Flaring equipment for steel strip reinforced polyethylene corrugated pipe

By using the combined injection method of the clamping press and the double-sided injection molding machine in the expansion equipment of the steel strip reinforced polyethylene bellows, the problem of temperature drop caused by the long time for the injection material to fill the cavity is solved, and the mold filling and molding are improved. Effect.

CN221793583UActive Publication Date: 2024-10-01XINJIANG JINJIANG HIGH-TECH PLASTIC PIPE IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322930726.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-30
Publication Date
2024-10-01
Estimated Expiration
2033-10-30

AI Technical Summary

Technical Problem

At the joint of the steel-strip-reinforced polyethylene corrugated pipe, it takes a long time for the injection molding material to fill the cavity, resulting in a drop in melt temperature and fluidity, resulting in poor mold filling effect, which in turn affects the expansion molding effect.

Method used

Design a kind of expansion equipment. By setting up two injection molding machines on both sides of the clamping press, injection molding materials are injected into the cavity of the expansion mold respectively, thereby reducing the flow distance and filling time of the injection molding material and ensuring the temperature stability of the injection molding material. .

Benefits of technology

It effectively improves the filling effect and expansion molding quality of injection molding materials, weakens the impact of fluidity reduction caused by temperature drop, and improves the stability of the connection end.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221793583U_ABST
    Figure CN221793583U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of steel strip reinforced polyethylene corrugated pipes, in particular to flaring equipment for steel strip reinforced polyethylene corrugated pipes, which comprises a mould locking press, a conveying device and two injection molding machines. The flaring die is installed on the lock die press, the two injection molding machines are arranged on the two sides of the lock die press, and during flaring, the lock die press is used for separating and pulling open the upper die body and the lower die body. And the conveying device is used for pushing the steel strip reinforced polyethylene corrugated pipe to enter the space between the upper die body and the lower die body. And the upper die body and the lower die body are closed and buckled through a die locking press, and at the moment, the connecting end of the steel belt reinforced polyethylene corrugated pipe is buckled between the upper die body and the lower die body and inserted into the cavity. During injection molding, the two injection molding machines inject injection molding materials into the cavity of the flaring mold at the same time, the flowing distance of injection molding material melt is shortened, the mold filling time of the injection molding material melt is shortened, and therefore the influence that the flowability of the injection molding material melt is reduced due to gradual decrease of the temperature is weakened, the mold filling effect is better, and the flaring forming effect is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel-reinforced polyethylene corrugated pipes, and more specifically, to a flaring device for steel-reinforced polyethylene corrugated pipes. Background Art

[0002] Steel belt reinforced polyethylene corrugated pipe is a double-wall spiral corrugated pipe with high-density polyethylene (PE) as the base, with steel belt coated with adhesive resin on the surface to form a waveform as the main supporting structure, and wrapped with polyethylene material to form a whole. When in use, when two steel belt reinforced polyethylene corrugated pipes need to be connected, in order to ensure stability, such as Figure 7 As shown, it is often necessary to use flaring equipment to produce flares at the connection ends of steel-reinforced polyethylene corrugated pipes by injection molding.

[0003] Specifically, the expanding equipment includes a expanding mold, a expanding mold core, a locking mold press, a pipe conveying platform and an injection molding machine. The expanding mold includes an upper mold body and a lower mold body that can be buckled together. The upper mold body is provided with an upper cavity, and the lower mold body is provided with a lower cavity. When the upper mold body and the lower mold body are buckled, the upper cavity and the lower cavity are combined to form a cavity. The upper mold body and the lower mold body are respectively installed on the locking mold press, and the steel-belt reinforced polyethylene corrugated pipe is placed on the conveying device. After the locking mold press separates the upper mold body and the lower mold body, the conveying device pushes the steel-belt reinforced polyethylene corrugated pipe so that its connecting end enters between the upper mold body and the lower mold body. After the locking mold press buckles the upper mold body and the lower mold body, the connecting end of the steel-belt reinforced polyethylene corrugated pipe is inserted into the cavity. An injection molding machine is used to inject molten injection material into the gate on the expansion mold, which flows through the runner and enters the cavity. After the injection material solidifies, the locking mold press separates the upper mold body and the lower mold body, thereby forming a flare at the connecting end of the steel belt reinforced polyethylene corrugated pipe.

[0004] Since the injection material has a long flow distance in the cavity, it takes a long time to fill the cavity. As time goes by, the temperature of the melt gradually decreases, resulting in reduced melt fluidity, poor mold filling, and poor expansion molding effects. Utility Model Content

[0005] In order to overcome the problems existing in the related art to a certain extent at least, the purpose of the present application is to provide a flaring device for steel-strip reinforced polyethylene corrugated pipes, which can solve the problem that the injection molding material takes a long time to fill the cavity, and as time goes by, the temperature of the melt gradually decreases, resulting in reduced melt fluidity, poor mold filling effect, and thus poor flaring molding effect. The many technical effects that can be produced by the preferred technical solution among the many technical solutions provided in the present application are described in detail below.

[0006] The present application provides a flaring device for a steel-reinforced polyethylene corrugated pipe, comprising:

[0007] A clamping press, on which a flaring die is mounted, and which is used to press and pull the upper die body and the lower die body of the flaring die away;

[0008] A conveying device, used for pushing the steel-strip reinforced polyethylene corrugated pipe to move toward and away from the clamping press, and the connecting end of the steel-strip reinforced polyethylene corrugated pipe can extend between the upper mold body and the lower mold body of the expansion mold;

[0009] Injection molding machine, two of the injection molding machines are respectively arranged on both sides of the locking mold press, and the two injection molding machines can respectively inject injection molding materials into the expansion mold on both sides.

[0010] Optionally, the conveying device includes: a platform and a movable baffle slidably connected to the platform, and the steel-belt reinforced polyethylene corrugated pipe abuts against the movable baffle.

[0011] Optionally, a sealing ring installation device is provided on the movable baffle, and the sealing ring installation device includes:

[0012] An upper part, slidably connected to the movable baffle;

[0013] The lower half is slidably connected to the movable baffle, the upper half and the lower half can slide away from and close to each other up and down, and the sealing ring is sleeved on the outer periphery of the upper half and the lower half;

[0014] an elastic member, the upper half and the lower half being connected by the elastic member;

[0015] An outward expansion device, used to push the upper half and the lower half away from each other;

[0016] A push rod is used to push the sealing ring away from the upper half and the lower half.

[0017] Optionally, the external expansion device includes:

[0018] An upper push rod, the top end of which is fixedly connected to the bottom of the upper half;

[0019] A push rod, the bottom end of which is fixedly connected to the top of the lower half;

[0020] A pushing block, wherein a slope is arranged on the side wall of the pushing block, and the bottom end of the upper pushing rod and the top end of the lower pushing rod respectively abut against the side wall of the pushing block at the upper and lower sides.

[0021] Optionally, the injection molding machine includes an injection glue unit, a pre-plastic unit and a discharge end, the discharge end of the injection glue unit, the feed end of the pre-plastic unit and the inlet end of the discharge end are respectively connected to rotary valves, the pre-plastic unit is unidirectionally connected with the injection glue unit through the rotary valve, the pre-plastic unit and the injection glue unit are extruded separately or simultaneously through the rotary valve, the extrusion pressure of the pre-plastic unit is greater than the extrusion pressure of the injection glue unit, the pre-plastic unit and the injection glue unit are electrically connected to a control unit, the outlet end of the rotary valve monitors the pressure through the control unit, and the rotary valve is electrically connected to the control unit.

[0022] Optionally, the rotary valve includes a valve body, which is fixedly connected to the discharge end head, and three groups of material ports and material flow channels are opened in the valve body, the three groups of material ports are connected to the same material flow channel, and the three groups of material ports are respectively connected to the discharge end, the material storage chamber, and the discharge end of the injection glue unit. A valve core is rotatably connected in the material flow channel, and a second servo motor is fixedly connected to the outer surface of the discharge end head. The valve core is driven by the output shaft of the second servo motor, and any two groups of the material ports are connected through the valve core or three groups of the material ports are connected through the valve core, and the second servo motor is electrically connected to the control unit.

[0023] Optionally, the pre-plasticizing unit includes a storage cylinder, one end of which is fixedly connected to the inlet end of the discharge terminal, the injection glue unit is unidirectionally connected to one end of the storage cylinder through the rotary valve, a screw pushing assembly is arranged in the storage cylinder, a first servo motor is arranged at the other end of the storage cylinder, the screw pushing assembly is transmission-connected via the first servo motor, and the screw pushing assembly and the first servo motor are electrically connected to the control unit respectively.

[0024] Optionally, the screw pushing assembly includes a screw coaxially slidably connected to the storage cylinder, a piston part coaxially connected to one end of the screw, and a load sensor installed at the connection between the screw and the piston part; the piston part is fixedly connected to one end of the screw through the load sensor; the screw is transmission-connected to the first servo motor; a storage chamber is formed between the piston part and the rotary valve; the pre-plasticizing unit is connected to the storage chamber through the rotary valve; and the piston part and the load sensor are electrically connected to the control unit respectively.

[0025] Optionally, the piston part includes an electronic ruler, a piston rod and a piston, one end of the piston rod is fixedly connected to one end of the screw rod through the load sensor, the other end of the piston rod is fixedly connected to the piston coaxially, the piston is axially slidingly connected to the inner wall of the storage cylinder, the storage chamber is located between the piston and the rotary valve, the electronic ruler is installed on the piston rod, and the electronic ruler is electrically connected to the control unit.

[0026] Optionally, the locking mold press includes a base, an upper fixed plate and a lower fixed plate arranged on the base, an upper movable plate and a lower movable plate arranged between the upper fixed plate and the lower fixed plate, a first driving component arranged on the upper fixed plate to drive the upper fixed plate to move, and a second driving component arranged on the lower fixed plate to drive the lower movable plate to move. The upper fixed plate is provided with a first adjusting component to limit the movement stroke of the lower movable plate, and the lower fixed plate is provided with a second adjusting component to limit the movement stroke of the upper movable plate. When the first adjusting component abuts against the lower movable plate and the second adjusting component abuts against the upper movable plate, a gap is formed between the upper movable plate and the lower movable plate to allow the bellows to enter or exit the mold, and the upper mold body and the lower mold body of the expanding mold are respectively provided on the surfaces of the upper movable plate and the lower movable plate that are opposite to each other.

[0027] The technical solution provided by this application may have the following beneficial effects:

[0028] The present application provides a flaring device for steel-strip reinforced polyethylene corrugated pipes, wherein the flaring mold is installed on a locking mold press, and two injection molding machines are arranged on both sides of the locking mold press. When flaring is performed, the locking mold press is used to separate and pull apart the upper mold body and the lower mold body. A conveying device is used to push the steel-strip reinforced polyethylene corrugated pipe into between the upper mold body and the lower mold body. The locking mold press is used to close and snap the upper mold body and the lower mold body together, at which time the connecting end of the steel-strip reinforced polyethylene corrugated pipe is snapped between the upper mold body and the lower mold body and inserted into the cavity. During injection molding, the two injection molding machines simultaneously inject the injection molding material into the cavity of the flaring mold, which reduces the flow distance and the filling time of the injection molding material melt, thereby reducing the influence of the injection molding material melt on the reduced fluidity due to the gradual decrease in temperature, and the filling effect is better, and the flaring molding effect is better.

[0029] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0031] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 It is a schematic diagram of the position of the injection molding machine relative to the clamping press;

[0033] Figure 2 It is a schematic diagram of the layout of the expansion equipment used for steel-reinforced polyethylene corrugated pipe;

[0034] Figure 3 It is a schematic diagram of the structure of the conveying device;

[0035] Figure 4 It is a structural schematic diagram of a sealing ring installation device;

[0036] Figure 5 It is a schematic diagram of the structure of the clamping press;

[0037] Figure 6 It is a structural diagram of an injection molding machine;

[0038] Figure 7 It is a cross-sectional schematic diagram of the combined state of the valve body and the valve core;

[0039] Figure 8 is a cross-sectional schematic diagram of the valve core;

[0040] Fig. 9 It is a side view of the valve core;

[0041] Fig.10 It is a schematic diagram of the connection between three groups of material ports and material flow channels;

[0042] Fig.11 It is a schematic diagram of different connection states of the valve core.

[0043] In the figure: 1. clamping press; 2. conveying device; 201. platform; 202. movable baffle; 3. injection molding machine; 4. upper half; 5. lower half; 6. elastic member; 7. expansion device; 701. upper push rod; 702. lower push rod; 703. push block; 8. push rod; 9. rotary valve; 91. valve body; 92. material flow channel; 93. valve core; 94. second servo motor; 10. storage cylinder; 11. first servo motor; 12. load sensor; 13. electronic ruler; 14. piston rod. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.

[0045] The following is an explanation of the embodiments with reference to the accompanying drawings. In addition, the embodiments shown below do not limit the contents of the utility model described in the claims. In addition, the entire contents of the structures represented by the following embodiments are not limited to the solutions required as the utility model described in the claims.

[0046] refer to Figure 1-11 This specific embodiment provides a flaring device for steel-reinforced polyethylene corrugated pipes, characterized in that it includes: a clamping press 1, a conveying device 2 and two injection molding machines 3. The flaring mold includes an upper mold body and a lower mold body, the upper mold body is provided with an upper cavity, and the lower mold body is provided with a lower cavity. The upper mold body and the lower mold body of the flaring mold are buckled to form a flaring mold. At this time, the upper cavity and the lower cavity are combined to form a cavity, and a gate is provided on both sides of the flaring mold to connect the cavity. The upper mold body and the lower mold body are respectively installed on the clamping press 1.

[0047] After the steel belt reinforced polyethylene corrugated pipe is placed on the conveying device 2, the conveying device 2 can push the steel belt reinforced polyethylene corrugated pipe to move, and the upper mold body and the lower mold body are located on the moving track of the steel belt reinforced polyethylene corrugated pipe. Two injection molding machines 3 are respectively arranged on both sides of the clamping press 1.

[0048] When expanding, the upper mold body and the lower mold body are separated and pulled apart by using a locking mold press 1. The steel-reinforced polyethylene corrugated pipe is placed on the conveying device 2 so that the connecting end of the steel-reinforced polyethylene corrugated pipe is away from the conveying device 2, and the conveying device 2 is used to push the steel-reinforced polyethylene corrugated pipe so that its connecting end enters between the upper mold body and the lower mold body. The upper mold body and the lower mold body are buckled together by using a locking mold press 1, at which time the connecting end of the steel-reinforced polyethylene corrugated pipe is buckled between the upper mold body and the lower mold body and inserted into the mold cavity. An injection molding machine 3 is used to inject molten injection molding material into the mold cavity from the gate on the first side of the expanding mold, and another injection molding machine 3 is used to inject molten injection molding material into the mold cavity from the gate on the second side of the expanding mold. In this way, the two injection molding machines 3 inject injection molding material into the mold cavity of the expanding mold at the same time, which reduces the flow distance and filling time of the injection molding material melt, thereby reducing the influence of the injection molding material melt on the fluidity reduction caused by the gradual decrease in temperature, and the filling effect is better, and the expansion molding effect is better.

[0049] As an optional embodiment, the conveying device 2 includes: a platform 201 and a movable baffle 202 slidably connected to the platform 201. The movable baffle 202 can be driven to move back and forth by a cylinder. After the steel-reinforced polyethylene corrugated pipe is placed on the platform 201, the other end of the connection end of the steel-reinforced polyethylene corrugated pipe is against the movable baffle 202. The steel-reinforced polyethylene corrugated pipe can be pushed to be inserted between the upper mold body and the lower mold body by driving the movable baffle 202 by a cylinder.

[0050] In some embodiments, a sealing ring installation device is provided on the movable baffle 202. Figure 7 As shown, for the connection of the steel-reinforced polyethylene corrugated pipe, both ends should be injection molded to form a flared part and a socket part respectively. The flared part and the socket part are connected together to complete the connection. In order to further ensure the sealing, after the socket part is formed by injection molding, a sealing ring needs to be set on the socket part.

[0051] The sealing ring installation device includes: an upper half 4, a lower half 5, an elastic member 6, an external expansion device 7 and a push rod 8. A sleeve is fixedly arranged on the movable baffle 202, and sliding holes are arranged on the upper and lower sides of the sleeve. Sliding columns are arranged on the upper half 4 and the lower half 5 and are respectively inserted into the sliding holes. At this time, the upper half 4 and the lower half 5 are both slidably connected to the movable baffle 202 and can slide up and down. The elastic member 6 is an annular coil spring and is sleeved on the outer periphery of the upper half 4 and the lower half 5, so that the upper half 4 and the lower half 5 are connected through the elastic member 6. At this time, when a force is applied to move the upper half 4 and the lower half 5 away from each other, the annular coil spring is stretched, and after the force is removed, the annular coil spring rebounds to reset the upper half 4 and the lower half 5.

[0052] The outward expansion device 7 includes an upper push rod 701, a lower push rod 702 and a push block 703. The top end of the upper push rod 701 is fixedly connected to the bottom of the upper half 4, and the bottom end of the lower push rod 702 is fixedly connected to the top of the lower half 5. An inclined surface is arranged on the side wall of the first end of the push block 703, and the second end of the push block 703 is fixedly connected to the vertical plate after passing through the movable baffle 202. At this time, the bottom end of the upper push rod 701 abuts against the upper side inclined surface of the first end of the push block 703, and the top end of the lower push rod 702 abuts against the lower side inclined surface of the first end of the push block 703. Two push rods 8 are arranged and are respectively arranged on the upper side surface of the upper half 4 and the lower side surface of the lower half 5. The two push rods 8 are fixedly connected to the vertical plate after passing through the movable baffle 202. The vertical plate is fixedly connected to the cylinder.

[0053] First, the sealing ring is sleeved on the periphery of the upper half 4 and the lower half 5. Then the socket of the steel-reinforced polyethylene corrugated pipe is pressed against the side of the upper half 4 and the lower half 5 away from the movable baffle 202. At this time, the cylinder is used to push the vertical plate to move close to the movable baffle 202, so that the push block 703 moves close to the steel-reinforced polyethylene corrugated pipe, and the upper push rod 701 and the lower push rod 702 slide along the inclined surface to move up and down respectively. At this time, the upper half 4 and the lower half 5 move away and expand the sealing ring until it is larger than the socket. With the push of the vertical plate, the push rod 8 moves close to the sealing ring along the periphery of the upper half 4 and the lower half 5. When the size of the sealing ring expands to be larger than the socket, the push rod 8 begins to contact the sealing ring. Continue to push the vertical plate, and the push rod 8 pushes the sealing ring away from the upper half 4 and the lower half 5 and sleeves it on the socket of the steel-reinforced polyethylene corrugated pipe.

[0054] As an optional embodiment, the injection molding machine 3 includes a preplastic unit, an injection glue unit and a discharge end. The discharge end of the injection glue unit, the feed end of the preplastic unit and the inlet end of the discharge end are respectively connected to a rotary valve 9. The preplastic unit is unidirectionally connected to the injection glue unit through the rotary valve 9. The preplastic unit and the injection glue unit are extruded separately or simultaneously through the rotary valve 9. The extrusion pressure of the preplastic unit is greater than the extrusion pressure of the injection glue unit. The preplastic unit and the injection glue unit are electrically connected to a control unit. The outlet end of the rotary valve 9 monitors the pressure through the control unit, and the rotary valve 9 is electrically connected to the control unit.

[0055] The discharge end is equivalent to a three-way structure. The pre-plastic unit is connected to the injection glue unit through the rotary valve 9, the pre-plastic unit is connected to the mold cavity through the rotary valve 9, the injection glue unit is connected to the mold cavity through the rotary valve 9, and the pre-plastic unit and the injection glue unit are connected to the mold cavity at the same time through the rotary valve 9.

[0056] Monitoring the pressure at the outlet of the rotary valve 9 is to monitor the pressure in the mold cavity, so as to accurately identify the filling degree in the mold cavity; when the pre-plastic unit is unidirectionally connected to the injection glue unit through the rotary valve 9, the injection glue unit injects plasticized material into the pre-plastic unit; the injection glue unit mainly performs low-pressure and low-speed injection molding, and the pre-plastic unit is mainly for high-pressure and high-speed injection molding mode; the main function of the control unit is to control the flow state of the rotary valve 9 according to the monitored pressure value, that is, to realize the injection glue unit to inject plasticized material into the pre-plastic unit in one direction or the injection glue unit is extruded into the mold cavity alone or the pre-plastic unit is extruded into the mold cavity alone or the injection glue unit and the pre-plastic unit are extruded into the mold cavity together; on the whole, it can automatically switch between high and low pressure extrusion working modes, and inject sufficient plasticized material into the mold cavity by switching the mode, so as to achieve high injection pressure and high-speed injection and stable working performance, and flexible working mode, creating conditions for molding large products.

[0057] In some embodiments, the rotary valve 5 includes a valve body 91, which is fixedly connected to the discharge end. Three groups of material ports and material flow channels 92 are provided in the valve body 91. The three groups of material ports are connected to the same material flow channel 92. The three groups of material ports are respectively connected to the discharge end of the injection glue unit, the material storage chamber, and the discharge end of the discharge end. A valve core 93 is rotatably connected in the material flow channel 92. A second servo motor 94 is fixedly connected to the outer surface of the discharge end. The valve core 93 is driven by the output shaft of the second servo motor 94. A T-shaped channel (not marked in the figure) is provided in the valve core 93. Any two groups of material ports are connected through the T-shaped channel or three groups of material ports are connected through the T-shaped channel. The second servo motor 94 is electrically connected to the control unit.

[0058] The valve core 93 is driven to rotate by the second servo motor 94, so that the storage cylinder 10 is connected with the injection glue unit, the storage cylinder 10 is connected with the mold cavity, and the injection glue unit is connected with the mold cavity. The storage cylinder 10 and the injection glue unit are connected to the mold cavity at the same time through the rotary valve 5, which can realize multiple functional injection molding modes, solve the problem of small injection capacity of the quantitative storage cylinder on the injection equipment, and change the operation mode can appropriately meet the injection volume requirements of large injection parts, creating conditions for injection molding of large products.

[0059] To further optimize the solution, the pre-plasticizing unit includes a storage cylinder 10, one end of which is fixedly connected to the inlet end of the discharge end, the injection glue unit is unidirectionally connected to one end of the storage cylinder 10 through a rotary valve 9, a screw pushing assembly is arranged in the storage cylinder 10, and a first servo motor 11 is arranged at the other end of the storage cylinder 10, the screw pushing assembly is connected through the first servo motor 11, and the screw pushing assembly and the first servo motor 11 are electrically connected to the control unit respectively.

[0060] To further optimize the solution, the screw pushing assembly includes a screw coaxially slidably connected in the storage cylinder 10, a piston coaxially connected to one end of the screw, and a load sensor 12 installed at the connection between the screw and the piston. The piston is fixedly connected to one end of the screw through the load sensor, the screw is transmission-connected to the first servo motor 11, a storage chamber is formed between the piston and the rotary valve 9, the pre-plasticizing unit is connected to the storage chamber through the rotary valve 9, and the piston and the load sensor are electrically connected to the control unit respectively.

[0061] When the injection glue unit is required to inject plasticized material into the pre-plasticizing unit, the piston part is located in the storage chamber near the rotary valve 9, and there is not enough plasticized material in the storage chamber; the injection glue unit is connected with one end of the storage cylinder 10 through the rotary valve 9, and the control unit controls the start of the first servo motor 11, and the first servo motor 11 drives the screw rod pushing assembly to operate, that is, drives the screw rod and the piston part to operate, and the injected plasticized material gradually fills the storage chamber; when a high-pressure and high-speed injection molding mode is required, the control unit sends a control signal, and the pre-plasticizing unit is connected with the mold cavity through the rotary valve 9, and the first servo motor 11 is driven in reverse to push the plasticized material into the mold cavity through the piston part.

[0062] A further optimized solution is that the piston part includes an electronic ruler 13, a piston rod 14 and a piston. One end of the piston rod 14 is fixedly connected to one end of the screw rod through the load sensor 12, and the other end of the piston rod 14 is fixedly connected to the piston coaxially. The piston is axially slidably connected to the inner wall of the storage cylinder 10, and the storage chamber is located between the piston and the rotary valve 9. The electronic ruler 13 is installed on the piston rod 14, and the electronic ruler 13 is electrically connected to the control unit.

[0063] When the piston is pushing the plasticized material into the mold cavity, the load sensor 12 obtains the pressure value transmitted to the piston rod 14, that is, the extrusion pressure and extrusion amount can be determined. After the pressure value of the load sensor 12 is tracked, compared and calculated with the parameters pre-set in the control unit, the control unit outputs a control signal to control the first servo motor 11 to ensure the accuracy of the piston rod 14 retreat speed during the control of the pre-plastic back pressure, which can improve the homogenization degree of the melt, reduce the temperature difference, and ensure the plasticization quality.

[0064] During the synchronous movement of the piston rod 14 and the piston, whether filling the plasticized material in the storage cylinder 10 or extruding the plasticized material, the stroke of the piston is monitored by the electronic ruler 13, and its monitoring value represents the change in the molten plasticized material in the storage cylinder 10. The piston drives the stroke position of the electronic ruler 13 to change as it moves, and the detected position signal is transmitted to the control unit, and the pre-stored program position signal point and the aging position are set for precise feedback to control the pressure and speed of injection molding and pre-molding and end the pre-molding or injection process.

[0065] As an optional embodiment, the clamping mold press 1 includes a base 101, an upper fixed plate 102 and a lower fixed plate 103 arranged on the base 101, an upper movable plate 104 and a lower movable plate 105 arranged between the upper fixed plate 102 and the lower fixed plate 103, a first driving assembly arranged on the upper fixed plate 102 to drive the upper fixed plate 102 to move, and a second driving assembly arranged on the lower fixed plate to drive the lower movable plate 105 to move, and the upper mold body and the lower mold body of the expansion mold are respectively arranged on the surfaces where the upper movable plate 104 and the lower movable plate 105 are arranged opposite to each other. Among them, the upper fixed plate 102 and the lower fixed plate 103 are connected by a plurality of studs, and the studs are provided with fastening nuts for fixing the upper fixed plate and the lower fixed plate, so that a space for accommodating the upper movable plate 104 and the lower movable plate 105 is formed between the upper fixed plate 102 and the lower fixed plate 103. The upper movable plate 104 is close to the upper fixed plate 102, and the lower movable plate 105 is close to the lower fixed plate 103. The upper fixed plate 102 is provided with a first adjustment component for limiting the movement stroke of the lower movable plate 105, and the lower fixed plate 103 is provided with a second adjustment component for limiting the movement stroke of the upper movable plate 104. The first adjustment component limits the moving position of the lower movable plate 105, and the second adjustment component limits the movement space of the upper movable plate 104. In this way, the upper movable plate 104 and the lower movable plate 105 can be prevented from moving too much up and down. Only a distance that allows the bellows to enter or exit the mold is required, thereby improving the efficiency of the bellows expansion process and shortening the movement time. In addition, for bellows of different diameters, by adjusting the first adjustment component and the second adjustment component, the movement distance of the upper movable plate 104 and the lower movable plate 105 can be limited, and the movement time of the upper movable plate 104 and the lower movable plate 105 can be reduced.

[0066] It should be noted that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc. used herein to indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", "third", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0067] In the description of this article, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to the specific circumstances.

[0068] Although the embodiments of the present application have been shown and described above, it is understood that the above embodiments are exemplary and cannot be construed as limitations of the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application. It is understood that the same or similar parts in the above embodiments may refer to each other, and the contents not described in detail in some embodiments may refer to the same or similar contents in other embodiments. The multiple schemes provided in the present application include the basic schemes themselves, which are independent of each other and do not restrict each other, but they may also be combined with each other without conflict to achieve a plurality of effects to be realized together.

Claims

1. A flaring device for steel-reinforced polyethylene corrugated pipes, It is characterized in that include: A clamping press (1), on which a flaring die is mounted, and the clamping press (1) is used to press and pull apart an upper die body and a lower die body of the flaring die; A conveying device (2) is used to push the steel-strip reinforced polyethylene corrugated pipe to move toward and away from the locking mold press (1), and the connecting end of the steel-strip reinforced polyethylene corrugated pipe can extend between the upper mold body and the lower mold body of the expansion mold; Injection molding machines (3), two of the injection molding machines (3) are respectively arranged on both sides of the locking mold press (1), and the two injection molding machines (3) can respectively inject injection molding materials into the expansion mold on both sides.

2. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 1, It is characterized in that The conveying device (2) comprises: a platform (201) and a movable baffle (202) slidably connected to the platform (201), and a steel-belt reinforced polyethylene corrugated pipe abuts against the movable baffle (202).

3. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 2, It is characterized in that The movable baffle (202) is provided with a sealing ring installation device, and the sealing ring installation device comprises: An upper part (4) is slidably connected to the movable baffle (202); The lower half (5) is slidably connected to the movable baffle (202), the upper half (4) and the lower half (5) can slide upward and downward, and a sealing ring is sleeved on the outer periphery of the upper half (4) and the lower half (5); An elastic member (6), the upper half (4) and the lower half (5) are connected via the elastic member (6); An outward expansion device (7) for pushing the upper half (4) and the lower half (5) away from each other; A push rod (8) is used to push the sealing ring away from the upper half (4) and the lower half (5).

4. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 3, It is characterized in that The external expansion device (7) comprises: A push rod (701), the top end of which is fixedly connected to the bottom of the upper half (4); A push rod (702), the bottom end of which is fixedly connected to the top of the lower half (5); A pushing block (703), wherein a slope is arranged on the side wall of the pushing block (703), and the bottom end of the upper pushing rod (701) and the top end of the lower pushing rod (702) respectively abut against the side wall of the pushing block (703) at the upper and lower sides.

5. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 1, It is characterized in that The injection molding machine (3) comprises a glue injection unit, a pre-plastic unit and a discharge end. The discharge end of the glue injection unit, the feed end of the pre-plastic unit and the feed end of the discharge end are respectively connected to a rotary valve (9). The pre-plastic unit is unidirectionally connected to the glue injection unit through the rotary valve (9). The pre-plastic unit and the glue injection unit are extruded separately or simultaneously through the rotary valve (9). The extrusion pressure of the pre-plastic unit is greater than the extrusion pressure of the glue injection unit. The pre-plastic unit and the glue injection unit are electrically connected to a control unit. The outlet end of the rotary valve (9) monitors the pressure through the control unit. The rotary valve (9) is electrically connected to the control unit.

6. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 5, It is characterized in that The rotary valve (9) comprises a valve body (91), wherein the valve body (91) is fixedly connected to the discharge end head, and three groups of material ports and material flow channels (92) are provided in the valve body (91), wherein the three groups of material ports are connected to the same material flow channel (92), and the three groups of material ports are respectively connected to the discharge end, the material storage chamber, and the discharge end of the injection glue unit, and a valve core (93) is rotatably connected to the material flow channel (92), and a second servo motor (94) is fixedly connected to the outer surface of the discharge end head, and the valve core (93) is driven by the output shaft of the second servo motor (94), and any two groups of the material ports are connected through the valve core (93) or any three groups of the material ports are connected through the valve core (93), and the second servo motor (94) is electrically connected to the control unit.

7. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 5, It is characterized in that The pre-plasticizing unit comprises a material storage cylinder (10), one end of the material storage cylinder (10) is fixedly connected to the inlet end of the material discharge end, the injection unit is unidirectionally connected to one end of the material storage cylinder (10) through the rotary valve (9), a screw pusher assembly is arranged in the material storage cylinder (10), and a first servo motor (11) is arranged at the other end of the material storage cylinder (10), the screw pusher assembly is connected by transmission through the first servo motor (11), and the screw pusher assembly and the first servo motor (11) are respectively electrically connected to the control unit.

8. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 7, It is characterized in that The screw pushing assembly comprises a screw coaxially connected to the storage cylinder (10), a piston coaxially connected to one end of the screw, and a load sensor (12) installed at the connection between the screw and the piston; the piston is fixedly connected to one end of the screw via the load sensor; the screw is transmission-connected to the first servo motor (11); a storage chamber is formed between the piston and the rotary valve (9); the pre-plasticizing unit is connected to the storage chamber via the rotary valve (9); and the piston and the load sensor are electrically connected to the control unit, respectively.

9. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 8, It is characterized in that The piston part comprises an electronic ruler (13), a piston rod (14) and a piston. One end of the piston rod (14) is fixedly connected to one end of the screw rod through the load sensor (12). The other end of the piston rod (14) is fixedly connected to the piston coaxially. The piston is axially slidably connected to the inner wall of the storage cylinder (10). The storage chamber is located between the piston and the rotary valve (9). The electronic ruler (13) is installed on the piston rod (14). The electronic ruler (13) is electrically connected to the control unit.

10. The expansion device for steel-reinforced polyethylene corrugated pipe according to claim 1, It is characterized in that The locking mold press (1) comprises a base (101), an upper fixed plate (102) and a lower fixed plate (103) arranged on the base (101), an upper movable plate (104) and a lower movable plate (105) arranged between the upper fixed plate (102) and the lower fixed plate (103), a first driving component arranged on the upper fixed plate (102) to drive the upper fixed plate (102) to move, and a second driving component arranged on the lower fixed plate to drive the lower movable plate (105) to move, wherein the upper fixed plate (102) is provided with a limiting A first adjustment component for limiting the movement stroke of the lower movable plate (105), a second adjustment component for limiting the movement stroke of the upper movable plate (104) is arranged on the lower fixed plate (103), the first adjustment component abuts against the lower movable plate, and when the second adjustment component abuts against the upper movable plate, a gap is formed between the upper movable plate (104) and the lower movable plate (105) to allow the bellows to enter or exit the mold, and the upper mold body and the lower mold body of the expansion mold are respectively arranged on the surfaces of the upper movable plate (104) and the lower movable plate (105) that are arranged opposite to each other.