Energy management device and power distribution system

By integrating the current sampling component and voltage sampling pin in the energy management device, power is drawn directly from the copper bar, which solves the problem of complex cable connections of existing power collectors, achieves integration of power collection functions, and reduces space occupation. , improving the monitoring and control capabilities of electrical equipment.

CN221862495UActive Publication Date: 2024-10-18HUAWEI DIGITAL POWER TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323038709.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-10
Publication Date
2024-10-18
Estimated Expiration
2033-11-10

AI Technical Summary

Technical Problem

Existing power collectors require additional voltage cables and current cables, which complicates assembly and increases space occupation.

Method used

An energy management device is designed. By integrating the current sampling component and voltage sampling pin in the power board and sampling component, it directly draws power from the copper bar, avoiding cable connections, simplifying the structure and reducing the occupied space.

Benefits of technology

It realizes the integration of power collection function, simplifies the structure of the energy management device, reduces space occupation, and improves the convenience of assembly and the monitoring and control capabilities of electrical equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221862495U_ABST
    Figure CN221862495U_ABST
Patent Text Reader

Abstract

The utility model provides an energy management device and a power distribution system. The energy management device comprises a shell, a power panel, a sampling metering board and a sampling assembly. The sampling assembly is located on one side of the power panel and comprises a copper bar, a current sampling assembly and a voltage sampling lead needle. The current sampling assembly comprises a current transformer and a current sampling pin. And the current transformer is fixedly connected to the copper bar and is conductively connected with the copper bar. And the current sampling lead pin is conductively connected between the current transformer and the power panel. And the voltage sampling lead pin is conductively connected between the copper bar and the power panel. The sampling metering board is conductively connected with the power board. The power board receives the sampling data and sends the sampling data to the sampling metering board for processing. The energy management device integrates an electric quantity acquisition function and can be connected to a power distribution system so as to control the operation state of electric equipment. In addition, the current sampling assembly and the voltage sampling assembly directly take electricity from the copper bar, no cable needs to be arranged, and therefore the structure of the energy management device can be simplified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy technology, and in particular to an energy management device and a power distribution system. Background Art

[0002] With the demand for stable power supply, it is necessary to set up a power collector in the energy storage system to collect characteristic quantities such as voltage, current, and power on the power bus, so as to realize the energy storage charging and discharging function based on the collected data.

[0003] Existing power collectors are usually connected externally, such as by connecting the power collector to the system through cables. However, the addition of power collectors requires additional voltage cables and current cables, which not only requires additional space for accommodation, but also complicates the assembly operation of technicians. Utility Model Content

[0004] The present application provides an energy management device and a power distribution system to configure an electric quantity collection function in the energy management device and simplify the structure of the energy management device to reduce the occupied space of the energy management device.

[0005] In a first aspect, the present application provides an energy management device. The energy management device includes a housing, a power board, a sampling and metering board, and a sampling component, wherein the power board, the sampling and metering board, and the sampling component are located in the housing. The sampling component is located on one side of the power board, and the sampling component specifically includes a copper bus, a current sampling component, and a voltage sampling pin. Specifically, the current sampling component includes a current transformer and a current sampling pin, wherein the current transformer is fixedly connected to the copper bus, and the current transformer is conductively connected to the copper bus. One end of the current sampling pin is conductively connected to the current transformer, and the other end of the current sampling pin is conductively connected to the sampling and metering board. One end of the voltage sampling pin is conductively connected to the copper bus, and the other end of the voltage sampling pin is conductively connected to the power board. The sampling and metering board is conductively connected to the power board. The power board is used to receive sampling data of the sampling component and send the sampling data to the sampling and metering board. The sampling and metering board is used to process the sampling data.

[0006] The above-mentioned energy management device can be applied to the power distribution system. Among them, the sampling component can realize the power collection function, that is, the current sampling component is used to collect current data, and the voltage sampling pin is used to collect voltage data. The sampling component sends the current sampling data and the voltage sampling data to the sampling and metering board, and the sampling and metering board can process the current sampling data and the voltage sampling data for the energy management device to control the electrical equipment. The energy management device of the present application can be connected to the power distribution system and integrated with the power collection function of the electric meter, so that the monitoring and communication of the electrical equipment can be realized, and the operating status of the electrical equipment can be controlled according to the sampling data. In addition, the current sampling component and the voltage sampling pin directly draw electricity from the copper busbar, and there is no need to realize the conductive connection through cables, so that the structure of the energy management device can be simplified, thereby reducing the occupied space of the energy management device.

[0007] When specifically setting the position of the sampling and metering board, in one possible implementation, the power board and the sampling assembly can be located on the same side of the sampling and metering board, and the sampling and metering board is arranged perpendicular to the power board. In another possible implementation, the power board and the sampling and metering board are arranged in parallel, and the sampling assembly is located between the power board and the sampling and metering.

[0008] In a possible implementation, the energy management device further includes a connector, and the sampling and metering board is connected to the power board via the connector. The connection may include a mechanical connection and a conductive connection.

[0009] In a possible implementation, the sampling assembly may further include a housing, which is sleeved on one end of the copper busbar. The current transformer is located in the housing, and the current sampling pins are located in the housing and extend out of the housing respectively. In the sampling assembly, the current transformer can be fixed in the housing, and the copper busbar can be connected to the current transformer while passing through the housing, so as to assemble the sampling assembly.

[0010] In one possible implementation, the housing includes a base and a cover, the base and the cover are detachably connected to form a receiving space, and the power board, sampling and metering board and sampling assembly are arranged in the receiving space, which is conducive to the integration of the energy management device.

[0011] In a possible implementation, the energy management device further includes a central processing unit board, which is located on a side of the power supply board away from the sampling assembly and is conductively connected to the sampling metering board. The central processing unit board is used to generate control instructions based on the processed sampling data to control the operating state of the power-consuming device.

[0012] In a possible implementation, the central processing unit board and the sampling and metering board may be formed as an integrated structure to further simplify the structure of the energy management device.

[0013] In one possible implementation, the central processing unit board is connected to the outer shell. In this way, when assembling the energy management device, the central processing unit board can be connected to the outer shell first, and then the central processing unit board can be connected to the power board and the sampling and metering board. In this way, when assembling the energy management device, the central processing unit board, the power board and the sampling and metering board can be assembled at the same time as the outer shell. Of course, in another possible implementation, the central processing unit board can be connected to the power board and the sampling and metering board. In this way, when assembling the energy management device, the central processing unit board, the power board, the sampling and metering board and the sampling assembly can be assembled first and placed in the outer shell, and then the outer shell can be assembled. Among them, the connection between the central processing unit board and the outer shell, or the connection between the central processing unit board and the power board and the sampling and metering board includes a fixed connection or a detachable connection.

[0014] In a possible implementation, the housing is provided with a current transformer external interface, and the current transformer external interface is conductively connected to the power board. Therefore, in practical applications, the energy management device can also be externally connected to a current transformer.

[0015] In the second aspect, the present application provides a power distribution system. The power distribution system includes a backup power box and the energy management device of the first aspect mentioned above, and the energy management device is arranged in the backup power box. In the power distribution system of the present application, the energy management device can be connected to the power distribution system and integrated with the power collection function of the electric meter, so that the monitoring and communication of the electric equipment can be realized, and the operating status of the electric equipment can be controlled according to the sampled data. In addition, in the energy management device, the current sampling component and the voltage sampling pin directly draw power from the copper busbar, and there is no need to achieve conductive connection through cables, thereby simplifying the structure of the energy management device and reducing the occupied space of the energy management device.

[0016] In a possible implementation, the energy management device can be connected to a system with a built-in current transformer. Specifically, the power distribution system includes a power supply device. The energy management device is provided with an incoming line interface and an outgoing line interface, the incoming line interface is connected to the power supply device, and the outgoing line interface is connected to the load.

[0017] In a possible implementation, the energy management device may also be connected to a system of an external current transformer. Specifically, the power distribution system includes a power supply device and an external current transformer. The energy management device is provided with an incoming line interface and a current transformer external interface, the incoming line interface is connected to the power supply device, the current transformer external interface is connected to the external current transformer, and the load is connected through the external current transformer. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of a power distribution system provided in an embodiment of the present application;

[0019] Figure 2 Another schematic diagram of a power distribution system provided in an embodiment of the present application;

[0020] Figure 3 A schematic diagram of an energy management device provided in an embodiment of the present application;

[0021] Figure 4 An exploded schematic diagram of an energy management device provided in an embodiment of the present application;

[0022] Figure 5 Another exploded schematic diagram of the energy management device provided in an embodiment of the present application;

[0023] Figure 6 An exploded schematic diagram of a central processing unit board, a power supply board, a sampling metering board and a sampling assembly provided in an embodiment of the present application;

[0024] Figure 7 Another exploded schematic diagram of a central processing unit board, a power supply board, a sampling metering board and a sampling assembly provided in an embodiment of the present application;

[0025] Figure 8 Another exploded schematic diagram of a central processing unit board, a power supply board, a sampling metering board and a sampling assembly provided in an embodiment of the present application;

[0026] Fig. 9 A schematic diagram of the cooperation between the power board, the sampling and metering board and the sampling assembly provided in an embodiment of the present application;

[0027] Fig.10 Another schematic diagram of the cooperation between the power board, the sampling and metering board and the sampling assembly provided in the embodiment of the present application;

[0028] Fig.11 A schematic diagram of a sampling assembly provided in an embodiment of the present application;

[0029] Fig.12 Another schematic diagram of a sampling assembly provided in an embodiment of the present application;

[0030] Fig.13 for Fig.11 An exploded schematic diagram of a sampling assembly;

[0031] Fig.14 A schematic diagram of a current sampling component provided in an embodiment of the present application;

[0032] Fig.15 Another schematic diagram of a current sampling component provided in an embodiment of the present application;

[0033] Fig.16 A schematic diagram of a housing provided in an embodiment of the present application;

[0034] Fig.17 Another schematic diagram of a housing provided in an embodiment of the present application.

[0035] Reference numerals:

[0036] 10- Power distribution system

[0037] 11-Energy management device

[0038] 111-Housing

[0039] 112-CPU Board

[0040] 113-Power board

[0041] 114-Sampling metering board

[0042] 115-Sampling Components

[0043] 116-Insulation partition

[0044] 117-Connector

[0045] 1111-Base

[0046] 1112-cover

[0047] 1131-Limiting hole

[0048] 1151-Copper busbar

[0049] 1152-Current Sampling Component

[0050] 1153-voltage sampling pin

[0051] 1154-Shell

[0052] 11111-Incoming line interface

[0053] 11112-Outlet interface

[0054] 11121-Current transformer external interface

[0055] 11511-Conductor

[0056] 11521-Current Transformer

[0057] 11522-Current sampling pin

[0058] 11541-Support column

[0059] 11542-Through hole

[0060] 11543-Limiting clip

[0061] 11544-Clip protrusion DETAILED DESCRIPTION

[0062] In order to make the objectives, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings.

[0063] It should be noted that the terms used in the following embodiments are only for the purpose of describing specific embodiments and are not intended to be limiting of the present application. As used in the specification and appended claims of the present application, the singular expressions "a", "an", "said", "above", "the" and "this" are intended to also include expressions such as "one or more", unless there is a clear indication to the contrary in the context.

[0064] References to "one embodiment" or "some embodiments" etc. described in this specification mean that a particular feature, structure or characteristic described in conjunction with the embodiment is included in one or more embodiments of the present application. Thus, the phrases "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear at different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0065] In order to facilitate understanding of the energy management device and power distribution system provided in the embodiments of the present application, the application scenarios thereof are described below. The power distribution system can be applied to household power supply, industrial power supply or commercial power supply, and is used to supply power to electrical equipment. Figure 1 A schematic diagram of a power distribution system provided in an embodiment of the present application, Figure 2 Another schematic diagram of the power distribution system provided in the embodiment of the present application. Figure 1 and Figure 2As shown, the power distribution system 10 includes a power grid and an energy management device 11. The energy management device 11 is connected to the power supply line of the power grid, wherein the input end of the energy management device 11 is connected to the power grid, and the output end of the energy management device 11 is connected to the power consumption device. The power consumption device may include a household load, a heat pump, a charging pile and / or a router, etc. In the power distribution system 10 of the present application, the energy management device 11 can be used to monitor the current and voltage of the power supply line, and control the operating state of the power consumption device according to the monitoring results. For example, in one application scenario, when a large load is suddenly turned on, or the power consumption device works abnormally, or the power of the household load exceeds the maximum power of the household load, the energy management device 11 can reduce the power consumption of the charging pile or the power consumption of the smart power consumption device connected to the household load. In another application scenario, when the power generation power of the power generation system changes, the energy management device 11 can adjust the power consumption of the charging pile or the smart power consumption device. In another application scenario, when the home network communication line is abnormal, the energy management device 11 can switch the charging pile and the power consumption device to their respective off-line power. In addition, the energy management device 11 can also control the power supply of intelligent electrical equipment to prevent the circuit breaker of the household load from overcurrent and causing the circuit breaker to trip or fire. In other words, the energy management device 11 has an overload protection function. When the energy management device 11 detects that the power supply current exceeds the rated current, the energy management device 11 can disconnect the power supply of the electrical equipment to ensure power safety. In addition, the energy management device 11 of the present application has an electric meter function, which can quantify the power consumption and electricity cost of each electrical equipment, so that users can compare the power consumption and electricity cost of different electrical equipment to intelligently control the operating status of the electrical equipment.

[0066] Figure 3 A schematic diagram of an energy management device provided in an embodiment of the present application, Figure 4 An exploded schematic diagram of an energy management device provided in an embodiment of the present application, Figure 5 Another exploded schematic diagram of the energy management device provided in the embodiment of the present application. Figure 3 , Figure 4 and Figure 5 As shown, the energy management device 11 includes a housing 111, a central processing unit board 112, a power supply board 113, a sampling and metering board 114, and a sampling component 115. In the present application, the sampling component 115 is used to collect current data and voltage data. The power supply board 113 is used to receive the sampling data collected by the sampling component 115, and send the sampling data to the sampling and metering board 114. The sampling and metering board 114 is used to process the received sampling data and send the processed sampling data to the central processing unit board 112. The central processing unit board 112 controls the operating device of the electrical equipment according to the processed sampling data. Among them, the central processing unit board 112, the power supply board 113, the sampling and metering board 114, and the sampling component 115 are located in the housing 111, and the specific position is not limited.

[0067] Figure 6 An exploded schematic diagram of a central processing unit board, a power supply board, a sampling metering board and a sampling assembly provided in an embodiment of the present application, Figure 7 Another exploded schematic diagram of the central processing unit board, power supply board, sampling metering board and sampling assembly provided in the embodiment of the present application. Figure 6 and Figure 7 As shown, in one embodiment, the power board 113 is located on one side of the central processor board 112, the sampling assembly 115 is located on the side of the power board 113 away from the central processor board 112, and the sampling metering board 114 is arranged perpendicular to the power board 113 and is located on one side of the power board 113. In this embodiment, the power board 113, the sampling metering board 114 and the sampling assembly 115 are located on the same side of the central processor board 112, and the power board 113 and the sampling assembly 115 are located on the same side of the sampling metering board 114.

[0068] Figure 8 Another exploded schematic diagram of the central processing unit board, power supply board, sampling metering board and sampling assembly provided in the embodiment of the present application. Figure 8 As shown, in another embodiment, the power board 113 is located on one side of the central processing unit board 112, the sampling component 115 is located on the side of the power board 113 away from the central processing unit board 112, and the sampling and metering board 114 is located on the side of the sampling component 115 away from the power board 113. In this embodiment, the central processing unit board 112, the power board 113, the sampling component 115 and the sampling and metering board 114 are arranged in a direction perpendicular to the power board 113 (such as Figure 8 In order to prevent the sampling and metering plate 114 and the power supply plate 113 from interfering with each other, the energy management device 11 further includes an insulating partition 116, which is located between the power supply plate 113 and the sampling assembly 115.

[0069] Fig. 9 A schematic diagram of the cooperation between the power board, the sampling and metering board and the sampling assembly provided in an embodiment of the present application, Fig.10 Another schematic diagram of the cooperation between the power board, the sampling and metering board, and the sampling assembly provided in the embodiment of the present application. Fig. 9 and Fig.10 As shown, in the present application, the sampling assembly 115 is conductively connected to the power board 113. The energy management device 11 further includes a connector 117. The sampling and metering board 114 and the power board 113 are connected via the connector 117, wherein the connection between the sampling and metering board 114 and the power board 113 includes a mechanical connection and a conductive connection. That is, when the sampling and metering board 114 and the power board 113 are connected via the connector 117, the sampling and metering board 114 is fixed relative to the power board 113, and the sampling and metering board 114 is conductively connected to the power board 113.

[0070] It should be noted that, in the embodiment of the present application, the position of the sampling and metering board 114 in the housing 111 is not limited. For example, the sampling and metering board 114 can be located on the side of the power board 113 away from the central processing unit board 112, or the sampling and metering board 114 can also be located on the side of the central processing unit board 112 away from the power board 113, or the sampling and metering board 114 can also be arranged on the central processing unit board 112, or the sampling and metering board 114 can also be integrated on the central processing unit board 112.

[0071] Fig.11 A schematic diagram of a sampling assembly provided in an embodiment of the present application, Fig.12 Another schematic diagram of a sampling assembly provided in an embodiment of the present application, Fig.13 for Fig.11 An exploded schematic diagram of the sampling assembly. Fig.11 , Fig.12 and Fig.13 As shown, the sampling component 115 specifically includes a copper bus 1151, a current sampling component 1152 and a voltage sampling pin 1153. Among them, the current sampling component 1152 is sleeved on one end of the copper bus 1151 and is conductively connected to the copper bus 1151. One end of the voltage sampling pin 1153 is conductively connected to the copper bus 1151, and the other end is conductively connected to the power board 113. In this embodiment, the fixed connection between the voltage sampling pin 1153 and the copper bus 1151 can include welding, clamping or threaded connection.

[0072] Fig.14 A schematic diagram of a current sampling component provided in an embodiment of the present application, Fig.15 Another schematic diagram of the current sampling component provided in the embodiment of the present application. Fig.14 and Fig.15 As shown, specifically, the current sampling component 1152 includes a current transformer 11521 and a current sampling pin 11522. The current transformer 11521 is fixedly connected to the copper bus 1151, and the current transformer 11521 is conductively connected to the copper bus 1151. One end of the current sampling pin 11522 is conductively connected to the current transformer 11521, and the other end is conductively connected to the power board 113.

[0073] The sampling assembly 115 is used to access the alternating current of the power grid. In a specific embodiment, the copper bus 1151 includes four conductors 11511 arranged in parallel, and the four conductors 11511 are respectively connected to the L1 line, the L2 line, the L3 line and the neutral line (N line). Correspondingly, the current sampling assembly 1152 includes four current transformers 11521 and four current sampling pins 11522. The aforementioned four current transformers 11521 are arranged in a one-to-one correspondence with the aforementioned four conductors 11511, and the aforementioned four current sampling pins 11522 are arranged in a one-to-one correspondence with the aforementioned four current transformers 11521. In other words, a current transformer 11521 is sleeved at the end of a conductor 11511, and a current sampling pin 11522 is connected to a current transformer 11521. The sampling assembly 115 includes four voltage sampling pins 1153, and the four voltage sampling pins 1153 are arranged in a one-to-one correspondence with the aforementioned four conductors 11511.

[0074] The energy management device 11 of the above embodiment is integrated with the electricity collection function of the electric meter, wherein the sampling component 115 can realize the electricity collection function, that is, the current sampling component 1152 is used to collect current data, and the voltage sampling pin 1153 is used to collect voltage data. The sampling component 115 sends the current sampling data and the voltage sampling data to the sampling metering board 114, and the sampling metering board 114 can process the current sampling data and the voltage sampling data so that the energy management device 11 can control the operating status of the electrical equipment, thereby realizing the monitoring and communication of the electrical equipment. In addition, the current sampling component 1152 and the voltage sampling pin 1153 directly draw electricity from the copper bus 1151, and do not need to realize conductive connection through cables, thereby simplifying the structure of the energy management device 11 and reducing the occupied space of the energy management device 11.

[0075] like Fig.14 and Fig.15As shown, the sampling assembly 115 may also include a housing 1154, and the housing 1154 is sleeved on one end of the copper busbar 1151. The current transformer 11521 is located in the housing 1154, and the current sampling pins 11522 are located in the housing 1154 and extend out of the housing 1154 respectively. In the sampling assembly 115, the current transformer 11521 can be fixed in the housing 1154, and the copper busbar 1151 can be connected to the current transformer 11521 while passing through the housing 1154, so as to facilitate the assembly of the sampling assembly 115. Specifically, a support column 11541 is provided in the housing 1154, and the current transformer 11521 is sleeved on the outer periphery of the support column 11541. The support column 11541 has a through hole 11542 extending in the axial direction, and the conductor 11511 of the copper busbar 1151 passes through the through hole 11542 and is conductively connected to the current transformer 11521. In addition, a limit clamp 11543 is also provided on the surface of the housing 1154, and the limit clamp 11543 can be limited close to the through hole 11542. When the voltage sampling lead pin 1153 is clamped in the limit clamp 11543, the end of the voltage sampling lead pin 1153 close to the copper bus 1151 can contact the conductor 11511 of the copper bus 1151, and maintain the conductive connection between the voltage sampling lead pin 1153 and the copper bus 1151. In addition, a clamping protrusion 11544 is also provided on the surface of the housing 1154 on one side facing the power board 113, and the power board 113 is correspondingly provided with a limit hole 1131, and the limit hole 1131 and the clamping protrusion 11544 can be clamped and matched. When the engaging protrusion 11544 is inserted into the limiting hole 1131 and engaged, the housing 1154 can be fixed relative to the power board 113, so that the current sampling pin 11522 and the voltage sampling pin 1153 are respectively connected to the power board 113 in an electrically conductive manner, thereby realizing the connection between the sampling component 115 and the power board 113 without the need to set cables. This connection method can simplify the structure of the energy management device 11 and facilitate assembly and disassembly operations. Figure 6 As shown, in one embodiment, the power board 113 and the sampling and metering board 114 are located on the same side of the sampling component 115, and the current sampling pin 11522 and the clamping protrusion 11544 are arranged in the same direction. In this embodiment, the sampling component 115 sends the current sampling data and the voltage sampling data to the sampling and metering board 114 through the power board 113. Figure 8As shown, in another embodiment, the power board 113 and the sampling and metering board 114 are located on both sides of the sampling assembly 115, the current sampling pin 11522 is arranged toward the sampling and metering board 114 and is conductively connected to the sampling and metering board 114, the clamping protrusion 11544 and the voltage sampling pin 1153 are arranged toward the power board 113, and the voltage sampling pin 1153 is conductively connected to the power board 113. In this embodiment, the sampling assembly 115 directly sends the current sampling data to the sampling and metering board 114, and sends the voltage sampling data to the sampling and metering board 114 through the power board 113. Of course, in some other embodiments, the sampling assembly 115 can also omit the housing 1154. In this embodiment, the end of the conductor 11511 can be sleeved with a support column 11541, and the current transformer 11521 can be directly sleeved on the peripheral side of the support column 11541.

[0076] In one embodiment, the housing 111 of the energy management device 11 may specifically include a base 1111 and a cover 1112 . Fig.16 A schematic diagram of a housing provided in an embodiment of the present application, Fig.17 Another schematic diagram of a housing provided in an embodiment of the present application. Figure 4 , Fig.16 and Fig.17As shown, the base 1111 is detachably connected to the cover 1112, and the base 1111 and the cover 1112 are connected to form an accommodating space, and the central processing unit board 112, the power board 113, the sampling and metering board 114 and the sampling assembly 115 are arranged in the accommodating space. In one embodiment, the central processing unit board 112 can be connected to the cover 1112 of the housing 111. In this way, when assembling the energy management device 11, the central processing unit board 112 can be assembled and connected to the cover 1112 first, and the power board 113, the sampling and metering board 114 and the sampling assembly 115 can be assembled and arranged in the base 1111. When the base 1111 and the cover 1112 are assembled, the central processing unit board 112 can be connected to the power board 113 and the sampling and metering board 114. In another embodiment, the central processing unit board 112 can be connected to the power board 113 and the sampling and metering board 114. Among them, the power board 113 and the sampling and metering board 114 are respectively connected to the central processing unit board 112. In this way, when assembling the energy management device 11, the central processing unit board 112, the power supply board 113, the sampling and metering board 114 and the sampling assembly 115 can be assembled and placed in the housing 111, and then the housing 111 can be assembled. The connection between the central processing unit board 112 and the power supply board 113 and the sampling and metering board 114 includes a fixed connection or a detachable connection. In addition, the base 1111 is provided with an input interface 11111 and an output interface 11112. The input interface 11111 includes an L1 input interface (L1 IN), an L2 input interface (L2IN), an L3 input interface (L3 IN) and an N input interface (N IN), which are used to access the power grid. The output interface 11112 includes an L1 output interface (L1 OUT), an L2 output interface (L2OUT), an L3 output interface (L3 OUT) and an N output interface (N OUT), which are used to access electrical equipment. The cover 1112 is provided with other interfaces, for example, for connecting to a charging pile, a heat pump, or a router.

[0077] In one embodiment, the nominal current on the copper bus 1151 can be set to 63A. When the current sampling component 1152 detects current data greater than 63A, the energy management device 11 can adjust the power of the electrical equipment. Figure 2 As shown, in actual application, the connected electrical equipment may include multiple devices, and the nominal currents on some lines may be different. Therefore, the energy management device 11 can also be connected to an external current transformer. Fig.16 As shown, the cover 1112 is also provided with a current transformer external interface 11121, and the current transformer external interface 11121 is conductively connected to the power board 113. In this embodiment, the current transformer 11521 of the sampling component 115 and the external current transformer can be used to collect different currents. For example, the external current transformer can be used to collect current data greater than 250A.

[0078] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An energy management device, characterized in that: The invention comprises a housing, and a power supply board, a sampling metering board and a sampling assembly located in the housing, wherein: The sampling component is located on one side of the power board, and the sampling component includes a copper bus, a current sampling component and a voltage sampling pin; The current sampling assembly includes a current transformer and a current sampling pin, wherein the current transformer is fixedly connected to the copper busbar and is conductively connected to the copper busbar, one end of the current sampling pin is conductively connected to the current transformer, and the other end is conductively connected to the sampling and metering board; one end of the voltage sampling pin is conductively connected to the copper busbar, and the other end is conductively connected to the power board; The sampling and metering board is conductively connected to the power board; the power board is used to receive sampling data of the sampling component and send the sampling data to the sampling and metering board; the sampling and metering board is used to process the sampling data.

2. The energy management device according to claim 1, characterized in that: The power board and the sampling assembly are located on the same side of the sampling and metering board, and the sampling and metering board is arranged perpendicular to the power board; or, the power board and the sampling and metering board are arranged in parallel, and the sampling assembly is located between the power board and the sampling and metering.

3. The energy management device according to claim 1 or 2, characterized in that: The energy management device further comprises a connector, and the sampling and metering board is connected to the power board via the connector.

4. The energy management device according to claim 1 or 2, characterized in that: The sampling component comprises a shell, the shell is sleeved on one end of the copper busbar, the current transformer is located in the shell; the current sampling pins are located in the shell and extend out of the shell respectively.

5. The energy management device according to claim 4, characterized in that: The housing comprises a base and a cover body, wherein the base is detachably connected to the cover body and forms an accommodating space, wherein the power board, the sampling and metering board and the sampling assembly are arranged in the accommodating space.

6. The energy management device according to claim 1 or 2, characterized in that: The energy management device also includes a central processing unit board, which is located on a side of the power supply board away from the sampling component and is conductively connected to the sampling metering board; the central processing unit board is used to generate control instructions based on the processed sampling data.

7. The energy management device according to claim 6, characterized in that: The central processing unit board and the sampling and metering board are integrally formed into a structure.

8. The energy management device according to claim 6, characterized in that: The central processing unit board is detachably connected to the housing.

9. The energy management device according to claim 1 or 2, characterized in that: The shell is provided with a current transformer external interface, and the current transformer external interface is conductively connected to the power board.

10. A power distribution system, characterized in that: It comprises a backup power box and an energy management device as claimed in any one of claims 1 to 9, wherein the energy management device is arranged in the backup power box.

11. The power distribution system according to claim 10, characterized in that: The power distribution system includes a power supply device; The energy management device is provided with an incoming line interface and an outgoing line interface, the incoming line interface is connected to the power supply device, and the outgoing line interface is connected to the load.

12. The power distribution system according to claim 10, characterized in that The power distribution system includes a power supply device and an external current transformer; The energy management device is provided with an incoming line interface and a current transformer external interface, the incoming line interface is connected to the power supply device, the current transformer external interface is connected to the external current transformer, and is connected to the load through the external current transformer.

Citation Information