is soft-bypassed until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range.

[0011] In one embodiment, the real-time adjustment of the power and voltage on the AC side of the plurality of rectifier modules includes: Based on power regulation control, the AC side power and DC side voltage of multiple rectifier modules are adjusted in real time. The average voltage of each phase module on the DC side of multiple rectifier modules is acquired in real time. When the average voltage of each phase module on the DC side of multiple rectifier modules stably reaches the preset voltage regulation range and remains in a preset steady state for a duration, the converter module enters the unlocking operation phase.

[0012] In one embodiment, adjusting the output voltage on the low-voltage DC side of the plurality of conversion modules includes: Based on output voltage closed-loop control, the low-voltage DC voltage output from the low-voltage DC side of multiple conversion modules is adjusted to the preset low-voltage rated voltage range; The low-voltage DC voltage output from the low-voltage DC side of multiple conversion modules is acquired in real time, and the two-stage solid-state transformer is started up when the low-voltage DC voltage output from multiple conversion modules is stable within the preset low-voltage rated voltage range and continues for a preset steady-state duration.

[0013] In one embodiment, before the two-stage solid-state transformer enters the rectifier module unlocking operation phase, the method further includes: Control the two-stage solid-state transformer to enter the unlocking stage; During the unlocking phase, adaptive voltage regulation control is performed on the multiple rectifier modules to ensure that the capacitor voltage of the multiple DC bus capacitors remains stable within the preset rated voltage range. When an unlock operation command is received, the two-stage solid-state transformer is controlled to enter the rectifier module unlock operation phase.

[0014] Furthermore, to achieve the above objectives, this application also proposes a two-stage solid-state transformer graded flexible start-up device, which includes: a memory, a processor, and a two-stage solid-state transformer graded flexible start-up program stored in the memory and executable on the processor. The two-stage solid-state transformer graded flexible start-up program is configured to implement the two-stage solid-state transformer graded flexible start-up method as described above.

[0015] In summary, the two-stage solid-state transformer graded flexible start-up method proposed in this application divides the start-up voltage boosting process of the two-stage solid-state transformer into an uncontrolled charging stage, a small pulse voltage build-up stage, and a soft bypass voltage boosting stage. By constructing a three-stage buffer voltage boosting mechanism through the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass voltage boosting stage, the capacitor voltage of the DC bus capacitor and the output voltage of the low-voltage DC side are smoothly increased from zero to the rated value. There are no sudden changes or fast charging impacts throughout the process, which effectively reduces the electrical stress on power devices, capacitors, and contactors, significantly extends the service life of the equipment, and improves the start-up safety of the two-stage solid-state transformer. Attached Figure Description

[0016] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1 A schematic flowchart of a two-stage solid-state transformer graded flexible start-up method provided in an embodiment of this application; Figure 2 for Figure 1 A detailed flowchart of step S30 is shown below; Figure 3 for Figure 1 A detailed flowchart of step S40 is shown below; Figure 4 for Figure 3 A detailed flowchart of step S44 is shown below; Figure 5 for Figure 1 A schematic diagram of the specific process after step S10; Figure 6 for Figure 5 A detailed flowchart of step S60 is shown below; Figure 7 for Figure 5 A detailed flowchart of step S70 is shown below; Figure 8 This is another flowchart illustrating the two-stage solid-state transformer graded flexible start-up method of this application. Figure 9 This is a topology diagram of the two-stage solid-state transformer of this application; Figure 10 This is a block diagram of the flexible start-up logic state of the two-stage solid-state transformer in this application. Detailed Implementation

[0018] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0019] Furthermore, the use of terms such as "first" and "second" in this application is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. Additionally, the technical solutions of the various embodiments can be combined with each other, but only on the basis of being achievable by those skilled in the art. When the combination of technical solutions is contradictory or impossible to implement, such a combination of technical solutions should be considered non-existent and not within the scope of protection claimed in this application.

[0020] Existing two-stage solid-state transformer startup technologies mostly adopt a direct power-on and overall forced voltage regulation startup method. In the initial stage of power-on, direct grid connection on the AC side can easily generate a large inrush current. This inrush current can cause power devices, contact devices, and capacitors to be subjected to excessive current stress and be easily damaged, resulting in startup failure of the two-stage solid-state transformer. This poses a significant safety problem in the startup process of two-stage solid-state transformers.

[0021] To address the aforementioned issues, this application provides a graded flexible start-up method for a two-stage solid-state transformer. The start-up voltage boosting process of the two-stage solid-state transformer is divided into an uncontrolled charging stage, a small-pulse voltage build-up stage, and a soft bypass voltage boosting stage. A three-stage buffer voltage boosting mechanism is constructed through these stages to achieve a smooth rise in the DC bus capacitor voltage and the low-voltage DC side output voltage from zero to the rated value. This process is characterized by no sudden changes or fast-charging impacts, effectively reducing the electrical stress on power devices, capacitors, and contactors, significantly extending equipment lifespan, and improving the start-up safety of the two-stage solid-state transformer.

[0022] The two-stage solid-state transformer in this embodiment can be applied to power electronic conversion fields such as high-power supercharging piles, AC / DC distribution networks, and new energy grid connection. (Refer to...) Figure 9 As shown, the two-stage solid-state transformer in this embodiment includes multiple rectifier modules 210, multiple converter modules 220, and multiple DC bus capacitors 230 connected in series. The series input terminal of each rectifier module 210 is connected to an AC power source. The high-voltage DC output terminal of each rectifier module 210 is connected to the high-voltage DC input terminal of a converter module 220. Each converter module 220 outputs low-voltage DC power at its low-voltage DC output terminal. A DC bus capacitor 230 is connected in parallel between the high-voltage DC output terminal of each rectifier module 210 and the corresponding high-voltage DC input terminal of the converter module 220. The rectifier modules 210 are used to realize the DC conversion of high-voltage AC power. The converter modules 220 are used to realize the isolated conversion of DC power.

[0023] The rectifier module 210 can be an H-bridge rectifier or an MMC rectifier; this embodiment does not limit the choice. This embodiment uses an H-bridge rectifier module 210 as an example for explanation. The AC input terminal of the H-bridge rectifier is connected to an AC power supply, and the high-voltage DC output terminal of the H-bridge rectifier is connected in parallel with the DC bus capacitor 230.

[0024] The conversion module 220 includes a primary-side active bridge 221, a high-frequency isolation transformer 222, and a secondary-side active bridge 223. The high-voltage DC input terminal of the primary-side active bridge 221 is connected to the high-voltage DC output terminal of the H-bridge rectifier. The output terminal of the primary-side active bridge 221 is connected to the primary-side input terminal of the high-frequency isolation transformer 222. The secondary-side output terminal of the high-frequency isolation transformer 222 is connected to the input terminal of the secondary-side active bridge 212. The low-voltage DC output terminal of the secondary-side active bridge 212 outputs low-voltage DC power.

[0025] The executing entity in this application is a computing service device with data processing, network communication, and program execution functions, such as a controller, or an electronic device or intelligent control terminal such as an industrial host, tablet computer, or personal computer. The following description uses a controller as an example to illustrate various embodiments of this application.

[0026] The controller in this embodiment can also be connected to a monitoring backend. The monitoring backend can be set up in the power distribution room, or in the power grid dispatch room or monitoring room, so that dispatch management personnel or operation and maintenance management personnel can monitor the start-up status and operation status of the two-stage solid-state transformer in real time, or send control commands to the controller to control the start-up process of the two-stage solid-state transformer.

[0027] Combination Figure 1 and Figure 9 As shown, the two-stage solid-state transformer graded flexible start-up method proposed in this application includes steps S10-S20: S10, based on a preset startup strategy, controls the two-stage solid-state transformer to sequentially enter the uncontrolled charging stage, the small pulse voltage building stage, and the soft bypass voltage boosting stage.

[0028] The preset startup strategy includes the startup process of a two-stage solid-state transformer and the termination conditions for each startup stage. Examples include the termination conditions for the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass boost stage. It also includes termination conditions for other startup stages.

[0029] When controlling a two-stage solid-state transformer to sequentially enter the uncontrolled charging stage, the small pulse voltage building stage, and the soft bypass voltage boosting stage, the dispatching and management personnel can issue instructions to the controller through the monitoring background to control the two-stage solid-state transformer to enter different startup stages.

[0030] For example, the dispatcher sends an AC charging command to the controller via the monitoring backend. Upon receiving the command, the controller initiates uncontrolled charging of the two-stage solid-state transformer. When the uncontrolled charging phase ends, the dispatcher sends a small-pulse voltage-building command to the controller via the monitoring backend. Upon receiving this command, the controller initiates small-pulse voltage-building of the two-stage solid-state transformer. Similarly, when the small-pulse voltage-building phase ends, the dispatcher sends a soft-bypass voltage-boosting command to the controller via the monitoring backend. Upon receiving this command, the controller initiates soft-bypass voltage-boosting of the two-stage solid-state transformer.

[0031] Of course, controlling the two-stage solid-state transformer to enter different startup stages can also be automatically triggered by the controller. For example, when the controller receives the end signal of the uncontrolled charging stage, it automatically controls the two-stage solid-state transformer to enter the small pulse voltage build-up stage. When the controller receives the end signal of the small pulse voltage build-up stage, it automatically controls the two-stage solid-state transformer to enter the soft bypass voltage boost stage.

[0032] S20: During the uncontrolled charging phase, multiple rectifier modules are controlled to start synchronously to perform uncontrolled charging on the corresponding DC bus capacitors. The uncontrolled charging phase ends when the capacitor voltages of multiple DC bus capacitors all reach the preset charging threshold.

[0033] This specification describes the application of a two-stage solid-state transformer in an AC / DC power distribution network. This embodiment uses a two-stage solid-state transformer with a rated voltage of AC10kV / DC800V and a rated capacity of 2500kVA as the application object, applied to an AC / DC power distribution network.

[0034] An AC input circuit breaker is provided between the series input terminals of multiple rectifier modules 210 in the front stage of the two-stage solid-state transformer and the AC / DC power distribution network. This circuit breaker is used to disconnect the connection with the AC / DC power distribution network when the two-stage solid-state transformer malfunctions.

[0035] Optionally, the preset charging threshold is set to 50% of the rated voltage of the two-stage solid-state transformer. Of course, the preset charging threshold can also be set to other thresholds. This embodiment does not limit this, as long as it does not exceed the charging cutoff voltage of the DC bus capacitor.

[0036] In this embodiment, when the two-stage solid-state transformer enters the uncontrolled charging stage, the controller controls the AC input circuit breaker to close, allowing the AC power supply in the AC / DC distribution network to be rectified by multiple series-connected rectifier modules, thereby uncontrolled charging the DC bus capacitors corresponding to each rectifier module. During the uncontrolled charging process of the DC bus capacitors, the charging speed of each DC bus capacitor may vary due to factors such as differences in line impedance and initial capacitor voltage. To avoid undervoltage or overvoltage of any DC bus capacitor when entering the next startup stage, this embodiment collects the capacitor voltage of the DC bus capacitors in real time. When the capacitor voltage of each DC bus capacitor reaches a preset charging threshold, the uncontrolled charging stage is determined to end, and an uncontrolled charging stage end signal is sent back to the monitoring backend.

[0037] The two-stage solid-state transformer is also connected to the high-voltage control board via a soft-start contactor. The high-voltage control board is equipped with a register, which stores at least the communication and operating parameters of the rectifier module. In this embodiment, when the controller determines that the capacitor voltage of multiple DC bus capacitors has reached a preset charging threshold, it controls the soft-start contactor to close, energizing the high-voltage control board and resetting the communication and operating parameters of the rectifier module stored in the register. This is to prevent the register from retaining the communication and operating parameters from the previous operation, which could cause communication address conflicts, incorrect operating modes, or other abnormal faults during the current startup.

[0038] In this embodiment, when starting the two-stage solid-state transformer, the DC bus capacitor is charged first. This is to increase the voltage of the pre-charge resistor at the front end of the two-stage solid-state transformer before closing it. This prevents the main contactor in the main circuit from being closed due to the large voltage drop across the terminals, which would cause a large inrush current to the power devices and damage the power devices, as well as the rectifier and converter modules of the two-stage solid-state transformer.

[0039] S30, during the small pulse voltage building-up phase, uses a control strategy that starts with a preset initial duty cycle and gradually increases the duty cycle with a preset increment to control the startup of multiple conversion modules, and ends the small pulse voltage building-up phase when the secondary and primary voltages of multiple conversion modules reach the preset voltage regulation conditions.

[0040] The preset voltage regulation condition refers to the phase and amplitude of the secondary voltage and primary voltage of the converter module being consistent, that is, the secondary voltage and primary voltage of the high-frequency isolation transformer reaching a steady state. The preset initial duty cycle is set to 0%, and the preset increment is set to 1%. The preset increment can also be set to 2% or other proportions. This embodiment does not limit this. This embodiment takes a preset initial duty cycle of 0% and a preset increment of 1% as an example to control the start-up of the converter module by gradually increasing the preset initial duty cycle to the target duty cycle.

[0041] Optionally, the target duty cycle can be set to 10%. Of course, the target duty cycle can also be set to other ratios. This embodiment does not limit this, as long as the power switching transistor on the high-voltage side of the converter module is driven to start the converter module by a small pulse drive.

[0042] Both the high-voltage and low-voltage sides of the converter module are connected to power switching transistors. The power switching transistors on the high-voltage side are used to build up voltage in the converter module during the initial startup phase, while the power switching transistors on the low-voltage side are used to control the secondary voltage of the converter module to stably follow the primary voltage.

[0043] In this embodiment, when the two-stage solid-state transformer enters the small-pulse voltage build-up stage, the controller turns on the power switch on the high-voltage side of the converter module and gradually increases the drive pulse duty cycle from 0 to the target duty cycle at a rate of 1%. The controller then drives the high-frequency isolation transformer in the converter module to start at the target duty cycle, causing the secondary voltage of the high-frequency isolation transformer to rise slowly. When the secondary and primary voltages of the high-frequency isolation transformer reach the preset voltage regulation condition, the small-pulse voltage build-up stage is considered to have ended, and a signal indicating the end of the small-pulse voltage build-up stage is sent to the monitoring backend. This embodiment, by using small-pulse driving to slowly raise the secondary voltage of the converter module and bring the primary and secondary voltages to a steady state, avoids problems such as surge current and voltage overshoot caused by the converter module using full or large duty cycle driving methods.

[0044] The two-stage solid-state transformer is also connected to the low-voltage control board via a soft-start contactor. The low-voltage control board is equipped with a register, which stores at least the communication and operating parameters of the conversion module. In this embodiment, when the controller determines that the secondary and primary voltages of the conversion module have reached the preset voltage regulation conditions, it controls the soft-start contactor to close, energizing the high-voltage control board and resetting the communication and operating parameters of the conversion module stored in the register. This is to prevent the register from retaining the communication and operating parameters from the previous operation, which could cause communication address conflicts, incorrect operating modes, or other abnormal faults during the current startup.

[0045] S40, during the soft bypass boost stage, bypasses multiple rectifier modules one by one according to the preset bypass voltage regulation rate until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range, at which point the soft bypass boost stage ends.

[0046] Optionally, the preset rated voltage range is set to 95% to 100% of the rated voltage of the two-stage solid-state transformer. Of course, it can also be set to other proportions, which are not limited in this embodiment.

[0047] Optionally, the preset bypass voltage regulation rate can be set to 500ms / unit, or it can be adjusted according to actual application requirements. This embodiment does not limit this.

[0048] Multiple rectifier modules are connected to soft bypass switches, which can be transistors, MOSFETs, or other power switching transistors. This embodiment does not limit the specific type of switch.

[0049] In this embodiment, when the two-stage solid-state transformer enters the uncontrolled charging stage, the controller first scans the current status of multiple rectifier modules and counts the number of rectifier modules in fault state to correct the preset theoretical number of soft bypass modules, thereby obtaining the actual number of soft bypass modules. Based on the actual number of soft bypass modules, the controller performs soft bypass operation on the rectifier modules in normal state module by module according to the preset bypass voltage regulation rate, until the capacitor voltage of multiple DC bus capacitors is gradually boosted to the preset rated voltage range. When the capacitor voltage of multiple DC bus capacitors is boosted to the preset rated voltage range, the soft bypass boost stage is determined to be over, and the buffer boost of the two-stage solid-state transformer is completed. This embodiment first charges the DC bus capacitor through an uncontrolled charging stage to avoid large inrush currents on power devices due to excessive voltage drop across the main contactor in the main circuit. Secondly, a small-pulse voltage build-up stage ensures a smooth establishment of the primary and secondary voltages of the converter module, preventing surge currents or voltage overshoots caused by full or large duty cycle driving. Then, a soft-bypass boost stage smoothly raises the DC bus capacitor voltage to its rated range. This three-stage buffer boost mechanism, consisting of the uncontrolled charging stage, the small-pulse voltage build-up stage, and the soft-bypass boost stage, achieves a smooth rise in the DC bus capacitor voltage and the low-voltage DC side output voltage from zero to the rated value, without sudden changes or fast-charging shocks. This effectively reduces the electrical stress on power devices, capacitors, and contactors, significantly extends equipment lifespan, and improves the startup safety of the two-stage solid-state transformer.

[0050] In one embodiment, before step S10, which controls the two-stage solid-state transformer to sequentially enter the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass voltage boost stage based on a preset startup strategy, step S1 is further included, wherein: Step S1: Initialize the operating status of the two-stage solid-state transformer.

[0051] The controller stores various startup parameter configurations during the startup process. Of course, the controller also stores communication parameters, operating parameters, and status monitoring flags, etc., during the startup and operation of the two-stage solid-state transformer.

[0052] In this embodiment, when the two-stage solid-state transformer is connected to the AC / DC distribution network, the two-stage solid-state transformer enters the shutdown state by default. At this time, the controller controls all power switches, AC input circuit breakers and DC output circuit breakers in the two-stage solid-state transformer to disconnect, and automatically completes the initialization and clearing of analog quantity acquisition variables, digital quantity counters, module control instructions and fault registers, and resets all status flags.

[0053] Before the two-stage solid-state transformer is officially started, this embodiment will first reset and initialize the controller and the operating status flags of the two-stage solid-state transformer to avoid the enabling status, operating mode, fault flag or temporary variable left over from the previous operation from affecting the current start-up. It also prevents the two-stage solid-state transformer from accidentally closing the switch tube or the circuit breaker when it is not ready to start up, thus improving the safety of the start-up.

[0054] In one embodiment, please refer to Figure 2 As shown, in step S30, the control strategy of starting with a preset initial duty cycle and gradually increasing the duty cycle with a preset increment to control the startup of multiple conversion modules includes steps S31-S33, wherein: S31, the preset initial duty cycle is gradually increased from zero to the preset target duty cycle by a preset increment to drive the high-frequency isolation transformer; S32, when the secondary voltage of the high-frequency isolation transformer reaches the preset voltage condition, based on open-loop zero-phase-shift control, the secondary voltage of the high-frequency isolation transformer is controlled to follow the primary voltage. S33: When the secondary voltage and primary voltage of the high-frequency isolation transformer reach the preset voltage regulation condition, the small pulse voltage building-up stage ends.

[0055] Optionally, the preset initial duty cycle is set to 0%, the preset increment is set to 1%, and the preset target duty cycle is set to 10%. Of course, the preset initial duty cycle, preset increment, and preset target duty cycle can also be set to other ratios. This embodiment does not limit this, as long as the high-frequency isolation transformer is driven to start in a small pulse manner.

[0056] Optionally, the preset voltage condition is set to the secondary voltage of the high-frequency isolation transformer reaching 95% of the primary voltage. Of course, the preset voltage condition can also be set to other ratios of the secondary voltage reaching the primary voltage. This embodiment does not limit this. However, it is worth noting that the ratio between the secondary voltage and the primary voltage of the high-frequency isolation transformer cannot be set too low. Otherwise, when performing open-loop zero-phase shift control, there will be a large voltage difference between the primary and secondary voltages of the high-frequency isolation transformer, generating a huge instantaneous current that will damage the high-frequency isolation transformer.

[0057] Open-loop zero-phase-shift control refers to an open-loop control method that forcibly locks the phase difference between the primary and secondary drive signals of a high-frequency isolation transformer to zero when a two-stage solid-state transformer is in low-voltage startup condition. In this embodiment, the open-loop zero-phase-shift control method is adopted to ensure that the amplitude voltage of the high-frequency isolation transformer rises smoothly with the primary voltage, avoiding the secondary voltage from continuously rising and exceeding the rated voltage of the equipment, which could damage the equipment. It also avoids problems such as control oscillation and response lag caused by fluctuations in electrical parameters during the initial startup phase, thus achieving a rapid and accurate smooth rise of the secondary voltage of the high-frequency isolation transformer in line with the primary voltage.

[0058] In this embodiment, when the two-stage solid-state transformer enters the small-pulse voltage build-up stage, the controller controls the power switch on the high-voltage side of the conversion module to turn on and controls the duty cycle of the drive pulse of the power switch to slowly and linearly increase to the preset duty cycle at a rate of 1% / s. The high-frequency isolation transformer is started by driving it in a small-pulse drive mode, so that the secondary voltage of the high-frequency isolation transformer rises slowly. This avoids directly applying the rated drive pulse to the primary winding of the high-frequency isolation transformer in the initial stage of startup, which would cause a sudden excitation change in the high-frequency isolation transformer and result in a spike in the secondary voltage. When the secondary voltage of the high-frequency isolation transformer reaches the preset voltage condition, the controller controls the power switch on the low-voltage side of the conversion module to turn on and sets the phase shift angle of the primary and secondary sides of the high-frequency isolation transformer to 0. This allows the secondary voltage of the high-frequency isolation transformer to accurately follow the primary voltage and rise steadily, eliminating the phase shift and amplitude mismatch problems of the voltages on both sides of the high-frequency isolation transformer. When the secondary voltage and primary voltage of the high-frequency isolation transformer reach the preset voltage stabilization condition, that is, when the steady state is reached, the small-pulse voltage build-up stage is determined to be completed.

[0059] In one embodiment, please refer to Figure 3 As shown, in step S40, the step of bypassing multiple rectifier modules one by one according to the preset bypass voltage regulation rate, further includes steps S41-S44, wherein: S41, scan the status of multiple rectifier modules and divide the multiple rectifier modules into normal state rectifier modules and fault state rectifier modules; S42, Based on the number of rectifier modules in fault condition, the preset theoretical number of soft bypass modules is corrected to obtain the actual number of soft bypass modules; S43, sort the rectifier modules in normal state in real time according to the capacitor voltage of the corresponding connected straight bus capacitor, and sort them from high to low to select the number of rectifier modules corresponding to the actual number of soft bypass modules. S44, based on the preset bypass voltage regulation rate, bypasses the selected rectifier modules one by one until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range, and then ends the soft bypass boost stage.

[0060] Optionally, the preset rated voltage range is set to 95% to 100% of the rated voltage of the two-stage solid-state transformer. Of course, it can also be adjusted according to the actual voltage requirements, but this embodiment does not limit it.

[0061] A fault-prone rectifier module refers to a rectifier module that cannot function properly due to overcurrent, overvoltage, undervoltage, overtemperature, or communication interruption. A normal-prone rectifier module refers to a rectifier module without fault indicators such as overcurrent, overvoltage, undervoltage, overtemperature, or communication failure. The number of soft bypass modules refers to the number of effective rectifier modules in a two-stage solid-state transformer that participate in voltage boosting regulation and bear the responsibility of gradually raising the bus voltage. It is a regulation parameter used to evenly distribute starting power and achieve smooth voltage boosting. The preset theoretical number of soft bypass modules is an initial reference parameter configured based on the rated starting conditions of the two-stage solid-state transformer. The actual number of soft bypass modules is the number of effective rectifier modules that can be put into operation after fault elimination and dynamic correction of the theoretical number of soft bypass modules.

[0062] The system also scans the status of multiple rectifier modules. It can collect electrical parameters of the AC input side and the high-voltage DC output side of the rectifier modules in real time through voltage or current sensors to determine whether electrical abnormal faults such as overcurrent or overvoltage have occurred. It can also determine whether communication abnormal faults have occurred through communication link status verification. This embodiment does not limit the specific scanning methods. This embodiment uses monitoring electrical abnormal faults of rectifier modules as an example for explanation.

[0063] In this embodiment, when the two-stage solid-state transformer enters the soft bypass boost stage, the controller collects the electrical parameters of each rectifier module in real time. Rectifier modules exhibiting electrical abnormalities such as overcurrent or overvoltage are classified as faulty rectifier modules, while those operating normally are classified as normal rectifier modules. Then, based on the current number of faulty rectifier modules, the preset theoretical number of soft bypass modules is corrected to eliminate the error influence of faulty rectifier modules, thus obtaining the effective number of rectifier modules required during the actual startup process. The specific correction process is as follows: Actual number of soft bypass modules = theoretical number of soft bypass modules - number of rectifier modules in fault condition.

[0064] All normal-state rectifier modules are sorted in real time according to the capacitor voltage of the corresponding connected straight bus capacitors from high to low. The number of normal-state rectifier modules in the current sort that corresponds to the actual number of soft bypass modules is locked and numbered. According to the preset bypass voltage regulation rate, the soft bypass voltage boost operation is performed on each rectifier module according to the number until the capacitor voltage of each DC bus capacitor is boosted to the preset rated voltage range. When the capacitor voltage of each DC bus capacitor is boosted to the preset rated voltage range, the soft bypass voltage boost stage is determined to be over. At this time, the buffer voltage boost of the two-stage solid-state transformer is completed.

[0065] It is worth noting that in this embodiment, when the capacitor voltage of each DC bus capacitor is boosted to the preset rated voltage range, a voltage stabilization operation is also performed to stabilize the voltage of each DC bus capacitor within the preset rated voltage range. During this stage, each normal state rectifier module is sorted in real time, and when the capacitor voltage of each DC bus capacitor is lower than or exceeds the preset rated voltage range, the normal state rectifier module with higher voltage is soft-bypassed based on the actual number of soft bypass modules. This avoids the voltage of each DC bus capacitor from exceeding the preset rated voltage range due to voltage fluctuations or other interference factors in the AC / DC distribution network.

[0066] It is worth noting that when performing a soft bypass operation on each normal-state rectifier module, if one of the normal-state rectifier modules has already been soft-bypassed, the next soft bypass operation will not continue to soft-bypass that normal-state rectifier module, thus avoiding repeated soft bypass operations on the same rectifier module and causing invalid operations.

[0067] In this embodiment, faulty rectifier modules in the two-stage solid-state transformer are removed from the soft bypass boosting process, and the preset theoretical number of soft bypass modules is corrected to obtain the actual number of soft bypass modules. This avoids the situation where the normal modules are overvoltaged, overcurrented, or lose voltage equalization control due to the original theoretical number of soft bypass modules being put into operation when some modules are faulty. It also avoids the situation where too few modules are put into operation, resulting in insufficient boosting rate and excessively long start-up time. This ensures that the soft bypass boosting process matches the actual capacity of the remaining normal modules. Secondly, all normally operating rectifier modules in the two-stage solid-state transformer are sorted, and the rectifier modules with higher voltage are prioritized for soft bypass boosting. This allows the capacitor voltage of the DC bus capacitor and the secondary output voltage of the high-frequency isolation transformer to rise at a controllable slope, avoiding bus overvoltage and current surges caused by multiple rectifier modules being bypassed simultaneously or voltage sudden changes.

[0068] In one embodiment, please refer to Figure 4 As shown, in step S44, the step of bypassing the selected rectifier modules one by one based on the preset bypass voltage regulation rate further includes steps S441-S443, wherein: S441, based on the preset bypass voltage regulation rate, performs soft bypass on the normal state rectifier module with the highest ranking among the selected rectifier modules in sequence; S442: Obtain the capacitor voltage of multiple DC bus capacitors. If the capacitor voltage of multiple DC bus capacitors is not within the preset rated voltage range, perform soft bypass on the next sorted normal state rectifier module until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range.

[0069] In this embodiment, when performing a soft bypass operation on the normal state rectifier modules, the system selects a number of normal state rectifier modules corresponding to the actual number of soft bypass modules. For example, if the corrected actual number of soft bypass modules is 4, the four normal state rectifier modules with the highest voltage in the voltage ranking are selected. During the soft bypass operation, the normal state rectifier modules with the highest voltage in the ranking are first bypassed. At this time, the power provided by the AC / DC distribution network is evenly distributed to the remaining DC bus capacitors, causing the capacitor voltage of each DC bus capacitor to rise. The controller then determines whether the capacitor voltage of each DC bus capacitor has reached the preset rated voltage range. If so, it means that the voltage rise requirement has been met, and the buffer voltage rise of the two-stage solid-state transformer is completed. If the preset rated voltage range has not been reached, the next normal state rectifier module in the ranking is also bypassed. The controller then determines again whether the capacitor voltage of each DC bus capacitor has reached the preset rated voltage range, and so on, until the capacitor voltage of each DC bus capacitor reaches the preset rated voltage range.

[0070] It is worth noting that the actual number of soft bypass modules is obtained by correcting the preset theoretical number of soft bypass modules based on the rated starting condition configuration of the two-stage solid-state transformer. Therefore, there will be no situation where the preset rated voltage range is not reached after bypassing all the normal state rectifier modules corresponding to the actual number of soft bypass modules.

[0071] In one embodiment, please refer to Figure 5 As shown, in step S10, after controlling the two-stage solid-state transformer to sequentially enter the uncontrolled charging stage, the small pulse voltage building stage, and the soft bypass voltage boost stage based on the preset startup strategy, steps S50-S70 are further included, wherein: S50 controls the two-stage solid-state transformer to sequentially enter the rectifier module unlock operation stage and the converter module unlock operation stage; S60, during the rectifier module unlocking operation phase, adjusts the power and voltage of multiple rectifier modules in real time, and enters the converter module unlocking operation phase when the average voltage of each phase module on the DC side of multiple rectifier modules reaches the first preset operating condition. S70, during the unlocking and operation phase of the conversion modules, adjusts the output voltage of the low-voltage DC side of multiple conversion modules, and when the output voltage of the low-voltage DC side of multiple conversion modules reaches the second preset operating condition, completes the start-up of the two-stage transformer.

[0072] When controlling a two-stage solid-state transformer to sequentially enter the rectifier module unlocking operation phase and the converter module unlocking operation phase, the dispatching manager can issue commands to the controller through the monitoring backend to control the two-stage solid-state transformer to enter different start-up phases. For example, the dispatching manager issues a rectifier module unlocking command to the controller through the monitoring backend. When the controller receives the rectifier module unlocking command, it controls the two-stage solid-state transformer to enter the rectifier module unlocking operation phase. When the rectifier module unlocking operation phase ends, the dispatching manager issues a converter module unlocking command to the controller through the monitoring backend. When the controller receives the converter module unlocking command, it controls the two-stage solid-state transformer to enter the converter module unlocking operation phase.

[0073] Of course, the controller can also automatically trigger the two-stage solid-state transformer to enter different startup stages. For example, when the controller receives the end signal of the rectifier module unlocking operation stage, it can automatically control the two-stage solid-state transformer to enter the converter module unlocking operation stage.

[0074] In this embodiment, in order to improve the startup safety and reliability of the two-stage solid-state transformer, it is preferable to use a manual command issuance method.

[0075] In this embodiment, the rectifier module is unlocked and operated first, and the converter module is unlocked and operated only after the average voltage of each phase on the AC side of the rectifier module reaches the preset voltage regulation range. This hierarchical control logic avoids problems such as voltage mismatch between high and low voltage sides and instantaneous overvoltage and overcurrent when the rectifier module and the converter module are unlocked simultaneously. By performing the grid connection process and low-voltage side load-carrying process of the two-stage solid-state transformer in stages, the grid connection impact and load input impact are avoided to be superimposed at the same time, reducing the impact on the AC / DC distribution network and low-voltage side load. At the same time, it also solves the system oscillation and voltage fluctuation problems caused by abrupt control mode switching, and significantly improves the system startup success rate.

[0076] In one embodiment, before step S50, which unlocks the rectifier module, steps S2-S4 are further included, wherein: S2 controls the two-stage solid-state transformer to enter the unlocking stage; S3, during the unlocking phase, adaptive voltage regulation control is performed on multiple rectifier modules to ensure that the capacitor voltage of multiple DC bus capacitors remains stable within the preset rated voltage range. S4, when receiving the unlock operation command, controls the two-stage solid-state transformer to enter the rectifier module unlock operation stage.

[0077] Before unlocking the rectifier module after determining that the soft bypass boost stage is complete, the two-stage solid-state transformer is controlled to enter the unlocking stage. In this stage, the two-stage solid-state transformer still executes the control logic of the soft bypass boost stage, so that the capacitor voltage of multiple DC bus capacitors remains stable within the preset rated voltage range, ensuring that the primary and secondary voltages of the high-frequency isolation transformer remain in a steady state.

[0078] In this embodiment, before the two-stage solid-state transformer enters the unlocking stage, it first enters the waiting unlocking stage. Upon receiving the unlocking command, it then enters the unlocking stage. This is to avoid immediately unlocking the rectifier module and converter module after the soft-start voltage boost is completed, thus avoiding voltage surges and grid connection surges caused by transient instability of operating conditions. This improves the smoothness and reliability of the two-stage solid-state transformer switching from soft-start operating conditions to rated steady-state operating conditions.

[0079] In one embodiment, please refer to Figure 6 As shown, in step S60, when entering the rectifier module unlocking operation stage, the step of real-time adjustment of the power and voltage of multiple rectifier modules further includes steps S61-S62, wherein: S61, based on power regulation control, performs real-time adjustment of the AC side power and DC side voltage of multiple rectifier modules; S62 acquires the average voltage of each phase module on the DC side of multiple rectifier modules in real time, and enters the unlocking operation phase of the converter module when the average voltage of each phase module on the DC side of multiple rectifier modules stably reaches the preset voltage regulation range and continues for a preset steady state duration.

[0080] Optionally, the preset voltage regulation range is set to ±10% of the rated voltage of the two-stage solid-state transformer, and the preset steady-state duration is set to 3s. Of course, the preset voltage regulation range can also be set to other ranges, and the preset steady-state duration can also be adjusted. This embodiment does not limit these settings.

[0081] Power regulation control includes at least active power regulation and reactive power regulation, used to regulate the active power, reactive power, DC bus voltage or AC side voltage of each rectifier module to operate stably according to the target given value. Active power regulation and reactive power regulation are conventional technologies, and will not be described in detail in this embodiment. The average voltage of each phase module refers to the voltage value obtained by averaging the voltage of each phase of the three phases A, B, and C on the DC side of the same rectifier module over multiple consecutive sampling periods.

[0082] In this embodiment, during the unlocking operation of the rectifier modules, the controller collects the AC voltage, AC current, active power, reactive power, and DC bus capacitor voltage of each rectifier module's AC input side in real time. It then adjusts the modulation ratio, phase shift angle, or switching sequence of the AC-side power switches of each rectifier module according to power regulation control, gradually matching the power of the AC input side and the DC-side voltage of each rectifier module with the amplitude, phase, and frequency of the AC / DC distribution network. The controller also obtains the average voltage of each phase on the DC side of each rectifier module in real time. When the average voltage of each phase on the DC side of each rectifier module stabilizes within a preset voltage regulation range, and this stable state lasts for a preset steady-state duration, it indicates that the phase voltages of each rectifier module are balanced and stable, and the voltage relationship with the corresponding side of the AC / DC distribution network meets the requirements for synchronous grid connection. This ensures that the AC side of the two-stage solid-state transformer meets the conditions for synchronous grid connection, at which point the two-stage solid-state transformer is determined to have completed the rectifier module unlocking stage.

[0083] In one embodiment, please refer to Figure 7 As shown, in step S70, when entering the conversion module unlocking operation stage, the step of adjusting the output voltage of the low-voltage DC side of multiple conversion modules further includes steps S71-S72, wherein: S71, based on output voltage closed-loop control, adjusts the low-voltage DC voltage output from the low-voltage DC side of multiple conversion modules to a preset low-voltage rated voltage range; S72 acquires the low-voltage DC output from the low-voltage DC side of multiple conversion modules in real time, and completes the startup of the two-stage solid-state transformer when the low-voltage DC output from multiple conversion modules stabilizes within the preset low-voltage rated voltage range and continues for a preset steady-state duration.

[0084] Optionally, the preset low-voltage rated voltage range is set to ±0.5% of the rated voltage of the two-stage solid-state transformer, and the preset steady-state duration is set to 3s. Of course, the preset low-voltage rated voltage range can also be set to other ranges, and the preset steady-state duration can also be adjusted. This embodiment does not limit these settings.

[0085] The low-voltage rated voltage of the converter module's low-voltage DC side refers to the DC voltage output from the low-voltage DC side of the converter module to the low-voltage side load under rated operating conditions. This low-voltage rated voltage is set according to the rated voltage of the low-voltage side load and can be set to voltage levels such as DC 48V and 24V.

[0086] In this embodiment, when the two-stage solid-state transformer enters the unlocking stage of the downstream module, the controller collects the actual output voltage of the low-voltage DC output terminal of the conversion module in real time, compares the actual output voltage with the given value of the rated voltage on the low-voltage side to obtain the output voltage deviation, and uses a proportional-integral regulator or a proportional-resonant regulator to perform calculations to dynamically generate a phase shift angle command between the primary high-voltage side and the secondary low-voltage side. Then, a phase shift drive pulse is generated according to the phase shift angle command to drive the power switching transistors on the primary and secondary sides respectively, so as to achieve precise control of the low-voltage DC power output from the low-voltage DC output terminal. When the low-voltage DC power output from the conversion module is stable within the preset low-voltage rated voltage range, and this stable state continues for a preset steady-state duration, it indicates that the DC voltage output from the low-voltage DC side of the conversion module meets the power voltage requirements of the low-voltage side load. At this time, the controller drives the closing of the output side low-voltage circuit breaker to formally connect the low-voltage DC output terminal with the low-voltage side load, and the equipment completes the entire startup process and enters the normal grid-connected operation state.

[0087] In one embodiment, please refer to Figure 8 As shown, the two-stage solid-state transformer graded flexible start-up method further includes steps S80-S90, wherein: S80 acquires the electrical and status parameters of the two-stage solid-state transformer in real time during the startup process. S90 controls the two-stage solid-state transformer to enter a fault state when the electrical parameters and / or status parameters exceed the preset normal operating range.

[0088] The electrical parameters include at least the voltage and current of each module in the two-stage solid-state transformer, and the status parameters include at least the operating status, communication status, and status of multiple contactors and power switching transistors of each module in the two-stage solid-state transformer. The preset normal operating range refers to the range of operating parameters during the normal startup and operation of the two-stage solid-state transformer, which is the safe operating parameter range to ensure that the two-stage solid-state transformer can operate normally.

[0089] In this embodiment, during the entire startup process of the two-stage solid-state transformer from shutdown to normal grid-connected operation, the voltage, current, module status, communication status, and contactor status of the two-stage solid-state transformer are monitored in real time. Once any fault signal such as overvoltage, overcurrent, module failure, communication interruption, or contactor failure to operate is detected, the two-stage solid-state transformer is immediately controlled to enter the fault state, all power device drive pulses are shut off, the AC circuit breaker and output circuit breaker are disconnected, the current fault state and fault code are locked, all startup operations are blocked, and only the fault alarm and data storage functions are retained. The equipment can only be manually reset and restarted after the fault is manually checked and eliminated.

[0090] This embodiment monitors the startup process of the two-stage solid-state transformer and promptly stops its operation when a fault or abnormality is detected during startup, thus preventing the fault from escalating or causing equipment damage in subsequent stages.

[0091] This specification also proposes a two-stage solid-state transformer graded flexible start-up device, which includes: a memory, a processor, and a two-stage solid-state transformer graded flexible start-up program stored in the memory and executable on the processor. The two-stage solid-state transformer graded flexible start-up program is configured to implement the above-described two-stage solid-state transformer graded flexible start-up method.

[0092] Reference Figure 10 As shown in the embodiments of this specification, the two-stage solid-state transformer graded flexible starting device starts the two-stage solid-state transformer according to... Figure 10 The startup logic shown is used to start the application.

[0093] It is worth noting that, since the two-stage solid-state transformer graded flexible start-up device of this application is used to implement the above-mentioned two-stage solid-state transformer graded flexible start-up method, the embodiments of the two-stage solid-state transformer graded flexible start-up device of this application include all the technical solutions of all embodiments of the above-mentioned two-stage solid-state transformer graded flexible start-up method, and the technical effects achieved are exactly the same, so they will not be repeated here.

[0094] Those skilled in the art should understand that the above-described embodiments are specific to the content and do not imply that the specific implementation of this application is limited to these descriptions. Furthermore, due to differences in industry naming conventions, the application is not limited to the above names or English names. Any methods or structures similar to or identical to those of this application, or any technical deductions or substitutions made based on the concept of this application, should be considered within the scope of protection of this application.

Claims

1. A two-stage solid-state transformer graded flexible start-up method, characterized in that, The two-stage solid-state transformer includes multiple rectifier modules, multiple converter modules, and multiple DC bus capacitors connected in series. The high-voltage DC output terminal of each rectifier module is connected to the high-voltage DC input terminal of one converter module and one DC bus capacitor. The two-stage solid-state transformer graded flexible start-up method includes: Based on a preset startup strategy, the two-stage solid-state transformer is controlled to sequentially enter the uncontrolled charging stage, the small pulse voltage building stage, and the soft bypass voltage boost stage. During the uncontrolled charging phase, multiple rectifier modules are controlled to start synchronously to perform uncontrolled charging on the corresponding DC bus capacitors, and the uncontrolled charging phase ends when the capacitor voltages of multiple DC bus capacitors all reach a preset charging threshold. During the small pulse voltage building-up phase, a control strategy is employed to start multiple conversion modules by starting with a preset initial duty cycle and gradually increasing the duty cycle with a preset increment. The small pulse voltage building-up phase ends when both the secondary and primary voltages of the multiple conversion modules reach the preset voltage regulation condition. During the soft bypass boosting stage, the multiple rectifier modules are bypassed one by one according to the preset bypass voltage regulation rate until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range, at which point the soft bypass boosting stage ends.

2. The two-stage solid-state transformer graded flexible start-up method according to claim 1, characterized in that, After the two-stage solid-state transformer is controlled to sequentially enter the uncontrolled charging stage, the small pulse voltage build-up stage, and the soft bypass voltage boost stage based on the preset startup strategy, the method further includes: The two-stage solid-state transformer is controlled to sequentially enter the rectifier module unlocking operation stage and the converter module unlocking operation stage; During the rectifier module unlocking operation phase, the power and voltage of the multiple rectifier modules are adjusted in real time, and when the average voltage of each phase module on the DC side of the multiple rectifier modules reaches the first preset operating condition, the converter module unlocking operation phase is entered. During the unlocking and operation phase of the conversion module, the output voltage of the low-voltage DC side of the multiple conversion modules is adjusted, and when the output voltage of the low-voltage DC side of the multiple conversion modules reaches the second preset operating condition, the two-stage solid-state transformer is started.

3. The two-stage solid-state transformer graded flexible start-up method according to claim 1, characterized in that, The two-stage solid-state transformer graded flexible start-up method also includes: During the startup process of the two-stage solid-state transformer, the electrical parameters and status parameters of the two-stage solid-state transformer are acquired in real time. When the electrical parameters and / or the status parameters exceed the preset normal operating range, the two-stage solid-state transformer is controlled to enter a fault state.

4. The two-stage solid-state transformer graded flexible start-up method according to claim 1, characterized in that, The conversion module includes a high-frequency isolation transformer; The control strategy of starting with a preset initial duty cycle and gradually increasing the duty cycle with a preset increment, controls the startup of multiple transformation modules, including: The preset initial duty cycle is gradually increased from zero to the preset target duty cycle by a preset increment to drive the high-frequency isolation transformer; When the secondary voltage of the high-frequency isolation transformer reaches the preset voltage condition, the secondary voltage of the high-frequency isolation transformer is controlled to follow the primary voltage based on open-loop zero-phase shift control. When the secondary and primary voltages of the high-frequency isolation transformer reach the preset voltage stabilization conditions, the small pulse voltage build-up phase ends.

5. The two-stage solid-state transformer graded flexible start-up method according to claim 1, characterized in that, The step of bypassing the multiple rectifier modules one by one according to a preset bypass voltage regulation rate includes: Scan the status of multiple rectifier modules and classify them into normal state rectifier modules and fault state rectifier modules; Based on the number of rectifier modules in fault condition, the preset theoretical number of soft bypass modules is corrected to obtain the actual number of soft bypass modules; The rectifier modules in normal state are sorted in real time according to the capacitor voltage of the corresponding connected straight bus capacitor, and then sorted from high to low to select the number of rectifier modules corresponding to the actual number of soft bypass modules. Based on the preset bypass voltage regulation rate, the selected rectifier modules are bypassed module by module until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range, thus ending the soft bypass boost stage.

6. The two-stage solid-state transformer graded flexible start-up method according to claim 5, characterized in that, The step of bypassing the selected rectifier modules one by one based on a preset bypass voltage regulation rate includes: Based on the preset bypass voltage regulation rate, the normal state rectifier module with the highest ranking among the selected rectifier modules is soft bypassed in sequence. The capacitor voltages of the current multiple DC bus capacitors are obtained, and if the capacitor voltages of the multiple DC bus capacitors are not within the preset rated voltage range, the normal state rectifier module of the next sequence is soft bypassed until the capacitor voltage of the corresponding DC bus capacitor reaches the preset rated voltage range.

7. The two-stage solid-state transformer graded flexible start-up method according to claim 2, characterized in that, The real-time adjustment of the power and voltage of the multiple rectifier modules includes: Based on power regulation control, the AC power and DC voltage of multiple rectifier modules are adjusted in real time. The average voltage of each phase module on the DC side of multiple rectifier modules is acquired in real time. When the average voltage of each phase module on the DC side of multiple rectifier modules stably reaches the preset voltage regulation range and remains in a preset steady state for a duration, the converter module enters the unlocking operation phase.

8. The two-stage solid-state transformer graded flexible start-up method according to claim 2, characterized in that, The adjustment of the output voltage on the low-voltage DC side of the multiple conversion modules includes: Based on output voltage closed-loop control, the low-voltage DC voltage output from the low-voltage DC side of multiple conversion modules is adjusted to the preset low-voltage rated voltage range; The low-voltage DC voltage output from the low-voltage DC side of multiple conversion modules is acquired in real time, and the two-stage solid-state transformer is started up when the low-voltage DC voltage output from multiple conversion modules is stable within the preset low-voltage rated voltage range and continues for a preset steady-state duration.

9. The two-stage solid-state transformer graded flexible start-up method according to claim 2, characterized in that, Before the controlled two-stage solid-state transformer enters the rectifier module unlocking operation phase, the method further includes: Control the two-stage solid-state transformer to enter the unlocking stage; During the unlocking phase, adaptive voltage regulation control is performed on the multiple rectifier modules to ensure that the capacitor voltage of the multiple DC bus capacitors remains stable within the preset rated voltage range. When an unlock operation command is received, the two-stage solid-state transformer is controlled to enter the rectifier module unlock operation phase.

10. A two-stage solid-state transformer graded flexible starting device, characterized in that, The two-stage solid-state transformer graded flexible start-up device includes: a memory, a processor, and a two-stage solid-state transformer graded flexible start-up program stored in the memory and executable on the processor, wherein the two-stage solid-state transformer graded flexible start-up program is configured to implement the two-stage solid-state transformer graded flexible start-up method as described in any one of claims 1 to 9.