Installation device for hub system of wind generating set
By designing a wind turbine hub system installation device with a rotatable hanging plate and a hydraulic drive device, the problem of stable contact of the offshore wind turbine hub hoist under the influence of wind and waves is solved, and efficient and safe hub hoisting operations are achieved.
Patent Information
- Application Number
- CN202420567159.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-22
AI Technical Summary
When the existing wind turbine hub spreader is installed at sea, it is difficult to stably contact the hub due to the influence of wind and waves, resulting in installation difficulties and high safety risks.
A wind turbine hub system installation device is designed, which includes a rotatable hanging plate and a hanging beam, equipped with a clamping component and a hydraulic drive device. The pad is inserted into the backing plate through a rope and the hub is clamped by a hydraulic cylinder to achieve stable lifting. operate.
It improves the efficiency and safety of wheel hub hoisting, reduces the risk of manual operation, and is suitable for complex offshore operating environments.
Smart Images

Figure CN221821689U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of hoisting equipment, and more specifically, to a wind turbine hub system installation device. Background Art
[0002] The hub is an important component of a wind turbine generator set. It has a special structure, large size, complex shape, and is difficult to hoist. At present, offshore wind turbines are in a rapid development stage, and the operating conditions of offshore wind turbines are complex and the operation window period is short. The hoisting equipment needs to be more professional and reliable. When the hub is transported in reverse, due to the influence of environmental factors such as wind and waves, it is difficult for the hub hoist to stably contact the hub on the ship, and the hub hoist is prone to collision with the hub, causing damage to the hub.
[0003] Existing hub hangers are mostly fixed to the hub by bolts. When the hub is transported backwards and there are wind and waves at sea, manual installation is very difficult and has poor safety.
[0004] In view of this, how to design a reliable and efficient wind turbine hub hanger is a technical problem that technical personnel in this field need to solve urgently. Utility Model Content
[0005] The present application provides a wind turbine hub system installation device, which realizes the lifting of the hub during the inverted transportation process, has a simple structure, is easy and efficient to install and operate, has high reliability and a good safety factor.
[0006] The present application provides a wind turbine hub system installation device, comprising:
[0007] A shackle, which is fixedly connected to the top of the hanging plate and is used to hang external lifting equipment;
[0008] A hanging plate rotatably connected to the hanging beam;
[0009] A hanging beam, on which is provided a hanging plate connecting portion for rotatably connecting the hanging plate and two symmetrically distributed pads for inserting ropes and respectively installing two clamping assemblies;
[0010] Two clamping assemblies are respectively fixedly mounted on the backing plate, and the clamping assemblies include clamps that can be opened and closed under the action of driving force to clamp or release the wheel hub.
[0011] In some embodiments, the bottom of the hanging plate is rotatably connected to the center of gravity of the hanging beam.
[0012] In some embodiments, the hanging plate is connected to the hanging beam via a transition assembly;
[0013] The adapter assembly includes a rotating shaft penetrating the hanging plate and the hanging beam, bearings arranged inside the hanging beam and sleeved on both ends of the rotating shaft, and a cover plate covered on the outer end of the rotating shaft.
[0014] In some embodiments, the fixture comprises:
[0015] A mounting seat, fixedly mounted on the pad;
[0016] A driving device, fixedly mounted on the mounting seat and used to provide driving force to the pressure rod;
[0017] A pressure rod is connected to the driving device and is used for being clamped on the inner wall of the wheel hub under the driving force of the driving device.
[0018] In some embodiments, a pressure head is provided at the front end of the pressure rod.
[0019] In some embodiments, the indenter is a rubber indenter.
[0020] In some embodiments, the pressing rod is detachably connected to the pressing head.
[0021] In some embodiments, the pressure head is disposed at the bottom of the pressure rod, and the pressure head extends in a direction perpendicular to the pressure rod and extends beyond a projection of the pressure rod in the vertical direction.
[0022] The wind turbine hub system installation device provided by the present application inserts a rope or a hanging beam into a pad, cooperates with a shackle and an external lifting device, and rotates the hanging beam by pulling the rope; then, the hanging beam is hoisted into the hub, and then the two clamps on the clamping assembly are driven to clamp the hub under the action of a driving force to perform the hub hoisting operation. After the operation is completed, the clamping assembly releases the hub under the action of a driving force, and the hub can be reused.
[0023] The present application overcomes the current defect that the hoist and the hub cannot stably contact when the hoist is affected by wind and waves during offshore transportation and installation, thereby improving the hoisting efficiency and reducing the safety risks of manual hoisting. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0025] Figure 1 A schematic diagram of the three-dimensional structure of the wind turbine hub system installation device provided in this application;
[0026] Figure 2 A schematic diagram of the installation device for the hub system of a wind turbine generator set provided by the present application in a hub clamping state;
[0027] Figure 3 for Figure 2 Side view of
[0028] Figure 4 for Figure 1 An enlarged view of the I portion in FIG.
[0029] Among them, 1-shackle, 2-hanging plate, 3-hanging beam, 4-pad, 5-rotating shaft, 6-cover plate, 7-mounting seat, 8-driving device, 9-pressure rod, 10-wheel hub. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0031] refer to Figure 1 The present application provides a wind turbine hub system installation device, which mainly includes: a shackle 1, a hanging plate 2, a hanging beam 3 and two clamping components.
[0032] The shackle 1 is fixedly connected to the top of the hanging plate 2 for hanging external lifting equipment. The bottom of the hanging plate 2 is rotatably connected to the hanging beam 3.
[0033] like Figure 2 and Figure 3 As shown. A hanging plate connection part and two pads 4 are provided on the hanging beam 3, and the hanging plate connection part is rotatably connected to the hanging plate 2. The two pads 4 are fixed on the hanging beam 3 and are symmetrical with respect to the center of the hanging beam 3. The pads 4 installed on both sides of the hanging beam 3 can be inserted into the rope. After the rope is tightened, the pads 4 are used to fit the inner plane of the hub 10 to ensure the stability of the lifting.
[0034] The two clamping assemblies are respectively fixedly mounted on the backing plate 4, and the two clamping assemblies are driven to open and close to clamp the wheel hub 10. The clamping assembly has a clamp, which is symmetrically distributed on the suspension beam 3 and can be opened and closed under the action of a driving force to clamp or release the wheel hub 10.
[0035] Lift the sling above the wheel hub 10, use a sling or rope to put into the pad 4 on one side of the sling, pull the rope to rotate the sling beam 3, and then lift it into the wheel hub 10, drive the clamping assembly to lift the sling until the pad 4 fits the wheel hub 10, and through the combined action of the clamping assembly and the pad 4, the sling is firmly clamped on the wheel hub 10, and the hoisting operation of the wheel hub 10 can be carried out. After the operation is completed, the clamping assembly is controlled to open, and the sling can be separated from the wheel hub 10.
[0036] The clamping assembly in the present application can adapt to the working environment during offshore lifting, and while ensuring safety and convenience, it takes into account working efficiency, reduces operating difficulty and labor intensity, and saves assembly costs.
[0037] Preferably, the bottom of the hanging plate 2 is rotatably connected to the center of gravity of the hanging beam 3 to ensure the stability of the hanging.
[0038] Specifically, the hanging plate 2 is connected to the hanging beam 3 through an adapter assembly. The adapter assembly includes: a rotating shaft 5, a bearing and a cover plate 6. The rotating shaft 5 is installed horizontally on the hanging beam 3, and passes through the hanging plate 2 and the hanging beam 3 and is arranged inside the hanging beam 3. The ends of the rotating shaft 5 are fixed by locking members. Bearings are arranged in the left and right inner walls of the hanging beam 3, and the bearings are mounted on both ends of the rotating shaft 5. The cover plate 6 is covered on the outer end of the rotating shaft 5.
[0039] Such arrangement enables the hanging plate 2 to be connected to the hanging beam 3 via the rotating shaft, and the hanging plate 2 and the hanging beam 3 can rotate relative to each other, thereby adjusting the angle between the hanging plate 2 and the hanging beam 3 to facilitate the hanging device to enter the wheel hub 10.
[0040] like Figure 4 In a specific embodiment, the clamp includes: a mounting seat 7, a driving device 8 and a pressure rod 9, wherein the mounting seat 7 is fixedly mounted on the backing plate 4, the driving device 8 is fixedly mounted on the mounting seat 7, and the driving device 8 provides a driving force to the pressure rod 9. The pressure rod 9 is connected to the driving device 8, and the pressure rod 9 is pressed down and clamped on the inner wall of the wheel hub 10 under the driving force of the driving device 8.
[0041] The driving device 8 is fixed to the base plate 4 of the spreader by bolts. The driving device 8 is preferably a hydraulic cylinder, which is connected to the pressure rod 9 through the rotating shaft 5, and the hydraulic cylinder and the pressure rod 9 are fixed to the hydraulic mounting seat 7 through the rotating shaft 5. The hydraulic function is realized by connecting the hydraulic pump externally through the oil pipe.
[0042] In this embodiment, the extension and contraction of the hydraulic cylinder is controlled to firmly clamp the sling on the inner edge of the wheel hub 10. The use of a hydraulic cylinder to fix the sling has the advantages of high convenience, strong load bearing capacity, high reliability, stable performance, etc., especially on land, the hoisting drive device 8 can be disassembled and has high versatility.
[0043] In this embodiment, by controlling the hydraulic pump to drive the hydraulic cylinder to extend and retract, the pressure plate is moved to firmly fasten the sling to the hub 10. It has a simple structure, high mechanical efficiency, and high safety factor, and is particularly suitable for offshore transshipment and lifting operations.
[0044] It should be noted that the above-mentioned shackle 1, hanging beam 3 and hanging plate 2 in the present application can be designed according to the shape weight of the hung hub 10, and the specifications of the hydraulic cylinder are designed according to the weight of the hanger.
[0045] In addition, the driving device 8 can also be a cylinder to achieve pneumatic opening and closing, or it can be other linear driving devices 8.
[0046] In order to ensure the reliability of the pressing rod 9, a pressure head can be provided at the front end of the pressure rod 9, and a pressing force can be applied to the inner edge and outer wall of the hub through the pressure head to increase the pressing area and ensure stable and reliable clamping. The pressure head is preferably a pressure head made of soft material such as a rubber pressure head to avoid hard contact with the hub to scratch the hub, thereby effectively protecting the hub.
[0047] The pressure rod 9 and the pressure head can be detachably connected by means of a clamping connection, a threaded connection, or a bolt connection. In this way, a severely worn pressure head can be replaced without replacing the pressure rod 9 and the pressure head as a whole. The pressure rod 9 with intact functions can still be used normally, thereby saving costs. In addition, the detachable connection structure between the pressure rod 9 and the pressure head can facilitate the replacement of pressure heads of different sizes and is suitable for various types of pressure heads, thereby improving the wide range of applicability.
[0048] In a specific embodiment, the pressure head is arranged at the bottom of the pressure rod 9, and the pressure head extends in a direction perpendicular to the pressure rod 9 and extends beyond the projection of the pressure rod 9 in the vertical direction. With such an arrangement, when the pressure head is used to clamp the wheel hub, the clamping area between the wheel hub and the pressure head can be increased, the reliability of the clamping can be enhanced, and the clamping effect can be improved.
[0049] It should be noted that, in this specification, relational terms such as first and second are merely used to distinguish one entity from other entities, but do not necessarily require or imply any actual relationship or order between these entities.
[0050] The above is a detailed introduction to the installation device of the hub system of the wind turbine provided by the present application. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.
Claims
1. A wind turbine hub system installation device, characterized in that: include: A shackle (1), the shackle (1) being fixedly connected to the top of the hanging plate (2) and used for hanging external lifting equipment; A hanging plate (2), wherein the hanging plate (2) is rotatably connected to the hanging beam (3); A hanging beam (3) is provided with a hanging plate connecting portion for rotatably connecting the hanging plate (2) and two symmetrically distributed pads (4) for inserting ropes and respectively installing two clamping assemblies; Two clamping assemblies are respectively fixedly mounted on the backing plate (4), and the clamping assemblies include clamps that can be opened and closed under the action of a driving force to clamp or release the wheel hub (10).
2. The installation device for the hub system of a wind turbine generator set according to claim 1, characterized in that: The bottom of the hanging plate (2) is rotatably connected to the center of gravity of the hanging beam (3).
3. The installation device for the hub system of a wind turbine generator set according to claim 1, characterized in that: The hanging plate (2) and the hanging beam (3) are connected via a connecting assembly; The adapter assembly comprises a rotating shaft (5) passing through the hanging plate (2) and the hanging beam (3), bearings arranged inside the hanging beam (3) and sleeved on both ends of the rotating shaft (5), and a cover plate (6) covered on the outer end of the rotating shaft (5).
4. The installation device for the hub system of a wind turbine generator set according to any one of claims 1 to 3, characterized in that: The fixture comprises: A mounting seat (7) fixedly mounted on the backing plate (4); A driving device (8) fixedly mounted on the mounting seat (7) and used to provide a driving force to the pressure rod (9); A pressure rod (9) is connected to the driving device (8) and is used to be clamped on the inner wall of the wheel hub (10) under the driving force of the driving device (8).
5. The installation device for the hub system of a wind turbine generator set according to claim 4, characterized in that: The front end of the pressure rod (9) is provided with a pressure head.
6. The installation device for the hub system of a wind turbine generator set according to claim 5, characterized in that: The pressure head is a rubber pressure head.
7. The installation device for the hub system of a wind turbine generator set according to claim 5, characterized in that: The pressing rod (9) is detachably connected to the pressing head.
8. The installation device for the hub system of a wind turbine generator set according to any one of claims 5 to 7, characterized in that: The pressure head is arranged at the bottom of the pressure rod (9), and the pressure head extends in a direction perpendicular to the pressure rod (9) and extends beyond the projection of the pressure rod (9) in the vertical direction.