Alloy ring piece immersion coating wire deposition line for aero-engine and gas turbine

By introducing an automated system of aerial rails and suspended accumulation trolleys into the production line of alloy rings for aero-engines and gas turbines, the problems of low manual painting efficiency and pollution have been solved, efficient coating and drying processes have been achieved, and production efficiency and Cost effective.

CN221847651UActive Publication Date: 2024-10-18ZHENGZHOU QINGLIAN HANGDA AUTOMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323566492.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-10-18
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

Manual hand-held brushes dipped in paint for painting are inefficient, the paint is easy to drip and cause pollution, and the natural drying time is long, which affects the processing progress.

Method used

Design an immersion coating accumulation and discharge line for alloy rings used in aerospace engines and gas turbines, using aerial rails and suspended accumulation and discharge trolleys to transfer ring parts between multiple workstations, including unloading, caching, loading, temporary storage, and maintenance , dust removal, heating, soaking coating, drying and cold air stations, using automated systems for coating and drying.

Benefits of technology

It improves the painting efficiency, reduces manual operations, avoids paint contamination, shortens drying time, and saves costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221847651U_ABST
    Figure CN221847651U_ABST
Patent Text Reader

Abstract

The alloy ring piece soaking and coating accumulation line for the aero-engine and the gas turbine is integrally annular and comprises a plurality of stations connected in series, an air track is arranged above the stations, the air track is fixed to the top of a steel structure, and the air track is integrally annular; along the air track, the stations in the front row are sequentially a discharging station, a temporary storage station, a workpiece feeding station, a temporary storage station A and a temporary storage station B from right to left, and the stations in the rear row are sequentially an overhauling station, a temporary storage station C, an ash removal station, a heating station, a soaking and coating station, a drying station and a cold air station from left to right. Compared with the prior art, the ring piece transfer device has the technical effects that the ring piece transfer device is provided with a production line, and ring pieces are transferred among a plurality of stations by utilizing an air track and a suspended power and free trolley, so that the efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of alloy ring processing, and specifically relates to an alloy ring immersion coating accumulation line for aircraft engines and gas turbines. Background Art

[0002] Alloy steel will undergo severe oxidation and decarburization at high temperatures (usually 600~1300℃), resulting in the formation of multiple oxide layers and deep decarburization layers on the surface of the steel. Oxidation and decarburization not only seriously affect the surface quality, mechanical properties and fatigue life of the steel, but also increase the difficulty of subsequent processing. Especially for large steel parts with high carbon content, surface oxidation and decarburization will cause greater material loss. At the same time, alloy steel will also experience surface alloy element depletion under long-term high temperature. For example, stainless steel is prone to grain boundary chromium depletion at high temperature. Based on the above factors, it is economical and efficient to apply a high-temperature protective coating on the surface of the alloy steel before heating in the furnace to prevent oxidation, decarburization and alloy element depletion during heating.

[0003] At present, alloy rings for domestic aviation engines and gas turbines (hereinafter referred to as rings) are painted manually with a hand-held brush dipped in paint. Before painting, the barreled paint needs to be stirred with a hand-held stirrer. After stirring evenly, the painting work begins. The rings are placed upright on the ground, and the parts not attached to the ground are painted manually first. After the painting is completed and dried, the rings are rolled to expose the unpainted parts, and then painted manually. After the painting is completed, they are placed to dry.

[0004] Technical issues: Manually holding a brush and dipping it in paint to paint the rods is labor-intensive; during the painting process, the paint will drip onto the ground along the brush or rods, contaminating the ground and making it difficult to clean up; after the rods are painted, it takes a long time for them to dry naturally, which can easily affect the processing progress and cause inconvenience. Utility Model Content

[0005] The technical problem to be solved by the utility model is: how to design an immersion coating accumulation line for alloy rings used in aircraft engines and gas turbines to improve the coating efficiency.

[0006] The technical solution of the utility model is specifically as follows:

[0007] An alloy ring immersion coating accumulation line for aircraft engines and gas turbines is annular in shape as a whole, and includes a plurality of workstations connected in series, an aerial track is arranged above the workstations, the aerial track is fixed on the top of the steel structure, and the aerial track is annular in shape as a whole;

[0008] Along the aerial track, the front row of workstations from right to left are: unloading station, buffer station, loading station, temporary storage station A, temporary storage station B; the back row of workstations from left to right are: maintenance station, temporary storage station C, dust removal station, heating station, immersion and coating station, drying station, and cold air station.

[0009] Among them, the loading station is the starting station, and the unloading station is the ending station;

[0010] The aerial track is provided with a plurality of suspended accumulation trolleys capable of moving along the aerial track. The aerial track is connected to the suspended accumulation trolleys through a connecting mechanism. Two electric hoists are fixed on the connecting mechanism. The free ends of the steel wire ropes of the two electric hoists are fixed on the lifting mechanism. The lifting mechanism includes a crossbeam, and two sets of chains are connected to the crossbeam.

[0011] The cache stations include eight connected in series: cache station C, cache station D, cache station E, cache station F, cache station G, cache station H, cache station I and cache station J in sequence.

[0012] The ash removal station includes an ash removal chamber, which includes an ash removal chamber body. A high-pressure gas nozzle is arranged inside the ash removal chamber body. The ash removal chamber body is provided with two ash removal chamber doors for ring parts to enter and exit. A hanging accumulation trolley channel is provided on the top surface of the ash removal chamber body for the hanging accumulation trolley to pass through. A drawer is provided at the bottom of the ash removal chamber. A dust removal device is provided outside the ash removal chamber, and an observation window is provided on the side wall of the ash removal chamber.

[0013] The heating station includes a heating chamber, which includes a heating chamber body. A heating chamber heating furnace is arranged in the heating chamber body. A heating chamber door is arranged on the heating chamber body for rings to enter and exit. A hanging accumulation trolley channel is arranged on the top surface of the heating chamber for the hanging accumulation trolley to pass through.

[0014] The immersion coating station includes a immersion tank, which includes a immersion tank body. A immersion tank cover is provided on the top of the immersion tank body. A loading pump is provided at the immersion coating station. The feeding pipe of the loading pump is connected to two branches: branch A and branch B. Branch B is provided with a discharge valve, which is connected to the lower part of the immersion tank body. Branch A is provided with a feed valve, which is connected to the loading trough. The discharge pipe of the loading pump is connected to the immersion tank body. The upper part of the immersion tank body is connected to the loading trough through an overflow pipe. A step is provided on the outer wall of the immersion tank body. The immersion coating station is provided with a receiving trough in the downstream direction of the immersion tank body.

[0015] The drying station includes a drying chamber body, a heating furnace is arranged on the drying chamber body, a drying chamber door is arranged on the drying chamber body for rings to enter and exit, a hanging accumulation trolley channel is arranged on the top surface of the drying chamber body for the hanging accumulation trolley to pass through, and the air outlet of the heating furnace is connected to the drying chamber body.

[0016] The cold air station includes a cold air chamber, which includes a cold air chamber body and an air supply device. A hanging accumulation trolley channel is provided on the top surface of the cold air chamber body for the hanging accumulation trolley to pass through. The air supply device is connected to a plurality of cold air nozzles, which are fixed on the inner surface of the side wall of the cold air chamber body. The air supply device is located outside the cold air chamber body.

[0017] The blowing nozzles are arranged in a matrix shape.

[0018] Compared with the prior art, the technical effect of the utility model is that the utility model is provided with a production line, and the rings are transferred among a plurality of workstations by using an aerial track and a suspended accumulation trolley, thereby improving efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a top view schematic diagram of the utility model.

[0020] Figure 2 It is a schematic diagram of the utility model.

[0021] Figure 3 It is a schematic diagram of the ash removal chamber body.

[0022] Figure 4 It is a cross-sectional schematic diagram of the ash removal chamber body.

[0023] Figure 5 is a schematic diagram of a heating chamber body.

[0024] Figure 6 is a schematic diagram of an immersion tank body.

[0025] Figure 7 It is a schematic diagram of a drying chamber body.

[0026] Figure 8 It is a schematic diagram of the cold air chamber body.

[0027] Fig. 9 is a schematic diagram of the connection mechanism. DETAILED DESCRIPTION

[0028] The utility model is described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0029] like Figure 1-2 An alloy ring immersion coating accumulation line for aircraft engines and gas turbines is ring-shaped as a whole, including multiple workstations connected in series, with an aerial track 27 above the workstations. The aerial track 27 is fixed on the top of a steel structure 26. The steel structure 26 is similar to a frame and provides support for the aerial track 27. The aerial track 27 is ring-shaped as a whole.

[0030] Along the aerial track 27, the front row of workstations are from right to left: unloading workstation 11, buffering workstation, loading workstation 1, temporary storage workstation A2, temporary storage workstation B3, and the back row of workstations are from left to right: maintenance workstation 4, temporary storage workstation C5, dust removal workstation 6, heating workstation 7, immersion and coating workstation 8, drying workstation 9, and cold air workstation 10.

[0031] Among them, the buffer station is the starting station, and the unloading station 11 is the ending station.

[0032] like Fig. 9 The aerial track 27 is provided with a plurality of suspended accumulation trolleys 28 that can move along the aerial track 27. The accumulation trolleys 28 are fixed to a connecting mechanism 55. Two electric hoists 54 are fixed to the connecting mechanism 55. The free ends of the steel wire ropes of the two electric hoists 54 are fixed to a lifting mechanism 53. The lifting mechanism 53 includes a crossbeam 5301. Two groups of chains 52 are connected to the crossbeam 5301. Each group of chains 52 can hang a ring.

[0033] A plurality of suspended accumulation carts 28 can improve the efficiency of the operation.

[0034] like Figure 1 The cache stations include eight connected in series: cache station C12, cache station D13, cache station E14, cache station F15, cache station G16, cache station H17, cache station I18 and cache station J19.

[0035] like Figure 2-4 The ash removal station 6 includes an ash removal chamber 20, which includes an ash removal chamber body 29. A high-pressure gas nozzle is arranged in the ash removal chamber body 29, and the high-pressure gas nozzle is connected to an external high-pressure gas source (generally provided by the workshop). The dust on the surface of the ring is blown off by high-pressure gas. The ash removal chamber body 29 is provided with two ash removal chamber doors 30 for the ring to enter and exit. A hanging accumulation trolley channel 31 is provided on the top surface of the ash removal chamber body 29 for the hanging accumulation trolley 28 to pass through. A drawer 33 is provided at the bottom of the ash removal chamber 20. The drawer 33 is used to collect falling dust. A dust removal device 32 is provided outside the ash removal chamber 20. The dust removal device 32 is used to collect dust generated when the ash removal chamber 20 is working. An observation window 34 is provided on the side wall of the ash removal chamber 20 for people to observe conveniently.

[0036] like Figure 2 , Figure 5The heating station 7 includes a heating chamber 21, and the heating chamber 21 includes a heating chamber body 35. A heating chamber heating furnace 36 is provided in the heating chamber body 35. A heating chamber door 37 is provided on the heating chamber body 35 for the rings to enter and exit. A hanging accumulation trolley channel 31 is provided on the top surface of the heating chamber 21 for the hanging accumulation trolley 28 to pass through. In order to improve production efficiency, the heating chamber 21 is provided with 4 stations. The heating chamber heating furnace 36 provides hot air to the heating chamber body 35 to increase the temperature in the heating chamber body 35. The temperature can be adjusted. During the working process, the heating chamber door 37 is automatically opened except when the rings enter and exit the heating chamber body 35, and is closed at other times.

[0037] like Figure 2 , Figure 6 The immersion coating station 8 includes an immersion tank 22, and the immersion tank 22 includes an immersion tank body 42. A immersion tank cover 43 is provided on the top of the immersion tank body 42. A loading pump 45 is provided at the immersion coating station 8. A feeding pipe 4503 of the feeding pump 45 is connected to two branches: branch A4501 and branch B4502. A discharge valve 39 is provided on the branch B4502, which is connected to the lower part of the immersion tank body 42. A feed valve 38 is provided on the branch A4501, which is connected to the loading trough 41. A discharge pipe 4504 of the loading pump 45 is connected to the immersion tank body 42. The upper part of the immersion tank body 42 is connected to the loading trough 41 through an overflow pipe 4201. A step 44 is provided on the outer wall of the immersion tank body 42. The immersion coating station 8 is provided with a receiving trough 40 in the downstream direction of the immersion tank body 42. Excess paint on the surface of the ring after the immersion coating operation is completed will drip into the receiving trough 40 for recovery.

[0038] The paint can be manually poured into the loading tank 41, the feed valve 38 is opened, the discharge valve 39 is closed, and the paint can be fed into the soaking tank body 42 through the feed pump 45. In case of overflow, the paint can flow back to the loading tank 41 through the overflow pipe 4201. The ring parts in the soaking tank body 42 are soaked. If the operation is completed, the feed valve 38 is opened, the discharge valve 39 is opened, and the paint in the soaking tank body 42 can flow into the loading tank 41 and be taken away manually.

[0039] Except for the time of loading and unloading the immersion tank 22, the feed valve 38 and the discharge valve 39 are closed at other times. Before the immersion coating work, a manual hand-held stirrer stirs the paint in the immersion tank body 42. The receiving trough 40 is located between the immersion tank 22 and the drying chamber 23. The ring parts that have just been immersed and coated will stay above the receiving trough 40, and the excess paint on the surface will drip into the receiving trough 40 and be taken away manually.

[0040] like Figure 2 , Figure 7The drying station 9 includes a drying chamber body 47, a heating furnace 46 is provided on the drying chamber body 47, a drying chamber door 48 is provided on the drying chamber body 47 for the rings to enter and exit, a hanging accumulation trolley channel 31 is provided on the top surface of the drying chamber body 47 for the hanging accumulation trolley 28 to pass through, the air outlet of the heating furnace 46 is connected to the drying chamber body 47, hot air is provided to the drying chamber body 47, the temperature in the drying chamber body 47 is increased, and the temperature can be adjusted. During the working process, the drying chamber door 48 is automatically opened when the rings enter and exit the drying chamber body 47, and is closed at other times.

[0041] like Figure 2 , Figure 8 The cold air station 10 includes a cold air chamber 24, which includes a cold air chamber body 50 and an air supply device 51. A hanging accumulation trolley channel 31 is provided on the top surface of the cold air chamber body 50 for the hanging accumulation trolley 28 to pass through. The air supply device 51 is connected to a plurality of cold air blowing nozzles 49, which are fixed on the inner surface of the side wall of the cold air chamber body 50, and the air supply device 51 is located outside the cold air chamber body 50. When the ring enters the cold air chamber body 50, the air supply device 51 provides cold air to blow onto the ring through the blowing nozzles 49 to cool and dry the ring.

[0042] In order to blow air evenly, the blowing nozzles 49 are arranged in a matrix shape.

[0043] Its working principle is:

[0044] When using, the following steps are included:

[0045] S1. Use upstream equipment (such as a forklift 25) to place the ring on the loading station for standby use.

[0046] S2. When the hanging accumulation trolley 28 moves to the top of the loading station, the electric hoist 54 starts, driving the hoisting mechanism 53 and the chain 52 to descend, and the ring is manually hung on the chain 52. The electric hoist 54 starts, the ring is in a high position, and the ring hanging accumulation trolley 28 can carry the ring to move to the downstream station.

[0047] S3, after the suspension accumulation trolley 28 fails, it enters the maintenance station 4, and the faulty suspension accumulation trolley 28 can be repaired alone, and the line operates normally.

[0048] S4. After the ring enters the dust removal station 6, the door 30 of the dust removal chamber is closed, and the air flow provided by the high-pressure air source in the workshop is sprayed onto the ring from the high-pressure air nozzle. The dust on the surface of the ring is blown off by the high-pressure gas. The dust removal operation can be observed through the observation window 34. When the dust removal is completed (controlled by setting the dust removal time), the door 30 of the dust removal chamber is automatically opened, and the ring enters the next station.

[0049] The heavier dust falls into the drawer 33 of the dust removal chamber 20 and is manually cleaned, while the lighter dust in the air is collected by the dust removal device 32.

[0050] S5. After the ring enters the heating station 7, the heating chamber door 37 is closed, and the heating furnace 36 in the heating chamber starts with the line body to provide hot air to the heating chamber body 35 to increase the temperature in the heating chamber body 35. After the ring is heated, the heating chamber door 37 is opened, and the ring enters the next station.

[0051] The heating temperature can be adjusted.

[0052] S6, when the ring enters the immersion coating station 8, the ring rises to a high position. At this time, there is paint in the immersion tank body 42, and the immersion tank cover 43 has been opened (opened when the line body starts and covered when it ends). The electric hoist 54 is started to drive the lifting mechanism 53, the chain 52, and the ring to slowly descend. The ring enters the immersion tank body 42 from the top. Paint is adhered to the surface of the ring. The immersion coating operation is completed, the electric hoist 54 is started, and the ring rises to a high position and can enter the next station.

[0053] Regarding "there is already paint in the immersion tank body 42", the specific explanation is as follows: paint is added manually to the loading trough 41, the feed valve 38 is opened, and the discharge valve 39 is closed, and the paint can be input into the immersion tank body 42 through the loading pump 45. In case of overflow (for example, when a ring enters the immersion tank body 42), it can flow back to the loading trough 41 through the overflow pipe 4201; when the immersion coating operation needs to replace new paint, the paint in the immersion tank body 42 needs to be recovered: the feed valve 38 is opened, the discharge valve 39 is opened, and the paint in the immersion tank body 42 can automatically flow into the loading trough 41 and be taken away manually.

[0054] After the ring leaves the immersion tank body 42, it will drip paint, and the paint will drip into the receiving tank 40 for recovery.

[0055] S7, after the ring enters the drying station 9, the drying chamber door 48 is closed, the heating furnace 46 is started, and the hot air generated enters the drying chamber body 47 to increase the temperature in the drying chamber body 47. After the drying operation of the ring is completed, the heating furnace 46 is closed, the drying chamber door 48 is opened, and the ring enters the next station.

[0056] S8. After the ring enters the cold air station 10, the air supply device 51 is started, and the air sprayed from the cold air nozzle 49 cools the ring. If the paint at a certain place is not completely dried, it can also be dried by wind. After the cooling operation of the ring is completed, the air supply device 51 is closed, and the ring enters the next station.

[0057] S9, after the ring enters the unloading station 11, the electric hoist 54 is started, driving the hoisting mechanism 53, the chain 52, and the ring to descend, the ring reaches the low position, and the ring is manually removed from the chain 52, and the whole operation is completed.

[0058] Features of this application:

[0059] S1. Fully automatic immersion coating is adopted to save labor.

[0060] S2. A material receiving trough is provided between the immersion tank and the drying chamber to prevent the coating of the ring parts that have just been immersed and coated from dripping onto the ground along the ring parts and causing pollution when passing through the immersion tank and the drying chamber. In addition, the coating is expensive, and the coating in the coating trough can be recycled and reused, saving costs.

[0061] S3. Reasonable setting of the internal space of each chamber and the size of the immersion pool can be compatible with rings of various specifications and has a wide range of uses.

[0062] S4. The hanging accumulation trolley is controlled to rise and fall by an electric hoist. When loading and unloading parts, the hanging accumulation trolley can be lowered to a very low level and can be manually unhooked by the chain. It is simple to operate and easy to use.

[0063] S5. Before immersion coating, by adjusting the temperature in the heating room and the residence time of the suspended accumulation trolley in each station in the heating room, the temperature of the ring surface before immersion coating can be controlled, and then the coating thickness on the ring surface after immersion coating can be controlled. By adjusting the temperature, it can be applied to rings of different materials and specifications, with good compatibility and a wide range of applications.

[0064] S6. Equipped with a drying room with drying function, it can shorten the drying time and improve production efficiency.

[0065] For other contents, please refer to the prior art.

[0066] The above-described embodiments are only preferred embodiments of the present invention. It should be noted that those skilled in the art may make several changes and improvements without departing from the overall concept of the present invention, and these should also be regarded as within the protection scope of the present invention.

Claims

1. An alloy ring immersion coating accumulation line for aircraft engines and gas turbines, characterized in that: The whole is in a ring shape, including a plurality of workstations connected in series, an aerial track (27) is provided above the workstations, the aerial track (27) is fixed on the top of the steel structure (26), and the aerial track (27) is in a ring shape as a whole; Along the aerial track (27), the front row of workstations are, from right to left: unloading workstation (11), buffering workstation, loading workstation (1), temporary storage workstation A (2), temporary storage workstation B (3); the back row of workstations are, from left to right: maintenance workstation (4), temporary storage workstation C (5), dust removal workstation (6), heating workstation (7), immersion coating workstation (8), drying workstation (9), cold air workstation (10); Among them, the loading station (1) is the starting station, and the unloading station (11) is the ending station; A plurality of suspended accumulation trolleys (28) capable of moving along the aerial track (27) are provided. The aerial track (27) and the suspended accumulation trolleys (28) are connected via a connecting mechanism (55). Two electric hoists (54) are fixed to the connecting mechanism (55). The free ends of the steel wire ropes of the two electric hoists (54) are fixed to a lifting mechanism (53). The lifting mechanism (53) includes a crossbeam (5301). Two sets of chains (52) are connected to the crossbeam (5301).

2. The alloy ring immersion coating accumulation line for aircraft engines and gas turbines according to claim 1, characterized in that: The cache stations include eight cache stations connected in series: cache station C (12), cache station D (13), cache station E (14), cache station F (15), cache station G (16), cache station H (17), cache station I (18) and cache station J (19).

3. The alloy ring immersion coating accumulation line for aircraft engines and gas turbines according to claim 2, characterized in that: The ash removal station (6) comprises an ash removal chamber (20), the ash removal chamber (20) comprises an ash removal chamber body (29), a high-pressure gas nozzle is arranged in the ash removal chamber body (29), the ash removal chamber body (29) is provided with two ash removal chamber doors (30) for the ring parts to enter and exit, a hanging accumulation trolley passage (31) is provided on the top surface of the ash removal chamber body (29) for the hanging accumulation trolley (28) to pass through, a drawer (33) is provided at the bottom of the ash removal chamber (20), a dust removal device (32) is provided outside the ash removal chamber (20), and an observation window (34) is provided on the side wall of the ash removal chamber (20).

4. The alloy ring immersion coating accumulation line for aircraft engines and gas turbines according to claim 3, characterized in that: The heating station (7) comprises a heating chamber (21), the heating chamber (21) comprises a heating chamber body (35), a heating chamber heating furnace (36) is arranged in the heating chamber body (35), a heating chamber door (37) is arranged on the heating chamber body (35) for the rings to enter and exit, and a hanging accumulation trolley passage (31) is arranged on the top surface of the heating chamber (21) for the hanging accumulation trolley (28) to pass through.

5. The alloy ring immersion coating accumulation line for aircraft engines and gas turbines as claimed in claim 4, characterized in that: The immersion coating station (8) comprises a immersion tank (22), the immersion tank (22) comprises a immersion tank body (42), a immersion tank cover (43) is provided on the top of the immersion tank body (42), a feeding pump (45) is provided at the immersion coating station (8), a feeding pipe (4503) of the feeding pump (45) is connected to two branch lines: branch line A (4501) and branch line B (4502), and a discharge valve (39) is provided on the branch line B (4502), which is connected to the immersion tank body ( A feed valve (38) is provided on the branch line A (4501) at the lower part of the immersion tank (42), which is connected to the feeding trough (41); a discharge pipe (4504) of the feeding pump (45) is connected to the immersion tank body (42); the upper part of the immersion tank body (42) is connected to the feeding trough (41) via an overflow pipe (4201); a step (44) is provided on the outer wall of the immersion tank body (42); and a receiving trough (40) is provided at the immersion coating station (8) in the downstream direction of the immersion tank body (42).

6. The alloy ring immersion coating accumulation line for aircraft engines and gas turbines according to claim 5, characterized in that: The drying station (9) comprises a drying chamber body (47), a heating furnace (46) is provided on the drying chamber body (47), a drying chamber door (48) is provided on the drying chamber body (47) for the rings to enter and exit, a hanging accumulation trolley passage (31) is provided on the top surface of the drying chamber body (47) for the hanging accumulation trolley (28) to pass through, and an air outlet of the heating furnace (46) is connected to the drying chamber body (47).

7. The alloy ring immersion coating accumulation line for aircraft engines and gas turbines according to claim 6, characterized in that: The cold air station (10) comprises a cold air chamber (24), the cold air chamber (24) comprises a cold air chamber body (50) and an air supply device (51), a hanging accumulation trolley channel (31) is provided on the top surface of the cold air chamber body (50) for the hanging accumulation trolley (28) to pass through, the air supply device (51) is connected to a plurality of cold air blowing nozzles (49), the cold air blowing nozzles (49) are fixed on the inner surface of the side wall of the cold air chamber body (50), and the air supply device (51) is located outside the cold air chamber body (50); The blowing nozzles (49) are arranged in a matrix shape.