A high-speed string welding machine for photovoltaic production

By optimizing the dual welding station design and the vertical moving mechanism, the problem of low production efficiency of the string welding machine was solved, and efficient alternation of welding stations and tooling transfer between workstations were achieved, thereby improving the overall production efficiency and material feeding efficiency.

CN123124495APending Publication Date: 2026-11-17ZHONGBU QINGTIAN NEW ENERGY (HUBEI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611475496.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The low production efficiency of existing string welding machines is mainly due to the excessively long waiting time between welding stations, which limits the overall efficiency of the machine.

Method used

The design features dual welding stations that can be raised and lowered without interfering with each other in the horizontal direction, enabling alternating operation. The welding strip laying, tooling laying, and welding mechanisms are distributed in the vertical direction, while the gripping and transmission components are designed to move vertically, reducing process waiting time. The cell transfer mechanism enables batch feeding.

Benefits of technology

By optimizing the dual welding station design and the vertical moving mechanism, the waiting time of the welding station between workstations is reduced, the overall production efficiency and tooling flow efficiency are improved, and the operation efficiency of the material loading process is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123124495A_ABST
    Figure CN123124495A_ABST
Patent Text Reader

Abstract

This invention relates to a high-speed string welding machine for photovoltaic production, comprising: a welding support mechanism including two welding stations, each movable horizontally in a first direction; a loading station and a unloading station on each welding station; a welding station that moves sequentially from the loading station to the unloading station, passing through a ribbon laying station, a tooling laying station, and a welding station; and a lifting mechanism that allows the two welding stations to be raised to different heights to ensure their movement in the first direction does not interfere with each other. The welding station also includes a ribbon laying mechanism for laying the ribbon onto the solar cells; a tooling laying mechanism for placing the ribbon welding tooling onto the solar cells; and a welding mechanism for welding the ribbon onto the solar cells. By providing two lifting welding stations that can move horizontally in the first direction without interference, this invention enables the two welding stations to operate alternately, transforming the originally sequential loading, welding, and unloading processes into parallel execution. This reduces the waiting time of the welding stations between stations and improves the overall production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of photovoltaic cell manufacturing technology, and specifically to a high-speed string welding machine for photovoltaic production. Background Technology

[0002] In the competitive landscape of the photovoltaic industry where efficiency is paramount, production cycle time is the primary indicator for measuring the performance of string welding machines. Therefore, improving production efficiency is also the primary research and development direction for all equipment manufacturers.

[0003] Existing string welding machines typically employ a single welding station structure. The welding station sequentially passes through the tape laying station, welding station, and unloading station along the conveying direction to complete a full welding cycle. When a single welding station is in operation, the loading, welding, and unloading processes are executed sequentially along the time axis. After welding is completed, the welding station moves sequentially to the unloading station to complete the unloading and then returns to the loading station to start a new round of work. Throughout this process, a significant amount of time is consumed by the welding station waiting between stations, limiting the overall efficiency of the machine. Summary of the Invention

[0004] Based on the above description, the present invention provides a high-speed string welding machine for photovoltaic production to solve the problem of low production efficiency of a single welding station.

[0005] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: This application provides a high-speed string welding machine for photovoltaic production, comprising: A welding support mechanism includes two welding stations. The welding stations can move along a horizontal first direction and can reciprocate between a loading station and a unloading station along the first direction. When the welding station moves from the loading station to the unloading station, it passes through a welding strip laying station, a tooling laying station, and a welding station in sequence. The welding stations can be raised and lowered, and the two welding stations can be raised and lowered to different heights so that their movement in the first direction does not interfere with each other. A ribbon-laying mechanism is used to lay ribbon on the battery cell when the welding station moves to the ribbon-laying station; A tooling placement mechanism is used to place a pressure welding strip tooling on the battery cell when the welding station is moved to the tooling placement station; A welding mechanism for welding strips onto battery cells as the welding station moves to the welding position.

[0006] Preferably, the laying fixture mechanism includes: The tooling transfer assembly and the welding bearing mechanism are spaced apart in a horizontal second direction, which is perpendicular to the first direction. The tooling transfer assembly is used to transport the pressure welding strip tooling to the tooling laying station. A tooling placement assembly is provided at a tooling placement station and includes at least one first gripper that can reciprocate and rise and fall above the tooling transfer assembly and the welding support mechanism.

[0007] Preferably, it also includes an unloading mechanism located at the unloading station. When the welding station moves from the loading station to the unloading station, it passes through the welding strip laying station, the tooling laying station, the welding station, and the unloading station in sequence. When the welding strip tooling is transferred on the tooling transfer assembly, it passes through the unloading station and the tooling laying station in sequence. The unloading mechanism is used to transfer the welding strip tooling on the battery cell to the tooling transfer assembly when the welding station moves to the unloading station.

[0008] Preferably, the unloading mechanism includes at least one second gripper that is reciprocating and lifting above the tooling transfer assembly and the welding support mechanism.

[0009] Preferably, the transmission direction of the tooling transmission component is parallel to the first direction.

[0010] Preferably, the first gripper and the second gripper reciprocate in directions parallel to the second direction above the tooling transfer assembly and the welding support mechanism.

[0011] Preferably, both the first gripper and the second gripper grip the welding strip tooling via electromagnetic adsorption.

[0012] Preferred options also include: A battery cell transfer mechanism and a welding support mechanism are spaced apart in a second direction. The battery cell transfer mechanism includes a transfer table that can move along a first direction. The transfer table has a loading position located within a loading station. The transfer table is used to carry and transport multiple battery cells arranged sequentially at a set interval. The feeding mechanism is located within the feeding station and is used to transfer multiple battery cells from the transfer table to the welding table in one go when the welding table moves to the feeding station.

[0013] Preferably, there are two transfer platforms, which are height-adjustable, and the two transfer platforms can be raised and lowered to different heights so that their horizontal movement does not interfere with each other.

[0014] Preferably, the moving direction of the transfer station is parallel to the first direction.

[0015] Compared with the prior art, the technical solution of this application has at least the following beneficial technical effects: 1. This application sets up two lifting welding stations, which can be raised and lowered to different heights, so that their horizontal movement in the first direction does not interfere with each other, thereby realizing the alternating operation of the two welding stations. When one welding station is performing welding operations, the other welding station can simultaneously perform loading or unloading operations, transforming the originally serial loading, welding and unloading processes into parallel execution, reducing the waiting time of the welding stations between workstations and improving the overall production efficiency of the machine.

[0016] 2. The tooling transfer assembly and welding support mechanism are spaced apart in the second direction. The first gripper of the tooling laying mechanism reciprocates along the second direction above the tooling transfer assembly and the welding support mechanism, picking up the welding strip tooling from the transfer assembly onto the welding platform at the tooling laying station. The second gripper of the tooling unloading mechanism reciprocates along the second direction above the welding support mechanism and the tooling transfer assembly, picking up the welding strip tooling from the welding platform at the tooling unloading station back onto the transfer assembly. After being retrieved at the tooling unloading station, the welding strip tooling continues to be transported along the tooling transfer assembly to the tooling laying station for the next cycle, forming a circular flow of tooling between the transfer assembly and the welding platform. This reduces the manual retrieval and reloading of tooling, improving tooling turnover efficiency. The movement direction of both grippers is perpendicular to the movement direction of the welding platform, and the transfer direction of the tooling transfer assembly is parallel to the first direction. The welding strip tooling is transported in the same direction from the tooling unloading station to the tooling laying station without the need for reversing or turning.

[0017] 3. A cell transfer mechanism and a welding support mechanism are arranged at intervals in a second direction. The transfer platform can move along the first direction to the loading position within the loading station, transporting multiple cells arranged sequentially at set intervals to the loading station in one go. The loading mechanism then transfers the multiple cells from the transfer platform to the welding platform in one go within the loading station, achieving batch loading of cells and reducing the time spent placing each cell individually. The two transfer platforms can be raised and lowered to different heights so that their horizontal movement does not interfere with each other. This allows one transfer platform to load cells onto the welding platform while the other simultaneously receives and arranges cells, improving the efficiency of the loading process. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the structure of a high-speed string welding machine for photovoltaic production provided in an embodiment of the present invention, wherein the three welding stations are schematic diagrams of the three stations being in different positions.

[0019] Explanation of reference numerals in the attached figures: 1. Welding support mechanism; 11. Welding station; 2. Welding strip laying mechanism; 3. Tooling laying mechanism; 31. Tooling transfer assembly; 32. Tooling laying assembly; 321. First gripper; 4. Welding mechanism; 5. Tooling unloading mechanism; 51. Second gripper; 6. Battery cell transfer mechanism; 61. Transfer station; 7. Loading mechanism; a. Loading station; b. Unloading station; c. Welding strip laying station; d. Tooling laying station; e. Welding station; f. Tooling unloading station; g. Loading position; h. Receiving position. Detailed Implementation

[0020] To facilitate understanding of this application, a more complete description will be provided below with reference to the accompanying drawings, which illustrate embodiments of the present application. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that the disclosure of this application will be thorough and complete.

[0021] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the application.

[0022] It is understood that spatial relation terms such as "below," "under," "below," "below," "above," "above," etc., can be used here to describe the relationship between one element or feature shown in the figure and other elements or features. It should be understood that, in addition to the orientation shown in the figure, spatial relation terms also include different orientations of the device in use and operation. For example, if the device in the figure is flipped, the element or feature described as "below" or "below" of the other element or feature will be oriented "above" the other element or feature. Therefore, the exemplary terms "below" and "below" can include both upper and lower orientations. Furthermore, the device may also include other orientations (e.g., rotated 90 degrees or other orientations), and the spatial descriptive terms used herein will be interpreted accordingly.

[0023] It should be noted that when one element is considered to be "connected" to another element, it can be directly connected to the other element or connected to the other element through an intermediary element. In the following embodiments, "connection" should be understood as "electrical connection," "communication connection," etc., if the connected circuits, modules, units, etc., have the transmission of electrical signals or data between them.

[0024] When used herein, the singular forms of “a,” “an,” and “the” may also include the plural forms unless the context clearly indicates otherwise. It should also be understood that the terms “comprising,” “including,” or “having,” etc., specify the presence of the stated feature, whole, step, operation, component, part, or combination thereof, but do not preclude the possibility of the presence or addition of one or more other features, wholes, steps, operations, components, parts, or combinations thereof.

[0025] Reference Figure 1 As shown, this application provides a high-speed string welding machine for photovoltaic production, which includes a welding support mechanism 1, a welding strip laying mechanism 2, a tooling laying mechanism 3, and a welding mechanism 4.

[0026] Reference Figure 1 As shown, the welding support mechanism 1 includes two welding stations 11. The welding stations 11 can move along a horizontal first direction. The welding stations 11 can reciprocate between the loading station a and the unloading station b along the first direction. When the welding stations 11 move from the loading station a to the unloading station b, they pass through the welding strip laying station c, the tooling laying station d, and the welding station e in sequence. The welding stations 11 can be raised and lowered. The two welding stations 11 can be raised and lowered to different heights so that their movement in the first direction does not interfere with each other.

[0027] Reference Figure 1 As shown, specifically, the soldering station 11 is horizontally arranged to stably support the battery cells. The movement of the soldering station 11 along the first direction and its vertical lifting can be achieved by a linear motor or a lead screw mechanism. The specific driving method can be selected by those skilled in the art according to actual needs, and the driving systems of the two soldering stations 11 are staggered during the arrangement.

[0028] The ribbon laying mechanism 2 is used to lay the ribbon onto the battery cell when the welding station 11 moves to the ribbon laying station c. Specifically, the ribbon laying mechanism 2 includes a ribbon sorting module and a clamping module. The ribbon is released by the wire feeding module, sorted by the ribbon sorting module, clamped by the clamping module, pulled out a certain length, and then cut, thus laying the ribbon onto the battery cell on the welding station 11. The specific structure and operation of the ribbon laying mechanism 2 are well known to those skilled in the art and will not be described in detail in this embodiment.

[0029] Reference Figure 1As shown, the tooling placement mechanism 3 is used to place the pressure welding strip tooling on the battery cell when the welding station 11 moves to the tooling placement station d. In this embodiment, the tooling placement mechanism 3 includes a tooling transfer assembly 31 and a tooling placement assembly 32. The tooling transfer assembly 31 and the welding support mechanism 1 are spaced apart in a horizontal second direction, which is perpendicular to the first direction. The tooling transfer assembly 31 is used to transport the pressure welding strip tooling to the tooling placement station d. The tooling placement assembly 32 is located at the tooling placement station d and includes at least one first gripper 321. The first gripper 321 can reciprocate and move up and down above the tooling transfer assembly 31 and above the welding support mechanism 1.

[0030] After the tooling transfer component 31 conveys the welding strip tooling to the tooling laying station d, it moves above the tooling transfer component 31 via the first gripper 321 and then descends to grip the welding strip tooling. It then rises and moves above the welding support mechanism 1. After the welding station 11 moves to the welding strip laying station c, the first gripper 321 descends to place the welding strip tooling on the battery cell and press the welding strip to prepare for subsequent welding.

[0031] Reference Figure 1 As shown, in this embodiment, in order to improve the laying efficiency of the pressure welding strip tooling, two tooling laying components 32 are provided and distributed at intervals along the first direction. The two tooling laying components 32 operate independently, which can reduce the downtime and increase the working cycle, thereby improving efficiency.

[0032] Reference Figure 1 As shown, after the welding strip fixture is placed onto the solar cell, the welding station 11 continues to move towards the welding station e. Upon reaching the welding station e, the welding mechanism 4 welds the welding strip onto the solar cell. The welding mechanism 4 is a welding light box, located above the welding support mechanism 1. After the welding station 11 reaches the welding station e, the welding light box is activated to weld the welding strip onto the solar cell. The specific structure and operation of the welding light box are well-known to those skilled in the art and will not be described in detail in this embodiment.

[0033] Reference Figure 1 As shown, after the welding station 11 moves past the welding station e, the welding fixtures on the battery cell need to be removed. Therefore, a fixture removal mechanism 5 is also provided at the fixture removal station f. The fixture removal station f is located between the welding station e and the unloading station b. That is, when the welding station 11 moves from the loading station a to the unloading station b, it passes through the welding strip laying station c, the fixture laying station d, the welding station e, and the fixture removal station f in sequence. After the welding station 11 moves to the fixture removal station f, the fixture removal mechanism 5 removes the welding strip fixtures from the battery cell.

[0034] Reference Figure 1As shown, in this embodiment, when the welding strip tooling is transferred on the tooling transfer assembly 31, it passes through the tooling removal station f and the tooling laying station d in sequence. When the welding station 11 moves to the tooling removal station f, the tooling removal mechanism 5 transfers the welding strip tooling on the battery cell to the tooling transfer assembly 31.

[0035] With the above setup, the welding strip tooling is unloaded at the tooling unloading station f and placed on the tooling transfer assembly 31. The tooling continues to be transported along the tooling transfer assembly 31 to the tooling laying station d for the next cycle, forming a circular flow of the tooling between the transfer assembly and the welding station 11. This reduces the manual recycling and reloading of the tooling and improves the tooling turnover efficiency.

[0036] Reference Figure 1 As shown, specifically, the unloading mechanism 5 includes at least one second gripper 51, which can reciprocate and rise and fall above the tooling transfer assembly 31 and the welding support mechanism 1.

[0037] Reference Figure 1 As shown, after the welding station 11 moves to the tooling unloading station f, it moves above the welding support mechanism 1 via the second gripper 51 and then descends to grip the pressure welding strip tooling on the battery cell. Then it rises and moves above the tooling transfer assembly 31, and then descends to place the pressure welding strip tooling on the tooling transfer assembly 31.

[0038] Reference Figure 1 As shown, in this embodiment, to reduce unnecessary reversing actions, the transmission direction of the tooling transfer assembly 31 is set to be parallel to the first direction, while the reciprocating movement directions of the first gripper 321 and the second gripper 51 above the tooling transfer assembly 31 and above the welding support mechanism 1 are both parallel to the second direction. This design ensures that the tooling maintains its direction when flowing between the tooling transfer assembly 31 and the welding station 11, avoiding positioning offset of the pressure welding strip tooling.

[0039] Reference Figure 1 As shown, in this embodiment, both the first gripper 321 and the second gripper 51 grip the welding strip fixture via electromagnetic adsorption. Correspondingly, the welding strip fixture is made of a material that can be attracted by a magnet, such as stainless steel. The first gripper 321 and the second gripper 51 can be electromagnets, and the specific translation and lifting actions can be achieved by linear motors and cylinders, respectively, which can be selected by the technician as needed.

[0040] After passing the unloading station f, the welding station 11 continues to be conveyed to the unloading station b. Upon reaching the unloading station b, the welded battery strings are transferred to the next process by subsequent equipment. Then, the welding station 11 descends, resets, and moves to the loading station a before rising again to receive the battery cells, repeating the above process. The two welding stations 11 operate alternately, reducing the waiting time between stations and improving the overall production efficiency.

[0041] Reference Figure 1 As shown, in this embodiment, a battery cell transfer mechanism 6 and a loading mechanism 7 are further provided. The battery cell transfer mechanism 6 and the welding support mechanism 1 are spaced apart in the second direction. The battery cell transfer mechanism 6 includes a transfer table 61, which can move horizontally. The transfer table 61 has a loading position g located within the loading station a. The transfer table 61 is used to carry and transport multiple battery cells arranged sequentially at a set interval. The loading mechanism 7 is located within the loading station a and is used to transfer the multiple battery cells on the transfer table 61 to the welding station 11 in one go when the welding station 11 moves to the loading station a.

[0042] Reference Figure 1 As shown, the transfer platform 61 is installed horizontally, and its moving direction is set to be parallel to the first direction. The specific translational movement can be achieved by a linear motor or a cylinder.

[0043] Reference Figure 1 As shown, the transfer station 61 is configured to also have a receiving position h located outside the loading station a. The transfer station 61 receives the battery cells output from the previous process at the receiving position h. The discharge end of the previous process places the battery cells on the transfer station 61 in sequence according to a set interval.

[0044] After the transfer station 61 reaches the loading position g, the loading mechanism 7 transfers multiple battery cells from the transfer station 61 to the welding station 11 in one go. Specifically, the loading mechanism 7 includes a suction cup frame with multiple suction cups for adsorbing the battery cells. The suction cup frame is designed to move back and forth above the battery cell transfer mechanism 6 and above the welding support mechanism 1, and can also be raised and lowered. The translation direction is along the second direction. The translation and raising / lowering actions can be achieved by linear motors and cylinders, respectively.

[0045] In this embodiment, there are two transfer platforms 61. Similarly, the transfer platforms 61 are also designed to be height-adjustable. The two transfer platforms 61 can be raised and lowered to different heights so that their movement in the horizontal direction, i.e., the first direction, does not interfere with each other.

[0046] The translation and lifting movements of the transfer station 61 can also be achieved by driving a linear motor or a screw mechanism. Technicians can select the appropriate combination of driving methods as needed and arrange the drive systems of the two transfer stations 61 to be staggered.

[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A high-speed string welding machine for photovoltaic production, characterized in that, include: The welding support mechanism (1) includes two welding stations (11). The welding stations (11) can move along a horizontal first direction. The welding stations (11) can reciprocate between the loading station (a) and the unloading station (b) along the first direction. When the welding stations (11) move from the loading station (a) to the unloading station (b), they pass through the welding strip laying station (c), the tooling laying station (d), and the welding station (e) in sequence. The welding stations (11) can be raised and lowered. The two welding stations (11) can be raised and lowered to different heights so that their movement in the first direction does not interfere with each other. The ribbon laying mechanism (2) is used to lay the ribbon on the battery cell when the welding station (11) moves to the ribbon laying station (c); The tooling laying mechanism (3) is used to place the pressure welding strip tooling on the battery cell when the welding station (11) moves to the tooling laying station (d); Welding mechanism (4) is used to weld the welding strip onto the battery cell when the welding station (11) moves to the welding station (e).

2. The high-speed string welding machine for photovoltaic production according to claim 1, characterized in that, The paving equipment mechanism (3) includes: Tooling transfer assembly (31), the tooling transfer assembly (31) and the welding bearing mechanism (1) are spaced apart in a horizontal second direction, the second direction is perpendicular to the first direction, the tooling transfer assembly (31) is used to transport the pressure welding strip tooling to the tooling laying station (d); Tooling laying assembly (32), which is located at tooling laying station (d), includes at least one first gripper (321), which can reciprocate and rise and fall above the tooling transfer assembly (31) and above the welding support mechanism (1).

3. The high-speed string welding machine for photovoltaic production according to claim 2, characterized in that: It also includes an unloading mechanism (5) located at the unloading station (f). When the welding station (11) moves from the loading station (a) to the unloading station (b), it passes through the welding strip laying station (c), the tooling laying station (d), the welding station (e), and the unloading station (f) in sequence. When the welding strip tool is transferred on the tooling transfer assembly (31), it passes through the unloading station (f) and the tooling laying station (d) in sequence. The unloading mechanism (5) is used to transfer the welding strip tool on the battery cell to the tooling transfer assembly (31) when the welding station (11) moves to the unloading station (f).

4. The high-speed string welding machine for photovoltaic production according to claim 3, characterized in that: The unloading mechanism (5) includes at least one second gripper (51) which is reciprocating and lifting above the tooling transfer assembly (31) and the welding support mechanism (1).

5. The high-speed string welding machine for photovoltaic production according to claim 4, characterized in that: The transmission direction of the tooling transmission component (31) is parallel to the first direction.

6. The high-speed string welding machine for photovoltaic production according to claim 5, characterized in that: The first gripper (321) and the second gripper (51) reciprocate above the tooling transfer assembly (31) and above the welding bearing mechanism (1) in directions parallel to the second direction.

7. The high-speed string welding machine for photovoltaic production according to claim 4, characterized in that: Both the first gripper (321) and the second gripper (51) grip the welding strip tooling by electromagnetic adsorption.

8. The high-speed string welding machine for photovoltaic production according to claim 1, characterized in that, Also includes: A battery cell transfer mechanism (6) and a welding support mechanism (1) are spaced apart in a second direction. The battery cell transfer mechanism (6) includes a transfer table (61) which can move in a horizontal direction. The transfer table (61) has a loading position (g) located in the loading station (a). The transfer table (61) is used to carry and transport multiple battery cells arranged sequentially at a set interval. The loading mechanism (7) is located in the loading station (a) and is used to transfer multiple battery cells on the transfer station (61) to the welding station (11) in one go when the welding station (11) moves to the loading station (a).

9. The high-speed string welding machine for photovoltaic production according to claim 8, characterized in that: Two transfer stations (61) are provided. The transfer stations (61) can be raised and lowered. The two transfer stations (61) can be raised and lowered to different heights so that their movement in the first direction does not interfere with each other.

10. The high-speed string welding machine for photovoltaic production according to claim 8, characterized in that: The moving direction of the transfer station (61) is parallel to the first direction.