Excavating and unearthing system for climbing section of subway entrance and exit

By using the excavation and excavation system composed of conveyor belts, chutes, and excavation openings during the construction of multiple guide tunnels in the climbing section of the subway entrance and exit, the problem that the bottom guide tunnels are blind holes and cannot be excavated upwards has been solved, and the soil has been realized. The safe and effective transportation of materials improves construction efficiency and safety.

CN221838334UActive Publication Date: 2024-10-15BEIJING URBAN CONSTR ROAD & BRIDGE GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420603116.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-10-15
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

When excavating the climbing section of the subway entrance and exit, since the bottom guide tunnel is a blind tunnel, it is impossible to use upward excavation construction, causing difficulties in soil transportation.

Method used

The multi-guide tunnel underground excavation method is used for construction. Through the excavation and excavation system composed of conveyor belts, chutes, bottom slopes and excavation openings, the conveyor belt is used to transport soil upward in the top guide tunnel, and the chute is used to transport soil downward in the non-top guide tunnel. , and set up an excavation port and lifting equipment in the sub-bottom guide tunnel to solve the problem of soil transportation in the bottom guide tunnel.

Benefits of technology

It is possible to safely and effectively transport earth materials when the bottom guide tunnel is a blind tunnel, which solves the problem of inability to dig upward during construction and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221838334U_ABST
    Figure CN221838334U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of removing or transporting excavated materials or gangues, and discloses an excavation unearthing system for a climbing section of a subway entrance and exit, and the climbing section is constructed by adopting a multi-pilot-hole underground excavation method, top-layer pilot hole downward excavation construction and non-top pilot hole downward excavation construction; the soil discharging system comprises a conveying belt which is arranged in the top pilot tunnel and is used for upwards moving soil; the chute is arranged in the non-top pilot tunnel and is used for moving soil downwards; the soil outlet is formed in an inverted arch at the bottom of the secondary bottom layer pilot tunnel; the bottom slope is arranged at the bottom of the bottom-layer pilot tunnel, extends towards the soil outlet and is used for loading soil in the bottom-layer pilot tunnel into the bottom slope of the secondary bottom-layer pilot tunnel along the soil outlet. In the utility model, the soil outlet is formed in the inverted arch of the secondary bottom layer pilot tunnel, the inverted excavation is carried out by taking the soil outlet as a starting point, and the soil remained at the bottom of the bottom layer pilot tunnel in the inverted excavation process of the bottom layer pilot tunnel forms a bottom slope, so that the soil of the bottom layer pilot tunnel can be conveyed into the secondary bottom layer pilot tunnel along the bottom slope and the soil outlet; the problem that the bottom pilot tunnel is a blind hole and cannot be dug upwards is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of clearing or transporting excavated materials or gangue, in particular to an excavation and earth-discharging system for a climbing section of a subway entrance and exit. Background Art

[0002] Different from ground buildings, underground caverns naturally have the conditions to be set up as three-dimensional structures. Therefore, it is very common that two adjacent underground caverns with different heights need to be connected together. This part of the underground cavern that serves as a connection between the two underground caverns has a certain slope, which is usually called a climbing section / climbing section.

[0003] Considering that the horizontal spacing between the two underground caverns that need to be connected is small, this kind of underground cavern with a slope, which is called the climbing section, is quite steep. If the digging is done upward, there is a high risk of collapse above the cave wall during the excavation process. Therefore, digging downward is usually used, that is, excavation from top to bottom. However, digging downward is not conducive to excavation and excavation. Although digging upward is dangerous, it greatly facilitates excavation. Each digging process may bring down extra soil, and the soil will not accumulate near the face. The existence of height difference also makes soil transportation extremely convenient, and the excavated soil can slide down. Therefore, some people have tried to use digging upward to construct this kind of underground cavern with a slope. For example, CN104806251B-a method for digging upward for construction of an attached urban subway station in a complex environment, which adopts a large-scale soil reinforcement method to avoid collapse during digging upward, but the cost is relatively high. CN114991777A-a method for excavating the climbing section of a subway entrance and exit, which adopts a method of controlling the digging upward angle to prevent collapse during digging upward, but the scope of application is small. A better method is to construct the upper pilot tunnel by digging downwards. The lining of the upper pilot tunnel blocks the soil above, and the remaining pilot tunnels can be constructed by digging upwards.

[0004] However, this method of digging the upper pilot tunnel downward and the remaining pilot tunnel upward will result in the problem of being unable to excavate when encountering a blind hole (a hole closed at one end). Considering that many underground caverns with slopes are quite steep, these underground caverns are equipped with stairs and elevators (such as the climbing section of subway entrances and exits). This requires that in addition to the space for connection, these underground caverns also need to have some space below for installing stairs and elevator ancillary equipment. When these spaces are constructed using the multi-guide tunnel dark excavation method, they are located at the bottom guide tunnel position, resulting in the bottom guide tunnel becoming a blind hole with a closed lower end, which cannot be excavated at all by upward excavation. Utility Model Content

[0005] The utility model provides an excavation and earth-discharging system for a climbing section of a subway entrance and exit.

[0006] The technical problem to be solved is: when the climbing section of the subway entrance and exit is excavated, it is impossible to dig upward because the underlying guide tunnel is a blind tunnel.

[0007] In order to solve the above technical problems, the utility model adopts the following technical solutions: an excavation and earth-discharging system for the climbing section of a subway entrance and exit, wherein the climbing section is a connecting passage connecting two underground caverns with a height difference, the underground cavern above the climbing section is recorded as the upper cavern, and the underground cavern below is recorded as the lower cavern; the climbing section is constructed by a multi-guide hole dark excavation method, and among the guide holes of each layer, the topmost guide hole is recorded as the top guide hole, the bottommost guide hole is recorded as the bottom guide hole, the guide hole of the layer above the bottom guide hole is recorded as the second bottom guide hole, and the guide holes other than the top guide hole are uniformly recorded as non-top guide holes; the bottom guide hole is a blind hole with a closed lower end, the top guide hole is constructed by downward excavation, and the non-top guide hole is constructed by upward excavation; the earth-discharging system includes a conveyor belt, a chute, a bottom slope, and an earth-discharging port;

[0008] The conveyor belts are respectively arranged in each top-level guide tunnel, extending downward from the upper cavern to the tunnel face, and are used to transport soil upward;

[0009] The chutes are respectively arranged in each non-top guide tunnel, extending upward from the bottom of the non-top guide tunnel to the tunnel face, and used for transporting soil downward;

[0010] The unearthed opening is opened on the inverted arch at the bottom of the secondary bottom guide hole;

[0011] The bottom slope is arranged at the bottom of the bottom guide tunnel, extending from the invert of the bottom guide tunnel to the excavation port, and is used for the soil in the bottom guide tunnel to enter the second bottom guide tunnel along the excavation port after being loaded into a truck;

[0012] The secondary bottom guide tunnel is connected with the cavern below, and there is no drop on both sides of the connecting surface between the secondary bottom guide tunnel and the cavern below, and the size of the connecting surface is not less than the cross section of the vehicle transporting soil in the guide tunnel.

[0013] Furthermore, the bottom slope is a soil slope formed by the soil remaining at the bottom of the bottom guide tunnel when the bottom guide tunnel is excavated upward from the excavation opening, and an anti-skid steel plate is laid on the soil slope.

[0014] Furthermore, the excavation system also includes a lifting device arranged in the secondary bottom guide tunnel, which is used to lift the remaining soil along the excavation port after the excavation of the bottom guide tunnel is completed.

[0015] Furthermore, the bottom of the bottom guide tunnel and the second bottom guide tunnel are both provided with a non-slope section with a length no less than that of a soil transport vehicle for parking and loading.

[0016] Furthermore, if there is one or more layers of guide tunnels between the top guide tunnel and the second bottom guide tunnel, this part of the guide tunnel is recorded as the middle guide tunnel, and the chute of the middle guide tunnel extends downward into the cavern below.

[0017] Furthermore, a steel frame is arranged around the excavation opening and is connected to the main reinforcement of the lining to avoid opening holes in the lining to affect the strength.

[0018] Furthermore, the chute is made of waste formwork or steel plates.

[0019] Compared with the prior art, the excavation and earth removal system for the climbing section of a subway entrance and exit of the utility model has the following beneficial effects:

[0020] In the utility model, an excavation opening is opened on the inverted arch of the secondary bottom guide tunnel, and upward excavation is carried out with the excavation opening as the starting point. During the upward excavation of the bottom guide tunnel, the soil remaining at the bottom of the bottom guide tunnel forms a bottom slope, thereby the soil of the bottom guide tunnel can be transported to the secondary bottom guide tunnel along the bottom slope and the excavation opening, thus solving the problem that the bottom guide tunnel cannot be upward excavated because it is a blind tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a structural schematic diagram of an excavation and earth-discharging system for a climbing section of a subway entrance and exit according to the utility model;

[0022] In the figure, 1-lower cavern, 21-top guide tunnel, 22-second bottom guide tunnel, 23-bottom guide tunnel, 3-bottom slope, 4-excavation outlet, 5-conveyor belt, 6-chute. DETAILED DESCRIPTION

[0023] Take the Beitaipingzhuang Station of Beijing Subway Line 19, to which the utility model is applied, as an example. Figure 1 As shown, an excavation and dismantling system for a climbing section of a subway entrance and exit, the climbing section is a connecting passage connecting two underground caverns with a height difference, the underground cavern above the climbing section is recorded as an upper cavern, and the underground cavern below is recorded as a lower cavern 1; the climbing section is constructed by a multi-guide hole dark excavation method, among each layer of guide holes, the topmost guide hole is recorded as a top guide hole 21, the bottommost guide hole is recorded as a bottom guide hole 23, the guide hole one layer above the bottom guide hole 23 is recorded as a sub-bottom guide hole 22, and the guide holes other than the top guide hole 21 are uniformly recorded as non-top guide holes; the bottom guide hole 23 is a blind hole with a closed lower end, the top guide hole 21 is constructed by downward excavation, and the non-top guide hole is constructed by upward excavation; the dismantling system includes a conveyor belt 5, a chute 6, a bottom slope 3, and an dismantling port 4;

[0024] The upper cavern and the lower cavern 1 also need to be excavated during the excavation process, so they either have a vertical shaft leading to the ground or directly lead to the ground, and the soil transportation channel here can be directly used.

[0025] The conveyor belt 5 is respectively arranged in each top-level guide tunnel 21, extending downward from the upper cavern to the face, and used to transport soil upward to the upper cavern; during the excavation process of the top-level guide tunnel 21, the conveyor belt 5 is continuously extended downward following the face of the guide tunnel where it is located. The soil of the top-level guide tunnel 21 is transported to the upper cavern along the conveyor belt 5, and there is a height difference with the bottom plate of the upper cavern, so the soil can be directly received in the upper cavern by a vehicle (in this embodiment, the vehicle for transporting soil is an electric tricycle with a bucket). It is not advisable to set a non-slope segment at the top of the top-level guide tunnel 21 to load soil, because this is very dangerous. When the vehicle slips, it directly threatens the personal safety of all personnel in the guide tunnel, and it is also difficult for the vehicle to drive away after loading the soil (height difference).

[0026] The chute 6 is respectively arranged in each non-top guide tunnel, extending upward from the bottom of the non-top guide tunnel to the face, and is used to transport soil downward to the lower cavern 1. During the excavation process, the chute 6 is continuously extended upward following the face of the guide tunnel where it is located.

[0027] The excavation opening 4 is provided on the inverted arch at the bottom of the secondary bottom guide tunnel 22; the bottom slope 3 is provided at the bottom of the bottom guide tunnel 23, extending from the inverted arch of the bottom guide tunnel 23 to the excavation opening 4, and is used for the soil in the bottom guide tunnel 23 to enter the secondary bottom guide tunnel 22 along the excavation opening 4 after being loaded into a truck;

[0028] The sub-bottom guide tunnel 22 is connected to the lower cavern 1, and there is no drop on both sides of the connecting surface between the sub-bottom guide tunnel 22 and the lower cavern 1, and the size of the connecting surface is not less than the cross section of the vehicle transporting soil in the guide tunnel. There is no drop, that is, there is no high-side-low-side situation like steps on both sides, and the vehicle loaded with soil can be directly pushed into the lower cavern 1. After the soil in the bottom guide tunnel 23 and the sub-bottom guide tunnel 22 is loaded into the lower cavern 1, it is uniformly transported along the sub-bottom guide tunnel 22.

[0029] The bottom slope 3 is a soil slope formed by the soil remaining at the bottom of the bottom guide tunnel 23 when the bottom guide tunnel 23 is excavated upward from the excavation port 4. The soil slope is paved with an anti-skid steel plate. Because the bottom slope 3 needs to be frequently passed, the soil slope has poor trafficability after being repeatedly rolled.

[0030] The excavation system also includes a lifting device arranged in the secondary bottom guide hole 22, which is used to lift the remaining soil along the excavation port 4 after the bottom guide hole 23 is excavated. The amount of this part of soil is very small and easy to handle. It can be lifted up by hand or electric hoist, or a part of it can be excavated first, leaving a part on the side as a slope for transporting soil, and finally the soil under this slope can be excavated and lifted up.

[0031] The bottom of the bottom guide tunnel 23 and the second bottom guide tunnel 22 are both provided with a non-slope segment with a length not less than that of a soil transport vehicle for parking and loading. The bottom of the bottom guide tunnel 23 and the second bottom guide tunnel 22 is not higher than the bottom plate of the cavern 1 below, and the soil flowing down the chute 6 cannot fall directly into the bucket, so loading is slow, and long-term parking for loading will affect the passage of vehicles in the cavern 1 below.

[0032] If there is one or more layers of guide tunnels between the top guide tunnel 21 and the second bottom guide tunnel 22, this part of the guide tunnel is recorded as the middle guide tunnel, and the chute 6 of the middle guide tunnel extends downward to the lower cavern 1. When the soil in this part of the guide tunnel falls in the chute 6, there is a height difference with the bottom plate of the lower cavern 1, so it can directly fall into the bucket of the lower cavern 1.

[0033] In this embodiment, a steel frame connected with the main reinforcement of the lining is arranged around the earth-excavation opening 4 to prevent the lining from being opened to affect the strength. The chute 6 is made of waste formwork or steel plate.

[0034] The utility model discloses a primary lining system that can utilize waste piles, and a method for using the system comprises the following steps:

[0035] Step 1: When the upper pilot tunnel is excavated, soil is transported upward along the conveyor belt 5, and the soil falls into the bucket of the upper cavern and is transported out;

[0036] Step 2: When the middle pilot tunnel is excavated, soil is transported downward along the chute 6, and the soil falls into the bucket of the cavern 1 below and is transported out;

[0037] Step 3: When the secondary bottom guide tunnel 22 is excavated, soil is transported downward along the chute 6, and the soil falls to the bottom of the secondary bottom guide tunnel 22 and is loaded onto a truck, which moves to the lower cavern 1 and transports the soil out;

[0038] Step 4: When the bottom guide tunnel 23 is excavated, soil is transported downward along the chute 6, and the soil falls to the bottom of the bottom slope 3 and is loaded onto a truck. The truck moves along the bottom slope 3 and the excavation port 4 to the lower cavern 1 for transportation out. The excavation of the bottom guide tunnel 23 is completed, and part of the soil on the bottom slope 3 is lifted along the excavation port 4 to the bottom of the secondary bottom guide tunnel 22 and is loaded onto a truck. The truck moves to the lower cavern 1 for transportation out.

[0039] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. An excavation system for a climbing section of a subway entrance and exit, the climbing section being a connecting passage connecting two underground caverns with a height difference, the underground cavern above the climbing section being recorded as an upper cavern, and the underground cavern below being recorded as a lower cavern (1); the climbing section being constructed by a multi-guide hole dark excavation method, the guide hole at the top layer of each layer of guide holes being recorded as a top guide hole (21), the guide hole at the bottom layer being recorded as a bottom guide hole (23), the guide hole at the layer above the bottom guide hole (23) being recorded as a sub-bottom guide hole (22), and the guide holes other than the top guide hole (21) being uniformly recorded as non-top guide holes; the bottom guide hole (23) being a blind hole with a closed lower end, the top guide hole (21) being constructed by downward excavation, and the non-top guide holes being constructed by upward excavation; characterized in that: The excavation system comprises a conveyor belt (5), a chute (6), a bottom slope (3), and an excavation port (4); The conveyor belts (5) are respectively arranged in each top-level guide tunnel (21), extending downward from the upper cavern to the tunnel face, and are used to transport soil upward; The chute (6) is respectively arranged in each non-top guide tunnel, extends upward from the bottom of the non-top guide tunnel to the tunnel face, and is used to transport soil downward; The unearthed opening (4) is formed on the inverted arch at the bottom of the secondary bottom guide tunnel (22); The bottom slope (3) is arranged at the bottom of the bottom guide tunnel (23), extends from the invert of the bottom guide tunnel (23) to the excavation opening (4), and is used for allowing the soil in the bottom guide tunnel (23) to enter the secondary bottom guide tunnel (22) along the excavation opening (4) after being loaded into a truck; The secondary bottom guide tunnel (22) is connected to the cavern (1) below, and there is no drop on both sides of the connecting surface between the secondary bottom guide tunnel (22) and the cavern (1) below, and the size of the connecting surface is not less than the cross section of a vehicle transporting soil in the guide tunnel.

2. The excavation and earth removal system for the climbing section of a subway entrance and exit according to claim 1, characterized in that: The bottom slope (3) is a soil slope formed by soil remaining at the bottom of the bottom guide hole (23) when the bottom guide hole (23) is excavated upward from the excavation opening (4), and an anti-slip steel plate is laid on the soil slope.

3. The excavation and earth removal system for the climbing section of a subway entrance and exit according to claim 2 is characterized in that: The excavation system also includes a lifting device arranged in the secondary bottom guide hole (22) and used to lift away the remaining soil along the excavation opening (4) after the excavation of the bottom guide hole (23) is completed.

4. The excavation and earth removal system for the climbing section of a subway entrance and exit according to claim 1, characterized in that: The bottom of the bottom guide tunnel (23) and the bottom guide tunnel (22) are both provided with a non-slope segment having a length not less than that of a soil transport vehicle and used for parking and loading vehicles.

5. The excavation and earth removal system for the climbing section of a subway entrance and exit according to claim 1, characterized in that: If there is one or more layers of guide tunnels between the top guide tunnel (21) and the second bottom guide tunnel (22), this part of the guide tunnel is recorded as the middle guide tunnel, and the chute (6) of the middle guide tunnel extends downward into the lower cavern (1).

6. The excavation and earth removal system for the climbing section of a subway entrance and exit according to claim 1, characterized in that: A steel frame is arranged around the excavation opening (4) and is connected to the main reinforcement of the lining to prevent holes from being opened in the lining to affect the strength.

7. The excavation and earth removal system for the climbing section of a subway entrance and exit according to claim 1, characterized in that: The chute (6) is made of waste formwork or steel plate.