Drying tower tail gas waste heat utilization equipment
By using a heat-taking fin group and a heat-releasing fin group in the drying tower tail gas waste heat utilization equipment, combined with heat pipes for separated vacuum phase change heat transfer, the problem of unutilized heat energy of the drying tower tail gas and easy damage to the equipment is solved. Efficient energy recovery and stable operation.
Patent Information
- Application Number
- CN202420502951.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-15
AI Technical Summary
In the industrial manufacturing process of maldextrin, the heat energy in the drying tower exhaust gas is not fully utilized, resulting in large steam output. Moreover, the heat exchange area of the existing drying tower exhaust waste heat recovery device is small and easy to be damaged, resulting in energy waste and pollution problem.
A drying tower tail gas waste heat utilization equipment is designed, which uses a heat-taking fin group and a heat-releasing fin group to increase the heat transfer area, and performs separated vacuum phase change heat transfer through heat pipes to ensure that no smoke occurs when the structure is damaged. To avoid mutual contamination of air and cold air, use connection kits and sealing rings for fixation and sealing, and fans and insulation tubes are used to preheat the air.
It significantly increases the heat transfer area and equipment stability, avoids cross-contamination of flue gas and cold air, ensures the normal operation of the drying tower, and improves energy utilization efficiency.
Smart Images

Figure CN221882131U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waste heat utilization, in particular to a drying tower tail gas waste heat utilization device. Background Art
[0002] Drying towers have been widely used in the production of detergents, dairy products, dehydrated foods, dyes, cement, and fertilizers. In the industrial manufacturing of maltose, the heat energy produced by the drying tower after drying the maltose or part of the raw materials is often not fully utilized, resulting in a large consumption of steam output in the maltose production line.
[0003] After searching, we found a drying tower tail gas waste heat recovery device with publication number CN206499884U, which includes a tail gas inlet duct, a tail gas outlet duct, and two sets of air heat exchangers. It is used to solve the problem of low energy utilization rate and energy waste in most spray drying towers. The practical air heat exchanger is horizontally connected in series, with a small heat exchange area. When the air heat exchanger is damaged, it is easy to cause the tail gas to pollute the clean air to be heated, affecting the stable operation of the drying tower. For this reason, we propose a drying tower tail gas waste heat utilization device. Utility Model Content
[0004] The purpose of the utility model is to provide a drying tower tail gas waste heat utilization device to solve the problems raised in the above background technology.
[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a drying tower tail gas waste heat utilization device, comprising:
[0006] A heating chamber, one end of the heating chamber is connected to a smoke inlet pipe, the other end of the heating chamber is connected to a smoke outlet pipe, the upper outer wall of the heating chamber is sleeved with a connecting kit, a partition is fixed to the middle inner wall of the connecting kit, a heat extraction chamber is arranged on the upper inner wall of the connecting kit, one end of the heat extraction chamber is connected to a protective sleeve, the other end of the protective sleeve is connected to a fan, and the other end of the heat extraction chamber is connected to a hot air pipe;
[0007] A heat extraction fin group is arranged inside the heating bin, a heat pipe is passed through the middle of the heat extraction fin group, and the heat pipe passes through the outer wall of one end of the partition close to the heat extraction bin, and a heat release fin group is sleeved on the outer wall of one end of the heat pipe close to the heat extraction bin.
[0008] Furthermore, the heat extraction chamber is connected to the heating chamber by a snap-fit connection through a connecting kit, the smoke inlet pipe is connected to the smoke outlet pipe through the heating chamber, and the fan is connected to the heat extraction chamber and the hot air pipe through a protective sleeve.
[0009] Furthermore, the heat extraction fin group and the heat pipe are symmetrically arranged with respect to the central axis of the heating chamber, and the heat extraction fin group and the heat release fin group are all welded to the heat pipe.
[0010] Furthermore, a gasket is provided at the connection between the connection kit and the heating chamber and the heat extraction chamber, and a sealing ring is provided at the connection between the partition and the heat pipe.
[0011] Furthermore, the gasket is consistent with the end surface structure of the heating chamber and the heat extraction chamber, and the sealing ring is symmetrically arranged with respect to the central axis of the partition.
[0012] Furthermore, a filter screen is provided at the input end of the fan, and a heat preservation pipe is passed through the interior of the protective sleeve.
[0013] Furthermore, the fan is connected to the heat extraction chamber through the insulation pipe and the filter, and a semi-enclosed structure is formed between the protective sleeve and the insulation pipe.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] The drying tower exhaust waste heat utilization equipment is provided with a heat extraction fin group and a heat release fin group, and its heat conduction area is huge, which greatly enhances the heat transfer area, and performs two separate vacuum phase change heat transfers through the heat pipe, so that when the heated structure is damaged, the flue gas and the cold air to be heated will not be cross-contaminated, and the normal operation of the drying tower will not be affected. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the main structure of the utility model in working state;
[0017] Figure 2 This is a schematic diagram of the cross-sectional structure of the heating chamber and the connection kit of the utility model;
[0018] Figure 3 This is a schematic diagram of the cross-sectional structure of the heat extraction chamber of the utility model;
[0019] Figure 4 This is a schematic diagram of the rear view structure of the protective casing and the fan part of the utility model.
[0020] In the figure: 1. Heating chamber; 2. Smoke inlet pipe; 3. Smoke outlet pipe; 4. Connection kit; 5. Heat extraction chamber; 6. Protective sleeve; 7. Fan; 8. Hot air pipe; 9. Heat extraction fin group; 10. Heat pipe; 11. Heat release fin group; 12. Partition; 13. Gasket; 14. Sealing ring; 15. Filter; 16. Insulation pipe. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] The utility model provides a drying tower tail gas waste heat utilization device through improvement. Figure 1-Figure 3 , comprising: a heating chamber 1, one end of the heating chamber 1 is connected to a smoke inlet pipe 2, the other end of the heating chamber 1 is connected to a smoke outlet pipe 3, and the smoke inlet pipe 2 is connected to the smoke outlet pipe 3 through the heating chamber 1, and the upper end outer wall of the heating chamber 1 is provided with a connecting kit 4, the middle inner wall of the connecting kit 4 is fixed with a partition 12, and the upper end inner wall of the connecting kit 4 is provided with a heat extraction chamber 5, and the heat extraction chamber 5 is connected to the heating chamber 1 through the connecting kit 4. The connecting kit 4 is used to isolate the heating chamber 1 and the heat extraction chamber 5, and to fix the heating chamber 1 and the heat extraction chamber 5 at the same time, which has low construction difficulty, simplifies the connection structure, reduces space occupancy, improves the flexibility of equipment layout and the stability of the device after installation; one end of the heat extraction chamber 5 is connected to a protective sleeve 6, the other end of the protective sleeve 6 is connected to a fan 7, and the other end of the heat extraction chamber 5 is connected to a hot air Tube 8, and the fan 7 is connected with the hot air tube 8 through the protective sleeve 6 and the heat taking bin 5. A heat taking fin group 9 is arranged inside the heating bin 1, and a heat pipe 10 is penetrated in the middle of the heat taking fin group 9, and the heat pipe 10 penetrates to the outer wall of one end of the partition 12 close to the heat taking bin 5. The heat taking fin group 9 and the heat pipe 10 are symmetrically arranged about the central axis of the heating bin 1, and a heat releasing fin group 11 is sleeved on the outer wall of one end of the heat taking bin 5 close to the heat taking bin 5, and the heat taking fin group 9 and the heat releasing fin group 11 are welded to the heat pipe 10. The heat taking fin group 9 and the heat releasing fin group 11 have huge heat conduction areas, which greatly enhance the heat transfer area, and two separate vacuum phase change heat transfers are performed through the heat pipe 10, so that when the heated structure is damaged, the flue gas and the cold air to be heated will not be cross-contaminated, and the normal operation of the drying tower will not be affected.
[0023] See also Figure 2 A drying tower tail gas waste heat utilization device includes: a gasket 13 is arranged at the connection between the connection kit 4 and the heating bin 1 and the heat taking bin 5, the gasket 13 is consistent with the end surface structure of the heating bin 1 and the heat taking bin 5, the gasket 13 is used to play a sealing and buffering role, a sealing ring 14 is sleeved at the connection between the partition 12 and the heat pipe 10, and the sealing ring 14 is symmetrically arranged about the central axis of the partition 12, and the arranged sealing ring 14 is used to block the gap that may be generated between the heat pipe 10 and the partition 12, so as to prevent the smoke and dust of the heating bin 1 from penetrating into the heat taking bin 5 and polluting the cold air to be heated.
[0024] See also Figure 1 and Figure 4 A drying tower tail gas waste heat utilization device includes: a filter screen 15 is laid at the input end of the fan 7, the filter screen 15 is used to filter and remove dust from the air input from the outside, an insulation pipe 16 is penetrated inside the protective sleeve 6, the fan 7 is connected with the heat taking bin 5 through the insulation pipe 16 and the filter screen 15, and a semi-enclosed structure is formed between the protective sleeve 6 and the insulation pipe 16. The insulation pipe 16 is used to keep the temperature at the channel stable through the heat transferred from the heat taking bin 5 and preheat the input air.
[0025] Working principle: For this type of drying tower exhaust waste heat utilization equipment, the staff will first place the heating chamber 1 near the exhaust outlet of the drying tower, connect it to the exhaust outlet of the drying tower through the smoke inlet pipe 2, and then fix the connection kit 4 and the inserted heat pipe 10, heat collection fin group 9 and heat release fin group 11 inside and on the upper end of the heating chamber 1. The connection kit 4 seals the upper opening of the heating chamber 1 through the partition 12 and the gasket 13 to prevent smoke and dust from leaking into the heating chamber 1. Then the heat collection chamber 5 is placed on the upper end of the connection kit 4 through the gasket 13, covering the heat release fin group 11 and sealing the heat collection chamber 5. The partition 12 blocks the gaps that may be generated at the insertion of the heat pipe 10 through the sealing ring 14 to prevent smoke and dust from penetrating into the heat collection chamber 5 from the gap between the heat pipe 10 and the partition 12. Then the hot air pipe 8 of the heat collection chamber 5 is It is connected to the air inlet of the drying tower. When the high-temperature exhaust gas from the drying tower is discharged into the heating bin 1, the heat in the exhaust gas is conducted to the heat releasing fin group 11 welded on the outer wall of the upper end of the heat pipe 10 through the heat taking fin group 9 and the welded heat pipe 10, so as to heat the outside air introduced into the heat taking bin 5 after being filtered by the fan 7 and the filter screen 15, and the insulation pipe 16 and the protective sleeve 6 at the connection between the fan 7 and the heat taking bin 5 can preheat the air. Finally, the heat taking fin group 9, the heat pipe 10 and the heat releasing fin group 11 are heat-conducted through two vacuum phase changes, so that even if the heat taking fin group 9 and the heat releasing fin group 11 are damaged in time, smoke and dust will not penetrate each other, thereby improving the stability and safety of equipment operation. Finally, the heated cold air is sent into the drying tower through the hot air pipe 8 for use, and the smoke and dust that are further cooled are discharged through the smoke outlet pipe 3 for further treatment.
[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A drying tower tail gas waste heat utilization device, characterized in that: include: A heating chamber (1), one end of the heating chamber (1) is connected to a smoke inlet pipe (2), the other end of the heating chamber (1) is connected to a smoke outlet pipe (3), the upper outer wall of the heating chamber (1) is sleeved with a connecting sleeve (4), a partition (12) is fixed to the middle inner wall of the connecting sleeve (4), a heat extraction chamber (5) is arranged on the upper inner wall of the connecting sleeve (4), one end of the heat extraction chamber (5) is connected to a protective sleeve (6), the other end of the protective sleeve (6) is connected to a fan (7), and the other end of the heat extraction chamber (5) is connected to a hot air pipe (8); A heat extraction fin group (9) is arranged inside the heating chamber (1), a heat pipe (10) is passed through the middle of the heat extraction fin group (9), and the heat pipe (10) passes through the outer wall of one end of the partition (12) close to the heat extraction chamber (5), and a heat release fin group (11) is sleeved on the outer wall of one end of the heat pipe (10) close to the heat extraction chamber (5).
2. A drying tower tail gas waste heat utilization device according to claim 1, characterized in that: The heat extraction chamber (5) is connected to the heating chamber (1) by means of a connecting sleeve (4), the smoke inlet pipe (2) is connected to the smoke outlet pipe (3) by means of the heating chamber (1), and the fan (7) is connected to the heat extraction chamber (5) and the hot air pipe (8) by means of a protective sleeve (6).
3. A drying tower tail gas waste heat utilization device according to claim 1, characterized in that: The heat extraction fin group (9) and the heat pipe (10) are symmetrically arranged with respect to the central axis of the heating chamber (1), and the heat extraction fin group (9) and the heat release fin group (11) are all connected to the heat pipe (10) by welding.
4. A drying tower tail gas waste heat utilization device according to claim 1, characterized in that: A gasket (13) is provided at the connection between the connection kit (4) and the heating chamber (1) and the heat extraction chamber (5), and a sealing ring (14) is provided at the connection between the partition plate (12) and the heat pipe (10).
5. A drying tower tail gas waste heat utilization device according to claim 4, characterized in that: The gasket (13) matches the end surface structure of the heating chamber (1) and the heat extraction chamber (5), and the sealing ring (14) is symmetrically arranged with respect to the central axis of the partition (12).
6. The drying tower tail gas waste heat utilization device according to claim 1, characterized in that: A filter screen (15) is provided at the input end of the fan (7), and a heat preservation pipe (16) is provided inside the protective sleeve (6).
7. A drying tower tail gas waste heat utilization device according to claim 6, characterized in that: The fan (7) is connected to the heat extraction chamber (5) via the heat preservation pipe (16) and the filter screen (15), and a semi-enclosed structure is formed between the protective sleeve (6) and the heat preservation pipe (16).