Lifesaving channel construction device

By designing a life-saving passage construction device for coal mine tunnel collapse rescue, the host locomotive and power vehicle components are used to drive the drilling tool assembly to build a stable escape tunnel in the coal mine tunnel, which solves the problem of insufficient tunnel safety in the existing technology and achieves high efficiency. , safe rescue process.

CN221799875UActive Publication Date: 2024-10-01SHANXI HONGAN TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323569240.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-10-01
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

Existing coal mine tunnel collapse rescue equipment has insufficient safety problems when constructing escape passages, especially loose materials on the working surface that cause the passage to collapse, causing secondary injuries.

Method used

A life-saving passage construction device is designed, which includes a main locomotive assembly, a power vehicle assembly and a drilling tool assembly. The first drilling tool is used to drill a placement hole on the working surface, and the second drilling tool discharges the slag material and pulls out the first drilling tool to form The stable escape channel enhances the safety and stability of the channel, and provides power through the power vehicle assembly, improving drilling efficiency and maneuverability.

Benefits of technology

It effectively improves the safety and stability of the escape channel, avoids secondary damage caused by channel collapse, and improves the success rate of rescue. The device has simple disassembly and assembly of drilling tools, good traveling maneuverability, and high excavation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799875U_ABST
    Figure CN221799875U_ABST
Patent Text Reader

Abstract

In order to overcome the defects in the prior art, the utility model provides a lifesaving channel construction device which comprises a main vehicle assembly, a connecting piece, a power vehicle assembly, a material slag conveying assembly, a drilling tool conveying assembly and a drilling tool assembly. Wherein the power vehicle assembly is connected with the main vehicle assembly and used for providing power for the main vehicle; the connecting piece is arranged between the main vehicle assembly and the motor vehicle assembly and used for enabling the main vehicle assembly and the motor vehicle assembly to be telescopically connected so as to prevent vibration; the drilling tool assembly is movably arranged on the main locomotive assembly and used for constructing a lifesaving channel. The first drilling tool is used for forming the escape channel, the safety and stability of the escape channel are improved, and secondary damage caused by channel collapse is avoided; meanwhile, the lifesaving channel construction device has the advantages that the drilling tool is easy to disassemble and assemble, the advancing maneuverability is good, and the drilling efficiency is high, and the rescue success rate can be effectively increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of coal mine tunnel collapse rescue equipment, and in particular to a life-saving passage construction device. Background Art

[0002] Coal mine tunnel collapse is an accident that may occur in coal mine production. Once a tunnel collapse accident occurs, people are trapped inside the mine. How to scientifically and quickly build an "escape passage" to rescue the trapped people in the shortest time is the primary task of rescue.

[0003] At present, the horizontal rescue drill used in coal mines is generally composed of multiple casings, multiple spiral shafts, drill drive mechanisms and frame components. When performing horizontal rescue, drilling is carried out through the casing, and the spiral shaft assists in discharging the slag in the casing. The casing and spiral shaft are continuously driven by the drill drive mechanism, and driven forward horizontally by the frame assembly until a suitable "escape passage" is drilled on the working surface. However, due to the complex conditions on the working surface, when the "escape passage" is drilled with casing, if the slag on the working surface is loose material, it is easy to cause collapse when personnel pass through the "escape passage", causing secondary injuries.

[0004] It can be seen that the current large-diameter horizontal drilling rigs have the problem of insufficient safety.

[0005] In view of this, a scientific, fast, safe and efficient life-saving channel construction device is in urgent need of development. Summary of the invention

[0006] In order to overcome the deficiencies of the prior art, the present application provides a life-saving passage construction device for solving at least one of the aforementioned technical problems.

[0007] Specifically, the technical solution is as follows:

[0008] A life-saving passage construction device, comprising:

[0009] Main vehicle components;

[0010] A power car assembly, connected to the main car assembly, for providing power to the main car;

[0011] A drilling tool assembly is movably arranged on the main vehicle assembly and is used to construct a rescue passage;

[0012] The drilling tool assembly comprises:

[0013] a first drilling tool, detachably connected to the main vehicle assembly, for drilling placement holes on the working surface;

[0014] The second drilling tool is coaxially arranged in the first drilling tool and connected to the main vehicle assembly, and is used for being extracted from the first drilling tool after the slag in the first drilling tool is discharged, so as to leave the first drilling tool in the placement hole as a rescue channel.

[0015] In one embodiment, the main vehicle assembly comprises:

[0016] Mainframe frame;

[0017] A first power assembly is movably disposed on the main frame and is detachably connected to the first drilling tool, and is used to provide power to the first drilling tool to drill a placement hole on the working surface;

[0018] A second power assembly is movably disposed on the main frame and is located on a side of the first power assembly away from the first drilling tool;

[0019] The second power assembly is in driving connection with the second drilling tool, and is used for driving the second drilling tool and driving the second drilling tool to be pulled out from the first drilling tool.

[0020] In one embodiment, the first power assembly includes:

[0021] A first power slider is movably arranged on the main frame;

[0022] A first power transmission box, arranged on the first power sliding block;

[0023] A first power drilling tool seat, arranged at the output end of the first power transmission box and detachably connected to the first drilling tool;

[0024] The driving displacement mechanism is arranged on a side of the first power transmission box away from the first drilling tool, and is used to drive the first power transmission box to move toward the working surface on the main frame to drill placement holes on the working surface.

[0025] In one embodiment, the second power assembly comprises:

[0026] A second power slider is movably arranged on the main frame;

[0027] A second power transmission box, disposed on the second power sliding block;

[0028] A second power drilling tool seat, arranged at the output end of the second power transmission box, and used for arranging the second drilling tool;

[0029] The extraction displacement mechanism is arranged on the side of the second power transmission box facing the first power assembly, and is used to drive the second power transmission box to move along the second power sliding block in a direction away from the first drilling tool to extract the second drilling tool from the first drilling tool.

[0030] In one embodiment, the main vehicle assembly further includes:

[0031] At least one clamping unit is arranged on the main frame and is located between the first power assembly and the working surface;

[0032] The boom unit is arranged on the main frame and located between the clamping unit and the first power assembly, and is used for hoisting the first drilling tool.

[0033] In one embodiment, the lifesaving passage construction device further includes:

[0034] A connecting member is arranged between the main vehicle assembly and the power vehicle assembly, and is used to enable the main vehicle assembly and the power vehicle assembly to be telescopically connected to prevent vibration.

[0035] In one embodiment, the lifesaving passage construction device further includes:

[0036] The slag conveying assembly is arranged on the main vehicle assembly and is located between the main vehicle assembly and the ground, and is used to transport the slag generated by the drilling tool assembly.

[0037] In one embodiment, the drilling tool assembly further comprises:

[0038] The third drilling tool is arranged at the end of the first drilling tool facing the working surface and is connected to an external air source for performing impact crushing drilling.

[0039] In one embodiment, the lifesaving passage construction device further includes:

[0040] at least one drilling tool support assembly, disposed between the first drilling tool and the working surface, for supporting the first drilling tool;

[0041] The drill tool support assembly is coaxially arranged with the first drill tool.

[0042] In one embodiment, at least two supporting and stabilizing components are provided on the main vehicle component and the power vehicle component;

[0043] The supporting and stabilizing component comprises:

[0044] A supporting hydraulic cylinder is rotatably arranged on the main vehicle assembly or the power vehicle assembly to adjust the supporting angle;

[0045] The outriggers are arranged at the output end of the supporting hydraulic cylinder and are used to support the main vehicle assembly, the power vehicle assembly and the working surface.

[0046] The life-saving passage construction device described in the present application provides power to the main vehicle through a power vehicle assembly; a drill tool assembly is arranged on the main vehicle assembly to construct a life-saving passage; wherein, a first drill tool in the drill tool assembly drills a placement hole on the working surface; after the slag in the first drill tool is discharged by a second drill tool coaxially arranged in the first drill tool, the second drill tool is pulled out from the first drill tool, and finally the first drill tool is left in the placement hole as a life-saving passage; the present application uses the first drill tool to form an escape passage, which improves the safety and stability of the escape passage and avoids secondary injuries caused by passage collapse; at the same time, the life-saving passage construction device described in the present application has the characteristics of simple disassembly and assembly of the drill tool, good traveling maneuverability and high drilling efficiency, which can effectively improve the rescue success rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0048] Figure 1 A three-dimensional diagram of the life-saving passage construction device described in this application;

[0049] Figure 2 for Figure 1 A schematic diagram of the structure of the drilling tool assembly;

[0050] Figure 3 for Figure 1 A perspective view of the main vehicle assembly in FIG.

[0051] Figure 4 for Figure 3 A perspective view of the first power assembly in FIG.

[0052] Figure 5 for Figure 3 A perspective view of the second power assembly in FIG.

[0053] Figure 6 for Figure 1 A perspective view of the power car assembly in FIG.

[0054] Description of main component symbols:

[0055] In the figure: 1. Main vehicle assembly; 2. Connecting piece; 3. Power vehicle assembly; 4. Slag conveying assembly; 5. Drilling tool conveying assembly; 6. Drilling tool assembly; 7. Drilling tool support assembly; 11. Main vehicle frame; 12. Main vehicle support and stabilization mechanism; 13. Clamping unit; 14. Boom unit; 15. First power assembly; 16. Second power assembly; 31. Power vehicle frame; 32. Power box; 33. Power vehicle support and stabilization mechanism; 61. First drilling tool; 62. Second drilling tool; 111. Main vehicle running track; 112. Guide rail; 113. Steel frame; 121. Main vehicle supporting hydraulic cylinder; 122. Main vehicle outrigger; 151. First power transmission box; 152. First power oil pipe interface; 153. First power drilling tool seat; 154. First power slide; 155. First power cylinder; 161. Second power transmission box; 162. Second power oil pipe interface; 163. Second power cylinder; 164. Second power drilling tool seat; 165. Second power slide; 331. Power vehicle supporting hydraulic cylinder; 332. Power vehicle outrigger. DETAILED DESCRIPTION

[0056] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0057] Hereinafter, various embodiments of the present application will be described more fully. The present application may have various embodiments, and adjustments and changes may be made therein. However, it should be understood that there is no intention to limit the various embodiments of the present application to the specific embodiments disclosed herein, but the present application should be understood to cover all adjustments, equivalents and / or alternatives within the spirit and scope of the various embodiments of the present application.

[0058] Hereinafter, the term "include" or "may include" used in various embodiments of the present application indicates the presence of a disclosed function, operation, or element, and does not limit the addition of one or more functions, operations, or elements. In addition, as used in various embodiments of the present application, the terms "include", "have", and their cognates are intended only to indicate a specific feature, number, step, operation, element, component, or combination of the foregoing, and should not be understood as first excluding the presence of one or more other features, numbers, steps, operations, elements, components, or a combination of the foregoing or the possibility of adding one or more features, numbers, steps, operations, elements, components, or a combination of the foregoing.

[0059] In various embodiments of the present application, the expression "or" or "at least one of A or / and B" includes any combination or all combinations of the words listed at the same time. For example, the expression "A or B" or "at least one of A or / and B" may include A, may include B, or may include both A and B.

[0060] The expressions (such as "first", "second", etc.) used in the various embodiments of the present application may modify the various constituent elements in the various embodiments, but may not limit the corresponding constituent elements. For example, the above expressions do not limit the order and / or importance of the elements. The above expressions are only used for the purpose of distinguishing one element from other elements. For example, the first user device and the second user device indicate different user devices, although both are user devices. For example, without departing from the scope of the various embodiments of the present application, the first element may be referred to as the second element, and similarly, the second element may also be referred to as the first element.

[0061] It should be noted that in this application, unless otherwise clearly specified and defined, the terms "installation", "connection", "fixation" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0062] In the present application, it is understood by those of ordinary skill in the art that the terms indicating orientation or positional relationship in the text are based on the orientation or positional relationship shown in the drawings, which are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present application. The terms used in the various embodiments of the present application are only used for the purpose of describing a specific embodiment and are not intended to limit the various embodiments of the present application. As used herein, the singular form is intended to also include the plural form, unless the context clearly indicates otherwise. Unless otherwise defined, all terms used here (including technical terms and scientific terms) have the same meaning as the meanings commonly understood by those of ordinary skill in the art to which the various embodiments of the present application belong. The terms (such as the terms defined in the generally used dictionary) will be interpreted as having the same meaning as the contextual meaning in the relevant technical field and will not be interpreted as having an idealized meaning or an overly formal meaning, unless clearly defined in the various embodiments of the present application.

[0063] After a landslide accident occurs in a coal mine tunnel, the collapsed slag blocks the tunnel, isolating the personnel in front from the outside world. It is necessary to open a passage for personnel to pass through on the working surface of the slag so that the trapped personnel can escape. Therefore, this embodiment provides a life-saving passage construction device, which can quickly construct a life-saving passage to achieve the purpose of escaping the trapped personnel. Specifically:

[0064] like Figure 1A life-saving passage construction device comprises: a main vehicle assembly 1, a connecting piece 2, a power vehicle assembly 3, a slag conveying assembly 4, a drilling tool conveying assembly 5 and a drilling tool assembly 6; wherein the power vehicle assembly 3 is connected to the main vehicle assembly 1 for providing power to the main vehicle 1; the connecting piece 2 is arranged between the main vehicle assembly 1 and the power vehicle assembly 3 for enabling the main vehicle assembly 1 to be telescopically connected to the power vehicle assembly 3 to prevent vibration; the drilling tool assembly 6 is movably arranged on the main vehicle assembly 1 for constructing a life-saving passage.

[0065] In order to quickly build an escape route, such as Figure 2 The drilling tool assembly 6 in this embodiment includes: a first drilling tool 61 and a second drilling tool 62; further, the first drilling tool 61 is cylindrical and detachably connected to the main vehicle assembly 1, and is used to drill a placement hole on the working surface; the second drilling tool 62 is coaxially arranged in the first drilling tool 61 and is connected to the main vehicle assembly 1, and is used to be extracted from the first drilling tool 61 after the slag in the first drilling tool 61 is discharged, so as to leave the first drilling tool 61 in the placement hole as a rescue channel; preferably, the first drilling tool 61 is a casing-type drilling tool; the second drilling tool 62 is an auger-type drilling tool.

[0066] In this embodiment, the first drilling tool 61 is provided with teeth for drilling at one end facing the working surface; the end away from the working surface is quickly connected to the main vehicle assembly 1 by bolts or other connecting structures, so that it can be conveniently left in the placement hole as a life-saving passage.

[0067] In order to facilitate the first drilling tool 61 to drill the placement hole and the second drilling tool 62 to discharge the debris and extract it from the first drilling tool 61, the main vehicle assembly 1 includes: a main vehicle frame 11, a first power assembly 15 and a second power assembly 16; wherein the first power assembly 15 can be movably arranged on the main vehicle frame 11 and is detachably connected to the first drilling tool 61, and is used to provide power for the first drilling tool 61 to drill the placement hole on the working surface; the second power assembly 16 is movably arranged on the main vehicle frame 11 and is located on the side of the first power assembly 15 away from the first drilling tool 61; the second power assembly 16 is transmission-connected to the second drilling tool 62, and is used to drive the second drilling tool 62 and drive the second drilling tool 62 to be extracted from the first drilling tool 61.

[0068] Specifically, Figure 3 The main vehicle frame 11 includes a main vehicle running track 111, a guide rail 112 and a steel frame 113; wherein the main vehicle running track 111 is set on the ground; the first power assembly 15 and the second power assembly 16 are set on the guide rail 112 for easy movement; the steel frame 113 is set at one end of the steel rail 112 away from the first drilling tool 61.

[0069] Specifically, Figure 4 The first power assembly 15 includes: a first power slider 154, a first power transmission box 151, a first power drill seat 153 and a driving displacement mechanism; wherein the first power slider 154 is arranged on the guide rail 112 through the structure of the slider and the guide rail, so as to facilitate movement; the first power transmission box 151 is arranged on the first power slider 154; the first power drill seat 153 is arranged at the output end of the first power transmission box 151, and is detachably connected to the first drill 61; the driving displacement mechanism is arranged on the side of the first power transmission box 151 away from the first drill 61, and is used to drive the first power transmission box 151 on the guide rail 1 12 moves toward the working surface to drill a placement hole on the working surface; wherein the driving displacement mechanism includes: a first power oil pipe interface 152 and a first power oil cylinder 155; the cylinder body of the first power oil cylinder 155 is connected to the first power slider 154, and the output end of the first power oil cylinder 155 abuts against the steel frame 113, so that when the first power oil cylinder 155 is extended, the first drilling tool 61 can be moved toward the working surface; the first power oil pipe interface 152 is connected to the power car component 3, and the oil circuit supplied by the power car component 3 can be used to provide power to the first power oil cylinder 155, so that the first power component 15 reciprocates on the guide rail 112, so as to disassemble or install the first drilling tool 61;

[0070] Preferably, the first power transmission box 151 uses two dual-speed hydraulic motors with a planetary gear reducer to drive the rotating large gear, which can withstand a large feed force while providing a large torque.

[0071] Further, such as Figure 5The second power assembly 16 comprises: a second power slider 165, a second power transmission box 161, a second power drill seat 164 and an extraction displacement mechanism; wherein the second power slider 165 is movably arranged on the guide rail 112; the second power transmission box 161 is arranged on the second power slider 165; the second power drill seat 164 is arranged at the output end of the second power transmission box 161, and the second drill 62 can be arranged by a spline or other structure; the extraction displacement mechanism is arranged on the side of the second power transmission box 161 facing the first power assembly 15, and is used to drive the second The power transmission box 161 moves along the second power slide block 165 in a direction away from the first drilling tool 61 to extract the second drilling tool 62 from the first drilling tool 61; preferably, the extraction displacement mechanism includes: a second power cylinder 163 and a second power oil pipe interface 162; wherein the cylinder body of the second power cylinder 163 abuts against the side of the first power transmission box 151 facing the second power assembly 16; the output end of the second power cylinder 163 is connected to the second power slide block 165; due to the use of the second power cylinder 163, the second power assembly 16 can also reciprocate on the guide rail 112. When in use, when the second power cylinder 163 is extended, the second power transmission box 161 can be moved away from the first power transmission box 151, thereby extracting the second drilling tool 62 from the first drilling tool 61; on the other hand, it can also provide a force for the first power transmission box 151 to move toward the working surface to prevent the first drilling tool 61 from retreating.

[0072] Preferably, the second power transmission box 161 is realized by directly driving a three-ring reduction box with two dual-speed hydraulic motors.

[0073] Specifically, Figure 6 The power vehicle assembly 3 described in this embodiment includes: a power frame 31 and a power box 32; the power frame 31 is arranged close to the ground, and the power box 32 is arranged on the power frame 31, including a motor and a hydraulic station, which is used to provide hydraulic power to the first power cylinder 155, the first power transmission box 151, the second power transmission box 161, and the second power cylinder 163. Preferably, the power box 32 adopts the form of a hydraulic pump station driven by two explosion-proof motors, integrating a hydraulic oil tank and related control units, and the power frame 31 adopts an independent crawler to walk, which is convenient for on-site adjustment, and the hydraulic oil therein can be cooled by water cooling.

[0074] In order to facilitate the loading and unloading of the drilling tool assembly 6, Figure 1The main vehicle assembly 1 mentioned above further includes: a clamping unit 13 arranged on the main vehicle frame 11 and a boom unit 14 arranged on the main vehicle frame 11; the boom unit 14 is located between the clamping unit 13 and the first power assembly 15, and is used to hoist and disassemble the first drilling tool 61. The clamping unit 13 is located between the first power assembly 15 and the working surface, and cooperates with the boom unit 14 to clamp and position the drilling tool assembly 6 when installing or removing the drilling tool assembly 6, and can provide a certain clamping torque and axial restraint force; preferably, the boom unit 14 is designed with a hydraulic motor-driven winch with a braking function, and the drilling tool assembly 6 is hoisted through a guide pulley arranged at the top of the boom unit 14.

[0075] In order to discharge the slag generated when drilling the escape passage, the rescue passage construction device described in this embodiment also includes: a slag conveying assembly 4 arranged on the main vehicle assembly 1; the slag conveying assembly 4 is located between the main vehicle assembly 1 and the ground, and is used to transport the slag generated by the drilling tool assembly 6; preferably, the slag conveying assembly 4 adopts a chain plate conveying structure, which can transport the slag brought out by the second drilling tool 62 from the lower part of the main vehicle assembly 1 to the rear side of the main vehicle assembly 1 to prevent slag accumulation.

[0076] Since the first drilling tool 61 needs to be used directly as an escape route after drilling the placement hole, the drill bit needs to be replaced when performing the next step of excavation. For this reason, the life-saving channel construction device described in this embodiment also includes: a drilling tool conveying assembly 5; the drilling tool conveying assembly 5 is arranged on one side of the main vehicle assembly 1, and is used to transport the drilling tool assembly 6; the drilling tool conveying assembly 5 can be a chain plate conveying structure or other structure that is convenient for transportation.

[0077] In order to ensure the coaxiality of the first drill tool 61 during drilling, radial support can be performed. Therefore, the life-saving channel construction device described in this embodiment also includes: two drill tool support assemblies 7, which are arranged between the first drill tool 61 and the working surface, and are used to support the first drill tool 61; the drill tool support assembly 7 is coaxially arranged with the first drill tool 61; preferably, three groups of rotatable supporting wheels can be evenly distributed on the arc surface of the drill tool support assembly 7 used to support the first drill tool 61, and the height position can be appropriately adjusted.

[0078] Due to the external environment caused by accidents and disasters such as tunnel collapse, mine roof collapse, and water seepage, it is very unstable, and additional support is needed at this time; at the same time, the drilling tool assembly 6 must be stable during the drilling process. Figure 3 and 6 The main locomotive assembly 1 and the power locomotive assembly 3 are both provided with four supporting and stabilizing assemblies, including: a main locomotive supporting and stabilizing mechanism 12 provided in the main locomotive assembly 1 and a power locomotive supporting and stabilizing mechanism 33 provided in the power locomotive assembly 3;

[0079] Among them, the main vehicle support and stabilization mechanism 12 includes: a main vehicle support hydraulic cylinder 121 and a main vehicle support leg 122. The cylinder end of the main vehicle support hydraulic cylinder 121 is connected to the two sides of the main vehicle frame 11 through a pin shaft, which is convenient for adjusting the support angle; at the same time, the output end of the main vehicle support hydraulic cylinder 121 is connected to the main vehicle support leg 122, supporting the four sides of the working surface to ensure stability. Among them, the power vehicle support and stabilization mechanism 33 includes: a power vehicle support hydraulic cylinder 331 and a power vehicle support leg 332; the cylinder end of the power vehicle support hydraulic cylinder 331 is connected to the front and rear sides of the power vehicle frame 31 through a pin shaft, which is convenient for adjusting the support angle; the output end of the power vehicle support hydraulic cylinder 331 is connected to the power vehicle support leg 332, which plays a role in supporting and stabilizing; preferably, the size of the main vehicle support leg 122 and the power vehicle support leg 332 can be adjusted as needed.

[0080] In specific use, if there is a large volume of rock in the collapsed stratum on the drilling route, the front end of the drill assembly 6 can be connected to a crushing drill, such as being set at the end of the first drill 61 facing the working surface and connected to an external air source for impact crushing drilling; preferably, the crushing drill is a pneumatic down-the-hole hammer drill.

[0081] Specifically, a reserved hole is also provided on the second power assembly 16 described in specific embodiment I; the reserved hole is arranged in the middle of the second power drill seat 164, which can be used as a channel for compressed air to connect the pneumatic down-the-hole hammer drill with an external high-pressure air source for impact crushing drilling.

[0082] Specific embodiment II:

[0083] During the drilling process, when encountering a steel component, the second drilling tool described in the specific embodiment 1 is removed, and the first drilling tool 61 is manually entered to cut the steel component along the periphery of the excavation surface using a demolition tool or an oxyacetylene flame cutting gun. During the cutting process, a small air compressor can be used to supply air into the pipe to remove smoke.

[0084] The life-saving channel construction device described in this application has high comprehensive excavation efficiency, and its speed is much higher than that of the traditional small pilot pit method and hydraulic jacking method. The safety during the excavation process is greatly guaranteed, and the working environment of the operators is greatly improved. In addition, the life-saving channel construction device is small in size and light in weight, and has a self-propelled chassis, which is convenient for transportation and arrangement. It can be used as emergency supplies for storage in high-risk coal mining areas, further improving the deployment efficiency of equipment, and providing a new option for the rescue of underground projects such as coal mines, with obvious social benefits. At the same time, the life-saving channel construction device described in this application has a lower loss cost for one rescue than other mechanical rescue methods, and requires less labor, and the rescue process is more humane and safer, which can produce better economic benefits.

[0085] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

Claims

1. A life-saving passage construction device, It is characterized in that include: Main vehicle components; A power car assembly, connected to the main car assembly, for providing power to the main car; A drilling tool assembly is movably arranged on the main vehicle assembly and is used to construct a rescue passage; The drilling tool assembly comprises: a first drilling tool, detachably connected to the main vehicle assembly, for drilling placement holes on the working surface; a second drilling tool, coaxially disposed in the first drilling tool and connected to the main vehicle assembly, for being used to be extracted from the first drilling tool after the slag in the first drilling tool is discharged, so as to leave the first drilling tool in the placement hole as a rescue passage; The main vehicle assembly comprises: Mainframe frame; a first power assembly, movably disposed on the main frame and detachably connected to the first drilling tool, for providing power to the first drilling tool to drill the placement hole; A second power assembly is movably disposed on the main frame and is located on a side of the first power assembly away from the first drilling tool; The second power assembly is in driving connection with the second drilling tool, and is used for driving the second drilling tool and driving the second drilling tool to be pulled out from the first drilling tool.

2. The lifesaving passage construction device according to claim 1, It is characterized in that The first power assembly comprises: A first power slider is movably arranged on the main frame; A first power transmission box, arranged on the first power sliding block; A first power drilling tool seat, arranged at the output end of the first power transmission box and detachably connected to the first drilling tool; The driving displacement mechanism is arranged on a side of the first power transmission box away from the first drilling tool, and is used to drive the first power transmission box to move toward the working surface to drill the placement hole.

3. The lifesaving passage construction device according to claim 1, It is characterized in that The second power assembly comprises: A second power slider is movably arranged on the main frame; A second power transmission box, disposed on the second power sliding block; A second power drilling tool seat, arranged at the output end of the second power transmission box, and used for arranging the second drilling tool; The extraction displacement mechanism is arranged on the side of the second power transmission box facing the first power assembly, and is used to drive the second power transmission box to move in a direction away from the first drilling tool so as to extract the second drilling tool from the first drilling tool.

4. The lifesaving passage construction device according to claim 1, It is characterized in that The main vehicle assembly further comprises: At least one clamping unit is arranged on the main frame and is located between the first power assembly and the working surface; The boom unit is arranged on the main frame and located between the clamping unit and the first power assembly, and is used for hoisting or disassembling the first drilling tool.

5. The lifesaving passage construction device according to claim 1, It is characterized in that Also includes: A connecting member is arranged between the main vehicle assembly and the power vehicle assembly, and is used to enable the main vehicle assembly and the power vehicle assembly to be telescopically connected to prevent vibration.

6. The lifesaving passage construction device according to claim 1, It is characterized in that Also includes: The slag conveying assembly is arranged on the main vehicle assembly and is located between the main vehicle assembly and the ground, and is used to transport the slag generated by the drilling tool assembly.

7. The lifesaving passage construction device according to claim 1, It is characterized in that Also includes: at least one drilling tool support assembly, disposed between the first drilling tool and the working surface, for supporting the first drilling tool; The drill tool support assembly is coaxially arranged with the first drill tool.

8. The lifesaving passage construction device according to claim 1, Features: The main vehicle assembly and the power vehicle assembly are each provided with at least two supporting and stabilizing assemblies; The supporting and stabilizing component comprises: A supporting hydraulic cylinder is rotatably arranged on the main vehicle assembly or the power vehicle assembly and is used to adjust the supporting angle; The outriggers are arranged at the output end of the supporting hydraulic cylinder and are used to support the main vehicle assembly, the power vehicle assembly and the working surface.

9. The lifesaving passage construction device according to claim 1, It is characterized in that Also includes: The drilling tool conveying assembly is arranged on one side of the main vehicle assembly and is used for conveying the drilling tool assembly.

10. The lifesaving passage construction device according to claim 1, Features: The first drilling tool is cylindrical.