Gas-steam combined cycle thermoelectric deep decoupling system
Through the gas-steam combined cycle thermoelectric deep decoupling system, the connection between the gas turbine and the waste heat boiler and the steam bypass system are used to solve the problem of reduced heating capacity of the gas-steam combined cycle cogeneration unit during peak load regulation of the power grid, and achieve flexible Excellent thermoelectric separation and efficient heating response capability.
Patent Information
- Application Number
- CN202323615530.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The heating capacity of gas-steam combined cycle cogeneration units decreases during grid peak shaving, making it difficult to meet the thermal energy needs of end users. Moreover, the cost of electric boiler modification is high and the energy utilization rate is low.
Design a gas-steam combined cycle thermoelectric deep decoupling system. Through the connection of the gas turbine and the waste heat boiler, the high-pressure and low-pressure steam bypass systems are used, combined with the temperature and pressure reduction device, to realize the flexible steam extraction and heating mode of the steam turbine. Rigid coupling between steam turbine heating and power generation functions.
It ensures large-scale heating capacity under low load conditions, responds quickly during power grid peak shaving, provides flexible heating methods, and avoids the high cost and low energy utilization problems of electric boilers.
Smart Images

Figure CN221856817U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a gas-steam combined cycle thermoelectric deep decoupling system. Background Art
[0002] Gas-steam combined cycle generator sets are the best choice for grid peak load capacity due to their fast start and stop, high efficiency and low emissions. However, for gas-steam combined cycle cogeneration units that operate in a heat-to-electricity mode, due to the restrictions of grid peak load, the heating capacity of the units is often greatly reduced, making it difficult to meet the thermal energy needs of end users. For this reason, some cogeneration units have undergone technical transformation. Currently, successful cases include turbine light shaft transformation, turbine low-pressure cylinder removal, and additional electric boilers. However, for dual-pressure combined cycle cogeneration units, their steam turbines are usually single-cylinder, and there is no basis for the implementation of light shaft transformation and low-pressure cylinder removal. Electric boilers are used to achieve thermal and electrical decoupling, but electric boilers have the disadvantages of high cost and low energy utilization. Utility Model Content
[0003] The purpose of the utility model is to solve the above-mentioned problems and provide a gas-steam combined cycle thermal power deep decoupling system.
[0004] The above purpose is achieved through the following technical solutions:
[0005] A gas-steam combined cycle thermal power deep decoupling system, comprising: a gas turbine and a waste heat boiler, wherein the high-temperature exhaust gas of the gas turbine is connected to the flue gas side of the waste heat boiler through an exhaust pipe; the high-pressure steam generated by the waste heat boiler is connected to the steam turbine through a main steam pipeline and a main steam valve, the exhaust steam outlet of the steam turbine is connected to a condenser, and the outlet of the condenser is connected to a deaerator through a condensate pipe system, and the low-pressure feed water pump and the high-pressure feed water pump at the outlet of the deaerator are respectively transported to the low-pressure heating side and the high-pressure heating side of the waste heat boiler through the feed water pipeline, and are respectively connected to the main steam pipeline and the low-pressure steam pipeline after being heated by the gas turbine.
[0006] The gas-steam combined cycle thermal power deep decoupling system, the main steam pipeline leads to two branches of a high-pressure bypass pipeline and a temperature reduction and pressure reduction pipeline, the high-pressure bypass pipeline is divided into a high-pressure heating pipeline connected to the heat user and a high-pressure bypass exhaust pipeline connected to the condenser after the high-pressure bypass valve and the high-pressure bypass valve downstream pipeline, the temperature reduction and pressure reduction pipeline is connected to the temperature reduction and pressure reduction device, and the outlet of the temperature reduction and pressure reduction device is connected to the heat user.
[0007] The gas-steam combined cycle thermal power deep decoupling system, the steam turbine has a steam turbine high-pressure extraction steam heating pipeline and a steam turbine low-pressure extraction steam heating pipeline.
[0008] In the gas-steam combined cycle thermal power deep decoupling system, a heating shut-off valve is installed on the high-pressure heating pipeline, and a high-pressure bypass exhaust shut-off valve is installed on the high-pressure bypass exhaust pipeline.
[0009] In the gas-steam combined cycle thermal power deep decoupling system, the low-pressure steam pipeline is led out from the waste heat boiler and divided into a steam supply pipeline connected to the steam supply port of the turbine and a branch connected to the low-pressure bypass valve, and the outlet of the low-pressure bypass valve is connected to the condenser. Beneficial Effects
[0010] 1. The utility model leads a branch pipe from the combined cycle main steam system and the downstream of its high-pressure bypass valve, wherein the branch pipe on the main steam pipeline is equipped with a temperature reduction and pressure reduction device, and the outlets of the two are directly connected to heat users with different needs. When there is no peak-shaving demand in the power grid or the peak-shaving amplitude demand is not large, the multi-stage steam extraction of the steam turbine provides a heat source for the heat users; when the power grid performs peak-shaving on the unit and the unit is running at low load, the main steam system of the waste heat boiler is disconnected from the steam turbine, and the main steam is sent to the heat user after being cooled and reduced in pressure as required through the bypass system and the temperature reduction and pressure reduction device, and the vacuum of the condenser is maintained through the low-pressure bypass to keep the steam turbine in hot standby state.
[0011] 2. The utility model releases the rigid coupling between the steam turbine heating and power generation functions in the combined cycle, thereby ensuring large-scale heating capacity under low-load conditions and rapid response capability of the power grid to load increase and peak regulation, and the heating mode is flexible and changeable. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Attached Figure 1 It is the principle diagram of the utility model;
[0013] Attached Figure 2 It is a flow chart for implementing the decoupling of steam turbine;
[0014] In the figure: 100, gas turbine; 101, exhaust pipe; 200, waste heat boiler; 300, steam turbine; 400, main steam pipeline; 401, main steam valve; 410, high-pressure bypass pipeline; 411, high-pressure bypass valve; 413, pipeline downstream of high-pressure bypass valve; 414, high-pressure heating pipeline; 415, high-pressure bypass exhaust pipeline; 416, heating shut-off valve; 417, high-pressure bypass exhaust shut-off valve; 420, temperature and pressure reduction pipeline; 421, temperature and pressure reduction device; 4 22. Low-pressure heating pipeline; 430. Low-pressure steam pipeline; 431. Low-pressure steam shut-off valve; 432. Low-pressure bypass valve; 433. Supplementary steam pipeline; 440. Condenser; 441. Condensate pump; 442. Condensate pipeline; 443. Deaerator; 444. Low-pressure feed water pump; 445. Make-up water pipeline; 446. Feed water pipeline; 447. High-pressure feed water pump; 500. Turbine high-pressure extraction steam heating pipeline; 501. Turbine low-pressure extraction steam heating pipeline. DETAILED DESCRIPTION
[0015] Reference Figure 1 A gas-steam combined cycle thermal power deep decoupling system, comprising: a gas turbine 100 and a waste heat boiler 200, wherein the high-temperature exhaust gas of the gas turbine 100 is connected to the flue gas side of the waste heat boiler 200 through an exhaust pipe 101; the high-pressure steam generated by the waste heat boiler 200 is connected to the steam turbine 300 through a main steam pipeline 400 and a main steam valve 401, the exhaust steam outlet of the steam turbine 300 is connected to a condenser 440, and the outlet of the condenser is connected to a deaerator 443 through a condensate pipe system 442, and the low-pressure feed water pump 444 and the high-pressure feed water pump 447 at the outlet of the deaerator 443 are respectively transported to the low-pressure heating side and the high-pressure heating side of the waste heat boiler 200 through a feed water pipeline 446, and are respectively connected to the main steam pipeline and the low-pressure steam pipeline after being heated by the gas turbine 100.
[0016] The main steam pipeline 400 leads to two branches, namely a high-pressure bypass pipeline 410 and a temperature reduction and pressure reduction pipeline 420. The high-pressure bypass pipeline 410 is divided into a high-pressure heating pipeline 414 connected to a heat user and a high-pressure bypass exhaust pipeline 415 connected to a condenser 440 after passing through a high-pressure bypass valve downstream pipeline 413 after a high-pressure bypass valve 411. The temperature reduction and pressure reduction pipeline 420 is connected to a temperature reduction and pressure reduction device 421, and the outlet of the temperature reduction and pressure reduction device 421 is connected to a heat user.
[0017] The steam turbine 300 has a steam turbine high-pressure extraction steam heating pipeline 500 and a steam turbine low-pressure extraction steam heating pipeline 501 .
[0018] A heating shut-off valve 416 is installed on the high-pressure heating pipeline, and a high-pressure bypass exhaust shut-off valve 417 is installed on the high-pressure bypass exhaust pipeline.
[0019] The low-pressure steam pipeline 430 is led out from the waste heat boiler and is divided into a steam supply pipeline connected to the steam supply port of the steam turbine 300 and a branch connected to a low-pressure bypass valve 432 . The outlet of the low-pressure bypass valve 432 is connected to the condenser 400 .
[0020] Reference Figure 1When there is no peak load demand in the power grid, the main steam valve 401 and the shut-off valve 431 are opened, and the high-pressure bypass valve 411, the low-pressure bypass valve 432, the temperature and pressure reducer 421 and its upstream shut-off valve 423, the shut-off valves (416) and 417 are closed. The gas turbine 100 converts the chemical energy of light fossil fuel into electrical energy to supply the power grid, and its high-temperature exhaust enters the flue gas side of the waste heat boiler 200 through the exhaust pipe 101 to heat the boiler feed water from the feed water pipe 446. A part of the feed water is heated into low-pressure steam in the low-pressure heat exchange circuit of the waste heat boiler, and is sent to the steam supply port of the steam turbine 300 through the low-pressure steam pipe 430 and its branch 433; the other part is converted into steam after being heated by the flue gas in the high-pressure heat exchange circuit of the waste heat boiler, and is sent to the steam turbine through the main steam pipeline; the main steam and the supplementary steam drive the steam turbine 300 to generate power and supply the power grid. At the same time, part of the steam is extracted through the steam extraction pipes 500 and 501 of the steam turbine 300 to provide heat energy for the heat users. After the steam expands and does work in the steam turbine, the exhaust steam is discharged into the condenser 400, and the cooled condensate is transported to the deaerator 443 through the condensate pipeline 442 and the condensate pump 441, while the make-up water is sent to the deaerator 443 through the make-up water pipe 445. After the condensate and make-up water are heated and deoxygenated in the deaerator 443, they are respectively sent to the low-pressure heating circuit and the high-pressure heating circuit of the waste heat boiler 200 through the low-pressure feed water pump 444 and the high-pressure feed water pump 447.
[0021] Reference Figure 2 When the power grid has a peak-shaving demand, and the output of a gas turbine is sufficient to meet the peak-shaving demand of the power grid, the main steam valve 401 and the shut-off valve 431 are closed, the high-pressure bypass valve 411, the low-pressure bypass valve 432, the temperature-reducing and pressure-reducing device 421 and its upstream shut-off valve 423, the shut-off valves 416 and 417 are opened, the steam turbine 300 is cut off in the steam-water circuit, and the peak-shaving demand of the power grid is achieved through the fuel supply regulation of the gas turbine. The feed water is heated to low-pressure steam and high-pressure steam in the low-pressure heating circuit and high-pressure heating circuit of the waste heat boiler 200 through the high-temperature exhaust gas of the gas turbine 100. The high-pressure steam passes through the main steam pipeline 400 and its two branches 410 and 420, and then after being reduced in temperature and pressure by the high-pressure bypass valve 411 and the temperature-reducing and pressure-reducing device 421, it provides heat energy to heat users through the heating pipelines 414 and 422.
[0022] A branch pipe is led out from the downstream of the combined cycle high-pressure bypass valve, and a branch pipe is led out from the main steam pipeline and is equipped with temperature reduction and pressure reduction. The outlets of the two are connected to heat users with different needs. When there is no peak-shaving demand in the power grid, the gas turbine generator set and the steam turbine generator set provide electricity to the power grid at the same time, and the multi-stage steam extraction of the steam turbine provides heat source for heat users; when the power grid performs peak-shaving on the unit and the unit is running at low load, the steam turbine generator set is decoupled, and only the gas turbine generator set transmits electricity to the power grid. The heat load is provided by the bypass system and the temperature reduction and pressure reduction device, so that the high-temperature and high-pressure steam generated by the waste heat boiler directly participates in the heating without passing through the steam turbine, realizing the deep decoupling of heat and electricity so that the high-temperature and high-pressure steam generated by the boiler directly participates in the heating without passing through the steam turbine.
Claims
1. A gas-steam combined cycle thermal power deep decoupling system, comprising: A gas turbine and a waste heat boiler, wherein the high-temperature exhaust gas of the gas turbine is connected to the flue gas side of the waste heat boiler through an exhaust pipe; the high-pressure steam generated by the waste heat boiler is connected to the steam turbine through a main steam pipeline and a main steam valve. It is characterized in that: the exhaust steam outlet of the steam turbine is connected to the condenser, and the outlet of the condenser is connected to the deaerator through a condensate pipe system. The low-pressure feed water pump and the high-pressure feed water pump at the outlet of the deaerator are respectively transported to the low-pressure heating side and the high-pressure heating side of the waste heat boiler through the feed water pipeline, and are respectively connected to the main steam pipeline and the low-pressure steam pipeline after being heated by the gas turbine.
2. The gas-steam combined cycle thermal power deep decoupling system according to claim 1 is characterized by: The main steam pipeline leads to two branches, a high-pressure bypass pipeline and a temperature reduction and pressure reduction pipeline. The high-pressure bypass pipeline is divided into a high-pressure heating pipeline connected to a heat user and a high-pressure bypass exhaust pipeline connected to a condenser after passing through a high-pressure bypass valve and a downstream pipeline of the high-pressure bypass valve. The temperature reduction and pressure reduction pipeline is connected to a temperature reduction and pressure reduction device, and an outlet of the temperature reduction and pressure reduction device is connected to a heat user.
3. The gas-steam combined cycle thermal power deep decoupling system according to claim 2 is characterized by: The steam turbine is provided with a steam turbine high-pressure steam extraction heating pipeline and a steam turbine low-pressure steam extraction heating pipeline.
4. The gas-steam combined cycle thermal power deep decoupling system according to claim 3 is characterized by: A heating shut-off valve is installed on the high-pressure heating pipeline, and a high-pressure bypass exhaust shut-off valve is installed on the high-pressure bypass exhaust pipeline.
5. The gas-steam combined cycle thermal power deep decoupling system according to claim 4 is characterized in that: The low-pressure steam pipeline is led out from the waste heat boiler and is divided into a steam supply pipeline connected to the steam supply port of the steam turbine and a branch connected to the low-pressure bypass valve. The outlet of the low-pressure bypass valve is connected to the condenser.