By designing an automatic air-tightness detection device for pressure reactors with sealing test components and push auxiliary components, the problem of the inability of the existing technology to comprehensively detect the overall airtightness of the reactor has been solved, and efficient airtightness testing of the pressure reactor has been achieved. Simplifies operation and improves detection efficiency.
Patent Information
- Application Number
- CN202323557811.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-26
AI Technical Summary
The existing pressure reactor air tightness detection device cannot comprehensively detect the overall air tightness of the reactor. In particular, the air leakage parts are not limited to the connection between the cover and the tank, but also include valves, inlet and outlet flanges, and inspection blind hole covers. boards, etc., and the pressure test time is too long, which cannot effectively solve the problem of air tightness testing.
An automatic air tightness detection device for a pressure reactor is designed that includes a sealing test component and a push auxiliary component. Through the first and second detection enclosure frames, gas detector groups, electric telescopic rods and other components, the pressure reactor can be tested The comprehensive sealing and gas detection of the main body enhances the range of air pressure detection and avoids missed detection.
This device simplifies the operation, improves the efficiency of air tightness detection of the pressure reactor, ensures effective detection of the overall air tightness of the reactor, and avoids the problem of missed detection.
Smart Images

Figure CN221803259U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of air tightness detection of pressure reactors, in particular to an automatic air tightness detection device for pressure reactors. Background Art
[0002] Reactors are a type of pressure vessel commonly used in chemical production. They can be used for physical mixing and chemical reactions. They are widely used in petrochemical, building materials, pharmaceutical, pesticide and other industries. In reactions involving or generating gases, the container needs to remain sealed to prevent poisoning and pollution accidents caused by gas leakage. Therefore, the reactor generally needs to be pressure tested before the reaction to check its air tightness. The pressure test is usually done by closing all valves and openings of the reactor, filling the reactor with compressed air or nitrogen to keep the reactor at a higher pressure than the working pressure, and continuously observing the pressure changes in the reactor. If the pressure of the reactor does not drop after a period of time or the drop is within the allowable range, the pressure test is passed.
[0003] The existing patent number is: CN215262263U, which discloses a pressure vessel air tightness monitoring and alarm device. By placing an arc box close to the edge of the connection between the lid and the tank body of the reactor, when there is a leak at the edge, the gas will enter the inner side of the arc box through the lower opening, and the wave plate will swing. By visually detecting the sealing problem at the edge of the connection between the lid and the tank body at the arc segment position, the detection is convenient and intuitive. However, the leaking parts of the reactor are not only the connection between the lid and the tank body, but also the valves, inlet and outlet flanges, and blind hole cover plates for inspection. The existing air tightness detection device cannot complete the air tightness detection of the reactor as a whole, and cannot solve the problem of too long pressure test time.
[0004] Therefore, those skilled in the art provide an automatic airtightness detection device for a pressure reactor to solve the problems raised in the above background technology. Utility Model Content
[0005] The utility model aims to provide a pressure reactor air tightness automatic detection device to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A pressure reactor air tightness automatic detection device comprises a connecting bottom plate, the upper end of which is provided with the reactor air tightness automatic detection device, the reactor air tightness automatic detection device comprises: a sealing test component and a pushing auxiliary component, the lower ends of the sealing test component and the pushing auxiliary component are installed on the upper end of the connecting bottom plate.
[0008] As a further solution of the utility model, the sealing test assembly includes: a first detection enclosure frame, a second detection enclosure frame, a gas detector group and a pressure reactor body, the first detection enclosure frame is provided with a first upper sealing cover on the upper end, the second detection enclosure frame is provided with a second upper sealing cover on the upper end, the second upper sealing cover is provided with a sealing placement groove on the inner side, a sealing strip is fixedly installed on the inner side of the first upper sealing cover, the inner side of the sealing strip is detachably installed in the sealing placement groove, the first detection enclosure frame is provided with a first side fitting enclosure block group on the inner wall, and the second A second side-fitting enclosure block group is installed on the inner wall of the second detection enclosure frame, an assembly column group is opened on both sides of the front end of the first detection enclosure frame, an assembly hole group is opened on both sides of the front end of the second detection enclosure frame, a second sealing docking block is installed on the side of the second detection enclosure frame, a U-shaped sealing groove is opened at the front end of the second sealing docking block, a first sealing docking block is installed on the side of the first detection enclosure frame, a U-shaped sealing gasket is installed at the front end of the first sealing docking block, the U-shaped sealing gasket is detachably installed in the U-shaped sealing groove, and the front end of the assembly column group is detachably installed in the assembly hole group.
[0009] As a further scheme of the utility model, the pushing auxiliary component includes: a first sliding auxiliary groove, a first connecting block, a first movable roller, a first upper placement rack, a second sliding auxiliary groove, a second connecting block and a second electric telescopic rod, the second electric telescopic rod is installed with the second upper placement rack at the lower end, the first upper placement rack is installed with the first electric telescopic rod at the upper end, the first movable roller is rotatably installed at the upper end of the first connecting block, the second movable roller is rotatably installed at the lower end of the second connecting block, the second movable roller is rotatably installed at the lower end, the second movable roller is rotatably installed at the lower end of the second connecting block, the lower end of the second movable roller is rotatably installed in the second sliding auxiliary groove, and the lower end of the first movable roller is rotatably installed in the first sliding auxiliary groove.
[0010] As a further solution of the utility model, the lower end of the first upper placing rack is installed on the upper end of one side of the connecting base plate, the lower end of the second upper placing rack is installed on the upper end of the other side of the connecting base plate, and the first sliding auxiliary groove and the second sliding auxiliary groove are both opened on the upper end of the connecting base plate.
[0011] As a further solution of the utility model, the gas detector groups are provided with two groups, and the front ends of the two groups of gas detector groups successively penetrate the first detection enclosure frame, the inner and outer walls of the second detection enclosure frame and the rear ends of the first side fitting enclosure block group and the second side fitting enclosure block group.
[0012] As a further solution of the utility model, the sizes of the first side fitting enclosing block group and the second side fitting enclosing block group are adapted to the model of the upper outer wall of the pressure reactor body, and the inner sides of the first side fitting enclosing block group and the second side fitting enclosing block group can be detachably installed on the outer wall of the pressure reactor body.
[0013] As a further solution of the utility model, the inner sides of the upper ends of the first connecting block and the second connecting block are installed on the outer walls of the lower ends of the first detection enclosure frame and the second detection enclosure frame, the second electric telescopic rod and the output end of the first electric telescopic rod are installed on the outer walls of the sides of the first detection enclosure frame and the second detection enclosure frame, and the first detection enclosure frame and the second detection enclosure frame are semi-cylindrical.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] By setting up an automatic air tightness detection device for the reactor, when the pressure reactor body completes the gas detection work, the first detection enclosure frame and the second detection enclosure frame are separated and moved out. When the first detection enclosure frame and the second detection enclosure frame are moved out, the pressure reactor body can be used for subsequent work. The sealing test component and the pushing auxiliary component cooperate with each other to seal the entire exterior of the pressure reactor body, further enhancing the range of air pressure detection and effectively avoiding the problem of missed detection. In addition, the device is simple and convenient to operate, and the convenient detection operation greatly improves the efficiency of the entire device in detecting the air tightness of the pressure reactor body. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of an automatic gas tightness detection device for a pressure reactor;
[0017] Figure 2 It is a schematic structural diagram of an automatic pressure reactor air tightness detection device;
[0018] Figure 3 It is a schematic diagram of the structure of a sealing test component of an automatic airtightness detection device for a pressure reactor;
[0019] Figure 4 The present invention is a schematic diagram of the structure of a push auxiliary component of an automatic air tightness detection device for a pressure reactor.
[0020] In the figure: 1, connecting bottom plate; 2, automatic air tightness detection device for reactor; 21, sealing test assembly; 211, first detection enclosure frame; 212, first sealing docking block; 213, U-shaped sealing gasket; 214, assembly column group; 215, gas detector group; 216, second detection enclosure frame; 217, second sealing docking block; 218, U-shaped sealing groove; 219, assembly hole group; 210, second upper sealing cover; 2101, sealing placement long groove; 2102, first upper sealing cover; 2103 , sealing strip; 2104, second side fitting enclosure block group; 2105, first side fitting enclosure block group; 2106, pressure reactor body; 22, pushing auxiliary component; 221, first upper placement rack; 222, first electric telescopic rod; 223, first sliding auxiliary groove; 224, first connecting block; 225, first moving roller; 226, second sliding auxiliary groove; 227, second connecting block; 228, second moving roller; 229, second electric telescopic rod; 220, second upper placement rack. DETAILED DESCRIPTION
[0021] See also Figures 1-2 In an embodiment of the utility model, a pressure reactor air tightness automatic detection device includes a connecting bottom plate 1, and an automatic reactor air tightness detection device 2 is provided on the upper end of the connecting bottom plate 1. The automatic reactor air tightness detection device 2 includes: a sealing test component 21 and a pushing auxiliary component 22. The lower ends of the sealing test component 21 and the pushing auxiliary component 22 are installed on the upper end of the connecting bottom plate 1.
[0022] like Figure 3As shown, the sealing test assembly 21 includes: a first detection enclosure frame 211, a second detection enclosure frame 216, a gas detector group 215 and a pressure reactor body 2106, a first upper sealing cover 2102 is installed on the upper end of the first detection enclosure frame 211, a second upper sealing cover 210 is opened on the upper end of the second detection enclosure frame 216, a sealing placement long groove 2101 is opened on the inner side of the second upper sealing cover 210, and a sealing strip 2103 is fixedly installed on the inner side of the first upper sealing cover 2102 The inner side of the sealing strip 2103 can be detachably installed in the sealing placement slot 2101. The inner wall of the first detection enclosure frame 211 is installed with a first side fitting enclosure block group 2105. The inner wall of the second detection enclosure frame 216 is installed with a second side fitting enclosure block group 2104. The front end of the first detection enclosure frame 211 is provided with an assembly column group 214 on both sides. The front end of the second detection enclosure frame 216 is provided with an assembly hole group 219 on both sides. The second detection enclosure frame 216 is provided with a second sealing pair on the side. The second sealing docking block 217 has a U-shaped sealing groove 218 at the front end, the first detection enclosure frame 211 is provided with a first sealing docking block 212 at the side, and the first sealing docking block 212 has a U-shaped sealing gasket 213 at the front end, and the U-shaped sealing gasket 213 is detachably installed in the U-shaped sealing groove 218. The front end of the assembly column group 214 is detachably installed in the assembly hole group 219. The gas detector group 215 has two groups, and the front ends of the two gas detector groups 215 are arranged in sequence. It penetrates the inner and outer walls of the first detection enclosure frame 211, the second detection enclosure frame 216 and the rear ends of the first side fitting enclosure block group 2105 and the second side fitting enclosure block group 2104. The size of the first side fitting enclosure block group 2105 and the second side fitting enclosure block group 2104 are adapted to the size of the upper outer wall of the pressure reactor body 2106, and the inner sides of the first side fitting enclosure block group 2105 and the second side fitting enclosure block group 2104 can be detachably installed on the outer wall of the pressure reactor body 2106.
[0023] like Figure 4As shown, the pushing auxiliary component 22 includes: a first sliding auxiliary groove 223, a first connecting block 224, a first moving roller 225, a first upper placement frame 221, a second sliding auxiliary groove 226, a second connecting block 227 and a second electric telescopic rod 229, the second upper placement frame 220 is installed at the lower end of the second electric telescopic rod 229, the first upper placement frame 221 is installed at the upper end of the first electric telescopic rod 222, the upper end of the first moving roller 225 is rotatably installed at the lower end of the first connecting block 224, the lower end of the second connecting block 227 is rotatably installed with the second moving roller 228, the lower end of the second moving roller 228 is rotatably installed in the second sliding auxiliary groove 226, and the lower end of the first moving roller 225 is rotatably installed in the first sliding auxiliary groove 223 The lower end of the first upper placement rack 221 is installed on the upper end of one side of the connecting base plate 1, and the lower end of the second upper placement rack 220 is installed on the upper end of the other side of the connecting base plate 1. The first sliding auxiliary groove 223 and the second sliding auxiliary groove 226 are both opened at the upper end of the connecting base plate 1. The inner sides of the upper ends of the first connecting block 224 and the second connecting block 227 are installed on the lower outer wall of the first detection enclosure frame 211 and the second detection enclosure frame 216. The output ends of the second electric telescopic rod 229 and the first electric telescopic rod 222 are installed on the side outer walls of the first detection enclosure frame 211 and the second detection enclosure frame 216. The first detection enclosure frame 211 and the second detection enclosure frame 216 are semi-cylindrical. The component can be used by starting the first electric telescopic rod 222 and the second electric telescopic rod 229. When the first electric telescopic rod 222 and the second electric telescopic rod 229 are started, the first detection enclosure frame 211 and the first detection enclosure frame 216 at the output end are driven to move forward and backward. When the first detection enclosure frame 211 and the second detection enclosure frame 216 move forward, the first moving roller 225 and the second moving roller 228 installed at the lower end are driven to move forward in the first sliding auxiliary groove 223 and the second sliding auxiliary groove 226. The first detection enclosure frame 211 and the second detection enclosure frame 216 complete the front and rear inner side docking. When the first detection enclosure frame 211 and the second detection enclosure frame 216 are docked inside, the outer wall of the pressure reactor body 2106 can be sealed and protected. After the outside of the pressure reactor body 2106 is sealed, the two sets of gas detectors 2 are started. 15. The gas detector group 215 can perform gas detection on the side of the pressure reactor body 2106. When the pressure reactor body 2106 completes the gas detection work, the first detection enclosure frame 211 and the second detection enclosure frame 216 are separated and moved out. When the first detection enclosure frame 211 and the second detection enclosure frame 216 are moved out, the pressure reactor body 2106 can be used for subsequent work. The sealing test component 21 and the pushing auxiliary component 22 cooperate with each other to seal the outer part of the pressure reactor body 2106 as a whole, further enhancing the range of air pressure detection and effectively avoiding the problem of missed detection. In addition, the device is simple and convenient to operate, and the convenient detection operation greatly improves the efficiency of the entire device in detecting the air tightness of the pressure reactor body 2106.
[0024] The working principle of the utility model is as follows: the component can be used by starting the first electric telescopic rod 222 and the second electric telescopic rod 229. When the first electric telescopic rod 222 and the second electric telescopic rod 229 are started, the first detection enclosure frame 211 and the first detection enclosure frame 216 at the output end are driven to move forward and backward. When the first detection enclosure frame 211 and the second detection enclosure frame 216 move forward, the first moving roller 225 and the second moving roller 228 installed at the lower end are driven to move forward in the first sliding auxiliary groove 223 and the second sliding auxiliary groove 226. The first detection enclosure frame 211 and the second detection enclosure frame 216 complete the front and rear inner side docking, and the first detection enclosure frame 211 and the second detection enclosure frame 216 complete the front and rear inner side docking. When the inner side is docked, the outer wall of the pressure reactor body 2106 can be sealed and protected. After the outside of the pressure reactor body 2106 is sealed, the two groups of gas detector groups 215 are started. The gas detector group 215 can perform gas detection on the side of the pressure reactor body 2106. When the pressure reactor body 2106 completes the gas detection work, the first detection enclosure frame 211 and the second detection enclosure frame 216 are separated and moved out. When the first detection enclosure frame 211 and the second detection enclosure frame 216 are moved out, the pressure reactor body 2106 can be used subsequently. The sealing test component 21 and the pushing auxiliary component 22 cooperate with each other to seal the entire outside of the pressure reactor body 2106.
[0025] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An automatic airtightness detection device for a pressure reactor, comprising a connecting bottom plate (1), characterized in that: The upper end of the connecting base plate (1) is provided with an automatic air tightness detection device (2) for a reactor. The automatic air tightness detection device (2) for a reactor comprises: a sealing test component (21) and a pushing auxiliary component (22). The lower ends of the sealing test component (21) and the pushing auxiliary component (22) are mounted on the upper end of the connecting base plate (1).
2. The automatic airtightness detection device for a pressure reactor according to claim 1, characterized in that: The sealing test assembly (21) comprises: a first detection enclosure frame (211), a second detection enclosure frame (216), a gas detector group (215) and a pressure reactor body (2106), wherein a first upper sealing cover (2102) is installed on the upper end of the first detection enclosure frame (211), a second upper sealing cover (210) is provided on the upper end of the second detection enclosure frame (216), a sealing placement slot (2101) is provided on the inner side of the second upper sealing cover (210), a sealing strip (2103) is fixedly installed on the inner side of the first upper sealing cover (2102), and the inner side of the sealing strip (2103) is detachably installed inside the sealing placement slot (2101), a first side fitting enclosure block group (2105) is installed on the inner wall of the first detection enclosure frame (211), and a second upper sealing cover (2101) is provided on the inner side of the second detection enclosure frame (216). A second side-fitting enclosure block group (2104) is installed on the inner wall of the first detection enclosure frame (216), an assembly column group (214) is opened on both sides of the front end of the first detection enclosure frame (211), an assembly hole group (219) is opened on both sides of the front end of the second detection enclosure frame (216), a second sealing docking block (217) is installed on the side of the second detection enclosure frame (216), a U-shaped sealing groove (218) is opened on the front end of the second sealing docking block (217), a first sealing docking block (212) is installed on the side of the first detection enclosure frame (211), a U-shaped sealing gasket (213) is installed on the front end of the first sealing docking block (212), the U-shaped sealing gasket (213) is detachably installed in the U-shaped sealing groove (218), and the front end of the assembly column group (214) is detachably installed in the assembly hole group (219).
3. The automatic airtightness detection device for a pressure reactor according to claim 1, characterized in that: The pushing auxiliary component (22) includes: a first sliding auxiliary groove (223), a first connecting block (224), a first moving roller (225), a first upper placement rack (221), a second sliding auxiliary groove (226), a second connecting block (227) and a second electric telescopic rod (229), wherein the second upper placement rack (220) is installed at the lower end of the second electric telescopic rod (229), the first upper placement rack (221) is installed at the upper end of the first upper placement rack (221), the upper end of the first moving roller (225) is rotatably installed at the lower end of the first connecting block (224), the lower end of the second connecting block (227) is rotatably installed at the second moving roller (228), the lower end of the second moving roller (228) is rotatably installed in the second sliding auxiliary groove (226), and the lower end of the first moving roller (225) is rotatably installed in the first sliding auxiliary groove (223).
4. The automatic airtightness detection device for a pressure reactor according to claim 3, characterized in that: The lower end of the first upper placement rack (221) is mounted on the upper end of one side of the connecting base plate (1), and the lower end of the second upper placement rack (220) is mounted on the upper end of the other side of the connecting base plate (1). The first sliding auxiliary groove (223) and the second sliding auxiliary groove (226) are both provided on the upper end of the connecting base plate (1).
5. The automatic airtightness detection device for a pressure reactor according to claim 2, characterized in that: The gas detector groups (215) are provided in two groups, and the front ends of the two gas detector groups (215) are sequentially installed to pass through the inner and outer walls of the first detection enclosure frame (211), the second detection enclosure frame (216), and the rear ends of the first side-fitting enclosure block group (2105) and the second side-fitting enclosure block group (2104).
6. The automatic airtightness detection device for a pressure reactor according to claim 2, characterized in that: The size of the first side fitting enclosure block group (2105) and the second side fitting enclosure block group (2104) is adapted to the size of the upper outer wall of the pressure reactor body (2106), and the inner sides of the first side fitting enclosure block group (2105) and the second side fitting enclosure block group (2104) can be detachably mounted on the outer wall of the pressure reactor body (2106).
7. The automatic airtightness detection device for a pressure reactor according to claim 3, characterized in that: The inner sides of the upper ends of the first connecting block (224) and the second connecting block (227) are mounted on the outer walls of the lower ends of the first detection enclosure frame (211) and the second detection enclosure frame (216), and the output ends of the second electric telescopic rod (229) and the first electric telescopic rod (222) are mounted on the outer walls of the side edges of the first detection enclosure frame (211) and the second detection enclosure frame (216). The first detection enclosure frame (211) and the second detection enclosure frame (216) are semi-cylindrical.