Drainage structure of small-section oil pipe tunnel

By setting up water collection wells and drainage ditches in small-section oil pipe tunnels, combined with float-type water pumps and filters, the drainage problem of large water inflows is solved, construction safety and efficiency are improved, and labor costs are reduced.

CN221810852UActive Publication Date: 2024-10-08CHINA RAILWAY SEVENTH GRP CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420532821.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-10-08
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

In the construction of small-section oil pipe tunnels, existing technologies are difficult to effectively deal with the drainage problem of large water inflows, resulting in low construction efficiency and safety and quality risks. In addition, the existing drainage scheme has problems such as large cross-interference and poor construction conditions.

Method used

A drainage structure including a water collection well, a bottom plate and a drainage ditch is designed. The water collection well is welded by steel plates, and the bottom plate is cast by concrete. A water pump and drainage channel are set up, and water is intercepted in sections through a float-type water pump and a filter. and emissions to ensure construction safety.

Benefits of technology

By setting up a water collection well in the middle of the tunnel and building drainage ditches on both sides, this drainage structure uses water pumps, drainage channels and filters to effectively intercept water seepage in the tunnel, ensure construction safety, reduce drainage pressure and reduce labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810852U_ABST
    Figure CN221810852U_ABST
Patent Text Reader

Abstract

The utility model discloses a small-section oil pipe tunnel drainage structure which comprises a water collecting well formed by welding steel plates and buried below the middle section of a tunnel, and a bottom plate laid at the bottom of the tunnel. Two rows of drainage ditches are formed on the bottom plate along the two sides of the primary support section and the inner wall of the tunnel at certain intervals; a water pump is arranged in the water-collecting well, the drainage end of the water pump is connected to the outside of the tunnel through a pipeline, a drainage channel is arranged between the water-collecting well and the drainage ditch, one end of the drainage channel is connected with the drainage ditch, and the other end of the drainage channel is connected with the water-collecting well; according to the drainage structure, the water collecting well is built in the middle of the tunnel, the water suction pump is arranged in the water collecting well, the ditches are built on the two sides of the tunnel, seepage water of the side wall is intercepted into the nearby water collecting well in a segmented mode in time, and safety of driving construction in the tunnel is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of small-section oil pipe tunnel drainage structures. More specifically, the utility model relates to a small-section oil pipe tunnel drainage structure. Background Art

[0002] With the increasing share of large-scale hydropower projects, water diversion projects, sewage projects, oil pipeline projects, etc. in the construction market in recent years, small-section tunnels are indispensable engineering projects in the above projects.

[0003] The characteristics of small-section oil pipeline tunnels are generally small cross-section, long tunnel lines, multiple processes, large cross-interference, poor construction conditions, and long construction periods. In the construction of large reverse slope oil pipeline tunnels with large water inflow, the rationality of the drainage plan is particularly important and is also the key controlling factor for the success or failure of tunnel construction. If it is not handled properly, it will affect the construction efficiency at the least and cause safety and quality accidents at the worst. Therefore, it is necessary to develop a drainage structure. Utility Model Content

[0004] In order to achieve these purposes and other advantages according to the utility model, a preferred embodiment of the utility model provides a small-section oil pipe tunnel drainage structure, comprising:

[0005] A water collection well, which is welded from steel plates and is buried below the middle section of the tunnel. A plurality of water collection wells are arranged at intervals along the length of the tunnel;

[0006] The bottom plate is made of concrete and laid at the bottom of the tunnel; the bottom plate forms two rows of drainage ditches at a certain distance along both sides of the primary support section and the inner wall of the tunnel;

[0007] The bottom plate is provided with through holes corresponding to the water collection well to connect with the water collection well. A water pump is arranged in the water collection well. The drainage end of the water pump is connected to the outside of the tunnel through a pipeline. A drainage channel is arranged between the water collection well and the drainage ditch. One end of the drainage channel is connected to the drainage ditch, and the other end is connected to the water collection well to discharge the water in the drainage ditch into the water collection well.

[0008] According to a preferred embodiment of the present utility model, the water pump is a float type water pump.

[0009] According to a preferred embodiment of the present invention, a cover plate can be detachably mounted on the through hole surface of the bottom plate surface.

[0010] According to a preferred embodiment of the utility model, at least one drainage channel is transversely arranged in the bottom plate.

[0011] According to a preferred embodiment of the utility model, the upper end surface of the water collection well is lower than the drainage outlet of the drainage ditch.

[0012] According to a preferred embodiment of the utility model, a filter screen is installed at one end of the drainage channel connected to the water collection well, and the filter screen is detachably installed on the end of the drainage channel connected to the water collection well by a bolt structure. The filter screen includes a square-shaped double-layer filter screen body and a central filter plate inserted therein, and one end of the double-layer filter screen body is open for the insertion of the central filter plate.

[0013] The utility model at least includes the following beneficial effects: the drainage structure of the utility model adopts a water collection well built in the middle of the tunnel, a water pump is arranged in the well, and ditches are built on both sides of the tunnel, so as to timely intercept the seepage of the side wall in sections and enter the nearest water collection well to ensure the safety of driving construction in the tunnel.

[0014] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is the front view of the small and medium-section oil pipe tunnel drainage structure of the utility model.

[0016] Figure 2 This is a cross-sectional view of the drainage structure of a small and medium-section oil pipe tunnel of the utility model.

[0017] Figure 3 It is a structural schematic diagram of the filter screen in the utility model. DETAILED DESCRIPTION

[0018] The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0019] The following description is used to disclose the utility model so that those skilled in the art can implement the utility model. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the utility model defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the utility model.

[0020] Those skilled in the art should understand that, in the disclosure of the present invention, the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.

[0021] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.

[0022] like Figure 1-3 As shown, a preferred embodiment of the utility model provides a small-section oil pipeline tunnel drainage structure, comprising:

[0023] The water collection well 1 is welded by steel plates and is buried below the middle section of the tunnel. A plurality of water collection wells 1 are arranged at intervals along the length direction of the tunnel 2. The water collection well is buried below the middle section of the tunnel.

[0024] The bottom plate 3 is made of concrete and laid at the bottom of the tunnel 2; the bottom plate 3 forms two rows of drainage ditches 4 at a certain distance along both sides of the primary support section and the inner wall of the tunnel;

[0025] The bottom plate 3 is provided with through holes corresponding to the water collecting well 1 to connect with the water collecting well 1. A water pump 5 is arranged in the water collecting well 1. The drainage end of the water pump 5 is connected to the outside of the tunnel through a pipeline. A drainage channel 6 is arranged between the water collecting well and the drainage ditch. One end of the drainage channel 6 is connected to the drainage ditch 4 and the other end is connected to the water collecting well 1 to discharge the water in the drainage ditch into the water collecting well 1. The water pump is a float type water pump.

[0026] In the above technical scheme, drainage ditches 4 are constructed on both sides of the initial support section of the tunnel. The drainage ditches will collect the water discharged from the tunnel. Then, since a collection well is arranged in the middle section of the tunnel, the collected water will be intercepted in sections into the nearest collection well according to the water discharge situation in the cave. If the amount of water is large, it will automatically flow into the collection well 1. Reasonable optimization avoids all the water from being concentrated on the heading face, reduces drainage pressure, and a water pump is also arranged in the collection well to reduce labor cost expenditure.

[0027] In another technical solution, a cover plate can be removably installed on the surface of the through hole on the bottom plate. After the water collection well pump is installed, it is covered with a 1 cm thick steel plate to prevent people and machinery from falling in and ensure driving safety in the hole.

[0028] In another technical solution, at least one drainage channel is transversely arranged in the bottom plate 3, and the number of the drainage channels is.

[0029] In another technical solution, the upper end surface of the water collection well 1 is lower than the drainage outlet of the drainage ditch, which is conducive to discharging water from the drainage ditch into the water collection well 1.

[0030] In another technical solution, a filter screen 5 is installed at one end of the drainage channel connected to the water collection well to filter the collected tunnel water. The filter screen 5 is detachably installed on the end of the drainage channel connected to the water collection well through a bolt structure. The filter screen 5 includes a square-shaped double-layer filter screen body 5-1 and a central filter plate 5-2 inserted therein. One end of the double-layer filter screen body 5-1 is open for the insertion of the central filter plate 5-2. The central filter plate 5-2 is designed to be plug-in type, mainly to facilitate later replacement. For example, central filter plates 5-2 of different densities can be replaced according to the size of the residue to be filtered.

[0031] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A small-section oil pipe tunnel drainage structure, characterized in that: include: A water collection well, which is welded from steel plates and is buried below the middle section of the tunnel. A plurality of water collection wells are arranged at intervals along the length of the tunnel; The bottom plate is made of concrete and laid at the bottom of the tunnel; the bottom plate forms two rows of drainage ditches at a certain distance along both sides of the primary support section and the inner wall of the tunnel; The bottom plate is provided with through holes corresponding to the water collection well to connect with the water collection well. A water pump is arranged in the water collection well. The drainage end of the water pump is connected to the outside of the tunnel through a pipeline. A drainage channel is arranged between the water collection well and the drainage ditch. One end of the drainage channel is connected to the drainage ditch, and the other end is connected to the water collection well to discharge the water in the drainage ditch into the water collection well.

2. The small-section oil pipeline tunnel drainage structure according to claim 1 is characterized in that: The water pump is a float type water pump.

3. The small-section oil pipeline tunnel drainage structure according to claim 1 is characterized in that: The through hole surface on the bottom plate surface can be detachably mounted with a cover plate.

4. The small-section oil pipeline tunnel drainage structure according to claim 1 is characterized in that: At least one drainage channel is transversely arranged in the bottom plate.

5. The small-section oil pipeline tunnel drainage structure according to claim 1 is characterized in that: The upper end surface of the water collection well is lower than the drainage outlet of the drainage ditch.

6. The small-section oil pipeline tunnel drainage structure according to claim 1 is characterized in that: A filter screen is installed at one end of the drainage channel connected to the water collection well. The filter screen is detachably installed on the end of the drainage channel connected to the water collection well through a bolt structure. The filter screen includes a square-shaped double-layer filter screen body and a central filter plate inserted therein. One end of the double-layer filter screen body is open for the insertion of the central filter plate.