Hydrophobic pavement brick

By designing cavities, plug-in blocks and reinforcement components on the hydrophobic bricks, the problem of water splashing out of existing hydrophobic bricks after being washed away by rainwater is solved, and the stability and splash-proof effect between the bricks are achieved.

CN221798043UActive Publication Date: 2024-10-01唐山路远建材有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323515396.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-10-01
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

After the existing hydrophobic bricks are washed away by rainwater, water stains are likely to splash out from the gaps in the bricks when stepped on, causing contamination of pedestrians' clothing.

Method used

The design includes hydrophobic pavement bricks with multiple parallel drainage channels on the top surface of the bricks, uniformly spaced leak holes through the cavity, plug-in blocks and reinforcement components. The brick body is strengthened through the design of the cavity and plug-in blocks. The stability between the front and rear bricks is ensured through staggered overlapping of reinforcement components such as the first and second reinforcement plates to prevent water stains from splashing out.

Benefits of technology

It effectively prevents water stains from splashing from the gaps between the bricks during trampling, ensures that pedestrians' clothes are not contaminated, and improves the stability of the installation between the bricks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798043U_ABST
    Figure CN221798043U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydrophobic pavement brick which comprises a brick body, and a plurality of mutually parallel hydrophobic grooves are formed in the top surface of the brick body; a cavity penetrating through the brick body is formed in the position, below the drainage groove, in the brick body, and the cavity is formed in the length direction of the drainage groove; water leakage holes are uniformly formed in the groove bottom of the drainage groove at intervals; an inserting block is fixedly arranged on one side, located on the cavity, of the brick body, and a penetrating channel communicating with the cavity is formed in the inserting block; reinforcing assemblies are arranged on the two sides, adjacent to the inserting blocks, of the brick bodies and used for reinforcing installation between the adjacent brick bodies. The utility model discloses a hydrophobic pavement brick, which not only prevents water spots from being splashed upwards in a mounting gap between a left brick body and a right brick body in a treading process, but also ensures that the water spots are not splashed upwards in the mounting gap between two front and back adjacent brick bodies in the treading process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pavement bricks, in particular to a hydrophobic pavement brick. Background Art

[0002] Hydrophobic bricks are a common type of brick in urban roads. They are widely used due to their efficient hydrophobic properties. However, after being washed by rainwater, the existing hydrophobic bricks often cause water stains under the bricks to splash out from the gaps between the bricks when people step on them, causing contamination of pedestrians' clothes. Therefore, a hydrophobic brick for urban roads is needed to solve the above problem. Utility Model Content

[0003] In view of the above-mentioned defects or deficiencies in the prior art, it is desired to provide a hydrophobic pavement brick.

[0004] The utility model provides a hydrophobic pavement brick, comprising a brick body, wherein a plurality of mutually parallel hydrophobic grooves are arranged on the top surface of the brick body; a cavity penetrating the brick body is arranged inside the brick body below the hydrophobic groove, and the cavity is arranged along the length direction of the hydrophobic groove; drainage holes are evenly spaced at the bottom of the hydrophobic groove; a plug-in block is fixedly arranged on one side of the cavity on the brick body, and a through channel connected to the cavity is arranged inside the plug-in block; reinforcement components are arranged on both sides of the brick body adjacent to the plug-in block for reinforcing the installation between adjacent brick bodies.

[0005] Preferably, the plug-in block is inserted into the interior of the cavity of the adjacent brick body.

[0006] Preferably, the reinforcement assembly includes a first reinforcement plate fixed in the horizontal direction and arranged on one side of the brick body, and a second reinforcement plate on the other side; two of the first reinforcement plate and the second reinforcement plate are arranged parallel to each other up and down; the horizontal plane where the bottom surface of the first reinforcement plate located at the top is located is matched with the horizontal plane where the top surface of the second reinforcement plate located at the top is located; the horizontal plane where the bottom surface of the first reinforcement plate located at the bottom is located is matched with the horizontal plane where the top surface of the second reinforcement plate located at the bottom is located.

[0007] Preferably, both the first reinforcement plate located above and the second reinforcement plate located above are provided with guide through holes on their plate surfaces, and the guide through holes on the first reinforcement plate located above are arranged opposite to and connected with the guide through holes on the second reinforcement plate located above.

[0008] Preferably, the drainage groove is arranged throughout the length direction of the brick body.

[0009] Preferably, the water leakage hole is communicated with the interior of the cavity.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] The hydrophobic pavement brick of the utility model can ensure that the installation between two adjacent brick bodies on the left and right is more stable through the design of the cavity and the plug-in block arranged on the brick body, and avoid water stains splashing upwards in the installation gap between the two brick bodies on the left and right during the trampling process; in addition, through the reinforcement components arranged on the other two sides of the brick body, that is, the first reinforcement plate and the second reinforcement plate respectively arranged on the two sides of the brick body, the first reinforcement plates are respectively located on the top surface of the second reinforcement plates at the corresponding height, forming a staggered overlapping design, thereby ensuring the stability of the installation between the front and rear adjacent brick bodies and ensuring that water stains will not splash upwards in the installation gap between the front and rear adjacent brick bodies during the trampling process.

[0012] It should be understood that the contents described in the summary of the utility model are not intended to limit the key or important features of the embodiments of the utility model, nor are they intended to limit the scope of the utility model.

[0013] Other features of the present invention will become readily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0015] Figure 1 It is a schematic diagram of the structure after two adjacent pavement bricks are laid from a bird's-eye view;

[0016] Figure 2 It is a schematic diagram of the structure from the side after two adjacent pavement bricks are laid;

[0017] Figure 3 It is a schematic structural diagram of a single pavement brick in a front view;

[0018] Numbers in the figure: 1, brick body; 2, drain groove; 3, cavity; 4, leakage hole; 5, plug-in block; 6, first reinforcement plate; 7, second reinforcement plate; 8, diversion through hole; 9, conical diversion column; 10, diversion channel. DETAILED DESCRIPTION

[0019] The utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It is understood that the specific embodiments described herein are only used to explain the relevant utility model, rather than to limit the utility model. It is also necessary to explain that, for the convenience of description, only the parts related to the utility model are shown in the accompanying drawings.

[0020] It should be noted that, in the absence of conflict, the embodiments and features of the embodiments of the present invention can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] Please refer to Figures 1 to 3 The embodiment of the utility model provides a hydrophobic pavement brick, comprising a brick body 1, on the top surface of which a plurality of mutually parallel hydrophobic grooves 2 are arranged; the hydrophobic grooves 2 are arranged in the length direction of the brick body 1; the hydrophobic grooves 2 on two adjacent brick bodies 1 are arranged in contact with each other; the arrangement of the hydrophobic grooves 2 allows rainwater falling on the brick body 1 to be quickly diverted to the inside of the hydrophobic grooves 2, avoiding accumulation on the top surface of the brick body 1, forming puddles, and other problems;

[0022] The interior of the brick body 1 is provided with a cavity 3 penetrating the brick body below the drain groove 2, and the cavity 3 is provided along the length direction of the drain groove 2; the bottom of the drain groove 2 is provided with leak holes 4 at even intervals; the leak holes 4 are connected to the interior of the cavity 3. Rainwater entering the drain groove 2 flows into the interior of the cavity 3 through the leak holes 4, and the rainwater on the brick body 1 is diverted to the interior of the cavity 3 inside the brick body 1. Since the brick body 1 is laid in series on the left and right, the cavity 3 inside it is also connected in series, and the rainwater can be diverted to the canals on both sides of the road, avoiding the problem of rainwater accumulation on the road surface and the brick body 1 on the road surface.

[0023] A plug-in block 5 is fixedly provided on one side of the cavity 3 on the brick body 1, and a through channel connected to the cavity 31 is provided inside the plug-in block 5, so that the design of series connection between the cavities 3 inside the left and right brick bodies can be realized, thereby achieving the function of diversion; reinforcement components are provided on both sides of the brick body 1 adjacent to the plug-in block, which are used to reinforce the installation between adjacent brick bodies 1.

[0024] In a preferred embodiment, the plug-in block 5 is inserted into the cavity 3 of the adjacent brick body 1 .

[0025] Among them, the brick body 1 is installed in series on the left and right sides, and the plug-in block 5 can be inserted into the cavity 3 of the adjacent brick body 1 away from the end of the plug-in block 5 itself, forming a setting in which the cavities 3 inside the left and right brick bodies 1 are connected, and the rainwater directed into the cavity 3 is directed to the canals on both sides of the road.

[0026] In a preferred embodiment, the reinforcement assembly includes a first reinforcement plate 6 fixed in the horizontal direction and arranged on one side of the brick body 1, and a second reinforcement plate 7 on the other side; two first reinforcement plates 6 and two second reinforcement plates 7 are arranged parallel to each other up and down; the horizontal plane where the bottom surface of the first reinforcement plate 6 located at the top is located is matched with the horizontal plane where the top surface of the second reinforcement plate 7 located at the top is located; the horizontal plane where the bottom surface of the first reinforcement plate 6 located at the bottom is located is matched with the horizontal plane where the top surface of the second reinforcement plate 7 located at the bottom is located.

[0027] In a preferred embodiment, the first reinforcement plate 6 located above and the second reinforcement plate 7 located above are both provided with diversion through holes 8 on their plate surfaces. After laying, the diversion through holes 8 on the first reinforcement plate 6 located above and the diversion through holes 8 on the second reinforcement plate 7 located above on the two brick bodies 1 are arranged opposite to and connected with each other.

[0028] After the brick body 1 is installed, a long strip of diversion channel 10 is formed between the second reinforcing plate 7 located above and the first reinforcing plate 6 located below, which is used to divert rainwater coming down through the diversion through hole 8 to both sides of the road.

[0029] Among them, a conical guide column 9 is fixedly arranged on the bottom surface of the guide through hole 8 on the first reinforcement plate 6 located above, corresponding to the guide through hole 8 on the second reinforcement plate 7 located above. The interior of the conical guide column 9 is hollow, and the conical guide column 9 is inserted into the corresponding interior of the guide through hole 8 on the second reinforcement plate 7 located above; rainwater flows through the guide through hole 8 on the first reinforcement plate 6 located above, the conical guide column 9 and the guide through hole 8 on the second reinforcement plate 7 located above in turn, and enters the interior of the guide channel 10, thereby discharging the rainwater to both sides of the road.

[0030] The provision of the conical guide column 9 can increase the stability of the installation structure between the front and rear installed brick bodies 1, and prevent water stains from splashing out of the installation gaps between the front and rear brick bodies 1 when stepping on the brick bodies 1.

[0031] In the description of this specification, the terms "connection", "installation", "fixation" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0032] In the description of this specification, the description of the terms "one embodiment", "some embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0033] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A hydrophobic pavement brick, characterized in that: It comprises a brick body, on the top surface of which a plurality of mutually parallel drainage grooves are arranged; inside the brick body, a cavity penetrating the brick body is arranged below the drainage grooves, and the cavity is arranged along the length direction of the drainage grooves; drainage holes are evenly spaced at the bottom of the drainage grooves; a plug-in block is fixedly arranged on one side of the cavity on the brick body, and a through channel connected to the cavity is arranged inside the plug-in block; reinforcement components are arranged on both sides of the brick body adjacent to the plug-in block for reinforcing the installation between adjacent brick bodies.

2. The hydrophobic pavement brick according to claim 1, characterized in that: The plug-in block is inserted into the interior of the cavity of the adjacent brick body.

3. The hydrophobic pavement brick according to claim 2, characterized in that: The reinforcement assembly includes a first reinforcement plate fixed in the horizontal direction and arranged on one side of the brick body, and a second reinforcement plate on the other side; two of the first reinforcement plate and the second reinforcement plate are arranged parallel to each other up and down; the horizontal plane where the bottom surface of the first reinforcement plate located at the top is located is matched with the horizontal plane where the top surface of the second reinforcement plate located at the top is located; the horizontal plane where the bottom surface of the first reinforcement plate located at the bottom is located is matched with the horizontal plane where the top surface of the second reinforcement plate located at the bottom is located.

4. The hydrophobic pavement brick according to claim 3, characterized in that: The first reinforcement plate located above and the second reinforcement plate located above are both provided with flow guide through holes on their plate surfaces. The flow guide through holes on the first reinforcement plate located above are arranged opposite to and connected with the flow guide through holes on the second reinforcement plate located above.

5. The hydrophobic pavement brick according to claim 4, characterized in that: The drainage groove is arranged throughout the length direction of the brick body.

6. The hydrophobic pavement brick according to claim 5, characterized in that: The water leakage hole is communicated with the interior of the cavity.