Greening facility based on sponge concept
By embedding water-storing bamboo tubes in the tree pond to collect and slowly replenish water, the problem of insufficient water caused by limited space for trees is solved, the survival rate of trees is improved, and it is suitable for a variety of places.
Patent Information
- Application Number
- CN202420422048.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The limited space for tree ponds on municipal roads makes it difficult for trees to get enough water and can easily lead to death.
Design a greening facility based on the sponge concept, including tree caves, planting soil layers, permeable covering layers and pre-buried water-retaining bamboo tubes. The water-retaining bamboo tubes collect surface runoff water and slowly replenish the trees to ensure that the soil is moist.
It effectively improves the survival rate of trees and prevents roots from drying out due to lack of water. It is suitable for various places, including municipal roads, parks and communities.
Smart Images

Figure CN221863733U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of garden planting, in particular to a greening facility based on the sponge concept. Background Art
[0002] Tree pits are artificial structures for planting trees and are the most basic space required for the growth of trees in urban roads and squares. Most tree pits set up on non-motorized vehicle lanes on municipal roads have limited space, which affects the growth of newly built trees. In order to alleviate the death of trees, watering is generally carried out by sprinkler trucks. Generally, the method of watering thoroughly after the trees are planted to keep the soil moist, and then replenishing water in time according to the conditions of the trees in the later stage. This method has the problem that the soil cannot meet the amount of water required for the survival of trees, which can easily lead to the death of trees. Utility Model Content
[0003] The utility model aims to provide a greening facility based on the sponge concept, so as to accumulate water, keep the soil moist and improve the survival rate of trees.
[0004] In order to achieve the above-mentioned purpose, the technical solution proposed by the utility model is:
[0005] A greening facility based on the sponge concept, comprising a tree hole, a planting soil layer, a permeable covering layer and a plurality of water-storing bamboo tubes, wherein the tree hole is opened in the original soil layer, the planting soil layer is laid in the tree hole, the permeable covering layer is laid on the planting soil layer, and the water-storing bamboo tubes are pre-buried in the planting soil layer.
[0006] Preferably, the water-storing bamboo tube comprises a tube body and a filter medium. The tube body is hollow inside and open at both ends. The filter medium covers the top of the tube body.
[0007] Preferably, the water-storing bamboo cylinder further comprises at least one bamboo-joint diaphragm arranged in the cylinder body, and the bamboo-joint diaphragm is provided with at least one water-passing hole.
[0008] Preferably, the top surface of the water-storing bamboo tube is connected to the bottom surface of the water-permeable covering layer.
[0009] Alternatively, the top surface of the water-storing bamboo tube is located within the permeable covering layer.
[0010] Preferably, the bottom end of the cylinder is a sharp end and is inserted into the original soil layer.
[0011] Preferably, a plurality of water-storing bamboo tubes are arranged around the circumference of the tree hole.
[0012] Preferably, the water-storage bamboo tube is inserted into the original soil layer to a depth of 14 to 16 cm.
[0013] Preferably, the distance between two adjacent water-storage bamboo tubes is 25 to 35 cm.
[0014] Preferably, the filter medium is a geotextile.
[0015] Preferably, the permeable covering layer includes a gravel layer, a medium-coarse sand layer and a permeable brick layer, the gravel layer is laid on the planting soil layer, the medium-coarse sand layer is laid on the gravel layer, and the permeable brick layer is laid on the medium-coarse sand layer.
[0016] Preferably, the gravel layer is paved with gravel having a diameter of 1 to 2 cm, the thickness of the medium-coarse sand layer is 2 to 4 cm, and the thickness of the permeable brick layer is 7 to 9 cm.
[0017] By adopting the above technical scheme, the beneficial effect of the utility model is as follows: the utility model combines the sponge concept to pre-bury water-storing bamboo tubes in the planting soil to collect surface runoff water, slowly replenish trees, promote plant root growth, avoid root lack of water and death, and can effectively improve the survival rate of trees. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a plan layout diagram of a preferred embodiment of the utility model.
[0019] Figure 2 for Figure 1 Middle AA section view.
[0020] Figure 3 for Figure 2 Schematic diagram of the structure of the water-storing bamboo tube.
[0021] Among them: 1. tree hole; 2. planting soil layer; 3. permeable covering layer; 31. gravel layer; 32. medium-coarse sand layer; 33. permeable brick layer; 4. water-storing bamboo tube; 41. tube body; 411. sharp end; 42. filter medium; 5. original soil layer; 6. trees. DETAILED DESCRIPTION
[0022] The utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.
[0023] like Figure 1 to Figure 3 As shown, this embodiment discloses a greening facility based on the sponge concept, which includes a tree hole 1 opened in the original soil layer 5, a permeable covering layer 3 laid on the planting soil layer 2, and a plurality of water storage bamboo tubes 4 pre-buried in the planting soil layer 2.
[0024] Specifically, the water storage bamboo tube 4 of this embodiment includes a tube body 41 and a filter medium 42. The tube body 41 is made of a bamboo stalk with all the bamboo diaphragms inside pierced. The filter medium 42 covers the top of the tube body 41 to prevent the tube body 41 from being blocked. The filter medium 42 can be made of geotextile, filter net, etc., and is directly wrapped and tied to the top of the tube body 41.
[0025] In another feasible option of this embodiment, the water storage bamboo tube 4 also includes a bamboo diaphragm arranged in the cylinder body 41, and the bamboo diaphragm is provided with at least one water hole. The speed of water replenishment can be controlled by controlling the number and size of the water holes.
[0026] In order to collect surface runoff water, the top surface of the water-storing bamboo tube 4 of this embodiment is connected to the bottom surface of the water-permeable covering layer 3 or extends into the water-permeable covering layer 3 .
[0027] The tree 6 is generally planted in the middle of the tree hole 1. In order to keep the soil moisture as consistent as possible and allow the tree roots to absorb water from all directions, the water-storing bamboo tubes 4 are designed to be arranged around the tree hole 1 to surround the tree roots in the middle. Preferably, they are arranged around the tree hole 1 at equal intervals, and the interval between two adjacent water-storing bamboo tubes 4 is preferably between 25 and 35 cm, and the diameter of the tube body 41 is preferably between 8 and 10 cm.
[0028] In order to facilitate construction, the bottom end of the cylinder 41 of this embodiment can be cut into a sharp end 411. Before laying the planting soil layer 2, the water storage bamboo tube 4 is inserted into the original soil layer 5 through the sharp end 411 for fixation for subsequent construction. The depth of the water storage bamboo tube 4 inserted into the original soil layer 5 is 14 to 16 cm. The sharp end 411 can reduce the contact area with the soil and effectively reduce the insertion resistance.
[0029] The permeable cover layer 3 of this embodiment includes a gravel layer 31 laid on the planting soil layer 2, a medium-coarse sand layer 32 laid on the gravel layer 31, and a permeable brick layer 33 laid on the medium-coarse sand layer 32. The gravel layer 31 is laid with gravels with a diameter of 1 to 2 cm, the laying thickness of the medium-coarse sand layer 32 is 2 to 4 cm, and the thickness of the permeable brick layer 33 is 7 to 9 cm.
[0030] The greening facilities based on the sponge concept of this embodiment can collect surface runoff water in the water-storing bamboo tube 4, slowly replenish the trees 6, keep the soil moist, improve the growth conditions of the trees in limited space, avoid the roots from lacking water and drying up, promote root growth, and thus improve the survival rate of the trees 6.
[0031] The greening facilities based on the sponge concept of this embodiment occupy a small area and have low cost; they have a simple structure, are easy to construct, and have low maintenance costs; they are widely used and suitable for new city construction and old city renovation, and can be used in municipal roads, parks, communities, parking lots and other places.
[0032] Although the present invention has been specifically shown and described in conjunction with the preferred embodiments, those skilled in the art should understand that various changes in form and details of the present invention are within the scope of protection of the present invention without departing from the spirit and scope of the present invention as defined in the appended claims.
Claims
1. A greening facility based on the sponge concept, characterized in that: include: A tree hole (1) is opened in the original soil layer (5); A planting soil layer (2) is laid in the tree hole (1); A permeable covering layer (3) is laid on the planting soil layer (2); A plurality of water-storing bamboo tubes (4) are pre-buried in the planting soil layer (2).
2. The greening facility based on the sponge concept according to claim 1 is characterized in that: The water-storing bamboo tube (4) comprises: a tube body (41) which is hollow inside and open at both ends, and a filter medium (42) covering the top end of the tube body (41).
3. The greening facility based on the sponge concept according to claim 2 is characterized in that: The water storage bamboo cylinder (4) further comprises: at least one bamboo diaphragm arranged in the cylinder body (41), the bamboo diaphragm being provided with at least one water passing hole.
4. The greening facility based on the sponge concept according to claim 2 or 3 is characterized in that: The top surface of the water-storing bamboo tube (4) is connected to the bottom surface of the water-permeable covering layer (3), or the top surface of the water-storing bamboo tube (4) is located inside the water-permeable covering layer (3).
5. The greening facility based on the sponge concept according to claim 4 is characterized in that: The bottom end of the cylinder (41) is a sharp end (411) and is inserted into the original soil layer (5).
6. The greening facility based on the sponge concept according to claim 5 is characterized in that: A plurality of the water-storing bamboo tubes (4) are arranged around the circumference of the tree hole (1).
7. The greening facility based on the sponge concept according to claim 6 is characterized in that: The water-storage bamboo tube (4) is inserted into the original soil layer (5) to a depth of 14 to 16 cm; the distance between two adjacent water-storage bamboo tubes (4) is 25 to 35 cm; and the filter medium (42) is a geotextile.
8. The greening facility based on the sponge concept according to claim 1 is characterized in that: The water-permeable covering layer (3) comprises: A gravel layer (31) is laid on the planting soil layer (2); A medium-coarse sand layer (32) is laid on the gravel layer (31); The permeable brick layer (33) is laid on the medium-coarse sand layer (32).
9. The greening facility based on the sponge concept according to claim 8 is characterized in that: The gravel layer (31) is paved with gravel having a diameter of 1 to 2 cm; the thickness of the medium-coarse sand layer (32) is 2 to 4 cm; and the thickness of the permeable brick layer (33) is 7 to 9 cm.
