Green building energy-saving roof
By designing green building energy-saving roofs, using beams, splicing panels and recycling mechanisms, we solve the problems of resource recycling and indoor insulation in house construction, achieve effective recycling of rainwater and watering of green plants, and improve resource utilization efficiency and building quality. Green energy-saving performance.
Patent Information
- Application Number
- CN202420295634.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-18
AI Technical Summary
During the house construction process, resource recycling and reuse are less effective and rainwater cannot be effectively used, resulting in a waste of resources. At the same time, green buildings need to achieve indoor insulation effects.
A green building energy-saving roof is designed, including beams, splicing plates, splicing mechanisms and recycling mechanisms. Fixed boxes are set above the splicing plates for planting, and water conduits are used for rainwater recovery. The splicing troughs are installed in conjunction with raised blocks, and built-in rock wool The insulation layer and rainwater recovery system, including drainage channels, pipes, reservoirs and sprinklers, enable the collection and reuse of rainwater.
It achieves effective recycling and reuse of rainwater and roof insulation, prevents green plants from dying due to drought, and improves resource utilization efficiency and the green energy-saving performance of the building.
Smart Images

Figure CN221798929U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of green buildings, in particular to a green building energy-saving roof. Background Art
[0002] Green building refers to high-quality buildings that save resources, protect the environment, reduce pollution, provide people with healthy, applicable and efficient use space, and maximize the harmonious coexistence of man and nature throughout their entire life cycle. The evaluation of green buildings should follow the principle of adapting measures to local conditions, and combine the climate, environment, resources, economy and culture of the region where the building is located to conduct a comprehensive evaluation of the five performance indicators of safety and durability, health and comfort, convenience of life, resource conservation, and livable environment throughout the life cycle of the building.
[0003] However, when some houses are being built, the resource recycling and reuse effect is poor, and rainwater cannot be recycled well, resulting in corresponding waste of resources. Green energy saving also requires indoor insulation. Utility Model Content
[0004] The purpose of the utility model is to provide a green building energy-saving roof to solve the problem raised in the above background technology that when some houses are built, the resource recycling and reuse effect is poor and rainwater cannot be recycled well, resulting in corresponding resource waste. Green energy saving also requires the effect of indoor insulation.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a green building energy-saving roof, comprising a crossbeam, a splicing plate, a splicing mechanism and a recycling mechanism, the outer surface of the crossbeam is fixedly connected with a splicing plate, the upper surface of the splicing plate is fixedly connected with a fixing box, the outer surface of the splicing plate is provided with a splicing mechanism, the inner surface of the splicing plate is provided with an insulation layer, and one end surface of the splicing plate is provided with a recycling mechanism.
[0006] Preferably, a water guide groove is provided at the connection between the splicing plate and the fixing box, and the splicing plates are distributed at equal intervals on the outer wall of the crossbeam.
[0007] Preferably, the splicing mechanism comprises a splicing groove and a protruding block, a splicing groove is provided on one side surface of the splicing plate, a protruding block is integrally formed on the other side surface of the splicing plate, and an inner wall size of the splicing groove matches an outer wall size of the protruding block.
[0008] Preferably, the thermal insulation layer is made of rock wool board.
[0009] Preferably, the recovery mechanism includes a drain trough, a first pipe, a water tank, a water pump, a second water pipe, a third water pipe and a nozzle, one end surface of the splicing plate is fixedly connected to the drain trough, the lower surface of the drain trough is connected to the first pipe, one end surface of the first pipe is connected to the water tank, the upper surface of the water tank is fixedly connected to the water pump, one end of the water inlet of the water pump is connected to the second water pipe, one end of the drain outlet of the water pump is connected to the third water pipe, and the outer surface of the third water pipe is connected to the nozzle.
[0010] Preferably, the nozzles are distributed at equal intervals on the outer wall of the third water pipe, and one end of the second water pipe extends to the inside of the water tank.
[0011] Compared with the prior art, the beneficial effect of the utility model is as follows: during the use of the green building energy-saving roof, after the cross beam is installed, the splicing plate is installed with the cross beam to fix the splicing plate, and the fixing box above the splicing plate can be used to plant grass seeds or green plants, and rainwater will be discharged through the water guide groove, and rainwater can also be used to water the green plants in the fixing box, and the splicing groove is stuck on the raised block, so that the splicing plate can be installed more conveniently, and the inner wall size of the splicing groove is consistent with the outer wall size of the raised block, which can ensure a stable connection, and the rainwater is discharged into the drainage trough through the water guide groove, and is stored in the water storage tank through the first pipe, and the water in the water storage tank is pumped out to the third water pipe through the second water pipe by controlling the water pump, and then sprayed out through the nozzle, so that the green plants in the fixed box on the roof can be sprayed to prevent the phenomenon of drought and the death of green plants, and the effect of rainwater recycling and reuse is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of the appearance of the utility model;
[0013] Figure 2 This is a schematic diagram of the structure of the splicing plate and the insulation layer used in conjunction with each other in the utility model;
[0014] Figure 3 This is a schematic diagram of the structure of the recycling mechanism of the utility model;
[0015] Figure 4 This is a schematic diagram of the structure of the splicing plate and the fixing box of the utility model in cooperation with each other.
[0016] In the figure: 1. crossbeam; 2. splicing plate; 3. fixing box; 4. water guide groove; 5. splicing groove; 6. raised block; 7. insulation layer; 8. recovery mechanism; 801. drainage trough; 802. first pipeline; 803. water storage tank; 804. water pump; 805. second water pipe; 806. third water pipe; 807. nozzle. DETAILED DESCRIPTION
[0017] The following will clearly and completely describe the technical solutions in the embodiments of the utility model in conjunction with the drawings in the embodiments of the utility model. Obviously, the described implementation regulations are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0018] See also Figure 1-4 The utility model discloses a green building energy-saving roof: it comprises a cross beam 1, a splicing plate 2, a splicing mechanism and a recycling mechanism 8, the outer surface of the cross beam 1 is fixedly connected with the splicing plate 2, the upper surface of the splicing plate 2 is fixedly connected with a fixing box 3, the outer surface of the splicing plate 2 is provided with a splicing mechanism, the inner surface of the splicing plate 2 is provided with a thermal insulation layer 7, and one end surface of the splicing plate 2 is provided with a recycling mechanism 8. During use, after the cross beam 1 is installed, the splicing plate 2 is installed with the cross beam 1, so as to fix the splicing plate 2, and the fixing box 3 above the splicing plate 2 can be used to plant grass seeds or green plants.
[0019] In order to facilitate drainage of the roof, a water gutter 4 is provided at the connection between the splicing plate 2 and the fixing box 3. The splicing plates 2 are evenly distributed on the outer wall of the beam 1. Rainwater will be discharged through the water gutter 4, and the rainwater can also be used to irrigate the green plants in the fixing box 3.
[0020] In order to facilitate the installation of the splicing plate 2, the splicing mechanism includes a splicing groove 5 and a protruding block 6. The splicing groove 5 is opened on one side surface of the splicing plate 2, and the protruding block 6 is integrally formed on the other side surface of the splicing plate 2. The inner wall size of the splicing groove 5 is consistent with the outer wall size of the protruding block 6. The splicing groove 5 is clamped on the protruding block 6, which can make the splicing plate 2 more convenient to install. The inner wall size of the splicing groove 5 is consistent with the outer wall size of the protruding block 6, which can ensure a stable connection.
[0021] In order to save energy better, the insulation layer 7 is made of rock wool board. Through the setting of rock wool board, the room can be better insulated.
[0022] In order to facilitate the recycling and reuse of rainwater, the recycling mechanism 8 includes a drainage trough 801, a first pipe 802, a water tank 803, a water pump 804, a second water pipe 805, a third water pipe 806 and a nozzle 807. The surface of one end of the splicing plate 2 is fixedly connected to the drainage trough 801, the lower surface of the drainage trough 801 is connected to the first pipe 802, one end surface of the first pipe 802 is connected to the water tank 803, the upper surface of the water tank 803 is fixedly connected to the water pump 804, one end of the water inlet of the water pump 804 is connected to the second water pipe 805, and the outlet of the water pump 804 is connected to the outlet of the water pump 804. One end of the water outlet is connected to a third water pipe 806, and the outer surface of the third water pipe 806 is connected to a nozzle 807. When in use, rainwater is discharged into the drainage trough 801 through the water guide trough 4, and is stored in the water storage tank 803 through the first pipe 802. The water in the water storage tank 803 is pumped out to the third water pipe 806 through the second water pipe 805 by controlling the water pump 804, and then sprayed out through the nozzle 807. In this way, the green plants in the fixed box 3 on the roof can be sprayed to prevent the phenomenon of drought causing the death of green plants, and the effect of rainwater recycling and reuse can be achieved.
[0023] In order to facilitate the recycling of rainwater, the nozzles 807 are evenly spaced on the outer wall of the third water pipe 806 , and one end of the second water pipe 805 extends to the inside of the water tank 803 .
[0024] Working principle: During use, after the crossbeam 1 is installed, the splicing plate 2 is installed with the crossbeam 1 to fix the splicing plate 2, and the fixing box 3 above the splicing plate 2 can be used to plant grass seeds or green plants, and rainwater will be discharged through the water guide groove 4, and rainwater can also be used to irrigate the green plants in the fixing box 3. The splicing groove 5 is stuck on the protruding block 6, which can more conveniently install the splicing plate 2, and the inner wall size of the splicing groove 5 is consistent with the outer wall size of the protruding block 6, which can ensure a stable connection. The rainwater is discharged into the drainage groove 801 through the water guide groove 4, and is stored in the water tank 803 through the first pipe 802. The water in the water tank 803 is pumped out to the third water pipe 806 through the second water pipe 805 by controlling the water pump 804, and then sprayed out through the nozzle 807, so that the green plants in the fixing box 3 on the roof can be sprayed to prevent the phenomenon of drought and the death of green plants, and the effect of rainwater recycling and reuse is achieved.
[0025] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the implementation rules without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A green building energy-saving roof, comprising a beam (1), a splicing plate (2), a splicing mechanism and a recycling mechanism (8), characterized in that: The outer surface of the crossbeam (1) is fixedly connected to a splicing plate (2), the upper surface of the splicing plate (2) is fixedly connected to a fixing box (3), the outer surface of the splicing plate (2) is provided with a splicing mechanism, the inner surface of the splicing plate (2) is provided with a heat-insulating layer (7), and one end surface of the splicing plate (2) is provided with a recovery mechanism (8).
2. The green building energy-saving roof according to claim 1, characterized in that: A water guide groove (4) is provided at the connection between the splicing plate (2) and the fixing box (3), and the splicing plates (2) are distributed at equal intervals on the outer wall of the crossbeam (1).
3. The green building energy-saving roof according to claim 1, characterized in that: The splicing mechanism comprises a splicing groove (5) and a protruding block (6); a splicing groove (5) is provided on one side surface of the splicing plate (2); a protruding block (6) is integrally formed on the other side surface of the splicing plate (2); and the inner wall size of the splicing groove (5) matches the outer wall size of the protruding block (6).
4. The green building energy-saving roof according to claim 1, characterized in that: The thermal insulation layer (7) is made of rock wool board.
5. The green building energy-saving roof according to claim 1, characterized in that: The recovery mechanism (8) comprises a drainage trough (801), a first pipe (802), a water tank (803), a water pump (804), a second water pipe (805), a third water pipe (806) and a nozzle (807); one end surface of the splicing plate (2) is fixedly connected to the drainage trough (801); the lower surface of the drainage trough (801) is connected to the first pipe (802); one end surface of the first pipe (802) is connected to the water tank (803); the upper surface of the water tank (803) is fixedly connected to the water pump (804); one end of the water inlet of the water pump (804) is connected to the second water pipe (805); one end of the water outlet of the water pump (804) is connected to the third water pipe (806); and the outer surface of the third water pipe (806) is connected to the nozzle (807).
6. The green building energy-saving roof according to claim 5, characterized in that: The nozzles (807) are distributed at equal intervals on the outer wall of the third water pipe (806), and one end of the second water pipe (805) extends to the inside of the water tank (803).