Underwater grouting and drilling positioning device for underwater platform operation under deepwater condition

By designing an underwater grouting drilling positioning device including a guide pipe, a level and a GPS locator under deep water conditions, the accuracy and safety problems of deep water drilling positioning are solved, and efficient and precise drilling operations are achieved. Reduced project costs and risks.

CN221856628UActive Publication Date: 2024-10-18YICHANG HUANGBAI RIVER BASIN MANAGEMENT BUREAU +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420071559.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-10-18
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

Under deep water conditions, traditional underwater drilling positioning methods have problems such as large underwater workload, high difficulty, and high safety risks. In addition, the above-water platform is greatly affected by wind, waves, and water levels, resulting in serious drilling deviation, making it difficult to achieve accurate positioning.

Method used

An underwater grouting drilling positioning device for above-water platform operations under deep water conditions is designed, which includes an above-water platform, a guide pipe, a casing, a level, an underwater positioning device and a GPS locator. The casing is fixed through the guide pipe, and a level is installed in the casing. And drill pipe, the underwater positioning device is wrapped with a transparent seal, and a camera and GPS locator are installed inside to achieve real-time positioning and monitoring.

Benefits of technology

It improves the accuracy and construction efficiency of drilling positioning, reduces the workload of divers, reduces safety risks, ensures the stability and positioning accuracy of the drilling platform, and avoids drilling deviations caused by wind, waves and water level changes. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856628U_ABST
    Figure CN221856628U_ABST
Patent Text Reader

Abstract

An underwater grouting and drilling positioning device for underwater platform operation under the deepwater condition comprises an overwater platform, a guide pipe is fixed to the overwater platform, a sleeve is sleeved with the guide pipe, a gradienter is fixed to the upper portion of the sleeve, an underwater positioning device is fixed to the lower portion of the sleeve, a drill rod is fixed to the interior of the sleeve and installed on a drilling machine, and a drill tower is further arranged on the periphery of the drilling machine. The drilling machine and the drilling tower are both fixed to the water platform, the water platform is laid on a plurality of pontoons, the pontoons are symmetrically arranged in groups, a gap is reserved between the pontoons, a plurality of guide pipes are fixedly installed in the gap, a plurality of platform anchor rods and supporting rods are arranged on the side, close to a slope bank, of the water platform, and the supporting rods are fixedly arranged on vertical limiting rods in a sleeving mode and slide up and down. The vertical limiting rod and the slope bank anchor rod are rigidly fixed together; the utility model solves the problems that the underwater workload is large, the difficulty is high and the safety risk is high due to the underwater measurement and positioning of a diver in the traditional deepwater drilling, and the drilling is greatly influenced by storm waves and water level and the drilling offset is serious due to the drilling of an overwater platform.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of underwater drilling and grouting, in particular to an underwater grouting drilling positioning device for water platform operation under deep water conditions. Background Art

[0002] Concrete face earth-rock dams are usually accompanied by seepage damage, which in severe cases may cause loosening, dislocation, settlement and other problems of the face panels. Curtain grouting of the face panel dam toe is a very common anti-seepage measure, but the construction conditions of grouting in deep water environments and the particularity of the external environment make construction difficult.

[0003] The main problem is that currently, the commonly used underwater drilling positioning methods are:

[0004] Method 1: Divers measure underwater and then locate the drilling rig. Guided by the heavy hammer ball, divers use a diving gauge to measure the water depth underwater, and coordinate the positioning of the underwater orifice pipe and take photos to check the quality of the casting. After the drilling and grouting work is completed and the inspection hole and other construction are completed, the divers go underwater to cut off the underwater orifice pipe.

[0005] Method 2: Divers install the drilling rig travel and fixed slideway underwater. The drilling rig can slide up and down along the slideway. After positioning, it is fixed on the slideway by bolts and the like to perform alignment drilling.

[0006] The above methods involve a large amount of underwater work, low work efficiency, and high safety risks, especially the low hole positioning accuracy, which makes it impossible to achieve precise positioning.

[0007] Due to the particularity of the construction conditions and external environment of water drilling, the following aspects must be considered in water drilling: First, a platform with a certain area and sufficient load capacity must be equipped to install drilling equipment as a water drilling site; second, in order to prevent the water flow from scouring the drill bit and causing the drill bit to tilt downstream and cause the borehole to deviate, a protective casing of a certain depth should be placed at the hole position in the water and ensure that it is vertically buried to the bottom of the water; third, during the drilling process, the drilling platform is often affected by factors such as water level, flow rate, and wind force. The platform is easy to move, causing the casing to bend or break, resulting in the movement of the hole position, so effective safety measures should be taken to ensure the stability of the drilling platform and the accuracy of positioning.

[0008] Currently, the hole positioning is mainly done by using instruments to locate the position on the water surface. The casing is directly lowered to the bottom of the water and fixed on the bedrock. There is no positioning device under the water. In deep waters or waters with rapid currents, this method will cause the casing to be tilted and cause the borehole to deviate. In severe cases, the platform will move, causing the casing to bend or break, resulting in the movement of the hole, making it difficult or impossible to construct as expected, increasing the project cost.

[0009] For example, the article "Research on Curtain Grouting Drilling Positioning Method under Deep Water Conditions" in "Yunnan Powering Hydropower" introduces the method of underwater curtain grouting drilling positioning under deep water conditions, and proposes that the accurate positioning of drilling under deep water conditions must be based on the establishment of a stable surface operation platform. The article proposes that the first thing to be solved in underwater drilling is to place the hole coordinates on the dam toe plate opening position, but the opening position is located in deep water, and the positioning is difficult. Later, it was considered to measure and place the hole coordinates on the fixed surface operation platform, and guide it underwater through the measuring rope and drill rod on the platform. Underwater, the diver determines the approximate water depth and the approximate position of the drilling hole through the diving table, and then accurately measures and locates the drilling hole through the contour line of the hydraulic structure. In this article, only the method of underwater drilling positioning under deep water conditions is introduced, and it is recommended that the diver determine the approximate water depth through the diving table. It does not take into account that at a certain underwater depth, the diver may not be able to reach the specified opening position, and the exact situation of the opening position is obtained, which increases the difficulty of construction and increases the project cost.

[0010] Underwater drilling is the most technically demanding and difficult operation in deepwater geological exploration projects. The drilling location is deep underwater, which makes it difficult to locate and the hole position cannot be directly measured. In addition, deepwater drilling is carried out in an invisible and intangible situation. The entire operation process of deepwater drilling is carried out on a surface operating platform. The drilling process is carried out underwater and the drilling situation cannot be directly observed. The accuracy of underwater drilling positioning in deepwater areas and the quality and hole formation rate of underwater drilling directly affect whether the construction project can meet the design requirements, and also directly affect the exploration effect and project cost of deepwater geological exploration projects. The deep water and large waves have caused great difficulties in drilling positioning. How to improve the accuracy of drilling positioning is one of the key issues that need to be solved urgently.

[0011] For example, CN206071455U discloses an underwater drilling positioning device, which includes an underwater positioning truss fixed to the bottom of the water and an above-water platform fixed to the water surface, wherein the underwater positioning and above-water platforms are respectively provided with a corresponding lower guide tube and an upper guide tube, a guide rope is provided at the center of the guide tube, the guide lock passes through the corresponding upper guide cylinder and extends out of the above-water platform, and the casing passes through the guide tube and successively passes through the upper guide cylinder and the lower guide cylinder. Although the existing patents have taken into account simultaneous positioning above and below the water, and the positioning is made more accurate by the guide rope and the casing, they have not taken into account that during drilling, the drilling platform is often affected by factors such as water level, flow velocity, and wind speed, and the platform is easy to move, causing the casing to bend or break, resulting in the movement of the hole position, causing the problem of drilling deviation, making it difficult to construct as expected, and increasing the project cost. Summary of the invention

[0012] The technical problem to be solved by the utility model is to provide an underwater grouting drilling positioning device for water platform operations under deep water conditions, which solves the problems that traditional deep-water drilling uses divers for underwater measurement and positioning, has a large underwater workload, high difficulty, and high safety risks, and that drilling on water platforms is greatly affected by wind and waves and water levels, resulting in serious drilling deviation.

[0013] In order to solve the above technical problems, the technical solution adopted by the utility model is: an underwater grouting drilling positioning device for water platform operations under deep water conditions, including a water platform, and also including a guide tube fixed on the water platform, a casing is sleeved inside the guide tube, a spirit level is fixed on the upper part of the casing, an underwater positioning device is fixed on the lower part of the casing, a drill rod is fixed inside the casing, the drill rod is installed on a drilling rig, and a drilling tower is also arranged outside the drilling rig, and the drilling rig and the drilling tower are both fixed on the water platform.

[0014] In a preferred solution, the above-water platform is paved on a plurality of floating boats, which are arranged symmetrically in groups perpendicular to the curtain grouting axis, with gaps in between, and a plurality of guide tubes are installed and fixed in the gaps.

[0015] In a preferred solution, the above-water platform comprises a plurality of cross beams, trusses are installed on both sides of the cross beams, longitudinal bones are connected between the cross beams, and wooden boards are laid on the cross beams and the longitudinal bones.

[0016] In the preferred solution, the above-water platform is provided with a plurality of platform anchor rods near the slope bank side, and a support rod is installed on the platform anchor rod. The other end of the support rod is fixed on the vertical limit rod and slides up and down along the vertical limit rod. The vertical limit rod is rigidly fixed to the slope bank anchor rod, and the slope bank anchor rod is fixed on the slope bank.

[0017] In a preferred solution, a borehole pipe is installed inside the casing, a drill rod is sleeved inside the borehole pipe, the casing is installed in the underwater silt covering layer, the borehole pipe passes through the underwater silt covering layer and the toe concrete layer, and is fixed in the bedrock layer.

[0018] In a preferred solution, the guide tube and the casing, the casing and the orifice tube, and the orifice tube and the drill pipe are all clearance-fitted.

[0019] In a preferred solution, a transparent seal is provided on the outside of the underwater positioning device, and a light source device, a camera and a GPS locator are installed inside.

[0020] In the preferred solution, the power lines of the level, light source device, camera and GPS locator are connected to the power supply, the data lines of the level, camera and GPS locator are connected to the user terminal, and the waterproof level of the light source device, camera, GPS locator, power line and data line is IP68.

[0021] The utility model provides an underwater grouting drilling positioning device for water platform operation under deep water conditions, which has the following beneficial effects:

[0022] 1. The utility model fixes the guide tube on the water platform, and the casing is sleeved in the guide tube and matched with the guide tube. The guide tube guides the casing, straightens the casing, reduces the influence of water level rise and fall and water flow impact on the casing, and increases the stability of the drill rod in the casing;

[0023] 2. The underwater positioning device of the utility model is fixed to the lower end of the casing, and is covered with a seal for waterproofing. While protecting the components inside the underwater positioning device, it does not affect the sight and shooting of the internal components, further improving the reliability and safety of the device;

[0024] 3. The underwater positioning device of the utility model is equipped with a camera, a light source device and a GPS locator for underwater positioning, which replaces the underwater measurement and positioning work of divers, reduces the manual workload of divers, and improves the accuracy of underwater positioning drilling;

[0025] 4. The utility model adopts a method of horizontally rigidly connecting the water working platform with the slope bank, which can slide up and down in the vertical direction, thereby reducing the displacement influence of water level rise and fall and wind and wave impact on the water platform and drilling tools, and improving the construction quality and efficiency;

[0026] 5. The underwater positioning device provided by the utility model adopts a GPS positioning device, which solves the problem that when the deep-water hole position cannot be directly observed, manual diving is required for deep-water operations, which results in heavy workload, high difficulty and risk, and low positioning accuracy. At the same time, it realizes the feedback of real-time underwater positioning information. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The utility model is further described below in conjunction with the accompanying drawings and implementation examples:

[0028] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0029] Figure 2 It is a top view of the water platform of the utility model;

[0030] Figure 3 It is a left view of the water platform of the utility model;

[0031] Figure 4 It is a partial schematic diagram of the assembly of the water platform and the slope bank of the utility model;

[0032] Figure 5 It is a partial schematic diagram of the assembly of the underwater positioning device, drill pipe, casing and orifice pipe of the utility model;

[0033] Figure 6 It is a partial schematic diagram of the assembly of the support rod and the vertical limit rod of the utility model;

[0034] In the figure: guide pipe 1, water platform 2, casing 3, level 4, underwater positioning device 5, drill pipe 6, drilling rig 7, drilling tower 8, floating boat 9, truss 10, platform anchor rod 11, support rod 12, vertical limit rod 13, slope anchor rod 14, slope 15, orifice pipe 16, cross beam 21, longitudinal bone 22, wooden board 23. DETAILED DESCRIPTION

[0035] like Figures 1 to 6 As shown, an underwater grouting drilling positioning device for water platform operations under deep water conditions includes an water platform 2 and a guide tube 1 fixed on the water platform 2, a casing 3 is sleeved inside the guide tube 1, a level 4 is fixed on the upper part of the casing 3, an underwater positioning device 5 is fixed on the lower part of the casing 3, a drill rod 6 is fixed inside the casing 3, the drill rod 6 is installed on a drilling rig 7, a drilling tower 8 is also arranged on the periphery of the drilling rig 7, and the drilling rig 7 and the drilling tower 8 are both fixed on the water platform 2.

[0036] In this embodiment, the above-water platform 2 is paved on a plurality of floating boats 9, which are arranged in groups perpendicular to the curtain grouting axis and symmetrically, with a gap in the middle, in which a plurality of guide pipes 1 are installed and fixed;

[0037] The above-water platform 2 comprises a plurality of beams 21, trusses 10 are installed on both sides of the beams 21, longitudinal bones 22 are connected between the beams 21, and wooden boards 23 are laid on the beams 21 and the longitudinal bones 22;

[0038] The above-water platform 2 is provided with a plurality of platform anchor rods 11 near the slope bank side, and a support rod 12 is installed on the platform anchor rod 11, and the other end of the support rod 12 is fixed on the vertical limit rod 13, and slides up and down along the vertical limit rod 13, and the vertical limit rod 13 is rigidly fixed with the slope bank anchor rod 14, and the slope bank anchor rod 14 is fixed on the slope bank 15;

[0039] The casing 3 is also provided with an orifice pipe 16, the orifice pipe 16 is sleeved with a drill pipe 6, the casing 3 is installed in the underwater silt covering layer, the orifice pipe 16 passes through the underwater silt covering layer and the toe concrete layer, and is fixed in the bedrock layer;

[0040] The guide tube 1 and the casing 3, the casing 3 and the orifice tube 16, and the orifice tube 16 and the drill pipe 6 are all clearance-fitted;

[0041] The underwater positioning device 5 is coated with a transparent seal on the outside, and a light source device, a camera and a GPS locator are installed inside;

[0042] The power lines of the level 4, light source device, camera and GPS locator are connected to the power supply, and the data lines of the level 4, camera and GPS locator are connected to the user terminal. The waterproof level of the light source device, camera, GPS locator, power line and data line is IP68.

[0043] When used specifically, the underwater grouting and drilling positioning device for water platform operation under deep water conditions is used to perform underwater positioning and drilling in the following specific steps:

[0044] Step 1: Fix the floating boats 9 and the water platform 2, arrange the floating boats 9 along the axis of the curtain grouting as the floating body of the water platform 2, and arrange the floating boats 9 symmetrically along the axis of the curtain grouting in pairs, and reserve a gap in the middle as the installation space for the upper and lower drilling tools and the orifice pipe 16 when drilling;

[0045] Step 2: After the construction of the water platform 2 is completed, the surveyor will horizontally project the predicted hole positions onto the water platform 2 along the toe board and measure the hole positions using a total station;

[0046] Step 3: Arrange the drilling rig 7 and the drilling tower 8, and adjust the positions of the drilling rig 7 and the drilling tower 8 according to the predicted hole positions on the water surface platform, and then use a speedboat or a small boat to rigidly connect the water platform 2 and the slope 15 with the support rod 12, and the water platform 2;

[0047] Step 4: Weld the guide tube 1 to the predicted hole position of the water platform 2. When selecting the guide tube 1, it should be noted that the inner diameter of the guide tube 1 is larger than the outer diameter of the casing 3. Then lower the casing 3 and the drilling tool. Divers need to go into the water to fix the underwater positioning device 5 to the bottom of the casing 3 in the shallow water area, and then lower the casing 3 and the drilling tool to the bottom of the water, and then fix the level 4 vertically to the upper end of the casing 3.

[0048] Step 5: After lowering the casing 3 and the drilling tool to the bottom of the water, the construction personnel on the shore turn on the light source device, camera, and GPS locator in the underwater positioning device 6. The GPS locator records the coordinates of the underwater hole position. The camera takes pictures of the underwater siltation and the casting of the underwater orifice pipe 16, and guides the orifice pipe 16 into place. The level meter 4 is always observed on the platform to keep the casing 3 and the drilling tool in a horizontal state. The GPS locator adopts a real-time differential positioning working mode. Two GPS receivers are configured at the bottom of the water platform 2 and the casing 3, one of which is used as a reference station on the water platform 2, and the other is used as a mobile station underwater. Two radio stations and two data conversion interfaces for data communication are also required. A portable computer is used to provide underwater coordinate data calculation and management;

[0049] Step 6: Divers desilt the dam toe plate underwater. In the case of thick and dense sediment, only the scum on the surface of the sediment layer can be washed clean, but the sediment must be cleaned at the corner point of the curtain grouting axis (i.e., the control point of the curtain grouting axis). The drilling rig is in place, and the orifice pipe 16, the drilling tool, and the casing 3 are gradually lowered to the surface of the underwater sediment layer at the hole position measured on the water platform 2. The drilling rig 7 is started with light pressure and slow rotation, and the pipe is drilled to the surface of the dam toe plate. The verticality of the casing 3 is measured above and below the water while drilling. A flat diamond drill bit is installed at the bottom of the casing 3. The casing 3 is drilled into the concrete of the dam toe plate by 0.3 to 0.4 m. The upper end of the casing 3 is fixed on the water platform 2. Then, the curtain grouting drilling and opening construction is carried out in the casing 3.

[0050] In the preferred scheme, the water platform 2 is paved on a plurality of floating boats 9, and the floating boats 9 are arranged symmetrically in groups perpendicular to the axis of the curtain grouting, with a gap in the middle, and a plurality of guide pipes 1 are installed and fixed in the gap; the water platform 2 is paved on the floating boats 9 to fix the water platform 2 and facilitate the construction drilling operation; the guide pipes 1 are installed in the gap to guide the casing 3, straighten the casing 3, and reduce the influence of the deflection of the casing 3 caused by the rise and fall of water level and the impact of water flow; the floating boats 9 are arranged symmetrically in groups perpendicular to the axis of the curtain grouting, which further improves the stability of the water platform 2 and facilitates the drilling construction operation.

[0051] In the preferred solution, the water platform 2 includes a plurality of cross beams 21, trusses 10 are installed on both sides of the cross beams 21, longitudinal bones 22 are connected between the cross beams 21, and wooden boards 23 are laid on the cross beams 21 and the longitudinal bones 22; the cross beams 21 and the two-side trusses 10 are installed and fixed to further improve the stability of the water platform 2 and facilitate construction operations; the longitudinal bones 22 are provided at the connection between the cross beams 21 so that the water platform 2 can adapt to water level changes within a certain range and have a certain ability to resist wind and waves.

[0052] In the preferred solution, the above-water platform 2 is provided with a plurality of platform anchor rods 11 near the slope bank side, and a support rod 12 is installed on the platform anchor rod 11, and the other end of the support rod 12 is fixed on a vertical limit rod 13, and slides up and down along the vertical limit rod 13, and the vertical limit rod 13 is rigidly fixed to the slope bank anchor rod 14, and the slope bank anchor rod 14 is fixed to the slope bank 15; the support rod 12 is installed on the platform anchor rod 11 in order to slide up and down and adjust the underwater drilling positioning position at any time, and the vertical limit rod 13 is rigidly fixed to the slope bank anchor rod 14 so that it cannot move in the horizontal direction, thereby ensuring accurate underwater drilling positioning.

[0053] In the preferred solution, a borehole pipe 16 is also installed inside the casing 3, and a drill rod 6 is sleeved inside the borehole pipe 16. The casing 3 is installed in the underwater silt covering layer, and the borehole pipe 16 passes through the underwater silt covering layer and the toe concrete layer and is fixed in the bedrock layer. The above arrangement further ensures that the drill rod 6 is not affected by the impact of wind and waves and water flow, and the positioning is accurate and the drilling construction operation is anti-interference, thereby further improving the drilling accuracy and efficiency.

[0054] In the preferred solution, the guide tube 1 and the casing 3, the casing 3 and the orifice tube 16, and the orifice tube 16 and the drill rod 6 are all clearance-fitted; the clearance-fitting is adopted in order to adjust the drilling position at any time and reduce the safety risk.

[0055] In the preferred scheme, the underwater positioning device 5 is coated with a transparent seal on the outside, and a light source device, a camera and a GPS locator are installed inside; in this process, the transparent seal is equipped with a light source device, a camera and a GPS locator, so that the real-time situation of the drilling position can be checked at any time, thereby improving the drilling accuracy, reducing the workload of manual work and reducing safety risks.

[0056] In the preferred scheme, the power lines of the level 4, light source device, camera and GPS locator are connected to the power supply, the data lines of the level 4, camera and GPS locator are connected to the user terminal, and the waterproof level of the light source device, camera, GPS locator, power line and data line is IP68; with the above settings, the GPS locator data line is connected to the user terminal, so that the underwater drilling situation can be monitored at any time, the drilling position can be adjusted conveniently, and the construction quality and efficiency can be improved.

[0057] In summary, the utility model provides an underwater grouting and drilling positioning device for water platform operation under deep water conditions. By setting an water platform 2 on a group of floating boats 9, a stable platform and construction space are provided for underwater grouting and drilling operations under deep water conditions; a guide tube 1 is set on the water platform 2 for construction operation guidance, a fixed casing 3 is set inside the guide tube 1, a straightening casing 3 is set inside the casing 3, an orifice tube 16 is set inside the casing 3, and a drill rod 6 is set inside the orifice tube 16, so as to protect and position the device layer by layer, reduce the influence of water level rise and fall and water flow impact on the operation of the drill rod 6; a level meter 4 is set on the casing 3, so that the casing 3 is monitored in real time to control its Verticality improves the accuracy of drilling grouting and the efficiency of drilling grouting operations; an underwater positioning device 5 is arranged at the lower part of the casing 3 to accurately locate the underwater drilling position and monitor the drilling situation in real time; the utility model solves the problems of traditional deep-water drilling using divers for underwater measurement and positioning, large underwater workload, high difficulty and high safety risks, and drilling on the water platform 2, which is greatly affected by wind and waves and water level and has serious drilling deviation; accurate positioning, efficient operation, and at the same time not affected by wind and waves, water flow impact, and water level changes, safe and reliable, strong operability, with high practical application value, good economic and social benefits.

Claims

1. An underwater grouting and drilling positioning device for water platform operation under deep water conditions, comprising a water platform (2), characterized in that: The invention also comprises a guide tube (1) fixed on the above-water platform (2), a casing (3) being sleeved inside the guide tube (1), a level (4) being fixed on the upper part of the casing (3), an underwater positioning device (5) being fixed on the lower part of the casing (3), a drill rod (6) being fixed inside the casing (3), the drill rod (6) being installed on a drilling rig (7), a drilling tower (8) being arranged outside the drilling rig (7), and both the drilling rig (7) and the drilling tower (8) being fixed on the above-water platform (2).

2. According to claim 1, an underwater grouting drilling positioning device for water platform operation under deep water conditions is characterized in that: The above-water platform (2) is paved on a plurality of floating boats (9), and the floating boats (9) are arranged symmetrically in groups perpendicular to the curtain grouting axis, with a gap left in the middle, and a plurality of guide pipes (1) are installed and fixed in the gap.

3. The underwater grouting and drilling positioning device for water platform operation under deep water conditions according to claim 2 is characterized in that: The above-water platform (2) comprises a plurality of cross beams (21), trusses (10) are installed on both sides of the cross beams (21), longitudinal bones (22) are connected between the cross beams (21), and wooden boards (23) are laid on the cross beams (21) and the longitudinal bones (22).

4. The underwater grouting and drilling positioning device for water platform operation under deep water conditions according to claim 3 is characterized by: The above-water platform (2) is provided with a plurality of platform anchor rods (11) near the slope bank side, and a support rod (12) is installed on the platform anchor rod (11). The other end of the support rod (12) is fixedly mounted on a vertical limit rod (13) and slides up and down along the vertical limit rod (13). The vertical limit rod (13) is rigidly fixed to the slope bank anchor rod (14), and the slope bank anchor rod (14) is fixed on the slope bank (15).

5. The underwater grouting and drilling positioning device for water platform operation under deep water conditions according to claim 1 is characterized in that: A borehole pipe (16) is also installed inside the casing (3), and a drill rod (6) is sleeved inside the borehole pipe (16). The casing (3) is installed in an underwater silt covering layer, and the borehole pipe (16) passes through the underwater silt covering layer and the toe concrete layer and is fixed to the bedrock layer.

6. The underwater grouting and drilling positioning device for water platform operation under deep water conditions according to claim 5 is characterized in that: The guide tube (1) and the casing (3), the casing (3) and the orifice tube (16), and the orifice tube (16) and the drill rod (6) all adopt clearance fit.

7. The underwater grouting and drilling positioning device for water platform operation under deep water conditions according to claim 1 is characterized by: The underwater positioning device (5) is coated with a transparent sealing member on the outside and is internally installed with a light source device, a camera and a GPS locator.

8. The underwater grouting and drilling positioning device for water platform operation under deep water conditions according to claim 7 is characterized by: The power lines of the level meter (4), the light source device, the camera and the GPS locator are connected to a power source, and the data lines of the level meter (4), the camera and the GPS locator are connected to a user terminal. The waterproof level of the light source device, the camera, the GPS locator, the power line and the data line is IP68.