Light partition board pipe clamp mounting piece

By introducing fastening components and locking components into the pipe clamp installation parts, and utilizing the cooperation of springs and blocks, the problems of inconvenient fixing and maintenance difficulties in the existing technology are solved, and the convenient installation of the lightweight partition board pipe clamp installation parts is realized. and securely fastened.

CN221800821UActive Publication Date: 2024-10-01THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322470933.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-09-12
Publication Date
2024-10-01
Estimated Expiration
2033-09-12

AI Technical Summary

Technical Problem

The existing pipe clamp installation parts are inconvenient to fix and difficult to maintain and disassemble when in use. Especially when fixed with screws, the process of fixing the pipe is inconvenient.

Method used

A lightweight partition board pipe clamp installation piece is designed, which adopts a fastening component and a locking component, including a first spring, an inner block, a telescopic rod, a first pressing block, a second spring and a lower pipe hoop, and is manually operated And the elastic force of the spring realizes the convenient installation and locking of the upper and lower pipe hoops.

Benefits of technology

Through the design of fastening components and locking components, this device simplifies the installation and fixing process of pipelines, improves the convenience of installation and fixing effect, and facilitates later maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221800821U_ABST
    Figure CN221800821U_ABST
Patent Text Reader

Abstract

The utility model discloses a light partition board pipe clamp installation part, relates to the field of water heating installation equipment, and adopts the technical scheme that the light partition board pipe clamp installation part comprises a pipe clamp main body, the pipe clamp main body comprises an installation plate, the outer surface of the installation plate is connected with a bearing plate, the interior of the bearing plate is connected with a locking assembly, and the outer surface of the bearing plate is hinged with an upper pipe hoop; the surface of one side of the upper pipe hoop is connected with a fastening assembly; and the fastening assembly comprises a first spring, an inner abutting block and a telescopic rod, the inner abutting block is connected to the interior of the bearing plate, the telescopic rod is connected to the interior of the inner abutting block, and the first spring is connected to the outer surface of the inner abutting block. Compared with the prior art, the light partition board pipe clamp installation piece has the advantages that the fastening assembly is arranged, the upper pipe hoop can be effectively and conveniently installed, and the locking assembly is arranged, so that the upper pipe hoop and the lower pipe hoop can be effectively and conveniently locked and installed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of water heating installation equipment, in particular to a light partition board pipe clamp installation piece. Background Art

[0002] Pipe clamp installation parts refer to a kind of pipe fittings commonly used in plumbing installation, which are used to fix pipes and the ground (note that the floor of geothermal or the location where there are pipelines on the ground cannot be fixed by drilling). The live lines do not run inside the gypsum lines, and the pipes of the ground leveling lines must also be fixed.

[0003] At present, some of the existing pipe clamp installation parts, when working, generally place the pipe clamp installation parts on the surface of the wall panel, and then fix them with screws. However, there are certain disadvantages in working in this way. First, the traditional pipe clamp installation parts need to be fixed to the wall surface with a nail gun, but the use of a nail gun will cause the pipe clamp installation parts to be inconvenient to disassemble and assemble during later maintenance. In addition, some of the existing pipe clamp installation parts, when working, are generally fixed with screws, and screw fixation will cause the pipe clamp installation parts to be inconvenient to fix when clamping the pipe. Utility Model Content

[0004] In view of the above technical problems, the utility model provides a lightweight partition board pipe clamp installation part.

[0005] The technical solution is as follows: it comprises a pipe clamp body, the pipe clamp body comprises a mounting plate, the outer surface of the mounting plate is connected to a receiving plate, the inside of the receiving plate is connected to a locking assembly, the outer surface of the receiving plate is hinged to an upper pipe hoop, and one side surface of the upper pipe hoop is connected to a fastening assembly;

[0006] The fastening assembly comprises a first spring, an inner abutment block and a telescopic rod. The inner part of the receiving plate is connected to the inner abutment block, the inner part of the inner abutment block is connected to the telescopic rod, and the outer surface of the inner abutment block is connected to the first spring.

[0007] Preferably, the locking assembly includes a first pressing block, a second spring and a lower pipe hoop, the first pressing block is inserted into the upper pipe hoop, the bottom outer surface of the first pressing block is connected to the lower pipe hoop, and the second spring is connected to the lower pipe hoop.

[0008] Preferably, a notch is provided on the outer surface of the upper pipe clamp, and the internal shape and size of the notch match the shape and size of the outer surface of the first pressing block.

[0009] Preferably, two ends of the first spring are respectively connected to inner walls of two groups of inner abutment blocks.

[0010] Preferably, a through hole is formed inside the inner stop block, and the shape and size of the inner part of the through hole match the shape and size of the outer surface of the telescopic rod.

[0011] Preferably, one end of the second spring is connected to the inner wall of the first pressing block, and the other end of the second spring is connected to the inner wall of the lower pipe hoop.

[0012] Preferably, a notch is provided inside the upper pipe clamp, and the internal shape and size of the notch match the shape and size of the outer surface of the inner stop block.

[0013] The beneficial effects brought about by the technical solution provided by the embodiment of the utility model are: the lightweight partition board pipe clamp installation piece can effectively and conveniently install the upper pipe clamp by setting a fastening component, and the device can effectively and conveniently lock the upper pipe clamp and the lower pipe clamp by setting a locking component.

[0014] 1. The device is provided with a fastening assembly. When the staff is working, they can first manually place the upper pipe hoop and the lower pipe hoop on the inner side of the receiving plate, and at the same time manually press the inner resistance block to make them move toward each other. Then, by pressing the inner resistance block, the first spring connected to the inner wall of the inner resistance block can be in a force storage and compression state. Then, when the position between the upper pipe hoop and the receiving plate is adjusted, the inner resistance block can be manually loosened to facilitate the rebound of the inner resistance block through the elastic force of the first spring, thereby effectively and conveniently installing and fixing the upper pipe hoop and the lower pipe hoop.

[0015] 2. The device is provided with a locking assembly. When the device is working, the first pressing block can be manually held first, and the first pressing block can be inserted through the upper pipe hoop into the interior of the lower pipe hoop. Then, the docking position of the first pressing block and the lower pipe hoop can be manually adjusted. When the position adjustment is completed, the first pressing block can be manually rotated ninety degrees so that the bottom end of the first pressing block and the inner wall of the lower pipe hoop are tightly abutted. At this time, the first pressing block will also be firmly fixed inside the lower pipe hoop through the elastic force of the second spring, so that the upper pipe hoop and the lower pipe hoop can be conveniently locked and installed. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of a front cross-section of the structure of the utility model;

[0017] Figure 2 It is a schematic side view of the structure of the utility model;

[0018] Figure 3 It is a schematic top view of the structure of the utility model;

[0019] Figure 4 For this utility model Figure 1 A schematic diagram of the structure enlargement at the center A;

[0020] Figure 5 For this utility model Figure 1 A magnified schematic diagram of the structure at point B in the middle.

[0021] In the figure: 1. mounting plate; 2. receiving plate; 3. upper pipe clamp; 4. first pressing block; 5. first spring; 6. inner resistance block; 7. telescopic rod; 8. second spring; 9. lower pipe clamp. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0023] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0024] In the description of the invention of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the invention of the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention of the utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the invention of the present utility model, unless otherwise specified, "multiple" means two or more.

[0025] In the description of the invention of the utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention of the utility model can be understood according to specific circumstances.

[0026] Example 1

[0027] See also Figures 1 to 5The utility model provides a lightweight partition board pipe clamp installation piece, including a pipe clamp body, the pipe clamp body including a mounting plate 1, the outer surface of the mounting plate 1 is connected with a receiving plate 2, and the inside of the receiving plate 2 is connected with a locking component, the outer surface of the receiving plate 2 is hinged with an upper pipe hoop 3, and one side surface of the upper pipe hoop 3 is connected with a fastening component;

[0028] The fastening assembly includes a first spring 5, an inner stop block 6 and a telescopic rod 7. The inner portion of the receiving plate 2 is connected to the inner stop block 6, and the inner portion of the inner stop block 6 is connected to the telescopic rod 7. The outer surface of the inner stop block 6 is connected to the first spring 5. By setting the fastening assembly, the upper pipe clamp 3 can be easily pressed to the outer surface of the receiving plate 2 to facilitate subsequent maintenance.

[0029] The locking assembly includes a first pressing block 4, a second spring 8 and a lower pipe hoop 9. The first pressing block 4 is inserted into the upper pipe hoop 3, and the outer surface of the bottom end of the first pressing block 4 is connected to the lower pipe hoop 9. The lower pipe hoop 9 is connected to the second spring 8. By setting the locking assembly, the upper pipe hoop 3 and the lower pipe hoop 9 can be effectively and conveniently closed.

[0030] A notch is provided on the outer surface of the upper pipe clamp 3 , and the internal shape and size of the notch match the shape and size of the outer surface of the first pressing block 4 . The matching shapes and sizes can effectively increase the tightness of the connection.

[0031] The two ends of the first spring 5 are respectively connected to the inner walls of the two groups of inner abutment blocks 6. By connecting the two ends of the two groups of first springs 5 ​​to the inner walls of the inner abutment blocks 6, the fixing effect of the upper pipe clamp 3 and the inner wall of the receiving plate 2 can be effectively increased.

[0032] A perforation is provided inside the inner abutment block 6 , and the internal shape and size of the perforation matches the shape and size of the outer surface of the telescopic rod 7 . The matching shape and size can effectively increase the fitting effect.

[0033] One end of the second spring 8 is connected to the inner wall of the first pressing block 4 , and the other end of the second spring 8 is connected to the inner wall of the lower pipe hoop 9 , so that the first pressing block 4 can be tightly engaged inside the lower pipe hoop 9 through the elastic force of the second spring 8 .

[0034] A notch is provided inside the upper pipe clamp 3 , and the internal shape and size of the notch match the shape and size of the outer surface of the inner stop block 6 . The matching shapes and sizes can effectively increase the fitting effect.

[0035] When the utility model is in use, when the staff is working, they can first manually place the upper pipe clamp 3 and the lower pipe clamp 9 on the inner side of the receiving plate 2, and at the same time manually press the inner resistance block 6 to make them move towards each other, and then by pressing the inner resistance block 6, the first spring 5 connected to the inner wall of the inner resistance block 6 can be in a force storage and compression state. Then, when the position between the upper pipe clamp 3 and the receiving plate 2 is adjusted, the inner resistance block 6 can be manually loosened to facilitate the elastic force of the first spring 5 to make the inner resistance block 6 rebound, thereby effectively and conveniently installing and fixing the upper pipe clamp 3 and the lower pipe clamp 9.

[0036] When the device is working, the first pressing block 4 can be manually held first, and the first pressing block 4 can be inserted into the lower pipe hoop 9 through the upper pipe hoop 3. Then, the docking position of the first pressing block 4 and the lower pipe hoop 9 can be manually adjusted. When the position adjustment is completed, the first pressing block 4 can be manually rotated ninety degrees so that the bottom end of the first pressing block 4 and the inner wall of the lower pipe hoop 9 are tightly abutted. At this time, the first pressing block 4 will also be firmly fixed in the lower pipe hoop 9 through the elastic force of the second spring 8, so that the upper pipe hoop 3 and the lower pipe hoop 9 can be conveniently locked and installed.

[0037] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A lightweight partition board pipe clamp mounting member, characterized in that: The pipe clamp comprises a pipe clamp body, the pipe clamp body comprises a mounting plate (1), the outer surface of the mounting plate (1) is connected to a receiving plate (2), the inside of the receiving plate (2) is connected to a locking component, the outer surface of the receiving plate (2) is hinged to an upper pipe hoop (3), and one side surface of the upper pipe hoop (3) is connected to a fastening component; The fastening assembly comprises a first spring (5), an inner abutment block (6) and a telescopic rod (7); the inner portion of the receiving plate (2) is connected to the inner abutment block (6), the inner portion of the inner abutment block (6) is connected to the telescopic rod (7), and the outer surface of the inner abutment block (6) is connected to the first spring (5).

2. The lightweight partition board pipe clamp installation member according to claim 1 is characterized in that: The locking assembly comprises a first pressing block (4), a second spring (8) and a lower pipe hoop (9); the first pressing block (4) is inserted into the interior of the upper pipe hoop (3); the outer surface of the bottom end of the first pressing block (4) is connected to the lower pipe hoop (9); and the interior of the lower pipe hoop (9) is connected to the second spring (8).

3. The lightweight partition board pipe clamp mounting member according to claim 2 is characterized in that: The outer surface of the upper pipe clamp (3) is provided with a notch, and the internal shape and size of the notch are matched to the shape and size of the outer surface of the first pressing block (4).

4. The lightweight partition board pipe clamp installation member according to claim 3 is characterized in that: The two ends of the first spring (5) are respectively connected to the inner walls of the two groups of inner abutment blocks (6).

5. The lightweight partition board pipe clamp installation member according to claim 4 is characterized in that: A through hole is provided inside the inner abutment block (6), and the shape and size of the inside of the through hole match the shape and size of the outer surface of the telescopic rod (7).

6. The lightweight partition board pipe clamp installation member according to claim 5, characterized in that: One end of the second spring (8) is connected to the inner wall of the first pressing block (4), and the other end of the second spring (8) is connected to the inner wall of the lower pipe hoop (9).

7. The lightweight partition board pipe clamp installation member according to claim 6 is characterized in that: A notch is provided inside the upper pipe clamp (3), and the shape and size of the interior of the notch match the shape and size of the outer surface of the inner stop block (6).