Air-tight seal test system

By introducing a residual gas recovery system into the air seal test system, the tested gas is recycled into the circuit to be tested, which solves the problem of gas waste in the air seal test and improves testing efficiency and resource utilization.

CN221859865UActive Publication Date: 2024-10-18MATORLY (SHENZHEN) FLUID ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420488096.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-10-18
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

In the air seal test, the waste of test gas leads to waste of resources and low test efficiency.

Method used

Design a gas seal testing system, including a gas pressure supply system, a controlled pressure maintaining circuit system and a residual gas recovery system. By recycling the residual gas in the tested pressure maintaining circuit into the pressure maintaining circuit to be tested, the gas is realized. Reuse.

Benefits of technology

It reduces the testing time of the circuit to be tested, avoids waste of resources, improves the overall testing efficiency, and improves resource utilization by recycling the residual gas in the tested circuit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221859865U_ABST
    Figure CN221859865U_ABST
Patent Text Reader

Abstract

The utility model discloses an air-tight seal test system, which relates to the technical field of pressure test equipment and comprises a gas pressure supply system, a gas pressure detection system and a gas pressure detection system, the control pressure maintaining loop system comprises at least two test loops which are arranged in parallel, any one test loop is provided with a pressure maintaining loop, any one pressure maintaining loop is communicated with the gas pressure supply system, and the pressure maintaining loop is used for carrying out pressure maintaining operation to detect the gas tightness of the to-be-tested element; and the two ends of the residual gas recovery system are connected with the tested pressure maintaining loop and the to-be-tested pressure maintaining loop respectively, and the residual gas recovery system is used for recovering residual gas in the tested pressure maintaining loop so that the residual gas can be used in the to-be-tested pressure maintaining loop. According to the airtight sealing test system, the residual gas in the tested loop can be recycled, so that the test time of the loop to be tested is shortened, the waste of resources is avoided, and the overall test efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pressure testing equipment, and more specifically to an airtightness testing system. Background Art

[0002] The air-tightness test system is a professional pressure test equipment for testing air tightness. It can be used to test pressure changes and the air tightness of the surface of an object, and can also be used to detect gas penetration. It has a wide range of applications and can be used for air tightness tests of valves, pipes, hoses, etc.

[0003] For example, if the medium of the gas sealing system is nitrogen, nitrogen is provided by a nitrogen production system. When performing a gas sealing test, after completing one gas sealing test, all the nitrogen used in the test will be leaked, resulting in a waste of resources.

[0004] In summary, how to avoid the waste of medium in the air sealing system is a problem that needs to be solved urgently by those skilled in the art. Utility Model Content

[0005] In view of this, the purpose of the utility model is to provide an airtight test system, which can reduce the test time of the circuit to be tested, avoid waste of resources and improve the overall test efficiency by recycling the residual gas in the tested circuit.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A gas-tightness test system, comprising:

[0008] A gas pressure supply system, used to provide test gas;

[0009] A control pressure-maintaining circuit system includes at least two test circuits arranged in parallel, any of the test circuits is provided with a pressure-maintaining circuit, any of the pressure-maintaining circuits is connected to the gas pressure supply system, and the pressure-maintaining circuit is used to perform a pressure-maintaining operation to detect the air tightness of the component to be tested;

[0010] A residual gas recovery system, wherein the two ends of the residual gas recovery system are respectively connected to the tested pressure-maintaining circuit and the pressure-maintaining circuit to be tested, and is used to recover the residual gas in the tested pressure-maintaining circuit for use in the pressure-maintaining circuit to be tested.

[0011] Preferably, the waste gas recovery system comprises:

[0012] A fourth solenoid valve;

[0013] The third air-controlled stop valve is arranged on a recovery passage connected to the control pressure-maintaining circuit system, one end of the recovery passage is connected to the tested pressure-maintaining circuit, and the other end of the recovery passage is connected to the pressure-maintaining circuit to be tested. When the fourth solenoid valve is energized, the third air-controlled stop valve opens to recover and transport the residual gas.

[0014] Preferably, a third bypass ball valve is also provided on the lower side of the fourth solenoid valve, and the two ports at the upper end of the third bypass ball valve are respectively connected to the fourth solenoid valve and the gas pressure supply system, and the lower end port of the third bypass ball valve is connected to the third gas-controlled stop valve.

[0015] Preferably, the test circuit is further provided with:

[0016] A test gas circuit, used for conveying the test gas and connected with the pressure maintaining circuit;

[0017] The control circuit is used to control the on-off between the test gas circuit and the pressure maintaining circuit. When the test gas circuit and the pressure maintaining circuit are disconnected, the pressure maintaining circuit can be tested for air tightness.

[0018] Preferably, the control circuit includes a pressure maintaining control circuit and a pressure relief control circuit;

[0019] The pressure-maintaining control circuit includes a driving gas supply source, a second solenoid valve, and a first gas-controlled stop valve. When the second solenoid valve is energized, the gas of the driving gas supply source can drive the first gas-controlled stop valve to open, so as to connect the test gas circuit and the pressure-maintaining circuit.

[0020] The pressure relief control circuit includes a third solenoid valve and a second air-controlled stop valve connected thereto, wherein the second air-controlled stop valve is arranged on an air relief passage, and the air relief passage is connected to the pressure maintaining circuit. When the third air-controlled stop valve is closed, the gas from the driving gas supply source can drive the second air-controlled stop valve to open so as to discharge the remaining test gas in the pressure maintaining circuit.

[0021] Preferably, the gas pressure supply system comprises:

[0022] A medium gas supply device, used for providing the test gas;

[0023] An air-driven air pressure booster pump, wherein the inlet end of the air-driven air pressure booster pump is connected to the outlet end of the medium gas supply device, and the outlet end of the air-driven air pressure booster pump is connected to the test gas circuit;

[0024] A driving assembly is connected to the air-driven air pressure booster pump and is used to drive the air-driven air pressure booster pump to pressurize the test gas.

[0025] Preferably, the driving component includes a second pressure regulating valve connected to the driving gas supply source, and a first solenoid valve is also provided between the second pressure regulating valve and the gas-driven air pressure booster pump. When the first solenoid valve is energized, the gas-driven air pressure booster pump is driven to pressurize.

[0026] Preferably, the outlet of the driving gas supply source is connected to a driving gas circuit, and the control circuit and the residual gas recovery system are both connected to the driving gas circuit.

[0027] Preferably, a first bypass ball valve is provided at the lower side of the second solenoid valve, two ports at the upper end of the first bypass ball valve are respectively connected to the second solenoid valve and the driving gas circuit, and a lower end port of the first bypass ball valve is connected to the first gas-controlled stop valve;

[0028] A second bypass ball valve is provided at the lower side of the third solenoid valve, and two ports at the upper end of the second bypass ball valve are respectively connected to the third solenoid valve and the driving gas circuit, and the lower end port of the first bypass ball valve is connected to the second gas-controlled stop valve.

[0029] Preferably, a second pressure regulating valve is further provided on the driving gas circuit, and two groups of the test circuits are connected in parallel to the rear end of the second pressure regulating valve.

[0030] The gas-tightness test system provided by the utility model includes a gas pressure supply system, a control pressure-maintaining circuit system and a residual gas recovery system, wherein the gas pressure supply system is used to provide test gas, the control pressure-maintaining circuit system includes at least two test circuits arranged in parallel, each test circuit is provided with a pressure-maintaining circuit, each pressure-maintaining circuit is connected to the gas pressure supply system, and the pressure-maintaining circuit can be used to perform a pressure-maintaining operation to detect the air tightness of the component to be tested. More specifically, when the pressure of the test gas in the pressure-maintaining circuit is constant, it can be used to detect the air tightness of the component to be tested. If the pressure decreases during the pressure-maintaining circuit test, it indicates that the component to be tested has a leakage problem; the two ends of the residual gas recovery system are respectively connected to the tested pressure-maintaining circuit and the pressure-maintaining circuit to be tested, and the residual gas in the tested pressure-maintaining circuit can be recovered by the residual gas recovery system and reused in the pressure-maintaining circuit to be tested. The above-mentioned gas-tightness test system can reduce the test time of the circuit to be tested, avoid waste of resources, and improve the overall test efficiency by recycling the residual gas in the tested circuit. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0032] Figure 1 This is a structural schematic diagram of the airtightness testing system provided by the utility model.

[0033] Figure 1 , the reference numerals include:

[0034] Gas pressure supply system 01, control pressure maintaining circuit system 02, residual gas recovery system 03;

[0035] Medium gas supply equipment 1, second pressure regulating valve 2, second pressure regulating valve 3, first solenoid valve 4, air-driven air pressure boosting pump 5, second solenoid valve 6, first bypass ball valve 7, first air-controlled stop valve 8, third solenoid valve 9, second bypass ball valve 10, second air-controlled stop valve 11, fourth solenoid valve 12, third bypass ball valve 13, third air-controlled stop valve 14, driving gas supply source 15, pressure relief circuit 16, pressure maintaining circuit 17, recovery passage 18, test gas circuit 19, driving gas circuit 20. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0037] The core of the utility model is to provide an airtight test system, which can reduce the test time of the circuit to be tested, avoid waste of resources and improve the overall test efficiency by recycling the residual gas in the tested circuit.

[0038] The gas sealing test system provided by the utility model includes a gas pressure supply system 01, a control pressure maintaining circuit system 02 and a residual gas recovery system 03. Please refer to Figure 1 .

[0039] The gas pressure supply system 01 is used to provide test gas, which can be an inert gas such as nitrogen or hydraulic oil. The test gas can be pressurized and maintained at a constant pressure to perform air tightness test on the component to be tested.

[0040] The control pressure-maintaining circuit system 02 includes at least two test circuits arranged in parallel. Any test circuit is provided with a pressure-maintaining circuit 17 . Any pressure-maintaining circuit 17 is connected to the gas pressure supply system 01 . The test gas can be delivered to the pressure-maintaining circuit 17 through the gas pressure supply system 01 .

[0041] When the gas pressure in the pressure-maintaining loop 17 is constant, a pressure detection element and a test element may be connected in parallel to the pressure-maintaining loop 17. If a sealing problem occurs in the test element, the value of the pressure detection element will decrease to provide feedback on the airtightness of the test element.

[0042] The two ends of the residual gas recovery system 03 are respectively connected to the tested pressure maintaining circuit 17 and the pressure maintaining circuit 17 to be tested. After the tested pressure maintaining circuit is completed, the remaining test gas in the pressure maintaining circuit 17 can be sent to the pressure maintaining circuit 17 to be tested for secondary utilization, thereby improving resource utilization and testing efficiency.

[0043] In addition, after the pressure-maintaining circuit 17 to be tested receives the test gas in the tested pressure-maintaining circuit 17, the test can be performed by only providing a small amount of test gas through the gas pressure supply system 01, thereby reducing the test time and improving the test efficiency.

[0044] The above-mentioned airtightness test system includes a gas pressure supply system 01, a control pressure maintaining circuit system 02 and a residual gas recovery system 03, wherein the gas pressure supply system 01 is used to provide test gas, and the control pressure maintaining circuit system 02 includes at least two test circuits arranged in parallel, each test circuit is provided with a pressure maintaining circuit 17, and each pressure maintaining circuit 17 is connected to the gas pressure supply system 01. The pressure maintaining circuit 17 can be used to perform pressure maintaining operation to detect the air tightness of the component to be tested. More specifically, when the test gas pressure in the pressure maintaining circuit 17 is constant, it can be used to detect the air tightness of the component to be tested. If the pressure decreases during the pressure maintaining circuit test, it means that the component to be tested has a leakage problem; the two ends of the residual gas recovery system 03 are respectively connected to the tested pressure maintaining circuit 17 and the pressure maintaining circuit 17 to be tested. The residual gas in the tested pressure maintaining circuit 17 can be recovered through the residual gas recovery system 03 and reused in the pressure maintaining circuit 17 to be tested. The above-mentioned air-tightness test system can reduce the test time of the circuit to be tested, avoid waste of resources, and improve the overall test efficiency by recycling the residual gas in the tested circuit.

[0045] On the basis of the above embodiment, the residual gas recovery system 03 includes:

[0046] Fourth solenoid valve 12;

[0047] The third pneumatically controlled stop valve 14 is arranged on a recovery passage 18 connected to the control pressure maintaining circuit system 02. One end of the recovery passage 18 is connected to the tested pressure maintaining circuit 17, and the other end of the recovery passage 18 is connected to the pressure maintaining circuit 17 to be tested. When the fourth solenoid valve 12 is energized, the third pneumatically controlled stop valve 14 opens to recover and transport the remaining gas.

[0048] Please refer to Figure 1The residual gas recovery system 03 includes a fourth solenoid valve 12 and a third gas-controlled stop valve 14, wherein the control pressure maintaining circuit system 02 is connected to a recovery passage 18, one end of the recovery passage 18 is connected to the tested pressure maintaining circuit 17, and the other end of the recovery passage 18 is connected to the pressure maintaining circuit 17 to be tested.

[0049] The third air-controlled stop valve 14 is arranged on the recovery passage 18. When the fourth solenoid valve 12 is energized, the third air-controlled stop valve 14 is opened. At this time, the remaining gas in the tested pressure-maintaining circuit 17 can be sent to the pressure-maintaining circuit 17 to be tested for recycling the remaining gas.

[0050] In this embodiment, it should be noted that if the pressure maintaining circuit 17 is provided with three groups, a third air-controlled stop valve 14 needs to be provided on both the first group and the second group. The third air-controlled stop valve 14 on the first group is used to recover the remaining gas in the first group to the second group, and the third air-controlled stop valve 14 on the second group is used to recover the remaining gas in the second group to the third group.

[0051] In addition, the third gas-controlled stop valve 14 is driven by gas, and there is no restriction on the specific gas used. The third gas-controlled stop valve 14 can be driven by gas and opened only when the fourth solenoid valve 12 is energized.

[0052] Optionally, the third gas-controlled stop valve 14 may also be other switch valves without limitation.

[0053] Based on any of the above embodiments, a third bypass ball valve 13 is also provided on the lower side of the fourth solenoid valve 12, and the two ports at the upper end of the third bypass ball valve 13 are respectively connected to the fourth solenoid valve 12 and the gas pressure supply system 01, and the lower end port of the third bypass ball valve 13 is connected to the third gas-controlled stop valve 14.

[0054] Please refer to Figure 1 The residual gas recovery system 03 also includes a third bypass ball valve 13, which is arranged at the lower side of the fourth solenoid valve 12. By manually controlling the direction of the third bypass ball valve 13, the third air-controlled stop valve 14 has more opening modes to ensure the reliability of residual gas recovery.

[0055] Specifically, when the fourth solenoid valve 12 is energized and the third bypass ball valve 13 is in the first direction, the third air-controlled stop valve 14 can be driven by the gas on the branch line through the fourth solenoid valve 12 and the third bypass ball valve 13 to open the third air-controlled stop valve 14; when the fourth solenoid valve 12 is damaged and the third bypass ball valve 13 is in the second direction, the gas can be directly driven by the third bypass ball valve 13 to open the third air-controlled stop valve 14.

[0056] Based on any of the above embodiments, the test circuit further comprises:

[0057] A test gas circuit 19, used for conveying test gas and connected with the pressure maintaining circuit 17;

[0058] The control circuit is used to control the on-off between the test gas circuit 19 and the pressure maintaining circuit 17. When the test gas circuit 19 and the pressure maintaining circuit 17 are disconnected, the pressure maintaining circuit 17 can perform an air tightness test.

[0059] Please refer to Figure 1 In addition to the pressure maintaining circuit 17 , the test circuit also includes a test gas circuit 19 and a control circuit, wherein the test gas circuit 19 is connected to the pressure maintaining circuit 17 for delivering test gas to the pressure maintaining circuit 17 .

[0060] The control circuit is used to control the on-off connection between the pressure maintaining circuit 17 and the test gas circuit 19. When the test gas circuit 19 and the pressure maintaining circuit 17 are connected, a certain amount of pressurized test gas is introduced into the pressure maintaining circuit 17; when the test gas circuit 19 and the pressure maintaining circuit 17 are disconnected, pressurized test gas is no longer introduced into the pressure maintaining circuit 17. At this time, the pressure in the pressure maintaining circuit 17 is constant. The component to be tested and the pressure detection element arranged in parallel on the pressure maintaining circuit 17 are used to evaluate whether there is a leak in the component to be tested based on the numerical value of the pressure detection element.

[0061] In this embodiment, the specific form of the control circuit is not limited, and any on-off effect of delivering the test gas to the pressure-maintaining circuit 17 can be achieved, such as a switch valve, a one-way valve, a stop valve, etc.

[0062] Based on any of the above embodiments, the control circuit includes a pressure maintaining control circuit and a pressure relief control circuit;

[0063] The pressure-maintaining control circuit includes a driving gas supply source 15, a second solenoid valve 6, and a first gas-controlled stop valve 8. When the second solenoid valve 6 is energized, the gas of the driving gas supply source 15 can drive the first gas-controlled stop valve 8 to open, so as to connect the test gas circuit 19 and the pressure-maintaining circuit 17.

[0064] The pressure relief control circuit includes a third solenoid valve 9 and a second air-controlled stop valve 11 connected thereto. The second air-controlled stop valve 11 is arranged on the air relief passage 16. The air relief passage 16 is connected to the pressure maintaining circuit 17. When the third air-controlled stop valve 14 is closed, the gas from the driving gas supply source 15 can drive the second air-controlled stop valve 11 to open to discharge the remaining test gas on the pressure maintaining circuit 17.

[0065] Please refer to Figure 1 The control circuit includes a pressure maintaining control circuit and a pressure relief control circuit. The pressure maintaining control circuit controls the on / off of the test gas in the pressure maintaining circuit 17, and the pressure relief control circuit is used to control the release of the remaining gas that cannot be recovered after the remaining gas in the pressure maintaining circuit 17 is recovered.

[0066] Specifically, when recycling the gas in the tested pressure maintaining circuit, there is still a small amount of high-pressure gas that cannot be recovered and needs to be released through the pressure relief control circuit, but the amount released is small. When releasing, it can effectively reduce the pressure and gas volume before the pressure relief, reduce the noise pollution during the pressure relief, and reduce the pressure relief time.

[0067] The pressure maintaining control circuit includes a driving gas supply source 15, a second solenoid valve 6, and a first air-controlled stop valve 8, which are connected in series. The driving gas supply source 15 is a device for providing driving gas, and the driving gas is preferably air. When the second solenoid valve 6 is energized, the driving gas flows to the first air-controlled stop valve 8 to open it. At this time, the pressure maintaining circuit 17 and the test gas circuit 19 are connected.

[0068] The pressure relief control circuit includes a third solenoid valve 9 and a second air-controlled stop valve 11 connected thereto. The pressure-maintaining circuit 17 is connected to a pressure relief circuit 16 . The second air-controlled stop valve 11 is arranged on the pressure relief circuit 16 to control the start and stop of pressure relief.

[0069] After the residual gas recovery operation in the tested pressure-maintaining circuit is completed, the third gas-controlled stop valve 14 is closed, and the discharge operation can be performed at this time. Specifically, when the third solenoid valve 9 is energized, the driving gas of the driving gas supply source 15 can drive the second gas-controlled stop valve 11 to open, so as to discharge the residual test gas on the pressure-maintaining circuit 17 through the discharge circuit 16.

[0070] Based on any of the above embodiments, the gas pressure supply system 01 includes:

[0071] Medium gas supply equipment 1, used for providing test gas;

[0072] An air-driven air pressure booster pump 5, the inlet end of the air-driven air pressure booster pump 5 is connected to the outlet end of the medium gas supply device 1, and the outlet end of the air-driven air pressure booster pump 5 is connected to the test gas circuit 19;

[0073] The driving assembly is connected to the air-driven air pressure booster pump 5 and is used to drive the air-driven air pressure booster pump 5 to pressurize the test gas.

[0074] Please refer to Figure 1 The gas pressure supply system 01 includes a medium gas supply device for providing a test gas, preferably nitrogen.

[0075] The inlet end of the air-driven air pressure booster pump 5 is connected to the outlet end of the medium gas supply device 1. The test gas is pressurized by the air-driven air pressure booster pump 5 and sent to the test gas circuit 19 through the outlet end to transport high-pressure test gas to the pressure maintaining circuit 17.

[0076] The driving component is connected to the air-driven air pressure booster pump 5 to start the air-driven air pressure booster pump 5 to pressurize the test gas of the medium gas supply device 1 and then send it to the test gas circuit 19.

[0077] Based on any of the above embodiments, the driving component includes a second pressure regulating valve 2 connected to the driving gas supply source 15, and a first solenoid valve 4 is also provided between the second pressure regulating valve 2 and the air-driven air pressure booster pump 5. When the first solenoid valve 4 is energized, the air-driven air pressure booster pump 5 is driven to pressurize.

[0078] Please refer to Figure 1 The driving component includes a second pressure regulating valve 2 and a first solenoid valve 4. The second pressure regulating valve 2 is arranged at the rear end of the driving gas supply source 15 and is used to stabilize the pressure of the driving gas to ensure the reliability and safety of the driving gas operation.

[0079] When the first solenoid valve 4 is energized, the driving gas from the driving gas supply source 15 can operate on the air-driven air pressure booster pump 5, and the air-driven air pressure booster pump 5 is driven to pressurize the test gas.

[0080] On the basis of any of the above embodiments, the outlet of the driving gas supply source 15 is connected to the driving gas circuit 20 , and the control circuit and the residual gas recovery system 03 are both connected to the driving gas circuit 20 .

[0081] Please refer to Figure 1 The outlet end of the driving gas supply source 15 is connected to a driving gas circuit 20, which is independent of the operation of the gas-driven air pressure booster pump 5 and is mainly used for controlling the circuit and the residual gas recovery system 03.

[0082] Specifically, first, the driving gas in the driving gas circuit 20 can drive the first air-controlled stop valve 8 to connect the pressure maintaining circuit 17 and the test gas circuit 19, so as to deliver high-pressure test gas to the pressure maintaining circuit 17; secondly, the driving gas in the driving circuit 20 can drive the second air-controlled stop valve 11 to discharge the remaining residual gas in the pressure maintaining circuit 17 after the residual gas recovery is completed; finally, the driving gas in the driving gas circuit 20 can drive the third air-controlled stop valve 14 to deliver the residual gas in the tested pressure maintaining circuit 17 to the pressure maintaining circuit 17 to be tested, so as to complete the recovery and utilization of the residual gas.

[0083] On the basis of any of the above embodiments, a first bypass ball valve 7 is provided at the lower side of the second solenoid valve 6, and two ports at the upper end of the first bypass ball valve 7 are respectively connected to the second solenoid valve 6 and the driving gas circuit 20, and the lower end port of the first bypass ball valve 7 is connected to the first gas-controlled stop valve 8;

[0084] A second bypass ball valve 10 is provided at the lower side of the third solenoid valve 9 , and two ports at the upper end of the second bypass ball valve 10 are respectively connected to the third solenoid valve 9 and the driving gas circuit 20 , and the lower end port of the first bypass ball valve 7 is connected to the second gas-controlled stop valve 11 .

[0085] Please refer to Figure 1 Both the first bypass ball valve 7 and the second bypass ball valve 10 ensure the stable operation of the gas-controlled stop valve and ensure the stability and reliability of the system.

[0086] Specifically, when the second solenoid valve 6 fails, the first bypass ball valve 7 can still connect the first air-controlled stop valve 8 and the driving gas circuit 20, so that the first air-controlled stop valve 8 is opened or closed under the action of the driving gas, and the driving gas 20 is not supplied when it is closed.

[0087] When the third solenoid valve 9 fails, the second bypass ball valve 10 can still connect the second air-controlled stop valve 11 and the driving gas circuit 20, so that the second air-controlled stop valve 11 is opened or closed under the action of the driving gas, correspondingly performing a pressure relief operation or not performing a pressure relief operation.

[0088] On the basis of any of the above embodiments, a second pressure regulating valve 3 is further provided on the driving gas circuit 20 , and two groups of test circuits are connected in parallel to the rear end of the second pressure regulating valve 3 .

[0089] Please refer to Figure 1 A second pressure regulating valve 3 is also provided on the driving gas circuit 20. The second pressure regulating valve 3 is provided at the rear end of the driving gas supply source 15 and is used to regulate the driving gas pressure and stabilize it before supplying it to the two test circuits at the rear end.

[0090] Optionally, if it is necessary to continue to add several groups of test circuits, they can be connected in parallel at the rear end of the second pressure regulating valve 2, and several groups of second air-controlled stop valves 11 and several groups of third air-controlled stop valves 14 can be added accordingly.

[0091] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0092] The above is a detailed introduction to the airtightness test system provided by the utility model. This article uses specific examples to illustrate the principle and implementation method of the utility model. The description of the above embodiments is only used to help understand the method and core idea of ​​the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

Claims

1. A gas-tightness test system, characterized in that: include: A gas pressure supply system (01), used for providing test gas; A control pressure-maintaining circuit system (02) comprises at least two test circuits arranged in parallel, each of the test circuits is provided with a pressure-maintaining circuit (17), each of the pressure-maintaining circuits (17) is connected to the gas pressure supply system (01), and the pressure-maintaining circuit (17) is used to perform a pressure-maintaining operation to detect the air tightness of the component to be tested; A residual gas recovery system (03), wherein two ends of the residual gas recovery system (03) are respectively connected to the tested pressure-maintaining circuit (17) and the pressure-maintaining circuit (17) to be tested, and is used to recover the residual gas in the tested pressure-maintaining circuit (17) for use in the pressure-maintaining circuit (17) to be tested.

2. The airtightness testing system according to claim 1, characterized in that: The residual gas recovery system (03) comprises: A fourth solenoid valve (12); The third air-controlled stop valve (14) is arranged on a recovery passage (18) connected to the control pressure-maintaining circuit system (02); one end of the recovery passage (18) is connected to the pressure-maintaining circuit (17) that has been tested, and the other end of the recovery passage (18) is connected to the pressure-maintaining circuit (17) to be tested; when the fourth solenoid valve (12) is energized, the third air-controlled stop valve (14) opens to recover and transport the residual gas.

3. The airtightness testing system according to claim 2, characterized in that: A third bypass ball valve (13) is also provided at the lower side of the fourth solenoid valve (12); two ports at the upper end of the third bypass ball valve (13) are respectively connected to the fourth solenoid valve (12) and the gas pressure supply system (01); and a lower end port of the third bypass ball valve (13) is connected to the third gas-controlled stop valve (14).

4. The airtightness testing system according to claim 1, characterized in that: The test circuit also includes: A test gas circuit (19), used for conveying the test gas and connected to the pressure maintaining circuit (17); The control circuit is used to control the on-off between the test gas circuit (19) and the pressure maintaining circuit (17); when the test gas circuit (19) and the pressure maintaining circuit (17) are disconnected, the pressure maintaining circuit (17) can be subjected to an air tightness test.

5. The airtightness testing system according to claim 4, characterized in that: The control circuit includes a pressure maintaining control circuit and a pressure relief control circuit; The pressure-maintaining control circuit comprises a driving gas supply source (15), a second solenoid valve (6), and a first gas-controlled stop valve (8); when the second solenoid valve (6) is energized, the gas of the driving gas supply source (15) can drive the first gas-controlled stop valve (8) to open, so as to connect the test gas circuit (19) and the pressure-maintaining circuit (17); The pressure relief control circuit comprises a third solenoid valve (9) and a second air-controlled stop valve (11) connected thereto, wherein the second air-controlled stop valve (11) is arranged on an air relief passage (16), and the air relief passage (16) is connected to the pressure maintaining circuit (17). When the third air-controlled stop valve (14) is closed, the gas from the driving gas supply source (15) can drive the second air-controlled stop valve (11) to open, so as to discharge the remaining test gas on the pressure maintaining circuit (17).

6. The airtightness testing system according to claim 5, characterized in that: The gas pressure supply system (01) comprises: A medium gas supply device (1), used for providing the test gas; An air-driven air pressure booster pump (5), wherein the inlet end of the air-driven air pressure booster pump (5) is connected to the outlet end of the medium gas supply device (1), and the outlet end of the air-driven air pressure booster pump (5) is connected to the test gas circuit (19); A driving assembly is connected to the air-driven air pressure boosting pump (5) and is used to drive the air-driven air pressure boosting pump (5) to pressurize the test gas.

7. The airtightness testing system according to claim 6, characterized in that: The driving component comprises a second pressure regulating valve (2) connected to the driving gas supply source (15), and a first solenoid valve (4) is also provided between the second pressure regulating valve (2) and the gas-driven air pressure boosting pump (5). When the first solenoid valve (4) is energized, the gas-driven air pressure boosting pump (5) is driven to increase pressure.

8. The airtightness testing system according to claim 7, characterized in that: The outlet of the driving gas supply source (15) is connected to a driving gas circuit (20), and the control circuit and the residual gas recovery system (03) are both connected to the driving gas circuit (20).

9. The airtightness testing system according to claim 8, characterized in that: A first bypass ball valve (7) is provided at the lower side of the second solenoid valve (6), two ports at the upper end of the first bypass ball valve (7) are respectively connected to the second solenoid valve (6) and the driving gas circuit (20), and a lower end port of the first bypass ball valve (7) is connected to the first gas-controlled stop valve (8); A second bypass ball valve (10) is provided at the lower side of the third solenoid valve (9), and two ports at the upper end of the second bypass ball valve (10) are respectively connected to the third solenoid valve (9) and the driving gas circuit (20), and a lower end port of the first bypass ball valve (7) is connected to the second gas-controlled stop valve (11).

10. The airtightness testing system according to claim 9, characterized in that: The driving gas circuit (20) is also provided with a second pressure regulating valve (3), and the rear end of the second pressure regulating valve (3) is connected in parallel with two groups of the test circuits.