Project progress display device for constructional engineering management
By designing a project progress display device for construction project management with adjustable legs and cleaning components, the problems of poor fixing effect and difficult cleaning are solved, achieving stable fixing and efficient cleaning, and adapting to cross wind and dust pollution.
Patent Information
- Application Number
- CN202322937019.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-10-31
AI Technical Summary
The existing project progress display device used for construction project management has poor fixing effect and is easily blown over by cross winds. The dust on the surface is difficult to clean and manual cleaning is difficult.
A device including a pillar, a fixing unit, a supporting unit and a cleaning unit is designed. It achieves all-round fixation through adjustable legs, sets cleaning components for parallel cleaning, and provides wind and rain protection for display signs in non-working conditions. Function.
It achieves stable fixation and efficient cleaning of the display device, enhances the practicality of the device, resists cross winds and facilitates cleaning at heights.
Smart Images

Figure CN221805023U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering management, in particular to a construction progress display device for construction engineering management. Background Art
[0002] A construction project refers to an engineering entity formed through the construction of various types of buildings and their ancillary facilities, and the installation of supporting lines, pipelines and equipment. Among them, "buildings" refer to projects with roofs, beams, columns, walls, foundations and internal spaces that can meet people's needs for production, residence, study and public activities.
[0003] The project progress display board is one of the indispensable boards in the scientific management of construction projects. It is used to intuitively display the construction target value and progress. The existing project progress display devices for construction project management on the market have the following defects: First, the fixing effect is poor and it is easy to be blown down by crosswinds; second, the dust on the construction site is adsorbed on the surface of the display board, and manual cleaning cannot reach the high place of the display board, making it difficult to clean. Utility Model Content
[0004] In view of the above situation, in order to overcome the defects of the prior art, the construction progress display device for construction project management proposed by the utility model effectively solves the problems of poor fixing effect and difficult surface cleaning of traditional display boards. By arranging adjustable legs on the pillars, all-round fixation of the device is achieved, and the effect of not being easily blown down by crosswinds is achieved. In addition, cleaning components are arranged on both sides of the display board. In the working state, they are arranged in parallel to complete the cleaning of the display board. In the non-working state, they are arranged in a "human" shape on the top of the display board to shield the display board from wind and rain, thereby improving the practicality of the device.
[0005] The technical solution adopted by the utility model is as follows: the project progress display device for construction project management proposed by the utility model comprises a pillar, a fixing unit, a supporting unit and a cleaning unit, wherein the fixing unit is arranged on the pillar, the supporting unit is arranged on the pillar, and the cleaning unit is arranged on the supporting unit, the supporting unit comprises a thread, a screw, a connecting block, a large leg, an adjustment hole one, a small leg, an adjustment hole two, a latch, a fixing seat and a steel chisel, the thread is fixedly connected to the pillar, the screw is rotatably connected to the thread, the connecting block is fixedly connected to the side of the screw, the large leg is rotatably connected to the connecting block, the adjustment hole one is fixedly connected to the large leg, and the adjustment holes play a connecting role, the small leg is slidably connected to the large leg, the adjustment hole two is fixedly connected to the small leg, and the adjustment hole two plays a connecting role, the latch is inserted and connected on the adjustment hole two, and the latch plays a fixing role, the fixing seat is rotatably connected to the bottom of the small leg, and the steel chisel is movably connected to the fixing seat, and the steel chisel plays a fixing role.
[0006] Preferably, the supporting unit comprises a frame, a display board, a bracket, a pulley, a support plate, a first binding rod and a second binding rod, the frame is fixedly connected to the pillar, the display board is fixedly connected to the frame, the bracket is fixedly connected to the side of the frame, the pulley is fixedly connected to the bracket, the support plate is fixedly connected to the bottom of the frame, the first binding rod is fixedly connected to the side of the support plate, and the binding rods play a fixing role, and the second binding rod is fixedly connected to the side of the support plate, and the second binding rod plays a fixing role.
[0007] Preferably, in order to achieve the effect of autonomous cleaning, the cleaning unit includes a slider, a steel wire rope 1, a large T-shaped plate, a connecting column, a small T-shaped plate, a rocker, a steel wire rope 2, a large rotating shaft 1, a large rotating shaft 2, a cleaning plate 1, a cleaning plate 2, a sunshade surface, a cleaning surface, a small rotating shaft 1, a small rotating shaft 2, a connecting rod 1 and a connecting rod 2. The slider is movably connected to the bracket, the steel wire rope 1 is fixedly connected to the slider, the large T-shaped plate is fixedly connected to the slider, the connecting column is fixedly connected to the large T-shaped plate, the small T-shaped plate is rotatably connected to the connecting column, the rocker is fixedly connected to the small T-shaped plate, the steel wire rope 2 is fixedly connected to the rocker, and the The large rotating shaft 1 is fixedly connected to the large T-shaped plate, the large rotating shaft 2 is fixedly connected to the large T-shaped plate, the cleaning plate 1 is fixedly connected to the large rotating shaft 1, the cleaning plate 2 is fixedly connected to the large rotating shaft 2, the sunshade surface is fixedly connected to the upper part of the cleaning plate 1 and the cleaning plate 2, the cleaning surface is fixedly connected to the bottom of the cleaning plate 1 and the cleaning plate 2, the small rotating shaft 1 is fixedly connected to the cleaning plate 1, the small rotating shaft 2 is fixedly connected to the cleaning plate 2, one end of the connecting rod 1 is rotatably connected to the small rotating shaft 1 and the other end is rotatably connected to the large rotating shaft 1, one end of the connecting rod 2 is rotatably connected to the small rotating shaft 2 and the other end is rotatably connected to the large rotating shaft 2.
[0008] Furthermore, the connecting block is arranged between the screw and the large leg, the small leg is arranged between the large leg and the steel chisel, the display board is arranged between cleaning plate 1 and cleaning plate 2, the large T-shaped plate is arranged between large rotating shaft 1 and large rotating shaft 2, and the small T-shaped plate is arranged between small rotating shaft 1 and small rotating shaft 2.
[0009] Furthermore, the screw is arranged parallel to the pillar, the small leg is arranged parallel to the second large leg, the fixing seat is arranged vertically to the steel chisel, the bracket is arranged parallel to the display board, the support plate is arranged vertically to the display board, the large T-shaped plate is arranged vertically to the bracket, the small T-shaped plate is arranged parallel to the large T-shaped plate, and the small T-shaped plate is arranged vertically to the large rotating shaft 1.
[0010] Furthermore, the large leg is rectangular, the small leg is rectangular, the latch is cylindrical, the large rotating shaft 1 is cylindrical, the small rotating shaft 1 is cylindrical, the display board is rectangular, the sunshade surface is rectangular, and the cleaning surface is rectangular.
[0011] In order to achieve the effect of overall flexible operation, the pillar is provided with one group, the large legs are provided with four groups, the small legs are provided with four groups, the steel drills are provided with four groups, the brackets are provided with two groups, the large T-shaped plates are provided with two groups, the small T-shaped plates are provided with two groups, the large rotating shaft 1 is provided with two groups, the small rotating shaft 1 is provided with two groups, the steel wire rope 1 is provided with two groups, the steel wire rope 2 is provided with two groups, and the pulleys are provided with four groups.
[0012] The beneficial effects achieved by the utility model using the above structure are as follows: the project progress display device for construction project management proposed in this scheme has the advantage that the large support feet and the small support feet in the fixing unit are adjustable, which can reduce the restrictions on the fixing device caused by the environment, and the four-foot fixing device is more stable; the rotation angle of the small T-plate in the cleaning unit can be adjusted to control the connecting rod, so as to control the spatial position relationship between the cleaning plate one and the cleaning plate two, making it convenient to implement the cleaning operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the overall structure from a first perspective of the construction progress display device for construction project management proposed by the utility model;
[0014] Figure 2 This is a second perspective overall structural diagram of the construction progress display device for construction project management proposed by the utility model;
[0015] Figure 3 for Figure 2 A magnified picture of the details of part A;
[0016] Figure 4 for Figure 2 A magnified view of the detail of part B.
[0017] Among them, 1. pillar, 2. fixing unit, 3. supporting unit, 4. cleaning unit, 5. thread, 6. screw, 7. connecting block, 8. large leg, 9. adjusting hole one, 10. small leg, 11. adjusting hole two, 12. latch, 13. fixing seat, 14. steel chisel, 15. frame, 16. display board, 17. bracket, 18. pulley, 19. supporting plate, 20. binding rod one, 21. binding rod two, 22. slider, 23. wire rope one, 24. large T-shaped plate, 25. connecting column, 26. small T-shaped plate, 27. rocker, 28. wire rope two, 29. large rotating shaft one, 30. large rotating shaft two, 31. cleaning plate one, 32. cleaning plate two, 33. sunshade surface, 34. cleaning surface, 35. small rotating shaft one, 36. small rotating shaft two, 37. connecting rod one, 38. connecting rod two.
[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0020] like Figure 1 , Figure 2 and Figure 3 As shown, the construction project management project progress display device proposed by the utility model includes a pillar 1, a fixing unit 2, a supporting unit 3 and a cleaning unit 4. The fixing unit 2 is arranged on the pillar 1, the supporting unit 3 is arranged on the pillar 1, and the cleaning unit 4 is arranged on the supporting unit 3. The supporting unit 3 includes a thread 5, a screw 6, a connecting block 7, a large supporting leg 8, an adjustment hole 1 9, a small supporting leg 10, an adjustment hole 2 11, a latch 12, a fixing seat 13 and a steel chisel 14. The thread 5 is fixedly connected to the pillar 1, the screw 6 is rotatably connected to the thread 5, and the connecting block 7 is fixed. It is fixedly connected to the side of the screw 6, the large leg 8 is rotatably connected to the connecting block 7, the adjusting hole 19 is fixedly connected to the large leg 8, and the adjusting hole 19 plays a connecting role, the small leg 10 is slidably connected to the large leg 8, the adjusting hole 2 11 is fixedly connected to the small leg 10, and the adjusting hole 2 11 plays a connecting role, the pin 12 is inserted and connected on the adjusting hole 2 11, and the pin 12 plays a fixing role, the fixing seat 13 is rotatably connected to the bottom of the small leg 10, and the steel chisel 14 is movably connected to the fixing seat 13, and the steel chisel 14 plays a fixing role.
[0021] like Figure 1 and Figure 2 As shown, the support unit 3 includes a frame 15, a display board 16, a bracket 17, a pulley 18, a support plate 19, a binding rod 1 20 and a binding rod 21. The frame 15 is fixedly connected to the pillar 1, the display board 16 is fixedly connected to the frame 15, the bracket 17 is fixedly connected to the side of the frame 15, the pulley 18 is fixedly connected to the bracket 17, the support plate 19 is fixedly connected to the bottom of the frame 15, the binding rod 1 20 is fixedly connected to the side of the support plate 19, and the binding rod 1 20 plays a fixing role. The binding rod 21 is fixedly connected to the side of the support plate 19, and the binding rod 21 plays a fixing role.
[0022] like Figure 1 , Figure 2 and Figure 4 As shown, the cleaning unit 4 includes a slider 22, a wire rope 1 23, a large T-shaped plate 24, a connecting column 25, a small T-shaped plate 26, a rocker 27, a wire rope 2 28, a large rotating shaft 1 29, a large rotating shaft 2 30, a cleaning plate 1 31, a cleaning plate 2 32, a sunshade surface 33, a cleaning surface 34, a small rotating shaft 1 35, a small rotating shaft 2 36, a connecting rod 1 37 and a connecting rod 2 37. The slider 22 is movably connected to the bracket 17, the wire rope 1 23 is fixedly connected to the slider 22, the large T-shaped plate 24 is fixedly connected to the slider 22, the connecting column 25 is fixedly connected to the large T-shaped plate 24, the small T-shaped plate 26 is rotatably connected to the connecting column 25, the rocker 27 is fixedly connected to the small T-shaped plate 26, and the wire rope 2 28 is fixedly connected to the rocker 27. , the large rotating shaft 29 is fixedly connected to the large T-shaped plate 24, the large rotating shaft 2 30 is fixedly connected to the large T-shaped plate 24, the cleaning plate 1 31 is fixedly connected to the large rotating shaft 29, the cleaning plate 2 32 is fixedly connected to the large rotating shaft 2 30, the sunshade surface 33 is fixedly connected to the upper parts of the cleaning plates 1 31 and 2 32, the cleaning surface 34 is fixedly connected to the bottoms of the cleaning plates 1 31 and 2 32, the small rotating shaft 1 35 is fixedly connected to the cleaning plate 1 31, the small rotating shaft 2 36 is fixedly connected to the cleaning plate 2 32, one end of the connecting rod 1 37 is rotatably connected to the small rotating shaft 1 35 and the other end is rotatably connected to the large rotating shaft 1 29, one end of the connecting rod 2 37 is rotatably connected to the small rotating shaft 2 36 and the other end is rotatably connected to the large rotating shaft 2 30.
[0023] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the connecting block 7 is arranged between the screw 6 and the large leg 8, the small leg 10 is arranged between the large leg 8 and the steel chisel 14, the display board 16 is arranged between the cleaning plate 1 31 and the cleaning plate 2 32, the large T-shaped plate 24 is arranged between the large rotating shaft 1 29 and the large rotating shaft 2 30, and the small T-shaped plate 26 is arranged between the small rotating shaft 1 35 and the small rotating shaft 2 36.
[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the screw 6 is arranged parallel to the pillar 1, the small leg 10 is arranged parallel to the large leg 8, the fixing seat 13 is arranged vertically to the steel chisel 14, the bracket 17 is arranged parallel to the display board 16, the support plate 19 is arranged vertically to the display board 16, the large T-shaped plate 24 is arranged vertically to the bracket 17, the small T-shaped plate 26 is arranged parallel to the large T-shaped plate 24, and the small T-shaped plate 26 is arranged vertically to the large rotating shaft 29.
[0025] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the large leg 8 is rectangular, the small leg 10 is rectangular, the latch 12 is cylindrical, the large rotating shaft 29 is cylindrical, the small rotating shaft 35 is cylindrical, the display board 16 is rectangular, the sunshade surface 33 is rectangular, and the cleaning surface 34 is rectangular.
[0026] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the pillar 1 is provided with one group, the large legs 8 are provided with four groups, the small legs 10 are provided with four groups, the steel drills 14 are provided with four groups, the brackets 17 are provided with two groups, the large T-shaped plates 24 are provided with two groups, the small T-shaped plates 26 are provided with two groups, the large rotating shaft 29 is provided with two groups, the small rotating shaft 35 is provided with two groups, the wire rope 1 23 is provided with two groups, the wire rope 28 is provided with two groups, and the pulley 18 is provided with four groups.
[0027] When in use, first open the large leg 8 to make it tilted with the pillar 1, and then fix the pillar 1 to the ground, rotate the screw 6 according to the installation requirements, adjust the position relationship between the small leg 10 and the large leg 8, and after meeting the requirements, insert the pin 12 into the adjusting hole 11 and the adjusting hole 19, insert the steel chisel 14 into the fixing seat 13, and the pillar 1 can be fixed. The display board 16 can display the construction progress. When cleaning is not required, tighten the wire rope 1 23 and wrap it around the binding rod 1 20, and then tie the wire rope 2 28 to the binding rod 21. After the wire rope 28 is tightened, the rocker 27 rotates after being subjected to tension, driving the small T-shaped plate 26 to rotate with the connecting column 25 as the axis, and the small rotating shaft 1 35 and the small rotating shaft 2 36 are respectively driven by the connecting rod 1 37 and the connecting rod 2 37 to The cleaning plate 1 31 rotates clockwise with the large rotating shaft 1 29 as the axis, and the cleaning plate 2 32 rotates counterclockwise with the large rotating shaft 2 30 as the axis until the two are staggered, and the sunshade surface 33 is at the outermost side to shield the display board 16 from wind and rain to form a protection. When the display board 16 needs to be cleaned, the wire rope 28 is loosened, and the cleaning plate 1 31 and the cleaning plate 2 32 are arranged in parallel to clamp the display board 16, and the cleaning surface 34 is close to the display board 16, and the wire rope 1 23 is slowly released. Due to gravity, the cleaning plate falls in the direction of the bracket 17. When falling, the cleaning surface 34 wipes the display board 16 to complete the cleaning of the contaminated surface. After cleaning, the wire rope 1 23 and the wire rope 2 28 can be tightened again. The above is the use process of the entire construction project management project progress display device.
[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
[0030] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A construction project progress display device for construction project management, characterized in that: It includes a pillar, a fixing unit, a supporting unit and a cleaning unit, wherein the fixing unit is arranged on the pillar, the supporting unit is arranged on the pillar, the cleaning unit is arranged on the supporting unit, the supporting unit includes a thread, a screw, a connecting block, a large leg, an adjustment hole one, a small leg, an adjustment hole two, a latch, a fixing seat and a steel chisel, the thread is fixedly connected to the pillar, the screw is rotatably connected to the thread, the connecting block is fixedly connected to the side of the screw, the large leg is rotatably connected to the connecting block, the adjustment hole one is fixedly connected to the large leg, the small leg is slidably connected to the large leg, the adjustment hole two is fixedly connected to the small leg, the latch is inserted and connected on the adjustment hole two, the fixing seat is rotatably connected to the bottom of the small leg, and the steel chisel is movably connected to the fixing seat.
2. The construction project management project progress display device according to claim 1, characterized in that: The support unit includes a frame, a display board, a bracket, a pulley, a support plate, a first binding rod and a second binding rod. The frame is fixedly connected to the pillar, the display board is fixedly connected to the frame, the bracket is fixedly connected to the side of the frame, the pulley is fixedly connected to the bracket, the support plate is fixedly connected to the bottom of the frame, the first binding rod is fixedly connected to the side of the support plate, and the second binding rod is fixedly connected to the side of the support plate.
3. The construction project management project progress display device according to claim 2, characterized in that: The cleaning unit includes a slider, a steel wire rope 1, a large T-shaped plate, a connecting column, a small T-shaped plate, a rocker, a steel wire rope 2, a large rotating shaft 1, a large rotating shaft 2, a cleaning plate 1, a cleaning plate 2, a sunshade surface, a cleaning surface, a small rotating shaft 1, a small rotating shaft 2, a connecting rod 1 and a connecting rod 2. The slider is movably connected to the bracket, the steel wire rope 1 is fixedly connected to the slider, the large T-shaped plate is fixedly connected to the slider, the connecting column is fixedly connected to the large T-shaped plate, the small T-shaped plate is rotatably connected to the connecting column, the rocker is fixedly connected to the small T-shaped plate, the steel wire rope 2 is fixedly connected to the rocker, the large rotating shaft 1 is fixedly connected to On the large T-shaped plate, the large rotating shaft 2 is fixedly connected to the large T-shaped plate, the cleaning plate 1 is fixedly connected to the large rotating shaft 1, the cleaning plate 2 is fixedly connected to the large rotating shaft 2, the sunshade surface is fixedly connected to the upper parts of the cleaning plates 1 and 2, the cleaning surface is fixedly connected to the bottoms of the cleaning plates 1 and 2, the small rotating shaft 1 is fixedly connected to the cleaning plate 1, the small rotating shaft 2 is fixedly connected to the cleaning plate 2, one end of the connecting rod 1 is rotatably connected to the small rotating shaft 1 and the other end is rotatably connected to the large rotating shaft 1, one end of the connecting rod 2 is rotatably connected to the small rotating shaft 2 and the other end is rotatably connected to the large rotating shaft 2.
4. The construction project management project progress display device according to claim 3, characterized in that: The connecting block is arranged between the screw and the large leg, the small leg is arranged between the large leg and the steel chisel, the display board is arranged between the cleaning plate 1 and the cleaning plate 2, the large T-shaped plate is arranged between the large rotating shaft 1 and the large rotating shaft 2, and the small T-shaped plate is arranged between the small rotating shaft 1 and the small rotating shaft 2.
5. The construction project management project progress display device according to claim 4, characterized in that: The screw is arranged parallel to the pillar, the small leg is arranged parallel to the second large leg, the fixing seat is arranged vertically to the steel chisel, the bracket is arranged parallel to the display board, the support plate is arranged vertically to the display board, the large T-shaped plate is arranged vertically to the bracket, the small T-shaped plate is arranged parallel to the large T-shaped plate, and the small T-shaped plate is arranged vertically to the large rotating shaft 1.
6. The construction project management project progress display device according to claim 5, characterized in that: The large supporting leg is rectangular, the small supporting leg is rectangular, the latch is cylindrical, the large rotating shaft 1 is cylindrical, the small rotating shaft 1 is cylindrical, the display board is rectangular, the sunshade surface is rectangular, and the cleaning surface is rectangular.
7. The construction project management project progress display device according to claim 6, characterized in that: The pillars are provided with one group, the large legs are provided with four groups, the small legs are provided with four groups, the steel chisels are provided with four groups, the brackets are provided with two groups, the large T-shaped plates are provided with two groups, the small T-shaped plates are provided with two groups, the large rotating shaft 1 is provided with two groups, the small rotating shaft 1 is provided with two groups, the steel wire rope 1 is provided with two groups, the steel wire rope 2 is provided with two groups, and the pulleys are provided with four groups.
