Ecological footpath

By designing structures such as fine sand layers, permeable bricks, balance pads and drainage arc pipes in sponge city walking trails, the problems of low drainage efficiency and safety hazards of traditional walking trails have been solved, rapid water permeability and effective drainage have been achieved, and the use of the walking trails has been improved. Security.

CN221810492UInactive Publication Date: 2024-10-08邵玥
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420859509.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The ground of traditional sponge city walking paths, parks, squares and other areas is flat and hardened, which makes it difficult for water to drain out after precipitation. It lacks a permeable structure and has low drainage efficiency, which can easily cause the ground to slip, and the ground bricks can easily loosen after being stepped on many times. There are safety risks.

Method used

An ecological trail is designed, which includes a fine sand layer on the original soil layer of the trail, edge boards on the left and right, balance pads and permeable bricks, limit baffles and permeable nets on the edges of the permeable bricks, and drainage arcs installed on the right edge board. Pipes and main manifolds, combined with ecological planting grooves, form a permeable and drainage system.

Benefits of technology

It improves the water permeability efficiency, avoids the accumulation of water on the surface of the trail after rainfall, enhances the compression and anti-offset capabilities of permeable bricks, improves drainage efficiency, and uses rainwater through green plants and drainage systems to reduce ground slippage and safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810492U_ABST
    Figure CN221810492U_ABST
Patent Text Reader

Abstract

The utility model provides an ecological footpath, which relates to the technical field of ecological footpaths, and comprises a footpath original soil layer, a fine sand layer and a fine sand layer, a left edge plate is arranged on the left side of the footpath original soil layer, a right edge plate is arranged on the right side of the footpath original soil layer, the left edge plate and the right edge plate are both perpendicular to the upper surface of the footpath original soil layer, a balance cushion frame is arranged above the footpath original soil layer, and a balance cushion frame body is buried in a fine sand layer. Water on the surface of the footpath can rapidly permeate into the ground after rainfall, normal passing is prevented from being affected, and the problems that in areas such as footpaths, parks and squares of traditional sponge cities, most of the ground is flat hardened road surfaces, so that the water on the ground after rainfall is not easy to discharge, corresponding permeable structures and water guiding structures are lacked, and construction is inconvenient are solved. The problems that in the prior art, ground slipping is easily caused by low drainage efficiency, passing is affected, meanwhile, ground bricks are easily loosened after being treaded for multiple times, the passing feeling of pedestrians is affected, and potential safety hazards exist are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ecological trails, in particular to an ecological trail. Background Art

[0002] As urban stormwater problems become increasingly serious, traditional drainage systems can no longer meet the needs of sustainable urban development. The concept of sponge city has emerged, emphasizing that cities should be like sponges, with good "elasticity" in adapting to environmental changes and coping with natural disasters caused by rain. They should absorb, store and purify water when it rains, and release and utilize the stored water when needed, in order to make the city more "elastic".

[0003] In traditional sponge cities, the ground in pedestrian paths, parks, squares and other areas is mostly flat hardened road surface, which makes it difficult to drain the water on the ground after precipitation. There is a lack of corresponding permeable structures and water guiding structures. The low drainage efficiency can easily cause the ground to slip, affecting traffic. At the same time, the ground bricks are prone to loosening after being stepped on many times, affecting the pedestrians' walking experience and posing a safety hazard. Utility Model Content

[0004] The disclosed embodiments relate to an ecological trail to solve the problem that in traditional sponge cities, the ground in pedestrian paths, parks, squares and other areas is mostly flat hardened road surface, which makes it difficult to drain the water on the ground after precipitation. There is a lack of corresponding permeable structures and water guiding structures. The low drainage efficiency can easily cause the ground to slip, affecting traffic. At the same time, the ground bricks are prone to loosening after being stepped on many times, affecting the pedestrian experience and posing a safety hazard.

[0005] In a first aspect of the present disclosure, an ecological trail is provided, which specifically includes an original soil layer of the trail, with a fine sand layer laid on the top; a left edge plate is provided on the left side of the original soil layer of the trail, and a right edge plate is provided on the right side of the original soil layer of the trail, the left edge plate and the right edge plate are both perpendicular to the upper surface of the original soil layer of the trail, a balancing pad frame is arranged above the original soil layer of the trail, the main body of the balancing pad frame is buried in the fine sand layer, permeable bricks are laid above the fine sand layer, the edge of the permeable bricks is located above the balancing pad frame, and a limiting baffle is fixedly connected above the original soil layer of the trail, and the limiting baffle is located at the left edge of the permeable brick.

[0006] In at least some embodiments, an ecological planting trough is provided on the right edge of the upper surface of the original soil layer of the trail.

[0007] In at least some embodiments, a drainage arc pipe is installed transversely through the right edge plate, the left end of the drainage arc pipe is bent downward, the opening of the drainage arc pipe faces downward, the axis height of the horizontal pipe part of the drainage arc pipe is 2cm-4cm lower than the bottom surface of the permeable brick, and the right end of the drainage arc pipe is fixedly connected to a main collector pipe, which is perpendicular to the horizontal pipe part of the drainage arc pipe.

[0008] In at least some embodiments, the front and rear surfaces of the balancing pad frame are vertically machined with pad support plates, the upper edge of the pad support plates is 2 cm lower than the upper edge of the middle plate body of the balancing pad frame, and pad column are fixedly connected to the outer edge of the pad support plates at the leftmost end, the rightmost end and the middle.

[0009] In at least some embodiments, the front edge and the rear edge of the lower surface of the permeable brick are respectively provided with a directional card slot with a depth of 2 cm, and the directional card slot is in contact with the upper edge of the middle plate of the balance pad frame.

[0010] In at least some embodiments, the limit baffle is a plate body with an "L"-shaped cross-section, a baffle water permeable port is opened on the limit baffle, the upper edge of the baffle water permeable port is flush with the lower surface of the permeable brick, a stainless steel permeable net is fixedly connected inside the baffle water permeable port, the front and rear ends of the limit baffle are fixedly connected with baffle docking edges, and the baffle docking edges of two adjacent limit baffles are fixedly connected by bolts.

[0011] In at least some embodiments, planting soil is provided on the right side of the limit baffle, above the ecological planting trough, and on the left side of the right edge plate, and green plants are planted in the planting soil.

[0012] The utility model provides an ecological trail, which has the following beneficial effects:

[0013] The ecological trail in the utility model is paved with permeable bricks with good water permeability, and a fine sand layer is used for padding under the permeable bricks. When it rains, rainwater contacts the permeable bricks, penetrates downward along the permeable bricks with a porous structure, and penetrates into the fine sand layer. The fine sand layer is paved with fine sand and has many gaps, so that rainwater can quickly penetrate into it, thereby improving the water permeability efficiency, so that the water on the surface of the trail after rainfall can quickly penetrate into the ground to avoid affecting normal traffic.

[0014] In addition, a balancing pad is buried inside the fine sand layer, and the upper edge of the pad support plate is flush with the upper surface of the fine sand layer. When laying permeable bricks, the lower surface edge of the permeable bricks contacts the upper edge of the pad support plate to provide auxiliary support for the permeable bricks, further improving the compression and anti-deviability strength of the permeable bricks, and avoiding sinking and deflection of the permeable bricks due to an increase in the number of trampling times.

[0015] In addition, a green plant planting area is set at the right edge of the fine sand layer and permeable bricks. When rainwater enters the fine sand layer, the rainwater will pass through the opening of the baffle water permeable port and enter the green plant planting area to increase the humidity of the soil. When the water level is too high and exceeds the horizontal pipe height of the drainage arc pipe, the water inside the planting area will enter the main confluence pipe along the drainage arc pipe and be transported to lakes and rivers through the main confluence pipe for storage. While improving the drainage efficiency, rainwater can be used to infiltrate the soil for planting green plants. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solution of the embodiment of the utility model, the drawings of the embodiment will be briefly introduced below.

[0017] The drawings described below only relate to some embodiments of the present invention, but are not intended to limit the present invention.

[0018] In the attached picture:

[0019] Figure 1 A schematic diagram showing the overall structure of the present application;

[0020] Figure 2 Shows this application Figure 1 A schematic diagram of the front view of the structure;

[0021] Figure 3 A schematic diagram of the structure of the balancing pad frame of the present application is shown;

[0022] Figure 4 The schematic diagram of the structure of the permeable brick of the present application is shown;

[0023] Figure 5 A schematic diagram of the structure of the limit baffle of the present application is shown;

[0024] Figure 6 A schematic structural diagram of the right edge plate of the present application is shown.

[0025] Reference numerals list

[0026] 1. Original soil layer of the trail; 101. Ecological planting trough; 2. Left edge board; 3. Right edge board; 301. Drainage arc pipe; 302. Main conduit; 4. Fine sand layer; 5. Balance pad frame; 501. Pad frame support plate; 502. Pad frame plug column; 6. Permeable brick; 601. Directional slot; 7. Limit baffle; 701. Baffle water permeable port; 702. Permeable net; 703. Baffle docking edge. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution of the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings of the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the described embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] Example 1: Please refer to Figures 1 to 6 :

[0029] The utility model proposes an ecological trail, comprising an original soil layer 1 of the trail, with a fine sand layer 4 laid on the top; a left edge plate 2 is provided on the left side of the original soil layer 1 of the trail, and a right edge plate 3 is provided on the right side of the original soil layer 1 of the trail, both the left edge plate 2 and the right edge plate 3 are perpendicular to the upper surface of the original soil layer 1 of the trail, a balancing cushion frame 5 is arranged above the original soil layer 1 of the trail, the main body of the balancing cushion frame 5 is buried in the fine sand layer 4, permeable bricks 6 are laid above the fine sand layer 4, and the edge of the permeable brick 6 is located above the balancing cushion frame 5, a limited baffle plate 7 is fixedly connected above the original soil layer 1 of the trail, the limited baffle plate 7 is located at the left edge of the permeable brick 6, an ecological planting trough 101 is opened on the right edge of the upper surface of the original soil layer 1 of the trail, planting soil is provided on the right side of the limited baffle plate 7, above the ecological planting trough 101 and the left side space of the right edge plate 3, and green plants are planted in the planting soil, so that greening and the trail are combined, and the trail is made more ecological and beautiful.

[0030] In the disclosed embodiment, a drainage arc pipe 301 is installed transversely through the right edge plate 3, the left end of the drainage arc pipe 301 is bent downward, the opening of the drainage arc pipe 301 faces downward, the axis height of the transverse pipe part of the drainage arc pipe 301 is 2cm-4cm lower than the bottom surface of the permeable brick 6, and the right end of the drainage arc pipe 301 is fixedly connected to a main conduit 302, which is perpendicular to the transverse pipe part of the drainage arc pipe 301, to ensure that the water level of the walkway will not be higher than the bottom surface of the permeable brick 6, to avoid the water level exceeding the permeable brick 6 and flooding the ground due to excessive precipitation.

[0031] In the embodiment of the present disclosure, the front and rear surfaces of the balancing pad frame 5 are vertically processed with pad frame support plates 501, and the upper edge of the pad frame support plate 501 is 2 cm lower than the upper edge of the middle plate body of the balancing pad frame 5, and the outer edge positions of the pad frame support plates 501 located at the leftmost end, the rightmost end and the middle are fixedly connected with pad frame plug posts 502, and the front and rear edges of the lower surface of the permeable brick 6 are respectively provided with a directional card groove 601 with a depth of 2 cm, and the directional card groove 601 is in contact with the upper edge of the middle plate body of the balancing pad frame 5; the pad frame plug posts 502 are inserted into the fine sand layer 4 to improve the stability of the balancing pad frame 5, and the upper edge of the pad frame support plate 501 is flush with the upper surface of the fine sand layer 4. When the permeable brick 6 is laid, the edge of the lower surface of the permeable brick 6 is in contact with the upper edge of the pad frame support plate 501, which firmly supports the edge of the permeable brick 6, improves the compression resistance and anti-deviation effect of the permeable brick 6, and avoids the sinking and deflection of the permeable brick 6 due to an increase in the number of trampling times.

[0032] Embodiment 2, on the basis of embodiment 1, the limit baffle 7 is a plate body with an "L"-shaped cross-section, a baffle water permeable port 701 is opened on the limit baffle 7, the upper edge of the baffle water permeable port 701 is flush with the lower surface of the permeable brick 6, a stainless steel permeable net 702 is fixedly connected inside the baffle water permeable port 701, the front and rear ends of the limit baffle 7 are fixedly connected with a baffle docking edge 703, and the baffle docking edges 703 of the two adjacent limit baffles 7 are fixedly connected by bolts; a plurality of groups of limit baffles 7 are combined to form an enclosure to enclose the edge of the ecological trail, and the permeable net 702 is used to prevent soil from entering the fine sand layer 4 and clogging it, thereby affecting its permeability, and the setting of the permeable net 702 allows water inside the fine sand layer 4 to enter the greening planting area to humidify the soil in the greening planting area.

[0033] The working principle of this embodiment is as follows: first, a fine sand layer 4 is laid on top of the original soil layer 1 of the trail, and a balancing pad frame 5 is installed in the fine sand layer 4 so that the upper edge of the pad frame support plate 501 is flush with the upper surface of the fine sand layer 4, and permeable bricks 6 are laid on top of the fine sand layer 4, and the directional slots 601 are fitted with the upper edge of the balancing pad frame 5. When it rains, rainwater contacts the upper surface of the permeable bricks 6 and penetrates into the permeable bricks 6, flowing into the fine sand layer 4 below for storage. When a certain amount is stored, the water inside the fine sand layer 4 flows to the right through the baffle water permeable port 701, passes through the permeable net 702 and enters the green plant planting area on the right side of the limit baffle 7, and penetrates into the soil in the planting area to increase the humidity of the soil. When the water level in the soil exceeds the horizontal pipe height of the drainage arc pipe 301, the water inside the planting area will enter the main conduit 302 along the drainage arc pipe 301, and be transported to lakes and rivers through the main conduit 302 for storage.

[0034] In this article, there are a few points to note:

[0035] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.

[0036] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0037] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.

Claims

1. An ecological trail, comprising: The original soil layer (1) of the walkway is provided with a fine sand layer (4) on the top, and is characterized in that a left edge plate (2) is provided on the left side of the original soil layer (1) of the walkway, and a right edge plate (3) is provided on the right side of the original soil layer (1) of the walkway, and the left edge plate (2) and the right edge plate (3) are both perpendicular to the upper surface of the original soil layer (1) of the walkway, and a balancing pad frame (5) is arranged on the top of the original soil layer (1) of the walkway, and the main body of the balancing pad frame (5) is buried in the fine sand layer (4), and permeable bricks (6) are laid on the top of the fine sand layer (4), and the edge of the permeable bricks (6) is located above the balancing pad frame (5), and a limit baffle (7) is fixedly connected to the top of the original soil layer (1) of the walkway, and the limit baffle (7) is located at the left edge of the permeable brick (6).

2. An ecological trail according to claim 1, characterized in that: An ecological planting trough (101) is provided at the right edge of the upper surface of the original soil layer (1) of the trail.

3. The ecological trail according to claim 1, characterized in that: A drainage arc pipe (301) is installed on the right edge plate (3) to penetrate horizontally. The left end of the drainage arc pipe (301) is bent downward, and the opening of the drainage arc pipe (301) faces downward. The axis height of the horizontal pipe part of the drainage arc pipe (301) is 2 cm to 4 cm lower than the bottom surface of the permeable brick (6). The right end of the drainage arc pipe (301) is fixedly connected to a main converging pipe (302), and the main converging pipe (302) is perpendicular to the horizontal pipe part of the drainage arc pipe (301).

4. The ecological trail according to claim 1, characterized in that: The front and rear surfaces of the balancing pad frame (5) are vertically processed with pad frame support plates (501), the upper edge of the pad frame support plate (501) is 2 cm lower than the upper edge of the middle plate body of the balancing pad frame (5), and the outer edge positions of the pad frame support plates (501) at the leftmost end, the rightmost end and the middle are fixedly connected to pad frame plug posts (502).

5. The ecological trail according to claim 1, characterized in that: The front edge and the rear edge of the lower surface of the permeable brick (6) are respectively provided with a directional card slot (601) with a depth of 2 cm, and the directional card slot (601) is in contact with the upper edge of the middle plate of the balancing pad frame (5).

6. The ecological trail according to claim 2, characterized in that: The limit baffle (7) is a plate body with an "L"-shaped cross section. The limit baffle (7) is provided with a baffle water permeable opening (701). The upper edge of the baffle water permeable opening (701) is flush with the lower surface of the permeable brick (6). A stainless steel permeable net (702) is fixedly connected inside the baffle water permeable opening (701). The front end and the rear end of the limit baffle (7) are both fixedly connected with a baffle docking edge (703).

7. An ecological trail according to claim 6, characterized in that: Planting soil is provided on the right side of the limit baffle (7), above the ecological planting trough (101) and on the left side of the right edge plate (3).