Dock water taking and recycling device

By designing a dock water reuse device to recover and treat open-pit floor water, the problem of overload of the floor water treatment system in open-pit mine production has been solved, the reuse of water resources and the improvement of effluent water quality have been achieved, and treatment costs and collapse have been reduced. dam risk.

CN221895920UActive Publication Date: 2024-10-25YIMIN SHENGDA IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323452958.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-25
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

During the production process of open-pit mines, the floor water treatment system is overloaded due to the large amount of incoming water and the deterioration of water quality, resulting in waste of water resources and poor quality of effluent water.

Method used

Design a dock water reuse device that utilizes a buoyant dock and a sewage pump to introduce the open floor water into the sewage pump through the incoming jellyfish pipe. The drainage pipe discharges the treated water to the temporary settlement reservoir of the drainage plant to realize the recycling of water resources. use and processing.

Benefits of technology

Effective recovery and treatment of open floor water reduces treatment system pressure, improves effluent water quality, reduces chemical usage, and avoids water waste and potential dam failure risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895920U_ABST
    Figure CN221895920U_ABST
Patent Text Reader

Abstract

The utility model discloses a dock water taking and recycling device. At present, most outdoor floor water is subjected to decrement treatment to relieve the pressure of a floor water treatment system, and part of floor water is discharged to a temporary reservoir of a drainage plant to settle, so that water resources are wasted. The dock water taking and recycling device comprises a dock body (1), a sewage pump (2) is installed on the dock body, the dock body is of a hollow cavity structure, a rectangular hole (3) penetrating through the dock body is formed in the middle of the dock body, the sewage pump is installed at the rectangular hole, an end cover of the sewage pump is connected with a hanging ring (4), the hanging ring is connected with a hanging plate (6) through a pull rope (5), and the pull rope (5) is connected with the hanging plate (6). The hanging plate is fixedly connected with the middle position of a cross beam (7), two ends of the cross beam are connected with stand columns (8), and the stand columns are fixedly connected with the dock body. The device is applied to the field of mineral production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a dock water intake and recycling device. Background Art

[0002] During the coal mining process in open-pit mines, the floor water disturbance is large and the water quality of the incoming water deteriorates, causing the floor water treatment system to operate at overcapacity, affecting the water quality of the floor water treatment system. Currently, most open-pit floors are subjected to water reduction treatment to alleviate the pressure on the floor water treatment system. Specifically, part of the floor water is discharged into the temporary water storage tank of the drainage plant for sedimentation, resulting in a waste of water resources. Summary of the invention

[0003] The utility model aims to provide a dock water intake and recycling device.

[0004] The above purpose is achieved through the following technical solutions:

[0005] A dock water intake and reuse device comprises: a dock body, a sewage pump is installed on the dock body, the dock body is a hollow cavity structure, and a rectangular hole penetrating the dock body is provided in the middle of the dock body, the sewage pump is installed in the rectangular hole, a lifting ring is connected to the end cover of the sewage pump, the lifting ring is connected to a hanging plate by a pull rope, the hanging plate is fixedly connected to the middle position of a crossbeam, the two ends of the crossbeam are connected to columns, and the columns are fixedly connected to the dock body.

[0006] The dock water intake and reuse device, the water inlet of the sewage pump is connected to the water main pipe with open-air bottom water as the water source, the water outlet of the sewage pump is connected to a drain pipe, and the drain pipe is inserted into the temporary sedimentation water storage tank of the drainage plant.

[0007] The dock water intake and reuse device has a buoyancy of 400KG and a 2mm patterned steel plate.

[0008] The dock water intake and reuse device, the sewage pump is a sewage pump with a flow rate of 100m³ / h. Beneficial Effects

[0009] 1. The utility model solves the problem that the amount of water coming from the bottom plate of the open-pit mine is large, the water quality is deteriorated, and the suspended solids exceed 3000 mg / L, which causes the bottom plate water treatment system of the sewage plant to operate at overcapacity and affects the effluent quality. The utility model uses a bottom plate water recycling device that reduces the suspended solids after sedimentation in the drainage field to relieve the water storage pressure in the drainage field and prevent environmental incidents caused by dam breach.

[0010] 2. After the utility model of dock water intake and reuse is put into use, the bottom plate water of the open-air bottom plate is effectively utilized, and up to about 100 cubic meters of bottom plate water originally discharged per hour can be reused, which effectively alleviates the risk of water volume reduction and high liquid level dam burst in the buffer water tank outside the yard when the water supply network of the bottom plate water is repaired, saves about 100 grams of chemicals for treatment, reduces the water production cost in the year-on-year water volume comparison, and greatly improves the water quality of the effluent.

[0011] 3. The utility model manufactures a dock with a buoyancy of 400KG. The material is a 2mm thick patterned steel plate. A sewage pump with a flow rate of 100m³ / h is installed in the dock. The manufactured dock is installed at the upper end of the water surface of the drainage field, and is connected to the water inlet pipe of the bottom plate water treatment system through a pipe network. The buoyancy characteristics of the dock are used to recycle the bottom plate water after sedimentation and clarification at the upper end of the water surface in the drainage field, thereby improving the effluent water quality and reducing the use of bottom plate water treatment chemicals. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Attached Figure 1 It is a structural schematic diagram of the utility model.

[0013] Attached Figure 2 Yes Figure 1 main view.

[0014] In the figure: 1. dock body, 2. sewage pump, 3. rectangular hole, 4. lifting ring, 5. pull rope, 6. hanging plate, 7. beam, 8. column, 9. water inlet pipe, 10. drainage pipe. DETAILED DESCRIPTION

[0015] A dock water intake and reuse device, comprising: a dock body 1, a sewage pump 2 is installed on the dock body, the sewage pump is a sewage pump with a flow rate of 100m³ / h, the dock body is a hollow cavity structure, and a rectangular hole 3 penetrating the dock body is provided in the middle of the dock body, the sewage pump is installed at the rectangular hole, a lifting ring 4 is connected to the end cover of the sewage pump, the lifting ring is connected to a hanging plate 6 through a pull rope 5, the hanging plate is fixedly connected to the middle position of a crossbeam 7, the two ends of the crossbeam are connected to a column 8, and the column is fixedly connected to the dock body. The bottom of the column is vertically welded and fixed to the plane of the dock body by welding, the two ends of the crossbeam are fixed between the two columns by welding, so as to form a support frame, a hanging plate is fixed in the middle of the crossbeam by welding, a pull rope is bolted on the hanging plate, and the other end of the pull rope is bolted to the sewage pump, so that the sewage pump is hoisted at the rectangular hole of the dock body.

[0016] A dock water intake and reuse device, wherein the buoyancy of the dock body is 400KG, and the dock body is a 2mm patterned steel plate. The upper part of the dock body is a rectangular structure as a whole, and the lower part is a trapezoidal structure as a whole, and is welded by patterned steel plates, so that the dock body is a hollow cavity structure, so that the dock body can float on the upper end of the water surface of the drainage field. The water inlet of the sewage pump is connected to the water main pipe 9 with open-air bottom water as the water source, and the water outlet of the sewage pump is connected to the drain pipe 10, and the drain pipe is inserted into the temporary sedimentation water storage tank of the drainage plant. The bottom water is recovered through the open-air bottom water inlet main pipe on the sewage pump, and then the bottom water is discharged into the temporary sedimentation water storage tank of the drainage plant through the drain pipe of the sewage pump.

Claims

1. A dock water intake and reuse device, comprising: A dock body, a sewage pump is installed on the dock body, and is characterized in that: the dock body is a hollow cavity structure, and a rectangular hole penetrating the dock body is opened in the middle position of the dock body, the sewage pump is installed at the rectangular hole, a lifting ring is connected to the end cover of the sewage pump, the lifting ring is connected to the hanging plate through a pull rope, the hanging plate is fixedly connected to the middle position of the beam, the two ends of the beam are connected to the columns, and the columns are fixedly connected to the dock body.

2. The dock water intake and reuse device according to claim 1 is characterized in that: The water inlet of the sewage pump is connected to the water main pipe with open-air bottom water as the water source, and the water outlet of the sewage pump is connected to a drain pipe, and the drain pipe is inserted into a temporary sedimentation reservoir of the drainage plant.

3. The dock water intake and reuse device according to claim 1 is characterized in that: The buoyancy of the dock body is 400KG, and the dock body is a 2mm patterned steel plate.

4. The dock water intake and reuse device according to claim 2 is characterized in that: The sewage pump is a sewage pump with a flow rate of 100m³ / h.