Anti-seismic structure for reducing earthquake displacement of earth and rockfill dam foundation

By setting a plastic concrete or low-grade concrete support between the earth-rock dam foundation and the dam body to form a contact zone, the problems of earth-rock dam foundation slippage and anti-seepage body damage in high seismic intensity areas are solved, and the seismic safety and security are improved. The reliability of the anti-seepage body.

CN221878187UActive Publication Date: 2024-10-22POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323661473.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-22
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

When an earth-rock dam is located in a high seismic intensity area, due to the difference in stiffness between the dam foundation and the dam body, the relative deformation is relatively large under the action of seismic waves, resulting in damage to the anti-seepage system and water seepage in the dam body, and there is a lack of effective anti-seismic structural measures.

Method used

Set 20~30cm thick plastic concrete or low-grade concrete between the dam foundation and the dam body as a support body to form a contact zone with thickness and roughness. The bottom of the support body is embedded in the plastic concrete or low-grade concrete to limit the relationship between the dam foundation and the earth and stone materials. relative displacement.

Benefits of technology

It effectively reduces the slip deformation of the dam foundation during earthquakes, improves the seismic safety of the dam and the reliability of the anti-seepage body, reduces the deformation of panels and structural joints during earthquakes, and is relatively convenient to construct.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878187U_ABST
    Figure CN221878187U_ABST
Patent Text Reader

Abstract

The utility model discloses an anti-seismic structure for reducing earthquake displacement of a dam foundation of an earth and rockfill dam. The anti-seismic structure comprises a dam body and the dam foundation. An anti-seepage body is arranged on the upstream side of the dam body, a supporting body is arranged on the downstream side of the anti-seepage body, and the anti-seepage dam is characterized in that plastic concrete or low-grade concrete with the thickness of 20-30 cm is arranged at the position, corresponding to the supporting body of the anti-seepage body, of the dam foundation, and the bottom of the supporting body is embedded into the plastic concrete or the low-grade concrete. The supporting body and the dam foundation are connected together through the plastic concrete or the low-grade concrete, and a contact zone with the corresponding thickness and roughness is formed. By means of special treatment measures on the contact face of the dam foundation and filling earth and stone materials, deformation of an anti-seepage body and a joint can be effectively limited when an earthquake occurs, and the problems that reliable structural anti-seismic measures for controlling earthquake displacement are lacked between the dam foundation and the dam body filling materials in the engineering field and the like are well solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of earth-rock dam design of hydropower and water conservancy projects, in particular to an earthquake-resistant structure for reducing earthquake displacement of an earth-rock dam foundation. Background Art

[0002] With the continuous development of water resources and hydropower, a large number of earth-rock dams have been built in areas with high seismic intensity. Some earth-rock dams have experienced earthquakes of different magnitudes, and some dams have suffered serious damage, mainly manifested in cracks in the dam body, loose soil and rocks, shallow landslides, damage to anti-seepage bodies and water-stopping structures caused by permanent deformation of the earthquake. Therefore, the appropriateness of the seismic measures of earth-rock dams is crucial to the long-term operation safety of the project.

[0003] Due to the large difference in stiffness between the dam foundation and the earth and stone filling materials of the dam body, when subjected to seismic waves, especially shear waves, a large relative deformation will occur along the dam foundation surface, causing problems such as damage to the anti-seepage system and water seepage in the dam body. This phenomenon will be more obvious if the bank slopes on both sides are steep or the earth and stone filling is not dense. For a long time, the engineering community has lacked more reliable structural seismic measures between the dam foundation and the earth and stone materials. How to reliably and properly handle the dam foundation and the filling earth and stone materials of the earth-rock dam through certain engineering measures, reduce the relative displacement between the two during an earthquake, improve the reliability of the dam's anti-seepage body, and make it meet the seismic requirements of earth-rock dams in high seismic intensity areas is an important technology in the design and operation of hydropower and water conservancy project dams. Utility Model Content

[0004] In view of the shortcomings of the existing technology, the engineering community lacks a relatively reliable structural seismic measure to control the seismic displacement between the earth-rock dam foundation and the earth and stone materials, which leads to the damage of the anti-seepage body or the water-stop structure. The purpose of this utility model is to propose a seismic structure that reduces the seismic displacement of the earth-rock dam foundation. To this end, this utility model adopts the following technical solutions:

[0005] A seismic resistant structure for reducing the seismic displacement of an earth-rock dam foundation comprises a dam body and a dam foundation; an impermeable body is arranged on the upstream side of the dam body, and a supporting body is arranged on the downstream side of the impermeable body, characterized in that a 20-30 cm thick plastic concrete or low-grade concrete is arranged at the supporting body position corresponding to the impermeable body of the dam foundation, the bottom of the supporting body is embedded in the plastic concrete or low-grade concrete, and the supporting body is connected to the dam foundation through the plastic concrete or low-grade concrete to form a contact zone with corresponding thickness and roughness.

[0006] On the basis of adopting the above technical solutions, the present invention can also adopt the following further technical solutions, or use these further technical solutions in combination:

[0007] The earth-rock dam is a panel rockfill dam, and the anti-seepage body is a concrete panel with a thickness of 30-40 cm at the top and gradually becoming thicker downwards, and a strength grade of C25-C30.

[0008] The dam body includes a rockfill area, a transition area located on the upstream side of the rockfill area, a cushion area located on the upstream side of the transition area, and a special cushion area arranged at the bottom of the cushion area. The upstream side of the rockfill area, the transition area, the cushion area and the special cushion area together constitute a support body of the anti-seepage body.

[0009] The backfill range of the plastic concrete or low-grade concrete is within the range of about 0.3 times the dam height downstream of the impermeable body.

[0010] Taking the face rockfill dam as an example, the utility model has the following advantages and beneficial effects compared with the prior art:

[0011] 1. The utility model provides a transition structure between the foundation of an earth-rock dam and the earth and stone materials for dam construction - a plastic concrete or low-grade concrete with a thickness of 20 to 30 cm. The smooth "contact surface" between the dam foundation and the earth and stone materials is changed into a "contact zone" with a certain thickness and roughness, and the bite force between the plastic or low-grade concrete aggregates and the cohesion of the cement matrix both increase the dynamic shear modulus of the soil in the "contact zone", thereby reducing the slip deformation of the dam foundation during an earthquake and improving the seismic safety of the dam.

[0012] 2. Since the displacement of the contact area between the soil and stone materials of the supporting body and the dam foundation on the downstream side of the dam's anti-seepage body has a significant impact on the deformation safety of the panels and structural joints, only plastic concrete or low-grade concrete backfill treatment is carried out in the range of about 0.3 times the dam height downstream of the anti-seepage body. This can effectively limit the deformation of the panels, peripheral joints and vertical joints in this range during an earthquake, and the increase in engineering investment is limited.

[0013] 3. Due to the different earthquake characteristics, the dam height, river valley shape, rockfill gradation, and compactness of the specific project are different, and the dam foundation sliding deformation reduced by the above engineering measures will be different. For rockfill dams with high earthquake magnitude and less compacted filling, the structure of the utility model has a more significant effect on controlling the seismic displacement of the contact area between the dam foundation and the soil and rock.

[0014] 4. Factors that facilitate construction have been fully considered. The construction methods and technical means such as pouring plastic or low-grade concrete for the dam foundation and filling rockfill are relatively mature and can ensure the quality of work. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The utility model is a typical cross-sectional schematic diagram of an earthquake-resistant structure for reducing earthquake displacement of an earth-rock dam foundation.

[0016] Figure 2It is the curved "contact zone" between the dam foundation and the dam body filling soil and stone materials, that is, Figure 1 Magnified view of part A. DETAILED DESCRIPTION

[0017] In order to enable those skilled in the art to better understand the technical solution of the utility model, Figure 1 , Figure 2 The utility model is further described by taking a concrete panel rockfill dam as an example, but it should be understood that the drawings are only used for exemplary description and cannot be understood as limiting this patent; in order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0018] Reference Figure 1 , Figure 2 . The utility model provides an earthquake-resistant structure for reducing the seismic displacement of the foundation of an earth-rock dam, comprising a dam body and a dam foundation 9, an impermeable body is arranged on the upstream side of the dam body, and a support body is arranged on the downstream side of the impermeable body, and a 20-30 cm thick plastic concrete or low-grade concrete 8 is arranged at the support body position corresponding to the impermeable body of the dam foundation, the bottom of the support body is embedded in the plastic concrete or low-grade concrete, and is connected to the dam foundation 9 through the plastic concrete or low-grade concrete 8, and a contact zone with corresponding thickness and roughness is formed. For a concrete panel rockfill dam, the dam body includes a rockfill area 7, a transition area 6 located on the upstream side of the rockfill area, a cushion area 5 located on the upstream side of the transition area, and a special cushion area 4 arranged at the bottom of the cushion area.

[0019] The following further details:

[0020] Concrete panel 1 is a reinforced concrete anti-seepage structure located on the upstream side of the rockfill body. The thickness of the top is generally 30~40cm, and gradually becomes thicker downwards. The strength grade is generally C25~C30. The anti-seepage and anti-freeze grades are determined according to the specific engineering application head and external environment.

[0021] The toe plate 2 is a concrete plate connecting the concrete face plate 1 and the dam foundation anti-seepage body. Generally, the thickness is similar to the thickness of the bottom of the face plate, and the strength, anti-seepage and anti-freeze ratings can be the same as those of the face plate. For dam foundations made of bedrock, a curtain anti-seepage body is formed by drilling holes and grouting on the toe plate.

[0022] Peripheral joint 3, the joint between the concrete face plate 1 and the toe plate 2. In order to adapt to the deformation of the dam body, generally 2 to 3 water stops are set in the joint, including copper sheet water stops and surface plastic water stops.

[0023] The special cushion layer area 4 is located in the cushion layer area 5 on the downstream side of the peripheral seam 3. It is a fine material with continuous gradation obtained by removing the large particles of 40 mm or more from the dam material in the cushion layer area 5. The content of particles smaller than 5 mm is generally 45% to 60%, and the content of particles smaller than 0.075 mm is generally 8% to 12%.

[0024] The cushion layer area 5, the support of the concrete panel 1, evenly transmits water pressure to the downstream dam body and plays a role in seepage control. The gradation is continuous, the maximum particle size is 80~100mm, the content of particles smaller than 5mm is generally 35%~55%, and the content of particles smaller than 0.075mm is 4%~8%.

[0025] The transition zone 6, located between the cushion zone 5 and the rockfill zone 7, has a filtering and protective effect on the cushion zone 5 and has high shear strength and free drainage performance.

[0026] Rockfill area 7 includes the upstream rockfill area and the downstream rockfill area. The upstream rockfill area is the main support body to bear the water pressure, and the downstream rockfill area and the upstream rockfill area jointly maintain the stability of the dam body. The rockfill gradation is continuous, the maximum particle size is generally 70~80cm, the content of particles less than 5mm is not more than 20%, and the content of particles less than 0.075mm is not more than 5%. It has high shear strength and free drainage performance.

[0027] Plastic concrete or low-grade concrete 8, in the range of about 0.3 times the dam height downstream of the concrete panel 1, pour plastic concrete with a 28-day compressive strength of 5~10MPa and a thickness of 20~30cm; for high dams with an earthquake fortification intensity of 7 degrees or above and a dam height of more than 70m, low-grade concrete can be used, with grades C10~C15, which is determined based on calculations.

[0028] Dam foundation 9. The foundation that supports the stability of the dam body (including the cushion area 5, transition area 6 and rockfill area 7) and prevents the dam body from sliding and leaking, mainly including the riverbed and both banks. It is generally strong to weak weathered, slightly weathered or fresh bedrock.

[0029] Dam axis 10. A line across the river valley representing the plan position of the dam, usually the centerline of the dam crest.

Claims

1. An earthquake-resistant structure for reducing earthquake displacement of an earth-rock dam foundation, comprising a dam body and a dam foundation; an impermeable body is arranged on the upstream side of the dam body, and a supporting body is arranged on the downstream side of the impermeable body. Features A 20-30 cm thick plastic concrete or low-grade concrete is arranged at the support body position corresponding to the anti-seepage body of the dam foundation, the bottom of the support body is embedded in the plastic concrete or low-grade concrete, and the support body and the dam foundation are connected together through the plastic concrete or low-grade concrete to form a contact zone with corresponding thickness and roughness.

2. A seismic resistant structure for reducing seismic displacement of an earth-rock dam foundation as claimed in claim 1, Features The earth-rock dam is a panel rockfill dam, and the anti-seepage body is a concrete panel with a thickness of 30-40 cm at the top and gradually becoming thicker downwards, and a strength grade of C25-C30.

3. The seismic resistant structure for reducing the seismic displacement of the foundation of an earth-rock dam as claimed in claim 1, Features The backfill range of the plastic concrete or low-grade concrete is within 0.3 times the dam height downstream of the impermeable body.

Citation Information

Cited By

  • Anti-seismic structure for reducing earthquake displacement of earth and rockfill dam foundation and construction method

    CN117888578A