A Smart Monitoring and Fault Self-Healing System and Method for Fiber Optic Communication Links in Power Distribution Networks

By constructing a dual interlocking mechanism for the communication domain and the electrical domain and a three-level cascaded bandwidth scheduling strategy in the fiber optic communication link of the power distribution network, the problem of not being able to distinguish between link degradation and electrical faults in the existing technology is solved. This enables early and accurate perception and self-healing of the fiber optic communication link, ensuring the deterministic transmission of core protection commands and service continuity.

CN123122645APending Publication Date: 2026-11-17ALTAY POWER SUPPLY CO OF STATE GRID XINJIANG ELECTRIC POWER CO
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611210097.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-11
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies struggle to accurately distinguish between media performance degradation and concurrent congestion caused by electrical faults in power grid fiber optic communication links without adding external detection hardware. This leads to relay protection devices malfunctioning or failing to operate under high current surges, and the deterministic transmission of core protection commands cannot be guaranteed under extreme bandwidth-limited conditions.

Method used

By calculating the coefficient of variation of the delay deviation sequence of the interactive messages through the scheduling delay deviation analysis module, and combining the interlock verification of the bus zero-sequence voltage mutation, a dual interlock mechanism of communication domain and electrical domain is constructed to achieve accurate differentiation between link physical degradation and power grid short circuit. Furthermore, a three-level cascaded bandwidth scheduling strategy and a two-level physical layer self-healing system are adopted to ensure the deterministic transmission of core protection commands.

Benefits of technology

It enables early and accurate detection and self-healing of fiber optic communication links, avoids unnecessary loss of protection commands, reduces the scope of fault impact, improves the utilization efficiency of fiber optic resources, and meets the communication continuity requirements of high real-time services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123122645A_ABST
    Figure CN123122645A_ABST
Patent Text Reader

Abstract

This invention discloses an intelligent monitoring and fault self-healing system and method for fiber optic communication links in distribution networks, relating to the technical field of distribution network monitoring. The system includes a physical layer monitoring, a self-healing execution architecture, and a service layer intelligent decision-making architecture. The physical layer consists of fiber optic link monitoring and self-healing nodes, a trunk optical path switching unit, and a spare fiber core connected in series on the working fiber optic backbone loop. The service layer includes a scheduling delay deviation analysis module, a scheduling distribution queue control module, a power grid defense decision simulation module, and a network-wide self-healing topology reconstruction module. By calculating the coefficient of variation of interaction message delay, when the coefficient of variation exceeds the standard, the low-priority load meter reading stream is truncated and the medium-priority telemetry and teleindication stream is compressed, and the bandwidth of the high-priority differential protection stream is rigidly locked to be no less than 64kbps. Combined with the bus zero-sequence voltage mutation interlock verification, the system accurately distinguishes between link degradation and electrical faults and controls the optical path to switch to the spare channel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power grid security and intelligent dispatching technology, and in particular to an intelligent monitoring and fault self-healing system and method for distribution network fiber optic communication links, used in distribution network fiber optic communication links. Background Technology

[0002] Currently, in the large-scale distribution network master station dispatching and security defense system, the use of distribution automation terminals to interact with the dispatching master station to produce business messages is a common way to ensure the safe operation of power supply. The master station and the terminal exchange bidirectional business messages through physical fiber optic communication links to achieve full network topology matching and calibrate the electrical sampling timing on both sides, thereby constructing a stable control boundary to prevent short-circuit current impacts. As the scale of the distribution network expands, the physical fiber optic links are in a long-term environment of alternating high temperature differences or dynamic stress changes in underground trenches, resulting in high-frequency degradation of the medium performance such as joint aging or micro-bending. This degradation does not produce high-order packet loss before it develops into a complete line break fault, but it produces microsecond-level intermittent transmission delay jitter and bidirectional asymmetrical delay. This timing deviation causes the data alignment failure on both sides of the longitudinal differential protection, leading to the risk of cross-zone maloperation or refusal to operate of the relay protection device under high current impact.

[0003] Intuitive approaches to addressing such channel impairments include large-scale installation of external time-domain reflectometers to measure impedance or relaxing protection action time limits. However, adding hardware increases deployment overhead, and relaxing time limits weakens transient convergence speed. Furthermore, during power grid short circuits, local terminals trigger logic resets due to electrical abrupt changes, leading to service packet backlog and increased transmission delays. Existing methods, relying solely on communication indicators, easily misjudge electrical short circuits as link impairments. Existing communication load scheduling and self-healing methods are insufficient for complex power grid conditions. For example, Chinese invention patent application CN104994030A discloses a dynamic bandwidth allocation method suitable for EPON communication systems in smart distribution networks, which corrects O by analyzing service buffer rates. The bandwidth requirements of NU terminals are excessively dependent on the traffic characteristics at the communication layer, failing to penetrate to the physical boundary of the primary power system. When a short-circuit transient or high-current impact occurs in the distribution network, the local terminal triggers a logic reset due to electrical sudden changes, inducing a momentary backlog of service messages and causing non-fault congestion. Due to the lack of communication fluctuation and local electrical quantity interlocking mechanism, the buffer monitoring mechanism has difficulty distinguishing between the concurrent congestion induced by physical degradation of the link and electrical faults. Under transient interference in the power grid, state misjudgment occurs, and unnecessary loss occurs during the routing switch of core protection instructions. Under extreme bandwidth-limited conditions, the existing technology lacks a rigid bandwidth locking strategy for high real-time services of differential protection, and it is difficult to maintain the deterministic transmission of critical services in non-ideal channel environments.

[0004] Therefore, the technical problem to be solved by this invention is how to achieve bidirectional interlocking of communication parameters and local bus electrical mutations while calculating the message delay residual sequence, isolate power grid transient interference without adding external detection hardware, and realize routing topology reconstruction and adaptive bandwidth truncation control before the optical fiber is completely broken. Summary of the Invention

[0005] In view of the above-mentioned or existing problems such as difficulty in perceiving implicit micro-losses in the link, inability to distinguish between link degradation and concurrent congestion caused by electrical faults, and lack of deterministic transmission guarantee for core protection commands under extreme bandwidth conditions, this invention proposes an intelligent monitoring and fault self-healing system and method for fiber optic communication links in power distribution networks.

[0006] To solve the above-mentioned technical problems, the present invention provides the following technical solution: a smart monitoring and fault self-healing system and method for fiber optic communication links in power distribution networks, comprising:

[0007] The beneficial effects of this invention are as follows:

[0008] 1. Enables early and accurate detection of subtle and hidden losses in communication links without the need for additional external detection hardware.

[0009] This invention calculates the coefficient of variation of the delay deviation sequence of interactive messages within a sliding window using a scheduling delay deviation analysis module. It uses the microscopic fluctuations in message transmission delay as a detection indicator of physical degradation in optical fiber links, enabling the capture of microsecond-level intermittent delay jitter and bidirectional asymmetric delay caused by media performance degradation such as fiber optic connector aging and micro-bending. Compared to existing technologies that rely on external hardware such as optical time-domain reflectometers and optical power monitoring, or on special fibers that rely on Brillouin scattering, this invention can complete the detection using existing service interactive messages, eliminating the need for additional external detection hardware. Furthermore, it is directly adaptable to existing ordinary optical fiber links, resulting in low engineering implementation costs and strong adaptability.

[0010] 2. Construct a dual interlocking mechanism of "communication domain delay detection + electrical domain fault confirmation" to accurately distinguish between concurrent congestion caused by physical degradation of the link and short circuit in the power grid.

[0011] When the coefficient of variation exceeds the limit, the power grid defense decision-making simulation module does not directly determine it as a link fault. Instead, it further retrieves the bus zero-sequence voltage mutation amount uploaded by the distributed automation terminal within the same period for electrical quantity interlock verification. Only when the bus zero-sequence voltage mutation amount is less than the power grid fault blocking threshold is it determined to be a physical loss degradation of the fiber optic link and triggers self-healing switching; when the bus zero-sequence voltage mutation amount is greater than or equal to the blocking threshold, it is determined to be concurrent congestion caused by a power grid short-circuit fault, and no switching is triggered. This dynamic linkage mechanism across the control domain and the electrical physical domain effectively eliminates the shortcomings of existing technologies (such as CN104994030A) that rely solely on the communication layer buffer rate and cannot distinguish between link degradation and electrical faults, and avoids the unnecessary loss of core protection commands during routing switching due to transient interference from power grid short circuits.

[0012] 3. Establish a three-level cascaded bandwidth scheduling strategy of "truncation + compression + rigid locking" to ensure the deterministic transmission of core protection commands under extreme bandwidth-constrained conditions.

[0013] The scheduling and distribution queue control module deconstructs the scheduling data stream into three priorities based on the power protocol priority markings. When the coefficient of variation exceeds the limit, it executes step-by-step cascaded control: truncating the low-priority historical load meter reading stream, compressing the medium-priority real-time telemetry and teleindication stream, and rigidly locking the reserved bandwidth of the high-priority differential protection stream to no less than 64kbps. Compared with the existing EPON dynamic bandwidth allocation scheme that allocates remaining bandwidth according to weight ratios, this invention adopts a forced truncation and compression yield strategy to ensure that, under extreme conditions where channel capacity approaches physical limits, the transmission of core tripping control commands and differential protection messages is not crowded out by low-priority services, thus ensuring the ultra-low latency and secure transmission of relay protection action signals.

[0014] 4. Construct a two-level physical layer self-healing system at the backbone level and segment branch level to reduce the scope of fault impact and improve the utilization efficiency of optical fiber resources.

[0015] By using branch optical switch modules within the self-healing nodes of each fiber optic link monitoring system in conjunction with segmented bypass fiber cores, refined self-healing of individual branch segments is achieved. Simultaneously, the backbone optical path switching unit, in conjunction with backbone backup fiber cores, enables overall protection switching at the backbone loop level. When a single link segment fails, only the corresponding branch switching is triggered, eliminating the need for a complete loop switch. Compared to existing dual-ring network complete loop switching schemes (such as CN202353563U), this effectively reduces the scope of fault impact and avoids the waste of fiber resources caused by healthy segments being completely bypassed due to single-point faults.

[0016] 5. Achieve millisecond-level fully automatic closed-loop self-healing from "sub-health detection" to "physical optical path switching", reducing business interruption time.

[0017] The network-wide self-healing topology reconfiguration module pre-stores routing table entries for primary and backup transmission channels in different base address register areas of the switching chip. When a switching command is issued, it modifies a single-bit status bit in the hardware status register to switch the data forwarding pointer, enabling the service data stream to reset and switch to the backup transmission channel within 8.5ms. The entire process requires no manual on-site intervention, is not constrained by the response speed of maintenance personnel, significantly shortens the window period from link degradation to service interruption, and meets the stringent requirements for communication continuity of high real-time services such as power distribution differential protection.

[0018] 6. Numerical translation is used to eliminate the divergence in the coefficient of variation calculation, ensuring the numerical stability of the detection algorithm.

[0019] When the scheduling delay deviation analysis module generates a delay deviation sequence, it subtracts a preset constant delay benchmark from the transmission delay time to generate the delay deviation sequence. This constant delay benchmark is a positive number. By simultaneously superimposing this benchmark into the numerator and denominator of the delay deviation sequence for overall numerical shifting, the statistical mean of the transformed sequence is locked near a stable benchmark value. This rigidly ensures the ground-state stability of the denominator in the calculation of the coefficient of variation while keeping the standard deviation of the sequence completely unchanged. It eliminates numerical overflow and calculation divergence caused by directly calculating the ratio of the standard deviation to the mean when the mean of the delay residual approaches zero.

[0020] 7. Set sliding window and threshold parameters to suppress random jitter and false triggering, and ensure system stability.

[0021] The sliding window span in the scheduling delay deviation analysis module is 5 sampling periods. The power grid defense decision inference module triggers the timing error judgment rule when the coefficient of variation is greater than 1.25. The span of the sliding window limits the upper limit of the time integration for timing misalignment judgment, which not only limits the time span of fault perception to avoid exceeding the protection tolerance time limit, but also effectively filters out the conventional deterministic random jitter caused by the dynamic buffer allocation of industrial Ethernet switches or high load traffic, preventing the power grid dispatching system from frequently triggering backup channel switching and secondary topology flicker blocking.

[0022] 8. An integrated online drift correction circuit eliminates false triggering interference caused by changes in ambient temperature.

[0023] The scheduling delay deviation analysis module also includes an online drift correction loop. It uses a first-order linear regression model to fit the unidirectional trend drift of historical delay deviation observations, and then subtracts this drift from the delay deviation sequence before calculating the coefficient of variation. This mechanism effectively compensates for the unidirectional drift in transmission timing caused by the gradual change in the electrical characteristics of photoelectric conversion components due to drastic changes in the local ambient temperature of the distributed automation terminal. It also blocks the interference of gradually accumulating errors on the logic threshold, further improving the system's reliability in complex outdoor operating environments. Attached Figure Description

[0024] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0025] Figure 1 This is a schematic diagram of the overall structure of the present invention;

[0026] Figure 2 This is a flowchart of the intelligent monitoring and fault self-healing system control of the present invention;

[0027] Figure 3 This is a schematic diagram illustrating the principle of dynamic adjustment of the safety threshold in this invention. Detailed Implementation

[0028] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0029] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways different from those described herein, and those skilled in the art can make similar extensions without departing from the spirit of the invention. Therefore, the invention is not limited to the specific embodiments disclosed below.

[0030] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that is mutually exclusive with other embodiments.

[0031] Example 1

[0032] This embodiment provides an intelligent monitoring and fault self-healing system for fiber optic communication links in power distribution networks. For example... Figure 1 As shown, the system includes a physical layer monitoring and self-healing execution architecture and a business layer intelligent decision-making architecture.

[0033] The physical layer monitoring and self-healing execution architecture includes: a working fiber optic backbone loop, a backbone optical path switching unit, several fiber optic link monitoring and self-healing nodes, a backbone spare fiber core, and several segmented bypass fiber cores. The backbone optical path switching unit and each fiber optic link monitoring and self-healing node are sequentially connected in series on the working fiber optic backbone loop. Each fiber optic link monitoring and self-healing node integrates a fiber optic link monitoring module and a branch optical switch module. The fiber optic link monitoring module is optically coupled to the corresponding segment of the working fiber optic backbone loop via an optical coupler, and the branch optical switch module is connected in series in the fiber optic path of the corresponding segment of the working fiber optic backbone loop. The backbone spare fiber core is connected in parallel to the spare optical port of the backbone optical path switching unit, and each segmented bypass fiber core is connected in parallel to the spare optical port of the corresponding branch optical switch module. The data collected by each fiber optic link monitoring module and the status signals of each branch optical switch are uploaded to the front-end interface module of the intelligent scheduling master station through the communication unit of the fiber optic link monitoring and self-healing node, and then integrated into the business layer intelligent decision-making architecture.

[0034] The business-layer intelligent decision-making architecture is deployed on the intelligent dispatch master station side, including: a dispatch delay deviation analysis module, a dispatch distribution queue control module, a power grid defense decision simulation module, and a network-wide self-healing topology reconstruction module. These modules are all connected to the front-end interface module of the intelligent dispatch master station via a dual-redundant Ethernet bus. Specifically, the coefficient of variation output by the dispatch delay deviation analysis module is simultaneously distributed to both the dispatch distribution queue control module and the power grid defense decision simulation module; the link degradation judgment result from the power grid defense decision simulation module is output to the network-wide self-healing topology reconstruction module, forming a closed-loop control link.

[0035] The whole network self-healing topology reconstruction module is connected to the power grid defense decision simulation module, the main optical path switching unit and each branch optical switch module, respectively. It is used to send a switching drive signal when it is determined that the link loss has deteriorated, and control the main optical path switching unit and / or the branch optical switch module to perform optical path switching.

[0036] In this embodiment, the working optical fiber backbone loop adopts a dual-ring network topology. The backbone optical switch array is equipped with two independent optical switch components, corresponding to the main ring and backup ring links of the dual-ring network, respectively, to achieve conventional link-layer protection. The backbone backup fiber core is laid along the entire working optical fiber backbone loop, providing an independent redundant route at the physical layer. It is used for full-domain self-healing switching when both rings deteriorate, forming a two-level physical redundancy with the dual-ring network. The segmented bypass fiber cores are laid between the fiber link monitoring and self-healing nodes on both sides of a single optical fiber link. Both the tributary optical switch modules and the backbone optical switch array adopt mechanical optical switch structures, with a switching response time of no more than 50ms, which can meet the transmission requirements of real-time services such as power distribution differential protection.

[0037] Example 2

[0038] This embodiment details the system's initialization configuration and transmission delay benchmark calibration process.

[0039] When the system faces the initial deployment and initial benchmark calibration of the secondary system channels, the locally deployed intelligent dispatch master station communication front-end unit and distributed automation terminal start the time base alignment calibration step under the fault-free steady-state power supply state. The calibration needs to be performed under the steady-state conditions of ambient temperature 25℃±5℃ and channel load rate less than 30% to ensure that the benchmark value is not affected by extreme environment and high load interference.

[0040] The intelligent scheduling master station communication front-end unit continuously collects the initial test pulse messages sent by each distributed automated terminal and extracts the transmission timestamp of each initial test pulse message. With the received timestamp Therefore, based on the transmission delay standard formula:

[0041] The corresponding channel's delay constant reference is calculated, where, This is the baseline value for the transmission delay between the distributed automation terminal and the intelligent scheduling master station. The total number of initial test pulse messages within the calibration period. Set to 500. For the system master station to receive timestamps, Send a timestamp to the terminal;

[0042] The scheduling delay deviation analysis module obtains the transmission delay reference value. Then, it is stored in the configuration register of the main station front-end interface module as a constant reference for subsequent delay deviation calculation.

[0043] The power grid defense decision simulation module retrieves the secondary-side transient overvoltage waveforms and their corresponding bus zero-sequence voltage abrupt changes from historical power grid fault records. The distribution gradient data is obtained on the primary network side. When a metallic short-circuit fault occurs outside the differential protection zone of the distribution network, the peak value of the zero-sequence voltage surge on the bus is greater than 32.5V, while the amplitude of the induced residual noise generated by the high throughput congestion of the communication system is below 5.0V. Since the absolute increment of the voltage surge during a metallic short circuit is much greater than the induced noise, this system uses the difference between the discrete sampling difference and the physical boundary difference of the noise floor to perform causal interlocking, directly fixing the grid fault blocking threshold to a single-value scalar of 15.0V. This causes the self-healing topology reconfiguration module of the entire network to perform a blocking action when the coefficient of variation of the time delay deviation sequence exceeds the limit, and the secondary control flow distribution path enters the online safety monitoring state.

[0044] Example 3

[0045] This embodiment details the delay deviation detection and coefficient of variation calculation process of the scheduling delay deviation analysis module.

[0046] The intelligent dispatch master station communication front-end unit collects business interaction messages uploaded by various distributed automated terminals during continuous system operation and extracts the sending timestamps carried in them. The bus zero-sequence voltage change reflects the operating conditions of the local primary power grid. It also synchronously reads the system reception timestamp of the main station front-end machine. .

[0047] The scheduling delay deviation analysis module uses the delay residual formula:

[0048] The discrete time delay residual sequence is obtained, where, For the latency residual of the interactive message, For the system master station to receive timestamps, Send a timestamp to the terminal. This serves as a benchmark for the steady-state transmission delay constant between the distributed automation terminal and the intelligent scheduling master station within a historically preset safe operating cycle.

[0049] To prevent the calculation results from diverging when the mean of the time delay residual sequence approaches zero, the scheduling time delay deviation analysis module uses a numerical shift method to transform the input data to a positive range. Time Delay Deviation Transformation Sequence The calculation formula is ,in, This is the converted time delay deviation value. For the original time delay deviation, This is the corresponding transmission delay reference value, and The value is greater than zero.

[0050] The principle of divergence suppression here is: when the physical link is in a lossless steady state, the time delay residual sequence The statistical mean approaches zero infinitely. If the ratio of the standard deviation to the mean is directly calculated, the denominator of the coefficient of variation will approach zero, leading to numerical overflow and severe divergence in the calculation results. A fixed delay constant, always greater than zero, is synchronously superimposed on each sample value of the time-delay residual sequence. Perform a global numerical shift to transform the sequence. The statistical mean is locked at a stable large numerical benchmark. The system is located near the target value, thus rigidly ensuring the ground-state stability of the denominator in the calculation of the coefficient of variation while keeping the standard deviation of the sequence completely unchanged, and eliminating the calculation divergence caused by the denominator approaching zero.

[0051] The scheduling delay deviation analysis module calculates the delay deviation conversion sequence. The coefficient of variation is the ratio of the standard deviation to the mean within the sliding sampling window. The sliding window spans 5 sampling periods, with a single sampling period defaulting to 1ms, corresponding to a 5ms time integration interval. This window is a real-time decision window in the runtime state, which has a different purpose than the statistical window in the calibration phase and does not conflict with it. This is used to lock the channel state in the early stages of loss degradation in the physical fiber optic link and suppress short-term random fluctuations caused by the dynamic buffer allocation of the switch.

[0052] Example 4

[0053] This embodiment details the three-level priority scheduling and bandwidth control process of the scheduling and distribution queue control module.

[0054] The scheduling and distribution queue control module obtains the power protocol priority flag from the scheduling data stream interaction message and classifies the scheduling data stream interaction message into three levels corresponding to the power protocol priority flag. The power protocol priority flag is embedded as a data label in the header of the distribution network automation interaction message. The high-priority differential protection flow includes distribution network differential protection control messages and trip control command messages; the medium-priority real-time telemetry and teleindication flow includes power grid telemetry and teleindication data messages; and the low-priority historical load meter reading flow includes power grid historical load meter reading data messages.

[0055] In this embodiment, the first security threshold is 0.8, the third security threshold is 1.0, and the second security threshold is 1.25, which satisfies the step-by-step increasing relationship of "first security threshold ≤ third security threshold < second security threshold", forming a hierarchical processing progressive logic of "first truncate low priority → then compress medium priority → finally switch channels".

[0056] When the coefficient of variation calculated by the scheduling delay deviation analysis module exceeds the first safety threshold, the scheduling distribution queue control module issues an interface queue rate-limiting command to the distributed automation terminal to cut off the low-priority historical load meter reading stream. Specifically, the scheduling distribution queue control module first retrieves a preset step size table based on the time change rate of the coefficient of variation to determine the rate-limiting step size. The preset step size table is divided into three levels based on the time change rate of the coefficient of variation: a change rate < 0.1 / cycle corresponds to a step size of 0.2, 0.1-0.3 / cycle corresponds to a step size of 0.5, and > 0.3 / cycle corresponds to a step size of 1.0. The rate-limiting step size is the bandwidth truncation ratio of the low-priority stream. Then, the rate-limiting step size is converted into the token bucket rate-limiting parameter of the Ethernet switch port. The rate-limiting step size is multiplied by the rated bandwidth of the port to obtain the token bucket committed information rate (CIR) parameter, which is written into the switch port register and sent to the communication interface queue of the distributed automation terminal to close the low-priority historical load meter reading stream.

[0057] When the coefficient of variation exceeds the third safety threshold, the scheduling and distribution queue control module performs time-frequency compression on the mid-priority real-time telemetry and teleindication stream to free up channel capacity for the high-priority differential protection stream. The time-frequency compression includes: performing equally spaced sampling on the telemetry data in the mid-priority real-time telemetry and teleindication stream, reducing the sampling frequency from 20 times per second to 5 times per second; and / or performing dead-zone compression on the teleindication data, setting the dead-zone threshold to 2% of the rated value, and only uploading when the change exceeds the dead zone; thereby reducing the data throughput of the mid-priority stream to 30%-40% of its original level while maintaining the observability of critical states.

[0058] Meanwhile, the scheduling and distribution queue control module always maintains a channel reserved bandwidth of no less than 64kbps for the high-priority differential protection flow.

[0059] Example 5

[0060] This embodiment details the electrical quantity interlocking determination process of the power grid defense decision-making simulation module.

[0061] The power grid defense decision simulation module calculates the coefficient of variation of the discrete time delay residual sequence within the current sliding sampling window in real time. When the coefficient of variation exceeds the second safety threshold, the timing error judgment rule is triggered to calculate the timing misalignment.

[0062] The specific calculation method for the timing error judgment rule is as follows: retrieve the conversion sequence of each delay deviation calculated within the current five consecutive sampling periods, calculate the absolute residual of each value with the mean of the sequence, and sum the five absolute residuals to obtain the timing misalignment integral value; when the timing misalignment integral value is greater than the preset misalignment threshold (0.5ms in this embodiment), it is determined that there is a trend of worsening timing misalignment; the cumulative integral value is directly used as a specific numerical indicator to quantitatively characterize the degree of bidirectional sampling timing misalignment between the intelligent scheduling master station and the distributed automation terminal.

[0063] Timing misalignment only indicates the degree of fluctuation in channel transmission delay. Further verification using bus electrical quantity interlocking is needed to distinguish whether the timing misalignment is caused by physical link loss or grid short-circuit congestion. The grid defense decision-making simulation module is also used to retrieve the bus zero-sequence voltage mutation amount uploaded by the distributed automation terminal within the same cycle. When the zero-sequence voltage of the bus changes abruptly... When the voltage is less than the preset grid fault blocking threshold (15.0V in this embodiment), it indicates that the interference of terminal concurrent data congestion caused by short circuit faults in the primary power system has been eliminated, and the data channel is diagnosed with a non-electrical physical fiber optic link latent micro-loss fault. Only then is it determined that the link loss has deteriorated and the whole network self-healing topology reconstruction module is allowed to perform optical path switching.

[0064] When the bus zero-sequence voltage change When the fault threshold is greater than or equal to the grid fault blocking threshold, it is determined to be a concurrent congestion caused by a grid short-circuit fault, and optical path switching is not triggered.

[0065] To eliminate the boundary blind zone where zero-sequence voltage does not change under three-phase metallic symmetrical short circuit or line-to-line short circuit conditions, the power grid defense decision simulation module also adds the bus positive-sequence voltage change. And the positive sequence blocking threshold. The positive sequence blocking threshold is set to 20.0V. During comparison, if the bus zero-sequence voltage change is... The voltage change is less than the preset grid fault blocking threshold and the positive sequence voltage change of the bus is less than the preset grid fault blocking threshold. If the value is less than the preset positive sequence blocking threshold, it is determined that the concurrent congestion caused by a single network short circuit has been excluded, and the link loss has been confirmed as deterioration.

[0066] Example 6

[0067] This embodiment details the physical layer optical path switching process of the whole network self-healing topology reconstruction module.

[0068] When the power grid defense decision simulation module determines that the link loss has deteriorated, the whole network self-healing topology reconstruction module coordinates with the intelligent scheduling master station to perform business data stream transmission redirection and switching.

[0069] The network-wide self-healing topology reconstruction module includes a network-wide topology matching submodule and a master station topology reconstruction submodule. The network-wide topology matching submodule generates a route reassembly matrix when the coefficient of variation is greater than the second security threshold for five consecutive sampling periods. The route reassembly matrix is ​​an N×2 matrix (N is the number of fiber segments), with each row corresponding to a segment and the two columns storing the forwarding port numbers corresponding to the primary and backup paths, respectively. The master station topology reconstruction submodule is signal-connected to the network-wide topology matching submodule and is used to send switching drive signals to the trunk optical path switching unit 3 and / or the tributary optical switch module 22 according to the route reassembly matrix.

[0070] The network-wide self-healing topology reconstruction module pre-stores the Layer 3 forwarding routing table entries for the primary and backup transmission channels in different base address register areas of the switching chip. When a switching command is issued, the data forwarding pointer is switched by modifying a single-bit status bit in the hardware status register. The processing time for switching the Layer 3 forwarding routing pointer and redirecting the service data flow in the switching chip is no more than 8.5ms. Combined with the physical optical path switching action of the mechanical optical switch, the total self-healing switching time does not exceed 50ms, enabling the service data flow to be redirected to the backbone backup fiber core 41 and / or the segmented bypass fiber core 42 within a preset millisecond time limit.

[0071] This system supports a two-level self-healing architecture: it locates faulty segments by combining the OTDR test results of each segment fiber link monitoring module; when only a single segment fiber loss exceeds the limit, the network-wide self-healing topology reconstruction module controls the branch optical switch module of the corresponding node to switch to the segment bypass fiber core, achieving fine-grained self-healing at the branch level without the need for full-loop switching; when there is a continuous segment or more fiber failure, or a backbone ingress link failure, the network-wide self-healing topology reconstruction module controls the backbone optical path switching unit to switch to the backbone backup fiber core, achieving overall self-healing at the backbone loop level.

[0072] Example 7

[0073] This embodiment comprehensively illustrates the complete workflow of the system under actual operating conditions in a power distribution network.

[0074] When the distribution network operates in a continuous power supply environment with multiple transmission and distribution cable lines connected in the grid, and the fiber optic communication link of the distribution network laid in the underground cable trench is subject to external interference from geological stress deformation and joint aging, the data interaction channel between the intelligent dispatch master station and the distributed automation terminal will generate microsecond-level intermittent time delay jitter and bidirectional asymmetric time delay.

[0075] The scheduling delay deviation analysis module continuously monitors the coefficient of variation of the delay deviation sequence within the sliding window. When the coefficient of variation is greater than 0.8 (the first safety threshold) but has not yet reached the third safety threshold, the scheduling distribution queue control module issues an interface queue rate limiting command to truncate low-priority historical load meter reading streams, ensuring the transmission quality of medium-priority and high-priority services.

[0076] When the link loss deteriorates further and the coefficient of variation reaches 1.0 (the third security threshold), the scheduling and distribution queue control module further compresses the time and frequency of the medium-priority real-time telemetry and teleindication stream to free up channel capacity for the high-priority differential protection stream, and maintains the channel reserved bandwidth of the high-priority differential protection stream at no less than 64kbps.

[0077] When the coefficient of variation is greater than 1.25 (the second safety threshold) for five consecutive sampling periods, the power grid defense decision-making simulation module triggers the timing error judgment rule to calculate the timing misalignment. Simultaneously, it retrieves the bus zero-sequence voltage mutation amount within the same period for electrical quantity interlock verification, and also retrieves the bus positive-sequence voltage mutation amount for joint judgment. If If the voltage is less than 15.0V, it is diagnosed as a deterioration in the physical loss of the fiber optic link. The network self-healing topology reconstruction module issues a switching command to control the tributary optical switch module 22 and / or the trunk optical path switching unit to complete the optical path switching within 8.5ms.

[0078] Throughout the entire process described above, when the available equivalent bandwidth of the channel is not less than 64kbps, the reserved bandwidth for the rigidly locked high-priority differential protection flow is not less than 64kbps, and the average transmission delay is stable within 4.2ms. When the available bandwidth is less than 64kbps, all low and medium priority services are cut off, and all available bandwidth is preferentially supplied to the high-priority differential protection flow. Under the extreme bandwidth of 16kbps, the transmission delay is controlled within 28.5ms. The electrical sampling data at both ends of the distributed differential protection device always maintain a synchronous alignment state, ensuring the power supply continuity and defense architecture stability of the large-scale power grid supply system.

[0079] Example 8

[0080] This embodiment details the process of resisting temperature drift interference in the online drift correction circuit.

[0081] When a distributed automated terminal experiences a sudden change in the local ambient temperature, causing a gradual change in the electrical characteristics of the photoelectric conversion components, resulting in an abnormal condition of continuous microsecond-level unidirectional drift in the transmission timing, the fixed delay of the interactive message in the predetermined physical link will undergo non-true cumulative changes. This may cause the delay deviation sequence calculated by the scheduling delay deviation analysis module to deviate from the preset transmission delay benchmark value, resulting in the coefficient of variation approaching the discrete step limit and causing false triggering.

[0082] The scheduling delay deviation analysis module also includes an online drift correction loop, which reads historical delay deviation observations from the previous 100 sampling periods to construct a time series array. A first-order linear regression model is used to fit the slope of the time series array to obtain a unidirectional drift slope value. The product of this unidirectional drift slope value and the current running period is used as the unidirectional trend drift amount of the delay. .

[0083] Online drift correction loop utilizes formula Calculate the corrected time delay deviation data, where, This is the corrected time delay deviation data. For the original time delay deviation, This represents the unidirectional drift of the time delay. The drift is updated every 10 sampling periods, and the time delay residual value is corrected using the current drift in each sampling period. When the drift exceeds the preset drift threshold (10μs / 100ms in this embodiment), an alarm is triggered to indicate the risk of component aging.

[0084] The scheduling delay deviation analysis module replaces the original delay deviation sequence with the calculated and corrected delay deviation data in situ, thereby correcting the coefficient of variation within the sliding window and eliminating non-fault-related delay spikes caused by variations in the thermal characteristics of communication components or minor stress changes in the physical link.

[0085] Based on the online drift correction loop blocking the interference of slowly changing cumulative errors on the logic threshold, the whole network self-healing topology reconstruction module remains in a steady-state distribution routing architecture, eliminating the risk of relay protection devices malfunctioning due to slowly changing channel components.

[0086] Example 9

[0087] This embodiment details the process of adjusting the optical power feedback-assisted threshold.

[0088] The power grid defense decision simulation module reuses data from the optical power acquisition units in each segment of the fiber optic link monitoring module. The optical power receiving module is optically coupled to the working fiber optic backbone loop 5 via an optical coupler to monitor the received optical power measurement value of the link.

[0089] The power grid defense decision-making module adjusts the first, third, and second security thresholds based on the measured optical power received by the optical power receiving module using a preset monotonically increasing stepwise mapping table. Specifically, when the measured optical power received by the link decreases, it indicates increased physical loss in the fiber optic link, and the system's tolerance for delay jitter decreases accordingly. Therefore, the values ​​of each security threshold are reduced accordingly through the monotonically increasing stepwise mapping table, enabling the system to trigger tiered response measures at a lower coefficient of variation level, achieving an adaptive match between the degree of link loss and the sensitivity of the scheduling response. In the monotonically increasing stepwise mapping table, the measured optical power received by the link is positively correlated with each security threshold.

[0090] The mapping table is divided into four optical power steps: when the optical power is ≥-12dBm, the threshold remains at the baseline value; when it is -12 to -18dBm, the threshold is reduced by 10%; when it is -18 to -24dBm, the threshold is reduced by 25%; and when it is <-24dBm, the threshold is reduced by 40%. Upper and lower limits for threshold adjustment are also set, with the second safety threshold not exceeding 1.5 and not lower than 0.6, to avoid extreme adjustments that could lead to system instability.

[0091] Example 10

[0092] This embodiment is based on a hardware-in-the-loop simulation test platform and provides experimental verification data for the system.

[0093] The experiment was conducted on a hybrid simulation platform for power distribution network communication, which included 10 distributed automation terminals and 1 intelligent dispatch master station communication front-end unit. A semi-physical power grid physical boundary environment with a clock synchronization accuracy of not less than 1μs and a signal sampling frequency of not less than 10kHz was constructed using a hardware-in-the-loop simulation tester. The optical carrier loss of the physical optical fiber communication link was adjusted by an optical attenuation simulator to generate discrete time delay residual sequences containing different damage intensities.

[0094] During the calibration phase, a fixed statistical window of 20 sampling points is used to calculate the background noise coefficient of variation. This balances the frequency of misjudgments of the coefficient of variation caused by occasional network jitter and the computational load on the front-end processor. The background noise variation envelope during normal power supply operation is determined based on 1000 sets of steady-state operation messages collected from a background channel containing Gaussian white noise and 50Hz power frequency interference harmonics. By calculating the mean of the coefficient of variation of the time delay deviation generated by the steady-state operation messages according to the formula, the second safety threshold (also known as the discrete step limit) is determined to be 3 times the mean of the coefficient of variation, resulting in a specific single-value scalar of 1.25. This calibration window is only used for threshold benchmark determination. During the operation phase, a sliding window of 5 sampling periods is used for real-time judgment. The two have different purposes and do not conflict with each other.

[0095] Under slight jitter gradient, the optical attenuation simulator applies a 3dB transient optical attenuation disturbance, and the channel generates a time delay oscillation with an amplitude of 15μs to 25μs. The coefficient of variation of the time delay residual sequence measured by the system is between 0.45 and 0.62, which does not cross the discrete step limit of 1.25. The data channel maintains the original route transmission, effectively avoiding frequent switching caused by occasional small jitter.

[0096] Two sets of control conditions were set up to verify the accuracy of the electrical interlocking mechanism:

[0097] Condition 1: Link degradation only, no power grid fault; under moderate optical attenuation gradient, no power grid short-circuit fault, stable distributed automation terminal service traffic, the coefficient of variation of the discrete delay residual sequence measured by the system within the sliding sampling window is between 1.45 and 1.68, and is greater than the second safety threshold of 1.25 for five consecutive sampling periods. The power grid defense decision inference module retrieves the bus zero-sequence voltage mutation amount collected in the same period. Its transient fluctuation measurement value is 3.2V, which is lower than the preset power grid fault blocking threshold of 15.0V. It is determined that the physical loss of the optical fiber link has deteriorated. The whole network self-healing topology reconstruction module completes the route redirection switch within 8.5ms. Combined with the physical action of the optical switch, the overall switching time does not exceed 50ms, so that the electrical sampling timing misalignment at both ends of the distributed differential protection device is controlled within 0.15ms.

[0098] Scenario 2: Power grid short circuit only, link normal; Normal link + external metallic short circuit fault, alarm service messages from distributed automation terminals surge onto the communication bus instantly, changing the bus transmission delay from the normal 2ms to 45ms. At this time, the measured bus zero-sequence voltage surge is 38.6V, which is higher than the 15.0V blocking threshold. The system judges it as concurrent congestion caused by the power grid short circuit fault, does not trigger optical path switching, and verifies the false judgment suppression capability of the interlocking mechanism.

[0099] Under severe interference conditions, where lightning strikes cause a 45% packet loss rate across the entire network and the available equivalent bandwidth drops from the standard 2Mbps to 28kbps, the scheduling and distribution queue control module truncates low-priority historical load meter reading streams and performs time-frequency compression on medium-priority streams, prioritizing all available bandwidth for high-priority differential protection streams. Its average transmission delay is 4.2ms, ensuring the deterministic transmission of core protection commands.

[0100] In the description of this invention, it should be noted that the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0101] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0102] In the several embodiments provided by this invention, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. The apparatus embodiments described above are merely illustrative. For example, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. Furthermore, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Additionally, the coupling or direct coupling or communication connection shown or discussed may be through some communication interfaces; the indirect coupling or communication connection between devices or units may be electrical, mechanical, or other forms.

[0103] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0104] In addition, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0105] Finally, it should be noted that the above-described embodiments are merely specific implementations of the present invention, used to illustrate the technical solutions of the present invention, and not to limit it. The scope of protection of the present invention is not limited thereto. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that any person skilled in the art can still modify or easily conceive of changes to the technical solutions described in the foregoing embodiments within the technical scope disclosed in the present invention, or make equivalent substitutions for some of the technical features; and these modifications, changes, or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

[0106] Furthermore, although the operations of the method of the present invention are described in a specific order in the accompanying drawings, this does not require or imply that these operations must be performed in that specific order, or that all the operations shown must be performed to achieve the desired result. Additionally or alternatively, certain steps may be omitted, multiple steps may be combined into one step, and / or one step may be broken down into multiple steps.

Claims

1. An intelligent monitoring and fault self-healing system for fiber optic communication links in power distribution networks. This includes a physical layer monitoring and self-healing execution architecture and a business layer intelligent decision-making architecture; The physical layer monitoring and self-healing execution architecture includes a working fiber backbone loop, a backbone optical path switching unit, several fiber link monitoring and self-healing nodes, a backbone spare fiber core, and several segmented bypass fiber cores. The backbone optical path switching unit and each of the fiber optic link monitoring and self-healing nodes are connected in series on the working fiber optic backbone loop. Each fiber optic link monitoring self-healing node integrates a fiber optic link monitoring module and a branch optical switch module. The fiber optic link monitoring module is optically coupled to the working fiber optic trunk loop of the corresponding segment, and the branch optical switch module is connected in series in the working fiber optic trunk loop of the corresponding segment. The main spare fiber core is connected in parallel to the spare optical port of the main optical path switching unit, and each of the segmented bypass fiber cores is connected in parallel to the spare optical port of the corresponding branch optical switch module. Its features are, The intelligent decision-making architecture of the business layer includes a scheduling delay deviation analysis module, a scheduling distribution queue control module, a power grid defense decision simulation module, and a full-network self-healing topology reconstruction module; The scheduling delay deviation analysis module is used to generate a delay deviation sequence based on the scheduling data stream interaction messages between the intelligent scheduling master station and the distributed automation terminal, and to calculate the coefficient of variation of the delay deviation sequence within a sliding window. The scheduling and distribution queue control module is connected to the scheduling delay deviation analysis module. It is used to deconstruct the scheduling data stream interaction message into a high-priority differential protection stream, a medium-priority real-time telemetry and teleindication stream, and a low-priority historical load meter reading stream according to the power protocol priority mark. When the coefficient of variation is greater than the first safety threshold, it issues an interface queue rate limiting command to cut off the low-priority historical load meter reading stream. When the coefficient of variation is greater than the third safety threshold, it compresses the medium-priority real-time telemetry and teleindication stream and locks the reserved bandwidth of the high-priority differential protection stream to be no less than 64kbps. The first security threshold, the third security threshold, and the second security threshold increase sequentially. The power grid defense decision simulation module is connected to the scheduling delay deviation analysis module. It is used to trigger the timing error judgment rule to calculate the timing misalignment when the coefficient of variation is greater than the second safety threshold, and to retrieve the bus zero-sequence voltage mutation amount uploaded by the distributed automation terminal in the same period for electrical quantity interlock verification. When the sudden change in the zero-sequence voltage of the bus is less than the preset grid fault blocking threshold, it is determined that the link loss has deteriorated. When the sudden change in the zero-sequence voltage of the bus is greater than or equal to the grid fault blocking threshold, it is determined to be a concurrent congestion caused by a grid short-circuit fault, and optical path switching is not triggered. The full-network self-healing topology reconstruction module is connected to the power grid defense decision-making module, the trunk optical path switching unit, and each of the branch optical switch modules. When it is determined that the link loss has deteriorated, the module controls the trunk optical path switching unit and / or the branch optical switch modules to perform optical path switching, switching the service data stream from the working optical fiber trunk loop to the trunk backup fiber core and / or the segmented bypass fiber core.

2. The system according to claim 1, Its features are, The fiber optic link monitoring module includes an optical power acquisition unit and an OTDR testing unit, both of which have their optical ports optically coupled to the same working fiber optic trunk loop. The main optical path switching unit includes a main optical switch array and a switch drive control board. Both the branch optical switch module and the main optical switch array adopt a mechanical optical switch structure, and the switching response time is no more than 50ms.

3. The system according to claim 1, Its features are, When the scheduling delay deviation analysis module generates a delay deviation sequence, it obtains the transmission delay time by reading the difference between the receiving timestamp and the sending timestamp of the scheduling data stream interaction message, and subtracts a preset constant delay benchmark from the transmission delay time to generate a delay deviation sequence. The constant delay benchmark is taken as a positive number. Before calculating the coefficient of variation, the constant delay benchmark is simultaneously superimposed on each sample value of the time delay deviation sequence to obtain the transformed sequence. Then, the coefficient of variation is calculated based on the transformed sequence to eliminate the numerical divergence caused by the denominator approaching zero in the calculation of the coefficient of variation when the mean of the time delay deviation sequence approaches zero.

4. The system according to claim 1, Its features are, The sliding window in the scheduling delay deviation analysis module spans 5 sampling periods; The power grid defense decision-making simulation module triggers the timing error judgment rule when the coefficient of variation is greater than 1.25; The span of the sliding window limits the upper limit of the time integral for determining timing misalignment, thereby locking the channel state in the early stages of physical fiber optic link loss deterioration and suppressing short-term random fluctuations caused by dynamic buffer allocation of the switch, thus limiting the frequent channel switching of the network-wide self-healing topology reconstruction module.

5. The system according to claim 1, Its features are, The scheduling and distribution queue control module adjusts the transmission rate of scheduling data stream interaction messages of different priorities according to the following step-by-step cascading control rules: Step S1: Obtain the power protocol priority flag in the scheduling data stream interaction message, and classify and deconstruct the scheduling data stream interaction message into three levels corresponding to the power protocol priority flag; Step S2: When the coefficient of variation is greater than the first security threshold, the preset step size table is retrieved according to the time change rate of the coefficient of variation to determine the rate limiting step size, the rate limiting step size is converted into the token bucket rate limiting parameter of the Ethernet switch port, and the interface queue rate limiting instruction is sent to the distributed automation terminal to cut off the low-priority historical load meter reading stream. Step S3: When the coefficient of variation is greater than the third security threshold, the medium-priority real-time telemetry and teleindication stream is compressed in time and frequency to free up channel capacity for the high-priority differential protection stream, and the channel reserved bandwidth of the high-priority differential protection stream is kept not less than 64kbps. The first safety threshold, the third safety threshold, and the second safety threshold satisfy a stepwise increasing relationship: the first safety threshold ≤ the third safety threshold < the second safety threshold.

6. The system according to claim 1, Its features are, The power grid defense decision simulation module is also used to retrieve the bus positive sequence voltage mutation amount uploaded by the distributed automation terminal within the same period; Only when the zero-sequence voltage mutation of the bus is less than the preset grid fault blocking threshold and the positive-sequence voltage mutation of the bus is less than the preset positive-sequence blocking threshold, is it determined that the link loss has deteriorated and the whole network self-healing topology reconstruction module is allowed to perform optical path switching.

7. The system according to claim 1, Its features are, The full-network self-healing topology reconstruction module pre-stores the three-layer forwarding routing table entries of the primary transmission channel and the backup transmission channel in different base address register areas of the switching chip; when a switching instruction is issued, it modifies a single-bit status bit in the hardware status register to switch the data forwarding pointer, so that the service data stream is redirected to the backbone backup fiber core and / or the segmented bypass fiber core within a preset millisecond time limit.

8. The system according to claim 1, Its features are, The power grid defense decision simulation module is connected to an optical power receiving module; The optical power receiving module is optically coupled to the working optical fiber trunk loop and is used to monitor the measured value of the received optical power of the link. The power grid defense decision-making module adjusts the first security threshold, the third security threshold, and the second security threshold based on the measured optical power received by the link using a preset monotonically increasing ladder mapping table. The measured optical power received by the link is positively correlated with each security threshold.

9. The system according to claim 1, Its features are, The scheduling delay deviation analysis module also includes an online drift correction loop; The online drift correction loop is used to read a preset number of historical time delay deviation observations from the previous sampling period to form a time series array. The slope of the time series array is fitted using a first-order linear regression model to obtain the unidirectional drift slope value. The product of the unidirectional drift slope value and the current operating period is used as the unidirectional trend drift amount of the time delay. The coefficient of variation is calculated by subtracting the unidirectional trend drift of the time delay from the time delay deviation sequence to compensate for the timing drift of photoelectric conversion components caused by changes in ambient temperature.

10. A method for intelligent monitoring and fault self-healing of fiber optic communication links in power distribution networks. Using the system as described in any one of claims 1 to 9, Its features are, Includes the following steps: Step S101: Using the scheduling delay deviation analysis module, a delay deviation sequence is generated based on the scheduling data flow interaction messages between the intelligent scheduling master station and the distributed automation terminal, and the coefficient of variation of the delay deviation sequence within the sliding window is calculated. Step S102: Using the scheduling and distribution queue control module, the scheduling data stream interaction message is deconstructed into a high-priority differential protection stream, a medium-priority real-time telemetry and teleindication stream, and a low-priority historical load meter reading stream according to the power protocol priority mark. When the coefficient of variation is greater than the first safety threshold, the low-priority historical load meter reading stream is cut off; when the coefficient of variation is greater than the third safety threshold, the medium-priority real-time telemetry and teleindication stream is compressed, and the reserved bandwidth of the high-priority differential protection stream is locked to be no less than 64kbps; the first safety threshold, the third safety threshold, and the second safety threshold increase sequentially. Step S103: Using the power grid defense decision-making module, when the coefficient of variation is greater than the second safety threshold, the timing error judgment rule is triggered to calculate the timing misalignment, and the bus zero-sequence voltage mutation amount uploaded by the distributed automation terminal in the same period is retrieved for electrical quantity interlock verification. When the sudden change in the zero-sequence voltage of the bus is less than the preset grid fault blocking threshold, it is determined that the link loss has deteriorated. When the sudden change in the zero-sequence voltage of the bus is greater than or equal to the grid fault blocking threshold, it is determined to be a concurrent congestion caused by a grid short-circuit fault, and optical path switching is not triggered. Step S104: When the link loss is determined to be deteriorated, the whole network self-healing topology reconstruction module is used to control the trunk optical path switching unit and / or the tributary optical switch module to perform optical path switching, and switch the service data stream from the working optical fiber trunk loop to the trunk spare fiber core and / or the segmented bypass fiber core.

Citation Information

Patent Citations

  • EPON communication system dynamic bandwidth allocation method used in intelligent power distribution network

    CN104994030A

  • Intelligent power-distributing network optical fiber double-loop self-healing communication and measurement system

    CN202353563U