Multifunctional pile pressing device for underwater implantable socketed pile construction

Through the design of a multi-functional pile pressing device, the problem of controlling the position and slope of engineering piles in the construction of underwater rock-socketed piles is solved, precise measurement, adjustment and fixation are achieved, the construction process is simplified and efficiency is improved.

CN221798430UActive Publication Date: 2024-10-01CCCC THIRD HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420043351.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-10-01
Estimated Expiration
2034-01-08

AI Technical Summary

Technical Problem

During the construction of underwater rock-socketed piles, it is difficult to accurately control the top plane position and slope of the engineering piles, and the underwater process is complex, making it difficult to achieve precise adjustment and fixation.

Method used

A multifunctional pile-pressing device is designed, including a temporary steel casing and a pile-pressing pipe. The pile-pressing pipe is composed of an upper exposed section, a lower inserted section and a pile-pressing ring plate. The guide head and stiffening plate are used to achieve high coaxiality. connections, allowing precise measurement, adjustment and fixation of engineering piles and the formation of sand filling channels.

Benefits of technology

It achieves precise measurement, adjustment and fixation of underwater engineering piles, simplifies the construction process, improves construction efficiency, and facilitates core filling operations in the piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798430U_ABST
    Figure CN221798430U_ABST
Patent Text Reader

Abstract

The utility model discloses a multifunctional pile pressing device for underwater implantable socketed pile construction. The multifunctional pile pressing device comprises a temporary steel casing and a pile pressing pipe. The temporary steel casing is arranged at the top of the rock-socketed hole and arranged outside the engineering pile inserted into the rock-socketed hole in a sleeving mode. The pile pressing pipe comprises an upper exposed section, a lower insertion section and a pile pressing annular plate; the height of the upper exposed section is at least the distance between the top of the engineering pile and the top surface of the construction platform; the outer diameter of the lower inserting section is 10-25 mm smaller than the inner diameter of the engineering pile, and the bottom of the lower inserting section is connected with an inverted-cone-shaped guide head. The pile pressing annular plate is fixed to the outer surface of the pile pressing pipe and located at the junction of the upper exposed section and the lower insertion section, and the outer diameter of the pile pressing annular plate is larger than that of an engineering pile and smaller than the inner diameter of a temporary steel casing. And the pile pressing pipe is inserted from the top of the temporary steel casing, so that the lower insertion section is inserted into the engineering pile until the pile pressing annular plate is located on the top surface of the engineering pile. According to the utility model, the construction of the underwater implantable socketed pile can be smoothly carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a multifunctional pile pressing device for underwater implantable rock-embedded pile construction. Background Art

[0002] The pile foundation of deepwater jackets is generally very long and needs to be driven deep below the mud surface and rock-embedded. During the construction of underwater rock-embedded piles, the engineering piles are embedded in the rock and then drilled. After the engineering piles are implanted in the rock-embedded holes, the top of the pile is located at a water depth of about 18.0 to 10 meters, and the bottom of the pile is located at a water depth of about 45.0 meters. Since the outer diameter of the engineering pile is about 40 cm smaller than the diameter of the rock-embedded hole, the engineering pile is in a free state of movement in the rock-embedded hole. Therefore, it is very difficult to accurately control the top plane position of the engineering pile and the slope of the engineering pile. After the engineering pile is adjusted in place, it is necessary to temporarily fix the engineering pile, and carry out a series of processes such as bottom grouting of the engineering pile, grouting of the outer annular seam of the engineering pile, and core filling in the pile. This series of processes is difficult to carry out underwater. Utility Model Content

[0003] The utility model aims to overcome the defects of the prior art and provide a multifunctional pile-pressing device for underwater implanted rock-embedded pile construction, which has a simple structure and multiple functions, so that the underwater implanted rock-embedded pile construction can proceed smoothly.

[0004] The purpose of the utility model is achieved as follows: a multifunctional pile-pressing device for underwater implantable rock-embedded pile construction, comprising a temporary steel casing and a pile-pressing pipe; the temporary steel casing is arranged at the top of the rock-embedded hole and is sleeved on the outside of the engineering pile inserted in the rock-embedded hole;

[0005] The pile driving pipe comprises an upper exposed section, a lower inserted section and a pile driving ring plate; wherein,

[0006] The height of the upper exposed section is at least the distance between the top of the engineering pile and the top surface of the construction platform built on the seabed;

[0007] The outer diameter of the lower insertion section is 10 to 25 mm smaller than the inner diameter of the engineering pile, the height of the lower insertion section is 3 to 10 m, and the bottom of the lower insertion section is connected to an inverted cone-shaped guide head;

[0008] The pile driving ring plate is fixed on the outer surface of the pile driving pipe and is located at the junction of the upper exposed section and the lower inserted section. The outer diameter of the pile driving ring plate is larger than the outer diameter of the engineering pile and smaller than the inner diameter of the temporary steel casing.

[0009] The pile driving pipe is inserted from the top of the temporary steel casing, so that the lower insertion section is inserted into the engineering pile until the pile driving ring plate is seated on the top surface of the engineering pile.

[0010] In the above-mentioned multifunctional pile driving device for underwater rock-embedded pile construction, the height of the guide head is 1.2 m, and the outer diameter of the bottom of the guide head is 60% of the outer diameter of the pile driving pipe.

[0011] In the above-mentioned multifunctional pile driving device for underwater rock-embedded pile construction, a plurality of stiffening plates are evenly distributed along the circumference between the top surface of the pile driving ring plate and the outer surface of the upper exposed section.

[0012] The multifunctional pile pressing device for underwater rock-embedded pile construction of the utility model has the following characteristics:

[0013] 1. Used for measurement: The pile driving pipe can guide the position, elevation, slope and other parameters of the engineering piles at a depth of 20 meters underwater to the water construction platform above the sea surface for measurement. Due to the extremely high coaxiality between the pile driving pipe and the engineering piles, accurate measurement of the engineering piles at a depth of 20 meters underwater can be achieved through calculation;

[0014] 2. Used for pile adjustment. Through the clever connection between the pile driving pipe and the engineering pile at a depth of 20 meters underwater, the extremely high coaxiality between the pile and the underwater engineering pile is ensured, and the position of the engineering pile at a depth of 20 meters underwater can be accurately adjusted on the top surface of the construction platform above the sea surface;

[0015] 3. For fixing, the pile driving pipe can be easily fixed and connected on the construction platform to control the position, elevation and slope of the engineering piles under 20 meters of water.

[0016] 4. For sand filling, the pile driving pipe can form a vertical sand filling channel to the engineering pile, which is convenient for the underwater core filling construction of the engineering pile; after the pile driving pipe is used, it is also easy to dismantle and take out. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of a multifunctional pile-pressing device for underwater implantable rock-embedded pile construction of the utility model;

[0018] Figure 2 It is a structural schematic diagram of a pile driving pipe of the multifunctional pile driving device of the utility model;

[0019] Figure 3 This is a usage state diagram of the multifunctional pile pressing device of the utility model;

[0020] Figure 4 This is another use state diagram of the multifunctional pile driving device of the utility model. DETAILED DESCRIPTION

[0021] The utility model will be further described below in conjunction with the accompanying drawings.

[0022] See also Figures 1 to 4The utility model discloses a multifunctional pile driving device for underwater rock-embedded pile construction, comprising a temporary steel casing 1 and a pile driving pipe 2.

[0023] The temporary steel casing 1 is arranged at the top of the rock-embedded hole 10 and is sleeved on the outside of the engineering pile 100 inserted into the rock-embedded hole 10 .

[0024] Pile pipe 2 (see Figure 2 ) comprises an upper exposed section 21, a lower inserted section 22 and a pile pressing ring plate 20; wherein,

[0025] The height h1 of the upper exposed section 21 is at least the distance between the top of the engineering pile 100 and the top surface of the construction platform 200 built on the seabed;

[0026] The outer diameter of the lower insertion section 22 is 10-25 mm smaller than the inner diameter of the engineering pile 100. The smaller the difference between the outer diameter of the lower insertion section 22 and the inner diameter of the engineering pile 10, the higher the measurement and pile adjustment accuracy. The height h2 of the lower insertion section 22 is determined according to the elevation of the core filling in the pile at a later stage, which is 3-10 m. The bottom of the lower insertion section 22 is connected to an inverted cone-shaped guide head 23; the height h3 of the guide head 23 is 1.2 m, and the bottom outer diameter of the guide head 23 is 60% of the outer diameter of the pile driving pipe 2.

[0027] The pile driving ring plate 20 is fixed on the outer surface of the pile driving pipe 2 and is located at the junction of the upper exposed section 21 and the lower inserted section 22. The outer diameter of the pile driving ring plate 20 is larger than the outer diameter of the engineering pile 100 and smaller than the inner diameter of the temporary steel casing 1. Eight stiffening plates 24 are evenly distributed along the circumference between the top surface of the pile driving ring plate 20 and the outer surface of the upper exposed section 21.

[0028] The pile driving pipe 2 is inserted from the top of the temporary steel casing 1, so that the lower insertion section 22 is inserted into the engineering pile 100 until the pile driving ring plate 20 is seated on the top surface of the engineering pile 100. The guide head 23 at the bottom of the lower insertion section 22 can smoothly insert the lower insertion section 22 into the engineering pile 100.

[0029] The following is a specific example to illustrate the use of the multifunctional pile driving device for underwater rock-embedded pile construction of the utility model.

[0030] The top of the engineering pile 100 is located at a water depth of 18.0 to 20 m, and the bottom of the pile is located at a water depth of about 45.0 m. The outer diameter of the engineering pile 100 is 2.20 m, and the inner diameter of the engineering pile 100 is 2.03 m. The total length of the pile driving pipe 2 is 34 m, the outer diameter of the upper exposed section 21 of the pile driving pipe 2 is 2.00 m, and the height h1 of the upper exposed section 21 is 27 m. The outer diameter of the lower inserted section 22 of the pile driving pipe 2 is 2.02 m, and the height h2 of the lower inserted section 22 is 7 m. The outer diameter of the lower end of the guide head 23 is 1.2 m.

[0031] The construction of the engineering pile 100 includes the following steps:

[0032] 1. First, a construction platform 200 is built on the seabed, and then a temporary steel casing 1 with an inner diameter of 2.8 m is driven into the seabed below the mud surface, and then a rock-embedded drill is used to drill a hole in the temporary steel casing 1. The inner diameter of the rock-embedded hole 10 is 2.8 m;

[0033] 2. Place an engineering pile 100 with an outer diameter of 2.20 m into the rock-embedded hole 10, with the top of the engineering pile 100 being 18.0 to 20 m below the water surface;

[0034] 3. First, insert the pile driving pipe 2 from the top of the temporary steel casing 1, and insert the lower insertion section 22 into the engineering pile 100 until the pile driving ring plate 20 is seated on the top surface of the engineering pile 100. Then, use the hook sling, jack, hand winch and other pushing and pulling tools on the construction platform 200 to adjust the posture of the underwater engineering pile 100 (see Figure 1 ), the coaxiality deviation value between the engineering pile 100 and the pile driving pipe 2 is controlled to be less than 1.4‰ by the gap between the outer diameter of the lower insertion section 22 and the inner diameter of the engineering pile 100; the top plane coordinates of the engineering pile 100 and the slope of the engineering pile 100 are accurately calculated by measuring the plane coordinates of the top of the upper exposed section 21 of the pile driving pipe 2 above the water surface and the slope of the pile driving pipe 2;

[0035] 4. After the engineering pile 100 is adjusted into place, the top of the upper exposed section 21 of the pile driving pipe is temporarily fixedly connected to the temporary steel casing 2 and the temporary steel casing 2 is temporarily fixedly connected to the construction platform 200 by iron welding, so that the engineering pile 100 is temporarily fixed in the rock-embedded hole 10;

[0036] 5. Perform grouted construction between the outer circumference of the engineering pile 100 and the inner circumference of the rock-embedded hole 10 to consolidate the engineering pile 100 in the rock-embedded hole 10 (see Figure 3 );

[0037] 6. Use the inner hole of the pile driving pipe 2 as a vertical sand filling channel to carry out the core filling construction of the engineering pile 100 (see Figure 4 );

[0038] 7. Remove the pile driving pipe 2, temporary steel casing 1 and construction platform 200 in sequence.

[0039] The above embodiments are only used to illustrate the present invention, rather than to limit the present invention. Technicians in the relevant technical field can make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.

Claims

1. A multifunctional pile driving device for underwater rock-embedded pile construction, comprising a temporary steel casing and a pile driving pipe; the temporary steel casing is arranged at the top of the rock-embedded hole and is sleeved on the outside of the engineering pile inserted in the rock-embedded hole; characterized in that: The pile driving pipe comprises an upper exposed section, a lower inserted section and a pile driving ring plate; wherein, The height of the upper exposed section is at least the distance between the top of the engineering pile and the top surface of the construction platform built on the seabed; The outer diameter of the lower insertion section is 10 to 25 mm smaller than the inner diameter of the engineering pile, the height of the lower insertion section is 3 to 10 m, and the bottom of the lower insertion section is connected to an inverted cone-shaped guide head; The pile driving ring plate is fixed on the outer surface of the pile driving pipe and is located at the junction of the upper exposed section and the lower inserted section. The outer diameter of the pile driving ring plate is larger than the outer diameter of the engineering pile and smaller than the inner diameter of the temporary steel casing. The pile driving pipe is inserted from the top of the temporary steel casing, so that the lower insertion section is inserted into the engineering pile until the pile driving ring plate is seated on the top surface of the engineering pile.

2. The multifunctional pile driving device for underwater rock-embedded pile construction according to claim 1, characterized in that: The height of the guide head is 1.2 m, and the outer diameter of the bottom of the guide head is 60% of the outer diameter of the pile driving pipe.

3. The multifunctional pile driving device for underwater rock-embedded pile construction according to claim 1, characterized in that: A plurality of stiffening plates are evenly distributed along the circumference between the top surface of the pile-pressing ring plate and the outer surface of the upper exposed section.