Channel structure and air film building
The skeleton components are quickly assembled through factory-prefabricated detachable connection frames and connectors, and covered with the main body of membrane material, which solves the problem of long construction period and high cost of the existing channel structure, and achieves the effect of quickly building the channel structure.
Patent Information
- Application Number
- CN202323529048.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-22
AI Technical Summary
The existing channel structure uses concrete on-site pouring construction method, which results in long construction period and high cost, making it impossible to build quickly.
Using factory-prefabricated detachable connection frames and connectors, the skeleton components are quickly assembled and covered with the main body of the membrane, and the fixings are used to hold the sides of the membrane to quickly build the channel structure.
The construction period and cost of the channel structure are reduced, and the construction efficiency and convenience are improved.
Smart Images

Figure CN221798730U_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the utility model relate to the technical field of channel structures, and in particular to a channel structure and an air membrane building. Background Art
[0002] Air-supported buildings are increasingly used in various industries due to their low cost, speed, ease of assembly and disassembly, and lightness, such as airports, terminal halls, industrial plants, warehouses, gymnasiums, etc. In order to facilitate people or vehicles to enter and exit air-supported buildings, air-supported buildings are generally equipped with passage structures.
[0003] However, in the process of implementing the embodiments of the utility model, the inventors found that: currently, the channel structure adopts a concrete structure and is constructed by on-site casting. However, the construction method of on-site casting of concrete is cumbersome and has a long construction period. The channel structure cannot be built quickly, resulting in high costs. Utility Model Content
[0004] The main technical problem solved by the utility model is to provide a channel structure and an air-film building. Due to the use of factory-prefabricated detachable frames and connectors, the skeleton components can be quickly assembled. Therefore, when building the channel structure, after quickly assembling the skeleton components, the membrane material body is covered on the skeleton components, and the side of the membrane material body is pressed against the plane to be installed by the fixing parts, thereby realizing the rapid construction of the channel structure and reducing costs.
[0005] In order to solve the above technical problems, a technical solution adopted by the utility model is: to provide a channel structure, including a skeleton component, a membrane material component and a fixing part, the skeleton component includes at least two frames and a plurality of connecting parts, the at least two frames are arranged in parallel and spaced apart, and one of the connecting parts can be detachably connected to two adjacent frames to fix the at least two frames to each other, the membrane material component includes a membrane material body and a connecting body, the membrane material body covers the outer surface of the skeleton component, one end of the connecting body is connected to the membrane material body, and the other end of the connecting body is used to connect to the air-film building body, and the fixing part is used to press the side part of the membrane material body to the plane to be installed.
[0006] Optionally, the fixing member includes a fixing portion and a first anchoring member, the first anchoring member passes through the fixing portion and is anchored to the plane to be installed, and the fixing portion is used to press a portion of the side edge of the membrane material body to the plane to be installed.
[0007] Optionally, the fixing member further includes a connecting portion, which is obtained by bending and extending the fixing portion, and the connecting portion is detachably connected to the bottom of the skeleton component, and the connecting portion and the skeleton component jointly clamp a portion of the side of the membrane material body.
[0008] Optionally, the skeleton assembly further includes a plurality of tensioning ropes and at least two hanging parts, one end of one of the hanging parts is fixed to one of the frames, the other end of the hanging part is provided with a hanging hole, and both ends of one of the tensioning ropes are respectively connected to the hanging holes of the hanging parts located on two adjacent frames.
[0009] Optionally, the frame includes a top frame and two door frames, the two door frames are detachably connected to both sides of the bottom end of the top frame, the hanging member is fixed to the top frame, and / or the hanging member is fixed to the door frames.
[0010] Optionally, the top frame includes two sub-top frames, the two sub-top frames are detachably connected, and the two door frames are detachably fixed to the bottom ends of the two sub-top frames.
[0011] Optionally, the sub-top frame includes a first outer frame, a first web and a plurality of first reinforcing ribs, the first web is fixed to the first outer frame, the first reinforcing ribs are longitudinally arranged, the two ends of the first reinforcing ribs are fixed to the two inner walls of the first outer frame, and the plurality of first reinforcing ribs are arranged at intervals.
[0012] Optionally, the door frame includes a second outer frame, a second web and a plurality of second reinforcing ribs, the second web is fixed to the second outer frame, the second reinforcing ribs are transversely arranged, the two ends of the second reinforcing ribs are fixed to the two inner walls of the second outer frame, and the plurality of second reinforcing ribs are arranged at intervals.
[0013] Optionally, the channel structure further includes a film pressing plate, which is detachably fixed to the frame assembly, and the film pressing plate is used to press the film material body to the frame assembly.
[0014] In order to solve the above technical problems, another technical solution adopted by the utility model is: to provide an air-film building, including an air-film building body and the above-mentioned channel structure, the air-film building body is provided with an opening, the connecting body of the membrane material assembly is used to connect the air-film building body, and the connecting body of the membrane material assembly surrounds the opening.
[0015] In the embodiment of the utility model, the channel structure includes a skeleton component, a membrane material component and a fixing part, the skeleton component includes at least two frames and a plurality of connecting parts, the at least two frames are arranged in parallel and spaced apart, one of the connecting parts is detachably connected to two adjacent frames to fix the at least two frames to each other, the membrane material component includes a membrane material body and a connecting body, the membrane material body covers the outer surface of the skeleton component, one end of the connecting body is connected to the membrane material body, the other end of the connecting body is used to connect the air film building body, and the fixing part is used to press the side of the membrane material body to the plane to be installed. Due to the use of factory-prefabricated detachably connected frames and connecting parts, the skeleton component can be quickly assembled. Therefore, when building the channel structure, after quickly assembling the skeleton component, the membrane material body is covered on the skeleton component, and the side of the membrane material body is pressed to the plane to be installed by the fixing part, thereby realizing the rapid construction of the channel structure and reducing costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the drawings without paying creative work.
[0017] Figure 1 It is a structural schematic diagram of the channel structure of an embodiment of the utility model;
[0018] Figure 2 It is a structural schematic diagram of the skeleton assembly and the fixing parts of the channel structure of the embodiment of the utility model;
[0019] Figure 3 yes Figure 2 A schematic diagram of the structure at A;
[0020] Figure 4 It is a schematic diagram of the structure explosion of the frame of the skeleton assembly of the channel structure of the embodiment of the utility model;
[0021] Figure 5 It is an enlarged schematic diagram of the main view of the channel structure of an embodiment of the utility model.
[0022] Description of reference numerals:
[0023] 100. Channel structure;
[0024] 1. Skeleton assembly; 11. Frame; 111. Top frame; 1111. Sub-top frame; 111a. First outer frame; 111b. First reinforcing rib; 111c. Third reinforcing rib; 111d. First web; 112. Door frame; 1121. Second outer frame; 1122. Second reinforcing rib; 1123. Second web; 113. Second anchor; 12. Connector; 121. Connecting pipe; 122. First connecting plate; 123. Second connecting plate; 13. Hanging member; 131. Hanging hole; 14. Tensioning rope;
[0025] 2. Membrane material assembly; 21. Membrane material body; 22. Connector; 23. Edge wrapping piece;
[0026] 3. fixing member; 31. connecting portion; 32. fixing portion; 33. first anchoring member;
[0027] 4. Film pressing plate; 41. Top pressing plate; 42. Side pressing plate. DETAILED DESCRIPTION
[0028] In order to facilitate the understanding of the utility model, the utility model is described in more detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that when an element is described as "locked to" another element, it can be directly on the other element, or there can be one or more centered elements between them. When an element is described as "connected to" another element, it can be directly connected to the other element, or there can be one or more centered elements between them. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this specification are for illustrative purposes only.
[0029] Unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as those commonly understood by technicians in the technical field of the present invention. The terms used in this specification are only for the purpose of describing specific embodiments and are not used to limit the present invention. The term "and / or" used in this specification includes any and all combinations of one or more related listed items.
[0030] See also Figure 1 and Figure 2 The channel structure 100 includes a frame assembly 1, a membrane assembly 2, a fixing member 3 and a film pressing plate 4. The frame assembly 1 is used to be fixed to the plane to be installed. The membrane assembly 2 covers the outer surface of the frame assembly 1 to form the channel structure 100. The membrane assembly 2 is used to connect the air-film building body to connect the channel structure 100 with the air-film building body. The fixing member 3 is used to press the side of the membrane assembly 2 to the plane to be installed. The film pressing plate 4 is detachably fixed to the frame assembly 1. The film pressing plate 4 is used to press the membrane assembly 2 to the frame assembly 1 to strengthen the fixing of the membrane assembly 2.
[0031] For the above skeleton component 1, see Figure 2-Figure 4 The skeleton assembly 1 includes at least two frames 11, a plurality of connecting members 12, at least two hanging members 13 and a plurality of tensioning ropes 14. At least two frames 11 are arranged in parallel and spaced apart, and the frames 11 are used to be fixed to the plane to be installed. Specifically, Figure 2 As shown, there are three frames 11, and the three frames 11 are arranged in parallel and at intervals. A connecting piece 12 is detachably connected to two adjacent frames 11 to fix at least two frames 11 together. Due to the detachably connected connecting frames 11 and connecting pieces 12, the skeleton assembly 1 can be quickly assembled. A hanging piece 13 is fixed to a frame 11. The two ends of a tension rope 14 are respectively connected to the connecting pieces 12 located at two adjacent frames 11 to tighten and reinforce the two adjacent frames 11 to maintain the shape and structural stability of the skeleton assembly 1. The detachable connection method allows the skeleton assembly 1 to be disassembled, which is convenient for transportation and standardization of the structural parts of the skeleton assembly 2, thereby facilitating production and later maintenance and reducing later maintenance costs.
[0032] It should be noted that the frame 11 and the connecting parts 12 are prefabricated in a factory, and are not processed and manufactured on site, which is beneficial to reducing the construction period of the channel structure 100.
[0033] In some embodiments, the frame 11, the connector 12, the hook 13 and the tension rope 14 are all made of metal materials, including but not limited to steel, aluminum alloy, and magnesium alloy. In some embodiments, the tension rope 14 can also be made of carbon fiber or high molecular weight polymer cable.
[0034] For the above-mentioned frame 11, the frame 11 includes a top frame 111, two door frames 112 and a second anchoring member 113. The two door frames 112 are respectively detachably fixed to the two sides of the bottom end of the top frame 111 to realize the rapid assembly of the frame 11. The second anchoring member 113 passes through the part of the door frame 112 on the plane to be installed and then is anchored to the plane to be installed, so as to fix the frame 11 to the plane to be installed.
[0035] For the top frame 111, the outer surface of the top frame 111 is elliptical, but the outer surface of the top frame 111 may also be semicircular, arc-shaped, triangular or other shapes. The top frame 111 includes two sub-top frames 1111. The two sub-top frames 1111 are connected by bolts or other detachable means, and the bottom ends of the two sub-top frames 1111 are respectively fixed to the two door frames 112 by bolts or other detachable means to achieve rapid assembly of the frame 11. The sub-top frame 1111 includes a first outer frame 111a, a plurality of first reinforcing ribs 111b, a plurality of third reinforcing ribs 111c and a first web 111d. In some embodiments, the first web 111d is made of metal. The first reinforcing rib 111b is arranged longitudinally, and the two ends of the first reinforcing rib 111b are fixed to the two inner walls of the first outer frame 111a, and the plurality of first reinforcing ribs 111b are arranged at intervals. The third reinforcing rib 111c is arranged transversely, and the plurality of third reinforcing ribs 111c are arranged crosswise with the plurality of first reinforcing ribs 111b. In some embodiments, the first web 111d is fixed in the first outer frame 111a, and a plurality of first reinforcing ribs 111b and a plurality of third reinforcing ribs 111c are fixed on the first web 111d. In some embodiments, the first web 111d can also be formed by wrapping the first outer frame 111a with a membrane material.
[0036] It is understood that in some embodiments, the top frame 111 includes a sub-top frame 1111, that is, the top frame 111 is made in one piece. Furthermore, the top frame 111 may include three or more sub-top frames 1111, and the three or more sub-top frames 1111 are detachably connected.
[0037] For the above-mentioned door frame 112, the door frame 112 includes a second outer frame 1121, a plurality of second reinforcing ribs 1122 and a second web 1123. The second reinforcing ribs 112 are arranged horizontally, and the two ends of the second reinforcing ribs 1122 are fixed to the two inner walls of the second outer frame 1121, and a plurality of second reinforcing ribs 1122 are arranged at intervals. In some embodiments, the second web 1123 is fixed in the second outer frame 1121, and a plurality of second reinforcing ribs 1122 are fixed on the second web 1123. In some embodiments, the second web 1123 can also be formed by wrapping the second outer frame 1121 with a membrane material. In some embodiments, one or more longitudinally arranged reinforcing ribs can also be provided to improve the overall strength of the door frame 112. In some embodiments, one or more longitudinally arranged reinforcing profiles can also be provided to improve the overall strength of the door frame 112 while providing an installation plane for the rolling shutter door.
[0038] It should be noted that when the number of frames 11 is greater than two, the sub-top frame 1111 of the top frame 111 of the frame 11 located between the two outermost frames 11 may not include the first web 111d, and the door frame 112 of the frame 11 located between the two outermost frames 11 may not include the second web 1123, that is, the top frame 111 and the door frame 112 of the frame 11 located between the two outermost frames 11 are both hollow structures, which is beneficial to reducing costs.
[0039] In some embodiments, in order to close or open the channel structure 100, the channel structure 100 further includes a rolling shutter, a first door mounting member, and a second door mounting member. The first door mounting member is detachably fixed to the bottom of the top frame 111. The second door mounting member is detachably fixed to the side of the door frame 112 away from the film material assembly 2. The rolling shutter is detachably fixed to the first mounting member and the second mounting member, and the rolling shutter can move relative to the frame 11 to open or close the channel structure 100.
[0040] For the above-mentioned connecting member 12, the connecting member 12 includes a connecting pipe 121, a first connecting plate 122 and a second connecting plate 123. One end of the connecting pipe 121 is fixed to the first connecting plate 122, and the other end of the connecting pipe 121 is fixed to the second connecting plate 123. The first connecting plate 122 is fixed to the first web 111d of the top frame 111 of a frame 11 by a detachable manner such as bolts, and / or the first connecting plate 122 is fixed to the second web 1123 of the door frame 112 of a frame 11 by a detachable manner such as bolts. The second connecting plate 123 is fixed to the first web 111d of the top frame 111 of another frame 11 adjacent to the one frame 11 by a detachable manner such as bolts, and / or the second connecting plate 123 is fixed to the second web 1123 of the door frame of another frame 11 adjacent to the one frame 11 by a detachable manner such as bolts, so as to connect and fix the two adjacent frames 11.
[0041] Regarding the above-mentioned hanging member 13, one end of the hanging member 13 is fixed to the first outer frame 111a, and / or one end of the hanging member 13 is fixed to the second outer frame 1121. The other end of the hanging member 13 is provided with a hanging hole 131.
[0042] As for the tension rope 14 , both ends of the tension rope 14 are respectively connected to the hanging holes 131 of the hanging parts 13 of two adjacent frames 11 to tighten the two adjacent top frames 111 and / or to tighten the two door frames 112 adjacent to each other.
[0043] For the above membrane component 2, please refer to Figure 1 and Figure 5The membrane assembly 2 is made of at least one layer of membrane material. For example, the membrane assembly 2 is made of a shading layer membrane material or a thermal insulation layer membrane material, or the membrane assembly 2 is made of a stacked shading layer membrane material and a thermal insulation layer membrane material to form a double-layer structure. The membrane assembly 2 includes a membrane body 21, a connector 22, and an edge member 23. The membrane body 21 covers the outer surface of the top frame 111, and the membrane body 21 covers the outer surface of the door frame 112. One end of the connector 22 is connected to the membrane body 21, and the other end of the connector 22 is used to connect to the air-supported building body, so that the channel structure 100 is connected to the air-supported building body, which is convenient for vehicles to enter and exit the air-supported building body through the channel structure 100. The edge member 23 is respectively arranged on the side of the membrane body 21 and the side of the connector 22.
[0044] For fixing 3 above, see Figure 5 There are two fixing members 3, and the fixing members 3 include a fixing portion 32 and a first anchoring member 33. The side of the fixing portion 32 away from the frame assembly 1 is pressed against the portion of the membrane material body 21 on the edge member 23. The first anchoring member 33 passes through the fixing portion 32 and is anchored to the plane to be installed, so as to fix the fixing portion 32 to the plane to be installed, so that the fixing portion 32 is used to press the side portion of the membrane material body 21 to the ground. In some embodiments, the first anchoring member 33 passes through the fixing portion 32 and is welded to the plane to be installed to improve the connection strength.
[0045] In some embodiments, in order to enhance the stability of the connection between the skeleton assembly 3 and the plane to be installed, the fixing member 3 further includes a connecting portion 31. The connecting portion 31 is obtained by bending and extending the fixing portion 32, and the connecting portion 31 is detachably connected to the bottom of the second outer frame 1121 of the door frame 112 of the two frames 11, and the connecting portion 31 and the second outer frame 1121 of the door frame 112 of the two frames 11 jointly clamp the side portion of the membrane material body 21.
[0046] In some embodiments, the connecting part 31 can be a separate component, and the connecting part 31 is arranged at intervals. One end of the connecting part 31 and the second outer frame 1121 of the door frame 112 of the frame 11 jointly clamp the side portion of the membrane material body 21, and the other end is connected to the fixing part 32 to enhance the stability of the connection between the skeleton component 3 and the plane to be installed.
[0047] In some embodiments, when there are three or more frames 11 , in order to facilitate production, transportation and installation, the fixing member 3 can also be divided into two or more parts as a whole.
[0048] In some embodiments, according to different installation locations, the film pressing plate 4 can be divided into a top pressing plate 41 and a side pressing plate 42. The film pressing plate 4 can be made of high-strength aging-resistant plastic.
[0049] For the top plate 41, see Figure 1There are at least two top pressure plates 41, one of which is detachably fixed to the outer surface of the first outer frame 111a of a sub-top frame 1111 of a top frame 111 of a frame 11, so as to press the film material body 21 on the top frame 111 of a frame 11 to strengthen the fixation of the film material body 21.
[0050] It is understandable that in some embodiments, there is only one top pressing plate 41, that is, the top pressing plate 41 is made in one piece. Furthermore, there may be three or more top pressing plates 41, and the three or more top pressing plates 41 may be detachably fixed to the top frame 111.
[0051] For the side pressure plate 42, see Figure 1 There are at least two side pressure plates 42, and the two side pressure plates 42 can be detachably fixed to the outer surfaces of the second outer frames 1121 of the two door frames 112 of a frame 11, so as to press the membrane material body 21 on the side outer surfaces of the two door frames 112 of a frame 11, thereby strengthening the fixing of the membrane material body 21.
[0052] In the embodiment of the utility model, the channel structure 100 includes a skeleton component 1, a membrane component 2 and a fixing member 3. The skeleton component 1 includes at least two frames 11 and a plurality of connecting members 12. At least two frames 11 are arranged in parallel and spaced apart. A connecting member 12 is detachably connected to two adjacent frames 11 to fix at least two frames 11. The membrane component 2 includes a membrane body 21 and a connecting body 22. The membrane body 21 covers the outer surface of the skeleton component 1. One end of the connecting body 22 is connected to the membrane body 21. The other end of the connecting body 22 is used to connect the air film building body. The fixing member 3 is used to press the side of the membrane body 21 on the plane to be installed. Due to the use of the factory-prefabricated detachably connected frame 11 and connecting member 12, the skeleton component 1 can be quickly assembled. Therefore, when building the channel structure 100, after quickly assembling the skeleton component 1, the membrane body 21 is covered on the skeleton component 1, and the side of the membrane body 21 is pressed on the plane to be installed by the fixing member 3, so as to realize the rapid construction of the channel structure 100 and reduce the cost.
[0053] The utility model also provides an embodiment of an air-film building, which includes an air-film building body and the above-mentioned channel structure 100. The air-film building body is provided with an opening, and the connector 22 of the membrane material assembly 2 is used to connect the air-film building body. The connector 22 of the membrane material assembly 2 surrounds the opening. The structure and function of the channel structure 100 can be referred to the above-mentioned embodiment, which will not be described one by one here.
[0054] It should be noted that the preferred embodiments of the utility model are given in the specification and drawings of the utility model, but the utility model can be implemented in many different forms and is not limited to the embodiments described in the specification. These embodiments are not used as additional restrictions on the content of the utility model. The purpose of providing these embodiments is to make the understanding of the disclosure of the utility model more thorough and comprehensive. In addition, the above-mentioned technical features continue to be combined with each other to form various embodiments not listed above, which are all regarded as the scope of the description of the utility model; further, for ordinary technicians in this field, they can be improved or transformed according to the above description, and all these improvements and transformations should belong to the scope of protection of the claims attached to the utility model.
Claims
1. A channel structure, characterized in that: include: A skeleton assembly comprises at least two frames and a plurality of connecting members, wherein the at least two frames are arranged in parallel and spaced apart, and one of the connecting members is detachably connected to two adjacent frames to fix the at least two frames together; The membrane material assembly comprises a membrane material body and a connector, wherein the membrane material body covers the outer surface of the frame assembly, one end of the connector is connected to the membrane material body, and the other end of the connector is used to connect to the air-film building body; The fixing piece is used to press the side edge of the membrane material body onto the plane to be installed.
2. The channel structure according to claim 1, characterized in that: The fixing member includes a fixing portion and a first anchoring member. The first anchoring member passes through the fixing portion and is anchored to the plane to be installed. The fixing portion is used to press a portion of the side edge of the membrane material body to the plane to be installed.
3. The channel structure according to claim 2, characterized in that: The fixing member also includes a connecting portion, which is obtained by bending and extending the fixing portion. The connecting portion is detachably connected to the bottom of the frame assembly, and the connecting portion and the frame assembly jointly clamp a portion of the side edge of the membrane material body.
4. The channel structure according to claim 1, characterized in that: The skeleton assembly also includes a plurality of tensioning ropes and at least two hanging parts, one end of a hanging part is fixed to a frame, the other end of the hanging part is provided with a hanging hole, and the two ends of a tensioning rope are respectively connected to the hanging holes of the hanging parts located on two adjacent frames.
5. The channel structure according to claim 4, characterized in that: The frame includes a top frame and two door frames, the two door frames are detachably connected to both sides of the bottom end of the top frame, the hanging member is fixed to the top frame, and / or the hanging member is fixed to the door frames.
6. The channel structure according to claim 5, characterized in that: The top frame comprises two sub-top frames, the two sub-top frames are detachably connected, and the two door frames are detachably fixed to the bottom ends of the two sub-top frames.
7. The channel structure according to claim 6, characterized in that: The sub-top frame includes a first outer frame, a first web and a plurality of first reinforcing ribs, wherein the first web is fixed to the first outer frame, the first reinforcing ribs are longitudinally arranged, the two ends of the first reinforcing ribs are fixed to the two inner walls of the first outer frame, and the plurality of first reinforcing ribs are arranged at intervals.
8. The channel structure according to claim 6, characterized in that: The door frame includes a second outer frame, a second web and a plurality of second reinforcing ribs, the second web is fixed to the second outer frame, the second reinforcing ribs are arranged transversely, and both ends are fixed to the two inner walls of the second outer frame, and the plurality of second reinforcing ribs are arranged at intervals.
9. The channel structure according to any one of claims 1 to 8, characterized in that: The channel structure further comprises a film pressing plate, which is detachably fixed to the frame assembly and is used for pressing the film material body to the frame assembly.
10. An air-film building, characterized in that: It comprises an air-film building body and the channel structure as claimed in any one of claims 1 to 9, wherein the air-film building body is provided with an opening, and the connecting body of the membrane material assembly is used to connect the air-film building body, and the connecting body of the membrane material assembly surrounds the opening.